Programs/Products that ERCOT Does Not Presently Offer ERCOT Demand Side Working Group New DR Product Options Subgroup Jay Zarnikau Frontier Associates LLC 4/13/2012

Upload: cameron-thomas-gaines

Post on 18-Jan-2018

218 views

Category:

Documents


0 download

DESCRIPTION

ERCOT’s Formal DR Products ERS (formerly EILS) – Mandatory response from loads selected to provide the service; ERCOT dispatch – Maximum 8 cumulative hours in contract period (but could be longer, if recall instructions extend longer), can be renewed by ERCOT upon exhaustion – Will soon include non-market generation – Minimum offer size 100 kW – 10 minutes notice – 475 MW from ~900 Load sites 3

TRANSCRIPT

Page 1: Programs/Products that ERCOT Does Not Presently Offer ERCOT Demand Side Working Group New DR Product Options Subgroup Jay Zarnikau Frontier Associates

Programs/Products that ERCOT Does Not Presently Offer

ERCOT Demand Side Working GroupNew DR Product Options Subgroup

Jay ZarnikauFrontier Associates LLC

4/13/2012

Page 2: Programs/Products that ERCOT Does Not Presently Offer ERCOT Demand Side Working Group New DR Product Options Subgroup Jay Zarnikau Frontier Associates

ERCOT’s Formal DR Products and Programs

• Load Resources providing RRS– Day-ahead Ancillary Service market clearing prices– 181 Load Resources with 2382 MW of registered DR

capacity– Participation in Responsive Reserves capped at 1150 MW

• Load Resources providing Non Spin– Day-ahead Ancillary Service market clearing prices– 30 minute ramp up time, must operate for at least 1 hour– Little or no participation, presently

• Controllable Load Resources Providing Regulation– Day-ahead Ancillary Service market clearing prices– Instantaneous response time

2

Page 3: Programs/Products that ERCOT Does Not Presently Offer ERCOT Demand Side Working Group New DR Product Options Subgroup Jay Zarnikau Frontier Associates

ERCOT’s Formal DR Products

• ERS (formerly EILS)– Mandatory response from loads selected to provide

the service; ERCOT dispatch– Maximum 8 cumulative hours in contract period (but

could be longer, if recall instructions extend longer), can be renewed by ERCOT upon exhaustion

– Will soon include non-market generation– Minimum offer size 100 kW– 10 minutes notice– 475 MW from ~900 Load sites

3

Page 4: Programs/Products that ERCOT Does Not Presently Offer ERCOT Demand Side Working Group New DR Product Options Subgroup Jay Zarnikau Frontier Associates

ERCOT’s Formal DR Products• TDSP Load Management SOP– TDSP instruction– ~150 MW enrolled in TDSP SOPs, size may be doubled for

this summer– Requirements depend upon TDSP

• Typical minimum offer size: approx. 100 kW (varies by TDSP)• Typical commitment of 4 hours of unscheduled curtailment + 2

hours of scheduled curtailment (varies by TDSP)• Penalty depends upon TDSP• Typical notice is 30 minutes to 1 hour, depending on TDSP rules• Incentives range from $15/kW to $60/kW depending on TDSP• Summer peak hours only, presently

4

Page 5: Programs/Products that ERCOT Does Not Presently Offer ERCOT Demand Side Working Group New DR Product Options Subgroup Jay Zarnikau Frontier Associates

Alberta Demand Opportunity Service (DOS)

– Mandatory response (like ERCOT’s formal programs)– No minimum size• Different from ERS, which requires 100 kW minimum

– AESO dispatch (like ERCOT)– Three service types, 7 minute, 1 hour, and standard:• DOS 1 Hour, curtail in 1 hour, availability is limited due to

system constraints– Similar ramping period to TDSP SOP—some TDSP SOPs offer 1 hour

ramping periods

– Currently has about 100 MW in participation

5

Page 6: Programs/Products that ERCOT Does Not Presently Offer ERCOT Demand Side Working Group New DR Product Options Subgroup Jay Zarnikau Frontier Associates

Alberta Voluntary Load Curtailment Program (VLCP)

• A minimum 1-hour notice• Similar to TDSP SOP—some TDSP SOPs offer a 1 hour ramping

period• Program is voluntary, participants can decline to

curtail load, no minimum size– Different from ERCOT’s formal program in these two

respects• AESO has identified need for up to 400 MW of

voluntary load curtailment• Current level of participation is negligible

6

Page 7: Programs/Products that ERCOT Does Not Presently Offer ERCOT Demand Side Working Group New DR Product Options Subgroup Jay Zarnikau Frontier Associates

