Program Update. Gary Hoffman, P.E. Topics. Partnering Efforts PennDOT’s Strategic Focus Areas PennDOT’s Infrastructure Needs PennDOT’s Program Federal Reauthorization. Partnering Efforts. Quarterly Meetings Pursuing Consistency Expand Constructability Reviews Improving ECMS - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Program Update](https://reader031.vdocument.in/reader031/viewer/2022013108/568139a6550346895da14307/html5/thumbnails/1.jpg)
Program UpdateProgram Update
Gary Hoffman, P.E.
![Page 2: Program Update](https://reader031.vdocument.in/reader031/viewer/2022013108/568139a6550346895da14307/html5/thumbnails/2.jpg)
Topics
Partnering Efforts PennDOT’s Strategic Focus Areas PennDOT’s Infrastructure Needs PennDOT’s Program Federal Reauthorization
![Page 3: Program Update](https://reader031.vdocument.in/reader031/viewer/2022013108/568139a6550346895da14307/html5/thumbnails/3.jpg)
Partnering Efforts
• Quarterly Meetings• Pursuing Consistency• Expand Constructability Reviews• Improving ECMS• Managing Letting Schedule• Implementing Innovation
![Page 4: Program Update](https://reader031.vdocument.in/reader031/viewer/2022013108/568139a6550346895da14307/html5/thumbnails/4.jpg)
PennDot’s Strategic Focus Areas
System Preservation
Management and Productivity
Quality of Life
Mobility
Safety
![Page 5: Program Update](https://reader031.vdocument.in/reader031/viewer/2022013108/568139a6550346895da14307/html5/thumbnails/5.jpg)
System PreservationSystem Preservation
“Maintenance First”
Bridge Structural Adequacy Reduce number of structurally deficient bridges
• PA’s structurally deficient bridges = 22%• National average for structurally deficient = 10%• Goal = match the national average within 20 yrs
Increase bridge preservation• Target: $350 M/year for rehab/replacement
$100 M/year for preservation
• Current Bridge Expenditure $300M
![Page 6: Program Update](https://reader031.vdocument.in/reader031/viewer/2022013108/568139a6550346895da14307/html5/thumbnails/6.jpg)
Infrastructure Needs
MAKING THE CASE FOR SYSTEM PRESERVATION
![Page 7: Program Update](https://reader031.vdocument.in/reader031/viewer/2022013108/568139a6550346895da14307/html5/thumbnails/7.jpg)
Pennsylvania’s Highway & Bridge Needs
• Highway Pavement:
• 6 Year Needs $ 18.0 Billion
• 6 Year Available Funds $ 13.2 Billion
• Gap $ 4.8 Billion
• Bridges:
• 6 Year Needs $ 3.3 Billion
• 6 Year Available Funds $ 1.8 Billion
• Gap $ 1.5 Billion
6 Year Funding GAP $ 6.3 Billion
![Page 8: Program Update](https://reader031.vdocument.in/reader031/viewer/2022013108/568139a6550346895da14307/html5/thumbnails/8.jpg)
2003 System PreservationInternational Roughness Index (IRI)
Good Fair Poor
Interstate 64% 29% 7%
NHS (Non-interstate) 59% 30% 11%
Non-NHS > 2000 ADT 63% 25% 12%
![Page 9: Program Update](https://reader031.vdocument.in/reader031/viewer/2022013108/568139a6550346895da14307/html5/thumbnails/9.jpg)
Pavement DeteriorationCurve
Programming Preservation Treatments for roads at key times will extend the life of the road greatly
Pavement Preservation
![Page 10: Program Update](https://reader031.vdocument.in/reader031/viewer/2022013108/568139a6550346895da14307/html5/thumbnails/10.jpg)
New Capacity vs. Preservation
24.5% 22.8%15.2%
28.3%19.1%
19.6%
47.2%58.1%
65.1%
0%
20%
40%
60%
80%
100%
01-04 TIP 03-06 TIP 05-08 TIP
Pe
rce
nta
ge
Preservation %
Operational %
New Capacity %
Statewide
![Page 11: Program Update](https://reader031.vdocument.in/reader031/viewer/2022013108/568139a6550346895da14307/html5/thumbnails/11.jpg)
