8/24/2019 MPR Report :: Jul_2019 1/52 Bihar Rajya Pul Nirman Nigam Ltd, Patna Progress Report of Ongoing Schemes for Projects Date:Jul_2019 Division: --:Select:--, Printed on: 24/08/2019 Approved by SPE Achievement for the month / till month Physical Financial 1 2 4 5 6 7 8 9 10 11 12 13 14 15 16 17 1 0.00 M 7.69/ 76.00 31.00/ 31.00 0.00/ 0.00 0.00/ 0.00 0.00/ 6.76 2 185.00 M 0.00/ 100.00 0.00/ 100.00 0.00/ 100.00 0.00/ 50.00 0.00/ 166.91 3 590.00 M 0.00/ 100.00 0.00/ 100.00 9.00/ 100.00 10.00/ 65.00 0.00/ 1264.96 Sl.No Division Name Of Work Head / Sub Head Distirct Administrative Approval Type/Length Of Bridge(M) Length of Approach (in M) Date of Commen cement Date Of Scheduled completion Revised Date of completion Likely date of completion Remarks Foundation (in %) Sub-Structure (in %) Super-Structure (in %) Approach (in %) Cumulative 3 18 External Division-2 (Kishanganj) Construction of Karpuri hostel under Kishanganj District (Chhahar Divari nirman work) Ganesh Contruction Araria Non-Plan Kishanganj 66.380000 / 2591 / 26 Dec 2017 Others/1.00 25 Sep 2018 24 Jan 2019 1. Work progress is slow due to rain/flood water. 2. SPE recommended for debar of the the contractor vide letter no. 441(we) dated 27.05.2019 3. Pilling - 128/128 4. Wall - 120/387 External Division-2 (Kishanganj) Construction of 2x16.50m R.C.C. Bridge over Kathliya Kochpara Dhar in Kishanganj Block in the District of Kishanganj. [Star Construction] MMSNY Kishanganj 261.530000 / 6868(s) / 23 Jul 2014 RCC/33.00 03 Oct 2014 02 Oct 2015 1. Contractor Debared vide MD lt. No. 1015 dt 15.03.2016 2. SPE recommended to rescind the contractor vide lt. No. 488 (WE) dt 07.06.2019 External Division-2 (Kishanganj) Construction of H.L. R.C.C. Bridge (21x24.75 m) over Koul River in Jurail Laucha Road of RWD Road in the District of Kishanganj. [Navin Chandra Sarkar] Nabard RWD Kishanganj 5205.970000 / 05 / 01 Jan 2018 RCC/430.00 24 Mar 2018 23 Sep 2019 23 Sep 2019 1. Workdone Previously-16 Span. 2. Bridge work completed. 3. E/W in approach road in progress.

Upload: others

Post on 02-Nov-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Progress Report of Ongoing Schemes ... - brpnnl.bihar.gov.inbrpnnl.bihar.gov.in/UploadFile/20/01-Oct-2019... · Sub-Structur e (in %) Super-Structur e (in %) Appr oach (in %) Cumulative

8/24/2019 MPR Report :: Jul_2019

1/52

Bihar Rajya Pul Nirman Nigam Ltd, PatnaProgress Report of Ongoing Schemes for Projects Date:Jul_2019

Division: --:Select:--, Printed on: 24/08/2019 Approved by SPEAchievement for the month / till month

Physical Financial

1 2 4 5 6 7 8 9 10 11 12 13 14 15 16 17

1 0.00 M 7.69/76.00

31.00/31.00

0.00/0.00

0.00/0.00

0.00/6.76

2 185.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/50.00

0.00/166.91

3 590.00 M 0.00/100.00

0.00/100.00

9.00/100.00

10.00/65.00

0.00/1264.96

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

3 18

Exte

rnal

Div

isio

n-2

(Kis

hang

anj)

Construction of Karpuri hostel underKishanganj District (Chhahar Divari

nirman work) Ganesh Contruction Araria Non

-Pla

n

Kis

hang

anj

66.3

8000

0 / 2

591

/ 26

Dec

201

7

Oth

ers/

1.00

25 S

ep 2

018

24 Ja

n 20

19

1. Work progress is slow due to rain/flood water. 2. SPErecommended for debar of the the contractor vide letter no.

441(we) dated 27.05.2019 3. Pilling - 128/128 4. Wall -120/387

Exte

rnal

Div

isio

n-2

(Kis

hang

anj)

Construction of 2x16.50m R.C.C. Bridgeover Kathliya Kochpara Dhar in

Kishanganj Block in the District ofKishanganj. [Star Construction] M

MSN

Y

Kis

hang

anj

261.

5300

00 /

6868

(s) /

23

Jul 2

014

RC

C/3

3.00

03 O

ct 2

014

02 O

ct 2

015 1. Contractor Debared vide MD lt. No. 1015 dt 15.03.2016 2.

SPE recommended to rescind the contractor vide lt. No. 488(WE) dt 07.06.2019

Exte

rnal

Div

isio

n-2

(Kis

hang

anj)

Construction of H.L. R.C.C. Bridge(21x24.75 m) over Koul River in Jurail

Laucha Road of RWD Road in theDistrict of Kishanganj. [Navin Chandra

Sarkar] Nab

ard

RWD

Kis

hang

anj

5205

.970

000

/ 05

/ 01

Jan

2018

RC

C/4

30.0

0

24 M

ar 2

018

23 S

ep 2

019

23 S

ep 2

019

1. Workdone Previously-16 Span. 2. Bridge work completed.3. E/W in approach road in progress.

Page 2: Progress Report of Ongoing Schemes ... - brpnnl.bihar.gov.inbrpnnl.bihar.gov.in/UploadFile/20/01-Oct-2019... · Sub-Structur e (in %) Super-Structur e (in %) Appr oach (in %) Cumulative

8/24/2019 MPR Report :: Jul_2019

2/52

Achievement for the month / till month

Physical Financial

4 525.00 M 2.00/96.00

7.00/68.00

0.00/6.00

0.00/0.00

0.00/614.89

5 210.00 M 0.00/30.00

0.00/0.00

0.00/0.00

0.00/0.00

70.23/274.45

6 300.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/15.00

0.00/547.05

7 537.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/20.00

0.00/6525.03

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Exte

rnal

Div

isio

n-2

(Kis

hang

anj)

Construction of 6X24.00M H.L.R.C.CBridge in 11th km. of Muraligach-

Thakurganj Road over Chenga river atChenga Ghat in Kishanganj District.

[Shiv Kishore Construction]Pl

an

Kis

hang

anj

2085

.000

000

/ 129

2(s)

/ 18

Feb

201

7

RC

C/1

47.7

8

11 Ja

n 20

18

10 Ja

n 20

20

Work stopped due to flood.

Exte

rnal

Div

isio

n-2

(Kis

hang

anj)

Construction of 5X16.00M H.L.R.C.CBridge over Kankai river under

Kochadhaman Block in 15th km. ofMastan Chowk-Bagalbari-Rahmatpara-

Alta-Barbatta road in the District ofKishanganj [Navin Chandra Sarkar,

Katihar]

Plan

Kis

hang

anj

1648

.000

000

/ 120

71(s

) / 2

7 D

ec 2

017

RC

C/8

3.05

06 O

ct 2

018

05 A

pr 2

020

Work stopped due to flood.

Exte

rnal

Div

isio

n-2

(Kis

hang

anj)

Construction of 3x30.00m H.L. R.C.C.Bridge on River Burhi Kankai of Indo-

Nepal Border Road in the District ofKisanganj at Ch-113.640 [S.P. Singla

Const. Pvt. Ltd.]

Nab

ard

Kis

hang

anj

724.

7100

00 /

7209

(S) /

09

Sep

2013

RC

C/9

0.00

01 O

ct 2

013

30 A

pr 2

016

1. Bridge work Completed 2. Approach road not completeddue to delay in Land Acquisition. 3.As per instruction joint

site inspection report with Road division RCD Kishanganj hasbeen submitted to Dy. CE, works circle no-2 vide this office

lt. No-382(E) dated-11.05.2019 to transfer the project to RoadDiv. RCD.

Exte

rnal

Div

isio

n-2

(Kis

hang

anj)

Construction of 37x30m H.L. R.C.C.Bridge on River Burhi Kankai of IndoNepal Border Road in the District of

Kisanganj at Ch- 109.65 [S.P. Singla Pvt.Ltd.]

Nab

ard

Kis

hang

anj

6654

.940

000

/ 720

9(S)

/ 09

Sep

201

3

RC

C/1

110.

00

30 O

ct 2

013

30 Ju

l 201

6

1. Bridge work Completed 2. Approach road not completeddue to delay in Land Acquisition. 3.As per instruction joint

site inspection report with Road division RCD Kishanganj hasbeen submitted to Dy. CE, works circle no-2 vide this office

lt. No-382(E) dated-11.05.2019 to transfer the project to RoadDiv. RCD.

Page 3: Progress Report of Ongoing Schemes ... - brpnnl.bihar.gov.inbrpnnl.bihar.gov.in/UploadFile/20/01-Oct-2019... · Sub-Structur e (in %) Super-Structur e (in %) Appr oach (in %) Cumulative

8/24/2019 MPR Report :: Jul_2019

3/52

Achievement for the month / till month

Physical Financial

8 260.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/20.00

0.00/405.07

9 246.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/0.00

0.00/2330.22

10 320.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/70.00

0.00/279.65

11 380.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/5.00

0.00/276.28

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Exte

rnal

Div

isio

n-2

(Kis

hang

anj)

Construction of 2x30.00m H.L. R.C.C.Bridge on River Surbhitha of Indo-NepalBorder Road in the District of Kisanganj

at Ch-123.00 [S.P. Singla Const. Pvt.Ltd.]

Nab

ard

Kis

hang

anj

650.

8500

00 /

7209

(s) /

09

Sep

2013

RC

C/6

0.00

01 O

ct 2

013

01 A

pr 2

016 1. Bridge work Completed 2. Approach road not completed

due to delay in Land Acquisition. 3.As per instruction jointsite inspection report with Road division RCD Kishanganj hasbeen submitted to Dy. CE, works circle no-2 vide this office

Exte

rnal

Div

isio

n-2

(Kis

hang

anj)

Construction of 14x30.00m H.L. R.C.C.Bridge on River Maichi of Indo-Nepal

Border Road in the District of Kisanganjat Ch-124.00 [S.P. Singla Const. Pvt.

Ltd.]

Nab

ard

Kis

hang

anj

3729

.170

000

/ 720

9(s)

/ 09

Sep

201

3

RC

C/4

20.0

0

01 O

ct 2

013

30 A

pr 2

016

1. Bridge work Completed 2. Approach road not completeddue to delay in Land Acquisition. 3.As per instruction joint

site inspection report with Road division RCD Kishanganj hasbeen submitted to Dy. CE, works circle no-2 vide this office

lt. No-382(E) dated-11.05.2019 to transfer the project to RoadDiv. RCD.

Exte

rnal

Div

isio

n-2

(Kis

hang

anj)

Construction of 2x30.00m H.L. R.C.C.Bridge on River Surbhitha Local Nala ofIndo-Nepal Border Road in the Districtof Kisanganj at Ch-146.850 [Bhartiya

Infrastructure Pvt. Ltd.]

Nab

ard

Kis

hang

anj

593.

6000

00 /

7209

(s) /

09

Sep

2013

RC

C/6

1.22

01 O

ct 2

013

30 Ju

l 201

5

1. Bridge work Completed 2. Approach road not completeddue to delay in Land Acquisition. 3.As per instruction joint

site inspection report with Road division RCD Kishanganj hasbeen submitted to Dy. CE, works circle no-2 vide this office

lt. No-382(E) dated-11.05.2019 to transfer the project to RoadDiv. RCD.

Exte

rnal

Div

isio

n-2

(Kis

hang

anj)

Construction of 2x30m H.L. R.C.C.Bridge on River Local Nala of Indo-Nepal Border Road in the District of

Kisanganj at Ch-149.00 [BhartiyaInfrastructure Pvt. Ltd.]

Nab

ard

Kis

hang

anj

691.

7300

00 /

7209

(s) /

09

Sep

2013

RC

C/6

0.00

01 O

ct 2

013

30 Ju

l 201

5

1. Bridge work Completed 2. Approach road not completeddue to delay in Land Acquisition. 3.As per instruction joint

site inspection report with Road division RCD Kishanganj hasbeen submitted to Dy. CE, works circle no-2 vide this office

lt. No-382(E) dated-11.05.2019 to transfer the project to RoadDiv. RCD.

Page 4: Progress Report of Ongoing Schemes ... - brpnnl.bihar.gov.inbrpnnl.bihar.gov.in/UploadFile/20/01-Oct-2019... · Sub-Structur e (in %) Super-Structur e (in %) Appr oach (in %) Cumulative

8/24/2019 MPR Report :: Jul_2019

4/52

Achievement for the month / till month

Physical Financial

12 420.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/5.00

0.00/248.75

13 300.00 M 0.00/100.00

0.00/100.00

0.00/90.00

0.00/35.00

0.00/201.84

14 300.00 M 0.00/100.00

0.00/20.00

0.00/0.00

0.00/0.00

17.13/346.67

15 300.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/100.00

0.00/551.61

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Exte

rnal

Div

isio

n-2

(Kis

hang

anj)

Construction of 2x30m H.L. R.C.C.Bridge on River Pahari Local Nala of

Indo-Nepal Border Road in the Districtof Kisanganj at Ch-151.00 [Bhartiya

Infrastructure Pvt. Ltd.]N

abar

d

Kis

hang

anj

555.

6300

00 /

7209

(s) /

09

Sep

2013

RC

C/6

0.00

01 O

ct 2

013

30 Ju

l 201

5

1. Bridge work Completed 2. Approach road not completeddue to delay in Land Acquisition. 3.As per instruction joint

site inspection report with Road division RCD Kishanganj hasbeen submitted to Dy. CE, works circle no-2 vide this office

lt. No-382(E) dated-11.05.2019 to transfer the project to RoadDiv. RCD.

Exte

rnal

Div

isio

n-2

(Kis

hang

anj)

Construction of HL RCC bridge(2x16.00m) including approach road,

diversion and protection work in place ofdamaged road by flood in 2017 in the13th km of Mastan chowk-Bagalbari-

Rahamatpara-Alta-Barbatta road in thedistrict of Kishanganj. [Tirupati Balajee

Earth Work Pvt. Ltd.]

FDR

Kis

hang

anj

442.

7300

00 /

1196

8(s)

/ 21

Dec

201

7

33.2

2

24 M

ar 2

018

23 Ju

n 20

19 1. Railing/Wearing Coat in progress 2. Work progress slowdue to rainy season/flood. 3. Notice to debar issued vide this

office lt. no. 668 dt.- 31.07.2019 4. LD imposed.

Exte

rnal

Div

isio

n-2

(Kis

hang

anj)

Construction of of H.L. RCC bridge(5X16.00 m) in 6th km. of Kishanganj-

Bahadurganj road under FDR in theDistrict of Kishanganj. [Balram Singh]

FDR

Kis

hang

anj

791.

4400

00 /

47 (S

) / 0

2 Ja

n 20

18

83.0

5

28 M

ar 2

018

27 S

ep 2

019 1. Work progress slow due to rainy season/flood. 2. Notice to

debar issued vide this office lt. no. 466 dt.- 03.06.2019 3. LDimposed.

Exte

rnal

Div

isio

n-2

(Kis

hang

anj)

Construction of H.L. RCC bridge(4X16.00 m) in 11th km. of

Bahadurganj-Tedhagach road in theDistrict of Kishanganj. [Binod Kumar

Singh]

FDR

Kis

hang

anj

786.

0000

00 /

1207

3(s)

/ 27

Dec

201

7

66.4

4

24 M

ar 2

018

23 S

ep 2

019

Work Completed

Page 5: Progress Report of Ongoing Schemes ... - brpnnl.bihar.gov.inbrpnnl.bihar.gov.in/UploadFile/20/01-Oct-2019... · Sub-Structur e (in %) Super-Structur e (in %) Appr oach (in %) Cumulative

8/24/2019 MPR Report :: Jul_2019

5/52

Achievement for the month / till month

Physical Financial

16 300.00 M 0.00/100.00

0.00/95.00

0.00/15.00

0.00/20.00

0.00/206.21

17 0.00 M 0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/25.12

18 30.00 M 0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

19 400.00 M 0.00/100.00

0.00/100.00

0.00/60.00

0.00/55.00

0.00/1111.37

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Exte

rnal

Div

isio

n-2

(Kis

hang

anj)

Construction of H.L. R.C.C. bridge(3x16.00m) including approach road,

diversion and protection work in place ofdamaged road in 9th km of Mastan

chowk-Bagalbari-Rahamatpara-Alta-Barbatta road in the district of

Kishanganj. [Bidyanand Gupta]FD

R

Kis

hang

anj

570.

9100

00 /

1207

2(s)

/ 27

Dec

201

7

49.8

3

24 M

ar 2

018

23 Ju

n 20

19 1. Work progress slow due to rainy season/flood. 2. Notice todebar issued vide this office lt. no. 669 dt.- 31.07.2019 3. LD

imposed.

Patn

a-1 (b) Construction of Jan Nayak Karpuri

Chhatrawas Chahar Diwari (Hostel) indistrict Patna.

Wel

fare

Dep

artm

ent

Patn

a

375.

8700

00 /

38(S

) / 1

3 A

pr 2

018

Oth

ers/

0.00

Boundary Wall Completed.

Cha

mpa

ran(

Mot

ihar

i) Construction of High Level R.C.C.Bridge (5x18.00 Mtr.) with approach

road and Protection work on 4.05 KM ofManuapul - Yogapatti-Nawalpur-RatwalRoad over Tirhut Canal in the District ofWest Champaran, Bridge Length - 93.00

Mtr. Pile Foundation.

CR

F

Pach

im C

ham

parn

1324

4.54

0000

/ 12

53(S

) / 1

5 Fe

b 20

18

RC

C/9

3.00

30 Ja

n 20

19

29 Ju

l 202

0

29 Ju

l 202

0

Work order Issued for NOC awaited from WRD

Cha

mpa

ran(

Mot

ihar

i)

Construction of H.L. R.C.C. Bridge(8x16.00m) over Balore River on 1st km.of Narkatiyaganj - Binwalia Road. PileFoundation. M/S Aditya Construction

Pvt. Ltd.

Plan

Pach

im C

ham

parn

1759

.380

000

/ 116

12(s

) / 1

3 D

ec 2

017

RC

C/9

6.00

09 M

ay 2

018

08 M

ay 2

020

08 M

ay 2

020

Work is in Progress

Page 6: Progress Report of Ongoing Schemes ... - brpnnl.bihar.gov.inbrpnnl.bihar.gov.in/UploadFile/20/01-Oct-2019... · Sub-Structur e (in %) Super-Structur e (in %) Appr oach (in %) Cumulative

8/24/2019 MPR Report :: Jul_2019

6/52

Achievement for the month / till month

Physical Financial

20 150.00 M 0.00/85.00

0.00/5.00

0.00/0.00

0.00/0.00

65.95/410.92

21 120.00 M 0.00/100.00

10.00/90.00

5.00/55.00

0.00/20.00

100.00/544.28

22 300.00 M 0.00/40.00

0.00/0.00

0.00/0.00

0.00/0.00

28.33/365.15

23 300.00 M 0.00/40.00

0.00/0.00

0.00/0.00

0.00/0.00

126.39/396.79

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Cha

mpa

ran(

Mot

ihar

i)

Construction of H.L. R.C.C. Bridge(5x12.00m) on 1st Km. of Lauriya -

Sikarpur-Thori Road. Pile FoundationM/S Parmar Construction .

FDR

Pach

im C

ham

parn

862.

0000

00 /

1383

(s) /

21

Feb

2018

RC

C/6

0.00

27 S

ep 2

018

26 D

ec 2

019

26 D

ec 2

019

Work stopped due to flood

Cha

mpa

ran(

Mot

ihar

i)

Construction of H.L. R.C.C. Bridge(7x12.00m) on 1st Km. of Lauriya -

Ramnagar Road. Pile Foundation M/SHaque Construction.

FDR

Pach

im C

ham

parn

1125

.530

000

/ 292

(s) /

10

Jan

2018

RC

C/8

4.00

29 M

ay 2

018

28 N

ov 2

019

28 N

ov 2

019

Work is stopped due to flood but finishing work in progress

Exte

rnal

Pro

ject

Div

isio

n

Construction of H.L. R.C.C.-P.S.C.Bridge with its approach road in 9th K.mof Sour-Patarghat road in the district of

Saharsa.(PKG-29 ) (M/s Jai Mata DiConstruction, Shri Krishnapuri (South),

Begusarai (Bihar)-851101) WB

P Ph

ase-

2

Saha

rsa

1265

.510

000

/ 404

/ 28

May

201

4

HL/

99.0

0

08 M

ar 2

019

07 M

ar 2

021 1. New Scheme started in March 19. 2. A1 Well Cap casted.

