State Project No.: 0079-245 Federal Aid Project No.: TBD I-91/I-691/ Route 15 Interchange Improvements in Meriden, CT 1 PROJECT DESCRIPTION Interchange Improvements to I-691 Eastbound Off-Ramp to I-91 Northbound LOCATION: This proposed project is located on a segment of Interstate 91 (I-91) that provides access to Route 15 (Wilbur Cross Parkway), Interstate 691 (I-691), and East Main Street in the City of Meriden. All three highways in the project area consist of a complex system of mainline lanes, weave sections and ramp connections that form the I-91/I-691/Route 15 Interchange. The improvements proposed as part of this project encompass highway elements along the northbound direction of I-91 and eastbound direction of I-691 within the limits as described below. The proposed project limits begin on I-91 NB from the junction of the on-ramp from Route 15 NB (MP 19.6) to the Middletown rest area (MP 21.42) for approximately 1.8 miles. The proposed project limits begin on I-691 EB off-ramp (MP 0.02) and extend to its junction with I-91 NB for approximately 0.4 miles. PURPOSE AND NEED: The purpose of this project is to reduce congestion for the traffic movement at the left-handed off-ramp from I-691 EB to I-91 NB and along I-91 NB mainline and address associated safety concerns within the proposed project limits. The project intends to complete the following: Reduce traffic congestion to achieve a Level of Service (LOS) of D or better by design year 2051.

Upload: others

Post on 23-Jan-2021

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PROJECT DESCRIPTION Northbound Interchange …Sep 28, 2020  · i-91/i-691/ route 15 interchange improvements in meriden, ct 4 i-91 northbound ... h g h t o ambridg s e t str e t av

State Project No.: 0079-245Federal Aid Project No.: TBD

I-91/I-691/ Route 15 Interchange Improvements in Meriden, CT

1

PROJECT DESCRIPTIONInterchange Improvements to I-691 Eastbound Off-Ramp to I-91

Northbound

LOCATION:

This proposed project is located on a segment of Interstate 91 (I-91) that provides access to Route 15 (Wilbur Cross Parkway), Interstate 691 (I-691), and East Main Street in the City of Meriden. All three highways in the project area consist of a complex system of mainline lanes, weave sections and ramp connections that form the I-91/I-691/Route 15 Interchange. The improvements proposed as part of this project encompass highway elements along the northbound direction of I-91 and eastbound direction of I-691 within the limits as described below.

The proposed project limits begin on I-91 NB from the junction of the on-ramp from Route 15 NB (MP 19.6) to the Middletown rest area (MP 21.42) for approximately 1.8 miles.

The proposed project limits begin on I-691 EB off-ramp (MP 0.02) and extend to its junction with I-91 NB for approximately 0.4 miles.

PURPOSE AND NEED:

The purpose of this project is to reduce congestion for the traffic movement at the left-handed off-ramp from I-691 EB to I-91 NB and along I-91 NB mainline and address associated safety concerns within the proposed project limits. The project intends to complete the following:

Reduce traffic congestion to achieve a Level of Service (LOS) of D or better by design year 2051.

Page 2: PROJECT DESCRIPTION Northbound Interchange …Sep 28, 2020  · i-91/i-691/ route 15 interchange improvements in meriden, ct 4 i-91 northbound ... h g h t o ambridg s e t str e t av

State Project No.: 0079-245Federal Aid Project No.: TBD

I-91/I-691/ Route 15 Interchange Improvements in Meriden, CT

2

Improve safety associated with crashes caused by congestion and weaving.

The proposed improvements consist of widening the off-ramp from I-691 EB to I-91 NB (Interchange no. 11) to two lanes and the construction of an operational lane on I-91 NB from the on-ramp from Interchange no. 11 s and the Middletown rest area.

EXISTING CONDITIONS:

I-691 Eastbound and Westbound

Within the project limits, I-691/Route 66 consists of two mainline lanes of travel in each direction. Access to I-91 NB (Interchange no. 11) consists of a single-lane left-hand off-ramp from I-691 EB that merges with a single-lane I-691 WB off-ramp prior to merging with I-91 NB.

