Field Report Report No.: 01
Project: Douglas Municipal Building Gym Roof Replacement- Roof Leaks
GRLA Project No.: 2015009.02
Date of Site Visit: 30 October, 2017 Routed to: Bill Cundiff Adam Furno Larry Lench Mark McKernan GRLA Project File
Date Produced: 31 October, 2017 Temperature: 54o F Weather: Sunny Time: 11:30 am- 12:00 pm
PRESENT AT SITE:
Adam Furno, Town of Douglas
Mike Fitzpatrick, Douglas Building Committee
Nima Mansour, GRLA
George O’Neill, GRLA
OBSERVATIONS:
1.1 Three (3) roof leaks were observed at the interior of the gymnasium (See attached annotated floor plan):
- Over bleachers at west end of south wall (photo 1)
- At 3-point line at far (west) end of court)
- At east wall and on wall mats (photo 2)
- Two of these leaks had been reported the previous Friday (10/27/17) by Adam Furno and the 3rd was noted by Matt Wojcik on Monday morning (10/30/17).
1.2 Water marks were observed at ceiling of equipment room (photo 3) and locker room (photo 4).
- These water marks are at the underside of where the locker room roof meets the east wall of the Gym.
1.3 Source of this water is yet to be determined, and may be from a failure of the locker room roof or water infiltration within the east wall.
1.4 Ponding water was observed near the roof edge at the southwest corner of the gym roof (photo 5).
- Numerous seams and patches are within the area of this ponding water.
- One lifted seam was observed at this area (photo 6), which is within the zone of the leak above the bleachers at the interior below.
1.5 A heavily patched area of membrane at the vertical parapet of the east wall was observed at the zone above the water leak at the interior of the east wall below (photo 7 & 8).
- It was observed that there is no sealant under the bottom edge of the aluminum drip edge/fascia;
1.6 The east wall (photo 9 & 10) includes the upper parapet/ roof edge of the Gym roof, an aged window and aged masonry.
- The Architect recommended a testing program to determine the source of the leak at this east wall, starting low and working up:
o lower (locker room) roof/ wall intersection,
o window assembly
Douglas Municipal Bldg Window Replacement Field Report-Roof Leaks October 30, 2017
G | R | L | A 239 South Street, Hopkinton, MA 01748
Gorman Richardson Lewis Architects T-508.544.2600 F-508.435.0072
Page 2 of 2
o upper parapet assembly
1.7 Other deficiencies and areas of concern were observed, including:
- Termination of roof system and ends of parapets (photo 11) have open edges of membrane;
- Patches without sealant at edges (photo 12);
- Mike Fitzpatrick noted that the sealant around the edges of roof patches were tooled flat rather than maintaining a raised form to channel water away from the edges of the patch.
- Regularly spaced membrane patches along tops of parapets at east and west ends of Gym roof (photo 13); What was the reason for these patches?
- Open joints at laps of stainless steel through-wall flashing are not sealed (photo 14).
1.8 The Architect recommends the following actions:
- Notify roof system manufacturer (Versico) that the roof system has developed leaks and request inspection of roof by manufacturer’s technical field representative to confirm required repairs to maintain warranty;
- Water testing of east wall to determine source of leaks at east wall as noted above.
1.9 Adam Furno noted that Greenwood Industries (Roofer and GC for the roofing project) was notified of the leaks and were on their way to visit the site.
- The Greenwood rep was delayed due to power outage at his home over the weekend due to the heavy wind storm.
