project closing report jalandhar
DESCRIPTION
a funky design as per product n great cost reductionTRANSCRIPT
AP PROJECTS
PROJECT CLOSING REPORT
1ROXTON-VIVA COLLAGE MALL(JALANDHAR)
VIVA COLLAGE MALL-JALANDHAR
2ROXTON-VIVA COLLAGE MALL(JALANDHAR)
CONTENTS PAGE NO.
INTRODUCTION 4
PROJECT TEAM 5
PROJECT PYRAMID 6
PROJECT INTRODUCTION 7
DESIGN 8
IMPLEMENTAION 11
BEFORE AND AFTER 12
FINISHED STORE INTERNALLY AND EXTERNALLY 16
PROJECT PLANNING 19
BARCHART 20
GRAPHS 223
ROXTON-VIVA COLLAGE MALL(JALANDHAR)
INDEX
INTRODUCTION
ADDRESS :ROXTON FIRST FLOORFF 22-A VIVA COLLAGE MALLGRANT TRUCK ROADPARAGPUR, NEAR LOVELYUNIVERSITYJALANDHAR-400101
4ROXTON-VIVA COLLAGE MALL(JALANDHAR)
ROXTON IS OFFERING CASUAL BRANDS INTO MENS WEAR.ROXTON IS SISTER CONCERN OF RAJHANS EXPORTS WHICH IS THIRD BEST TR IMPORTERS.ROXTON PROMISES HUNDRED PLUS RETAIL OUTLETS ACROSS THE COUNTRY BY 2011.ROXTON HAS ALREADY MADE ITS PRESENCE IN CITIES LIKE DELHI,MUMBAI.CHHATTISGARH,HARIYANA & PUNJABTHE STORE HAS CUSTOMER SERVICE DESK TO HELP CUSTOMER WITH ITS RELATED SERVICES
PROJECT HEAD MR. ARVIND PUROHIT
ARCHITECT: MR. BV RAGHAV
(IIT)
PROJECT MANAGER-SURESH TIWARI
PROJECT ENGINEER-. MR.SURJEET DHIMAN
& SITE EXECUTION TEAM
PROJECT TEAM
5ROXTON-VIVA COLLAGE MALL(JALANDHAR)
PROJECT PYRAMID
6ROXTON-VIVA COLLAGE MALL(JALANDHAR)
PROJECT INTRODUCTION
DESIGN
IMPLEMENTATION
PRODUCT STUDY W.R.T. MARKETDESIGNING AS PER THE PRODUCT’S REQUIRMENTPROJECT BUDGETING
CUSTOMER SATISFACTIONAPPROVALS
REALISING THE APPROVED DRAWINGSSITE SURVEYPROJECT EXECUTION
SUGGESTION IN DESIGN AS PER SITE SURVEY
PROJECT INTRODUCTION
7
ROXTON’S PRODUCT
MARKET STUDY TO DESIGN SHOW ROOM FOR ROXTON
VALUE ENGINEEERING FOR ROXTON
COMPETITORS ROXTON HAS VERY TOUGH COMPETIOTRS IN THE MARKET
ROXTON REQUIRES MORE FOOTFALL OF CUSTOMERS
CUSTOMER AGE GROUP IS 18 YEARS OLD TO 40 YEARS OLD
THE SHOWROOM REQUIRES A ROUGH AND ATTRACTIVE LOOK
THE COST CUTTING HAS TO BE LESS BY 30% WITH EXISTING ONE & MANY MORE….