PJM Economic Load Response Program (ELRP)

• Voluntary program– Perhaps similar to ERCOT’s future Loads in SCED program

• Participants specify minimum reduction price, shutdown costs, and the minimum duration of the load reduction– Perhaps similar to ERCOT’s future Loads in SCED program

• Price Mechanism:– Submit a sell offer into the Day-Ahead Market or Real-Time Market, or self

schedule that clears– Perhaps similar to ERCOT’s future Loads in SCED program

• ELRP participation decreased by 57,288 MWh in 2011, compared to the same period in 2010– Participation levels have been lower due to a number of factors:

• Lower price levels• Lower load levels• Improved measurement and verification

• On 2011’s peak load day, 2,042 MW was registered for ELRP

7

Page 8: Programs/Products that ERCOT Does Not Presently Offer ERCOT Demand Side Working Group New DR Product Options Subgroup Jay Zarnikau Frontier Associates

PJM Emergency Load Management• Three types of Load Management

– Energy Only (Voluntary), Capacity Only (Mandatory), Full Emergency (Mandatory)• Interruptible for 10 times from June through September, up to 6 consecutive

hours from 12:00 to 20:00 on non-holiday weekdays– Similar to TDSP SOP, where the time period is summer peak hours only, hours

committed set by program rules• Implement within 2 hours

– Participant can specify 1 hour or 2 hour ramping period– Different from ERCOT: ERS specifies 10 minutes and TDSP SOPs have a specific

ramping period• Curtailment Service Provider (CSP) must have registrations that total >=100

kW– Same as ERS and TDSP SOP

• Two price mechanisms:– If a participant in the PJM capacity market, participant will make an offer into the

auction and receive a Resource Clearing Price– If a participant outside of the PJM capacity market, participant is certified 3

months prior to the Delivery Year and receives a price tied to the zonal capacity charge• This option will be eliminated beginning June 1, 2012 8

Page 9: Programs/Products that ERCOT Does Not Presently Offer ERCOT Demand Side Working Group New DR Product Options Subgroup Jay Zarnikau Frontier Associates

PJM Load Management Program Cont’d

9

Table: 2011 Load Management Events Summary for PJM

• Total registered MW in the Load Management Program– 11,523 MW in 2011/2012

• Total zonal monthly capacity credits for CY 2011– $487,161,575

• Underperformance penalties of $5.6 million in 2011

Page 10: Programs/Products that ERCOT Does Not Presently Offer ERCOT Demand Side Working Group New DR Product Options Subgroup Jay Zarnikau Frontier Associates

MISO Emergency Demand Response (EDR)

• Resource-specific ramping offer• The participant can specify:

– The minimum and maximum amounts of demand reduction– The minimum and maximum number of contiguous hours to be

curtailed– The number of hours of advance notice needed to curtail load– Perhaps similar to ERCOT’s future Loads in SCED

• Participants submit daily offers, receive either the higher of the offer or the locational marginal price (LMP), but offers capped at $3,500/MWh

• Different from ERCOT– ERS sets price through a pay as bid mechanism 4 months in advance– The TDSP SOP sets the price in advance

• Approximately 900 MW registered in 2011

10

Page 11: Programs/Products that ERCOT Does Not Presently Offer ERCOT Demand Side Working Group New DR Product Options Subgroup Jay Zarnikau Frontier Associates

CAISO Proxy Demand Resource (PDR)

• Implemented May 1, 2010• Minimum size is 100 kW, loads may aggregate to

achieve threshold– Similar to ERS and TDSP SOP

• Minimum load reduction and response times based on the bid submitted and the award received– Different from ERCOT

• ERS and TDSP SOPs set the response times

• Participants submit bids into the wholesale Day Ahead and/or Real Time market– Perhaps similar to ERCOT’s future Loads in SCED program

11

Page 12: Programs/Products that ERCOT Does Not Presently Offer ERCOT Demand Side Working Group New DR Product Options Subgroup Jay Zarnikau Frontier Associates

Conclusion

• Not much in these programs that ERCOT doesn’t already offer or will offer in the future

• ERCOT’s Loads in SCED programs will allow loads to respond to prices in the market similar to many of the DR products explored in this presentation

• ERCOT does not offer DR products that:– Allow for ramping times longer than 1 hour– Allow participants to set their own ramping times– Accommodate aggregated residential (small,

temperature-sensitive loads) to the degree they are accommodated in some other markets.