Project Arna – Fløen
Entreprise UUT 31 - Contract UUT 31
Project Manager Srishankar Subramaniam, Engineering Manager Marianne Nyebak
Innhold Contents
Ulriken tunnel Fløen - Bergen
2
Om entreprisen
Arbeidsomfang
Utfordringer
05.10.2016
About the contract
Scope of work
Challenges
UUT 31 – Om entreprisen – About the contract
Ulriken tunnel Fløen - Bergen
3
UUT 31 – Tverrfaglig
jernbaneteknikk entreprise
• Spor/overbygning
• KL - anlegg
• Lavspenningsanlegg
• Høyspenningsanlegg
• Tele
Planlagt oppstart: 1. kvartal 2019
Ferdigstillelse: 3. kvartal 2022
05.10.2016
Interdisciplinary railway-technical
contract
• Track/superstructure
• Catenary system
• Low-voltage system
• High-voltage system
• Telecommunications
Planned start-up: 1. Quarter 2019
Completion: 3. Quarter 2022
UUT 31 – Arbeidsomfang – Scope of work
Ulriken tunnel Fløen - Bergen
4
Arna stasjon
• Oppgradere spor, KL - anlegg,
lavspenningsanlegg,
høyspenningsanlegg og teleanlegg
Tunneler
• Nye jernbanebanetekniske anlegg
i ny tunnel (unntak signal)
• Tilpassing av eksisterende
jernbanetekniske anlegg i
eksisterende tunnel grunnet nytt
sikringsanlegg og diagonal-
forbindelser mellom nytt og
eksisterende tunnel
05.10.2016
Arna Station
• Upgrading of tracks, catenary
system, low-voltage system, high-
voltage system,
telecommunications system
Tunnels
• New railway-technical systems in
new tunnel (except signals)
• Adapting existing railway-technical
systems in the existing tunnel due
to new interlocking systems and
diagonal connections between new
and existing tunnel
Main view of Arna station
05.10.2016
5
To Oslo
To Bergen
Sea side
Church side
Arna station and entrance to tunnels
05.10.2016
6
To Bergen
To Oslo
New Ulriken tunnel
05.10.2016
7
Arna station
Bergen station
Conventional blasting – Track area near Arna station
TBM operation for approx. 6,9 kilometres
Fløen and tunnel exits
05.10.2016
8
To Arna and Oslo
To Bergen
Interface between UUT 31 contract and UBF 33, 34 35 contracts
UUT 31 – Arbeidsomfang – Scope of work
Ulriken tunnel Fløen - Bergen
9
Fløen
• Jernbanetekniske anlegg (unntak
signal) for nytt spor fra ny tunnel i
Ulriken og fram til og med
tilknytning mot eksisterende
anlegg i Fløen
05.10.2016
Fløen
• Railway-technical systems (except
signals) for new track from new
tunnel in Ulriken up to and
including connection to existing
systems in Fløen
UUT 31 – Arbeidsomfang – Scope of work
Ulriken tunnel Fløen - Bergen
10
Spor
• Riving av spor
• Bygging av nytt spor
• TBM delen bygges som fastspor
ca. 6.9 km. Entreprenøren får
ansvar for prosjektering og valg
av løsning innen gitte rammer
• Ballastspor (ca. 3 km) og flere
nye sporveksler på Arna stasjon
og diagonal forbindelser i tunnel
05.10.2016
Track
• Track dismantling
• Construction of new track
• TBM section constructed as
slab track, approx. 6.9 km. The
contractor is responsible for the
design and choice of solutions
within the defined framework
• Ballasted track (approx. 3 km)
and several new points at Arna
station and diagonal
connections in tunnel
UUT 31 – Arbeidsomfang – Scope of work
Ulriken tunnel Fløen - Bergen
11
KL - anlegg
• Riving av KL - anlegg
• Bygging av nytt KL - anlegg
• KL - anlegg planlegges med
System 20
• Hastighet i ny tunnel 160 km/h
• Jordingsanlegg
05.10.2016
Catenary system
• Dismantling of catenary system
• Construction of new catenary
system
• The catenary system has been
planned with System 20
• Speed in the new tunnel is
160 km/h
• Earthing systems
UUT 31 – Arbeidsomfang – Scope of work
Ulriken tunnel Fløen - Bergen
12
Lavspenningsanlegg
• Bygging av ny lavspenningsanlegg
• Sporvekselvarme og belysning
• Nødbelysning i tunnel og
nødstrøm for kritiske anlegg
(signal, tele og nødlys)
• Strømforsyning til
brannventilasjon og
elektroinstallasjoner i
høyspentkioskene
05.10.2016
Low-voltage system
• Construction of new low-voltage
system
• Point heating and lighting
• Emergency lighting in the tunnel
and emergency power for
critical systems (signalling,
telecommunications and
emergency lighting
• Power supply to fire ventilation
and electrical installations in
high-voltage kiosks
UUT 31 – Arbeidsomfang – Scope of work
Ulriken tunnel Fløen - Bergen
13
Høyspenningsanlegg
Bygging av høyspenningsanlegg
(11kV) strekker seg fra Arna til
Fløen
• Høyspentkiosker og kabler
05.10.2016
High-voltage system
Construction of the high-voltage
system (11kV) extends from Arna to
Fløen
• High-voltage kiosks and cables
UUT 31 – Arbeidsomfang – Scope of work
Ulriken tunnel Fløen - Bergen
14
Tele
• Bygging av nytt anlegg for togradio
(GSM-R), nødnett (TETRA), mobil-
og internett (MIT) og
datatransmisjon (NGN)
• Det skal legges fiberkabel innom
alle nød gjennomganger og teknisk
hus i Fløen
05.10.2016
Telecommunication
• Construction of new train radio
system (GSM-R), emergency
communication network (TETRA),
mobile and internet (MIT) and data
transmission (NGN)
• Fibre-optic cables shall be laid in
all emergency passages and in the
technical building in Fløen
Railway technical equipments in
new tunnel
Ballasted track
Slab track 05.10.2016
15
Utfordringer prosjektgjennomføring
Challenges project implementation
Ulriken tunnel Fløen - Bergen
16
• Grensesnitt mot andre
entreprisene
• Riggareal
• Adkomst til eksisterende tunnel fra
Arna siden
05.10.2016
• Interfaces with other contracts
• Rigging area
• Access to existing tunnel from the
Arna side
Oppsummering - Summery
Interdisciplinary railway-technical
contract
• Track/superstructure
• Catenary system
• Low-voltage system
• High-voltage system
• Telecommunications
Planned start-up: 1. Quarter 2019
Completion: 3. Quarter 2022
05.10.2016
17