Project Fact Sheet 4 Stations Hammond Gateway South Hammond Munster Ridge Road Munster/Dyer Main Street Parking: Each proposed station concept design includes a parking lot, Kiss-and-Ride area, and ADA parking area. Maintenance & Storage: New combined facility in north Hammond to take advantage of shared facilities and central location. Sustainability Focus: Designed with a focus on sustainability and wetland mitigation. Project Overview The Northern Indiana Commuter Transportation District (NICTD) proposes to expand its commuter rail service through an approximate eight-mile extension of the South Shore Line (SSL), known as the West Lake Corridor Project (Project). The line would be extended to the south to provide passenger rail service to three municipalities in Lake County, Indiana: Hammond, Munster and Dyer. Trains on the new branch line would connect with the existing SSL and ultimately with the Metra Electric District (MED) line to the north to Millennium Station in downtown Chicago— a total distance of approximately 30 miles. This Project would provide a vital transportation link connecting northwest Indiana with Chicago and Cook County, Illinois. It would also expand NICTD’s service coverage, improve mobility and accessibility, and stimulate local job creation and economic development opportunities for Lake County. What Happens Next? In March 2019, NICTD received a positive Medium-High rating for the project from FTA. NICTD is awaiting approval from the FTA to enter into the final engineering phase of the project. NICTD issued a Request for Proposal seeking engineers and construction contractors to design and build the West Lake Project. With a Design-Build approach, the engineers and contractor work under a single contract with NICTD to provide integrated design and construction services. The combined Design-Build approach can save money by compressing the schedule and using one team from conceptual design through completion. Following review of the proposals, a Best Value Offeror was identified. Negotiations are underway and the Design-Build contract is expected to be awarded in 2020. HOW TO REACH US: NICTD West Lake Corridor Project, 33 East U.S. Highway 12, Chesterton, IN 46304 www.nictdwestlake.com | [email protected] | automated phone: 219.250.2920 Key Milestones EIS Process: 2014 to 2018 Property Acquisition: to begin in mid-2019 Engineering and Construction: 2020 to 2026 Project Completion: 2026 Project Cost Current capital cost estimate for the project, with the addition of the Gateway Station in North Hammond, is $852M. Capital costs will be updated as the project and design are further refined. Approximate Length: 8 Miles dedicated guideway Operating Schedule: 12 trips to/from Millennium Station (weekday peak) 12 trips connecting to South Shore Line (SSL) Trains at Hammond Gateway (weekday off-peak) Travel Time: 47 Minutes Munster/Dyer Main Street to Millennium Station in Chicago 14 Minutes Munster/Dyer Main Street to Hammond Gateway Station

Upload: others

Post on 16-Oct-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Project act heet · 1 day ago · Project act heet 4 Stations Hammond Gateway South Hammond Munster Ridge Road Munster/Dyer Main Street Parking: Each proposed station concept design

Project Fact Sheet

4 StationsHammond Gateway South HammondMunster Ridge RoadMunster/Dyer Main Street

Parking:Each proposed station concept design includes a parking lot, Kiss-and-Ride area, and ADA parking area.

Maintenance & Storage:New combined facility in north Hammond to take advantage of shared facilities and central location.

Sustainability Focus:Designed with a focus on sustainability and wetland mitigation.

Project Overview The Northern Indiana Commuter Transportation District (NICTD) proposes to expand its commuter rail service through an approximate eight-mile extension of the South Shore Line (SSL), known as the West Lake Corridor Project (Project). The line would be extended to the south to provide passenger rail service to three municipalities in Lake County, Indiana: Hammond, Munster and Dyer. Trains on the new branch line would connect with the existing SSL and ultimately with the Metra Electric District (MED) line to the north to Millennium Station in downtown Chicago— a total distance of approximately 30 miles.

This Project would provide a vital transportation link connecting northwest Indiana with Chicago and Cook County, Illinois. It would also expand NICTD’s service coverage, improve mobility and accessibility, and stimulate local job creation and economic development opportunities for Lake County.