3. P1 Well Stenning under completed. 4. A2 Well Stenningunder progress.

Exte

rnal

Pro

ject

Div

isio

n

Construction of H.L. R.C.C.-P.S.CBridge with its approach road in 3rd Km

of Baluwahat Kosibandh via Aghori-Sakra-Paharpur-Baghwa road in the

district of Saharsa.(PKG-13 ) (M/s JaiMata Di Construction, Shri Krishnapuri

(South), Begusarai (Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

1031

.430

000

/ 404

/ 28

May

201

4

HL/

112.

00

08 M

ar 2

019

07 M

ar 2

021 1. New Scheme started in March 19. 2. A2 Well Cap casted.

3. P3 Well Stenning under completed. 4. P1, P2, A1 WellStenning under progress.

Page 7: Progress Report of Ongoing Schemes ... - brpnnl.bihar.gov.inbrpnnl.bihar.gov.in/UploadFile/20/01-Oct-2019... · Sub-Structur e (in %) Super-Structur e (in %) Appr oach (in %) Cumulative

8/24/2019 MPR Report :: Jul_2019

7/52

Achievement for the month / till month

Physical Financial

24 240.00 M 0.00/100.00

0.00/100.00

0.00/100.00

10.00/75.00

35.89/369.37

25 100.00 M 0.00/80.00

0.00/25.00

0.00/0.00

0.00/0.00

0.00/342.49

26 200.00 M 0.00/100.00

0.00/100.00

0.00/100.00

20.00/60.00

0.00/328.06

27 350.00 M 10.00/80.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/596.91

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Cha

mpa

ran(

Mot

ihar

i)

Construction Of H.L. R.C.C. Bridge(4x21.75m) over Pandai River on

Narkatiyaganj - Balthar Road in WestChamparan . Pile Foundation M/S Rohan

Construction Pvt. Ltd. Nab

ard

RWD

Pach

im C

ham

parn

524.

0600

00 /

9379

(s) /

11

Dec

201

7

RC

C/8

7.00

20 O

ct 2

018

19 Ja

n 20

20

19 Ja

n 20

20

Bridge work completed Approach Road in Progress

Exte

rnal

Pro

ject

Div

isio

n Construction of H.L, R.C.CBridge(3X25) with its approach road in

along Kakurwa Dhar in 24th Km ofChandradei-Bangama-paktola-Matiary-Mongra road in the district of Araria.

{Nirman Engicons Pvt. Ltd., At + P.O.-Mohanpur, District-Begusarai

(Bihar)-851131}(PKG41)

WB

P Ph

ase-

2

Ara

ria

757.

7600

00 /

404

/ 28

May

201

4

75.0

0

27 F

eb 2

016

26 A

ug 2

017

30 Ju

n 20

19 1. A2 & P2 well cap completed. 2. A1,P1stenning in progress.3. Contractor is debarred. 4. By June,2020 it will be

completed. 5. LD is imposed. 6. Due to flood work is stopped.

Cha

mpa

ran(

Mot

ihar

i)

Construction Of H.L. R.C.C. Bridge(3x18.75m) over Harpatbeni River on

Sukhlahi Path. Pile Foundation. M/S SG.Piling and Construction Pvt. Ltd. N

abar

d RW

D

Pach

im C

ham

parn

571.

2700

00 /

180

/ 16

Jan

2017

RC

C/5

6.00

19 F

eb 2

018

18 A

ug 2

019

18 A

ug 2

019

Bridge work completed Approach Road in progress

Exte

rnal

Pro

ject

Div

isio

n Construction of H.L., R.C.C.Bridge(3X25) with its approach roadover Tilyuga river in Theho village-

Sonapur road in Dagmara Panchyat ofNirmali block in the District of Supaul.

(Devraha Construction Pvt. Ltd., GoutamNagar, Ward No.-12, Saharsa-852201)

(PKG-38 B)

WB

P Ph

ase-

2

Supa

ul

867.

7700

00 /

770

/ 25

Sep

2014

HL/

75.0

0

15 F

eb 2

017

14 F

eb 2

019 1. Abutment A1, P2 Plugging completed. 2. A2-P2 Well Cap

completed. 3. P1 & A2 stenning work in progress. 4. LD isimposed.

Page 8: Progress Report of Ongoing Schemes ... - brpnnl.bihar.gov.inbrpnnl.bihar.gov.in/UploadFile/20/01-Oct-2019... · Sub-Structur e (in %) Super-Structur e (in %) Appr oach (in %) Cumulative

8/24/2019 MPR Report :: Jul_2019

8/52

Achievement for the month / till month

Physical Financial

28 350.00 M 5.00/60.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/596.91

29 350.00 M 0.00/100.00

0.00/100.00

15.00/90.00

0.00/40.00

90.16/1100.20

30 0.00 M 15.00/40.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/25.12

31 350.00 M 0.00/100.00

0.00/100.00

0.00/30.00

0.00/20.00

30.00/315.27

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Exte

rnal

Pro

ject

Div

isio

n Construction of H.L., R.C.C.Bridge(4X25)with its approach road overTilyuga river besides screw pile bridge in

Kewtapatti-Nirmali Bazar road inNirmali Block in the district of Supaul.

(Devraha Construction Pvt. Ltd., GoutamNagar, Ward No.-12, Saharsa-852201)

(PKG-38 A)W

BP

Phas

e-2

Supa

ul

1172

.780

000

/ 770

/ 25

Sep

201

4

HL/

100.

00

15 F

eb 2

017

14 F

eb 2

019

1. Abutment A1 Plugging Completed. 2. Pier P1 in pluggingstage. 3. P2 & P3 well stenning in progress. 4. Abutment A2well curb in progress. 5. Land Acquition by perpetual lease is

under process and request has been sent to RWD forallotment. 6. LD is imposed.

Exte

rnal

Pro

ject

Div

isio

n Construction R.C.C. Bridge(7X25) withits approach road in Dubhari-Chakla

Ghat to Kosi Embankment road (NearSpur) on 57.20 R.D. of Kosi

Embankment in the district of Supaul.{Vishwanath Sharma, Vill. + P.O.-

Rahua, P.S.-Rosera, District- Samastipur-848210 (Bihar)}(PKG-34 )

WB

P Ph

ase-

2

Supa

ul

1530

.910

000

/ 404

/ 28

May

201

4

HL/

175.

00

17 O

ct 2

016

16 O

ct 2

018

1. All Deck Slab Completed. 2. Railing work in progress. 3.Earth work in progress. 4. Land Acquition by perpetual leaseis under process and Six man committee has submitted thereport and request has been sent to RWD for allotment. 5.

People is asking for higher rate from D.M. 6. By the help ofadministration the work is started. 7. Press release is

published for Perpetual Lease of Land.

Patn

a-1

(a) Construction of Jan Nayak KarpuriChhatrawas (Hostel) in district Patna.

Wel

fare

Dep

artm

ent

Patn

a

375.

8700

00 /

38(S

) / 1

3 A

pr 2

018

Oth

ers/

0.00 106/122 Pile work completed. Pile Cap work is under

progress.

Exte

rnal

Pro

ject

Div

isio

n Construction of H.L, R.C.CBridge(2X28)with its approach road in14th K.M. of Chaudhara-Amha-Lokha-Saharsa road in Place of damaged OldR.C.C Bridge in the district of Saharsa.

(Sincon Infrastructure Pvt. Ltd., S.KPuri, LG-1 & 2, Majestic Plaza, WestBoring Canal Road, Patna-800001)

(PKG-32)

WB

P Ph

ase-

2

Saha

rsa

870.

0000

00 /

609

/ 25

Jul 2

014

HL/

56.0

0

27 F

eb 2

016

26 A

ug 2

017

30 Ju

n 20

19

1. 3/6 Girder Casted. 2. A1-P1 slab reinforcement in progress.3. P1-A2 Girder Stagging-Shuttering under progress. 4.

Approach road work in Progress. 5. By December,2019 it willbe completed. 6. LD is imposed.

Page 9: Progress Report of Ongoing Schemes ... - brpnnl.bihar.gov.inbrpnnl.bihar.gov.in/UploadFile/20/01-Oct-2019... · Sub-Structur e (in %) Super-Structur e (in %) Appr oach (in %) Cumulative

8/24/2019 MPR Report :: Jul_2019

9/52

Achievement for the month / till month

Physical Financial

32 200.00 M 0.00/100.00

0.00/100.00

0.00/100.00

10.00/80.00

20.11/558.22

33 0.00 M 0.00/100.00

10.00/100.00

20.00/100.00

0.00/0.00

65.00/546.93

34 300.00 M 0.00/100.00

0.00/100.00

16.00/76.00

0.00/10.00

0.00/1598.09

35 0.00 M 0.00/100.00

5.00/100.00

0.00/100.00

0.00/0.00

0.00/25.56

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Cha

mpa

ran(

Mot

ihar

i)

Construction of H.L. R.C.C. Bridge(4x21.75 m) on 7th km. of Balther -

Narkatiyaganj Road over Kartaha River.Pile Foundation. M/S SG Piling and

Construction Pvt. Ltd. Nab

ard

RWD

Pach

im C

ham

parn

716.

6100

00 /

179

/ 16

Jan

2017

RC

C/8

7.00

19 F

eb 2

018

18 A

ug 2

019

18 A

ug 2

019

Bridge work completed Approach Road in Progress

Patn

a-1

Construction of Incubation Centre I.I.T.Patna (Bihta) O

ther

s

Patn

a

1640

.700

000

/ / 1

7 N

ov 2

016

Oth

ers/

0.00

06 O

ct 2

018

05 A

pr 2

020

Finishing & Utility work in progress.

Exte

rnal

Pro

ject

Div

isio

n

Construction of H.L, R.C.CBridge(7X33) with its approach road in

5th K.M. of Chhatapur-Girdharpu-Chunni road in the district of Supaul.

(Lall Construction Co., AA-105,Shalimar Bagh, Delhi-110088)(PKG-25) W

BP

Phas

e-2

Supa

ul

1988

.260

000

/ 404

/ 28

May

201

4

HL/

231.

00

14 F

eb 2

017

13 F

eb 2

019 1. 21/21 Girder completed. 2. 5/7 Deck Slab completed. 3.

Earth work in progress. 4. By December,2019 it will becompleted. 5. EOT applied bt Contractor upto

December,2019. 6. LD is imposed.

Patn

a-1

Construction of Accomodation withtoilet facility for Pataients and theirattendents in the campus of Indira

Ghandhi Institute of Medical Sciences(IGIMS) Patna (Total Area 2712sqft)

Plan

Patn

a

92.0

0000

0 / 2

22/1

8 / 2

9 Se

p 20

18

Oth

ers/

0.00

15 F

eb 2

019

14 N

ov 2

019

Roof Slab Casting Completed. Brick work completed.Finishing work under progress.

Page 10: Progress Report of Ongoing Schemes ... - brpnnl.bihar.gov.inbrpnnl.bihar.gov.in/UploadFile/20/01-Oct-2019... · Sub-Structur e (in %) Super-Structur e (in %) Appr oach (in %) Cumulative

8/24/2019 MPR Report :: Jul_2019

10/52

Achievement for the month / till month

Physical Financial

36 300.00 M 0.00/100.00

0.00/30.00

0.00/0.00

0.00/0.00

0.00/1481.28

37 320.00 M 0.00/100.00

0.00/100.00

0.00/100.00

10.00/100.00

0.00/1225.01

38 200.00 M 0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/1.33

39 350.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/85.00

0.00/124.50

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Exte

rnal

Pro

ject

Div

isio

n

Construction of H.L, R.C.CBridge(4X33) with its approach road in15th K.M. of Ranginiya-Sonbarsa Roadin Palce of Old S.P. Bridge in the districtof Saharsa. (Lall Construction Co., AA-

105, Shalimar Bagh, Delhi-110088)(PKG-24)

WB

P Ph

ase-

2

Saha

rsa

1549

.360

000

/ 404

/ 28

May

201

4

HL/

132.

00

29 Ju

n 20

17

28 Ju

n 20

19

30 Ju

n 20

20

1. Foundation completed progress. 2. A2 and P3 Shaft CapCompleted. 3. P2 Shaft Completed. 4. Due to encrochment atsite in Bridge alignment work started in the month of March2018 starting. Encrochment was removed with the help of

administration in Feb.2018 and work started in march. 5. ByJune,2020 it will be completed. 6. EOT applied by Contractor

upto March,2020.

Exte

rnal

Pro

ject

Div

isio

n Construction of H.L, R.C.CBridge(4X33) with its approach road in

15th Km in Khurhan-Parel-Ratwara-Kapasia road on Laliya Dhar in the

district of Madhepura. (Extended part ofRCD road 0 to 15 k.m.) {M/s Sri RamEnterprises, 2nd Floor, Sri ram Tower,M.P.D.Road, Naya Bazar, Bhagalpur-

812002 (Bihar)}(PKG-23)

WB

P Ph

ase-

2

Mad

hepu

ra

1274

.290

000

/ 404

/ 28

May

201

4

HL/

132.

00

13 S

ep 2

017

12 S

ep 2

019

Completed.

Patn

a-1

Construction of H.L. R.C.C. Bridge(6x18.00m) over river Punpun betweenNashopur (Naubatpur Block) PoaawanGhat (Masaudhi Block) in Kahaguri-Khaurat Road in the district of Patna.

Plan

Patn

a

1369

.000

000

/ 229

6(S)

/ 05

Mar

201

9

RC

C/1

08.0

0

Tender under Process.

Exte

rnal

Pro

ject

Div

isio

n

Construction of H.L, R.C.CBridge(1X21) with its approach road in

Chandradei-Kamaldha-Paratha roadalong Laliahi Dhar in 2nd Km in the

district of Araria.(Tirupati Balaji EarthWork Pvt. Ltd., A/230, P.C. Colony,

Kankarbagh, Patna-800020)(PKG-22)

WB

P Ph

ase-

2

Ara

ria

509.

9500

00 /

404

/ 28

May

201

4

HL/

21.0

0

27 F

eb 2

016

26 M

ay 2

017

1. Bridge work completed and opened for traffic. 2. WMMunder Progress (B) EOT applied by Agency to SPE office. (C

) Land dispute created by local villagers during WMMwork.Letter Written to Administration for resolving the issueand follow up being done with them to speed up in resolving

the issue.

Page 11: Progress Report of Ongoing Schemes ... - brpnnl.bihar.gov.inbrpnnl.bihar.gov.in/UploadFile/20/01-Oct-2019... · Sub-Structur e (in %) Super-Structur e (in %) Appr oach (in %) Cumulative

8/24/2019 MPR Report :: Jul_2019

11/52

Achievement for the month / till month

Physical Financial

40 100.00 M 25.00/60.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/5.20

41 160.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/90.00

43.48/819.36

42 350.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/70.00

43.48/819.35

43 380.00 M 0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Patn

a-1 Construction of H.L. R.C.C. Bridge

(6x18.00m) in place of damaged bridgein 12th Km of Pali-Ullar-Masaudhi Roadunder Pali Block in the district of Patna.

Plan

Patn

a

1346

.310

000

/ 746

1(S)

/ 26

Sep

201

8

RC

C/0

.00

06 M

ar 2

019

05 M

ar 2

021

54/54 Pile Completed.

Exte

rnal

Pro

ject

Div

isio

n

Construction of H.L, R.C.CBridge(1X33) with its approach road in

3rd K.M. Sesouni-East KoshiEmbankment (near Khakhi) in the district

of Supaul.(Tirupati Balaji Earth WorkPvt. Ltd., A/230, P.C. Colony,

Kankarbagh, Patna-800020)(PKG-21B )

WB

P Ph

ase-

2

Supa

ul

387.

2900

00 /

404

/ 28

May

201

4

HL/

33.0

0

27 F

eb 2

016

26 F

eb 2

018

30 A

pr 2

019

1. Bridge work copmleted. 2. Eatrh Work in progress. 3. LD isimposed.

Exte

rnal

Pro

ject

Div

isio

n

Construction of H.L, R.C.CBridge(2X25) with its approach road in3rd K.M. of Supaul Station to Bariya

Manch in the district of Supaul.(TirupatiBalaji Earth Work Pvt. Ltd., A/230, P.C.

Colony, Kankarbagh, Patna-800020)(PKG-21A )

WB

P Ph

ase-

2

Supa

ul

943.

4700

00 /

404

/ 28

May

201

4

HL/

50.0

0

27 F

eb 2

016

26 F

eb 2

018

30 A

pr 2

019

1. Bridge work copmleted. 2. WMM work completed. 3. LDis imposed.

Exte

rnal

Pro

ject

Div

isio

n

Construction of H.L, R.C.CBridge(4X21) in 13th Km of Nasir

Chowk Belwa Mazgama-Mongara roadin the district of Araria.(Braj KishoreRoy, Village-Kamrgama, Post-TiraJatmalpur, P.S-Kalyanpur, District-

Samastipur-847301)(PKG-20)

WB

P Ph

ase-

2

Ara

ria

775.

0000

00 /

552

/ 26

Oct

201

8

84.0

0

02 M

ar 2

016

01 Ju

n 20

17

1. Design Changed from pile to well and No. of span alsoincreased from 3 to 4. 2. Estimate for revise AA is approvedfrom BAPEPS Letter No.-552/2018 Dated-26.10.2018 andapproval of varriation awaited. 3. Contractor is not intrestedto start work due to old rate and has requested to cancel the

agreement.

Page 12: Progress Report of Ongoing Schemes ... - brpnnl.bihar.gov.inbrpnnl.bihar.gov.in/UploadFile/20/01-Oct-2019... · Sub-Structur e (in %) Super-Structur e (in %) Appr oach (in %) Cumulative

8/24/2019 MPR Report :: Jul_2019

12/52

Achievement for the month / till month

Physical Financial

44 475.00 M 0.00/100.00

0.00/100.00

0.00/60.00

0.00/5.00

107.50/564.80

45 475.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/75.00

107.50/564.80

46 1700.00M

0.00/100.00

0.00/100.00

0.00/95.00

0.00/80.00

0.00/904.37

47 250.00 M 0.00/100.00

0.00/100.00

20.00/35.00

0.00/10.00

0.00/1274.75

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Exte

rnal

Pro

ject

Div

isio

n

Construction of H.L, R.C.CBridge(2X25) with its approach road in25th K.M. of Falka-Sripur-Bhawanipur-Karman Chowk road (at Balia Ghat) inthe District of Purnea.{Basant VanijyaLimited, Lakhibagh, Manpur, Gaya-

825003 (Bihar)}(PKG-19B)W

BP

Phas

e-2

Purn

ia

608.

4500

00 /

404

/ 28

May

201

4

50.0

0

27 F

eb 2

016

26 F

eb 2

018

31 M

ay 2

019 1. 1/2 Deck Slab Casted. 2. A1-P1 Deck Salb shuttering under

Progress. 3. By December,2019 it will be completed. 4. Socause issued to contractor and LD is imposed.

Exte

rnal

Pro

ject

Div

isio

n

Construction of H.L, R.C.CBridge(2x25) with its approach road in4th K.M. of Falka-Sripur-Bhawanipur-Karman Chowk road in the District of

Purnea. {Basant Vanijya Limited,Lakhibagh, Manpur, Gaya-825003

(Bihar)} (PKG- 19 A)

WB

P Ph

ase-

2

Purn

ia

685.

3300

00 /

404

/ 28

May

201

4

HL/

50.0

0

27 F

eb 2

016

26 F

eb 2

018

31 M

ay 2

019 1. Bridge Completed. 2. GSB work in approach road under

progress. 3. By December,2019 it will be completed. 4. Socause issued to contractor and LD is imposed.

Exte

rnal

Pro

ject

Div

isio

n Construction of H.L, R.C.CBridge(3X33) in 11th K.M. of Baluwahatkoshi bandh via Aghori-Sakra-Paharpur-Baghwa road in Place of SP Bridge in the

district of Saharsa. (DevrahaConstruction Pvt. Ltd., Goutam Nagar,Ward No.-12, Saharsa-852201) (PKG-

18)

WB

P Ph

ase-

2

Saha

rsa

1632

.710

000

/ 404

/ 28

May

201

4

99.0

0

29 S

ep 2

016

29 S

ep 2

018

31 M

ar 2

019 1. 3/3 Deck Slab Completed 2. Crash Barrier casting under

progres. 3. WMM work under progress. 4. LD is imposed. 5.By August,2019 it will be completed.

Exte

rnal

Pro

ject

Div

isio

n Construction of H.L, R.C.CBridge(2X28) with its approach road in

4th K.M. of Parsara-Chikni road(Bardwari Station-Simra road) in Placeof damaged Old R.C.C. Bridge in the

district of Supaul. (Lall Construction Co.,AA-105, Shalimar Bagh, Delhi-110088)

(PKG-16C)

WB

P Ph

ase-

2

Supa

ul

792.

7400

00 /

609

/ 25

Jul 2

014

HL/

56.0

0

12 A

ug 2

017

11 A

ug 2

019 1. 3/6 Girder completed and other Girder staging work in

progress. 2. Earth work in progress. 3. By December,2019 itwill be completed. 4. LD is imposed.

