Project and Certification Approval Processes Kaizen Event
Black Ink Ops:Ramiro Jara, Paul Koelle, Willis Read-Button, Jessica Watkins
Report Out for May 12, 2010 MGMT E-5060
• Global manufacturer of medical devices and pharmaceuticals
• 42,000 employees with 58 manufacturing facilities located in 16 countries
• 2009 Sales – $10.9 BB
Medical DevicesEndomechanical, Energy,
Airway, Soft Tissue Repair, OximetryPharmceuticals
Specialty Pharma, Contrast, Radiopharma
Medical SuppliesOR, Nursing Care,
SharpSafety
About Covidien
Covidien / Black Ink Ops | May 12, 2010 | Confidential2 |
Master Black Belt 44
Black Belt 367
Green Belt 861
Lean Leader 374
OpEx Program Savings to Date:
OpEx Program Certifications to Date:
> $1.2 BB
Covidien / Black Ink Ops | May 12, 2010 | Confidential3 |
Kaizen Event Daily Structure
Covidien / Black Ink Ops | May 12, 2010 | Confidential4 |
• Focused 5-day, team-based, action-oriented activity focused on one discrete improvement effort
• Part of Value Stream Analysis of strategic processes• 4-6 people in a team, devoted to the effort for the week• Change is implemented as part of the Event• ‘Lean Sensei’ coach helps with methodology and learning
Covidien / Black Ink Ops | May 12, 2010 | Confidential5 |
Process Overview: Project and Certification Approvals
Candidate
Training
Exam
Corporate OpEx
Certification
Project #2
Certification Request
Project #1
Approval
Scope
Paper Based FormsProject Tracking - Instantis
Current State Process
Covidien / Black Ink Ops | May 12, 2010 | Confidential6 |
Multitude of StepsLong Lead Time
Current State Value Stream Map (VSM)
Covidien | April 19, 2023 | Confidential7 |
Int’l USALead Time: 651.31hrs 650.81hrsCycle Time: 3.31hrs 2.81hrs
First Pass Yield: 50%
Pareto Chart
Covidien | April 19, 2023 | Confidential8 |
Batching Projects
Lack Std. Work
Misuse of Tools
Incomplete Forms
Excessive L/T
Root Causes/Solutions
Problem Action
Batching of 1st and 2nd Projects • Begin Monthly Project Reviews• Enable project approvals at local level
Lack of Standard Work • Create standard work guidelines
Misuse of Tools • Create more accountability and mentorship through Monthly Reviews and Quarterly Audits by Corporate OpEx team
• Create Feedback Loop back to training team
Incomplete Forms • Migrate from paper-based to electronic forms with required field lockouts
Excessive Lead Time • Migrate from paper-based to electronic forms for improved stakeholder access
• Improve ability to access forms and approve during travel
• Eliminate redundant sign-offs and touches
Covidien | April 19, 2023 | Confidential9 |
Future State VSM
Covidien | April 19, 2023 | Confidential10 |
Lead Time: 48.95 hrsCycle Time: 0.95 hrs
First Pass Yield: >90%
VSM Side-by-Side
Covidien | April 19, 2023 | Confidential11 |
Cur
rent
Fut
ure
Hand-off Diagram Side-by-Side: Project Approval
Covidien | April 19, 2023 | Confidential12 |
Current Future
Hand-off Diagram Side-by-Side: Certification Approval
Covidien | April 19, 2023 | Confidential13 |
Current Future
Metrics Side-by-Side
Current State Future State Change
Cycle Time 3.31 hrs 0.95 hrs ▼71%
Lead Time 651.31 hrs 48.5 hrs ▼93%
Value Added Time 0.50% 27.98% ▲5596%
First Pass Yield 50% >90% ▲>40%
Touches 33 9-10 ▼70%
# of Forms 6 2 ▼66%
# of Signatures 11 7 ▼36%
Annual Savings n/a $117,398* ▲
Covidien | April 19, 2023 | Confidential14 |
*Corporate OpEx team savings based on current salary numbers.
The Softer Side of Savings
• Opportunity to find and catch project defects earlier in process
• Improved mentorship from OpEx Directors to OpEx Managers/Leaders in the plant, and eventually to candidates
• Accountability and performance tracking with better metrics, data collection, and report out capability
• Empowerment of GBU and Plant OpEx personnel
• Job satisfaction which results in less turnover
• Environmental responsibility (less paper/toner waste)
Covidien | April 19, 2023 | Confidential15 |
Covidien | April 19, 2023 | Confidential16 |
In progress
Complete
Scheduled
Workstream 1: Value Stream Analysis and Certification Kaizen
Kaizen #1 to document and analyze VS
Roll out at one GBU for Testing Phase
May 12 AugustJune 15
Implementation Timeline
July 15
Future Kaizen Events: Monthly Review, Qtrly. Audit, DFSS
Train and roll out company-wide to 58 plants
May-July
IS develops eForms
Run pilot in Texas plant
May 14
Workstream 2: Additional Kaizen Events
Q&A
Covidien / Black Ink Ops | May 12, 2010 | Confidential17 |
Appendix
Covidien / Black Ink Ops | May 12, 2010 | Confidential18 |
Covidien / Black Ink Ops | May 12, 2010 | Confidential19 |
Covidien / Black Ink Ops | May 12, 2010 | Confidential20 |
Our team at work…