ROXTON SPENDS ABOUT 20 LACS ON PER STORE
SHOWROOM HAS ONLY STATIC AND FORMAL LOOK
BREAK UP OF B.O.Q. WITH DETAIL COST ANALYSIS
POINTING TOWARDS HIDDEN COST DUE TO POOR DESIGN
DESIGN
3D-MODELINGSOFTWARES
CATIA
COST ANALYSIS
COST CUTTING OF ALMOST 50%
STATIC + DYNAMIC 3D-MODELING AND DESIGN
PROPOSED AN AUTO-FOCUSED MODIFIED BIKE ON CEILING
A ROUND S.S. GANDOLA AT THE CENTRE
A SEMI ROUND CASH COUNTER AT THE BACK OF STORE
A ROUGH AND DARK LOOK TO OVER ALL STORE
M/S/ POWERDE COATED FIXTURES
LIGHTING WITH CALCULATED INTENSITY
IRONICALLY POSTIONING OF MIRRORS
SYMMETRICAL PLACING OF DUCTING AND FIREFIGHTING PIPIES
A VERY ATTRACTIVE BLUE ILLUMINATED TRANSPARENT LOGO
COSTDIFFERENCE
02468
1012141618
PREVIOUS DESIGNAP PROJECTS DESIGN
COSTIN
LACS
ROXTON-VIVA COLLAGE MALL(JALANDHAR) 9
0
20
40
60
80
100
ROXTON'S PREVIOUS
DESIGN
AP PROJECTS DESIGN
FOOT FALL IN THE MALL
FOOT FALL IN OTHER SHOPS
FOOT FALL IN ROXTON'S STORE
10
FOOT FALL IN SHOP
FOOT FALLIN %
THE ABOVE REPORT IS BASED ON A SURVEY CONDUCTED FOR A MONTH IN JALANDHAR VERIFIED AND APPROVED BY ROXTON
ROXTON-VIVA COLLAGE MALL(JALANDHAR)
STORE LAYOUT11
ROXTON-VIVA COLLAGE MALL(JALANDHAR)
IMPLEMENTATION
BEFORE AND AFTER
12ROXTON-VIVA COLLAGE MALL(JALANDHAR)
BEFORE AND AFTER
13ROXTON-VIVA COLLAGE MALL(JALANDHAR)
BEFORE AND AFTER
14ROXTON-VIVA COLLAGE MALL(JALANDHAR)
BEFORE AND AFTER
15ROXTON-VIVA COLLAGE MALL(JALANDHAR)
FINISHED STORE
16ROXTON-VIVA COLLAGE MALL(JALANDHAR)
FINISHED STORE
17ROXTON-VIVA COLLAGE MALL(JALANDHAR)
FINISHED STORE
18ROXTON-VIVA COLLAGE MALL(JALANDHAR)
PROJECT PLANNING
CUSTOMER SATISFACTION
TIME MANAGMENT
PLANING
19ROXTON-VIVA COLLAGE MALL(JALANDHAR)
BAR CHART
20
18-4 19/4 20/1 21/4 22/4 23/4 24/4 25/4 26/4 27/4 28/4 29/4
Material N Tool
Manpower
AP.O.P & CIVIL WORK PLAN
PLASTERING
B.O.Q.
CIVIL1,CIVIL2
TILINGB.O.
CIVIL1,CI
1 ACTUAL
Marking as per dwg, PLAN
Line
P.O.P.(PE1,P
2 ACTUAL
Griding PLAN
B.O.Q.
PE1,PH1,PH2
3 ACTUAL
Fixing of Gypsum sheet as per dwgPLAN
Drill m
PE1,PH1,PH2
4 ACTUAL
Punning of Gypsum sheetPLAN
scrature
PE1,PH1,
PH2
5 ACTUAL
T
ADD.-THANE-RAM MARUTI ROAD
Resourc
Delay due to land lord
Delay due to architectDelay due to Roxton
Planned activiteis
On scheduleDelay due to contractor
COLOUR CODES
ROXTON-VIVA COLLAGE MALL(JALANDHAR)
CARPENTARY
ELECTRICAL
POP
PAINTIN
G
FIXTURES
NAME BOARD
DUCTING
CIVIL0%
10%20%30%40%50%60%70%80%90%
100%
REWORKEXTRA WORKQTY IN BOQ
COST ANALYSIS
ROXTON-VIVA COLLAGE MALL(JALANDHAR) 21
TIME MANAGMENT
5 LACS
10 LACS
15 LACS
20 LACS
25LACS
30LAC
35LACS
40 LACS
0
1
2
3
4
5
6
AP PROJECTSOTHER
COST
TIMEIN
MONTHS
ROXTON-VIVA COLLAGE MALL(JALANDHAR) 22
www.approjects.orgwww.indiamart.com/ap-projects
NO MORE ARCHITECTSNO MORE INTERIOR DESIGNERS
THIS IS SIMPLE INTERIOR ENGINEERING
THANK YOU