Project “Belkomur”
The complex industrial and infrastructural development program of Komi Republic, Perm Territory and Arkhangelsk area.
“Belkomur” project description
The complex industrial and infrastructural development program of Komi Republic, Perm Territory and Arkhangelsk area.
Project goals
The complex program provides implementation of regional enterprise investment projects and construction of trunk-railway Solikamsk – Arkhangelsk that will liquidate infrastructural dead ends, provide the access to raw material resources that are not used nowadays and create new short transit routes connecting the Ural Mountains and Siberia with northern Russian ports.
Project importance for national economy
• Involving of previously unused territories into economic life
• Creation of new Russian transit point for foreign trade cargos.
• Creation of new profitable industrial objects and workplaces.
• Creation of a short route connecting the regions of the country.
• Creation of a new international transit transport corridor.
Primary project objectives• Creation of new enterprises and industrial objects in
Bereznikovo - Solikamsk industrial hub of Perm Territory.
• Modernization and creation of new enterprises and industrial objects in Komi Republic.
• Construction of a new deep-water seaport in Arkhangelsk area.
• Construction of trunk-railway Solikamsk - Arkhangelsk.
• Total amount of project investments comprises 8 billion Euro.
Construction of trunk-railway Solikamsk – Gainy – Syktyvkar – Arkhangelsk (Belkomur).
Total railway mileage – 1252 km Including new construction – 795 km
Total investment volume – 2 billion Euro
Position of the trunk-railway
in comparison with world,
trans-Eurasia and Russian
transportation corridors
New railroad construction within Northern East – West (NEW) transportation corridor
New railroad construction within Eurasian transportation corridor
Belkomur and main Russian transportation corridors
Logistics
Freight flows
Transshipment points
Main technical and economic construction parameters
and the advantages of new trunk-railway
Solikamsk – Gainy – Syktyvkar – Arkhangelsk (Belkomur)
Main advantages of new trunk-railroad construction
Involving of previously unused territories that are inaccessible by transport into economic life, and consequently, uncultivated territory development.
Possible use of previously inaccessible forest recourses that comprise over 6 million m3.
Project “Belkomur” technical and economic features
Total railway mileage – 1252 kmincluding new construction – 795 km
Including mileage in Perm Territory – 392 kmin Komi republic– 243 km
in Arkhangelsk area – 160 km
Project “Belkomur” technical and economic features
Total construction cost – 2 billion Euro
Including: “Southern site” – 1.51 billion Euro“Northern site” – 485 million Euro
Project “Belkomur” technical and economic features
The pay-back period comprises 6.5 – 9 yearsdepending on a funding source.
Internal rate of return 27,5 %margin of profit is over 2,5%
Main advantages of new trunk-railroad construction
1. Cargo run reduction from the Urals to the ports of Arkhangelsk and Murmansk, as well as to the ports of Finland up to 800 km that reduces cost by 40 %.
2. Resolving railroad dead ends in the territory of three subjects of the Russian Federation
Main advantages of new trunk-railroad construction
3. Involving of previously unused territories that are inaccessible by transport into economic life, and consequently, uncultivated territory development.
4. Possible use of previously inaccessible forest recourses that comprise over 6 million m3
The state-private partnershipProject implementation is supposed to be financed by the
Investment fund of the Russian Federation. The state support is rendered to projects aimed at creation
and development of an infrastructure of national importance.
The Investment Fund finances designing and further construction of infrastructural objects (the railway and berthing structures of a new port, in our project) that will remain state joint stock companies’ property.
The objects that remain private investors’ property are financed by private capital.
From the address of the President of the Russian Federation Vladimir Putin to the Federal Assembly of the
Russian Federation:
“…What concerns the projects financed by development institutions, they should be devoted to the resolving of major economy problems. Budgetary funds should not play the main role here, but serve as a catalyst for private investments. Putting budgetary funds in economy, the state should grant its support in the spheres where the risks for private investors are still too high.”
Short description of the participants of Komi republic project
Total volume of investments by 2012 – about 2,53 billion Euro.
23 million tons of freight flow a
year (2006)
Industrial production volume increase by more than 571 million
Euro by 2010-2012.
Freight flow increase by 40-50% by 2010-2012
YaregaRuda JSC
Severstal-Resurs CJSCKomi Aluminiy CJSC
Syktyvkar timber processing complex, JSC
Short description of Bereznikovo - Solikamsk industrial hub of Perm
Territory
Territory – 5473 km2 Population – 327,600
35 major and medium industrial objectsGoods produced and shipped in 2006 to the
amount of 2,38 billion Euro.
Annual freight flow: 20 million tons.25% of industrial production of the Territory.
20% of working places.
Verkhnekamsk deposit of potassium and magnesium
salts is the base for Bereznikovo-Solikamsk
industrial hub development
Rock salt: 734,3 million tons.
Magnesium salt: 71413 million tons.
Potassium salt: 52 296 million tons.
Oil: 50 million tons.
Total volume of investments by 2012 – about 2 billion Euro.
Industrial production volume increase by more than 571 million Euro by 2010-2012.
Freight flow increase by 30-40% by 2010-2012.
Uralkaliy-Silvinit JSCSolikamskbumprom JSC
Soda-khlorat ltd.Bereznikovo soda plant ltd.
VSMPO-AVISMA corporation.
Investment program of Bereznikovo-Solikamsk industrial
hub enterprises
Arkhangelsk area Deep-water port
Annual freight flow: 30 million tons.Total volume of state and privatecapital investments: 1.28 billionEuro. More than 9000 workplaces. Reception of vessels with a deadweight over 70,000 tons.
Kholmogory gypsum deposit
Investment project on gypsummining by domestic investors and
Knauf company.
New deep-water
seaport
New deep-water Arkhangelsk seaport location.
Operating Arkhangelsk
port
New deep-water Arkhangelsk seaport
New trunk-railroad with 55 km mileage
is a part of “Strategic plan
of Russian railways development up to 2030.”
New deep-water Arkhangelsk seaport draft