progress of large ccs demonstrations in the uk: an overvie · 2009-11-13 · project • existing...
TRANSCRIPT
![Page 1: Progress of Large CCS Demonstrations in the UK: An Overvie · 2009-11-13 · Project • Existing 2.3GW e station • 300MW e demo of CO 2 capture proposed • Partners: Aker Clean](https://reader034.vdocument.in/reader034/viewer/2022042205/5ea6a867d4209d34291b3e87/html5/thumbnails/1.jpg)
APG TFAPG TF
Progress of Large CCS Demonstrations
in the UK: An Overview
Philip SharmanChairman
Advanced Power Generation Technology Forum (APGTF)
UK
28 October 2009, Amsterdam
![Page 2: Progress of Large CCS Demonstrations in the UK: An Overvie · 2009-11-13 · Project • Existing 2.3GW e station • 300MW e demo of CO 2 capture proposed • Partners: Aker Clean](https://reader034.vdocument.in/reader034/viewer/2022042205/5ea6a867d4209d34291b3e87/html5/thumbnails/2.jpg)
APG TFAPG TF
What is the APGTF?
• UK industry-led stakeholder group – PG sector:– power generators
– equipment manufacturers
– fuel suppliers
– technology providers (eg universities)
– CO2 storage sector (for CCS)
• Strong links with relevant trade associations
• Public sector and university representation
• Technology focus: long-term, proactive – RD&D
• Focus on fossil fuel ‘carbon abatement technologies’ (CATs) – generating efficiency, CCS, biomass co-firing
![Page 3: Progress of Large CCS Demonstrations in the UK: An Overvie · 2009-11-13 · Project • Existing 2.3GW e station • 300MW e demo of CO 2 capture proposed • Partners: Aker Clean](https://reader034.vdocument.in/reader034/viewer/2022042205/5ea6a867d4209d34291b3e87/html5/thumbnails/3.jpg)
APG TFAPG TF
Presentation Contents
• The UK Government CCS Demonstration Competition
– Contender A: E.ON UK’s Kingsnorth Project
– Contender B: Peel/DONG/RWE npower’s Tilbury Project
– Contender C: Scottish Power’s Longannet Project
• The European Energy Package for Recovery and the
UK
– Contender: Powerfuel’s Hatfield IGCC Project
• Other potential UK demonstrations
– Example: Coastal Energy’s Teesside Project
• Other UK demo activity (component/part-chain)
– Doosan Babcock Energy’s OxyCoalTM
2 Project
– Scottish CCS Study – Phase 2
• Regional networks and business clusters
![Page 4: Progress of Large CCS Demonstrations in the UK: An Overvie · 2009-11-13 · Project • Existing 2.3GW e station • 300MW e demo of CO 2 capture proposed • Partners: Aker Clean](https://reader034.vdocument.in/reader034/viewer/2022042205/5ea6a867d4209d34291b3e87/html5/thumbnails/4.jpg)
APG TFAPG TF
The UK CCS Competition
• Announced in 2007 Budget
• >300MWe post-combustion capture project on coal-fired power plant with CO2 stored offshore
• Operational by 2014 (latest view: “by 2015”)
• Focus on dissemination of knowledge
• Handled via competitive process
• 3 consortia: E.ON; Peel/DONG/RWE npower; Scottish Power - commercial negotiations ongoing
• 2 consortia to be selected for detailed design and development (FEED studies supported by Govt.)
• Decision was due mid-’09 (“some time in new year”)
![Page 5: Progress of Large CCS Demonstrations in the UK: An Overvie · 2009-11-13 · Project • Existing 2.3GW e station • 300MW e demo of CO 2 capture proposed • Partners: Aker Clean](https://reader034.vdocument.in/reader034/viewer/2022042205/5ea6a867d4209d34291b3e87/html5/thumbnails/5.jpg)
APG TFAPG TFContender A: E.ON UK’s
Kingsnorth Project
• Existing 2GWe station to close by 2015
• Two new 800MWe units proposed (now from 2016)
• 300-400MWe demo of CO2
capture proposed on 1 unit
• MHI amine capture technology (?)
