APG TF APG TF Progress of Large CCS Demonstrations in the UK: An Overview Philip Sharman Chairman Advanced Power Generation Technology Forum (APGTF) UK 28 October 2009, Amsterdam

Upload: others

Post on 25-Apr-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Progress of Large CCS Demonstrations in the UK: An Overvie · 2009-11-13 · Project • Existing 2.3GW e station • 300MW e demo of CO 2 capture proposed • Partners: Aker Clean

APG TFAPG TF

Progress of Large CCS Demonstrations

in the UK: An Overview

Philip SharmanChairman

Advanced Power Generation Technology Forum (APGTF)

UK

28 October 2009, Amsterdam

Page 2: Progress of Large CCS Demonstrations in the UK: An Overvie · 2009-11-13 · Project • Existing 2.3GW e station • 300MW e demo of CO 2 capture proposed • Partners: Aker Clean

APG TFAPG TF

What is the APGTF?

• UK industry-led stakeholder group – PG sector:– power generators

– equipment manufacturers

– fuel suppliers

– technology providers (eg universities)

– CO2 storage sector (for CCS)

• Strong links with relevant trade associations

• Public sector and university representation

• Technology focus: long-term, proactive – RD&D

• Focus on fossil fuel ‘carbon abatement technologies’ (CATs) – generating efficiency, CCS, biomass co-firing

Page 3: Progress of Large CCS Demonstrations in the UK: An Overvie · 2009-11-13 · Project • Existing 2.3GW e station • 300MW e demo of CO 2 capture proposed • Partners: Aker Clean

APG TFAPG TF

Presentation Contents

• The UK Government CCS Demonstration Competition

– Contender A: E.ON UK’s Kingsnorth Project

– Contender B: Peel/DONG/RWE npower’s Tilbury Project

– Contender C: Scottish Power’s Longannet Project

• The European Energy Package for Recovery and the

UK

– Contender: Powerfuel’s Hatfield IGCC Project

• Other potential UK demonstrations

– Example: Coastal Energy’s Teesside Project

• Other UK demo activity (component/part-chain)

– Doosan Babcock Energy’s OxyCoalTM

2 Project

– Scottish CCS Study – Phase 2

• Regional networks and business clusters

Page 4: Progress of Large CCS Demonstrations in the UK: An Overvie · 2009-11-13 · Project • Existing 2.3GW e station • 300MW e demo of CO 2 capture proposed • Partners: Aker Clean

APG TFAPG TF

The UK CCS Competition

• Announced in 2007 Budget

• >300MWe post-combustion capture project on coal-fired power plant with CO2 stored offshore

• Operational by 2014 (latest view: “by 2015”)

• Focus on dissemination of knowledge

• Handled via competitive process

• 3 consortia: E.ON; Peel/DONG/RWE npower; Scottish Power - commercial negotiations ongoing

• 2 consortia to be selected for detailed design and development (FEED studies supported by Govt.)

• Decision was due mid-’09 (“some time in new year”)

Page 5: Progress of Large CCS Demonstrations in the UK: An Overvie · 2009-11-13 · Project • Existing 2.3GW e station • 300MW e demo of CO 2 capture proposed • Partners: Aker Clean

APG TFAPG TFContender A: E.ON UK’s

Kingsnorth Project

• Existing 2GWe station to close by 2015

• Two new 800MWe units proposed (now from 2016)

• 300-400MWe demo of CO2

capture proposed on 1 unit

• MHI amine capture technology (?)

• ~2MtCO2/year

• CO2 storage in depleted gas fields in southern North Sea

• Kick-start Thames CCS Cluster

Page 6: Progress of Large CCS Demonstrations in the UK: An Overvie · 2009-11-13 · Project • Existing 2.3GW e station • 300MW e demo of CO 2 capture proposed • Partners: Aker Clean

APG TFAPG TFContender B: Peel/DONG/

RWE npower Tilbury Project

• New 1.6GWe clean coal power plant (‘CO2 capture

ready’) proposed at Tilbury

• Peel Energy, DONG

Energy and RWE npower

pre-qualify

• 400MWe demo of CO2

capture proposed

• Amine capture technology

– not yet selected

• ~2MtCO2/year

• CO2 storage in depleted gas fields in southern North

Sea

Page 7: Progress of Large CCS Demonstrations in the UK: An Overvie · 2009-11-13 · Project • Existing 2.3GW e station • 300MW e demo of CO 2 capture proposed • Partners: Aker Clean

APG TFAPG TFContender C: Scottish

Power’s Longannet

Project• Existing 2.3GWe station

• 300MWe demo of CO2 capture proposed

• Partners: Aker Clean Carbon, Aker Solutions, Shell and National Grid

• Aker Clean Carbon amine capture technology

• CO2 storage in depleted oil/gas field or saline aquifer under North Sea

• Beginning of Scottish CCS Cluster

• Mobile Test Unit on site -processing 1000m3/h of flue

Page 8: Progress of Large CCS Demonstrations in the UK: An Overvie · 2009-11-13 · Project • Existing 2.3GW e station • 300MW e demo of CO 2 capture proposed • Partners: Aker Clean

APG TFAPG TF

The EEPR and the UK

• EC proposed €1.25Bn for 5 CCS demos (x1 each in Germany, Netherlands, Poland, Spain+Portugal, UK) as part of EU Recovery Plan – Jan ‘09

• Approved €1.05Bn (x1 in Germany, Netherlands, Poland, Spain, UK, plus Italy & France) – Mar ’09