The existing (year 2017) operating conditions along mainline I-691 eastbound and westbound are considered good based on a level of service “C” or better. Intermittent backups on the I-691 EB off-ramp prior to its merge with the I-691 WB off-ramp have been observed during the peak hours. Future 2051 traffic volumes are anticipated to increase considerably resulting in LOS “E” on I-691 EB downstream of the off-ramp to I-91 NB. The off-ramp from I-691 EB to I-91 NB is expected to operate at a LOS “F” in 2051.

I-91 Northbound

I-91 NB within the project limits consists of three mainline lanes of travel. North of its merge with Interchange No. 11 ramps (MP 20.41), the existing I-91 NB serves an AM peak hour volume of 5,150 vehicles that is expected to increase to approximately 6,170 vehicles in 2051. The single lane entrance ramp from I-691 currently has an AM peak hour volume of 1,700 vehicles is expected to increase approximately to 2,070 vehicles per hour in 2051.

Levels of service downstream of the on-ramp from I-691 on I-91 NB are anticipated to be “C” during the AM and PM peak periods in 2051. The level of service upstream of the Interchange No. 11 ramp reduces to a LOS “E” in 2051 due to the heavy traffic from the ramp and mainline I-91 NB resulting in traffic congestion and backups.

The I-91 NB segment between the I-691 Interchange No. 11 (MP 20.41) and the rest area off-ramp has three percent positive grade and high truck volume (around 10%) that results in slower traffic.

Crash History

The crash data between May 1, 2014 and April 30, 2017 indicated that there were a total of 63 crashes with 12 injuries (I-91 NB recorded 40 crashes with 8 injuries, I-691 EB to I-91 NB ramp recorded 11 crashes with 2 injuries and I-691 WB to I-91 NB ramp recorded 12 crashes with 2 injuries).

Page 3: PROJECT DESCRIPTION Northbound Interchange …Sep 28, 2020  · i-91/i-691/ route 15 interchange improvements in meriden, ct 4 i-91 northbound ... h g h t o ambridg s e t str e t av

State Project No.: 0079-245Federal Aid Project No.: TBD

I-91/I-691/ Route 15 Interchange Improvements in Meriden, CT

3

The predominant types of crashes consist of the following:

I-91 NB I-691 EB (ramp to I-91 NB) I-691 WB (ramp to I-91 NB)Fixed Object – 37% Fixed Object – 64% Fixed Object – 83%Rear End – 35% Rear End – 27% Right Angle – 9%Sideswipe – 28% Sideswipe – 9% Sideswipe – 8%

The crash data show that the predominant types of crashes on the roadway segments can be attributed to congestion due to limited ramp capacity as well as to congestion on I-91 mainline.

Traffic Volumes

Maximum approximate peak hour volumes observed in the year 2017 and projected to the year 2051 for each highway corridor within the project area are as follows:

Year I-91 NB I-691 EB (ramp to I-91 NB) I-691 WB (ramp to I-91 NB)2017 5,370(5,350)* 1,620(1,560) 80(60)

2051 6,440 (6,430) 1,970(1,890) 100(70)

*AM Peak volume (PM Peak volume)

PROPOSED IMPROVEMENTS

I-691 Eastbound

It is proposed to widen the exit ramp from I-691 EB to I-91 NB to increase capacity and reduce congestion. Bridge No. 01837 will be widened due to the proposed improvements. The merge point of the I-691 EB and WB off-ramps will be re-aligned to improve traffic operations by providing additional storage and maneuverability for vehicles.

Page 4: PROJECT DESCRIPTION Northbound Interchange …Sep 28, 2020  · i-91/i-691/ route 15 interchange improvements in meriden, ct 4 i-91 northbound ... h g h t o ambridg s e t str e t av

State Project No.: 0079-245Federal Aid Project No.: TBD

I-91/I-691/ Route 15 Interchange Improvements in Meriden, CT

4

I-91 Northbound

I-91 NB is proposed to be improved between the on-ramp from Route 15 NB and the Middletown Rest Area by adding an operational lane and widening Bridge No. 03051 (I-91 NB over Baldwin Avenue) to accommodate the additional mainline lane. The deck for this bridge is also proposed to be replaced.

