State Project No.: 0079-245Federal Aid Project No.: TBD
I-91/I-691/ Route 15 Interchange Improvements in Meriden, CT
1
PROJECT DESCRIPTIONInterchange Improvements to I-691 Eastbound Off-Ramp to I-91
Northbound
LOCATION:
This proposed project is located on a segment of Interstate 91 (I-91) that provides access to Route 15 (Wilbur Cross Parkway), Interstate 691 (I-691), and East Main Street in the City of Meriden. All three highways in the project area consist of a complex system of mainline lanes, weave sections and ramp connections that form the I-91/I-691/Route 15 Interchange. The improvements proposed as part of this project encompass highway elements along the northbound direction of I-91 and eastbound direction of I-691 within the limits as described below.
The proposed project limits begin on I-91 NB from the junction of the on-ramp from Route 15 NB (MP 19.6) to the Middletown rest area (MP 21.42) for approximately 1.8 miles.
The proposed project limits begin on I-691 EB off-ramp (MP 0.02) and extend to its junction with I-91 NB for approximately 0.4 miles.
PURPOSE AND NEED:
The purpose of this project is to reduce congestion for the traffic movement at the left-handed off-ramp from I-691 EB to I-91 NB and along I-91 NB mainline and address associated safety concerns within the proposed project limits. The project intends to complete the following:
Reduce traffic congestion to achieve a Level of Service (LOS) of D or better by design year 2051.
State Project No.: 0079-245Federal Aid Project No.: TBD
I-91/I-691/ Route 15 Interchange Improvements in Meriden, CT
2
Improve safety associated with crashes caused by congestion and weaving.
The proposed improvements consist of widening the off-ramp from I-691 EB to I-91 NB (Interchange no. 11) to two lanes and the construction of an operational lane on I-91 NB from the on-ramp from Interchange no. 11 s and the Middletown rest area.
EXISTING CONDITIONS:
I-691 Eastbound and Westbound
Within the project limits, I-691/Route 66 consists of two mainline lanes of travel in each direction. Access to I-91 NB (Interchange no. 11) consists of a single-lane left-hand off-ramp from I-691 EB that merges with a single-lane I-691 WB off-ramp prior to merging with I-91 NB.
The existing (year 2017) operating conditions along mainline I-691 eastbound and westbound are considered good based on a level of service “C” or better. Intermittent backups on the I-691 EB off-ramp prior to its merge with the I-691 WB off-ramp have been observed during the peak hours. Future 2051 traffic volumes are anticipated to increase considerably resulting in LOS “E” on I-691 EB downstream of the off-ramp to I-91 NB. The off-ramp from I-691 EB to I-91 NB is expected to operate at a LOS “F” in 2051.
I-91 Northbound
I-91 NB within the project limits consists of three mainline lanes of travel. North of its merge with Interchange No. 11 ramps (MP 20.41), the existing I-91 NB serves an AM peak hour volume of 5,150 vehicles that is expected to increase to approximately 6,170 vehicles in 2051. The single lane entrance ramp from I-691 currently has an AM peak hour volume of 1,700 vehicles is expected to increase approximately to 2,070 vehicles per hour in 2051.
Levels of service downstream of the on-ramp from I-691 on I-91 NB are anticipated to be “C” during the AM and PM peak periods in 2051. The level of service upstream of the Interchange No. 11 ramp reduces to a LOS “E” in 2051 due to the heavy traffic from the ramp and mainline I-91 NB resulting in traffic congestion and backups.
The I-91 NB segment between the I-691 Interchange No. 11 (MP 20.41) and the rest area off-ramp has three percent positive grade and high truck volume (around 10%) that results in slower traffic.
Crash History
The crash data between May 1, 2014 and April 30, 2017 indicated that there were a total of 63 crashes with 12 injuries (I-91 NB recorded 40 crashes with 8 injuries, I-691 EB to I-91 NB ramp recorded 11 crashes with 2 injuries and I-691 WB to I-91 NB ramp recorded 12 crashes with 2 injuries).
State Project No.: 0079-245Federal Aid Project No.: TBD
I-91/I-691/ Route 15 Interchange Improvements in Meriden, CT
3
The predominant types of crashes consist of the following:
I-91 NB I-691 EB (ramp to I-91 NB) I-691 WB (ramp to I-91 NB)Fixed Object – 37% Fixed Object – 64% Fixed Object – 83%Rear End – 35% Rear End – 27% Right Angle – 9%Sideswipe – 28% Sideswipe – 9% Sideswipe – 8%
The crash data show that the predominant types of crashes on the roadway segments can be attributed to congestion due to limited ramp capacity as well as to congestion on I-91 mainline.
