Progress Meeting 4 4 th May 2011 ESA-ESRIN. Timeline. Phase 1 Formally approved Phase 2 Started Jan 1 st 2011. Progress Meeting 4 on May 4 th , 2011 UCM-2 on 5-6 October, 2011 at NMCI in Cork, Ireland Planned Finish on 31 st December, 2011 Phase 3 - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Progress Meeting 4 4 th  May 2011 ESA-ESRIN

Progress Meeting 44th May 2011ESA-ESRIN

Page 2: Progress Meeting 4 4 th  May 2011 ESA-ESRIN

17/04/2009 2

Timeline

• Phase 1

– Formally approved

• Phase 2

– Started Jan 1st 2011.

– Progress Meeting 4 on May 4th, 2011

– UCM-2 on 5-6 October, 2011 at NMCI in Cork, Ireland

– Planned Finish on 31st December, 2011

• Phase 3

– Planned Start on Jan 1st 2012 .

– PM6 in May 2012, exact date TBD

– UCM-3 in October 2012, venue and exact date TBD

– Planned Finish (and end of project) on 31st Dec 2012

Page 3: Progress Meeting 4 4 th  May 2011 ESA-ESRIN

17/04/2009 3

PM4 Deliverables

1. D.8 – Online tools for MDB (demo at PM4 and final release in June)

2. D.12 – Global Wave Statistics

3. D.13 – 4 months operations of NRT Data

4. D.14 – Verbal update on demonstration products status

5. D.17 – 1st Quarterly L2P Quality Control Report

6. D.21 – 2 Monthly Operational PS-WFVS reports

7. D.24 – 3rd GlobWave Newsletter

Page 4: Progress Meeting 4 4 th  May 2011 ESA-ESRIN

17/04/2009 4

1. D.8 – Online tools for MDB (JF, June/11))

2. D.9 – Handbook (EA+FC, July/11).

3. D.21 – PS-WFVS: GlobWave DDS (July/11), Report on first year of operation (Dec/11), and 11 monthly reports (Dec/11) (HS+DP)

4. Merged Altimeter product (JF, July/11)

5. D.17 – 2nd, 3rd and 4th Quarterly L2P Quality Control Reports (EA+FC, July-11/Oct-11/Jan-12)

6. D.24 – 4th GlobWave newsletter (GB+EP, Oct/11)

7. D.25 – Minutes of the 2nd UCM, Nov/11 (GB+EP)

8. D.26 – Recommendations of the GlobWave Steering Team (Nov/11, GB+EP)

9. D.28 – Annual User Assessment, Phase 2 (Nov/11, GB+EP)

10. D.6 – L2P Product User Guide, Phase 2 rev (EA+FC, Dec/11)

11. D.13 – L2P satellite wave data, 12 months of NRT operations (JF, Dec/11)

12. D.14 – Demonstration Products (GB, Dec/11)

13. D.18 – 1st Annual L2P Quality Control Report (EA+FC, Dec/11)

Plan – Deliverables Required by end of Phase 2

Page 5: Progress Meeting 4 4 th  May 2011 ESA-ESRIN

17/04/2009 5

Possible Demonstration Products

• Climatology Demo Product (Liz Kent, NOC)

• GNSS-R retrieval of sea state related parameters (Martin Unwin, SSTL)

• Radarsat Wave Retrievals (Will Perrie, DFO-MPO)

• Coastal Altimetry (Jerome Benveniste, ESA)

• Cross Seas Demo Product (Fabrice Collard, CLS)