project „integra“ - ectr as a main engineering part of sap ... i_day v_mahle be… · ectr as a...
TRANSCRIPT
MAHLE Behr GmbH & Co. KG © MAHLE
Project „Integra“ -
ECTR as a Main Engineering Part of SAP PLM 7
Dieter Heinle
Jörg Stenner
MAHLE Behr GmbH & Co. KG, TDR, D. Heinle / J. Stenner , 3. Dezember 2013 2
© MAHLE
Company MAHLE Behr
Main Steps of SAP PLM7 Introduction
ECTR Demo
Agenda
MAHLE Behr GmbH & Co. KG, TDR, D. Heinle / J. Stenner , 3. Dezember 2013 3
© MAHLE
Sales and Employees 2012 by Regions
Facts and Figures – MAHLE Behr GmbH & Co. KG
© MAHLE
Employees
16,928
58%
17%
10%
15%
Europe North America South America and RoW Asia/Pacific
56%
25%
5%
15%
Sales
3,630 Mio €
MAHLE Behr GmbH & Co. KG, TDR, D. Heinle / J. Stenner , 3. Dezember 2013 4
© MAHLE
France
Hambach
Rouffach
Brazil
Arujá
Jundiaí/Sao Paulo
USA
Charleston
Dayton
Troy
Wixom
Locations
© MAHLE
Mexico
Querétaro
Ramos Arizpe
Germany
Berga
Kirchberg
Kornwestheim
Lippstadt
Mühlacker
Neustadt/Do.
Pforzheim
Schwäbisch Hall
Stuttgart
Vaihingen/Enz
Spain
Montblanc
Italy
Grugliasco
Afrika
Durban
Port Elizabeth
India
Chennai
Pune
Sanand
China
Jinan
Nanjing
Qingdao
Shanghai
Shiyan
Wuhan
Czech Republic
Holýšov
Mnichovo Hradiště
Ostrava Russia
Naberezhnye Chelny
Korea
Jangan
Locations
Research and Development
Facts and Figures – MAHLE Behr GmbH & Co. KG
MAHLE Behr GmbH & Co. KG, TDR, D. Heinle / J. Stenner , 3. Dezember 2013 5
© MAHLE 5
Product Portfolio Air Conditioning
Thermal Management
© MAHLE
MAHLE Behr GmbH & Co. KG, TDR, D. Heinle / J. Stenner , 3. Dezember 2013 6
© MAHLE 6
Product Portfolio Engine Cooling
Thermal Management
© MAHLE
MAHLE Behr GmbH & Co. KG, TDR, D. Heinle / J. Stenner , 3. Dezember 2013 7
© MAHLE
Objectives
“EDM” 1) as Product Data Management system is
out of maintenance , introduction 1995
The current PTO 2004 (“PDP”) needs to be re-
engineered in terms of integrated processes
Synchronisation with Mahle Group
Project “Integra”
1) Siemens Metaphase
MAHLE Behr GmbH & Co. KG, TDR, D. Heinle / J. Stenner , 3. Dezember 2013 8
© MAHLE
Global PLM Implementation in 3 Steps until End of 2016
Enhanced Change
Management (GTA++)
Validation Process Support
Logistics
Quality
Change Management
(Replace GTA GTA+)
Prototype & Series BOM (PSS)
Enhanced PDP Support
(MLM2 & PM)
Total PDP
Integration
Level 3
Enhance the
PDP process
chain
Level 2
Build PDP
Foundation
Level 1
2010 2011 2012 2013 2014 2015
Integra Roll-Out Realization Project Blue Print Pilot
Projects
New PDP
Project Management
Maturity Level Mgmt.
CAD Integration
Document Management
Variant Management (PSM)
Project “Integra”
MAHLE Behr GmbH & Co. KG, TDR, D. Heinle / J. Stenner , 3. Dezember 2013 9
© MAHLE
Demo ECTR
PLM – Level 1
MAHLE Behr GmbH & Co. KG, TDR, D. Heinle / J. Stenner , 3. Dezember 2013 10
© MAHLE
Linking of SAP PPM with SAP DMS / CAD
Project creation base for all subsequent processes
MAHLE Behr GmbH & Co. KG, TDR, D. Heinle / J. Stenner , 3. Dezember 2013 11
© MAHLE
SAP PLM
DIR
DIR
DIR
DIR
DIR
DIR
47112255 V1 Package
47112255 V2 Package
The structures are stored incl. their single files in SAP PLM.
Already existing objects are recognized.
Stored as BOD structure.
Package data is managed under special
document type inside SAP PLM.
Import uses Cenit EnCo which is launched
directly from ECTR menu.
EnCo analyses file based package structure.
Existing package data can be identified in
SAP for re-use to prevent duplication (DELTA
import).
Package data is automatically placed in folder
named by DX-jobnumber.
Package data import
via EnCo
MAHLE Behr GmbH & Co. KG, TDR, D. Heinle / J. Stenner , 3. Dezember 2013 12
© MAHLE
Templates for Design
at MAHLE Thermal Management
MAHLE Behr GmbH & Co. KG, TDR, D. Heinle / J. Stenner , 3. Dezember 2013 13
© MAHLE
Linking to existing „old“ system:
SAP PLM EDM system
MAHLE Behr GmbH & Co. KG, TDR, D. Heinle / J. Stenner , 3. Dezember 2013 14
© MAHLE
Intuitive graphical User Interface for CAD systems (ECTR)
Viewing possibility directly within ECTR (integrated Viewer, no CAD needed)
Organizing the daily design work easily with ECTR GUI (tree view for detailled information, stored queries, directories for data import, data export, …)
“Load as stored” or with “last version” (precise & imprecise loading logic)
„Fast loading“ & viewing possible (cgr, jt, ...)
Intelligent data access worldwide (no replication set up required, no admin effort)
„Check-In / Keep working“ (continue working while Check-In)
PDM status within SAP PLM is visible in CAD (less switches from CAD to the SAP PLM)
Package data management fully integrated via EnCo in SAP (automatic Delta Import possible)
Automatic classification of STADE Master Models (reducing manual effort)
One base number – different concepts / different variants (always knowing what belongs together)
Summary „Big Points“