Prairie Region Project List: Calgary Structures Aman Singh Page 1 May 2011 Category Project Description Origin Approval Project Notes/Updates/Results Engineering Jim M. Steam Curing Chamber - West Jim M. Box Girder Form Installation Jim M. Installation completed. Box girders are in production Engineering Jim M. Aman Concrete Distribution Bucket Jim M. Analysis ROI on KRB Shear Machine David J. Coordination Coordination 30T Spreader beam design for Heavy Structural Bay Design, Drafting completed. As per Jim's instructions wait till second quarter for fabrication. Engineering/ Construction ….Going to look at the feasibility of reversing wheel track to avoid freezing up in winter conditions. Camtech has offered a drip lip solution to redirect the condensate back into the steam chamber. More metal track area is in contact with live steam thus possibly avoiding ice buildup. Jim and I are going to look at these options closely. Engineering/ Construction Fabrication of integral steps on NU and D-Tee forms NU form steps fabricated. Need to design the retractable steps for D-Tee as casting m/c goes by. Engineering/ Construction Condensate recovery system for curing chambers Received two pre-fabricated larger capacity tanks for condensate recovery. Waiting for maintenance dept. for hookup Design/ Construction Local fabrication of bucket completed. Cost is 50% of the cost of previous supplied buckets (net $4000 savings). Completed. Savings $139660/year Analysis/ Purchase Purchase of S65 aerial lift for plant usage Aman (CI Savings) Obtained quote from Western One. S65-$51900 & S85- $81400. Waiting to hear back from Wilf M. Need to obtain more quotations for S85 Development permit for the East Steam Curing Chamber City of Calgary Received correspondence from City of Calgary to submit more detailed drawings. Asked drafting dept assistance. Development permit for the West Steam Curing Chamber City of Calgary Received correspondence from City of Calgary to submit more detailed drawings. Asked drafting dept assistance.

Upload: amanpreet-singh

Post on 12-Apr-2016

220 views

Category:

Documents


0 download

DESCRIPTION

Project list

TRANSCRIPT

Page 1: Project List 2011

Prairie Region Project List: Calgary Structures

Aman Singh Page 1 May 2011

Category Project Description

Ori

gin

Ap

pro

val

Project Notes/Updates/Results

Engineering Jim M.

Steam Curing Chamber - West Jim M.

Box Girder Form Installation Jim M. Installation completed. Box girders are in production

Engineering Jim M.

Aman

Concrete Distribution Bucket Jim M.

Analysis ROI on KRB Shear Machine David J.

Coordination

Coordination

30T Spreader beam design for Heavy Structural Bay

Design, Drafting completed. As per Jim's instructions wait till second quarter for fabrication.

Engineering/ Construction

….Going to look at the feasibility of reversing wheel track to avoid freezing up in winter conditions. Camtech has offered a drip lip solution to redirect the condensate back into the steam chamber. More metal track area is in contact with live steam thus possibly avoiding ice buildup. Jim and I are going to look at these options closely.

Engineering/ Construction

Fabrication of integral steps on NU and D-Tee forms

NU form steps fabricated. Need to design the retractable steps for D-Tee as casting m/c goes by.

Engineering/ Construction

Condensate recovery system for curing chambers

Received two pre-fabricated larger capacity tanks for condensate recovery. Waiting for maintenance dept. for hookup

Design/ Construction

Local fabrication of bucket completed. Cost is 50% of the cost of previous supplied buckets (net $4000 savings).

Completed. Savings $139660/year

Analysis/ Purchase

Purchase of S65 aerial lift for plant usage

Aman (CI Savings)

Obtained quote from Western One. S65-$51900 & S85-$81400. Waiting to hear back from Wilf M. Need to obtain more quotations for S85

Development permit for the East Steam Curing Chamber

City of Calgary

Received correspondence from City of Calgary to submit more detailed drawings. Asked drafting dept assistance.

Development permit for the West Steam Curing Chamber

City of Calgary

Received correspondence from City of Calgary to submit more detailed drawings. Asked drafting dept assistance.

Page 2: Project List 2011

Prairie Region Project List: Calgary Structures

Aman Singh Page 2 May 2011

Coordination Aman

Category Project Description

Ori

gin

Ap

pro

val

Project Notes/Updates/Results

Coordination Boiler room Dealkalizer Jim M.

