Project : Gresik Gas Cogeneration Plant
Contractor : PT.PP (persero).Tbk
Client : PT. Pupuk Indonesia Energi
TECHNICAL BID EVALUATION
MV BUSDUCT
CAST RESIN TYPE
Spesification
Requirment
I GENERAL GENERAL
1 Completeness of Quotation 1 Spesifikasi Teknis beserta brosur
Submitted as per
Technical
Requisition
Submit √ Submit √ Submit √
2 Surat pernyataan garansi atas barang yang dikirim
Submitted as per
Technical
Requisition
Submit √ Submit √ Submit √
3Dokumen penawaran PBL tanpa dilengkapi harga (Un-priced
copy of Commercial BID as per Technical Requisition).
Submitted as per
Technical
Requisition
Submit √ Submit √ Submit √
4 Rencana Jadwal Pengadaan Barang dan Pengiriman Barang.
Submitted as per
Technical
Requisition
Submit √ Submit √ Submit √
5Referensi list untuk Produk sejenis yang ditawarkan dalam
tender ini
Submitted as per
Technical
Requisition
Submit √ Submit √ Submit √
6 After Sales Supporting Letter
Submitted as per
Technical
Requisition
Submit √ Submit √ Submit √
7 Statement Letter for supervision
Submitted as per
Technical
Requisition
Submit √ Submit √ Submit √
8 Organization Chart for supervision
Submitted as per
Technical
Requisition
Submit √ Submit √ Submit √
2 Warranty letter Terhitung dari acceptance test (commissioning) months 24 submit √ submit √ submit √
II MATERIAL AND EQUIPMENT
A ITEM TOBE SUPPLIED
1 Type of Busduct : Cast Resin Type set 1 Cast Resin Type Cast Resin Type Cast Resin Type
2 Voltage : 11 kV Voltage : 11 kV Voltage : 11 kV Voltage : 11 kV
3 Current : 2000 A Current : 2000 A Current : 2000 A Current : 2000 A
4 Phase/Wire : 3 Phase/3 Wire (R,S,T)
Phase/Wire : 3
Phase/3 Wire
(R,S,T)
Phase/Wire : 3
Phase/3 Wire
(R,S,T)
Phase/Wire : 3
Phase/3 Wire
(R,S,T)
5 Rated Short Circuit : 31.5 kARated Short
Circuit : 31.5 kA
Rated Short
Circuit : 31.5 kA
Rated Short
Circuit : 31.5 kA
6 Frequency : 50 HzFrequency : 50
Hz
Frequency : 50
Hz
Frequency : 50
Hz
7 Conductor Material : CopperConductor
Material : Copper
Conductor
Material : Copper
Conductor
Material : Copper
8 Design : Outdoor corrosive areaDesign : Outdoor
corrosive area
Design : Outdoor
corrosive area
Design : Outdoor
corrosive area
9 From terminal Generator to 11 kV MV Switchgear
Straight 1 Lot Comply √ Comply √ Comply √
Elbow 90 degrees (Horizontal/Vertical Bend) 1 Lot Comply √ Comply √ Comply √
Terminal element 1 Lot Comply √ Comply √ Comply √
Flexible Copper Connection 1 Lot Comply √ Comply √ Comply √
Connection Box 1 Lot Comply √ Comply √ Comply √
Wall flange 1 Lot Comply √ Comply √ Comply √
Thermostat 1 Lot Comply √ Comply √ Comply √
Jointing c/w accessories material 1 Lot Comply √ Comply √ Comply √
Support and fittings accessories 1 Lot Comply √ Comply √ Comply √
10 From terminal 11 kV MV Switchgear to Interbus Transformer
Straight 1 Lot Comply √ Comply √ Comply √
NO DESCRIPTION REQUIREMENT OR SPECIFICATION REMARKSVENDOR's
ProposedStatus
VENDOR's
ProposedStatus
UNIT Remark VENDOR's
ProposedStatus
PT. ABB PT. Berkah Cipta Persada PT.MHPP
Project : Gresik Gas Cogeneration Plant
Contractor : PT.PP (persero).Tbk
Client : PT. Pupuk Indonesia Energi
TECHNICAL BID EVALUATION
MV BUSDUCT
CAST RESIN TYPE
Spesification
RequirmentNO DESCRIPTION REQUIREMENT OR SPECIFICATION REMARKSVENDOR's
ProposedStatus
VENDOR's
ProposedStatus
UNIT Remark VENDOR's
ProposedStatus
PT. ABB PT. Berkah Cipta Persada PT.MHPP
Elbow 90 degrees 1 Lot Comply √ Comply √ Comply √
Terminal element 1 Lot Comply √ Comply √ Comply √
Flexible Copper Connection 1 Lot Comply √ Comply √ Comply √
Connection Box 1 Lot Comply √ Comply √ Comply √
Wall flange 1 Lot Comply √ Comply √ Comply √
Thermostat 1 Lot Comply √ Comply √ Comply √
Jointing c/w accessories material 1 Lot Comply √ Comply √ Comply √
Support and fittings accessories 1 Lot Comply √ Comply √ Comply √
11 Factory Acceptance Test
Routine Test 1 Lot Comply √ Comply √ Comply √
Type Test 1 Lot Comply √ Comply √ Comply √
III TEST-INSPECTION, COMMISSIONING, TRAINING AND DOCUMENTATION
1 Factory Acceptance Test Factory acceptance test (FAT) to be witnessed by Purchaser Lot 1 Comply √ Comply √ Comply √
2Documentation related to scope
of supply and scope of work
Certificates, Warranty, Procedures, Installation manual,
Operating manual, Maintenance Manual, Engineering
documents, ITP, etc
Lot 1 Comply √ Comply √ Comply √
3 Site SupervisionSupervision and instruction of field installation, adjustment,
Jointing and CommisioningLot 1 Comply √ Comply √ Comply √
IV DELIVERY TIME
1 Delivery Time (FOT Gresik) 5 MonthsAfter Appoval
DrawingComply √ Comply √ Comply √
TECHNICAL EVALUATION AAA
Acceptability
A : Acceptable
B : Acceptable with Note
C : Not Acceptable