Page 13: Progress Report of Ongoing Schemes ... - brpnnl.bihar.gov.inbrpnnl.bihar.gov.in/UploadFile/20/01-Oct-2019... · Sub-Structur e (in %) Super-Structur e (in %) Appr oach (in %) Cumulative

8/24/2019 MPR Report :: Jul_2019

13/52

Achievement for the month / till month

Physical Financial

48 40.00 M 0.00/100.00

0.00/85.00

0.00/0.00

0.00/15.00

0.00/472.08

49 200.00 M 0.00/100.00

0.00/100.00

5.00/10.00

0.00/0.00

0.00/1221.43

50 495.00 M 0.00/100.00

0.00/100.00

0.00/40.00

0.00/30.00

0.00/384.28

51 320.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/60.00

55.85/702.68

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Cha

mpa

ran(

Mot

ihar

i)

Construction of 7x25M size Bridge inMadanpur-Bhangha Road in Chainage43.400 Km Pakage No. 03.C.K.Infra

structureN

abar

d -I

ndo-

Nep

al-R

IDF-

XV

III

Pach

im C

ham

parn

1402

.910

000

/ 216

0(s)

/ 14

Mar

201

3

RC

C/1

75.0

0

30 N

ov 2

016

30 Ju

l 201

8

31 D

ec 2

019

Work is stopped due to flood

Exte

rnal

Pro

ject

Div

isio

n

Construction of H.L, R.C.CBridge(2X25) in 4th K.M. of Perserma-

Chikni road in Palce of damaged Old S.P.Bridge (on Khardaha Dhar) in the districtof Supaul. (Lall Construction Co., AA-

105, Shalimar Bagh, Delhi-110088)(PKG-16B)

WB

P Ph

ase-

2

Supa

ul

550.

6600

00 /

404

/ 28

May

201

4

HL/

50.0

0

12 A

ug 2

017

11 A

ug 2

019

1. 1/6 Girder completed. 2. By December,2019 it will becompleted. 3. LD is imposed.

Exte

rnal

Pro

ject

Div

isio

n

Construction of H.L, R.C.CBridge(5X21) with its approach road in

11th K.m of Chandradei-Bangama-Matiyari-Mogra road in the district of

Araria.(PKG-10) {Nirman Engicons Pvt.Ltd., At + P.O.- Mohanpur, District-Begusarai (Bihar)-851131}(PKG-10)

WB

P Ph

ase-

2

Ara

ria

857.

6100

00 /

404

/ 28

May

201

4

HL/

105.

00

27 F

eb 2

016

26 A

ug 2

017

30 Ju

n 20

19

1. 2/5 deck slab completed. 2. P2-P3 span Girderreinforcement under progress. 4. Approach road work underprogress. 5. Contactor is debarred. 6. By June,2020 it will becompleted. 7. LD is imposed. 8. Due to flood work is stopped

Exte

rnal

Pro

ject

Div

isio

n

Construction of H.L, R.C.CBridge(2X21) with its approach road in5th K.m of Alamnagar-Budhma- Mali

road in the district of Madhepura. (HaqueConstruction Co., Sarai Syed Ali,Muzaffarpur-842001)(PKG-7B) W

BP

Phas

e-2

Mad

hepu

ra

595.

8000

00 /

404

/ 28

May

201

4

HL/

42.0

0

07 D

ec 2

016

06 D

ec 2

018

31 Ju

l 201

9 1. Bridge Completed. 2. GSB completed. 3. Vehiclemovement started. 4. By July,2019 it will be completed. 5. LDis imposed and show-cause asked. 6. Debared from Division.

Page 14: Progress Report of Ongoing Schemes ... - brpnnl.bihar.gov.inbrpnnl.bihar.gov.in/UploadFile/20/01-Oct-2019... · Sub-Structur e (in %) Super-Structur e (in %) Appr oach (in %) Cumulative

8/24/2019 MPR Report :: Jul_2019

14/52

Achievement for the month / till month

Physical Financial

52 200.00 M 0.00/100.00

0.00/100.00

45.00/95.00

10.00/10.00

44.00/305.32

53 320.00 M 0.00/100.00

0.00/100.00

0.00/80.00

0.00/0.00

55.85/702.69

54 200.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/90.00

0.00/394.94

55 1500.00M

0.00/84.00

0.00/67.00

0.00/65.00

0.00/12.00

0.00/3947.28

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Dar

bhan

ga Construction of HL RCC bridge in 3rdkm of (5x16.50M) Bindha gamaChaksaho Road in the District of

Samastipur.FD

R

Sam

astip

ur

760.

7100

00 /

1676

(s) /

05

Mar

201

8

RC

C/8

2.50

10 O

ct 2

018

31 D

ec 2

019

31 D

ec 2

019

work in progress.

Exte

rnal

Pro

ject

Div

isio

n Construction of H.L, R.C.CBridge(4x25) with its approach road in10th K.m in Khurhan-Parel-Ratwara-

Kapasia road in the district of Madhepura(Extended part of RCD road 0 to 15

k.m.) (Haque Construction Co., SaraiSyed Ali, Muzaffarpur-842001

(PKG.7A)

WB

P Ph

ase-

2

Mad

hepu

ra

851.

6700

00 /

404

/ 28

May

201

4

HL/

100.

00

07 D

ec 2

016

06 D

ec 2

018

31 Ju

l 201

9 1. All Deck Slab Completed & Crash Barrier work inprogress. 2. By October,2019 it will be completed. 3. LD isimposed and show-cause asked. 4. Debared from Division.

Dar

bhan

ga Construction of HL RCC bridge inTajpur-Halai Road in 14th KM of Noon

River (5x21.75M) in the District ofSamastipur

Plan

Sam

astip

ur

879.

1000

00 /

1207

7(s)

/ 27

Dec

201

7

RC

C/1

08.7

5

11 A

pr 2

018

10 O

ct 2

019

Traffic Started. Work is Complete

Dar

bhan

ga

Construction of HLRCC bridge withLand acquisition ,approach road and

protection work in kareh river betweenhasanpur to soharwa sati ghat in

samastipur distrcit(21x24.00 m)RamKripal Singh Constructon Pvt Ltd., RCD

Plan

Sam

astip

ur

6813

.400

000

/ 717

1(s)

/ 05

Aug

201

5

RC

C/5

16.6

4

01 A

ug 2

015

30 O

ct 2

018

30 Ju

n 20

20 Section-37 completed & Payment being made to Raiyats

Remarks for LA: Section-37 completed & Payment beingmade to Raiyats

Page 15: Progress Report of Ongoing Schemes ... - brpnnl.bihar.gov.inbrpnnl.bihar.gov.in/UploadFile/20/01-Oct-2019... · Sub-Structur e (in %) Super-Structur e (in %) Appr oach (in %) Cumulative

8/24/2019 MPR Report :: Jul_2019

15/52

Achievement for the month / till month

Physical Financial

56 300.00 M 0.00/100.00

0.00/100.00

0.00/60.00

0.00/25.00

0.00/1382.10

57 300.00 M 0.00/100.00

0.00/100.00

0.00/95.00

0.00/40.00

0.00/1382.10

58 650.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/85.00

0.00/2997.49

59 780.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/80.00

0.00/1469.39

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Exte

rnal

Pro

ject

Div

isio

n

Construction of H.L, R.C.CBridge(2X25) with its approach road in

7th K.m of Panchgachhiya-Nauhatta roadin Palce of damaged Old R.C.C Bridge inthe district of Saharsa. (Lall Construction

Co., AA-105, Shalimar Bagh, Delhi-110088)(Package- 3 B)

WB

P Ph

ase-

2

Saha

rsa

764.

6700

00 /

609

/ 25

Jul 2

014

HL/

50.0

0

21 D

ec 2

016

20 D

ec 2

018

30 Ju

n 20

19 1. 1/2 Deck Slab Casted. 2. Approach Road under progress. 3.Due to local hindrance in fixing alignment work delayed. 4.By December,2019 it will be completed. 5. LD is imposed.

Exte

rnal

Pro

ject

Div

isio

n

Construction of H.L, R.C.CBridge(2X33) with its approach road in3rd K.M. of Panchgachhiya - NauhattaRoad in Palce of Old S.P. Bridge in thedistrict of Saharsa. (Lall ConstructionCo., AA-105, Shalimar Bagh, Delhi-

110088)( Package- 3 A)

WB

P Ph

ase-

2

Saha

rsa

1018

.280

000

/ 404

/ 28

May

201

4

HL/

66.0

0

21 D

ec 2

016

20 D

ec 2

018

30 Ju

n 20

19 1. 2/2 Deck Slab Completed. 2. Wearing Coat under Progress.3. Aproach road under Progress. 4. By December,2019 it will

be completed 5. LD is imposed.

Dar

bhan

ga Construction of HLRCC bridge at kakarghat in rosra morwara road in kareh

river(16x24.75 m) Shiv KishoreConstruction Pvt. Ltd.,9431858543 N

abar

d R

CD

Sam

astip

ur

3009

.420

000

/ 780

2(s)

/ 13

Jul 2

012

RC

C/4

05.8

0

30 D

ec 2

012

30 M

ar 2

015

Traffic Started

Remarks for LA: Rs.171.92 Lacs has been deposited toDLAO Samastipur vide letter no.-949 dated-02.09.2013.

Rs.-5.93 Lacs has been Deposited to DLAO Samastipur forPayment of SIA Work Vide Letter No-40(WE) date-

10.01.2019 . SIA work completed. Public Hearing done.

Dar

bhan

ga Construction of HLRCC bridge at angarghat in the budhi gandak river (10x24.75

m) Braj Kishor Rai,9430800861

Nab

ard

RC

D

Sam

astip

ur

2096

.720

000

/ 158

3(s)

/ 09

Feb

201

2

RC

C/2

53.6

4

30 M

ar 2

012

30 Ju

l 201

4

Traffic Started

Remarks for LA: Traffic Started Rs. 231.65 Lacs has beenDeposited to DLAO Samastipur vide letter No 487 dated06.06.2015. Rs.-3.7 Lacs has been Deposited to DLAO

Samastipur for Payment of SIA Work Vide letter no-29 Date-04.01.2019 SIA work completed. Public Hearing done.

Page 16: Progress Report of Ongoing Schemes ... - brpnnl.bihar.gov.inbrpnnl.bihar.gov.in/UploadFile/20/01-Oct-2019... · Sub-Structur e (in %) Super-Structur e (in %) Appr oach (in %) Cumulative

8/24/2019 MPR Report :: Jul_2019

16/52

Achievement for the month / till month

Physical Financial

60 65.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/80.00

0.00/153.16

61 290.00 M 20.00/25.00

0.00/0.00

0.00/0.00

0.00/0.00

181.87/185.17

62 0.00 M 0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/8.59

63 1620.00M

1.00/78.00

0.00/55.00

5.00/40.00

0.00/0.00

0.00/1300.56

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Dar

bhan

ga

costruction of HLRCC bridge in NH-28through chand chourdih to pathan tol

before river under ujiyarpur block(2x14.50).Sri RajeshKumar,94308343626

MM

SNY

Sam

astip

ur

204.

5900

00 /

7370

(s) /

06

Aug

201

4

RC

C/3

0.26

30 S

ep 2

014

30 S

ep 2

015 Work competed traffic started.

Remarks for LA: SIA Work is in Progress. Rs.-2.13 Lacs hasbeen Deposited to DLAO Samastipur for Payment of SIA

Work vide letter no-175 date-20.02.2019

Patn

a-1

Construction of H.L. R.C,.C. bridgeMusnaper to Masaurhi-Noubatpur via

duct NH-83 Potahi & Patna GayaRailway line cross 20 km in between

Shahwajpur, Block-Punpu and ChakkanBigha, Block-Noubatpur Approach road,Protection work with LA (6x18m)on the

punpun river.

Plan

Patn

a

1427

.170

000

/ 446

4(s)

/ 14

Jun

2018

RC

C/1

11.6

0

05 M

ar 2

019

04 M

ar 2

021

A1-12/12 P1-6/6 P2-6/6 P3-6/6 P4-6/6 P5-1/6 Total - 37/54Pile Completed.

Patn

a-1

Construction of left turning ramp 9 ExtraArm) connecting Newly constructedMithapur-Chiraiyatand via Railway

Station Flyover (P30-P31) withChiraiyatand Exhibition Road Flyover in

Patna.

Plan

Patn

a

818.

0000

00 /

8573

(S) /

15

Nov

201

8

RC

C/0

.00

09 M

ar 2

019

08 D

ec 2

019

Rig Machine mobilized, survey work for pile is underprogress.

Dar

bhan

ga

Construction of HLRCC bridge withLand acquisition ,approach road and

protection work near jhanjharpur at oldNH-57 in kamala balan river in

madhubani distrcit(9x24.00 m)TusharConstruction Company, Gaziabad., RCD

Plan

Mad

huba

ni

4197

.050

000

/ 622

0(S)

/ 09

Jul 2

015

RC

C/2

21.4

4

27 A

pr 2

016

27 D

ec 2

018

30 Ju

n 20

20 WORK IN PROGRESS

Remarks for LA: In LA section-19 is in Progress.

Page 17: Progress Report of Ongoing Schemes ... - brpnnl.bihar.gov.inbrpnnl.bihar.gov.in/UploadFile/20/01-Oct-2019... · Sub-Structur e (in %) Super-Structur e (in %) Appr oach (in %) Cumulative

8/24/2019 MPR Report :: Jul_2019

17/52

Achievement for the month / till month

Physical Financial

64 320.00 M 0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

2.89/53.52

65 330.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/50.00

0.00/369.77

66 100.00 M 5.00/100.00

5.00/100.00

5.00/95.00

15.00/25.00

78.24/651.21

67 290.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/95.00

0.00/653.97

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Patn

a-1 Construction of Cable Suspension Bridge

(Laxman Jhula) across Punpun River atPunpun ghat at the east side of Railway

bridge in district PatnaPl

an

Patn

a

4677

.290

000

/ 116

6(S)

/ 31

Jan

2019

Oth

ers/

0.00

Tender under Process.

Dar

bhan

ga costruction of HLRCC bridge at damlaghat in bisfi block (3x21.75 m) SriKrishna Kant Thakur,9430897941 M

MSN

Y

Mad

huba

ni

470.

4700

00 /

8291

(s) /

01

Sep

2014

RC

C/6

7.12

01 O

ct 2

014

01 Ja

n 20

16

Remarks for LA: One side B.T. approach and other sideEarthen approach completed. Traffic Started. In LA, SIA

completed .Expert committee to be formed.

Patn

a-1 Construction of H.L.R.C.C. Bridge

5x24.0 m in Punpun River in 11th Km ofMasaurhi-Naubatpur Pitmas Road in

Patna District.

Plan

Patn

a

1155

.000

000

/ 878

0(s)

/ 09

Oct

201

7

RC

C/1

20.0

0

25 A

pr 2

018

26 O

ct 2

019 Foundation Completed. Sub-structure Completed. Girder &

Dec Slab of all five span is completed. Expension joint &Retaining Wall under progress.

Dar

bhan

ga

Construction of HLRCC bridge withLand acquisition ,approach road and

protection work in tilyuga river betweendwalak village and janki nagar tola under

madhepur block in the district ofmadhubani (5x18.75 m)Shreem

Construction,9470627503

BD

F

Mad

huba

ni

995.

7400

00 /

1867

(s) /

03

Mar

201

4

RC

C/9

6.84

30 Ju

n 20

15

30 O

ct 2

014

31 D

ec 2

018

Approach upto GSB complted. B.T. work could not be doneas there is no access of Road Rollar to the Site. Traffic

Started.

Remarks for LA: Darbhanga- Section-19 in progressSamastipur- Security force deployment has been ordered as

land found to be govt, Land

Page 18: Progress Report of Ongoing Schemes ... - brpnnl.bihar.gov.inbrpnnl.bihar.gov.in/UploadFile/20/01-Oct-2019... · Sub-Structur e (in %) Super-Structur e (in %) Appr oach (in %) Cumulative

8/24/2019 MPR Report :: Jul_2019

18/52

Achievement for the month / till month

Physical Financial

68 585.00 M 0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/327.29

69 400.00 M 0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/139.93

70 250.00 M 0.00/100.00

0.00/100.00

0.00/100.00

25.00/25.00

23.54/394.89

71 2000.00M

0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/282.38

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Patn

a-1

Construction of Pontoon Bridge in riverGanga between Kachidargah to

Rustampur (Raghopur) (includingsetting, Resetting for 5 Years) of

Raghopur Block in district Vaishali.Pl

an

Patn

a

751.

5700

00 /

1180

4(s)

/ 19

Dec

201

7

Pont

oon

Brid

ge/0

.00

06 F

eb 2

018

15 Ju

n 20

22 Pontoon Sets dismantled from dated-09.07.2019 (MonsoonPeriod) and will be Re-installed after Monsoon.

Patn

a-1

Construction of Pontoon Bridge in riverGanga between Gyaspur to KaladiyaraDiyara (including opening & Resettingfor 5 Years) of Bakhtiyarpur Block in

district Patna.

Non

-Pla

n

Patn

a

582.

2300

00 /

1196

4(s)

/ 21

Dec

201

7

Pont

oon

Brid

ge/0

.00

06 F

eb 2

018

15 Ju

n 20

22 Pontoon Sets dismantled from dated-09.07.2019 (MonsoonPeriod) and will be Re-installed after Monsoon.

Dar

bhan

ga

Construction of HL RCC bridge(4x14.50M) Ujjan PWD Road in

Ghanshyampur Kathbara-Lagma KkoraMcheta-Lalpatti Road of 11.10 KM in(4x14.50 m) the District of Darbhanga.

Royal Engineers.

FDR

Dar

bhan

ga

842.

0500

00 /

289(

s) /

10 Ja

n 20

18

58.0

0

05 M

ay 2

018

04 N

ov 2

019

04 N

ov 2

019

Patn

a-1 Construction of Pontoon Bridge in river

Ganga between Danapur to PanapurDiyara (including opening & Resetting

for 5 Years) in district Patna. Non

-Pla

n

Patn

a

1114

.990

000

/ 119

65(s

) / 2

1 D

ec 2

017

Pont

oon

Brid

ge/0

.00

06 F

eb 2

018

15 Ju

n 20

22 ontoon Sets dismantled from dated-10.07.2019 (MonsoonPeriod) and will be Re-installed after Monsoon.

Page 19: Progress Report of Ongoing Schemes ... - brpnnl.bihar.gov.inbrpnnl.bihar.gov.in/UploadFile/20/01-Oct-2019... · Sub-Structur e (in %) Super-Structur e (in %) Appr oach (in %) Cumulative

8/24/2019 MPR Report :: Jul_2019

19/52

Achievement for the month / till month

Physical Financial

72 60.00 M 0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.56

73 120.00 M 0.00/85.00

0.00/75.00

0.00/65.00

0.00/40.00

0.00/147.44

74 200.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/100.00

60.77/258.53

75 250.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/25.00

37.92/393.24

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Patn

a-1

(b) Construction of Balance work of onespan out of three span H.L.R.C.C. Bridge

(1x16.50M) across Dhaba River in 4thKm. of Khusrupur-Nagarnausa Road atNirmali chak Middle Vidayalay in Patna

Dist. Including Approach in both sideand Bituminous work thereof.

Nab

ard

Patn

a

418.

9800

00 /

1871

(s) /

03

Mar

201

4

RC

C/1

6.50

Due to unavailibility of land, the work is stopped. Landowners had denied to given on Perpetual Lease because

nature of land decided by Six Man Committee is (Agriculture)not accepted by land owners. Land acquisition under LA act2003 has been requested to D.M. Patna vide this office letterno.402, dated-16.02.2019 S.I.A. is under progress by DLAO,

Patna.

Patn

a-1

(a) Construction of H.L.R.C.C. Bridge,3x16.50M and approach road work in 4thKm. of Khusrupur-Nagarnausa Road at

Nirmali chak Middle School ofKhusrupur Block, in the District of

Patna.

Nab

ard

Patn

a

418.

9800

00 /

1871

/ 03

Mar

201

4

RC

C/5

1.38

24 N

ov 2

014

23 N

ov 2

015

Due to unavailibility of land, the work is stopped. Landowners had denied to given on Perpetual Lease because

nature of land decided by Six Man Committee is (Agriculture)not accepted by land owners. Land acquisition under LA act2003 has been requested to D.M. Patna vide this office letterno.402, dated-16.02.2019 S.I.A. is under progress by DLAO,

Patna.

Dar

bhan

ga Construction of HL RCCbridge(2x16.50M) in 1st km of

Bishanpur Atarbel Road in the District ofDarbhanga.

FDR

Dar

bhan

ga

442.

5300

00 /

291(

s) /

13 Ja

n 20

18

RC

C/3

4.26

10 A

ug 2

018

09 N

ov 2

019

Work in Progress. Traffic Started.

Dar

bhan

ga

Construction of HL RCCbridge(4x14.50M) Ujjan PWD Road inGhanshyampur Kathbara-Lagma KkoraMacheta-Lalpatti Road of 12.10 KM in

the District of Darbhanga.

FDR

Dar

bhan

ga

816.