Traffic Volumes
Maximum approximate peak hour volumes observed in the year 2017 and projected to the year 2051 for each highway corridor within the project area are as follows:
Year I-91 NB I-691 EB (ramp to I-91 NB) I-691 WB (ramp to I-91 NB)2017 5,370(5,350)* 1,620(1,560) 80(60)
2051 6,440 (6,430) 1,970(1,890) 100(70)
*AM Peak volume (PM Peak volume)
PROPOSED IMPROVEMENTS
I-691 Eastbound
It is proposed to widen the exit ramp from I-691 EB to I-91 NB to increase capacity and reduce congestion. Bridge No. 01837 will be widened due to the proposed improvements. The merge point of the I-691 EB and WB off-ramps will be re-aligned to improve traffic operations by providing additional storage and maneuverability for vehicles.
State Project No.: 0079-245Federal Aid Project No.: TBD
I-91/I-691/ Route 15 Interchange Improvements in Meriden, CT
4
I-91 Northbound
I-91 NB is proposed to be improved between the on-ramp from Route 15 NB and the Middletown Rest Area by adding an operational lane and widening Bridge No. 03051 (I-91 NB over Baldwin Avenue) to accommodate the additional mainline lane. The deck for this bridge is also proposed to be replaced.
No right-of-way impact is anticipated as part of this project.
ESTIMATED COSTS:
Construction ………………………………...$45 million (2023 Construction Year) ROW …………………………………………$0 Utilities ……………………………………….TBD Preliminary Engineering ……………………$25 million (Includes Project 79-240 and 79-246)
SCHEDULE (DESIGN/BUILD):
Design Approval………………………………………………… 02/16/2022 Procurement ............................................................................February 2022 Final Design Completion Date.................................................February 2023 Construction Completion Date................................................. 03/31/2025
C
AMITY DET
ROIT
AV
EN
UE
BU
TT
ON
EET
STREET
BE
EC
HW
OO
DD
RI
VE
OA
KL
AN
D
CT.
STREET
GO
LDEN
AVENUE
MO
RS
E
STREET
HILL ST.
HIL
L
FRARY
GU
EIL
PL.
NO
RT
H
MICHAEL
DR.
ST.
MAYNARD ST.
ST.
CO
LO
NY
HG
HT
O
CAMBRIDGEST STREET
AVENUEBRECKENRIDGE
GRIS
WO
LD
TR
EM
ON
TS
TR
EE
T
LO
CUS
T S
T.
AR
TIZ
AN S
T.
BRITANNIASTREET
SMITH ST.ROBIN
HILL
ROAD
ROADH LLI
RO
BIN
D
RIVE
AVENUE
TWISS AVE.AVENUE
PU
TN
AM
HO
WE
ST.
HINMAN
ST.
BU
NK
ER
HIL
LS
T.
WA
RR
EN
AVE.
PR
ES
CO
TT
ST
RE
ET
STREET
ST
RE
ET
ST
RE
ET
ST.
STREET
LINDEN PL.LE
BROADVIE
WT
ER
RA
CE
YALE
AC
RES
ROAD
TE
R
.
WEL
LES
BROADVA
LE
GIL
BE
RT
RD
ROAD
ROAD
ELIZ
AB
ET
H
NO
RT
H
WALL
WHIT
ER
OA
D#1
STREET
BRIARWOOD
CHERRYHILL LA.
DRIV
E
RIDGEWOOD RD.
ST
RE
ET
PA
RKSID
ET
ER
R.STREET
DE
L T
ER
RA
CE
ST
RE
ET
PE
AR
L
NO
RT
H
LIBERTY MU
RR
AY
HUBER AV
EN
UE
NE
WT
ON
ST
RE
ET
ST
RE
ET
ST.
CO
LLI
NS
AV
EN
UE
NO
WALL
DAYTON
SOUTH
CT.
CAMP
DAVID
DRIVE
GR
AV
EL
SUNBRIGHT DRIVE
CRICKET DRIVE
SUNBRIGHTDRIVE
SO
UT
H
NOR
TH
STREET
ST
RE
ET
ST
REET
ST
REET
AVE.