END OF FIELD REPORT
Respectfully submitted, GORMAN RICHARDSON LEWIS ARCHITECTS
George O’Neill Senior Project Manager Attachments: • Photos • Annotated Floor Plan • Annotated Roof Plan
10/30/2017 Douglas Municipal Gym Roof Leaks 1
1. Leak above bleachers
2. Leak at front wall and on wall mats
10/30/2017 Douglas Municipal Gym Roof Leaks 2
3. Leaks at equipment room ceiling
4. Water marks at locker room ceiling
10/30/2017 Douglas Municipal Gym Roof Leaks 3
5. Ponding water at southwest corner
6. Lifted seam at south roof edge
10/30/2017 Douglas Municipal Gym Roof Leaks 4
7. Built up patch at parapet on east
8. Detail of patch at east wall parapet
10/30/2017 Douglas Municipal Gym Roof Leaks 5
9. View of east wall – exterior side of photo 8
10. Interior view of east wall where leak occurred
10/30/2017 Douglas Municipal Gym Roof Leaks 6
11. Open vertical end seam at northwest wall
12. Patch without edge sealant
10/30/2017 Douglas Municipal Gym Roof Leaks 7
13. Patches on top of parapet- what are these?
14. Open joint at stainless steel flashing (typical)
COMMUNITY
MTG. ROOM
1-125
BOARD OF
HEALTH
1-124
BUILDING
DEPT.
1-122
BUILDING
OFFICIAL
1-122A
TOWN
ENG.
1-122B
KITCHEN
1-121
WOMEN
TOILETS
1-120
ENTRY
LOBBY
1-110
GYMNASIUM
1-115
LOCKERS
1-116
STORAGE
1-118
VESTIBULE
1-111
MEN
1-114
WOMEN
1-113
ELEV.
MACH.
1-112
ELEV.
---
STAIR 1
---
ASSESSORS
1-108
OFFICE
1-109
OFFICE
1-107
TOWN
CLERK
1-106
TREASURER
1-103
TOWN
ACCOUNT
1-102
TAX
COLLECTOR
1-104
COPY
ROOM
1-131
OPEN
OFFICE
1-132
SELECTMAN'S
OFFICE
1-133
RESOURCE
ROOM
1-128
STOR.
1-128B
STOR.
1-128A
STOR.
1-128C
SUPPLY
ROOM
129
CORRIDOR
1-100
MECH.
1-119
MEN
TOILETS
1-126
EGRESS
LOBBY
1-127
CORR.
1-130
DN
UP
UP
UP
DN UP
UP
DN
DN
DN
DN
UP
ALTERNATE 1
ALTERNATE 2
ALTERNATE 3
GENERAL PLAN NOTES
RESTROOM
1-106A
RESTROOM
1-104A
KEY NOTES LEGEND
4
REINSTALL MECHANICAL PIPING AND REACTIVATE MECH. UNITS - SEAL NEW PENETRATIONS
THROUGH NEW INFILL PANEL AS REQUIRED AND SPECIFIED.
1
INSTALL NEW WINDOW ASSEMBLY AND RELATED ACCESSORIES AS DETAILED AND SPECIFIED -
REFER TO BUILDING ELEVATIONS AND WINDOW SCHEDULE FOR LOCATIONS AND
CONFIGURATIONS - ALL DIMENSIONS TO BE V.I.F. BY CONTRACTOR.
11111111
111
1
1
1 1 1 1 1 1 1 11
1
REINSTALL SALVAGED VERTICAL WINDOW BLIND ASSEMBLY AND ASSOCIATED HARDWARE.
5
5
CORRIDOR
1-101
1
A3.0
2
A3.0
3
A3.0
1.) ALL EXISTING SURFACES TO REMAIN THAT ARE DAMAGED DURING DEMOLITION AND NEW WORK
SCOPE SHALL BE PATCHED AND REPAIRED TO LIKE NEW CONDITION TO MATCH EXISTING.
2.) AREA OF WORK INDICATED ON THIS DRAWING IS PROVIDED AS ONLY A GUIDE AND DOES NOT
FULLY ENCOMPASS THE ENTIRETY OF WORK AREA SCOPE BASED ON OTHER DISCIPLINES AND
UNFORESEEN CONDITIONS. IT IS THE RESPONSIBILITY OF THE G.C./CONTRACTOR TO VERIFY
ALL EXISTING CONDITIONS AGAINST PROPOSED WORK SCOPE SO TO FULLY ASSESS THE EXTENTS
OF THE REQUIRED WORK AREA.
