progress of apmp.m.ff-k6
TRANSCRIPT
Progress of APMP.M.FF-K6.2018
Woong KANG
Thermometry and Fluid Flow Metrology GroupKorea Research Institute of Standards and Science
APMP 2020 TCFF meeting
1
Pilot Lab: CMI Czech Republic, SMU Slovakia, PTB Germany(Co-Pilot)
Participants from APMP: CMS, KRISS, NIM, NMIA, NMIJ (total 11 NMIs)
The transfer Standard: Rotary gas meter(Actaris)
Range of flow rates: 2 m3/h to 100 m3/h
CIPM Key Comparison CCM.FF-K6.2011
1
Pilot Lab / Contact point: KRISS / Woong KANG ([email protected])
PurposeDetermination degree of equivalence of national primary standards of low pressure
gas flow(10 to 100 m3/h) in NMIs of APMP with linkage to KCRV in CCM.FF-K6.2011
APMP.M.FF-K6.2018
Participants from APMP (9)- CMS, CSIR-NPL, NIM, NIMT, NMC A*STAR, NMIA, RCM-LIPI, VMI(Linking Lab. : KRISS, NMIA, NIM)
The transfer Standard: Rotary gas meter (Itron Delta S-Flow G65, DN50)
1
Measurement range of flow rates
- 10 m3/h to 100 m3/h (Set points: 10, 20, 30, 40, 50, 60, 70, 80, 90, and 100 m3/h)
- If the participating NMIs will not be able to covert the whole flow range, one part of the flow range could be measured.
- All the participating laboratories will measure the actual volumetric flow at the transfer standard based on the pressure and temperature measurements made at the transfer meter
APMP.M.FF-K6.2018
1
Method of measurement
- Use each NMI’s calibration procedure with traceability to the SI - Relative error of meter e in (%):Defined as the difference between the volume indicated by the transfer standard
and the volume measured by the reference standard
APMP.M.FF-K6.2018
𝑒𝑒 =𝑉𝑉𝑡𝑡 − 𝑉𝑉𝑠𝑠𝑉𝑉𝑠𝑠
× 100
Measurement procedure and conditions
- calibration medium: Air
- air temperature: 20±5℃
- ambient relative humidity : 25% to 75%
- ambient atmospheric pressure : 86 kPa to 106 kPa
1
APMP.M.FF-K6.2018Participants and Method of measurement
# Country NMI Flow range NMI Standard/ Uncertainty Contact Point
1 Republic of Korea KRISS (10 to 100)
m3/hVenturi NozzlesU=0.18%
Woong Kang([email protected])
2 Australia NMIA (10 to 100) m3/h
Venturi NozzlesU=0.13 – 0.16%
Khaled Chahine(khaled.chahine
@measurement.gov.au)
3 Singapore NMC A*STAR
(10 to 70) m3/h
Bell ProverU=0.50%
Yan Zeng(zeng_yan
@nmc.a-star.edu.sg)
4 Thailand NIMT (10 to 100) m3/h
Bell ProverU=0.20%
Sutham Masri([email protected])
5 Indonesia SNSU-BSN
(10 to 84) m3/h
Bell ProverU=0.80%
Fahmy Munawar Cholil([email protected])
1
APMP.M.FF-K6.2018Participants and Method of measurement
# Country NMI Flow range NMI Standard/ Uncertainty Contact Point
6 India CSIR-NPL (10 to 66) m3/h
Venturi NozzlesU=0.30%
Shiv Kumar Jaiswal (skjaiswal
@nplindia.org)
7 Chinese Taipei CMS (10 to 60)
m3/h
Venturi NozzlesU=0.15% Win-Ti Lin (wintilin
@itri.org.tw)
8 Vietnam VMI (10 to 100) m3/h
PVTtU=0.20% Nguyen Hoang Nam
9 China NIM (10 to 100) m3/h
PVTt(Venturi Nozzles)U=0.18 – 0.19% Chunhui Li
1
Progress of APMP.M.FF-K6.2018Status of KC in the KCDB of BIPM- Start from KRISS (#1st Pilot Lab Test) at 2018.06, Now Measurement in progress- Technical Protocol Ver. 4.3