7100

00 /

290(

s) /

10 Ja

n 20

18

RC

C/6

0.48

10 O

ct 2

018

07 A

pr 2

020

27 A

pr 2

020

Work in Progress.

Page 20: Progress Report of Ongoing Schemes ... - brpnnl.bihar.gov.inbrpnnl.bihar.gov.in/UploadFile/20/01-Oct-2019... · Sub-Structur e (in %) Super-Structur e (in %) Appr oach (in %) Cumulative

8/24/2019 MPR Report :: Jul_2019

20/52

Achievement for the month / till month

Physical Financial

76 250.00 M 0.00/100.00

0.00/100.00

10.00/90.00

10.00/20.00

60.36/534.02

77 2713.13M

0.00/100.00

0.00/100.00

0.00/100.00

0.00/55.00

0.00/1027.40

78 200.00 M 2.00/48.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/630.50

79 410.00 M 0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/1257.25

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Dar

bhan

ga

Construction of HL RCC bridge(6x14.50M) at Shivnagar Ghat in

11.50KM of Ghanshyampur- RasiyariRoad with approach road, Diversionwork and Miscellaneous work in the

District of Darbhanga.FD

R

Dar

bhan

ga

1046

.130

000

/ 294

(s) /

12

Jan

2018

RC

C/9

0.70

11 A

pr 2

018

10 A

pr 2

020

10 A

pr 2

020

Work in Progress.

Cha

mpa

ran(

Mot

ihar

i)

Construction of 5x24.75M R.C.C. brdigeover Trimuhan river in Dhankutawa

village (Sikata Block)-Shivpur (Lauria orChanpatia Block) Road. Well foundation.

Chankya construction Pvt. Ltd.

Nab

ard

Pach

im C

ham

parn

1998

.200

000

/ 221

1(s)

/ 27

Feb

201

7

RC

C/1

27.0

0

24 Ja

n 20

13

23 Ju

l 201

4

31 D

ec 2

018 Bridge Completed and App. Road balance both side. Vide Lt.

No. 379(we) Dated 27.03.2019 Rs.6,40,550.00 DepositedDLAO, Bettiah. for SIA.

Dar

bhan

ga

Construction of HL RCC bridge(4X18.75M) in 15 Km of Bathiya-

Narayanpur- Kakodha-Devena-Rajkharwar with approach road,

Diversion work and Miscellaneous workin the District of Darbhanga.

FDR

Dar

bhan

ga

1067

.000

000

/ 292

(s) /

12

Jan

2018

RC

C/7

7.48

11 A

pr 2

018

10 A

pr 2

020

WORK IN PROGRESS.

Dar

bhan

ga

Construction of HLRCC bridge withLand acquisition ,approach road andprotection work near naiyam gram at

pachphutiya ghat in Bagmati river(7x24.75 m) Hari Construction &

Associate Pvt. Ltd., Begusarai

BD

F

Dar

bhan

ga

2319

.190

000

/ 181

6(s)

/ 28

Feb

201

4

RC

C/1

77.5

6

03 M

ar 2

014

02 M

ar 2

016 EOT WILL BE APPLIED AFTER LA.

Remarks for LA: Darbhanga- Section-19 in progressSamastipur- Security force deployment has been ordered as

land found to be govt, Land

Page 21: Progress Report of Ongoing Schemes ... - brpnnl.bihar.gov.inbrpnnl.bihar.gov.in/UploadFile/20/01-Oct-2019... · Sub-Structur e (in %) Super-Structur e (in %) Appr oach (in %) Cumulative

8/24/2019 MPR Report :: Jul_2019

21/52

Achievement for the month / till month

Physical Financial

80 2340.00M

0.00/100.00

0.00/100.00

0.00/100.00

0.00/67.00

0.00/1355.00

81 20.00 M 0.00/100.00

5.00/10.00

0.00/0.00

0.00/0.00

0.00/241.05

82 240.00 M 5.00/65.00

0.00/25.00

0.00/0.00

0.00/0.00

63.06/437.15

83 240.00 M 0.00/100.00

5.00/100.00

40.00/70.00

0.00/0.00

34.28/145.93

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Cha

mpa

ran(

Mot

ihar

i)

Construction of 5x24.75M R.C.C. brdigeover Sikarhana river in Maheshara

village (Sikata Block) - Sarisawa bazar(Majhaulia Block) Road. Well foundation

Barhonia Engicon Pvt. Ltd.N

abar

d

Pach

im C

ham

parn

1927

.090

000

/ 237

0(s)

/ 12

Mar

201

2

RC

C/1

27.0

0

13 S

ep 2

012

12 S

ep 2

014

31 D

ec 2

018

Bridge Completed Sarisawa bazar side approach roadcompleted and Maheshara side approach uncompleted due to

L.A. but traffic movement through Kachchi road.Vide Lt.No.380(we) Dated 27.03.2019 Rs. 5,72,394.00 Deposited

DLAO, Bettiah. for SIA.

Cha

mpa

ran(

Mot

ihar

i)

Construction of H.L. R.C.C. 2x30.00 mtr.In the district of West Champaran underIndo-Nepal Border Ch. 5.819 km. Near

Inerwa Bazar.

Nab

ard

Pach

im C

ham

parn

990.

9700

00 /

5590

(s) /

27

May

201

7

RC

C/4

0.00

05 Ju

l 201

8

04 A

ug 2

019

04 A

ug 2

019

Work stopped due to water in canal

Cha

mpa

ran(

Mot

ihar

i)

Construction of 5x21.00 m H.L. R..C.C.Bridge work in 11th km. of Motihari-

Madhubani ghat Road in EastChamparan. Well Foundation. M/S Royal

Engineers b

FDR

East

Cha

mpa

ran(

Mot

ihar

i)

1523

.870

000

/ 130

0(s)

/ 16

Feb

201

8

RC

C/1

07.0

0

15 O

ct 2

018

14 O

ct 2

020

14 O

ct 2

020

Work is stopped due to flood

Cha

mpa

ran(

Mot

ihar

i)

Construction of 2x12.50 m H.L. R..C.C.Bridge with Approach Road, Safety

work, Diversion work and Misclaneouswork in 7th km. of Dhaka - Phulwariya

Road in East Champaran. PileFoundation. M/S. Royal Engineers.

FDR

East

Cha

mpa

ran(

Mot

ihar

i)

523.

8800

00 /

1301

(s) /

16

Feb

2018

RC

C/2

5.00

27 S

ep 2

018

26 S

ep 2

019

26 S

ep 2

019

Two Spain Completed and other work in progress

Page 22: Progress Report of Ongoing Schemes ... - brpnnl.bihar.gov.inbrpnnl.bihar.gov.in/UploadFile/20/01-Oct-2019... · Sub-Structur e (in %) Super-Structur e (in %) Appr oach (in %) Cumulative

8/24/2019 MPR Report :: Jul_2019

22/52

Achievement for the month / till month

Physical Financial

84 240.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/100.00

108.93/288.16

85 240.00 M 0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/5.10

86 240.00 M 0.00/100.00

0.00/20.00

0.00/0.00

0.00/0.00

0.00/227.90

87 1700.00M

0.00/8.00

0.00/0.00

0.00/0.00

0.00/0.00

98.32/98.32

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Cha

mpa

ran(

Mot

ihar

i)

Construction of 2x16.50 m H.L. R..C.C.Bridge with Approach Road, Safety

work, Diversion work and Misclaneouswork in 5th km. of Sirauna - Patahi Road

in East Champaran.FD

R

East

Cha

mpa

ran(

Mot

ihar

i)

401.

2400

00 /

1208

8(s)

/ 27

Dec

201

7

RC

C/3

3.00

01 Ju

n 20

18

31 M

ay 2

019

30 Ju

n 20

19

Completed Inaugurated on dated 11.06.2019

Cha

mpa

ran(

Mot

ihar

i)

Construction of 2x10.50 m H.L. R..C.C.Bridge with Approach Road, Safety

work, Diversion work and Misclaneouswork in 11th km. of Dhaka - Phulwariya

Road in East Champaran. PileFoundation. M/S Royal Engineers

FDR

East

Cha

mpa

ran(

Mot

ihar

i)

751.

5000

00 /

689(

s) /

19 Ja

n 20

18

RC

C/6

6.00

23 M

ay 2

018

22 N

ov 2

019

22 N

ov 2

019 Work order issued But work has stopped by villagers and vide

Letter No. 252 dated 27.02.2019 and letter No. 586 dated29.05.2019 submitted to DM, Motihari to resolve the problem

Cha

mpa

ran(

Mot

ihar

i)

Construction of 5x21.75 m H.L. R..C.C.Bridge with Approach Road, Safety

work, Diversion work and Misclaneouswork in 5th km. of Sugauli - Piparpati

Road in East Champaran.

FDR

East

Cha

mpa

ran(

Mot

ihar

i)

1259

.860

000

/ 474

(s) /

15

Oct

201

8

RC

C/1

08.7

5

05 M

ay 2

018

04 M

ay 2

020

04 M

ay 2

020

Work is Stopped due to flood

Cha

mpa

ran(

Mot

ihar

i) Construction of HL RCC Bridge (Sizes12x24.5M) over River Sikarahana withapproach road at Semara Ghat in BlockMehasi in Dist.- East Champaran underNABARD. Type of Foundation - Well,

Bridge Length - 304.32M. M/S AMBERINFRA PROJECT PVT. LTD.

Nab

ard

RWD

East

Cha

mpa

ran(

Mot

ihar

i)

4596

.000

000

/ 36

/ 03

Jan

2019

RC

C/3

04.3

2

05 M

ar 2

019

04 S

ep 2

021

04 S

ep 2

021

Work is Stopped due to flood

Page 23: Progress Report of Ongoing Schemes ... - brpnnl.bihar.gov.inbrpnnl.bihar.gov.in/UploadFile/20/01-Oct-2019... · Sub-Structur e (in %) Super-Structur e (in %) Appr oach (in %) Cumulative

8/24/2019 MPR Report :: Jul_2019

23/52

Achievement for the month / till month

Physical Financial

88 770.00 M 0.00/100.00

0.00/100.00

0.00/96.00

0.00/82.00

0.00/2440.14

89 200.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/70.00

0.00/616.58

90 200.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/90.00

0.00/713.15

91 300.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/90.00

0.00/826.40

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Cha

mpa

ran(

Mot

ihar

i)

Construction of HLRCC bridge withapproach road at kataha ghat in sikrahnariver under mehsi block in the district ofEast champaran(12 x 24.750 M), Well

foundation. M/S Jay shankarrai,9934867236

Nab

ard

East

Cha

mpa

ran(

Mot

ihar

i)

3539

.550

000

/ 807

9(s)

/ 07

Oct

201

3

RC

C/2

97.0

0

30 M

ar 2

014

30 M

ar 2

016

30 Ju

n 20

19

31 D

ec 2

019 Work started from dt. 10.10.2018 after compromising

between Agency and Raiyat Bridge work CompletedApproach road in solo progress due to Rainy season for L.A.

Preparation for Section -11.

Cha

mpa

ran(

Mot

ihar

i)

Construction of HLRCC bridge in Indo -Nepal border road at channage 40.772km in the district of Purvi champaranPackage No- 7 (2 x 30M),Barhonia

engicor Pvt ltd,9431269809

Nab

ard

East

Cha

mpa

ran(

Mot

ihar

i)

693.

3000

00 /

7209

(s) /

09

Sep

2013

RC

C/6

0.00

28 F

eb 2

014

30 M

ay 2

016

30 D

ec 2

018

31 O

ct 2

019

Bridge work Completed

Cha

mpa

ran(

Mot

ihar

i)

Construction of HLRCC bridge in Indo -Nepal border road at channage 35.650km in the district of Purvi champaranPackage No- 7 (2 x 35M),Barhonia

engicor Pvt ltd,9431269809

Nab

ard

East

Cha

mpa

ran(

Mot

ihar

i)

802.

9400

00 /

7209

(s) /

09

Sep

2013

RC

C/7

0.00

28 F

eb 2

014

30 M

ay 2

016

17 D

ec 2

018

31 O

ct 2

019

Bridge work Completed

Cha

mpa

ran(

Mot

ihar

i)

Construction of HLRCC bridge in Indo -Nepal border road at channage 32.875km in the district of Purvi champaranPackage No- 7 (2 x 35M),Barhonia

engicor Pvt ltd,9431269809

Nab

ard

East

Cha

mpa

ran(

Mot

ihar

i)

849.

0600

00 /

7209

(s) /

09

Sep

2013

RC

C/6

0.00

28 F

eb 2

014

30 M

ay 2

016

17 D

ec 2

018

31 O

ct 2

019

Bridge work completed

Page 24: Progress Report of Ongoing Schemes ... - brpnnl.bihar.gov.inbrpnnl.bihar.gov.in/UploadFile/20/01-Oct-2019... · Sub-Structur e (in %) Super-Structur e (in %) Appr oach (in %) Cumulative

8/24/2019 MPR Report :: Jul_2019

24/52

Achievement for the month / till month

Physical Financial

92 100.00 M 0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/68.38

93 0.00 M 0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/144.38

94 610.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/70.00

0.00/2450.99

95 1050.00M

0.00/100.00

0.00/100.00

0.00/100.00

0.00/0.00

0.00/1676.70

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Nal

anda

Construction of HL RCC bridge4x10.00m in place of old bridge over

Panchane river at 126 th km Biharshariff-Bakhtiyarpur road in Nalanda district.

CR

F

Nal

anda

320.

8000

00 /

5679

(s) /

25

Jun

2015

RC

C/4

0.00

18 A

pr 2

018

17 A

pr 2

019

After retender work order has been issued in favour of M/SHaque Construction on dated 18.04.2018. Diversion work hasbeen Completed. Dismantling of existing Bridge will be start

after rainy season. M.D BRPNNL, Patna advised toDismantling the existing old bridge after 15 september 2019

in the monthly meeting of BRPNNL, Patna. on dated20.06.2019.

Bha

galp

ur

Abstract Cost Detail Estimate for Re-etting, Repairing, Dissmentalling,maintainence work during flood

available 28 ests module of Pontoonbridge on Koshi river at Vijay Ghat

between Naugachhia & Dholbajja bazarin Bhagalpur District Pontoon Bridge on

Koshi river at Vijay Ghat betweenNougachia & Dholbajja bazar Year 2017-

21-22, M/s Shailesh Kumar, GopalGoshala, Nogachia, Bhagalpur.

Plan

Bha

galp

ur

394.

7500

00 /

1179

4(s)

/ 19

Dec

201

7

28.0

0

18 F

eb 2

018

17 F

eb 2

023

Due to rainy season pipa bridge has been dismantled and keptsafely by concern Contractor.

Bha

galp

ur

Balance work (Approach Road) forConstriction of H. L. R.C.C. Bridge

12X24.75m in Khrik Chorhar road atchorhar ghat of old kosi river branch inkharik Block District Bhagalpur underNabard loan project (RIDF-XVII) M/s

Rajiv Kumar Singh, Kharik, Bhagalpur.Mob.no. 9934095945

Nab

ard

Bha

galp

ur

2460

.570

000

/ 250

2(s)

/ 25

Mar

201

3

RC

C/3

04.3

6

12 Ju

n 20

19

11 O

ct 2

019

(i) L.A. -7.39 Accre. (ii) Section 11 notified on letter No. 03(P) LA dt- 10.03.2018 (iii) Total Raiyat- 29 No. (iv) Mauza- 2

(Maheshpur- 4.98 Acre & Ishapur- 2.41 Acre. (v) DLAOBhagalpur Demanded Rs. 73,36,594.00 vide his letter no. 530

dated 04.12.2018 and the same was deposited to DLAOBhagalpur vide letter no. 05(we) dated 05.01.2019 of this

office. (vi) DLAO Bhagalpur Demanded Rs.1,23,51,596.00vide his letter no. 202 dated. 26.04.2019 and Lt No. 332dated- 29.06.2019 (vii) Section-19 is in progress. (viii)

Declaration of Section- 19(1) for Land Acquisition has beenpublish by D.L.A.O, Bhagalpur in News Papers.

Bha

galp

ur

Balance work (Approach Road) forConstruction of H.L. RCC Bridge

14x18.75 m on gerua river near baisavillage in Sanhaula-Baisa-Hanwara road

in Sanhaula Block district Bhagalpurunder Nabard loan project (RIDF-XVIII)

M/s Sri Ram Enterprises, Bhagalpur.Mob.no. 9431422278

Nab

ard

Bha

galp

ur

2296

.080

000

/ 250

1(s)

/ 25

Mar

201

3

RC

C/2

51.6

8

12 Ju

n 20

19

11 O

ct 2

019

Bhagalpur (i) Land Acquisition-4.33 Accre Bhagalpur, Bihar.(ii) Total no of Raiyat-35 (iii) No of Mauza- 1 (Baisa) (iv)

Section 11 notified on letter No. 107 dt-30.03.18 (v) DLAOBhagalpur Demanded Rs. 1,69,36,343 vide his letter no. 535

dated 05.12.2018 and the same was deposited to DLAOBhagalpur vide letter no. 06(we) dated 05.01.2019 of thisoffice. (vi) Section-19 is in progress. (vii) Declaration ofSection- 19(1) for Land Acquisition has been publish by

D.L.A.O, Bhagalpur in News Papers.

Page 25: Progress Report of Ongoing Schemes ... - brpnnl.bihar.gov.inbrpnnl.bihar.gov.in/UploadFile/20/01-Oct-2019... · Sub-Structur e (in %) Super-Structur e (in %) Appr oach (in %) Cumulative

8/24/2019 MPR Report :: Jul_2019

25/52

Achievement for the month / till month

Physical Financial

96 520.00 M 25.00/100.00

25.00/35.00

0.00/0.00

0.00/0.00

0.00/286.47

97 300.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/25.00

0.00/402.32

98 240.00 M 0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/3.15

99 0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/26.85

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Gay

a

Construction of H.L.R.C.C. 7 x 16.50 mBridge including approach road,

Protection work and Miscellaneous workover Punpun River between Shahganj &Gohra in Kurtha Block of Arwal District

Under NABARD Scheme. Nab

ard

RWD

Arw

al

918.

5000

00 /

3099

/ 14

Aug

201

8

RC

C/1

19.8

5

07 M

ar 2

019

06 S

ep 2

020

06 S

ep 2

020

Pier work is in Progress.

Gay

a

Construction of H.L.R.C.C. 5x18.75mBridge including approach road andprotection work over Punpun River

between Bhagwatipur - Kusre village inArwal District under NABARD Scheme.

(R.A.S. Enterprises, 9199245601)

Nab

ard

RC

D

Arw

al

569.

2900

00 /

7135

(s) /

05

Sep

2013

RC

C/9

7.00

10 D

ec 2

013

10 Ju

n 20

15 Requisition is submitted D.M., Arwal vide letter no.-1390 dt.26-11-2018. Verification of LPC completed.

Gay

a

Construction of H.L.R.C.C. 19 x 18.00 mBridge inplace of damaged bridge Over

Falgu River at Ratan Bigha Villageincluding approach road, Protection

work, Diversion Work and Miscellaneouswork in 16th K.M. of Ghoshi-Islampur-

Giriyak Road in Jehanabad District.

Plan

Jeha

naba

d

2331

.040

000

/ 560

1 (S

) / 2

1 Ju

l 201

8

RC

C/3

53.4

0

21 F

eb 2

019

20 F

eb 2

021

20 F

eb 2

021

Diversion Complete. 40 Nos Span Dismentaled. Piling workin progress. 8/132 No's pile completed.

Gay

a

Construction of Retaining wall &addional lane approach road for newelyConstructed H.L. R.C.C. Bridge over

Falgu River at Barari village inMashauri-Okri-Telhara-Ekangarsarai

road in Jehanabad District Under NONPLAN (2 x 120.00 M).

Non

-Pla

n

Jeha

naba

d

249.

8400

00 /

217(

s) /

04 Ja

n 20

12

RC

C/1

20.0

0

L/A Issue. 2 No's L.P.C. for payment pending before DLAO.Payment Pending at DLAO Level.

Page 26: Progress Report of Ongoing Schemes ... - brpnnl.bihar.gov.inbrpnnl.bihar.gov.in/UploadFile/20/01-Oct-2019... · Sub-Structur e (in %) Super-Structur e (in %) Appr oach (in %) Cumulative

8/24/2019 MPR Report :: Jul_2019

26/52

Achievement for the month / till month

Physical Financial

100 1300.00M

0.00/100.00

0.00/100.00

0.00/0.00

0.00/40.00

132.65/618.98

101 110.00 M 0.00/100.00

0.00/100.00

20.00/100.00

30.00/30.00

0.00/2.67

102 200.00 M 0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/1.84

103 300.00 M 0.00/90.00

10.00/20.00

0.00/0.00

0.00/0.00

0.00/278.03

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Gay

a

Construction of H.L.R.C.C. 7 x 18.75 mBridge over river Punpun with approachroad, Protection work and Miscellaneouswork in between Khudwa - Kalen villagein Aurangabad District Under MMADY

Scheme. (JAI MATA DI ROADCONSTRUCTION PVT. LTD., PATNA)

MM

AD

Y

Aur

anga

bad

1318

.000

000

/ 111

0 / 3

0 A

pr 2

018

RC

C/1

35.5

6

25 D

ec 2

018

24 Ju

n 20

20

24 Ju

n 20

20 Work is in Progress. Foundation & Sub Structure finushed.Super Structure work is in progress. Approach 1000 m upto

GSB complete.

