project “danube water integrated management” – water mis etc 166 project manager: mary-jeanne...

20
Project “Danube WATER integrated management” – WATER MIS ETC 166 Project Manager: Mary-Jeanne Adler, PhD [email protected] ; [email protected] ; [email protected] www.danube-water.eu

Upload: hugo-todd

Post on 29-Jan-2016

214 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Project “Danube WATER integrated management” – WATER MIS ETC 166 Project Manager: Mary-Jeanne Adler, PhD mj.adler@hidro.romj.adler@hidro.ro; mj.adler@yahoo.com;

Project “Danube WATER integrated management” – WATERMIS ETC 166

Project Manager: Mary-Jeanne Adler, PhD

[email protected]; [email protected]; [email protected]

www.danube-water.eu

Page 2: Project “Danube WATER integrated management” – WATER MIS ETC 166 Project Manager: Mary-Jeanne Adler, PhD mj.adler@hidro.romj.adler@hidro.ro; mj.adler@yahoo.com;

Project Objectives

• Improving water monitoring and the warnings system, environmental data dissemination on the Romanian-Bulgarian border counties;

• Processing and conditioning the liquid organic wastes radioactively contaminated from the nuclear plants Cernavodǎ and Kozloduy.

Page 3: Project “Danube WATER integrated management” – WATER MIS ETC 166 Project Manager: Mary-Jeanne Adler, PhD mj.adler@hidro.romj.adler@hidro.ro; mj.adler@yahoo.com;

Project Activities

• Monitoring, data processing and forecasting water quantity and quality, under the European Commission standards for a better implementation of the European legislation in the water field (the Water Framework Directive 2000/60/EC, the Flood Directive 2007/60/CE) Increasing capacity for data and warning dissemination at the border areas.

Page 4: Project “Danube WATER integrated management” – WATER MIS ETC 166 Project Manager: Mary-Jeanne Adler, PhD mj.adler@hidro.romj.adler@hidro.ro; mj.adler@yahoo.com;

Project Activities

2.Expert System-DSS

5.Activation the Waters’ Rapid Response Center

Danube WATER automated stations

1.Informational System for Water and Environment Management

4.Warning System in border area

3.Communication System in border area

Page 5: Project “Danube WATER integrated management” – WATER MIS ETC 166 Project Manager: Mary-Jeanne Adler, PhD mj.adler@hidro.romj.adler@hidro.ro; mj.adler@yahoo.com;

Project Activities•

• Preventing Preventing • floods disasters and floods disasters and

pollution accidents pollution accidents interventionintervention

Modernizing the informational systems: * hydrologic - HIS and for* Water quality – CIS for the RO-BG Danube

Page 6: Project “Danube WATER integrated management” – WATER MIS ETC 166 Project Manager: Mary-Jeanne Adler, PhD mj.adler@hidro.romj.adler@hidro.ro; mj.adler@yahoo.com;

Project Activities

- 14 HYDROLOGICAL STATIONS on Danube- 60 HYDROGEOLOGICAL STATIONS- 12 GEODETIC LANDMARKS

UPGRADED OR REPLACE EXISTING EQUIPMENT:

- HARMONIZED GEODETIC SYSTEM- DATA COMMUNICATION - DATA ANALYSIS - DANUBE HIDROLOGIC FORECASTING- EARLY WARNING SYSTEM

Danube WATER- PARTIAL IMPLEMENTED

Page 7: Project “Danube WATER integrated management” – WATER MIS ETC 166 Project Manager: Mary-Jeanne Adler, PhD mj.adler@hidro.romj.adler@hidro.ro; mj.adler@yahoo.com;

Joint Danube monitoring

Page 8: Project “Danube WATER integrated management” – WATER MIS ETC 166 Project Manager: Mary-Jeanne Adler, PhD mj.adler@hidro.romj.adler@hidro.ro; mj.adler@yahoo.com;

• Flood and accidental pollution protection by increasing forecasting capacity by automate monitoring, data processing and common models application (hydrological and hydraulic)