3.) ALL EXISTING MASONRY WINDOW OPENINGS TO RECEIVE NEW WORK SHALL BE SPOT CLEANED
AND REPAIRED (MORTAR AND MASONRY), AS NECESSARY, PRIOR TO NEW WORK INSTALLATION.
4.) REINSTALL ALL REMOVED CEILING TILE, TRACKS AND ASSOCIATED HARDWARE AFTER NEW
WINDOW REPLACEMENT. REPLACE ANY DAMAGED OR STAINED TILES IMPACTED BY WINDOW
REPLACEMENT SCOPE OF WORK.
5.) ALTERNATES SHALL BE DESCRIBED IN PROJECT MANUAL AND THROUGHOUT THESE DRAWINGS.
CONTRACTOR IS RESPONSIBLE FOR PRICING INDICATED SCOPE AND NECESSARY WORK FOR EACH
ALTERNATE AS SPECIFIED. THERE ARE 3 ALTERNATES INDICATED PER THESE PROJECT
DRAWINGS.
3
REFINISH AND INSTALL SALVAGED EXTERIOR MECHANICAL GRILL - RECONNECT TO EXISTING
DUCTWORK. REPLACE ANY DAMAGED GRILLS AND DUCTWORK HARDWARE. REACTIVE
ASSOCIATED SYSTEMS AS REQUIRED.
2
INSTALL NEW EXTERIOR INFILL PANEL, FLASHING AND TRIM ABOVE WINDOW UNIT AS DETAILED
AND SPECIFIED.
252525252525252
5
2
525252
5
2
5
2
2 52 52 52 52 52 52 52 52
4
3 33
3
1
FIRST FLOOR PROPOSED PLAN
SCALE: 1/8" = 1'-0"
ALTERNATE 3ALTERNATE 1
ALTERNATE 1
ALTERNATE 1
ALTERNATE 2 ALTERNATE 2
ALTERNATE 2
ALTERNATE 2 ALTERNATE 2
© COPYRIGHT 2016
ALL DRAWN OR WRITTEN INFORMATION OR GRAPHICSHEREIN IS NOT GUARANTEED AGAINST DEFECTS THATINCLUDE, BUT ARE NOT LIMITED TO, ERRORS ANDOMISSIONS, DESIGN CALCULATIONS AND DIMENSIONS,DATA TRANSMISSION, OR DATA TRANSLATION.
ALL DRAWN OR WRITTEN INFORMATION OR GRAPHICSAPPEARING HEREIN SHALL REMAIN THE PROPERTY OFGORMAN RICHARDSON LEWIS ARCHITECTS, INC.AND AS SUCH IS NOT TO BE DUPLICATED INANY FORM OR DISCLOSED OR OTHERWISE USEDWITHOUT T H E EXPRESS WRITTEN CONSENT OFGORMAN RICHARDSON LEWIS ARCHITECTS, INC.
20
15
00
9.0
2 - TO
WN
O
F D
OU
GLA
S, M
A - D
OU
GLA
S M
UN
IC
IP
AL B
LD
G. W
IN
D/
RO
OF A
ND
P
RIM
AR
Y S
CH
OO
L R
OO
F - B
ID
D
OC
UM
EN
TS
- M
AY
2
4, 2
01
6
North
Project North
T:\PRO
J2015\2015009\02\_D
raw
ing_Set\_FO
RM
AT_SH
EETS\A1_1.dw
g, 5/13/2016 7:57:51 PM
, lspear
GYMNASIUM
ROOF
---
MUNICIPAL BLDG.
ROOF
---
EXISTING RTU
EXISTING RTU
EXISTING RTU
EXISTING RTU
EXISTING VENTEXISTING VENT
EXISTING ROOF HATCH
EXISTING ROOF HATCH
EXISTING EXHAUST
EXISTING EXHAUST
EXISTING
ROOF DRAIN
1.) REMOVE EXISTING ROOF SYSTEM DOWN TO THE DECK AND REPLACE WITH A NEW EPDM MEMBRANE SYSTEM AS
SPECIFIED AND DETAILED.