Gay

a

Construction of Multi Cell Box Culvertof 3 x 7.020 m Over Bagahi Canal nearProposed Power Sub - Station of PowerGrid Corporation of India in Sherghati

Block of Gaya District. (SatyendraKumar Yadav, Gaya)

Oth

ers

Gay

a

100.

9500

00 /

M.O

.U. /

03

Dec

201

8

RC

C/2

3.26

21 F

eb 2

019

20 Ju

l 201

9

31 A

ug 2

019 Work is in Progress. Foundation, Sub Structure, Super

Structure & Railing work is completed. Cut off wall is inprogress.

Gay

a

Construction of H.L.R.C.C. Bridgeincluding approach road, Protection work

and Miscellaneous work over DhadharRiver of Gaya-Fatehpur-Gopi More-

Murli Road (Gaya-Rajauli Road SH-70)in Gaya District Under Plan Scheme.

(Baban Kumar Singh, Gaya)

Plan

Gay

a

700.

0000

00 /

960

(S) /

01

Feb

2018

RC

C/1

25.0

0

07 M

ar 2

019

06 S

ep 2

020

06 S

ep 2

020

Diversion work is completed. Dismentling of existing bridgework is in progress.

Gay

a

Construction of H.L.R.C.C. 9x21.00mBridge including approach road andprotection work over Morhar RiverBetween Chitabkala and Gendabagvillage in Sherghati Block in Gaya

District.

Plan

Gay

a

1610

.870

000

/ 353

(s) /

01

Feb

2018

RC

C/1

94.4

0

10 M

ay 2

018

09 F

eb 2

020

09 F

eb 2

020 Work is in Progress. Out of 88 piles 85 pile work is completed

& A1, P1, P4, P5, P6, P7, P8 & A2 pile cap is completed. A1,P1 & A2 Shaft work completed.

Page 27: Progress Report of Ongoing Schemes ... - brpnnl.bihar.gov.inbrpnnl.bihar.gov.in/UploadFile/20/01-Oct-2019... · Sub-Structur e (in %) Super-Structur e (in %) Appr oach (in %) Cumulative

8/24/2019 MPR Report :: Jul_2019

27/52

Achievement for the month / till month

Physical Financial

104 200.00 M 0.00/100.00

0.00/100.00

0.00/40.00

0.00/20.00

0.00/69.41

105 200.00 M 0.00/100.00

0.00/100.00

0.00/90.00

0.00/50.00

0.00/116.69

106 160.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/80.00

11.87/972.18

107 620.00 M 15.00/100.00

30.00/50.00

0.00/0.00

0.00/0.00

105.74/285.75

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Gay

a

Construction of H.L.R.C.C. 3x21.00mBridge including approach road and

protection work in Bhalua to PaharpurRoad (K.M. 0 to K.M. 26.325) in

Chainage 600 M in Gaya District underPLAN Scheme. (Ramiya Construction

Pvt. Ltd., Gaya)Pl

an

Gay

a

556.

2800

00 /

1146

6(s)

/ 28

Nov

201

1

RC

C/6

4.84

10 M

ay 2

018

09 N

ov 2

019

09 N

ov 2

019 Work is in Progress. Notice issue for slow progress, again

work has started. Span no.-1 deck slab is completed. Girderwork is in progress in span 2 & 3.

Gay

a

Construction of H.L.R.C.C. 3x14.00mBridge including approach road andprotection work in Dhangai Bazar to

B.B. Pesra-Sobh to G.T. Road (K.M. 0 toK.M. 14.10) in Chainage 13970 M inGaya District under PLAN Scheme.

(M/s. JAY SHANKAR RAY,Muzaffarpur)

Plan

Gay

a

429.

7300

00 /

1153

9(s)

/ 01

Dec

201

4

RC

C/5

5.84

26 D

ec 2

016

25 M

ar 2

018

30 A

pr 2

019

31 A

ug 2

019 Work is in Progress. Notice issued to agency for delay.

Recommended to debar. span no.-1, 2 & 3 of deck Slab iscompleted. Railing, wearing coat & Approach Road is in

Progress.

Gay

a

Construction of H.L.R.C.C. 17x21.75mBridge including approach road andprotection work over river Muhane

between Silaunjua-Bataspur village inBodhGaya Block of Gaya District underNABARD Scheme. (Ajay Engicon Pvt.

Ltd., Aurangabad (Bihar).

Nab

ard

RWD

Gay

a

983.

9500

00 /

1127

.86

/ 05

Mar

201

2

RC

C/3

80.0

0

15 M

ar 2

013

14 S

ep 2

014

31 M

ar 2

019

31 A

ug 2

019 Bridge work completed. One side approach Road work

stopped due to L/A Problem. L.A. process completed butcompensation pending due to CFMS.

Nal

anda

Construction of H.L. Bridge 5 x14.50 mBerma-Arai Road of Karai-Parsurai

block under nalanda district. district ofNalanda N

abar

d RW

D

Nal

anda

536.

0000

00 /

1760

/ 29

May

201

8

RC

C/7

2.50

19 Ja

n 20

19

18 A

pr 2

020

18 A

pr 2

020

Foundation work completed. A1, A2, P1,P2 P3 & P4 shaftcompleted. A1 & A2 Shaft cap is in progress.

Page 28: Progress Report of Ongoing Schemes ... - brpnnl.bihar.gov.inbrpnnl.bihar.gov.in/UploadFile/20/01-Oct-2019... · Sub-Structur e (in %) Super-Structur e (in %) Appr oach (in %) Cumulative

8/24/2019 MPR Report :: Jul_2019

28/52

Achievement for the month / till month

Physical Financial

108 780.00 M 14.00/92.00

20.00/35.00

0.00/0.00

0.00/0.00

61.66/306.09

109 585.00 M 20.00/100.00

35.00/50.00

0.00/0.00

0.00/0.00

57.85/157.99

110 480.00 M 0.00/100.00

0.00/100.00

0.00/100.00

2.00/87.00

61.03/2338.81

111 250.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/0.00

0.00/254.20

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Nal

anda

Construction of H.L.R.C.C Bridge6x14.50 m over lokine river Near Radhil

Chhilka of Ekangarsarai Block underNalanda district. N

abar

d RW

D

Nal

anda

692.

0000

00 /

1761

/ 29

May

201

8

RC

C/8

7.00

19 Ja

n 20

19

18 Ju

l 202

0

18 Ju

l 202

0

Foundation work 92% completed. A1, A2 shaft completed.Rest Sub structure work is in progress.

Nal

anda

Construction of H.L.R.C.C Bridge3x14.50 m over Mohane river Near

Sitabigha village of Parwalpur Blockunder Naward Scheme of Nalanda

district. Nab

ard

RWD

Nal

anda

366.

6500

00 /

4115

/ 07

Sep

201

8

RC

C/4

3.50

09 F

eb 2

019

08 M

ay 2

020

08 M

ay 2

020

Foundation work completed. A1, A2, P1 P2 shaft completed.Rest Sub-structure work is in progress.

Nal

anda

construction of HL RCC bridge9x24.75M on Harohar river in

Sadaibigha village at Barahiya block inLakhisarai district. NARAYAN DAS

CONSTRUCTION Mob. - 9431815725 /9431815726

Plan

Lakh

isar

ai

3068

.390

000

/ 182

1(s)

/ 28

Feb

201

4

RC

C/2

53.6

0

08 N

ov 2

014

07 N

ov 2

016

31 Ju

l 201

9

31 Ju

l 201

9 Bridge work completed. Construction of Via duct in approachroad foundation and Substructure completed. Super structurework is awaiting. Other side (A2 side) earth work completed.

GSB work is in progress.

Kat

ihar

"Construction of 4x16.50m span H.L.R.C.C. Bridge over on BakhriKola Dharin Bakhrikol to Vishhariya in the District

of Purnea. Baba Construction."

Nab

ard

Purn

ia

421.

1400

00 /

1807

(s) /

06

Mar

201

3

RC

C/6

8.44

30 Ju

n 20

13

30 S

ep 2

014

Bridge work completed. Approach road Land in under L/Aprocess.

Page 29: Progress Report of Ongoing Schemes ... - brpnnl.bihar.gov.inbrpnnl.bihar.gov.in/UploadFile/20/01-Oct-2019... · Sub-Structur e (in %) Super-Structur e (in %) Appr oach (in %) Cumulative

8/24/2019 MPR Report :: Jul_2019

29/52

Achievement for the month / till month

Physical Financial

112 270.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/125.00

0.00/286.88

113 200.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/40.00

0.00/188.55

114 300.00 M 0.00/95.00

0.00/15.00

0.00/0.00

0.00/0.00

0.00/722.15

115 3107.00M

0.00/100.00

0.00/100.00

0.00/100.00

0.00/93.00

0.00/3506.68

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Kat

ihar

"Construction of 3x18.75m span H.L.R.C.C. Bridge over Nasi Tola Dhar ofDamaily Panchayat under DhamdhaBlock in the District of Purnea. Baba

Construction."N

abar

d

Purn

ia

428.

5600

00 /

1806

(s) /

15

Mar

201

3

RC

C/5

8.08

bridge completed

Kat

ihar

Construction of 3x16.50m H.L. R.C.C.Bridge including approach Road in 3rdKm. of Saifganj Road in the District of

Araria. Shivdani Engineers Patna. Non

-Pla

n

Ara

ria

317.

2200

00 /

1435

3(s)

/ 28

Dec

201

1

RC

C/5

0.00

30 Ju

n 20

12

30 Ju

n 20

13

Bridge Work completed. LA is under process.

Kat

ihar

Construction of 6X24.00m H.L. R.C.C.Bridge over Bakra river at 1st km. of

Udahat Tekni road under PLAN in theDistrict of Araria. Tirupati Balajee Earth

Work Pvt. Ltd.

Plan

Ara

ria

2211

.730

000

/ 129

3(s)

/ 16

Feb

201

7

RC

C/1

47.8

5

01 Ja

n 20

18

01 Ja

n 20

20

AT A1=30m/30m, P1=27m/27m, P2=25m/25m, A2=11/30mwell casting in progress P5=27m/27m,Well Steining work inprogress. P4=25m/25m well steining casting in progress.P3=25/25m .A L/D has imposed to contructor for Rs. 7,43,838.00for Delay of work. by letter no- 1991 dt- 15-12-2018. Work

Slow due to Flood water

Kat

ihar

Const. of 11x18.75m H.L.R.C.C Bridgeover Parmar river on Diyari Ghat inbetween Dumariya to Diyari in the

district of Araria Braj KishorConstruction.

Plan

Ara

ria

4244

.200

000

/ 708

1(s)

/ 30

Jul 2

015

RC

C/2

06.2

5

03 Ja

n 20

16

02 Ja

n 20

18

31 M

ar 2

020

Bridge work completed. Approach work is in Progress.4X10.50m new span added in approach to increase waterway.

Pilling work is completed. 24/24 pile workcompleted.A1,P1,P2,P3,A2, Shaft cap work completed.4 Nos.S.S. Work complete. 4th super stucture Approach road work

in progress.

Page 30: Progress Report of Ongoing Schemes ... - brpnnl.bihar.gov.inbrpnnl.bihar.gov.in/UploadFile/20/01-Oct-2019... · Sub-Structur e (in %) Super-Structur e (in %) Appr oach (in %) Cumulative

8/24/2019 MPR Report :: Jul_2019

30/52

Achievement for the month / till month

Physical Financial

116 360.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/90.00

162.59/1465.69

117 1690.00M

0.00/100.00

0.00/100.00

0.00/100.00

0.00/95.00

0.00/6942.84

118 370.00 M 0.00/100.00

0.00/100.00

0.00/60.00

0.00/0.00

0.00/205.75

119 420.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/0.00

0.00/162.40

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Kat

ihar

Construction of 7x21.75M Bridge overPaharia Ghat of Bakra River in

Kursakanta to Teera Road of Dom SadakRoad in the District of Araria. M/S Raj

Construction Nab

ard

RWD

Ara

ria

1915

.810

000

/ 318

/ 19

Jan

2018

RC

C/1

57.0

0

28 F

eb 2

012

30 D

ec 2

019 Bridge work completed. Approach work in progress.

Approach Road in A1 side washed out in 175 m with E/W &B/P River flowing along approach road.

Kat

ihar

Construction of 27x30m Size of H.L.R.C.C. bridge at (Saidabad) Mieerganj

Railway crossing to Dhabeli RoadChainage 50.80 of Indo-Nepal Border

Road in the District of Araria. D2S InfraStructures Pvt. Ltd.

Nab

ard

Ara

ria

7896

.720

000

/ 216

0(s)

/ 14

Mar

201

3

RC

C/8

10.0

0

30 Ju

l 201

3

30 Ju

l 201

6 Bridge work completed. 1620 approach road BT workcompleted. Work is stoped due to L/A. L/A is done by RCD

Araria. Only 70m work is remaning in approach road.work isstoped due to local land owners incrochment.

Kat

ihar

Construction of 2x30m Size of H.L.R.C.C. bridge at (Velbwa River)

Mieerganj Railway crossing to DhabeliRoad Chainage 30.75 of Indo-NepalBorder Road in the District of Araria.

Baba Const.

Nab

ard

Ara

ria

570.

8000

00 /

2160

(s) /

13

Mar

201

3

RC

C/6

0.00

30 A

pr 2

013

30 Ju

n 20

14

Work is stoped due to L/A Problem. LA is done by RCDAraria. . A CWJC No……../2018 has filled in the Hon'ble

High court by baba contractor. Hon'ble H.C. directed tocontractor to go in Tribunal Court No any direction to

BRPNN by Hon'ble H.C. A latter had written to contractor tostart the work other wise you will be resigned vide this office

Latter No-460 dt-25.04.19

Kat

ihar

Construction of 2x12.50m span R.C.C.Bridge over hara dhar in between Gogra-Lalganj of Katihar District. Ashwani Kr.

Singh, Katihar. MM

SNY

Kat

ihar

251.

6400

00 /

1026

5(s)

/ 13

Sep

201

2

RC

C/3

0.00

30 D

ec 2

012

30 D

ec 2

013 Bridge work completed. Latter has been given to D.M.

Katihar for Fee relaxation vide latter No-471 dated-26.04.2019

Page 31: Progress Report of Ongoing Schemes ... - brpnnl.bihar.gov.inbrpnnl.bihar.gov.in/UploadFile/20/01-Oct-2019... · Sub-Structur e (in %) Super-Structur e (in %) Appr oach (in %) Cumulative

8/24/2019 MPR Report :: Jul_2019

31/52

Achievement for the month / till month

Physical Financial

120 365.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/90.00

0.00/1616.14

121 415.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/60.00

0.00/1685.33

122 250.00 M 0.00/85.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/155.94

123 320.00 M 0.00/100.00

0.00/100.00

0.00/85.00

0.00/90.00

0.00/385.60

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Kat

ihar

Construction of H.L. R.C.C. Bridge onGanjan Ghat in Barsoi Neemtala Chowkto Dakaita Puja Road via Beghour Hat to

Katihar District. Raj Construction Nab

ard

RWD

Kat

ihar

1691

.510

000

/ 920

/ 11

Jun

2013

RC

C/2

01.0

0

30 O

ct 2

013

30 Ju

l 201

5 Bridge work completed. Latter has been given to D.M.Katihar for Fee relaxation vide latter No-471 dated-

26.04.2019

Kat

ihar

Construction of H.L. R.C.C. bridge in10th Km of Barsoi Banbhui-Dhachana

Road of Katihar District. ShankarSharma

Nab

ard

Kat

ihar

1965

.650

000

/ 958

5(s)

/ 13

Dec

201

3

RC

C/1

94.0

0

30 M

ar 2

014

30 M

ar 2

016

Bridge work completed. 5 Nos. Registry completed. 15 nos.demanding residencial price registry stopped.

Kat

ihar

Construction of 3x18.75m H.L R.C.Cbridge in river Barjan near Palasmani of

Kursakanta block in the District ofAraria. ARZU CONST. LTD, PATNA N

abar

d RW

D

Ara

ria

475.

0700

00 /

1095

(s) /

28

Mar

201

8

RC

C/5

8.08

18 O

ct 2

018

17 Ja

n 20

20

30/30 pilling work completed, pile cap work in progress. ALetter has written to contractor to Expedise the work other

wise LD will be imposed. Letter No- 2014 dt- 17.12.2018 &Letter No- 2099 dt- 31.12.2018,131 dt-31.01.2019 & 486 dt-29.04.2019..notice give to start work otherwise you will be

resined to work.work stop due to flood water.

Kat

ihar Construction of 3x21.75m span R.C.C.

Bridge over Jahanpur Ghat in the Districtof Araria District. Pankaj Kumar M

MSN

Y

Ara

ria

420.

6600

00 /

9272

(s) /

23

Aug

201

2

RC

C/7

0.00

30 O

ct 2

012

30 Ja

n 20

14

Super Structure of 1st span casting completed. 2nd span superstructure work in progress. A letter has writtern to contractorto Expedise the work. Other wise LD will be imposed vide

this office letter No- 2041 Dt- 21-12-2018.Rescind ReminderLatter No-494 dt-03.05.19. work stop due to flood water.

Page 32: Progress Report of Ongoing Schemes ... - brpnnl.bihar.gov.inbrpnnl.bihar.gov.in/UploadFile/20/01-Oct-2019... · Sub-Structur e (in %) Super-Structur e (in %) Appr oach (in %) Cumulative

8/24/2019 MPR Report :: Jul_2019

32/52

Achievement for the month / till month

Physical Financial

124 320.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/95.00

0.00/362.80

125 320.00 M 0.00/100.00

0.00/100.00

0.00/0.00

0.00/0.00

0.00/216.51

126 295.00 M 0.00/100.00

0.00/95.00

20.00/90.00

0.00/50.00

237.09/463.38

127 300.00 M 0.00/100.00

0.00/100.00

15.00/100.00

20.00/70.00

46.50/998.34

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Kat

ihar

Construction of 4x21.75m span R.C.C.Bridge over Adiwashi Tola in Dumariyato Rampur Road of Palasi Panchayat inthe District of Araria District. Pankaj

KumarM

MSN

Y

Ara

ria

410.

6500

00 /

9348

(s) /

24

Aug

201

2

RC

C/8

7.00

30 D

ec 2

012

28 F

eb 2

014

Earth Work Progress in Approach road. A letter has writternto contractor to Expedise the work. Other wise LD will be

imposed vide this office letter No- 2040 Dt- 21-12-2018.Rescind Reminder Latter No-494 dt-03.05.19. work

slow due to flood water.

Kat

ihar

Construction of 3x21.75m span R.C.C.Bridge over Dhiwha (Chakka) dhar in

front of Yogipur in farhi to kanholi Roadof Narpatganj block in the District of

Araria District. Pankaj Kumar

MM

SNY

Ara

ria

331.

9400

00 /

9346

(s) /

24

Aug

201

2

RC

C/6

5.00

30 D

ec 2

012

28 F

eb 2

014

Super Structure 1st span stagging work in progress. A letterhas writtern to contractor to Expedise the work. Other wiseLD will be imposed vide this office letter No- 2039 Dt- 21-

12-2018 . Rescind Reminder Latter No-494 dt-03.05.19. workstop due to flood water.

Kat

ihar

Construction of 4x22.00m span H.L.R.C.C. Bridge over Retva River in

P.W.D. Nehru Chowk to DharamganjRoad of Araria District. S.K.

Construction

MM

SNY

Ara

ria

415.

2200

00 /

6776

(s) /

21

Jul 2

014

RC

C/6

8.00

30 Ja

n 20

14

30 O

ct 2

015

30 D

ec 2

019

Work in progress. P3 pile cap work completed. Pilling startedat A2.A letter has writtern to contractor to Expedise the work.

Other wise LD will be imposed vide this office letter No-2068 Dt- 28-12-2018 & Latter No-492 dt-03.05.19. work stop

due to flood water.

Kat

ihar

Construction of 6X21.75m H.L.R.C.CBridge at Kundi Tola in Mohna

Chandpur Panchayat of Barari Block ofKatihar District. Vishundev Yadav M

MK

VY

Kat

ihar

1800

.000

000

/ 145

4(s)

/ 21

Mar

201

7

83.0

5

30 N

ov 2

017

30 N

ov 2

019

Bridge work completed. Approach road work in progress.

Page 33: Progress Report of Ongoing Schemes ... - brpnnl.bihar.gov.inbrpnnl.bihar.gov.in/UploadFile/20/01-Oct-2019... · Sub-Structur e (in %) Super-Structur e (in %) Appr oach (in %) Cumulative

8/24/2019 MPR Report :: Jul_2019

33/52

Achievement for the month / till month

Physical Financial

128 280.00 M 0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

129 260.00 M 0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/2.13

130 350.00 M 20.00/80.00

0.00/0.00

0.00/0.00

0.00/0.00

112.99/196.51

131 440.00 M 0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Kat

ihar

Construction of of H.L. RCC bridge(2X16.00 m) including approach road,

diversion and protection work in place ofdamaged by flood in 2017 in 7th Km ofBairgachhi-Banglacol road in the district

of Araria. SAIYAD MUMTAZAKHTAR

FDR

Ara

ria

557.

