Project Cycle Management for International Development Cooperation Indicators Teacher Pietro Celotti Università degli Studi di Macerata 16 December 2011

Upload: gervase-blair

Post on 04-Jan-2016

214 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Project Cycle Management for International Development Cooperation Indicators Teacher Pietro Celotti Università degli Studi di Macerata 16 December 2011

Project Cycle Management for

International Development

Cooperation

Indicators

TeacherPietro Celotti

Università degli Studi di Macerata

16 December 2011

Page 2: Project Cycle Management for International Development Cooperation Indicators Teacher Pietro Celotti Università degli Studi di Macerata 16 December 2011

Agenda

Background

Definition and types of indicators

Monitoring

Quality of the indicator system

Page 3: Project Cycle Management for International Development Cooperation Indicators Teacher Pietro Celotti Università degli Studi di Macerata 16 December 2011

Programmes and projects

Programme

Project 1

Project n

Project …

Financial contribution from programmes to projects

Information (e.g. progress reports) concerning the status of implementation

to the authorities responsible for the programme -> support the day to day

management

Page 4: Project Cycle Management for International Development Cooperation Indicators Teacher Pietro Celotti Università degli Studi di Macerata 16 December 2011

Agenda

Background

Definition and types of

indicators

Monitoring

Quality of the indicator system

Page 5: Project Cycle Management for International Development Cooperation Indicators Teacher Pietro Celotti Università degli Studi di Macerata 16 December 2011

Indicators: what is needed?

Definition

Unit of measurement

Source of information (going from internal to external)

Baseline (i.e. the initial value against which an indicator is subsequently measured)

Refers to local context; or

Refers to activities in previous programmes

Target (combined with baseline information, provides information concerning the importance of the planned interventions)

Current status

Page 6: Project Cycle Management for International Development Cooperation Indicators Teacher Pietro Celotti Università degli Studi di Macerata 16 December 2011

Project indicators - Output

Output indicators: direct products of the project

Normally requires information from beneficiaries

Page 7: Project Cycle Management for International Development Cooperation Indicators Teacher Pietro Celotti Università degli Studi di Macerata 16 December 2011

Project indicators - Results

Result indicators:

relate to the direct and immediate effect on direct beneficiaries brought about by a project. They provide information on changes to, for example, the behaviour, capacity or performance of beneficiaries.

Page 8: Project Cycle Management for International Development Cooperation Indicators Teacher Pietro Celotti Università degli Studi di Macerata 16 December 2011

Project indicators - Output

Indicator type Indicator Name Unit

Output Length of rehabilitated/modernized county roads KM

ResultsIncrease passengers and freight traffic on the rehabilitated, constructed, modernized roads

%

Other examples - Regional and local transport infrastructure :

Page 9: Project Cycle Management for International Development Cooperation Indicators Teacher Pietro Celotti Università degli Studi di Macerata 16 December 2011

Project indicators - Output

Indicator type Indicator name Unit

OutputInhabitants benefiting from the implementation of integrated urban development plans

N

Other examples - Sustainable development of urban growth poles:

ResultCompanies established in the “urban action zones”

N

Page 10: Project Cycle Management for International Development Cooperation Indicators Teacher Pietro Celotti Università degli Studi di Macerata 16 December 2011

Project indicators - Output

Indicator type Indicator Name Unit

OutputRehabilitated/equipped health care mobile units (total and by type)

N

Other examples - Social Infrastructure:

Result Average response time of mobile units N

Page 11: Project Cycle Management for International Development Cooperation Indicators Teacher Pietro Celotti Università degli Studi di Macerata 16 December 2011

Project indicators - Output

Indicator type Indicator Name Unit

Other examples - Regional and local business environment:

Output Micro-enterprises created and supported N

ResultsNew jobs created in the supported micro-enterprises

N

Page 12: Project Cycle Management for International Development Cooperation Indicators Teacher Pietro Celotti Università degli Studi di Macerata 16 December 2011

Project indicators - Output

Indicator type Indicator Name Unit

Other examples - Sustainable development and promotion of tourism:

Output Tourism small infrastructures implemented N

Result Increase of overnights-staying %

Page 13: Project Cycle Management for International Development Cooperation Indicators Teacher Pietro Celotti Università degli Studi di Macerata 16 December 2011

Core indicators

Core indicators can be used to make comparisons or aggregations of data across similar programmes, priorities or measures.

How does it work? Programme authorities are required to include a number of ‘core’ indicators in their monitoring systems……

Page 14: Project Cycle Management for International Development Cooperation Indicators Teacher Pietro Celotti Università degli Studi di Macerata 16 December 2011

Programme indicators - Impacts

Impact indicators:

refer to the consequences of the programme beyond the immediate effects; often available only after a considerable time lag and they often need substantial methodological input in order to be valid.

At which stage of the programming cycle are they used?

during programme design, the ex-ante quantification of impacts clarifies the strategic direction of the programme;

ex-post, it helps understanding if the programme achieved the initial objectives (success or failure?)