Coordination Second Batch Plant Addition Jim M. AFCE

Development Lifting device Inspection Program Aman

Analysis ROI on D-Tee tarp roller Aman

Analysis

Analysis Aman

Engineering Jim M.

Jim M. AFCE

New Haarup mixer installation Jim M.

Boiler room main steam line Flow Meter

Quote received from Spirax Sarco for vortex type flowmeter ($4741)

Going to reassess steam consumption once second curing chamber is up and running for De-Alkalizer sizing

Met with Harrup rep. and took measurement inside the batch plant to ensure fit. Received specs sheet from Plant Systems and questioned on few items on the spec sheet.

Draft version given to Jodie Helpar for feedback (Deadline was March - Objective 2011). No feedback yet. Waiting for the feedback from Judie Helpard.

Savings generated by vertical storage of NU cage

Floor Emp.

ROI/CI savings on plant improved lighting

Westburn looked at the 50th ave facility on Apr 12th. Waiting to receive recommendations from Westburn.

Check and re-rate SWL for all lifting bars in use

14 bars total, 13 design checked and now due for MPI and visual inspection. 4 spreader bars repaired and due for post inspection. Going to coordinate more repairs.

Engineering/ Analysis

Strand pulling inside the box girder form

Order material required to prepull strand directly inside the box girder form. Need to do an ROI analysis. Latest followup with Jim indicated that it is not implemented yet.

Engineering/Coordination

Working on required hardware to install and comission new haarup 4500 mixer coming in August. (water storage tank, mixer foundation pedestals)

Page 3: Project List 2011

Prairie Region Project List: Calgary Structures

Aman Singh Page 3 May 2011

Sta

tus

Du

e D

ate

Com

ple

tion

ü

ü

ü

30-Jun-11

30-Jun-11

Page 4: Project List 2011

Prairie Region Project List: Calgary Structures

Aman Singh Page 4 May 2011

Sta

tus

Du

e D

ate

Com

ple

tion

15-May-11

30-May-11

30-May-11

30-Jun-11

Page 5: Project List 2011

Prairie Region Project List: Calgary Products

Aman Singh Page 5 May, 2011

Category Project Description

Ori

gin

Ap

pro

val

Project Notes/Updates/Results

Design Gantry Craneway Extension Ken R.

Coordination

Coordination Plant HVAC issues

40' East and 50' West extension completed. One brace needs to be moved. Waiting for warm weather.

Obtaining demolition permit for Packaging plant

TLC/ Target

Demolition permit obtained. Demolition started Feb 23. Paperwork sent to Tracy at TLC. Formal completion report pending.

City of Calgary

Obtained plant drawings from Tricycle and forwarded to HVAC consultant. Submitted the designed system drawing to City of Calgary and also to Tricycle Lane for comments. Next step is to invite quotes for awarding the contract.

Page 6: Project List 2011

Prairie Region Project List: Calgary Products

Aman Singh Page 6 May, 2011

Sta

tus

Du

e D

ate

Com

ple

tion

ü

ü

30-May-11

Page 7: Project List 2011

Prairie Region Project List: Calgary Culvert

Aman Singh Page 7 May, 2011

Category Project Description

Ori

gin

Ap

pro

val

Project Notes/Updates/Results

Kevin L. Going to start this project

Tony W.

Coordination Welding shop ventilation Issues Kevin L.

Kevin L.

Coil handling bar design Kevin L.

Steel storage racking - Load Rating KevinL.

Engineering Geotech Fabric Coil Handler Kevin L.

Engineering/ Construction

Larger diameter culvert stoppe arms redesign

Engineering/ Construction

Mill end removal from Helcor machine production line

Received quote for a floor mounted jib crane ($9,000). Took measurements for roof clearance checks. Requested dwg from manufacturer to ensure proper clearance below the hook. Not enough clr. to handle bigger culvert. Project stalled as investigating a practically feasible sloution

Visited the site with HVAC consultant (Kismet Engg). He is finalizing the quote based on the requirements that were observed in the site visits. Redesigned the ventilation system myself and have requested a contractor price to do all the duct working. Obtained quote from one contractor and forwarded to Kevin to decide.

Engineering/ Construction

Hydraulic drive unit for the culvert handling trolley

Designed the drive unit and have passed all cost info to Kevin for approval.

