Progress and Plans of RP-1677: Measurement and Prediction of Waterside Fouling Performance of Internally Enhanced Condenser Tubes Used in Cooling Tower Applications Dr. Chao Shen University of Illinois at Urbana-Champaign PIs: Dr. Xinlei Wang, Dr. Anthony M. Jacobi Feb. 10, 2015

Upload: nguyencong

Post on 28-Apr-2018

224 views

Category:

Documents


6 download

TRANSCRIPT

Page 1: Progress and Plans of RP-1677 - illinoisashrae.orgillinoisashrae.org/images/meeting/021015/2014_15_Documents/2_uic... · Progress and Plans of RP-1677: ... in Cooling Tower Applications

1

Progress and Plans of RP-1677:

Measurement and Prediction of Waterside Fouling Performance of Internally Enhanced Condenser Tubes Used

in Cooling Tower Applications

Dr. Chao Shen

University of Illinois at Urbana-Champaign

PIs: Dr. Xinlei Wang, Dr. Anthony M. Jacobi

Feb. 10, 2015

Page 2: Progress and Plans of RP-1677 - illinoisashrae.orgillinoisashrae.org/images/meeting/021015/2014_15_Documents/2_uic... · Progress and Plans of RP-1677: ... in Cooling Tower Applications

2

Contents

1.  Project Introduction

2.  Project Progress

3.  Initial Test Results

4. Future Plan

Page 3: Progress and Plans of RP-1677 - illinoisashrae.orgillinoisashrae.org/images/meeting/021015/2014_15_Documents/2_uic... · Progress and Plans of RP-1677: ... in Cooling Tower Applications

3

1.1 Background

● Use of enhanced tubes in cooling water tower

● Fouling issues

● Fouling resistance

Page 4: Progress and Plans of RP-1677 - illinoisashrae.orgillinoisashrae.org/images/meeting/021015/2014_15_Documents/2_uic... · Progress and Plans of RP-1677: ... in Cooling Tower Applications

4

1.2 Project Objectives

● Experimentally determine the fouling resistance.

● Develop a prediction model.

● Propose a generalized calculation approach.

Page 5: Progress and Plans of RP-1677 - illinoisashrae.orgillinoisashrae.org/images/meeting/021015/2014_15_Documents/2_uic... · Progress and Plans of RP-1677: ... in Cooling Tower Applications

5

1.3 Project Tasks

Task 1. Literature Review/Summary (Completed)

Task 2. Experiments and Data Acquisition (In process)

Task 2.1. Build the test system (1/3 completed)

Task 2.2. Make up the test cooling water

Task 2.3. Long-term fouling test

Task 3. Development of Fouling Model

Task 3.1. Develop the correlation of dry matter concentration

Task 3.2. Develop the prediction model of the asymptotic fouling resistance

Page 6: Progress and Plans of RP-1677 - illinoisashrae.orgillinoisashrae.org/images/meeting/021015/2014_15_Documents/2_uic... · Progress and Plans of RP-1677: ... in Cooling Tower Applications

6

Task 1. Literature Review/Summary (Completed)

Title:Fouling of Enhanced Tubes for Condensers Used in Cooling Tower Systems: A Literature Review

Authors: Chao Shen, Chris Cirone, Anthony M. Jacobi, Xinlei Wang

Journal: Applied Thermal Engineering, 79 (2015) 74-87.

2. Project Process

Page 7: Progress and Plans of RP-1677 - illinoisashrae.orgillinoisashrae.org/images/meeting/021015/2014_15_Documents/2_uic... · Progress and Plans of RP-1677: ... in Cooling Tower Applications

7

Task 2. Experiments and Data Acquisition (on-going) Task 2.1. Build the test system

(1) One of the three heat pumps is built

(2) The cooling water tower is built

(3) The data acquisition system is built

2. Project Process

Page 8: Progress and Plans of RP-1677 - illinoisashrae.orgillinoisashrae.org/images/meeting/021015/2014_15_Documents/2_uic... · Progress and Plans of RP-1677: ... in Cooling Tower Applications

8

Schematic of the test system

2. Project Process

Page 9: Progress and Plans of RP-1677 - illinoisashrae.orgillinoisashrae.org/images/meeting/021015/2014_15_Documents/2_uic... · Progress and Plans of RP-1677: ... in Cooling Tower Applications

9

Schematic of the test

system

2. Project Process

Page 10: Progress and Plans of RP-1677 - illinoisashrae.orgillinoisashrae.org/images/meeting/021015/2014_15_Documents/2_uic... · Progress and Plans of RP-1677: ... in Cooling Tower Applications

10

(1) The heat pump (1/3)

Page 11: Progress and Plans of RP-1677 - illinoisashrae.orgillinoisashrae.org/images/meeting/021015/2014_15_Documents/2_uic... · Progress and Plans of RP-1677: ... in Cooling Tower Applications

11

(1) The heat pump (1/3)

Page 12: Progress and Plans of RP-1677 - illinoisashrae.orgillinoisashrae.org/images/meeting/021015/2014_15_Documents/2_uic... · Progress and Plans of RP-1677: ... in Cooling Tower Applications

12

(2) The cooling water tower

Page 13: Progress and Plans of RP-1677 - illinoisashrae.orgillinoisashrae.org/images/meeting/021015/2014_15_Documents/2_uic... · Progress and Plans of RP-1677: ... in Cooling Tower Applications

13

(3) The DAQ and control system

Page 14: Progress and Plans of RP-1677 - illinoisashrae.orgillinoisashrae.org/images/meeting/021015/2014_15_Documents/2_uic... · Progress and Plans of RP-1677: ... in Cooling Tower Applications