9200

00 /

677(

s) /

19 Ja

n 20

18

33.2

0

19 O

ct 2

018

18 Ja

n 20

20

A joint inspection visit was done with EE RCD Araria & SPEKatihar on 27-12-2018 to locate position of bridge to start thework. Due to Publick Hindrence work was not started. Secondjoint inspection also done by both on 24-06-2019 and decidedto change it with 17th km. it is sent for approval to Dy Chief

Engineer, Work Circle-2. BRPNN Ltd., Patna.

Kat

ihar

Construction of of H.L. RCC bridge(2X16.00 m) in Place of Damaged by

flood in 2017 in the 12th Km ofBairagachi-Banglacol road in the Districtof Araria. ARZU CONST. LTD, PATNA

FDR

Ara

ria

557.

0700

00 /

286(

s) /

01 Ja

n 20

18

33.2

2

19 A

ug 2

018

18 N

ov 2

019

A joint inspection visit was done with EE RCD Araria & SPEKatihar on 27-12-2018 to locate position of bridge to start thework. Due to Publick Hindrence work was not started. Secondjoint inspection also done by both on 24-06-2019 and decidedto change it with 17th km. it is sent for approval to Dy Chief

Engineer, Work Circle-2. BRPNN Ltd., Patna.

Ara

Construction of High Level RCCbridge(3x14.50m) over river Gangi inlieu of Damaged Balbatra Lakri pul at

Ward No-03 in Ara Block in the Districtof Bhojpur (Ara)

Plan Ara

639.

3400

00 /

7459

(S) /

26

Sep

2018

RC

C/4

3.50

05 F

eb 2

019

04 A

ug 2

020

Foundation work in progress.

Ara

Construction of High Level RCC Bridge(4x18.0)m in 40th K.M. of Bhabhua

Adhaura Road (At Tala Village) acrossSuara River in Kaimur (Bhabhua)

District

Plan

Kai

mur

(Bha

bua)

560.

0000

00 /

9156

(S) /

03

Dec

201

8

RC

C/7

2.00

04 M

ar 2

019

03 Ju

n 20

20

Diversion work in progress

Page 34: Progress Report of Ongoing Schemes ... - brpnnl.bihar.gov.inbrpnnl.bihar.gov.in/UploadFile/20/01-Oct-2019... · Sub-Structur e (in %) Super-Structur e (in %) Appr oach (in %) Cumulative

8/24/2019 MPR Report :: Jul_2019

34/52

Achievement for the month / till month

Physical Financial

132 150.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/60.00

0.00/129.83

133 360.00 M 2.00/67.00

0.00/5.00

0.00/0.00

0.00/0.00

95.23/521.75

134 260.00 M 0.00/100.00

0.00/100.00

0.00/95.00

30.00/60.00

58.74/315.68

135 300.00 M 0.00/95.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/219.89

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Ara

Construction of H.L. R.C.C. BridgerOver Kauw river in samta Bigha -

Dhasadih at Sambhal bigha-Semaradih inSasaram Block in the District of Rohtasunder MMSNY. (Brajesh Kumar Singh)

MM

SNY

Roh

tas

214.

5000

00 /

1949

(s) /

04

Mar

201

4

RC

C/2

2.40

11 M

ay 2

015

10 M

ay 2

016

30 Ju

n 20

19

Work in progress. Contractor debarred for delay.

Ara

Construction of H.L.RCC Bridge at 19thK.M. of Mohania-Ramgarh road acrossDurgawati River in Kaimur District. JaiMata Dee Maa Sita Construction. Mob-

9934462616

Plan

Kai

mur

(Bha

bua)

1751

.040

000

/ 902

6(s)

/ 13

Oct

201

7

RC

C/1

40.0

0

21 A

ug 2

018

20 A

ug 2

020

Foundation work in progress

Kat

ihar

Construction of of H.L. RCC bridge(3X12.00 m) including approach road,

diversion and protection work in place ofdamaged by flood in 2017 in the ch. Ch.7th Km of Araria Kurshakatta road in the

distric of Araria. TIRUPATI BALAJIEARTH WORK PVT LTD. PATNA

FDR

Ara

ria

584.

1200

00 /

477(

s) /

15 Ja

n 20

18

37.2

2

17 A

ug 2

018

16 N

ov 2

019

Wearing coat work in progress Approach work is in progress.

Kat

ihar

Construction of of H.L. RCC bridge(3X14.00 m) including approach road,

diversion and protection work in place ofdamaged by flood in 2017 in 15th Km of

Parwaha-Mirdaul PWD road in thedistrtict of Araria. AAKASH KUMAR,

PATNA

FDR

Ara

ria

685.

1500

00 /

476(

s) /

15 Ja

n 20

18

43.8

0

19 O

ct 2

018

18 Ja

n 20

20

28/28 Pile work completed. pile cap work in progress. L/Dimposed to contractor vide Letter No- 476 dt-29.04.19 and

Rs-2,58,600/- A notice send to contrator to speedop the workotherwise 2nd L/D will be imposed.2nd L/D has been

imposed to contractor of amount 2,58,600/- vide letter No-556dated-23.05.2019. work stop due to flood water.

Page 35: Progress Report of Ongoing Schemes ... - brpnnl.bihar.gov.inbrpnnl.bihar.gov.in/UploadFile/20/01-Oct-2019... · Sub-Structur e (in %) Super-Structur e (in %) Appr oach (in %) Cumulative

8/24/2019 MPR Report :: Jul_2019

35/52

Achievement for the month / till month

Physical Financial

136 280.00 M 0.00/80.00

0.00/30.00

0.00/0.00

0.00/25.00

0.00/172.50

137 260.00 M 0.00/100.00

0.00/100.00

0.00/100.00

10.00/80.00

0.00/444.60

138 300.00 M 0.00/100.00

0.00/100.00

0.00/60.00

0.00/25.00

24.51/288.88

139 280.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/100.00

60.22/655.50

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Kat

ihar

Construction of of H.L. RCC bridge(2X18.00 m) including approach road,

diversion and protection work in place ofdamaged by flood in 2017 in 82Km of

Refujee colony-Meerganj chowk(NH57A) road in the district of Araria.

ARJU CONST. PATNAFD

R

Ara

ria

557.

6900

00 /

478(

s) /

15 Ja

n 20

18

37.2

0

19 O

ct 2

018

18 Ja

n 20

20

22/22 Pilling work in progress. Pile cap work in progress. ALetter has written to contractor to Expedise the work other

wise LD will be imposed. Letter No- 2017 dt- 17.12.2018 &Letter No- 2086 dt- 31.12.2018 & Latter No-490 dt-03.05.19.

Work is stop due to design changes and study to NIT Patnafor Approval. work stoped due to flood.

Kat

ihar

Construction of of H.L. RCC bridge(3X18.00 m) including approach road,

diversion and protection work in place ofdamaged by flood in 2017 in the ch. Ch.

9th Km of Meerganj-Kuwari by pass-sikti- Dhabeli road in the distric of

Araria. M/S JAI MATA DI CONST.BEGUSARAI.

FDR

Ara

ria

742.

8400

00 /

479(

s) /

15 Ja

n 20

18

55.8

3

19 A

ug 2

018

18 N

ov 2

019

Super structure work completed. Approach work in progress.

Kat

ihar

Construction of of H.L. RCC bridge(3X16.00 m) including approach road,

diversion and protection work in place ofdamaged by flood in 2017 in 8th Km ofMeerganj chowk- kuwari by pass to sikti

dhabeli road in the district ofAraria.ARJU CONST. PATNA

FDR

Ara

ria

762.

4600

00 /

678(

s) /

13 Ja

n 20

18

49.8

0

19 O

ct 2

018

18 A

pr 2

020

28/28 Pilling work completed. super structer work inprogress.. A Letter has written to contractor to Expedise the

work other wise LD will be imposed. Letter No- 2081 dt- 31-12-2018. Approach work is started. A L/D letter has been

imposed to contractor of amount 2,99,877/- vide letter No-580dated-30.05.2019. work stop due to rain.

Kat

ihar

Construction of of H.L. RCC bridge(3X18.00 m) including approach road,

diversion and protection work in place ofdamaged by flood in 2017 in Ch. 64

(NH-57A part of road no-6 ) in betweenRefujy colony to Meerganj chowk in the

district of Araria. BIPIN KUMARSINGH, KATIHAR

FDR

Ara

ria

734.

5700

00 /

680(

s) /

19 Ja

n 20

18

55.8

0

19 O

ct 2

018

18 A

pr 2

020

28/28 pilling work completed. Super structure workcompleted.Approach work in progress.

Page 36: Progress Report of Ongoing Schemes ... - brpnnl.bihar.gov.inbrpnnl.bihar.gov.in/UploadFile/20/01-Oct-2019... · Sub-Structur e (in %) Super-Structur e (in %) Appr oach (in %) Cumulative

8/24/2019 MPR Report :: Jul_2019

36/52

Achievement for the month / till month

Physical Financial

140 250.00 M 0.00/100.00

0.00/100.00

30.00/90.00

10.00/40.00

0.00/227.32

141 260.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/100.00

36.63/524.29

142 260.00 M 0.00/15.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/36.60

143 260.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/70.00

0.00/219.16

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Kat

ihar

Construction of of H.L. RCC bridge(2X16.00 m) including approach road,

diversion and protection work in place ofdamaged by flood in 2017 in 10th Km of

Meerganj chowk -Kuwari by pass tosikti-dhabeli road in the distric of Araria.

SHAILESH KR. SINGHFD

R

Ara

ria

554.

5000

00 /

283(

s) /

10 Ja

n 20

18

33.2

0

19 O

ct 2

018

18 O

ct 2

020

22/22 Pilling work completed. super structure work inprogress. A Letter has written to contractor to Expedise the

work other wise LD will be imposed. Letter No- 2080 dt- 31-12-2018. s.s. work completed Approach work stop due to

flood water.

Kat

ihar

Construction of of H.L. RCC bridge(3X18.00 m) in Place of Damaged by

flood in 2017 in the 70th Km of Refugeecolony to Mirganj Chowk (NH57A) road

in the District of Araria. BIPINKUMAR, KATIHAR

FDR

Ara

ria

746.

7000

00 /

285(

s) /

10 Ja

n 20

18

55.8

3

19 A

ug 2

018

18 N

ov 2

019

work completed & inaugrated.

Kat

ihar

Construction of of H.L. RCC bridge(2X16.00 m) in Place of Damaged by

flood in 2017 in the 9th Km ofBairagachi-Banglacol road in the District

of Araria. MS SONACONSTRUCTION, SUPAUL

FDR

Ara

ria

547.

0800

00 /

287(

s) /

10 Ja

n 20

18

33.2

2

19 A

ug 2

018

18 N

ov 2

019 5/22 pile cap completed. Rest pile stop due to flood water.. A

Latter has written to contractor to expedise the work otherwise. LD will be imposed. Latter No-432 dt-15.04.19.notice

give to start work otherwise you will be resined to work.

Kat

ihar

Construction of of H.L. RCC bridge(3X18.75 m) in Place of Damaged byflood in 2017 in the 4th km. of ArariaMeerganj Chowk Kuwari Bypass Skiti

Dhabeli road under in the District Araria.RAJ KISHOR SINGH, ARARIA

FDR

Ara

ria

604.

5000

00 /

285(

s) /

10 Ja

n 20

18

55.8

3

19 A

ug 2

018

18 N

ov 2

019 28/28 Pile work completed. A1, A2,P1,P2 pile cap work

completed. Shaft H.H also completed. Super structure workcompletd. Approach Road work in progress. Work slow due

to flood water.

Page 37: Progress Report of Ongoing Schemes ... - brpnnl.bihar.gov.inbrpnnl.bihar.gov.in/UploadFile/20/01-Oct-2019... · Sub-Structur e (in %) Super-Structur e (in %) Appr oach (in %) Cumulative

8/24/2019 MPR Report :: Jul_2019

37/52

Achievement for the month / till month

Physical Financial

144 250.00 M 0.00/100.00

0.00/100.00

0.00/30.00

0.00/0.00

0.00/273.46

145 250.00 M 0.00/100.00

0.00/100.00

0.00/15.00

0.00/0.00

0.00/274.81

146 300.00 M 0.00/60.00

0.00/0.00

0.00/0.00

0.00/0.00

72.33/552.37

147 350.00 M 0.00/100.00

0.00/70.00

0.00/10.00

0.00/0.00

0.00/605.75

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Kat

ihar

Construction of of H.L. RCC bridge(3X18.75 m) in 2nd km. of Araria

Meerganj Chowk Kuwari Bypass SkitiDhabeli road under FDR in the DistrictAraria. SHIV CHANDRA KUMKAR

FDR

Ara

ria

573.

7200

00 /

45 (S

) / 0

2 Ja

n 20

18

58.0

8

17 O

ct 2

018

16 Ja

n 20

20

28/28 Pilling work in completed. Pile cap work completed. ALetter has written to contractor to Expedise the work other

wise LD will be imposed. Letter No- 2015 dt- 17.12.2018. AL/D Letter has imposed to contractor 05% amount 2,13,881/-vide letter No-560 dated-24.05.2019. work stop due to flood

water.

Kat

ihar

Construction of of H.L. RCC bridge(3X18.75 m) in 3rd km. of Araria

Meerganj Chowk Kuwari Bypass SkitiDhabeli road under FDR in the DistrictofAraria. SHIV CHANDRA KUMAR

FDR

Ara

ria

577.

4200

00 /

46(s

) / 0

2 Ja

n 20

18

58.0

8

17 O

ct 2

018

16 Ja

n 20

20

A1-28m/28m,P1=30/30m,P2=4.6/30,P3=4.6/30,P5= 19/30mconcreting & sinking work in progress. A L/D has imposed to

contractor for Rs. 5,90,304.00 for delay of work vido letterNo-238 Dt-22.2.19 & Letter No. 491 dt-03.05.2019.work stop

due to flood water. diversion in under repair.

Kat

ihar

Construction of RCC HL bridge(6x21.00m) at 28th KM of Belauri-

Shivganj-Sonaili-Salmari Bazar road inthis district of Katihar. ARJUN

PRASAD,

FDR

Kat

ihar

1471

.000

000

/ 254

1(s)

/ 28

Mar

201

8

129.

60

10 O

ct 2

018

17 O

ct 2

020

A1-28m/28m,P1=30/30m,P2=4.6/30,P3=4.6/30,P5= 19/30mconcreting & sinking work in progress. A L/D has imposed to

contractor for Rs. 5,90,304.00 for delay of work vido letterNo-238 Dt-22.2.19 & Letter No. 491 dt-03.05.2019.work stop

due to flood water. diversion in under repair.

Kat

ihar

Construction of RCC HL bridge(6x21.00m) in the 15th Km of Katihar-

Sonaili-Jhowa-salmari-Barsoi-Balrampurroad including approach road diversion,

protection work in place of damagedroad by flood in 2017 in the distric of

Katihar. MUKESH KUMAR, KATIHAR

FDR

Kat

ihar

1379

.210

000

/ 234

8(s)

/ 28

Mar

201

8

127.

22

24 A

ug 2

018

23 A

ug 2

020 Foundation work completed. Sub stucture work in Progress.to

contractor 0.5% amount 5,03,114/- vide letter No-557 dated-23.05.2019.work stop due to flood water.

Page 38: Progress Report of Ongoing Schemes ... - brpnnl.bihar.gov.inbrpnnl.bihar.gov.in/UploadFile/20/01-Oct-2019... · Sub-Structur e (in %) Super-Structur e (in %) Appr oach (in %) Cumulative

8/24/2019 MPR Report :: Jul_2019

38/52

Achievement for the month / till month

Physical Financial

148 200.00 M 0.00/100.00

0.00/60.00

0.00/0.00

0.00/0.00

15.00/199.65

149 250.00 M 0.00/100.00

0.00/100.00

20.00/90.00

0.00/40.00

94.89/325.37

150 200.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/100.00

78.86/305.28

151 240.00 M 0.00/100.00

0.00/100.00

0.00/100.00

20.00/100.00

87.09/319.90

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Kat

ihar

Construction of RCC HL bridge(2x21.75m) at 9th KM of Kadwa Block

headquarter-chowki via bharri Aashiyaniroad including approach road diversion,protection work and road sefty in placeof dmaged road by flood in 2017 in thedistrict of Katihar. M/S SHIV SHAKTI

CONST. PURNEAFD

R

Kat

ihar

517.

1100

00 /

1390

(s) /

21

Feb

2018

44.7

2

24 A

ug 2

018

23 A

ug 2

019 22/22 Pilling work completed. And pile cap work in progress.

A LD has imposed to contructor for Rs. 1,78,800.00 for Delayof work. by Letter No- 2090 dt- 31.12.2018.work stop due to

flood water.

Kat

ihar

Construction of RCC HL bridge(2x21.75 m) including approach road,

diversion and protection work in place ofdamaged by flood in 2017 in the 4th Km

of Damdama-Azamnagar-KeshariChwok via Azamnagar railway Station

road in the district of Katihar. OMCONT. KATIHAR

FDR

Kat

ihar

586.

0000

00 /

1391

(s) /

21

Feb

2018

44.7

2

10 O

ct 2

018

17 Ja

n 20

20

Bridge work completed . Approach work in progress.

Kat

ihar

Construction of RCC HL bridge(2x18.00 m) including approach road,

diversion and protection work in place ofdamaged by flood in 2017 in the 35th kmof Katihar-Sonali-Jhowa-Salmari-Barsoi-Balrampur road in the district of Katihar.

BIPIN KUMAR SINGH

FDR

Kat

ihar

459.

5600

00 /

481(

s) /

15 Ja

n 20

18

37.2

2

01 Ju

n 20

18

31 A

ug 2

019

Bridge work completed & inaugrated.

Kat

ihar

Construction of RCC HL bridge(2x16.00 m) including approach road,

diversion and protection work in place ofdamaged by flood in 2017 in the 42th kmof Katihar-Sonali-Jhowa-Salmari-Barsoi-Balrampur road in the district of Katihar.

M/S SHAILESH KUMAR

FDR

Kat

ihar

458.

7200

00 /

480(

s) /

15 Ja

n 20

18

49.2

2

01 Ju

n 20

18

31 A

ug 2

019

Bridge work completed. Approach road work in progress.Bridge work completed. Approach road work in progress.

Page 39: Progress Report of Ongoing Schemes ... - brpnnl.bihar.gov.inbrpnnl.bihar.gov.in/UploadFile/20/01-Oct-2019... · Sub-Structur e (in %) Super-Structur e (in %) Appr oach (in %) Cumulative

8/24/2019 MPR Report :: Jul_2019

39/52

Achievement for the month / till month

Physical Financial

152 200.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/100.00

32.45/257.86

153 230.00 M 0.00/100.00

0.00/100.00

0.00/60.00

0.00/0.00

30.23/261.03

154 240.00 M 0.00/100.00

0.00/100.00

10.00/90.00

0.00/20.00

0.00/389.46

155 300.00 M 0.00/100.00

0.00/100.00

0.00/10.00

0.00/50.00

209.53/951.17

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Kat

ihar

Construction of RCC HL bridge(2X16.50 m) including approach road,

diversion and protection work in place ofdamaged by flood in 2017 in the 3rd kmof Aajamnagar link road in the district of

Katihar. M/S JAI SHIVCONSTRUCTION

FDR

Kat

ihar

387.

2700

00 /

693(

s) /

19 Ja

n 20

18

34.2

2

01 Ju

n 20

18

31 A

ug 2

019

Bridge work completed. Approach road also completed

Kat

ihar

Construction of H.L. RCC bridge(3X16.00 M) in Belauri-Shivganj-

Salmari Bazar 19th km. of (1st Cutting)in the district of Katihar. BABAN

KUMAR SINGH

FDR

Kat

ihar

639.

7300

00 /

294(

s) /

10 Ja

n 20

18

49.8

3

13 Ju

n 20

18

12 S

ep 2

019

28/28 pile completed.A1,A2,P1,P2 Shaft cap work completed.SS work in progress. A Letter has written to contractor to

Expedise the work other wise LD will be imposed. Letter No-2004 dt- 17.12.2018 & Letter No- 2089 dt- 31.12.2018. L/D

imposed to contractor vide letter No- 487 dt-29.04.19 Rs-2,07,755/-work stop due to flood water lagging under span.

Kat

ihar

Construction of H.L. RCC bridge(5X16.00 M) in Belauri-Shivganj-

Salmari Bazar 19th km. of (2nd Cutting)in the district of Katihar. GOKUL

HITECH INFRA PVT. LTD.

FDR

Kat

ihar

866.

