project administration hanna poikela 22 june 2015 summer school edusafe summer school 22 – 26 june...
TRANSCRIPT
Edusafe Summer School 22 – 26 June 2015
Project Administration
Hanna Poikela22 June 2015
Summer School
Edusafe Summer School 22 – 26 June 2015
Outline
• Training events• Deliverable and Milestone reports • Outreach and dissemination• Non-technical responsibilities• Secondments• Summer School practicalities
Edusafe Summer School 22 – 26 June 2015
Training EventsTraining event Tentative timing
Summer School June 2015, CERN
1st Joint training event September 2015, AUEB
2nd Joint training event December 2015, CERN
1st Joint training event concentrates on business training 2nd Joint training event includes training on CV writing and
interview skills
Technical meeting Testing campaign
Deliverable reportsNo W
PDeliverable Author Reviewer DL
D-4.2 4 Flexible system architecture of display setups, usability Yuta Itoh G. Klinker 31.3.2015
D-2.3 2 Algorithm designed for WRM tested and design concept translated in the first executive layout for multi-project run.
A. Abdallah, D. Felici, NS. LakshmiPrabha, P. Mousouliotis, A. Crivellaro, Y. Verdie
G. Aielli 31.3.2015
D-3.3 3 PSS module, CS, DAQ first prototype developed, performance test and system documentation F. Alam, E. Adamidi S. Katsikas 31.5.2015
D-5.3 5 Technol. assessment & reverse engineering potential V. Mantzios K. Pramatari 30.6.2015D-3.4 3 PSS module, CS, DAQ 2nd prototype developed, performance test and system
documentation 31.10.2015
D-4.5 4 New gamma imager, reconstruction algorithms and new fast dose calculation algorithms, including AR features performance and validation test campaign 31.10.2015
D-4.3 4 Report on scenario, technical options and evaluations of suitable display setups for selected scenarios 31.10.2015
D-6.1 6 Integrated VR/AR system prototype 31.1.2016
D-2.4 23D imaging, visualizer & tracking system and patch recognition method developed and integrated into visualization system and WRM acceleration platform. Validation tests completed.
31.1.2016
D-2.5 2 Final prototype, evaluation board and starter ready for final test in ATLAS 31.1.2016
D-5.4 5 Business plan, Financial plan, IPR protection plan 31.1.2016
D-3.5 3PSS system module, CS, DAQ HW+ SW final doc. incl. final tests results and recommendations, and incl. report on scalability and adaptability to different infrastructure and environmental conditions
31.1.2016
D-6.2 6 Validation of data from demonstration 30.6.2016D-5.5 5 Market feedback on prototype and demonstration 31.7.2016
Edusafe Summer School 22 – 26 June 2015
Milestone reportsNo WP Milestone Author Reviewer DL
MS-20 3 PSS module first prototype manufactured, Control system and DAQ first prototype developed
F. Alam,E. Adamidi S. Katsikas 31.3.2015
MS-16 2 First WRM layout, prod. and system integration; function library for executing patch based algorithms and Hough transform on WRM
A. Abdallah, D. Felici, NS. LakshmiPrabha,P. Mousouliotis, A. Crivellaro, Y. Verdie
G. Aielli 31.3.2015
MS-27 5 Reverse engineering methodology completed V. Mantzios K. Pramatari 15.5.2015MS-26 5 Technology assessment and framework + market study completed Vasileios Mantzios K. Pramatari 30.6.2015
MS-17 2 Final WRM prototype integrated in the DAQ system; performance test of the pattern recognition libraries accelerated by the WRM
A. Abdallah, D. Felici, NS. LakshmiPrabha,P. Mousouliotis, A. Crivellaro, Y. Verdie
G. Aielli 31.7.2015
MS-21 3 PSS module final prototype developed F. Alam,E. Adamidi S. Katsikas 31.7.2015
MS-24 4 Display infrastructure interactivity protocol and user interface developed, gamma imaging camera HW/SW prototype developed 31.10.2015
MS-30 6 Integrated VR/AR system tested and integrated into CERN PSS 31.1.2016
MS-31 6 Integrated VR/AR system demonstrated in simulated planned maintenance activity at CERN and results validated 31.7.2016
Edusafe Summer School 22 – 26 June 2015
Outreach and dissemination
• Visits to universities (D-1.5)• Visits to high schools (D-1.6)• Participation in annual Researchers Nights (D-1.7)
• Publications (D-1.8)• Conferences (D-1.9)
Edusafe Summer School 22 – 26 June 2015
Non-technical responsibilities
• Career Development plans– Update annually (responsibility of the beneficiary)
• Annual appraisal of research progress and training – Remember to do this (deliverable in Annex I)
• 2nd Progress report due in September 2015– WP annual reports– Researcher reports– PCDP update
Edusafe Summer School 22 – 26 June 2015
Secondments
• Length: min 2 weeks– Otherwise considered a visit
• 30% rule
• Academia Industry • List of secondments in Annex I, p. 27• Internal reporting
Edusafe Summer School 22 – 26 June 2015
Communication training
• Novotel, Ferney-Voltaire– Start at 8.30 am– Transportation– Lunch at Novotel
• Pre-course work– 3 min presentation of your (life) story
Enjoy! Have fun!