Page 15: Project Cycle Management for International Development Cooperation Indicators Teacher Pietro Celotti Università degli Studi di Macerata 16 December 2011

Context indicators

Context indicators: reflect the socio-

economic conditions of a programme area

they enable to assess local needs of the programme area, to assess how the general context of a programme is evolving

Not just programme indicators…

Page 16: Project Cycle Management for International Development Cooperation Indicators Teacher Pietro Celotti Università degli Studi di Macerata 16 December 2011

Monitoring

Background

Definition and types of indicators

Monitoring

Quality of the indicator system

Page 17: Project Cycle Management for International Development Cooperation Indicators Teacher Pietro Celotti Università degli Studi di Macerata 16 December 2011

Indicators – Physical, financial, procedural

Physical indicators: describe the concrete ‘products’ of the programme;

Financial indicators: provide a basic picture for usage of the available resources (i.e. how fast? which priorities?):

Committed/spent; Year/Priority/Source of funding.

Procedural indicators: provide information on the current status of the operational level and forecasts for the next steps.

Page 18: Project Cycle Management for International Development Cooperation Indicators Teacher Pietro Celotti Università degli Studi di Macerata 16 December 2011

Physical monitoring

Example of physical monitoring:

Indicator (number of enterprises)

Unit of Measurement

Target Achievement

Micro N 142 91

Small N 133 111

Medium N 39 21

Owner (women) N 50 40

Owner (<30y) N 26 3

Start-up N 54 3

Page 19: Project Cycle Management for International Development Cooperation Indicators Teacher Pietro Celotti Università degli Studi di Macerata 16 December 2011

Financial monitoring

Example of financial monitoring:

Priority Expected expenditures

Resources committed

Expenditures

Amount Amount % Amount %

(a) (b) (b/a) (c) (c/a)

P1 133.4 100.4 75.2 71.8 53.9

Page 20: Project Cycle Management for International Development Cooperation Indicators Teacher Pietro Celotti Università degli Studi di Macerata 16 December 2011

Procedural monitoring

Most public activities have to follow a more or less rigid schedule in which the different steps are mandated and the deadlines fixed (i.e.). Procedural monitoring usually provides information about how project pipelines are progressing (where and when calls for tenders have been published, contracts have been awarded, …).

Page 21: Project Cycle Management for International Development Cooperation Indicators Teacher Pietro Celotti Università degli Studi di Macerata 16 December 2011

Demand

Procedural monitoring

Prio

rity

Ap

plic

atio

ns

Bein

g a

ssessed

Not e

ligib

le o

pera

tion

s

Elig

ible

not c

o-fu

nd

ed

Co-fu

nd

ed

op

era

tion

s

Sta

rted C

an

celle

d

Ren

ou

nced

Tota

l

Com

ple

ted

Bein

g im

ple

men

ted

P1 3,650 156 341 643 2,395 1,769 1,615 154 51 64

Implementation status (number of projects):

Project capacityMortality

Operational efficiency

Page 22: Project Cycle Management for International Development Cooperation Indicators Teacher Pietro Celotti Università degli Studi di Macerata 16 December 2011

Monitoring and evaluation

• Monitoring =information about the ongoing situation

• Evaluation = analysis (using monitoring and additional data)

Indicators are not used just for the purpose of day to day management…

Page 23: Project Cycle Management for International Development Cooperation Indicators Teacher Pietro Celotti Università degli Studi di Macerata 16 December 2011

Monitoring and evaluation

Quantitative and qualitative data, used as

input in evaluation exercises.

Monitoring Evaluation

Lessons to improve monitoring systems – e.g. identify better

indicators for future projects / programming.

Monitoring: data are collected concerning the progress with respect to

stated objectives.

Evaluation: using monitoring and

additional data, provides policy recommendations.

Surveys of beneficiaries

Stakeholders interviews

Focus Group

Case studies

Participative techniques

Page 24: Project Cycle Management for International Development Cooperation Indicators Teacher Pietro Celotti Università degli Studi di Macerata 16 December 2011

Monitoring

Background

Definition and types of indicators

Monitoring

Quality of the indicator system

Page 25: Project Cycle Management for International Development Cooperation Indicators Teacher Pietro Celotti Università degli Studi di Macerata 16 December 2011

Quality - individual indicators

Timeliness: information concerning the indicator can be collected and reported in time to influence the managerial decisions.

Sensibility: interventions can influence the valorisation of the indicator. (e.g. supporting exports, better turnover

related to new customers reached through the programme than

general turnover)

Availability: this means that the costs necessary to collect information from sources must be reasonable.

Validity: understanding of the indicator shall be the same for every potential user.and… possible perverse effects…

Page 26: Project Cycle Management for International Development Cooperation Indicators Teacher Pietro Celotti Università degli Studi di Macerata 16 December 2011

Quality – indicator system

Coverage: adequate coverage of expected allocation of financial resources;

Balance: among the different categories of indicators;

Selection: capacity of the authorities to absorb data and information is limited!

Relevance: advanced development for indicators related to the most significant themes and interventions.

Page 27: Project Cycle Management for International Development Cooperation Indicators Teacher Pietro Celotti Università degli Studi di Macerata 16 December 2011

Thank you