8800

00 /

293(

s) /

10 Ja

n 20

18

83.0

5

13 Ju

n 20

18

12 S

ep 2

019 40/40 pile work completed. A1,A2,P1,P2,P3,P4 Shaft cap

work completed.SS work in progress. L/D imposed tocontractor vide letter No- 130 dt- 31.01.2019Rs.3,02,718.00.work slow due to flood water.

Kat

ihar

"Construction of RCC HL bridge(5X24.00 m) including approach road,

diversion and protection work in place ofdamaged by flood in 2017 in the 4th Km

of Plasi-Baraili road in the district ofPurnea. PRABHAT KR. "

FDR

Purn

ia

1606

.000

000

/ 167

7(S)

/ 05

Mar

201

8

123.

00

10 O

ct 2

018

17 A

pr 2

020

A1=30/30m ,P1=30/30,A2=30/30m,P2=6/30m,P3-30/30m,P4=30/30m completed. Well cap work in progress. A

Letter has written to contractor to Expedise the work otherwise LD will be imposed. Letter No- 2006 dt- 17.12.2018 &

Letter No- 2098 dt- 31.12.2018. work stop due to rain.

Page 40: Progress Report of Ongoing Schemes ... - brpnnl.bihar.gov.inbrpnnl.bihar.gov.in/UploadFile/20/01-Oct-2019... · Sub-Structur e (in %) Super-Structur e (in %) Appr oach (in %) Cumulative

8/24/2019 MPR Report :: Jul_2019

40/52

Achievement for the month / till month

Physical Financial

156 250.00 M 0.00/75.00

0.00/0.00

0.00/0.00

0.00/0.00

108.59/278.80

157 500.00 M 0.00/100.00

0.00/50.00

0.00/0.00

0.00/0.00

0.00/948.25

158 240.00 M 0.00/100.00

0.00/100.00

0.00/100.00

10.00/90.00

41.57/475.70

159 240.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/60.00

0.00/524.05

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Kat

ihar

"Construction of RCC HL bridge(3X24.75 m) including approach road,

diversion and protection work in place ofdamaged by flood in 2017 in the 1st Kmof Belgachi PWD Road Via Nitendra-

Macharhatta-goria road in the district ofPurnea. M/S SHIV SHAKTI CONST.

PURNEA"FD

R

Purn

ia

1185

.000

000

/ 138

4(S)

/ 21

Feb

201

8

76.0

8

10 O

ct 2

018

17 A

pr 2

020

1st bridge A2=30/30m,P3=30/30m,A1=30/30m,P1=30/30,P2=30/30 Pile cap work in progress. 2nd bridge A1- cutting

EdgeA1=30/30,A2=30/30,P1=30/30,P2=30/30,P3=30/30,P4=30/30A Letter has written to contractor to Expedise the work otherwise LD will be imposed. Letter No- 2009 dt- 17.12.2018. A

L/D imposed 0.5% and Rs 9,76,899/- vide latter no 858 dt-02-08-20

Kat

ihar

"Construction of RCC HL bridgeincluding approach road, diversion andprotection work in place of damaged byflood in 2017 in 1st Km of Palsa- KaliMandir-Baraili Road (4x21.00m)span(Ch. 245m to 340m) and (5x21.00m)span in (Ch. 480m to 600m ) in the

district of Purnea. HAQUECONSTRUCTION Muzaffarpur"

FDR

Purn

ia

2791

.300

000

/ 130

7(S)

/ 16

Feb

201

8

218.

40

10 O

ct 2

018

17 Ja

n 20

20

1st bridge A2=30/30m,P3=30/30m,A1=30/30m,P1=30/30,P2=30/30 Pile cap work in progress. 2nd bridge A1- cutting

EdgeA1=30/30,A2=30/30,P1=30/30,P2=30/30,P3=30/30,P4=30/30A Letter has written to contractor to Expedise the work otherwise LD will be imposed. Letter No- 2009 dt- 17.12.2018. A

L/D imposed 0.5% and Rs 9,76,899/- vide latter no 858 dt-02-08-2019

Kat

ihar

"Construction of RCC HL bridge(2X24.00 m) including approach road,

diversion and protection work in place ofdamaged by flood in 2017 in the 29th kmof Biasi-Amor-Bahadurganj road(SH-99)

in the district of Purnea. HAQUECONSTRUCTION"

FDR

Purn

ia

794.

7500

00 /

690(

S) /

19 Ja

n 20

18

49.2

2

13 Ju

n 20

18

12 D

ec 2

019

super structure work completed. Approach road work inprogress

Kat

ihar

"Construction of RCC HL bridge(4x16.00 m) including approach road,

diversion and protection work in place ofdamaged by flood in 2017 in the 6th kmof Jokihat-Dalmalpur-Garua road in the

district of Purnea. RAJ KISHORSINGH"

FDR

Purn

ia

877.

5300

00 /

683(

S) /

19 Ja

n 20

18

66.4

4

13 Ju

n 20

18

12 D

ec 2

019 48/48 Pile work completed. super structure work in progress.

A Letter has written to contractor to Expedise the work otherwise LD will be imposed. Letter No- 2005 dt- 17.12.2018 &

Letter No- 2096 dt- 31.12.2018.Work slow due to flood water.

Page 41: Progress Report of Ongoing Schemes ... - brpnnl.bihar.gov.inbrpnnl.bihar.gov.in/UploadFile/20/01-Oct-2019... · Sub-Structur e (in %) Super-Structur e (in %) Appr oach (in %) Cumulative

8/24/2019 MPR Report :: Jul_2019

41/52

Achievement for the month / till month

Physical Financial

160 240.00 M 0.00/100.00

0.00/100.00

0.00/60.00

0.00/50.00

0.00/308.68

161 240.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/90.00

33.99/310.05

162 240.00 M 0.00/100.00

0.00/100.00

0.00/60.00

0.00/0.00

0.00/923.88

163 240.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/90.00

47.82/313.94

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Kat

ihar

"Construction of H.L. RCC bridge(3X16.50 M) in the 9th km of BelgachhiPWD road via Nitendra-Machharhatta-

Geria road in the district of Purnia.HAQUE CONSTRUCTION"

FDR

Purn

ia

729.

4500

00 /

295(

S) /

10 Ja

n 20

18

51.3

3

13 Ju

n 20

18

12 S

ep 2

019

30/30 Pilling work in progress. A1, A2,P1,P2 pile cap workCompleted.Super structure work in progress. A Letter has

written to contractor to Expedise the work other wise LD willbe imposed. Letter No- 2011 dt- 17.12.2018 A LD has

imposed to contructor for Rs. 2,34,809.00 for Delay of work.by Letter No- 2095 dt- 31.12.2018 work stop due to flood

water.

Kat

ihar

"Construction of H.L. RCC bridge(3X16.50 M) in the 7th km of Ekba-Mahammodia-Dubouli road in thedistrict of Purnia. M/S SHAILESH

KUMAR"

FDR

Purn

ia

552.

1700

00 /

296(

S) /

10 Ja

n 20

18

51.3

3

04 A

pr 2

018

03 Ju

l 201

9 24/24 piles completed. Super stracture work completed.Approach Road work in progress. A LD has imposed to

contructor for Rs. 1,87,705.00 for Delay of work. by LetterNo- 2094 dt- 31.12.2018.

Kat

ihar

"Construction of RCC HL bridge(8x18.00m) including approach road,diversion and protection work in the

place of 10th km of Jokihat-Dalmalpur-Gerua road in the district of Purnia.

SHANKAR SHARMA & BAIJNATHSHARMA (J.V.)"

FDR

Purn

ia

1478

.980

000

/ 120

92(s

) / 2

7 D

ec 2

017

148.

88

27 M

ar 2

018

23 M

ar 2

020

80/80 piles work completed. A1,A2,P1,P2,P3,P4,P5,P6,P7pile cap completed .shaft work in progress. S.S. work also in

progress. A LD has imposed to contructor for Rs. 5,56,740.00for Delay of work. by letter no-2100 dt- 31-12-2018. work

slow due to rain.

Kat

ihar

"Construction of H.L. RCC bridge(3x16.50 M) in 2nd Km. of Ekhua

mahmadodia-Bareli-Duboli road in thedistrict of Purnea. BAIJNATH

SHARMA"

FDR

Purn

ia

619.

2400

00 /

42(s

) / 0

2 Ja

n 20

18

51.3

3

05 A

pr 2

018

04 Ju

l 201

9

24/24 piles completed. Super structure work completed.Approach worrk in progress.

Page 42: Progress Report of Ongoing Schemes ... - brpnnl.bihar.gov.inbrpnnl.bihar.gov.in/UploadFile/20/01-Oct-2019... · Sub-Structur e (in %) Super-Structur e (in %) Appr oach (in %) Cumulative

8/24/2019 MPR Report :: Jul_2019

42/52

Achievement for the month / till month

Physical Financial

164 240.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/90.00

0.00/428.82

165 240.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/40.00

0.00/384.33

166 240.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/60.00

0.00/813.98

167 0.00 M 0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/855.95

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Kat

ihar

"Construction of of H.L. RCC bridge(3X16.00 m) in (SH-99) 9th km. of

Baisi-Amour-Bahadurganj road in theDistrict of Purnea. RAJKISHOR

SINGH"FD

R

Purn

ia

739.

0000

00 /

41(s

) / 0

2 Ja

n 20

18

49.8

3

28 M

ar 2

018

22 S

ep 2

019

Super stucture completed. Appr. Work in Progress.

Kat

ihar

Construction of of H.L. RCC bridge(3X16.50 m) in 9th km. of Kali Mandir

to Baraily road in the District ofPurnea.SHANKAR SHARMA

FDR

Purn

ia

723.

7600

00 /

43(s

) / 0

2 Ja

n 20

18

51.3

3

16 M

ar 2

018

15 S

ep 2

019

Super stucture completed. Appr. Work in Progress. Work slowdue to rain

Kat

ihar

"Construction of Balance work of H.L.RCC bridge (4x21.00 m) in 9th km ofJokihat-Dalmalpur-Gerua road in the

district of Purnia BAIJNATH SHARMA"

FDR

Purn

ia

1196

.000

000

/ 44(

s) /

02 Ja

n 20

18

86.4

4

15 A

pr 2

018

14 A

pr 2

020

Super stucture completed. Appr. Work in Progress. Work slowdue to rain

Sara

n W

orks

Construction & Resetting of newPontoon Bridge and Maintenace of

Pontoon Bridge form Year 2016-17 to2020-21 and Dismentling of Pontoon

Bridge form the Alignment and storingthe Pontoon sets at safe place on the side

of river embankment at Pahleza Ghatinbetween Gaddipatti to Ramsapur

during rainy season. Agency- ShrishtiDevelopers Pvt. Ltd. Mob.-9431014606

Plan

Sara

n

1076

.720

000

/ 29

(s) /

06

Jan

2016

293.

00

22 A

pr 2

016 Pontoon Bridge open on Dt. 11-07-2019

Remarks for LA: LA proposal for sec-21,31, 32,33 & 34submitted to DLAO Chhapra. Proposal returned at dak stage

for copy of Khatiyan.

Page 43: Progress Report of Ongoing Schemes ... - brpnnl.bihar.gov.inbrpnnl.bihar.gov.in/UploadFile/20/01-Oct-2019... · Sub-Structur e (in %) Super-Structur e (in %) Appr oach (in %) Cumulative

8/24/2019 MPR Report :: Jul_2019

43/52

Achievement for the month / till month

Physical Financial

168 400.00 M 0.00/100.00

0.00/80.00

0.00/36.00

0.00/10.00

38.84/386.42

169 400.00 M 0.00/40.31

0.00/20.00

0.00/0.00

0.00/0.00

13.81/156.26

170 200.00 M 0.00/100.00

0.00/100.00

0.00/90.00

0.00/0.00

31.87/229.26

171 200.00 M 0.00/100.00

10.00/60.00

0.00/0.00

0.00/0.00

0.00/327.55

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Sara

n W

orks Construction of 5X18.75m H.L. R.C.C

Bridge over Dabra river in betweenAhimanpatti Kanakpur to ShitalpurStation in Dighwara block in Saran

District Nab

ard

RWD

Sara

n

765.

1500

00 /

1360

/ 26

Apr

201

8

RC

C/7

3.75

29 O

ct 2

018

28 A

pr 2

020

Work in Progress Pile Completed-42/42 Pile Cap Completed-06/06 Substructure & Super Structure work in Progress.

Girder & deck slab of 2 span completed.

Remarks for LA: LA proposal for sec-21,31, 32,33 & 34submitted to DLAO Chhapra. Proposal returned at dak stage

for copy of Khatiyan.

Sara

n W

orks

Construction of 4x18.75m H.L. R.C.CBridge including Approach Road,

rotection Work & Miscellaneous workover Bashi river crossing 1st KM ofTamkuhi-chhitauni road Damaged in2017 Flood under Gopalganj Distric.

FDR

Gop

alga

nj

808.

7400

00 /

687(

s) /

19 Ja

n 20

18

RC

C/7

5.00

03 O

ct 2

018

02 A

pr 2

020

Work in Progress Pile Completed-14/14 Pile cap - 2completed. Abument saft & cap 1 No. Completed. Pier shaft& Pier Cap 1 no. completed. Change of type of foundationform pile to well in 3 Points approved. 1 well curb sinking

complete.

Remarks for LA: LA proposal for sec-21,31, 32,33 & 34submitted to DLAO Chhapra. Proposal returned at dak stage

for copy of Khatiyan.

Sara

n W

orks

Construction of 2x16.00 m H.L. R.C.CBridge over Hathua Branch Canal

crossing Mirganj-Bhagipatti-Samaurroad Damaged in 2017 Flood underGopalganj District. Agency- M.K

Enterprises Mob.-9431212686

FDR

Gop

alga

nj

549.

0700

00 /

895(

S) /

30 Ja

n 20

18

RC

C/3

2.00

03 O

ct 2

018

02 Ja

n 20

20

30 Ju

n 20

19

NOC issued. Work in progress. Pile completed- 22/22 Pile capcompleted- 03/03. Sub Structure completed. Deck slab of both

spans completed.

Remarks for LA: LA proposal for sec-21,31, 32,33 & 34submitted to DLAO Chhapra. Proposal returned at dak stage

for copy of Khatiyan.

Sara

n W

orks

Construction of 4x14.00 m HL R.C.CBridge over Saran Main Canal crossingGopalganj-Barhariya road Damaged in2017 Flood under Gopalganj District.

Agency- Sona Engicon Pvt. Ltd.Mob.-9431407389

FDR

Gop

alga

nj

790.

3000

00 /

686(

S) /

19 Ja

n 20

18

RC

C/5

6.00

03 O

ct 2

018

02 A

pr 2

020

30 Ju

n 20

19

Pile Completed- 44/44 Pile cap completed- 5/5 NOC.Received from Engineer in Chief, WRD Headquarter vide

Letter No. 319 Dt. 07.03.2019. Substructure work is inprogress.

Remarks for LA: LA proposal for sec-21,31, 32,33 & 34submitted to DLAO Chhapra. Proposal returned at dak stage

for copy of Khatiyan.

Page 44: Progress Report of Ongoing Schemes ... - brpnnl.bihar.gov.inbrpnnl.bihar.gov.in/UploadFile/20/01-Oct-2019... · Sub-Structur e (in %) Super-Structur e (in %) Appr oach (in %) Cumulative

8/24/2019 MPR Report :: Jul_2019

44/52

Achievement for the month / till month

Physical Financial

172 200.00 M 0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/2.62

173 225.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/10.00

0.00/860.68

174 0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

175 0.00 M 11.12/80.70

0.00/0.00

0.00/0.00

0.00/0.00

0.00/4.71

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Sara

n W

orks

Construction of 4x16.00 m H.L. R.C.CBridge over Saran Main Canal crossing

Bagauch-Kotnarahwan road Damaged in2017 Flood under Gopalganj District.

Agency- M/s Tirupati Bala ji Earth WorkPvt. Ltd. mob.-9431011120

FDR

Gop

alga

nj

852.

1800

00 /

685(

S) /

19 Ja

n 20

18

RC

C/6

4.00

03 O

ct 2

018

02 A

pr 2

020

30 Ju

n 20

19

NOC. Received from Engineer in Chief, WRD Headquartervide Letter No. 319 Dt. 07.03.2019. Work not started due to

public complain regarding alignment.

Remarks for LA: LA proposal for sec-21,31, 32,33 & 34submitted to DLAO Chhapra. Proposal returned at dak stage

for copy of Khatiyan.

Kha

garia

costruction of HLRCC bridge in the riverBalan at basahi ghat under bhagwanpurblock(6x21.75 m)Mansa Engicom Pvt.

Ltd.,9431060060 RWD MM

SNY

Beg

usar

ai

658.

7200

00 /

9410

(s) /

23

Jun

2010

RC

C/3

4.20

07 M

ay 2

010

05 M

ar 2

012

Land acquisition process is under last phase and notices to therelevant Raiyati is send to receive the compensation amount

by the D.L.A.O. Begusarai. Retender (Financial opened)Process for construction of Remaining Approach road is

under progress.

Kha

garia Construction of HL RCC Bridge over

Bagmati River at Nawada Ghat inChautham Block of Khagaria district

Nab

ard

RWD

Kha

garia

5614

.000

000

/ 885

/ 01

Mar

201

9

RC

C/5

07.2

0

Tender evaluation in progress.

Kha

garia

Construction of H.L. RCC Bridge overChanha River at Chhanch Ghat in 3rd

km. of Bishanpur-Sumbha Road ofKhagaria District St

ate

Plan

Kha

garia

1817

.490

000

/ 300

(S) /

10

Jan

2018

RC

C/1

08.0

4

23 O

ct 2

018

22 A

pr 2

020

Page 45: Progress Report of Ongoing Schemes ... - brpnnl.bihar.gov.inbrpnnl.bihar.gov.in/UploadFile/20/01-Oct-2019... · Sub-Structur e (in %) Super-Structur e (in %) Appr oach (in %) Cumulative

8/24/2019 MPR Report :: Jul_2019

45/52

Achievement for the month / till month

Physical Financial

176 60.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/90.00

0.00/106.70

177 2000.00M

0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/271.70

178 1100.00M

0.00/95.00

0.00/85.00

0.00/35.00

0.00/0.00

345.54/3188.94

179 1025.00M

0.00/100.00

0.00/100.00

0.00/100.00

0.00/87.00

0.00/234.33

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Muz

affa

rpur

Construction of 2x10.37M size Bridgeover Canal to Siman chakjamal Siman

Road in ward No. 33 of Vaishali District MM

SNY

Vais

hali

169.

0400

00 /

6066

(S) /

08

Jul 2

014

RC

C/2

2.00

21 N

ov 2

014

20 N

ov 2

015

30 N

ov 2

019 Bridge Completed.

Remarks for LA: 1.L.A issue in approach road under P/L.2.Area:- 0.1375 Acre. 3.Formalities of News Paper

publication has been completed. 4. Update LPC awaited forregistry.

Muz

affa

rpur Construction of Pontoon Bridge in river

Ganga between Chakosanghat toJamindari Ghat (including opening &Resetting for 5 Years) of Bidupur in

district Vaishali.

Plan

Vais

hali

3013

.650

000

/ 233

8(S)

/ 31

Mar

201

6

Pont

oon

Brid

ge/5

97.0

0

06 F

eb 2

018

05 F

eb 2

023

Work Completed (05 years maintenance upto 2023)

Muz

affa

rpur

Construction of R.C.C H.L BridgeChandauli Ghat in Bagmati River District

of Sitamarhi.

Plan

Sita

mar

hi

7089

.380

000

/ 739

4(S)

/ 10

Aug

201

6

RC

C/4

32.0

0

10 F

eb 2

016

09 A

pr 2

019

30 Ju

n 20

20

30 Ju

n 20

20

Foundation work in Progress.

Remarks for LA: It was decided to execute the LandAcquisition by perpetual Lease process by the feasibility

committee in the meeting held on 24.01.2019. A request hasbeen sent to D.M, Sitamarhi to certify the ownership of Land

awards (Rayaits) Vide letter no 419 dated 30.04.2019 (i)Mauja Chandauli Timaha - 7.285 Acres, Raiyat-59 No. (ii)Mauja Bharwari - 5.540 Acres Raiyat- 58 No. (iii) Mauja

Bharwari Nankar - 1.548Acres, Raiyat- 09 No. Total Area tobe acquired- 14.365, Total No. of Raiyat- 126 A camp was

organised with C.O. Belsand at site on 06.06.2019.Verification of Rayatee Land ownership is under process.

Muz

affa

rpur Construction of R.C.C H.L Bridge

Across Lakhandei River in Kanhauli toSursand Vaya Sonbarsa Road under Indo-

Nepal Border Road (Chainage-45.888)2x6.00m District of Sitamarhi. N

abar

d R

CD

Sita

mar

hi

246.

0600

00 /

7209

/ 09

Sep

201

3

RC

C/1

2.00

06 Ja

n 20

14

05 Ja

n 20

16

31 Ju

l 201

9 Bridge work has been completed

Remarks for LA: Work of Approach Road is under Progress,Also Process of transfer to RCD Road Division, Sitamarhi.