1
Progress of APMP.M.FF-K6.2018
5 pages,
Status of KC in the KCDB of BIPM- Start from KRISS (#1st Pilot Lab Test) at 2018.06, Now Measurement in progress- Technical Protocol Ver. 4.3
1
Progress of APMP.M.FF-K6.2018Schedule for Comparison measurements
No. Participating NMI (Economy)
Beginning of Test End of Test Remark
1
KRISS (Republic of Korea)
2018-06-04 2018-07-01
1st Pilot lab Test
2018-07-02 Shipping, KRISS to NMIA 2 NMIA
(Australia) 2018-07-23 2018-08-19 Test finished
2018-08-20 Shipping, NMIA to NMC A*STAR 3 NMC A*STAR
(Singapore) 2018-08-27 2018-11-06 Test finished
2018-11-07 Shipping, NMC A*STAR to NIMT 4 NIMT
(Thailand) 2018-12-03 2019-01-23 Test finished
2018-01-24 Shipping, NIMT to KRISS 5 KRISS
(Republic of Korea) - 2019-07-14 Re-scheduling
2st Pilot lab Test 2019-07-15 Shipping, KRISS to VMI
6 VMI (Vietnam)
2019-08-05 2019-09-15 Test finished
2019-09-16 Shipping, VMI to NIM 7 NIM
(China) 2019-10-08 2019-12-23 Test finished
2020-01-16 Shipping, NIM to CSIR-NPLI 8 CSIR-NPLI
(India) 2020-01-23 2020-04-27 Test finished
2020-04-27 Shipping, CSIR-NPLI to CMS Delay due to the lockdown of the airport of India by COVID 19(4 months)
9 CMS (Chinese Taipei)
2020-08-17 2020-09-28 Test finished
2020-10-05 Shipping, CMS to RCM-LIPI 10 SNSU-BSN
(Indonesia) 2020-10-23 2020-11-22 One month
2020-11-22 Shipping, RCM-LIPI to KRISS (three weeks) 11 KRISS
(Republic of Korea) 2020-12-14 - 3rd Pilot lab Test
Reporting Draft A
1
Progress of APMP.M.FF-K6.2018Schedule for Comparison measurements
(1) KRISS, (2) NMIA, (3)NMC A*,(4) NIMT, (5) KRISS, (6) VMI(7) NIM, (8) CSIR-NPLI, (9) CMS KC measurements finished
No. Participating NMI (Economy)
Beginning of Test End of Test Remark
1
KRISS (Republic of Korea)
2018-06-04 2018-07-01
1st Pilot lab Test
2018-07-02 Shipping, KRISS to NMIA 2 NMIA
(Australia) 2018-07-23 2018-08-19 Test finished
2018-08-20 Shipping, NMIA to NMC A*STAR 3 NMC A*STAR
(Singapore) 2018-08-27 2018-11-06 Test finished
2018-11-07 Shipping, NMC A*STAR to NIMT 4 NIMT
(Thailand) 2018-12-03 2019-01-23 Test finished
2018-01-24 Shipping, NIMT to KRISS 5 KRISS
(Republic of Korea) - 2019-07-14 Re-scheduling
2st Pilot lab Test 2019-07-15 Shipping, KRISS to VMI
6 VMI (Vietnam)
2019-08-05 2019-09-15 Test finished
2019-09-16 Shipping, VMI to NIM 7 NIM
(China) 2019-10-08 2019-12-23 Test finished
2020-01-16 Shipping, NIM to CSIR-NPLI 8 CSIR-NPLI
(India) 2020-01-23 2020-04-27 Test finished
2020-04-27 Shipping, CSIR-NPLI to CMS Delay due to the lockdown of the airport of India by COVID 19(4 months)
9 CMS (Chinese Taipei)
2020-08-17 2020-09-28 Test finished
2020-10-05 Shipping, CMS to RCM-LIPI 10 SNSU-BSN
(Indonesia) 2020-10-23 2020-11-22 One month
2020-11-22 Shipping, RCM-LIPI to KRISS (three weeks) 11 KRISS
(Republic of Korea) 2020-12-14 - 3rd Pilot lab Test
Reporting Draft A
1
Progress of APMP.M.FF-K6.2018Schedule for Comparison measurements
(1) KRISS, (2) NMIA, (3)NMC A*,(4) NIMT, (5) KRISS, (6) VMI(7) NIM, (8) CSIR-NPLI, (9) CMS KC measurements finished
(10) Now, SNSU-BSN(Indonesia) is doing KC measurement.