Proposed Statewide Goal
• Improve all “POOR” NHS and Interstate miles
• Focus on Preservation instead of reconstruction to keep the good roads good
![Page 12: Program Update](https://reader031.vdocument.in/reader031/viewer/2022013108/568139a6550346895da14307/html5/thumbnails/12.jpg)
System Preservation Pennsylvania Bridge Facts
• Median Age > 50 yrs
• Average Life Span – 50 yrs
• Average Cost/Bridge - $1.25M
$1.25M X 9352 deficient bridges = $11.7 B
![Page 13: Program Update](https://reader031.vdocument.in/reader031/viewer/2022013108/568139a6550346895da14307/html5/thumbnails/13.jpg)
National Comparison(based on total deck area)
11.6%
8.0%6.0%
12.3%10.0%
21.9%
0.0%
5.0%
10.0%
15.0%
20.0%
25.0%
30.0%
NATIONAL PENNDOT NJ NY OH VA
Structurally Deficient Bridges
![Page 14: Program Update](https://reader031.vdocument.in/reader031/viewer/2022013108/568139a6550346895da14307/html5/thumbnails/14.jpg)
PENNDOT Bridges: Age and Eligibility
0-10 11-20 21-30 31-40 41-50 51-60 61-70 >700
5
10
15
20
25
30
Dec
k A
rea
in M
sf
Age of Bridges
All PENNDOT Highway Bridges 8 ft and Over - Deck Area
Eligible for REPLACE
Eligible for REHAB
NOT Eligible
![Page 15: Program Update](https://reader031.vdocument.in/reader031/viewer/2022013108/568139a6550346895da14307/html5/thumbnails/15.jpg)
Trend in Structurally Deficient BridgesPENNDOT Bridges > 8 ft.
19.5% 19.5%
22.6% 22.4% 22.2%
21.7%21.6%
21.9% 21.9%
8%
11%
13%
16%
18%
21%
23%
1998 1999 2000 2001 2002 2003 2004 2005 2006
% Structurally Deficient by Deck Area
National Average = 10%
Local Bridges > 20 ft = 26.9% in 2003
$150M/yr $300M/yr $450M/yr
![Page 16: Program Update](https://reader031.vdocument.in/reader031/viewer/2022013108/568139a6550346895da14307/html5/thumbnails/16.jpg)
Proposed Statewide Goal
• Reduce Structurally Deficient Bridges to the National Average of 10% by 2024
• Bridge preservation can reduce rehabilitation and replacement requirements
![Page 17: Program Update](https://reader031.vdocument.in/reader031/viewer/2022013108/568139a6550346895da14307/html5/thumbnails/17.jpg)
Bridge Modeling and Spending Needs
![Page 18: Program Update](https://reader031.vdocument.in/reader031/viewer/2022013108/568139a6550346895da14307/html5/thumbnails/18.jpg)
• Designate Bridge “Champion”
(Craig Beissel)
• Rebuild Legacy BMS System
• Participate in National Effort for
Robust Bridge Asset Management
System
• Bridge Bill Legislation
Improve Bridge ManagementImprove Bridge Management
![Page 19: Program Update](https://reader031.vdocument.in/reader031/viewer/2022013108/568139a6550346895da14307/html5/thumbnails/19.jpg)
Bridge NeedsAsset Management
• Preservation
- Fix leaky joints (expansion dams)
- Fix beam ends, bearings and supports
- Bridge Painting
- Deck patching/replacement
- Other
![Page 20: Program Update](https://reader031.vdocument.in/reader031/viewer/2022013108/568139a6550346895da14307/html5/thumbnails/20.jpg)
Annual Lettings
$1,550$1,550
$1,374.9$1,304.4
$1,349.7
$1,034.2
$1,331
$970
$0
$400
$800
$1,200
$1,600
1997 1998 1999 2000 2001 2002 2003 2004 2005
Actual To Date Projected
Millions
$1,300 $1,250
![Page 21: Program Update](https://reader031.vdocument.in/reader031/viewer/2022013108/568139a6550346895da14307/html5/thumbnails/21.jpg)
2004 Lettings
$400$350
$250 $273$200
$251
$400$425
$1,250$1,300
$0
$200
$400
$600
$800
$1,000
$1,200
$1,400
1st Qtr 2nd Qtr 3rd Qtr 4th Qtr Total
Projected Actual
Millions