No right-of-way impact is anticipated as part of this project.

ESTIMATED COSTS:

Construction ………………………………...$45 million (2023 Construction Year) ROW …………………………………………$0 Utilities ……………………………………….TBD Preliminary Engineering ……………………$25 million (Includes Project 79-240 and 79-246)

SCHEDULE (DESIGN/BUILD):

Design Approval………………………………………………… 02/16/2022 Procurement ............................................................................February 2022 Final Design Completion Date.................................................February 2023 Construction Completion Date................................................. 03/31/2025

Page 5: PROJECT DESCRIPTION Northbound Interchange …Sep 28, 2020  · i-91/i-691/ route 15 interchange improvements in meriden, ct 4 i-91 northbound ... h g h t o ambridg s e t str e t av

C

AMITY DET

ROIT

AV

EN

UE

BU

TT

ON

EET

STREET

BE

EC

HW

OO

DD

RI

VE

OA

KL

AN

D

CT.

STREET

GO

LDEN

AVENUE

MO

RS

E

STREET

HILL ST.

HIL

L

FRARY

GU

EIL

PL.

NO

RT

H

MICHAEL

DR.

ST.

MAYNARD ST.

ST.

CO

LO

NY

HG

HT

O

CAMBRIDGEST STREET

AVENUEBRECKENRIDGE

GRIS

WO

LD

TR

EM

ON

TS

TR

EE

T

LO

CUS

T S

T.

AR

TIZ

AN S

T.

BRITANNIASTREET

SMITH ST.ROBIN

HILL

ROAD

ROADH LLI

RO

BIN

D

RIVE

AVENUE

TWISS AVE.AVENUE

PU

TN

AM

HO

WE

ST.

HINMAN

ST.

BU

NK

ER

HIL

LS

T.

WA

RR

EN

AVE.

PR

ES

CO

TT

ST

RE

ET

STREET

ST

RE

ET

ST

RE

ET

ST.

STREET

LINDEN PL.LE

BROADVIE

WT

ER

RA

CE

YALE

AC

RES

ROAD

TE

R

.

WEL

LES

BROADVA

LE

GIL

BE

RT

RD

ROAD

ROAD

ELIZ

AB

ET

H

NO

RT

H

WALL

WHIT

ER

OA

D#1

STREET

BRIARWOOD

CHERRYHILL LA.

DRIV

E

RIDGEWOOD RD.

ST

RE

ET

PA

RKSID

ET

ER

R.STREET

DE

L T

ER

RA

CE

ST

RE

ET

PE

AR

L

NO

RT

H

LIBERTY MU

RR

AY

HUBER AV

EN

UE

NE

WT

ON

ST

RE

ET

ST

RE

ET

ST.

CO

LLI

NS

AV

EN

UE

NO

WALL

DAYTON

SOUTH

CT.

CAMP

DAVID

DRIVE

GR

AV

EL

SUNBRIGHT DRIVE

CRICKET DRIVE

SUNBRIGHTDRIVE

SO

UT

H

NOR

TH

STREET

ST

RE

ET

ST

REET

ST

REET

AVE.

GE

NES

T

SU

NS

ET

WIL

LIA

MS

ST

REET

ST

RE

ET

ST

RE

ET

ST

RE

ET

ST

REET

AV

EN

UE

HO

RT

ON

WIL

LIA

MS

SU

NS

ET

AV

EN

UE

MU

RR

AY

CLIN

TO

N

MAIN

PE

AR

L

ORIE

NTNE

WT

ON

ST. #1

CO

TT

AG

E

MIL

ES P

L.