• ~2MtCO2/year
• CO2 storage in depleted gas fields in southern North Sea
• Kick-start Thames CCS Cluster
![Page 6: Progress of Large CCS Demonstrations in the UK: An Overvie · 2009-11-13 · Project • Existing 2.3GW e station • 300MW e demo of CO 2 capture proposed • Partners: Aker Clean](https://reader034.vdocument.in/reader034/viewer/2022042205/5ea6a867d4209d34291b3e87/html5/thumbnails/6.jpg)
APG TFAPG TFContender B: Peel/DONG/
RWE npower Tilbury Project
• New 1.6GWe clean coal power plant (‘CO2 capture
ready’) proposed at Tilbury
• Peel Energy, DONG
Energy and RWE npower
pre-qualify
• 400MWe demo of CO2
capture proposed
• Amine capture technology
– not yet selected
• ~2MtCO2/year
• CO2 storage in depleted gas fields in southern North
Sea
![Page 7: Progress of Large CCS Demonstrations in the UK: An Overvie · 2009-11-13 · Project • Existing 2.3GW e station • 300MW e demo of CO 2 capture proposed • Partners: Aker Clean](https://reader034.vdocument.in/reader034/viewer/2022042205/5ea6a867d4209d34291b3e87/html5/thumbnails/7.jpg)
APG TFAPG TFContender C: Scottish
Power’s Longannet
Project• Existing 2.3GWe station
• 300MWe demo of CO2 capture proposed
• Partners: Aker Clean Carbon, Aker Solutions, Shell and National Grid
• Aker Clean Carbon amine capture technology
• CO2 storage in depleted oil/gas field or saline aquifer under North Sea
• Beginning of Scottish CCS Cluster
• Mobile Test Unit on site -processing 1000m3/h of flue
![Page 8: Progress of Large CCS Demonstrations in the UK: An Overvie · 2009-11-13 · Project • Existing 2.3GW e station • 300MW e demo of CO 2 capture proposed • Partners: Aker Clean](https://reader034.vdocument.in/reader034/viewer/2022042205/5ea6a867d4209d34291b3e87/html5/thumbnails/8.jpg)
APG TFAPG TF
The EEPR and the UK
• EC proposed €1.25Bn for 5 CCS demos (x1 each in Germany, Netherlands, Poland, Spain+Portugal, UK) as part of EU Recovery Plan – Jan ‘09
• Approved €1.05Bn (x1 in Germany, Netherlands, Poland, Spain, UK, plus Italy & France) – Mar ’09
• Only 4 UK projects in UK considered eligible to compete (Kingsnorth, Tilbury, Longannet & Hatfield)
• Called for proposals – May ‘09
• Shortlisted 7 projects (inc Powerfuel’s Hatfield IGCC
Project in UK) – Oct ’09 (not finalised)
• Funds need to be committed by end of 2010
![Page 9: Progress of Large CCS Demonstrations in the UK: An Overvie · 2009-11-13 · Project • Existing 2.3GW e station • 300MW e demo of CO 2 capture proposed • Partners: Aker Clean](https://reader034.vdocument.in/reader034/viewer/2022042205/5ea6a867d4209d34291b3e87/html5/thumbnails/9.jpg)
APG TFAPG TFEEPR Contender:
Powerfuel’s Hatfield
Project• 900MWe coal IGCC with
CCS
• 2 phases: CCGT (2013), then IGCC + CCS (2014/15)
• Coal from adjacent colliery
• Shell, GE, UOP and Air Products equipment
• ~4.5MtCO2/year
• CO2 storage in depleted gas fields in southern North Sea
• FEED study completed and s14/36 consents and local planning permission
CMD/Gasification
IslandGas
Treatment(Shift/AGR/SRU)
Cooling Tower
and Stacks
Power
IslandASUWater
Treatment
![Page 10: Progress of Large CCS Demonstrations in the UK: An Overvie · 2009-11-13 · Project • Existing 2.3GW e station • 300MW e demo of CO 2 capture proposed • Partners: Aker Clean](https://reader034.vdocument.in/reader034/viewer/2022042205/5ea6a867d4209d34291b3e87/html5/thumbnails/10.jpg)
APG TFAPG TFOther Potential UK
Demos
Courtesy of the
Scottish Centre for
Carbon Storage,
School of
Geosciences,
University of Edinburgh
www.geos.ed.ac.uk/
ccsmap
(Peterhead - cancelled)
Longannet (√√√√)
Hatfield (√√√√)
Corus Scunthorpe
(Killingholme – canc.)