2.) ANY ROOF LEAKS OR DEFICIENT ROOF CONDITIONS DISCOVERED DURING ORIGINAL SCOPE OF WORK SHALL BE
IMMEDIATELY BROUGHT TO THE ATTENTION OF THE OWNER AND/OR ARCHITECT FOR FURTHER REVIEW AND
ADVISEMENT.
3.) ALL EXISTING SURFACES TO REMAIN THAT ARE DAMAGED DURING DEMOLITION AND NEW WORK SCOPE SHALL BE
PATCHED AND REPAIRED TO LIKE NEW CONDITION TO MATCH EXISTING.
4.) AREA OF WORK INDICATED ON THIS DRAWINGS IS PROVIDED AS ONLY A GUIDE AND DOES NOT FULLY ENCOMPASS THE
ENTIRETY OF WORK AREA SCOPE BASED ON OTHER DISCIPLINES AND UNFORESEEN CONDITIONS. IT IS THE
RESPONSIBILITY OF THE G.C./CONTRACTOR TO VERIFY ALL EXISTING CONDITIONS AGAINST PROPOSED WORK SCOPE
SO TO FULLY ASSESS THE EXTENTS OF THE REQUIRED WORK AREA. REFER TO OTHER DISCIPLINE DRAWINGS WITHIN
THIS SET FOR FURTHER WORK SCOPE REQUIREMENTS.
GENERAL ROOF PLAN NOTES
AREA OF WORK
EXHAUST FAN
NEW ROOF INSULATION AND MEMBRANE SYSTEM OVER
EXISTING SUPPORT STRUCTURE AND DECKING
4
A7.3SIM.
5
A7.3
6
A7.3
7
A7.3
3
A7.3
4
A7.3
3
A7.3 SIM.
± 91'-8"
V.I.F.
± 76'-8"
V.I.F.
NEW GALV. & PTD. 42" HIGH GUARD RAIL -
SUPPORT POSTS TO BE ANCHORED
TO EXISTING ROOF STRUCTURE
5'-0"
5'-0"
11
A7.3
SEAL GUARD POST PENETRATIONS IN
ACCORDANCE WITH MEMBRANE ROOF
MANUFACTURER GUIDELINES AND
DETAIL 10/A7.3 - TYP. OF 6 LOCATIONS
© COPYRIGHT 2016
ALL DRAWN OR WRITTEN INFORMATION OR GRAPHICSHEREIN IS NOT GUARANTEED AGAINST DEFECTS THATINCLUDE, BUT ARE NOT LIMITED TO, ERRORS ANDOMISSIONS, DESIGN CALCULATIONS AND DIMENSIONS,DATA TRANSMISSION, OR DATA TRANSLATION.
ALL DRAWN OR WRITTEN INFORMATION OR GRAPHICSAPPEARING HEREIN SHALL REMAIN THE PROPERTY OFGORMAN RICHARDSON LEWIS ARCHITECTS, INC.AND AS SUCH IS NOT TO BE DUPLICATED INANY FORM OR DISCLOSED OR OTHERWISE USEDWITHOUT T H E EXPRESS WRITTEN CONSENT OFGORMAN RICHARDSON LEWIS ARCHITECTS, INC.
20
15
00
9.0
2 - TO
WN
O
F D
OU
GLA
S, M
A - D
OU
GLA
S M
UN
IC
IP
AL B
LD
G. W
IN
D/
RO
OF A
ND
P
RIM
AR
Y S
CH
OO
L R
OO
F - B
ID
D
OC
UM
EN
TS
- M
AY
2
4, 2
01
6
North
Project North
T:\PRO
J2015\2015009\02\_D
raw
ing_Set\_FO
RM
AT_SH
EETS\A1_3.dw
g, 5/13/2016 7:57:56 PM
, lspear