project earned value

Upload: katie-benson

Post on 05-Feb-2018

212 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/21/2019 Project Earned Value

    1/4

    Definitions

    Project Earned Value Analysis

    Metric Abbrev. Description Formula/Value

    Budget at Completion BAC Baseline cost for 100% of project. N/A

    Actual Cost AC Total costs actuall incurred so far. N/A

    !arned "alue !" N/A

    Planned "alue P" N/A

    Cost "ariance C"

    Cost Performance #nde$ CP#

    c&edule "ariance "

    c&edule Performance #nde$ P#

    !stimate to Completion !TC T&e e$pected additional cost to complete.

    !stimate at Completion !AC !$pected total cost 'ased on t&e current cost efficienc ratio.

    "ariance at Completion "AC !stimated cost o(errun at t&e end of project.

    tatus A(erage of CP# ) P#.*+!!N , -n trac 1.0

    !-2 , lig&tl 'e&ind sc&edule or 'udget 0.3

    +!D , Needs immediate attention 0.5

    BAC6 , 6illed or +estore 70.5

    Project !arned "alue Analsis measures t&e &ealt& of a project ' looing at cost information and sc&edule information concurrentl. #t tells ou 8&et&er t&e pon sc&edule and on 'udget9 as 8ell as 8&et&er t&e project is on 'udget for t&e amount of 8or done so far.

    Amount of 'udget earned so far 'ased on p&sical 8oraccomplis&ed9 8it&out reference to actual costs.

    T&e 'udget for t&e p&sical 8or sc&eduled to 'e completed 't&e end of t&e time period.

    :easure of cost o(errun. T&e difference 'et8een t&e 'udget fort&e 8or actuall done so far and t&e actual costs so far.

    !arned "alue;Actual Cos!";AC

    Cost efficienc ratio. A CP# of 1.00 means t&at t&e costs so farare e$actl t&e same as t&e 'udget for 8or actuall done so far.

    !arned "alue/Actual Cost

    !"/AC

    :easure of sc&edule slippage. T&e difference 'et8een t&e'udget for t&e 8or actuall done so far and t&e 'udgeted costof 8or sc&eduled.

    !arned "alue;Planned "alu!";P"

    T&e sc&edule efficienc ratio. An P# of 1.0 means t&at t&eproject is e$actl on sc&edule.

    !arned "alue/Planned "alu!"/P"

    !stimate at Completion;Actual!AC;AC

    Budget at Completion/CosPerformance #nde$

    BAC/CP#

    Budget at Completion;!stimaCompletionBAC;!AC

    /?

    /?

  • 7/21/2019 Project Earned Value

    2/4

    ource Data

    Page ? of 4

    Project Earned Value Analysis

    @100 @?00 @00 @40 @0 @300

    Actual Cost @100 @?0 @1 @500 @300 @19000

    Planned "alue

  • 7/21/2019 Project Earned Value

    3/4

    Trend Analsis

    Page of 4

    an Ee' :ar Apr :a un ul Aug ep -ct0.0

    0.50

    0.0

    0.30

    0.0

    1.00

    1.10

    Per*ormance +nde,

    Cost Performance #nde$ c&edule Performance #nde$

    Period

    E**icienc

    y

    an Ee' :ar Apr :a un ul Aug ep -ct

    @0

    @?00

    @400

    @500

    @300

    @19000

    @19?00

    @19400

    @19500

    @19300

    Earned Value Analysis

    Budget at Completion Actual Cos t

    !arned "alue

  • 7/21/2019 Project Earned Value

    4/4

    Trend Analsis

    Page 4 of 4

    an Ee' :ar Apr :a un ul Aug ep -ct

    @0

    @0

    Variance Analysis

    Cost "ariance