What Happens Next?In March 2019, NICTD received a positive Medium-High rating for the project from FTA. NICTD is awaiting approval from the FTA to enter into the final engineering phase of the project.

NICTD issued a Request for Proposal seeking engineers and construction contractors to design and build the West Lake Project. With a Design-Build approach, the engineers and contractor work under a single contract with NICTD to provide integrated design and construction services. The combined Design-Build approach can save money by compressing the schedule and using one team from conceptual design through completion.

Following review of the proposals, a Best Value Offeror was identified. Negotiations are underway and the Design-Build contract is expected to be awarded in 2020.

HOW TO REACH US:NICTD West Lake Corridor Project, 33 East U.S. Highway 12, Chesterton, IN 46304

www.nictdwestlake.com | [email protected] | automated phone: 219.250.2920

Key Milestones • EIS Process: 2014 to 2018 • Property Acquisition: to begin in mid-2019 • Engineering and Construction: 2020 to 2026 • Project Completion: 2026

Project CostCurrent capital cost estimate for the project, with the addition of the Gateway Station in North Hammond, is $852M. Capital costs will be updated as the project and design are further refined.

Approximate Length: 8 Miles dedicated guideway

Operating Schedule: 12 trips to/from Millennium Station (weekday peak)

12 trips connecting to South Shore Line (SSL) Trains at Hammond Gateway (weekday off-peak)

Travel Time:47 Minutes Munster/Dyer Main Street to Millennium Station in Chicago

14 Minutes Munster/Dyer Main Street to Hammond Gateway Station

Page 2: Project act heet · 1 day ago · Project act heet 4 Stations Hammond Gateway South Hammond Munster Ridge Road Munster/Dyer Main Street Parking: Each proposed station concept design

West Lake Corridor | Project Fact Sheet | August 2020

Bock Park Lions Park

LibertyMemorial

Park

RotaryPark

NorthgateCommunity

Park

Briar CreekPark

Riverside Park

MunsterCommunity Park

OakwoodPark

CentennialPark

Dr MLK ParkMemorial Park

Veterans Park

Harrison Park

Little Calumet River Trail

Edison Park

Pulaski Park

HermitPark

Pennsy Greenway

Burn

ham

Gre

enwa

y

Mon

on Tr

ail

ReavisElementary

School

HammondSchool

HeritageMiddle School

Nathan HaleElementary School

ProtsmanElementary

School

BurnhamElementary

School

Henry WEggers School

HammondHigh School

Thomas EdisonElementary School

MaywoodElementary School

St Casimir School

Washington IrvingElementary School

ConcordiaCemetery

Oak HillCemetery

SOUTH HAMMOND

MUNSTER RIDGE ROAD

MUNSTER/DYER MAIN STREET

HAMMOND GATEWAY

HEGEWISCH

HAMMOND

EAST CHICAGO

8094

90

80

94

END IMPROVEMENT

BEGIN IMPROVEMENT

41

41

12

41

20

912

90

312

152

94

83

6

394

30

LANSING

ILLI

NO

ISIN

DIA

NA

COO

K CO

UN

TYLA

KE C

OU

NTY

EASTCHICAGO

HIGHLAND

DYER

MUNSTER

WHITING

SCHERERVILLE

HAMMOND

CHICAGOHEIGHTS

SAUKVILLAGE

LYNWOOD

CHICAGO

CALUMETCITY

BURNHAM

SOUTHHOLLAND

THORNTON

DOLTON

FORDHEIGHTS

GLENWOOD

GRIFFITHLansingMunicipal

Airport

94

Wolf Lake

PowderHorn Lake

Calumet RiverGrand

Little Calumet River

LakeCalumet

Existing Station

South Shore Line

State Line

Major Roadway

Locally Preferred Alternative(At-Grade)

Locally Preferred Alternative(Elevated - Open UnderpassStructure)