Page 46: Progress Report of Ongoing Schemes ... - brpnnl.bihar.gov.inbrpnnl.bihar.gov.in/UploadFile/20/01-Oct-2019... · Sub-Structur e (in %) Super-Structur e (in %) Appr oach (in %) Cumulative

8/24/2019 MPR Report :: Jul_2019

46/52

Achievement for the month / till month

Physical Financial

180 1075.00M

0.00/100.00

0.00/100.00

0.00/100.00

0.00/87.00

0.00/254.42

181 1025.00M

0.00/100.00

0.00/100.00

0.00/100.00

0.00/75.00

0.00/168.56

182 350.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/30.00

0.00/705.16

183 675.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/75.00

0.00/460.32

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Muz

affa

rpur Construction of R.C.C H.L Bridge

Across Lakhandei River in Kanhauli toSursand Vaya Sonbarsa Road under Indo-

Nepal Border Road (Chainage-46.812)2x6.00m District of Sitamarhi. N

abar

d R

CD

Sita

mar

hi

242.

9300

00 /

7209

/ 09

Sep

201

3

RC

C/7

2.00

06 Ja

n 20

14

05 Ja

n 20

16

31 Ju

l 201

9 Bridge work has been completed

Remarks for LA: Work of Approach Road is under Progress,Also Process of transfer to RCD Road Division, Sitamarhi.

Muz

affa

rpur Construction of R.C.C H.L Bridge

Across Lakhandei River in Kanhauli toSursand Vaya Sonbarsa Road under Indo-

Nepal Border Road (Chainage-45.166)2x6.00m District of Sitamarhi. N

abar

d R

CD

Sita

mar

hi

245.

6100

00 /

7209

/ 09

Sep

201

3

RC

C/1

2.00

05 Ja

n 20

14

06 Ja

n 20

16

31 Ju

l 201

9 Bridge work has been completed

Remarks for LA: Work of Approach Road is under Progress,Also Process of transfer to RCD Road Division, Sitamarhi.

Muz

affa

rpur Construction of R.C.C H.L Bridge

Across Lakhandei River in Kanhauli toSursand Vaya Sonbarsa Road under Indo-

Nepal Border Road (Chainage-26.675)4x18.00m District of Sitamarhi. N

abar

d R

CD

Sita

mar

hi

890.

1600

00 /

7209

/ 09

Sep

201

3

RC

C/7

2.00

06 Ja

n 20

14

05 Ja

n 20

16

31 Ju

l 201

9 Bridge work has been completed

Remarks for LA: Work of Approach Road is under Progress,Also Process of transfer to RCD Road Division, Sitamarhi.

Muz

affa

rpur Construction of R.C.C H.L Bridge

Across Lakhandei River in Kanhauli toSursand Vaya Sonbarsa Road under Indo-

Nepal Border Road (Chainage-22.730)1x22.00m District of Sitamarhi. N

abar

d R

CD

Sita

mar

hi

581.

5700

00 /

7209

/ 09

Sep

201

3

RC

C/2

2.00

06 Ja

n 20

14

05 Ja

n 20

16

31 Ju

l 201

9 Bridge work has been completed

Remarks for LA: Work of Approach Road is under Progress,Also Process of transfer to RCD Road Division, Sitamarhi.

Page 47: Progress Report of Ongoing Schemes ... - brpnnl.bihar.gov.inbrpnnl.bihar.gov.in/UploadFile/20/01-Oct-2019... · Sub-Structur e (in %) Super-Structur e (in %) Appr oach (in %) Cumulative

8/24/2019 MPR Report :: Jul_2019

47/52

Achievement for the month / till month

Physical Financial

184 1052.00M

0.00/100.00

0.00/100.00

0.00/100.00

0.00/80.00

0.00/660.92

185 975.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/85.00

0.00/706.25

186 750.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/80.00

0.00/790.21

187 350.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/65.00

0.00/356.70

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Muz

affa

rpur Construction of R.C.C H.L Bridge

Across Lakhandei River in Kanhauli toSursand Vaya Sonbarsa Road under Indo-

Nepal Border Road (Chainage-13.066)2x25.00m District of Sitamarhi. N

abar

d R

CD

Sita

mar

hi

719.

6400

00 /

7209

/ 09

Sep

201

3

RC

C/5

0.00

06 Ja

n 20

14

05 Ja

n 20

16

31 Ju

l 201

9 Bridge work has been completed

Remarks for LA: Work of Approach Road is under Progress,Also Process of transfer to RCD Road Division, Sitamarhi.

Muz

affa

rpur Construction of R.C.C H.L Bridge

Across Lakhandei River in Kanhauli toSursand Vaya Sonbarsa Road under Indo-

Nepal Border Road (Chainage-11.695)3x18.00m District of Sitamarhi. N

abar

d R

CD

Sita

mar

hi

835.

0200

00 /

7209

/ 09

Sep

201

3

RC

C/5

4.00

06 F

eb 2

018

05 M

ar 2

018

31 Ju

l 201

9 Bridge work has been completed.

Remarks for LA: Work of Approach Road is under Progress,Also Process of transfer to RCD Road Division, Sitamarhi.

Muz

affa

rpur Construction of R.C.C H.L Bridge

Across Lakhandei River in Kanhauli toSursand Vaya Sonbarsa Road under Indo-

Nepal Border Road (Chainage-11.011)4x22.00m District of Sitamarhi. N

abar

d R

CD

Sita

mar

hi

932.

2300

00 /

7209

/ 09

Sep

201

3

RC

C/8

8.00

06 Ja

n 20

14

05 Ja

n 20

16

31 Ju

l 201

9 Bridge work has been completed.

Remarks for LA: Work of Approach Road is under Progress,Also Process of transfer to RCD Road Division, Sitamarhi.

Muz

affa

rpur Construction of R.C.C H.L Bridge

Across Lakhandei River in Bhittah MorChikani to Parsa Road under Indo-NepalBorder Road (Chainage-3.906) 1x25.00m

District of Sitamarhi. Nab

ard

RC

D

Sita

mar

hi

418.

9800

00 /

7209

/ 09

Sep

201

3

RC

C/2

5.00

06 Ja

n 20

14

05 Ja

n 20

16

31 Ju

l 201

9 Bridge work has been completed.

Remarks for LA: Work of Approach Road is under Progress,Also Process of transfer to RCD Road Division, Sitamarhi.

Page 48: Progress Report of Ongoing Schemes ... - brpnnl.bihar.gov.inbrpnnl.bihar.gov.in/UploadFile/20/01-Oct-2019... · Sub-Structur e (in %) Super-Structur e (in %) Appr oach (in %) Cumulative

8/24/2019 MPR Report :: Jul_2019

48/52

Achievement for the month / till month

Physical Financial

188 500.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/50.00

0.00/480.17

189 240.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/0.00

0.00/823.65

190 240.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/60.00

0.00/318.80

191 240.00 M 0.00/100.00

0.00/100.00

0.00/95.00

0.00/60.00

0.00/329.85

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Muz

affa

rpur Construction of R.C.C H.L Bridge

Across Lakhandei River in Bahar-Villageto Kanauli Road under Indo-NepalBorder Road (Chainage-132.400)1x40.00m District of Sitamarhi. N

abar

d R

CD

Sita

mar

hi

599.

7500

00 /

7209

/ 09

Sep

201

3

RC

C/4

0.00

06 Ja

n 20

14

05 Ja

n 20

16

31 Ju

l 201

9 Bridge work has been completed.

Remarks for LA: Work of Approach Road is under Progress,Also Process of transfer to RCD Road Division, Sitamarhi.

Muz

affa

rpur

Construction of R.C.C H.L BridgeBelsand-chhitauni-Tariyani Road in 2nd

Km. 4x21.00M District of Sitamarhi.

Nab

ard

RC

D

Sita

mar

hi

851.

4600

00 /

1012

5 / 1

0 Se

p 20

12

RC

C/8

4.00

30 D

ec 2

012

30 Ju

n 20

14

30 Ju

n 20

20

30 Ju

n 20

20

Bridge work has been completed & Agreement Closed.

Remarks for LA: Corrected Revised Estimate for theremaining work provisioning L/A & Approach road has beensubmitted. Publication in news papers regarding objection ofland ownership (Rayatee) has been done. LPC & Valuation is

awaited for registration of land. Mauja - Basaul - 0.520 3Acres. Raiyat- 06 No.

Muz

affa

rpur "Construction of 3x18.75m H.L.R.C.C.

Bridge in 3rd km of Aurai- Jale Road inthe district of Muzaffarpur. Ram Swarth

Rai, Mob- 9471091378"

FDR

Muz

affa

rpur

590.

4000

00 /

277(

S) /

10 Ja

n 20

18

RC

C/5

8.12

24 M

ay 2

018

23 A

ug 2

019

31 A

ug 2

019

Work in Progress.

Muz

affa

rpur "Construction of 3x18.75m H.L.R.C.C.

Bridge in 7th km of Aurai- Jale Road inthe district of Muzaffarpur. Ram Swarth

Rai, Mob- 9471091378"

FDR

Muz

affa

rpur

588.

4700

00 /

152(

S) /

05 Ja

n 20

18

RC

C/5

8.12

24 M

ay 2

018

23 A

ug 2

019

31 A

ug 2

019

Work in Progress.

Page 49: Progress Report of Ongoing Schemes ... - brpnnl.bihar.gov.inbrpnnl.bihar.gov.in/UploadFile/20/01-Oct-2019... · Sub-Structur e (in %) Super-Structur e (in %) Appr oach (in %) Cumulative

8/24/2019 MPR Report :: Jul_2019

49/52

Achievement for the month / till month

Physical Financial

192 700.00 M 0.00/100.00

0.00/75.00

0.00/10.00

0.00/15.00

22.86/489.68

193 2030.00M

0.00/100.00

0.00/100.00

0.00/95.00

0.00/60.00

77.81/2973.86

194 1306.00M

0.00/100.00

0.00/100.00

0.00/73.00

0.00/0.00

0.00/2372.14

195 250.00 M 0.00/15.00

0.00/0.00

0.00/0.00

0.00/5.00

126.37/323.37

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Muz

affa

rpur "Construction of 4x24.00m H.L.R.C.C.

Bridge in 1st km of Meenapur BelsandRoad in the district of Muzaffarpur. Jay

Shankar Kumar, Mob-9431006580 "Pl

an

Muz

affa

rpur

1246

.610

000

/ 842

8(S)

/ 22

Sep

201

7

RC

C/9

6.00

24 M

ay 2

018

23 M

ay 2

020

31 M

ay 2

020

Work in Progress

Muz

affa

rpur "Construction of 12x24.00 m H.L.R.C.C.

Bridge in Athar Ghat over BhudhiGandak river under Bochaha Block in the

district of Muzaffapur. (Plan) GaneshRam Dokania, Mob- 9471637819"

Plan

Muz

affa

rpur

3554

.810

000

/ 181

7(S)

/ 28

Feb

201

4

RC

C/2

97.0

0

22 N

ov 2

014

21 N

ov 2

016

31 M

ar 2

020

31 M

ar 2

020

Work in Progress.

Remarks for LA: Athar banshman Mauja-5.485 acres.Bishunpur Jagdish Mauja-2.605 acres. Binda Mauja-10.615

acres.Total land- 18.705 acres. Total Raiyat- 66 LPC receivedfrom DM, Muzaffarpur Registred LPC- 34 Registred Area-6.07 Acres. Corrected LPC awaited from D.M.Muzaffarpur.

Muz

affa

rpur

"Construction of 12x24.00 m H.L.R.C.C.Bridge in Dr Jagarnath Mishra College inbetween Soda Godaun to Ahiyapur with

approach road in the district ofMuzaffarpur. (Nabard). Ganesh Ram

Dokania, Mob- 9471637819"

Nab

ard

Muz

affa

rpur

4329

.610

000

/ 788

9(S)

/ 03

Jan

2013

RC

C/3

00.0

0

19 F

eb 2

014

18 F

eb 2

016

30 Ju

n 20

20

30 Ju

n 20

20

Work in Progress

Remarks for LA: LA Issue for approachroad. ChaqmohabbatMauja- 2.547 acres,Nazirpur Mauja- 2.43 acres, ChandrawaraMauja- 8.043 acres, Total Land- 13.02 acres, Total Raiyat- 38,

Documents are being prepared for registry.

Saha

rsa

Construction of High Level RCC(4x18.75) Bridge at Dakra Dhar of

Mahishi Block on the Ena to KanadiyaRoad (NABARD) Shankar Sharma

9934756142 Nab

ard

RWD

Saha

rsa

1810

.680

000

/ 129

3 / 1

6 A

pr 2

018

RC

C/6

34.0

0

Agg - 1418.23 Lac Well Curb A1- 6 lift , P1- 9 Lift, P2 - 9Lift, P3 - 8 Lift, P4 - 5lift and P5 - 5 lift Complete.

Page 50: Progress Report of Ongoing Schemes ... - brpnnl.bihar.gov.inbrpnnl.bihar.gov.in/UploadFile/20/01-Oct-2019... · Sub-Structur e (in %) Super-Structur e (in %) Appr oach (in %) Cumulative

8/24/2019 MPR Report :: Jul_2019

50/52

Achievement for the month / till month

Physical Financial

196 200.00 M 0.00/100.00

0.00/100.00

5.00/85.00

0.00/10.00

0.00/140.65

197 200.00 M 0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

198 200.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/65.00

0.00/808.87

199 1122.00M

0.00/100.00

0.00/90.00

0.00/35.00

0.00/0.00

32.38/552.75

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Saha

rsa

"Construction of High Level RCC Bridge(3x16.50M) at 2.70th KM of Lalminiyan-

Simraha Road in the district of Suapulincluding Approach road, ProtectionWork, in flood effected damage year

2017. Haqu Construction Mob -9955334076 & 7667383440"

FDR

Supa

ul

395.

5600

00 /

508(

S) /

16 Ja

n 20

18

49.5

0

06 S

ep 2

018

05 D

ec 2

019

30 Ju

n 20

19 Agg - 282.53 Lac All Deck slab Completed. Approach Roadis in Progress.

Saha

rsa

"Construction of High Level RCC Bridge(4x24.75M) at 19th KM of Nirmali-

Marauna-Madhepur Road in the districtof Suapul including Approach road,Protection Work, in flood effecteddamage year 2017. Shashi Ranjan

7488173962"

FDR

Supa

ul

604.

0000

00 /

47(S

) / 0

2 Ja

n 20

18

RC

C/1

01.4

8

31 M

ay 2

018

30 A

ug 2

020

30 Ju

n 20

19 Agg - 573.64 Lac For cancellation of project , written by M.DLetter No - 908 (We) Date - 29-03-2019

Saha

rsa

"Constraction of HL RCC (6x18.00M)Bridge on tilyuga River in 1st KM of

Lalminia-simraha road under Plan HeadMarouna block in supaul distt. Raj

Construction 9430883767"

Plan

Supa

ul

1359

.630

000

/ 300

7(S)

/ 31

Mar

201

5

RC

C/1

11.6

0

30 D

ec 2

015

30 D

ec 2

017

Agg - 821.36 Lac Bridge Work is Complete. Approach Workin Progress Perpetual Lease is in Progress

Saha

rsa

"Construction of High Level RCC Bridge(6x18.75) Marauna block of GanauraPWD Road to Maharaji Tola in the

district of Supaul (NABARD) ManojKumar - 9470049418" N

abar

d RW

D

Supa

ul

1178

.160

000

/ 745

2 / 1

4 Ju

l 201

7

RC

C/1

30.5

0

30 Ja

n 20

18

30 D

ec 2

020

Agg - 798.534 Lac All Well complete. Two no. Deck SlabCompleted

Page 51: Progress Report of Ongoing Schemes ... - brpnnl.bihar.gov.inbrpnnl.bihar.gov.in/UploadFile/20/01-Oct-2019... · Sub-Structur e (in %) Super-Structur e (in %) Appr oach (in %) Cumulative

8/24/2019 MPR Report :: Jul_2019

51/52

Achievement for the month / till month

Physical Financial

200 200.00 M 0.00/100.00

0.00/100.00

0.00/100.00

5.00/70.00

0.00/219.04

201 200.00 M 0.00/100.00

0.00/100.00

10.00/90.00

0.00/35.00

0.00/159.05

202 200.00 M 0.00/100.00

0.00/100.00

20.00/40.00

0.00/10.00

0.00/150.61

203 200.00 M 0.00/100.00

0.00/100.00

30.00/90.00

0.00/35.00

0.00/311.53

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Saha

rsa

"Construction of High Level RCC Bridge(3x16.50M) at 5th KM of Balthi

Musharniyan Road in the district ofSaharsa including Approach road,Protection Work, in flood effected

damage year 2017 Arju Construction -9304026134"

FDR

Saha

rsa

309.

7000

00 /

510(

S) /

16 Ja

n 20

18

RC

C/4

9.50

03 A

ug 2

018

02 N

ov 2

019

30 Ju

n 20

19 Agg - 280.12 Lac Bridge work in complete. Approach Roadwork is in progress

Saha

rsa

"Construction of High Level RCC Bridge(2x16.50M) at 1st KM of Fatehpur-

Kashnagar Road in the district of Saharsaincluding Approach road, Protection

Work in flood effected damage year 2017Balram Singh-9431082277"

FDR

Saha

rsa

317.

0000

00 /

482(

S) /

15 Ja

n 20

18

RC

C/3

3.50

03 A

ug 2

017

02 A

ug 2

019

30 Ju

n 20

19 Agg - 241.26 Lac Deck Slab Completed in both Span. Earthwork progress in approach road.

Saha

rsa

Construction of High Level RCC Bridge(2x16.50M) at 3rd KM of Balthi

Musharniyan viya N.H.-107 to BundRoad in the district of Saharsa including

Approach road, Protection Work, in floodeffected damage year 2017 Balram

Singh-9431082277

FDR

Saha

rsa

386.

7100

00 /

483(

S) /

15 Ja

n 20

18

RC

C/3

3.50

03 A

ug 2

018

02 A

ug 2

019

30 Ju

n 20

19 Agg - 288.06 Lac Substructure work is Complete. SuperStructure in progress. Earth Work is in progress

Saha

rsa

Construction of High Level RCC Bridge(3x24.75M) at 3.85th KM of Balthi

Musharniyan viya N.H.-107 Road in thedistrict of Saharsa including Approach

road, Protection Work, Diversion Work.Shashi Ranjan 7488173962

FDR

Saha

rsa

826.

9900

00 /

1207

5(S)

/ 27

Dec

201

7

RC

C/7

6.09

07 A

pr 2

018

19 O

ct 2

019

Agg - 486.46 Lac All Span Deck Slab is complete. Earthwork in progress of Approach road

Page 52: Progress Report of Ongoing Schemes ... - brpnnl.bihar.gov.inbrpnnl.bihar.gov.in/UploadFile/20/01-Oct-2019... · Sub-Structur e (in %) Super-Structur e (in %) Appr oach (in %) Cumulative

8/24/2019 MPR Report :: Jul_2019

52/52

Achievement for the month / till month

Physical Financial

204 400.00 M 0.00/100.00

0.00/90.00

0.00/0.00

0.00/10.00

0.00/174.76

205 0.00 M 0.00/100.00

0.00/100.00

20.00/30.00

0.00/15.00

0.00/156.29

206 300.00 M 0.00/100.00

0.00/100.00

0.00/80.00

0.00/30.00

0.00/164.21

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Saha

rsa

Construction of High Level RCC Bridge(3x21.75M) at 5.40th KM of Gwalpadato Bihariganj Road at the place of OldScrow Pile Bridge including ApproachRoad, Protection work, in the district ofMadhepura, in flood effected damage

year 2017. (Pile Foundation) ShivKrishna Builders Pvt.ltd. Mob -

9431268201

FDR

Mad

hepu

ra

482.

5500

00 /

899(

s) /

30 Ja

n 20

18

RC

C/6

7.12

06 S

ep 2

018

05 D

ec 2

019

30 Ju

n 20

19

Agg - 350.40 Lac Work is Progress

Saha

rsa

Construction of High Level RCC Bridge(3x16.50M) at 6.60th KM of Gwalpadato Bihariganj Road at the place of Old

Scrow Pile Bridge in the district ofMadhepura, in flood effected damage

year 2017. Manoj Kumar - 9470049418

FDR

Mad

hepu

ra

419.

4300

00 /

1196

7(s)

/ 21

Dec

201

7

RC

C/5

1.37

07 A

pr 2

018

06 A

pr 2

019

30 Ju

n 20

19 Agg - 287.95 Lac 1st Deck slab work is Completed. 2nd DeckSlab is in Progress

Saha

rsa

Construction of High Level RCC Bridge(3x16.50M) at 10.00th KM of

Lalminiyan-Simraha Road in the districtof Suapul including Approach road,Protection Work, in flood effected

damage year 2017. Laxman Kumar -9431383203

FDR

Supa

ul

425.

0000

00 /

509(

s) /

18 Ja

n 20

18

49.5

0

28 S

ep 2

018

27 D

ec 2

019

30 Ju

n 20

19 Agg - 314.44Lac All Deck slab Completed. Approach Road isin Progress.