• Only 4 UK projects in UK considered eligible to compete (Kingsnorth, Tilbury, Longannet & Hatfield)

• Called for proposals – May ‘09

• Shortlisted 7 projects (inc Powerfuel’s Hatfield IGCC

Project in UK) – Oct ’09 (not finalised)

• Funds need to be committed by end of 2010

Page 9: Progress of Large CCS Demonstrations in the UK: An Overvie · 2009-11-13 · Project • Existing 2.3GW e station • 300MW e demo of CO 2 capture proposed • Partners: Aker Clean

APG TFAPG TFEEPR Contender:

Powerfuel’s Hatfield

Project• 900MWe coal IGCC with

CCS

• 2 phases: CCGT (2013), then IGCC + CCS (2014/15)

• Coal from adjacent colliery

• Shell, GE, UOP and Air Products equipment

• ~4.5MtCO2/year

• CO2 storage in depleted gas fields in southern North Sea

• FEED study completed and s14/36 consents and local planning permission

CMD/Gasification

IslandGas

Treatment(Shift/AGR/SRU)

Cooling Tower

and Stacks

Power

IslandASUWater

Treatment

Page 10: Progress of Large CCS Demonstrations in the UK: An Overvie · 2009-11-13 · Project • Existing 2.3GW e station • 300MW e demo of CO 2 capture proposed • Partners: Aker Clean

APG TFAPG TFOther Potential UK

Demos

Courtesy of the

Scottish Centre for

Carbon Storage,

School of

Geosciences,

University of Edinburgh

www.geos.ed.ac.uk/

ccsmap

(Peterhead - cancelled)

Longannet (√√√√)

Hatfield (√√√√)

Corus Scunthorpe

(Killingholme – canc.)

Drymn

Aberthaw

Tilbury (√√√√)

Kingsnorth (√√√√)

Blyth

Teesside

Ferrybridge

Cockenzie

Hunterston

8 other projects at different

stages of

development (plus 2 now

cancelled)

Page 11: Progress of Large CCS Demonstrations in the UK: An Overvie · 2009-11-13 · Project • Existing 2.3GW e station • 300MW e demo of CO 2 capture proposed • Partners: Aker Clean

APG TFAPG TFExample: Coastal

Energy’s Teesside

Project• Developed by Progressive

Energy with Centrica

• 850MWe coal IGCC with CCS on complete plant from start

• Equipment not yet selected

• ~5MtCO2/year

• CO2 storage in saline aquifer under North Sea (capacity ~5BtCO2

• EIAs and Pre-FEED studies completed for full CCS chain

• Could be operational by end of 2015 if FID by end

Page 12: Progress of Large CCS Demonstrations in the UK: An Overvie · 2009-11-13 · Project • Existing 2.3GW e station • 300MW e demo of CO 2 capture proposed • Partners: Aker Clean

APG TFAPG TFOther UK Demo Activity (component/part-chain)

• Doosan Babcock Energy’s ‘OxyCoalTM 2’ Project– Demo of oxyfuel comb. system

– Full-scale oxy-burner (40MWth)

– UK Govt. support (DECC)

– Partners: Air Products, DONG Energy, EDF Energy, E.ON UK, S&S Energy, Vattenfall, Scottish Power, UK Coal

– FEED study for utility (100MWe)

• Scottish CCTS Development Study– Constrained aquifer storage demo

(Firth of Forth) proposed

– Characterisation of 2-3 saline aquifers as CO2 stores

– Public perception, skills, capacity

Page 13: Progress of Large CCS Demonstrations in the UK: An Overvie · 2009-11-13 · Project • Existing 2.3GW e station • 300MW e demo of CO 2 capture proposed • Partners: Aker Clean

APG TFAPG TFRegional

Networks/Clusters

Scotland

Teesside

Humber

Thames

Liverpool

Bay

Regional Network/ Cluster

Current CO2

Volume

% of Total UK Emission

sScotland 18Mt 3.4

Teesside 20Mt 3.8

Humber 68Mt 12.8

Liverpool Bay

10Mt 1.9

Thames 28Mt 5.3

Page 14: Progress of Large CCS Demonstrations in the UK: An Overvie · 2009-11-13 · Project • Existing 2.3GW e station • 300MW e demo of CO 2 capture proposed • Partners: Aker Clean

APG TFAPG TF

Summary

• Lots going on in the UK – a crucial time!

• Should be a >300MWe post-comb. capture demo on coal with offshore storage by ~2015 (UK Competition)

• Should be a 900MWe coal IGCC with pre-comb. decarbonisation on similar timescale (EEPR funding)

• Other potential full-chain demos – funding?– UK Government Consultation: “up to 4” CCS demos on coal

– Change of Government? Conservatives seeking 5GWe of CCS by 2020

– EC’s ‘NER300’ funding?

• Other key component demo or part-chain activity, including oxy-firing and constrained saline aquifers ongoing/proposed

• Hopefully addressing all 3 capture routes, pipeline transport and various storage options in next 5-8 years

• What about CCS on gas?

Page 15: Progress of Large CCS Demonstrations in the UK: An Overvie · 2009-11-13 · Project • Existing 2.3GW e station • 300MW e demo of CO 2 capture proposed • Partners: Aker Clean

APG TFAPG TF

Philip SharmanChairman

Advanced Power Generation Technology Forum (APGTF)

UK

28 October 2009, Amsterdam

Thank you for

listening!