Drymn
Aberthaw
Tilbury (√√√√)
Kingsnorth (√√√√)
Blyth
Teesside
Ferrybridge
Cockenzie
Hunterston
8 other projects at different
stages of
development (plus 2 now
cancelled)
![Page 11: Progress of Large CCS Demonstrations in the UK: An Overvie · 2009-11-13 · Project • Existing 2.3GW e station • 300MW e demo of CO 2 capture proposed • Partners: Aker Clean](https://reader034.vdocument.in/reader034/viewer/2022042205/5ea6a867d4209d34291b3e87/html5/thumbnails/11.jpg)
APG TFAPG TFExample: Coastal
Energy’s Teesside
Project• Developed by Progressive
Energy with Centrica
• 850MWe coal IGCC with CCS on complete plant from start
• Equipment not yet selected
• ~5MtCO2/year
• CO2 storage in saline aquifer under North Sea (capacity ~5BtCO2
• EIAs and Pre-FEED studies completed for full CCS chain
• Could be operational by end of 2015 if FID by end
![Page 12: Progress of Large CCS Demonstrations in the UK: An Overvie · 2009-11-13 · Project • Existing 2.3GW e station • 300MW e demo of CO 2 capture proposed • Partners: Aker Clean](https://reader034.vdocument.in/reader034/viewer/2022042205/5ea6a867d4209d34291b3e87/html5/thumbnails/12.jpg)
APG TFAPG TFOther UK Demo Activity (component/part-chain)
• Doosan Babcock Energy’s ‘OxyCoalTM 2’ Project– Demo of oxyfuel comb. system
– Full-scale oxy-burner (40MWth)
– UK Govt. support (DECC)
– Partners: Air Products, DONG Energy, EDF Energy, E.ON UK, S&S Energy, Vattenfall, Scottish Power, UK Coal
– FEED study for utility (100MWe)
• Scottish CCTS Development Study– Constrained aquifer storage demo
(Firth of Forth) proposed
– Characterisation of 2-3 saline aquifers as CO2 stores
– Public perception, skills, capacity
![Page 13: Progress of Large CCS Demonstrations in the UK: An Overvie · 2009-11-13 · Project • Existing 2.3GW e station • 300MW e demo of CO 2 capture proposed • Partners: Aker Clean](https://reader034.vdocument.in/reader034/viewer/2022042205/5ea6a867d4209d34291b3e87/html5/thumbnails/13.jpg)
APG TFAPG TFRegional
Networks/Clusters
Scotland
Teesside
Humber
Thames
Liverpool
Bay
Regional Network/ Cluster
Current CO2
Volume
% of Total UK Emission
sScotland 18Mt 3.4
Teesside 20Mt 3.8
Humber 68Mt 12.8
Liverpool Bay
10Mt 1.9
Thames 28Mt 5.3
![Page 14: Progress of Large CCS Demonstrations in the UK: An Overvie · 2009-11-13 · Project • Existing 2.3GW e station • 300MW e demo of CO 2 capture proposed • Partners: Aker Clean](https://reader034.vdocument.in/reader034/viewer/2022042205/5ea6a867d4209d34291b3e87/html5/thumbnails/14.jpg)
APG TFAPG TF
Summary
• Lots going on in the UK – a crucial time!
• Should be a >300MWe post-comb. capture demo on coal with offshore storage by ~2015 (UK Competition)
• Should be a 900MWe coal IGCC with pre-comb. decarbonisation on similar timescale (EEPR funding)
• Other potential full-chain demos – funding?– UK Government Consultation: “up to 4” CCS demos on coal
– Change of Government? Conservatives seeking 5GWe of CCS by 2020
– EC’s ‘NER300’ funding?
• Other key component demo or part-chain activity, including oxy-firing and constrained saline aquifers ongoing/proposed
• Hopefully addressing all 3 capture routes, pipeline transport and various storage options in next 5-8 years
• What about CCS on gas?
![Page 15: Progress of Large CCS Demonstrations in the UK: An Overvie · 2009-11-13 · Project • Existing 2.3GW e station • 300MW e demo of CO 2 capture proposed • Partners: Aker Clean](https://reader034.vdocument.in/reader034/viewer/2022042205/5ea6a867d4209d34291b3e87/html5/thumbnails/15.jpg)
APG TFAPG TF
Philip SharmanChairman
Advanced Power Generation Technology Forum (APGTF)
UK
28 October 2009, Amsterdam
Thank you for
listening!
Any questions?