CO

LLIN

S

PA

RK

WA

Y

LANE

DRIVE

LY

DA

LE

PLACE

TE

RR

AC

E

AV

EN

UE

AVE

NUE

WILSON

CARPEN-

HIL

LC

RES

T

#1

CA

RP

EN

TE

R

#2

LY

DA

LE

P

LACE

DE

XTE

R

ANN

STREET

AN

N

VIE

W

TE

R.

GR

AV

EL

LOIS

ST.

SYLVESTERST.

MA

RG

ERIE

ST

RE

ET

PL

AC

E

PA

RK

WA

Y

BELV EDERE

DRIV

E

STREET #1

AVENUE

AV

EN

UE

JEROME

ROSELAND AVE.

FARNES AVE.

DRI

VE

OX

BO

W

KI

M

LANE

OVER-LOOK

HA

WT

HO

RN

E

TE

R.

ROAD

NO

RT

HFIE

LD

HARNESS

DRIV

E

ROAD

PA

DD

OC

K

RO

AD

BA

RR

AV

EN

UE

DR

COURT

MILLER

L

KE

NNE

DY

DRI

VE

OV

ER

LO

OK

LO

NG

ME

AD

OW

DRIVE

WHIT

NE

Y

RO

AD

PRANN

EAST

CA

RTP

AT

H WEDGEDR.

PAR

KWAY

RESE

ARC

H

AVE

NUE

PO

MERO

Y

IVES OAK

RIDGEDR.

AVE.

TH

ORP

E

HIGH

KN

OL

LFIE

LD

WI

LD

W

OODS

ROAD

RO

AD

MO

RT

ON

RO

AD MILDRED

ROAD

ROAD

RO

AD

JA

NETMIL

DR

ED

AV

E.

HUM

BER

T

ST.

AV

E.

CO

NE

BI

RD

SE

YA

VE

NU

EE.MAIN

ST.#

2STREET

# 1

AVENUE

PR

ES

TO

NDRI

VE

#1

DRIVE

WE

ST

VIE

W

WES

TVIE

W

VALLEYV

IE

W

VA

LL

EY

VI

EW

DR.

#2

DRIVE

KNOLL-

PARKERROAD

CLE

ARFIE

LD

AV

EN

UE

DRI

VE

AVENUE

RO

AD

LA

NE

MAP

LE

RO

G

ERS DR.

AV

EN

UE

WA

YN

E

LO

WE

MAIN

PA

RK

WA

Y

P

OMEROY

EAST

BE

E

BOY

L

ST

ON

ST.

NO.

MEADOW

WA

Y

L

ANE

TU

MBLE

ROAD

RO

AD

CIRCLE

SHARON

WOOD

ROAD

BR

OO

KT

UM

BLE

HO

LL

Y

IVY

HOLIDAY HILL ROAD

AV

EN

UE

AR

LIN

GT

ON S

TR

EE

T

NO.

FULTONST.

ST

RE

ET

ST

RE

ET

AR

LIN

GT

ON

BO

YLS

TO

N

MA

PL

E

ORCHARDST

ATKINS

STREET

PR

AT

T#2

CO

NVERSE

CIR

.

CO

N

VERSE

AVENUEBALDWIN

WHIT

ER

OA

D#2

HEIN

EA

VE

NU

E

HOWARDAVE.

WA

LL

STREET ATKINSST. EXT.

HIG

BY

DRIV

E

SO MEADOW LANE

NORTHMEADOW LANE

AVENUE

RD.

WIN

DIN

G

BR

OO

K

HIG

BY

DRIV

E

LA

NE

LO

RI

BALDWIN PR

ES

TO

N

TH

UR

RO

TT

DRIVE

AL

EX

AN

DE

R

PRESTON

DRIV

E B

UT

TE

RU

NT

MAYFLOWER

LA

NE

DRIV

E

LA

NE

S

AGAMORE

MAYF

A

IRROAD R

OA

D

ROAD

RO

AD

RO

UN

D

RO

U

ND HILL

CEDAR

AVENUE

PAYNE

PLACE

ROAD

ORCHID

BALDWIN

HIL

L

HILLS RD.