GE
NES
T
SU
NS
ET
WIL
LIA
MS
ST
REET
ST
RE
ET
ST
RE
ET
ST
RE
ET
ST
REET
AV
EN
UE
HO
RT
ON
WIL
LIA
MS
SU
NS
ET
AV
EN
UE
MU
RR
AY
CLIN
TO
N
MAIN
PE
AR
L
ORIE
NTNE
WT
ON
ST. #1
CO
TT
AG
E
MIL
ES P
L.
CO
LLIN
S
PA
RK
WA
Y
LANE
DRIVE
LY
DA
LE
PLACE
TE
RR
AC
E
AV
EN
UE
AVE
NUE
WILSON
CARPEN-
HIL
LC
RES
T
#1
CA
RP
EN
TE
R
#2
LY
DA
LE
P
LACE
DE
XTE
R
ANN
STREET
AN
N
VIE
W
TE
R.
GR
AV
EL
LOIS
ST.
SYLVESTERST.
MA
RG
ERIE
ST
RE
ET
PL
AC
E
PA
RK
WA
Y
BELV EDERE
DRIV
E
STREET #1
AVENUE
AV
EN
UE
JEROME
ROSELAND AVE.
FARNES AVE.
DRI
VE
OX
BO
W
KI
M
LANE
OVER-LOOK
HA
WT
HO
RN
E
TE
R.
ROAD
NO
RT
HFIE
LD
HARNESS
DRIV
E
ROAD
PA
DD
OC
K
RO
AD
BA
RR
AV
EN
UE
DR
COURT
MILLER
L
KE
NNE
DY
DRI
VE
OV
ER
LO
OK
LO
NG
ME
AD
OW
DRIVE
WHIT
NE
Y
RO
AD
PRANN
EAST
CA
RTP
AT
H WEDGEDR.
PAR
KWAY
RESE
ARC
H
AVE
NUE
PO
MERO
Y
IVES OAK
RIDGEDR.
AVE.
TH
ORP
E
HIGH
KN
OL
LFIE
LD
WI
LD
W
OODS
ROAD
RO
AD
MO
RT
ON
RO
AD MILDRED
ROAD
ROAD
RO
AD
JA
NETMIL
DR
ED
AV
E.
HUM
BER
T
ST.
AV
E.
CO
NE
BI
RD
SE
YA
VE
NU
EE.MAIN
ST.#
2STREET
# 1
AVENUE
PR
ES
TO
NDRI
VE
#1
DRIVE
WE
ST
VIE
W
WES
TVIE
W
VALLEYV
IE
W
VA
LL
EY
VI
EW
DR.
#2
DRIVE
KNOLL-
PARKERROAD
CLE
ARFIE
LD
AV
EN
UE
DRI
VE
AVENUE
RO
AD
LA
NE
MAP
LE
RO
G
ERS DR.
AV
EN
UE
WA
YN
E
LO
WE
MAIN
PA
RK
WA
Y
P
OMEROY
EAST
BE
E
BOY
L
ST
ON
ST.
NO.
MEADOW
WA
Y
L
ANE
TU
MBLE
ROAD
RO
AD
CIRCLE
SHARON
WOOD
ROAD
BR
OO
KT
UM
BLE
HO
LL
Y
IVY
HOLIDAY HILL ROAD
AV
EN
UE
AR
LIN
GT
ON S
TR
EE
T
NO.
FULTONST.
ST
RE
ET
ST
RE
ET
AR
LIN
GT
ON
BO
YLS
TO
N
MA
PL
E
ORCHARDST
ATKINS
STREET
PR
AT
T#2
CO
NVERSE
CIR
.
CO
N
VERSE
AVENUEBALDWIN
WHIT
ER
OA
D#2
HEIN
EA
VE
NU
E
HOWARDAVE.
WA
LL
STREET ATKINSST. EXT.
HIG
BY
DRIV
E
SO MEADOW LANE
NORTHMEADOW LANE
AVENUE
RD.