Edusafe Summer School 22 – 26 June 2015
Dinner Café de l’Aviation
• Café de l’Aviation, today at 7pm• Public transportation
Tram 18 from Cern to Blandonnet (at 18.32)Chemin des Coquelicots 18, 1214 Vernier
• Menu Salade PaysanneEntrecôte Caravelle , Frites maison Moelleux au chocolat
Edusafe Summer School 22 – 26 June 2015
Edusafe Summer School 22 – 26 June 2015
Deliverables WP1 (not reports)
No WP
Deliverable DL Status
D-1.1 1 Kick-off meeting minutes 09/2012 Ok
D-1.2 1 Project website completed and internal + external communication channels set up 09/2012 Ok
D-1.3 1 Scientific, management and progress reports 08/2013, 08/2014, 08/2015,08/2016
Ongoing
D-1.4 1 Agenda/minutes of SB and EC meetings - Ongoing
D-1.5 1 Outreach: Visits by Fellows to universities completed 02/20142/20152/2016
Ongoing
D-1.6 Outreach: Fellows’ visit to high schools completed 10/2015 Ongoing
D-1.7 Outreach: Fellows participation in annual Researchers Nights completed 1/2014,1/20153/2016
Ongoing
D-1.8 Publications in journals 8/2016 Ongoing
D-1.9 Participation of Fellows in conferences 8/2016 Ongoing
D-1.10 Final report to the EC 8/2016 Not started
Edusafe Summer School 22 – 26 June 2015
Milestones WP1 (not reports)No WP Milestone DL Status
MS-1 1 Project kick-off meeting; recruitment process for all partners validated 9/2012 Ok
MS-2 1 Intake: 10 ESRs recruited 2/2013 Ok
MS-3 1 Kick-off week for ESRs completed 2/2013 Ok
MS-4 1 Review of periodic appraisals (supervisors-fellows) between CO and supervisors completed 08/2013, 08/2014, 08/2015,08/2016
Ongoing
MS-5 1 Second intake: 2 ERs recruited M18 Ok
MS-6 1 Summer Schools 1 + 2 completed M18, M33 Ongoing
MS-7 1 First Joint Training Event 1 + 2 completed M22, M26 Ongoing
MS-8 1 Midterm review completed and accepted by European Commission M24 Ok
MS-9 1 All Outreach activities (see deliverables list) completed M41
M-10 1 All Fellow secondments completed M42
M-11 1 Participation of Fellows in external conferences completed M42
M-12 1 Final conference completed with presentations from all Fellows M48
M-13 1 Articles in scientific journals published M48
M-14 1 Final report completed and accepted by European Commission M48
Edusafe Summer School 22 – 26 June 2015
Milestones WP2-WP5 (not reports)
No WP Milestone DL Status
MS-18,MS-22, MS-25,MS-28
2,3,4,5 Local specific trainings completed 4/2016 Ongoing
MS-29 5 Exploitation plan accepted by all partners 8/2016 Not started
Edusafe Summer School 22 – 26 June 2015
Deliverables WP2-WP5 (not reports)No WP Deliverable DL Status
D-2.6,D-3.2,D-4.6,D-5.2
2,3,4,5 Annual appraisal of research progress and training 2/2014,2/2015, 4/2016
Ongoing
D-2.7,D-3.6,D-4.7,D-5.6
Presentation of Fellow’s research at end conference 8/2016 Not started