Proposed Station

Existing Railroad Track

Stream and Water Body

WEST LAKE CORRIDOR PROJECT MAP - HAMMOND, IN TO DYER, IN

0 1½Miles

N

Bock Park Lions Park

LibertyMemorial

Park

RotaryPark

NorthgateCommunity

Park

Briar CreekPark

Riverside Park

MunsterCommunity Park

OakwoodPark

CentennialPark

Dr MLK ParkMemorial Park

Veterans Park

Harrison Park

Little Calumet River Trail

Edison Park

Pulaski Park

HermitPark

Pennsy Greenway

yawneer G mahnr uB li arT nono

M

ReavisElementary

School

HammondSchool

HeritageMiddle School

Nathan HaleElementary School

ProtsmanElementary

School

BurnhamElementary

School

Henry WEggers School

HammondHigh School

Thomas EdisonElementary School

MaywoodElementary School

St Casimir School

Washington IrvingElementary School

ConcordiaCemetery

Oak HillCemetery

SOUTH HAMMOND

MUNSTER RIDGE ROAD

MUNSTER/DYER MAIN STREET

HAMMOND GATEWAY

HEGEWISCH

HAMMOND

EAST CHICAGO

8094

90

80

94

END IMPROVEMENT

BEGIN IMPROVEMENT

41

41

12

41

20

912

90

312

152

94

83

6

394

30

LANSING

ILLI

NO

ISIN

DIA

NA

COO

K CO

UN

TYLA

KE C

OU

NTY

EASTCHICAGO

HIGHLAND

DYER

MUNSTER

WHITING

SCHERERVILLE

HAMMOND

CHICAGOHEIGHTS

SAUKVILLAGE

LYNWOOD

CHICAGO

CALUMETCITY

BURNHAM

SOUTHHOLLAND

THORNTON

DOLTON

FORDHEIGHTS

GLENWOOD

GRIFFITHLansingMunicipal

Airport

94

Wolf Lake

PowderHorn Lake

Calumet RiverGrand

Little Calumet River

LakeCalumet

Existing Station

South Shore Line

State Line

Major Roadway

Locally Preferred Alternative(At-Grade)

Locally Preferred Alternative(Elevated - Open UnderpassStructure)

Proposed Station

Existing Railroad Track

Stream and Water Body

0 1½Miles

N

Page 3: Project act heet · 1 day ago · Project act heet 4 Stations Hammond Gateway South Hammond Munster Ridge Road Munster/Dyer Main Street Parking: Each proposed station concept design

“With the expansion of the NICTD South Shore Commuter Rail Line – West Lake Corridor Project and Double Track NWI expansion – the Region will see increased economic development by attracting and keeping residents in Northwest Indiana. The South Shore Convention and Visitors Authority’s Board of Directors

supports the expansion as a source of increased business for our hospitality assets and to create opportunities to bring additional high-paying jobs to our corner of the state.”

South Shore Convention and Visitors Authority Board of Directors and Staff • www.southshorecva.com

West Lake Corridor | Project Fact Sheet | August 2020

20252014 2015 2016 2017 2018 2019 2020 2021 2022

Request to Enter

PD

Responded to Comments on Draft EIS and Prepare Combined FEIS/ROD

Issued Notice of Intent to

Prepare EIS

Scoping

Included Proposed Actions, Environmental Findings and Mitigation Requirements in

Combined FEIS/ROD

Environmental Impact Statement Process

Developed and Screened Alternatives

for Inclusion in Draft EIS

Prepared Draft EIS on Remaining

Alternatives

Conducted Scoping to Identify Issues

FEIS & ROD Draft EISScoping & Screening

Adoption of LPA

Publish FEIS/ROD

Environmental Impact Statement

Submit New Starts

Project Rating

Circulated Draft EIS and Hold Public Hearings

Published FEIS/ROD March 9, 2018

New StartsFull Funding

Grant Agreement

Anticipated Beginning of Real Estate Acquisition

2023 2026

Commissioning& Testing

Begin Design-Build Procurement

Project Development

Engineering

2024

Begin Revenue

Operations

NEPA = National Environmental Policy ActPD = Project DevelopmentLPA = Locally Preferred AlternativeFTA = Federal Transit AdministrationEIS = Environmental Impact StatementFEIS = Final Environmental Impact StatementROD = Record of Decision

Formal public opportunity for comments during EIS process

Construction