![Page 22: Program Update](https://reader031.vdocument.in/reader031/viewer/2022013108/568139a6550346895da14307/html5/thumbnails/22.jpg)
2004 Large Projects
SR / SEC County Est. Cost Ant. Let Date
0078 / 17M Berks $ 50 M December
0022 / B02 Westmoreland $ 40 M December
0090 / B07 Erie > $ 20 M December
![Page 23: Program Update](https://reader031.vdocument.in/reader031/viewer/2022013108/568139a6550346895da14307/html5/thumbnails/23.jpg)
2005 Lettings
$400
$250$200
$400
$1,250
$0
$200
$400
$600
$800
$1,000
$1,200
$1,400
1st Qtr 2nd Qtr 3rd Qtr 4th Qtr Total
Projected
Millions
![Page 24: Program Update](https://reader031.vdocument.in/reader031/viewer/2022013108/568139a6550346895da14307/html5/thumbnails/24.jpg)
First Quarter 2005 Large Projects
SR / SEC County Est. Cost Ant. Let Date
0202 / 3IT Chester $ 15 M January
7301 / BRG Allegheny $ 30 M January
6006 / 272 Lackawanna < $ 10 M January
0291 / S11 Philadelphia < $ 10 M February
0208 / A00 Mercer $ 15 M March
0079 / A25 Allegheny $ 10 M March
0068 / 650 Clarion $ 15 M March
2122 / A03 Allegheny $ 20 M March
![Page 25: Program Update](https://reader031.vdocument.in/reader031/viewer/2022013108/568139a6550346895da14307/html5/thumbnails/25.jpg)
Second Quarter 2005 Large Projects
SR / SEC County Est. Cost Ant. Let Date
0309 / NW1 Lehigh < $ 10 M April
0309 / 101 Montgomery $ 65 M April
0022 / 491 Indiana $ 45 M April
0022 / B08 Westmoreland $ 25 M April
0209 / 021 Monroe $ 15 M May
0019 / A27 Allegheny $ 40 M May
1021 / 370 Luzerne $ 20 M June
0048 / A16 Allegheny $ 15 M June
![Page 26: Program Update](https://reader031.vdocument.in/reader031/viewer/2022013108/568139a6550346895da14307/html5/thumbnails/26.jpg)
Materials Usage
2003 2004 2005
Asphalt (Tons) 8.2 M 8.1 M 8.3 M
Concrete (CY) 740 k 660 k 670 k
Aggregate (Tons) 12.3 M 14.8 M 12.9 M
![Page 27: Program Update](https://reader031.vdocument.in/reader031/viewer/2022013108/568139a6550346895da14307/html5/thumbnails/27.jpg)
Number of Consultant Final Selections
75
113127
195224
140 143 138 140
0
50
100
150
200
250
1996 1997 1998 1999 2000 2001 2002 2003 2004
ACT 3
TEA 21Projected
Actual
127
To Date
![Page 28: Program Update](https://reader031.vdocument.in/reader031/viewer/2022013108/568139a6550346895da14307/html5/thumbnails/28.jpg)
Payouts to Consultants
128 129163
200
232264
301 307 310
0
50
100
150
200
250
300
350
1996 1997 1998 1999 2000 2001 2002 2003 2004
Millions
Projected
Actual
To Date
254
![Page 29: Program Update](https://reader031.vdocument.in/reader031/viewer/2022013108/568139a6550346895da14307/html5/thumbnails/29.jpg)
Federal Reauthorization (?)
• 5 short term extensions
• 8 mos. through May 2005
• Current extend ($36.8 + $1.8 B)
• Funding guarantees and firewalls
• Nothing during “lame duck”
• Reintroduced late-winter/early spring
![Page 30: Program Update](https://reader031.vdocument.in/reader031/viewer/2022013108/568139a6550346895da14307/html5/thumbnails/30.jpg)
Federal Reauthorization (?)
• Size Of Appropriation
• “Growth” of Appropriation Over Time
• Distribution Mechanism
• Earmarks
• Categorization/Flexibility
• Speak With “One Voice”
![Page 31: Program Update](https://reader031.vdocument.in/reader031/viewer/2022013108/568139a6550346895da14307/html5/thumbnails/31.jpg)
SIX YEAR PROGRAM (Pennsylvania’s Estimated Funding)
9.449.92
8.33
0
5
10
TEA-21 S 1072 HR 3550
BILL
DO
LLA
RS
(B
illio
ns)
Federal Reauthorization
20% vs. 40%
![Page 32: Program Update](https://reader031.vdocument.in/reader031/viewer/2022013108/568139a6550346895da14307/html5/thumbnails/32.jpg)
Questions ???