No. Participating NMI (Economy)
Beginning of Test End of Test Remark
1
KRISS (Republic of Korea)
2018-06-04 2018-07-01
1st Pilot lab Test
2018-07-02 Shipping, KRISS to NMIA 2 NMIA
(Australia) 2018-07-23 2018-08-19 Test finished
2018-08-20 Shipping, NMIA to NMC A*STAR 3 NMC A*STAR
(Singapore) 2018-08-27 2018-11-06 Test finished
2018-11-07 Shipping, NMC A*STAR to NIMT 4 NIMT
(Thailand) 2018-12-03 2019-01-23 Test finished
2018-01-24 Shipping, NIMT to KRISS 5 KRISS
(Republic of Korea) - 2019-07-14 Re-scheduling
2st Pilot lab Test 2019-07-15 Shipping, KRISS to VMI
6 VMI (Vietnam)
2019-08-05 2019-09-15 Test finished
2019-09-16 Shipping, VMI to NIM 7 NIM
(China) 2019-10-08 2019-12-23 Test finished
2020-01-16 Shipping, NIM to CSIR-NPLI 8 CSIR-NPLI
(India) 2020-01-23 2020-04-27 Test finished
2020-04-27 Shipping, CSIR-NPLI to CMS Delay due to the lockdown of the airport of India by COVID 19(4 months)
9 CMS (Chinese Taipei)
2020-08-17 2020-09-28 Test finished
2020-10-05 Shipping, CMS to RCM-LIPI 10 SNSU-BSN
(Indonesia) 2020-10-23 2020-11-22 One month
2020-11-22 Shipping, RCM-LIPI to KRISS (three weeks) 11 KRISS
(Republic of Korea) 2020-12-14 - 3rd Pilot lab Test
Reporting Draft A
1
Progress of APMP.M.FF-K6.2018Schedule for Comparison measurements
(1) KRISS, (2) NMIA, (3)NMC A*,(4) NIMT, (5) KRISS, (6) VMI(7) NIM, (8) CSIR-NPLI, (9) CMS KC measurements finished
(10) Now, SNSU-BSN(Indonesia) is doing KC measurement.
No. Participating NMI (Economy)
Beginning of Test End of Test Remark
1
KRISS (Republic of Korea)
2018-06-04 2018-07-01
1st Pilot lab Test
2018-07-02 Shipping, KRISS to NMIA 2 NMIA
(Australia) 2018-07-23 2018-08-19 Test finished
2018-08-20 Shipping, NMIA to NMC A*STAR 3 NMC A*STAR
(Singapore) 2018-08-27 2018-11-06 Test finished
2018-11-07 Shipping, NMC A*STAR to NIMT 4 NIMT
(Thailand) 2018-12-03 2019-01-23 Test finished
2018-01-24 Shipping, NIMT to KRISS 5 KRISS
(Republic of Korea) - 2019-07-14 Re-scheduling
2st Pilot lab Test 2019-07-15 Shipping, KRISS to VMI
6 VMI (Vietnam)
2019-08-05 2019-09-15 Test finished
2019-09-16 Shipping, VMI to NIM 7 NIM
(China) 2019-10-08 2019-12-23 Test finished
2020-01-16 Shipping, NIM to CSIR-NPLI 8 CSIR-NPLI
(India) 2020-01-23 2020-04-27 Test finished
2020-04-27 Shipping, CSIR-NPLI to CMS Delay due to the lockdown of the airport of India by COVID 19(4 months)
9 CMS (Chinese Taipei)
2020-08-17 2020-09-28 Test finished
2020-10-05 Shipping, CMS to RCM-LIPI 10 SNSU-BSN
(Indonesia) 2020-10-23 2020-11-22 One month
2020-11-22 Shipping, RCM-LIPI to KRISS (three weeks) 11 KRISS
(Republic of Korea) 2020-12-14 - 3rd Pilot lab Test
Reporting Draft A
Delay due to COVID 19(4 months)
1
Plan of APMP.M.FF-K6.2018Schedule for Comparison measurements- 7 NMI(NMIA, NMC A*, NIMT, VMI, NIM, CSIR-NPLI, CMS) already sent the KC
measurement report to KRISS
- After SNSU-BSN, KRISS will do the 3rd Pilot lab test
- From ‘21.2, KRISS will start to write the Draft A of APMP.M.FF-K6.2018: If necessary, we will request the detailed information and data for Draft A
1
Plan of APMP.M.FF-K6.2018Schedule for Comparison measurements- 7 NMI(NMIA, NMC A*, NIMT, VMI, NIM, CSIR-NPLI, CMS) already sent the KC
measurement report to KRISS
- After SNSU-BSN, KRISS will do the 3rd Pilot lab test
- From ‘21.2, KRISS will start to write the Draft A of APMP.M.FF-K6.2018: If necessary, we will request the detailed information and data for Draft A
‘21.5 : Circulating the Draft A of KC report
‘21.8 : Writing the Draft B of KC report
1