OR

CHID

ROAD

BRET

DR.

BA

LD

WIN

AV

E.

OL

D

JODIDR.

BE

E

BA

R

WIL

L

DR.

ST

RE

ET

ST

RE

ET

ROAD

WEST

FIELD

WESTFIELD

FO

LS

AVE

ROAD

RE

YN

OL

DS

DO

GW

OO

D

WOODYMERE

KNOLL

PINE

TREE RIDGE

DRIV

E

SHADYCREST

ROAD

LA

NE

COUNTRY

CLUB DRIVE

ROAD

ST

RE

ET

BR

OA

D

ST

RE

ET

BR

OA

D

ST

REET

HIGHWAY

PAR

KWA

Y

8

8

10

9

68W

17

67W

68N-E

67S67

16

10

11 11

18

18

12

19

Brook

Baldwins

Pond

North

Spoon

Shop

Brook

Brook

Willo

w

Black Pond

691

691

91

15

15

66

66

91

91

5

5

BUDDINGRIDGE

PR

ES

TO

N

AV

EN

UE

AV

E

AV

EN

UE

PR

ES

TO

N

BROOK

MARLSON

DRIV

E

BO

UN

DA

RY

TO

WN

OF

MI

DD

DD

LE

TO

WN

BUNKER

RD.

WOOD DR.

RD.

KNOLL

WYND

.

LONSDALEAVE.

.

LE

SE

X

CO

UN

TY

DR.

DR.

TER HGTS.

.

PL.

NORTH

CT.

WO

OD

LA

WN

TE

R.

BRIAR LANE

#2

HORSESHOE

DR.

.

ST

REET #1

STREET #

1

CLARK ST.

STREET #1

17

NO

RT

H

WIL

BU

R

CR

OS

S

PA

RK

WA

Y

JIMMYLA.

AVE.

HA

RT

AV

E.

#2

#1

MALONEY

AVE.

LIN

DAC

T.

A

VE.

MO

RL

EY

DR.

HE

AT

HE

RH

EIG

HT

S

COURTNEY

CT.

TR

AFF

OR

DS

T.

BLACKSTONEST.

MIL

TO

N

PA

RK

ER

AV

E.

ST

RE

ET

MILICI

CIR.

SC

HWIN

K

DR.

HA

RKIN

SL

A.

JO

HN

GE

OR

GE

DR.

DA

FF

ODIL

LA.

DA

GG

ETT

DR.

ME

AD

OW

BR

OO

K

DR.

STONEYCRESTDR.

ST

ON

EY

CRESTDR.

HILL

ELMHURST

AVE.

COLLINDA

LE

COLO

RA

DO

CT.

MAPLE

AV

E.

EX

T.

COL

NY

.

S.

ST.

HICKS ST.

NIA

WS

AV

E.

LOUIS

DR.

KYLE

CT.

LUCIADR.

TE

R.

LO

UA

NN

ST.

WESTFIELD

ENOTSELBBOC

LA.

MERIDEN

Roaring

B

Black

Pond

66

13

TO

TO

WN

OF

ME

R

E066 0

03

E066 0

03T

E066 004

NEW HAVEN

CO

UN

TR

Y

PR

ES

TO

N

91

T O W N

TO

WN

OF

AREA

REST

20.97

21

21.96

HA

RTF

OR

D

BO

UN

DA

RY

ND

EP

AR

TM

E

NT

OF TRANS

PO

RT

ATI

ON

C

ONNECTICU

T

0079-0245

STATE PROJECT NO.:

CITY/TOWN:

DATE:

DEPARTMENT OF TRANSPORTATION

STATE OF CONNECTICUTC

ONNECTICUT

DE

PA

RT

ME

NT

O F TRANS

PO

RT

ATI

ON

06/23/2020

MERIDEN & MIDDLETOWN

LOCATION

PROJECT

0

HORIZONTAL SCALE

4000'2000'

1"=2000"

LOCATION MAP

I-691EB TO I-91NB IMPROVEMENTS

FIGURE 7