• Operational geodatabase as support for models application and data/information dissemination in the border area

Flood and pollution forecasting system

Data processingData processing HydrogramsHydrogramsHydraulic Hydraulic

modelsmodels

Stage-discharge Stage-discharge rating courverating courve

0

0.005

0.01

0.015

0.02

0.025

0.03

0.035

0.04

0 30000 60000 90000

Time [s]

Freq

uenc

y

D5

D14

D11

D10

D8

D15

D17

HydrographsHydrographs

Liguria Region

0.50

0.80

0.90

0.95

0.98

0.99

0.995

0.998

0.999

-2

0

2

4

6

8

0.0 2.0 4.0 6.0 8.0 10.0

Simulated Discharge for given T/ Simulated Discharge for T = 2.9 years

Gum

bel R

educ

ed V

aria

ble

Regional TCEV

Confidence interval (95%)

Simulated Discharge

Page 9: Project “Danube WATER integrated management” – WATER MIS ETC 166 Project Manager: Mary-Jeanne Adler, PhD mj.adler@hidro.romj.adler@hidro.ro; mj.adler@yahoo.com;

PREVENTION, INTERVENTION, PREVENTION, INTERVENTION, REHABILITATION: ACTIONS REHABILITATION: ACTIONS IMPLEMENTED BY BASIN IMPLEMENTED BY BASIN

MANAGEMENT PLAN AND FLOOD MANAGEMENT PLAN AND FLOOD AND ACCIDENTAL POLLUTION AND ACCIDENTAL POLLUTION

PLANSPLANS

Page 10: Project “Danube WATER integrated management” – WATER MIS ETC 166 Project Manager: Mary-Jeanne Adler, PhD mj.adler@hidro.romj.adler@hidro.ro; mj.adler@yahoo.com;

WARNING SYSTEM

PREPARATION

INTERVENTION

REHABILITATION

Flood monitorng and flood prevention

plan Planning resourcesRapid Intervention Centers

LOSS EVALUATION INSTRUMENTS

Danube WATER- AT THE END OF IMPLEMENTATION

Page 11: Project “Danube WATER integrated management” – WATER MIS ETC 166 Project Manager: Mary-Jeanne Adler, PhD mj.adler@hidro.romj.adler@hidro.ro; mj.adler@yahoo.com;

Technology

Knowledge End-use

End-user:

Deliver policy context;Define problems, functions, and usage of the Platform

Researchers:

Model main processes;Define resolution, scaleand levels of detail.

IT-specialists:

System architecture;Software technologyand implementation.

Select policy-relevant research

Inte

grat

e an

d

code

mod

els

Build usable and

user-friendly system

Architecture:

Integration Communication Management

DSS Development

Page 12: Project “Danube WATER integrated management” – WATER MIS ETC 166 Project Manager: Mary-Jeanne Adler, PhD mj.adler@hidro.romj.adler@hidro.ro; mj.adler@yahoo.com;

Steps in policy-relevant integrated modelling

• Definition of policy themes, problems, options and indicators

• Appropriate model selection

• Model integration

• Translation of scientific knowledge into information relevant for the policy-maker

• Calibration and validation

Translation of scientific knowledge into information relevant for policy-makers

Hedwig van Delden
Themes: broad, abstractProblems: specific, to make it more concreteChoice of models: benchmarking: process, data, running time, code available.Software architecture based on restrictions: degree of integration, should the system be available over the internet, should models keep their original code? Running time of the systemIntegration: knowledge of individual models as well as model integration. Pay attention to the consistency of the system. For simplification use process knowledge.Translation: indicators, MCA, CBA, Score-cardCalibration and validation of individual models as well as integrated model
Page 13: Project “Danube WATER integrated management” – WATER MIS ETC 166 Project Manager: Mary-Jeanne Adler, PhD mj.adler@hidro.romj.adler@hidro.ro; mj.adler@yahoo.com;