14

(3) The DAQ and control system

Page 15: Progress and Plans of RP-1677 - illinoisashrae.orgillinoisashrae.org/images/meeting/021015/2014_15_Documents/2_uic... · Progress and Plans of RP-1677: ... in Cooling Tower Applications

15

(4) The remaining two heat pumps

The test tubes are already delivered to our LAB

Page 16: Progress and Plans of RP-1677 - illinoisashrae.orgillinoisashrae.org/images/meeting/021015/2014_15_Documents/2_uic... · Progress and Plans of RP-1677: ... in Cooling Tower Applications

16

3. Initial tests

Test Water velocity

Saturation Temperature

Temperature controller

m/s ℃

Test 1 1.70 36.3 Manually Test 2 0.89 37.4 Controller

Page 17: Progress and Plans of RP-1677 - illinoisashrae.orgillinoisashrae.org/images/meeting/021015/2014_15_Documents/2_uic... · Progress and Plans of RP-1677: ... in Cooling Tower Applications

17

(1)Water velocity: 1.70 m/s; (2) Saturation temperature: 36.3 ℃

3. Initial test results-Test 1

Water temperature and saturation temperature of refrigerant

Page 18: Progress and Plans of RP-1677 - illinoisashrae.orgillinoisashrae.org/images/meeting/021015/2014_15_Documents/2_uic... · Progress and Plans of RP-1677: ... in Cooling Tower Applications

18

(1)Water velocity: 1.699 m/s; (2) Saturation temperature: 36.3 ℃

3. Initial test results-Test 1

Heat exchange rate and heat flux

Page 19: Progress and Plans of RP-1677 - illinoisashrae.orgillinoisashrae.org/images/meeting/021015/2014_15_Documents/2_uic... · Progress and Plans of RP-1677: ... in Cooling Tower Applications

19

Tube Water velocity

T-water-in

T-water-out

∆𝐓--inlet-outlet

Heat exchange rate

Heat Flux Heat Flux ∆𝐏--pressure drop

m/s °C °C °C W Btu/hr-ft2 W/m2 PSI 1 1.70 29.74 31.69 1.95 2612.3 6918.9 21825.0 1.78 2 1.70 29.72 31.69 1.97 2643.2 7000.7 22083.0 1.66 3 1.70 29.82 31.77 1.95 2614.8 6925.5 21845.8 1.86

Saturation Pressure

Saturation Temperature T-refrigerant-in-middle

PSI °C °C

132.5 36.26 78.1

Test 2: Cooling-water-side results (averaged)

Test 2: Refrigerant-side results (averaged)

3. Initial test results-Test 1

(1)Water velocity: 1.699 m/s; (2) Saturation temperature: 36.3 ℃

Page 20: Progress and Plans of RP-1677 - illinoisashrae.orgillinoisashrae.org/images/meeting/021015/2014_15_Documents/2_uic... · Progress and Plans of RP-1677: ... in Cooling Tower Applications

20

3. Initial test results-Test 2

Water temperature and saturation temperature of refrigerant

(1)Water velocity: 0.892 m/s; (2) Saturation temperature: 37.39 ℃

Page 21: Progress and Plans of RP-1677 - illinoisashrae.orgillinoisashrae.org/images/meeting/021015/2014_15_Documents/2_uic... · Progress and Plans of RP-1677: ... in Cooling Tower Applications

21

3. Initial test results-Test 2

Heat exchange rate and heat flux

(1)Water velocity: 0.892 m/s; (2) Saturation temperature: 37.39 ℃

Page 22: Progress and Plans of RP-1677 - illinoisashrae.orgillinoisashrae.org/images/meeting/021015/2014_15_Documents/2_uic... · Progress and Plans of RP-1677: ... in Cooling Tower Applications

22

3. Initial test results-Test 2

(1)Water velocity: 0.89 m/s; (2) Saturation temperature: 37.39 ℃

Tube Water velocity

T-water-in

T-water-out

∆𝐓--inlet-outlet

Heat exchange rate

Heat Flux Heat Flux

∆𝐏-pressure -pressure drop

  m/s °C °C °C W Btu/HR-ft2 W/m2 PSI1 0.89 29.71 33.25 3.54 2492.77 6602.21 20826.08 0.5042 0.89 29.65 33.16 3.51 2477.70 6562.30 20700.20 0.5023 0.89 29.76 33.20 3.53 2488.98 6592.17 20794.42 0.510

SaturationPressure

SaturationTemperature

T-refrigerant-in-middle

PSI °C °C136.34 37.39 85.34

Test 3: Refrigerant-side results (averaged)

Test 3: Cooling-water-side results (averaged)

Page 23: Progress and Plans of RP-1677 - illinoisashrae.orgillinoisashrae.org/images/meeting/021015/2014_15_Documents/2_uic... · Progress and Plans of RP-1677: ... in Cooling Tower Applications

23

●  Feb.-Mar. 31, 2015:

Complete all the construction of the test system ● April-May.15, 2015: Make up cooling water, and charge them into the test system to start the fouling test ● May. 15, 2015 - Jan.15, 2017: (20 months) Medium fouling potential: 1.6 m/s 4 months Medium fouling potential: 0.9 m/s 4 months Medium fouling potential: 2.4 m/s 4 months High fouling potential: 1.6 m/s 4 months Low fouling potential: 1.6 m/s 4 months

4. Project Plans

Page 24: Progress and Plans of RP-1677 - illinoisashrae.orgillinoisashrae.org/images/meeting/021015/2014_15_Documents/2_uic... · Progress and Plans of RP-1677: ... in Cooling Tower Applications

24

● During the fouling test (20 months) 1. Develop the correlation of dry matter concentration of cooling water based on the water quality analysis.

2. Analyze the fouling data.

● Feb. 1, 2017-April. 30, 2017 Develop the fouling prediction model based on the test data.

4. Project Plan