project chimney design and build participants sulphur ... bec case studies... · this chimney is...

2
BEC Group of Companies c/o 18 Boon Lay Way TradeHub 21 Singapore 609966 Tel: +(65) 6778 6858 Website: www.be-con.com Email: [email protected] Cert No: QS - 2009 - 14 Member of the IAF MLA for QMS Owner Chimney EPC Contractor CASE STUDY SULPHUR RECOVERY CHIMNEY DESIGN AND BUILD Project Participants Detail of work by BEC Challenges #10-159/162 Fax: +(65) 6690 9259 UNIT 7 BUGIS PROJECT Overcoming Design & Construct SRU-7 BUGIS Project SULPHUR RECOVERY PLANT 7 Shell Eastern Petroleum Pte Ltd was building a Sulphur Recovery Unit on Shell’s Pulau Bukom Refinery. Chiyoda Singapore Pte Ltd was the main contractor for the project, and BEC Pte Ltd was engaged to design and construct the chimney. Operating an oil refinery on Pulau Bukom, SEPL intended to construct a new Sulphur Recovery Unit SRU-7 and the associated incinerator requires a new chimney to remove the waste gases. This chimney is 100m high and consist of a reinforced concrete windshield inside of which there will be an insulated steel flue. The reinforced concrete windshield was constructed using the slipform technique. BEC was involved in the Design & Build of the chimney, including piling, pilecap, slipform, heavy lifting of roof, floors and flues, installation of internal rack and pinion hoist, AWL’s, internal lighting, lightning conductor, earthing works. Working in a "live" Oil Refinery Plant with constricted access and storage areas, and also amongst other contractors Working on an island refinery off Singapore provided many logistical challenges with labour timings for 2 shift/24Hr slipform activities and deliveries on limited transits Overcoming an open-type excavation for the Foundation without interfering neighbouring access routes by adopting a permanent block wall shutter system which allowed earlier backfilling prior to casting of concrete Shell Eastern Petroleum Pte Ltd Chiyoda Singapore Pte Ltd Balanced Engineering & Construction Pte Ltd Lining System Stainless Steel 316L

Upload: others

Post on 26-Jan-2020

18 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Project CHIMNEY DESIGN AND BUILD Participants SULPHUR ... BEC Case Studies... · This chimney is 100m high and consist of a reinforced concrete windshield inside of which there will

BEC Group of Companiesc/o 18 Boon Lay Way

TradeHub 21Singapore 609966

Tel: +(65) 6778 6858

Website: www.be-con.comEmail: [email protected]

Cert No: QS - 2009 - 14

Member of the IAF MLA for QMS

Owner

Chimney EPC Contractor

CASE STUDY SULPHUR RECOVERY

CHIMNEY DESIGN AND BUILDProjectParticipants

Detail of work by BEC

Challenges

#10-159/162 Fax: +(65) 6690 9259

UNIT 7 BUGIS PROJECT

Overcoming

Design & Construct

SRU-7 BUGIS Project

SU

LPH

UR

RE

CO

VE

RY

PLA

NT

7

Shell Eastern Petroleum Pte Ltd was building a Sulphur Recovery Unit on Shell’s Pulau Bukom Refinery. Chiyoda Singapore Pte Ltd was the main contractor for the project, and BEC Pte Ltd was engaged to design and construct the chimney.

Operating an oil refinery on Pulau Bukom, SEPL intended to construct a new Sulphur Recovery Unit SRU-7 and the associated incinerator requires a new chimney to remove the waste gases. This chimney is 100m high and consist ofa reinforced concrete windshield inside of which there will be an insulated steel flue. The reinforced concrete windshield was constructed using the slipform technique.

BEC was involved in the Design & Build of the chimney, including piling, pilecap, slipform, heavy lifting of roof, floors and flues, installation of internal rack and pinion hoist, AWL’s, internal lighting, lightning conductor, earthing works.

• Working in a "live" Oil Refinery Plant with constricted access and storage areas, and also amongst other contractors • Working on an island refinery off Singapore provided many logistical challenges with labour timings for 2 shift/24Hr

slipform activities and deliveries on limited transits• Overcoming an open-type excavation for the Foundation without interfering neighbouring access routes by adopting

a permanent block wall shutter system which allowed earlier backfilling prior to casting of concrete

Shell Eastern Petroleum Pte Ltd

Chiyoda Singapore Pte Ltd

Balanced Engineering & Construction Pte Ltd

Lining System

Stainless Steel 316L

Page 2: Project CHIMNEY DESIGN AND BUILD Participants SULPHUR ... BEC Case Studies... · This chimney is 100m high and consist of a reinforced concrete windshield inside of which there will

stack elevation

100m

3

1.05m

Chimney data:

Height

No. of internal steel flues

No. of internal platforms

Diameter of internal flues

External concrete diameter

Piles

Pile cap

Slipform Activities

1

5.6m - 4.9m

46Nos 300dia micropile

10.5m x 2.0m deep

SRU-7

+65m Access Floor

Internal Liner Insulation and Cladding

Foundation

Reinforcement & Permanent Blockwork Formwork