Danube WATER: long term planning – Implementation of WFD

Submit Interim Report on

Implementation

2012

Implement Program of Measures

2013

Revise Overview of Significant

Water issues

Evaluate 1st and Prepare

2nd Period

2015

Update RBMP

2009Gap Analysis

Develop River Basin Management Plans

Set up Program of Measures for River Basin Districts

Public Participation

2004

Assess current status

2006

Establish Monitoring Programs

Set up Environmental

Objectives

Page 14: Project “Danube WATER integrated management” – WATER MIS ETC 166 Project Manager: Mary-Jeanne Adler, PhD mj.adler@hidro.romj.adler@hidro.ro; mj.adler@yahoo.com;

Project Results

• Joint methodologies, joint standards for water monitoring and Joint aligned databases with interfaces for data exchange and data sharing with the large public, as demanded by INSPIRE Directive and will be shared with the ICPDR and the upstream countries. Warnings will be elaborated in case of floods, low flows and accidental pollution for the relevant actors in the border area, increasing the public awareness through information campaigns on the environmental protection and management in the cross-border area. Finally, a revision of the bilateral agreement for data exchange will be provided.

Page 15: Project “Danube WATER integrated management” – WATER MIS ETC 166 Project Manager: Mary-Jeanne Adler, PhD mj.adler@hidro.romj.adler@hidro.ro; mj.adler@yahoo.com;

Target Groups

• Large communities in flood risk areas, water management authorities, ICPDR, border counties, NPP Cernavodă -Romania and Kozloduy - Bulgaria

Page 16: Project “Danube WATER integrated management” – WATER MIS ETC 166 Project Manager: Mary-Jeanne Adler, PhD mj.adler@hidro.romj.adler@hidro.ro; mj.adler@yahoo.com;

Stakeholders’ involvement

Page 17: Project “Danube WATER integrated management” – WATER MIS ETC 166 Project Manager: Mary-Jeanne Adler, PhD mj.adler@hidro.romj.adler@hidro.ro; mj.adler@yahoo.com;

PARTNERS:

PP1- Ministry of Environment and Climate Change – Department for Waters, Forests and Fisheries

PP2- National Administration “Apele Romane”

PP3- National Institute of Hydrology and Water Resources

PP4- Civil Engineering Technical University, Bucharest

PP5- Environmental Protection Agency

PP6- Research Institute in Chemistry

PP7- Polytechnic University, Bucharest

PP8- Research Institute for Nuclear Research, Pitesti

PP9- Ministry of Environment and Waters, Sofia

PP10- National Institute Of Meteorology and Hydrology

PP11- Executive Agency for Exploration and Maintenance of the Danube River, Russe

PP12- Executive Protection Agency, Sofia

PP13- Institute of Research of Nuclear Energy, Sofia

Page 18: Project “Danube WATER integrated management” – WATER MIS ETC 166 Project Manager: Mary-Jeanne Adler, PhD mj.adler@hidro.romj.adler@hidro.ro; mj.adler@yahoo.com;

Stakeholders’ involvement – primary schools, teachers and parents

All participants got a project brochure about Pic Zbarlit and his adventures with Sturio.

Page 19: Project “Danube WATER integrated management” – WATER MIS ETC 166 Project Manager: Mary-Jeanne Adler, PhD mj.adler@hidro.romj.adler@hidro.ro; mj.adler@yahoo.com;

Summary: challenges taken to …

By modelling tool integrated into DSS it is/was possible to

• develop unified database for Low Danube floodplain,

• assess territorial policies,• predict certain processes,• understand spatial and time related

impacts of measures,• run scenarios,• publish results in easy-to understand

way – Portal development

Page 20: Project “Danube WATER integrated management” – WATER MIS ETC 166 Project Manager: Mary-Jeanne Adler, PhD mj.adler@hidro.romj.adler@hidro.ro; mj.adler@yahoo.com;

Contacts

Thank you for your attention!

www.cbcromaniabulgaria.eu

Investing in your future!Romania-Bulgaria Cross Border Cooperation Programme 2007-2013 is co-financed by the European Union

through the European Regional Development Fund