WIN
DIN
G
BR
OO
K
HIG
BY
DRIV
E
LA
NE
LO
RI
BALDWIN PR
ES
TO
N
TH
UR
RO
TT
DRIVE
AL
EX
AN
DE
R
PRESTON
DRIV
E B
UT
TE
RU
NT
MAYFLOWER
LA
NE
DRIV
E
LA
NE
S
AGAMORE
MAYF
A
IRROAD R
OA
D
ROAD
RO
AD
RO
UN
D
RO
U
ND HILL
CEDAR
AVENUE
PAYNE
PLACE
ROAD
ORCHID
BALDWIN
HIL
L
HILLS RD.
OR
CHID
ROAD
BRET
DR.
BA
LD
WIN
AV
E.
OL
D
JODIDR.
BE
E
BA
R
WIL
L
DR.
ST
RE
ET
ST
RE
ET
ROAD
WEST
FIELD
WESTFIELD
FO
LS
AVE
ROAD
RE
YN
OL
DS
DO
GW
OO
D
WOODYMERE
KNOLL
PINE
TREE RIDGE
DRIV
E
SHADYCREST
ROAD
LA
NE
COUNTRY
CLUB DRIVE
ROAD
ST
RE
ET
BR
OA
D
ST
RE
ET
BR
OA
D
ST
REET
HIGHWAY
PAR
KWA
Y
8
8
10
9
68W
17
67W
68N-E
67S67
16
10
11 11
18
18
12
19
Brook
Baldwins
Pond
North
Spoon
Shop
Brook
Brook
Willo
w
Black Pond
691
691
91
15
15
66
66
91
91
5
5
BUDDINGRIDGE
PR
ES
TO
N
AV
EN
UE
AV
E
AV
EN
UE
PR
ES
TO
N
BROOK
MARLSON
DRIV
E
BO
UN
DA
RY
TO
WN
OF
MI
DD
DD
LE
TO
WN
BUNKER
RD.
WOOD DR.
RD.
KNOLL
WYND
.
LONSDALEAVE.
.
LE
SE
X
CO
UN
TY
DR.
DR.
TER HGTS.
.
PL.
NORTH
CT.
WO
OD
LA
WN
TE
R.
BRIAR LANE
#2
HORSESHOE
DR.
.
ST
REET #1
STREET #
1
CLARK ST.
STREET #1
17
NO
RT
H
WIL
BU
R
CR
OS
S
PA
RK
WA
Y
JIMMYLA.
AVE.
HA
RT
AV
E.
#2
#1
MALONEY
AVE.
LIN
DAC
T.
A
VE.
MO
RL
EY
DR.
HE
AT
HE
RH
EIG
HT
S
COURTNEY
CT.
TR
AFF
OR
DS
T.
BLACKSTONEST.
MIL
TO
N
PA
RK
ER
AV
E.
ST
RE
ET
MILICI
CIR.
SC
HWIN
K
DR.
HA
RKIN
SL
A.
JO
HN
GE
OR
GE
DR.
DA
FF
ODIL
LA.
DA
GG
ETT
DR.
ME
AD
OW
BR
OO
K
DR.
STONEYCRESTDR.
ST
ON
EY
CRESTDR.
HILL
ELMHURST
AVE.
COLLINDA
LE
COLO
RA
DO
CT.
MAPLE
AV
E.
EX
T.
COL
NY
.
S.
ST.
HICKS ST.
NIA
WS
AV
E.
LOUIS
DR.
KYLE
CT.
LUCIADR.
TE
R.
LO
UA
NN
ST.
WESTFIELD
ENOTSELBBOC
LA.
MERIDEN
Roaring
B
Black
Pond
66
13
TO
TO
WN
OF
ME
R
E066 0
03
E066 0
03T
E066 004
NEW HAVEN
CO
UN
TR
Y
PR
ES
TO
N
91
T O W N
TO
WN
OF
AREA
REST
20.97
21
21.96
HA
RTF
OR
D
BO
UN
DA
RY
ND
EP
AR
TM
E
NT
OF TRANS
PO
RT
ATI
ON
C
ONNECTICU
T
0079-0245
STATE PROJECT NO.:
CITY/TOWN:
DATE:
DEPARTMENT OF TRANSPORTATION
STATE OF CONNECTICUTC
ONNECTICUT
DE
PA
RT
ME
NT
O F TRANS
PO
RT
ATI
ON
06/23/2020
MERIDEN & MIDDLETOWN
LOCATION
PROJECT
0
HORIZONTAL SCALE
4000'2000'
1"=2000"
LOCATION MAP
I-691EB TO I-91NB IMPROVEMENTS
FIGURE 7