Engineering/ Construction

Design of I-beam for handling coils with forklift. Design completed and sent to Kevin for approval. Check for feedback

Engineering/ Construction

Load rated one steel storage racking and passed informatino to Kevin to mark ratings on the shelving itself. Two more units are still pending.Design check on the existing geotech fab roll handler (safe load rating)

Page 8: Project List 2011

Prairie Region Project List: Calgary Culvert

Aman Singh Page 8 May, 2011

Sta

tus

Du

e D

ate

Com

ple

tion

ü

ü

Page 9: Project List 2011

Prairie Region Project List: RedWater Culvert

Aman Singh Page 9 May, 2011

Category Project Description

Ori

gin

Ap

pro

val

Project Notes/Updates/Results

1T mobile gantry crane design, fab Dave N.

Welding shop HVAC issues Dave N.

Engineering/ Construction

Design, draft, fabrication done in Calgary. Waiting to be shipped to Redwater. Going to ship coming Monday.

Engineering/ Construction

OH&S pointed out the inadequate welding shop ventilation. Going to talk to Matt (plant mgr.) about the course of action. Visited plant and redesigning exhaust system for mill saw area. Going to install new exhaust fan in welding shop with a makeup air unit. Coil handling beam design passed to Matt also.

Page 10: Project List 2011

Prairie Region Project List: RedWater Culvert

Aman Singh Page 10 May, 2011

Sta

tus

Du

e D

ate

Com

ple

tion

ü

Page 11: Project List 2011

Prairie Region Project List: Saskatoon Culvert

Aman Singh Page 11 May, 2011

Category Project Description

Ori

gin

Ap

pro

val

Project Notes/Updates/Results

2T Jib Crane Modifications Brent C.Engineering/ Construction

Design, Drafting done and sent to Brent. As per last conversation, he is awaiting parts from fabrication shop.Project is considered complete from my side.

Page 12: Project List 2011

Prairie Region Project List: Saskatoon Culvert

Aman Singh Page 12 May, 2011

Sta

tus

Du

e D

ate

Com

ple

tion

ü

Page 13: Project List 2011

Prairie Region Project List: Acheson Precast

Aman Singh Page 13 May, 2011

Category Project Description

Ori

gin

Ap

pro

val

Project Notes/Updates/Results

Coordination NU Sheave Block Failure Test John M.

Engineering Lifting beams rerating/SWL checks Dan H.

Engineering Jib crane certification Dave M.

Recently did one test as per John Moody's instructed test procedure. One test still pending.

One visit made to Acheson. Took measurement on 7 lifting beams. Did design check on 2 so far. Those were overrated - informed Dave MacDonald about this. Pending two beams checked for SWL and e-mailed David McDonald (June 30).

Dave MacDonald sent a picture of the existing 2Ton jib crane in the dry cast dept. Not certified, no drawings available. Going to look at that in the next visit. Measuring existing jib will require extensive time as it is over the production line. No plan of action yet.

Page 14: Project List 2011

Prairie Region Project List: Acheson Precast

Aman Singh Page 14 May, 2011

Sta

tus

Du

e D

ate

Com

ple

tion

30-Jun-11

ü

Page 15: Project List 2011

Prairie Region Project List: Winnipeg Precast

Aman Singh Page 15 May, 2011

Category Project Description

Ori

gin

Ap

pro

val

Project Notes/Updates/Results

Consultation Welding shop fumes issues Don Grant

Engineering Don Grant Sent detail to Dan Ginter

Sent recommendation report. One ceiling suspended filtered unit on order. Price obtained for the other unit - Plymovent extraction arm with exhaust to atmosphere. Discussed this with Dan Ginter.

Changing orientation of pillow block on pile pouring machine

Page 16: Project List 2011

Prairie Region Project List: Winnipeg Precast

Aman Singh Page 16 May, 2011

Sta

tus

Du

e D

ate

Com

ple

tion

ü

ü

Page 17: Project List 2011

Prairie Region Project List: Winnipeg Culvert

Aman Singh Page 17 May, 2011

Category Project Description

Ori

gin

Ap

pro

val

Project Notes/Updates/Results

Consultation Warren

1Ton Lifter for mill end removal Warren

10Ton Lifter for Coil rolls Warren

Engineering Dave N.

Reduce consumption and recycle coolant on Helcor machine

Stock 5gal and 10gal tanks (manufacturer-Little Giant) recommended to Warren. Easier to install & use.

Design/ Construction

Design, Drafting completed. Under fabrication in Calgary as per Warren's request

Design/ Construction

Design, Drafting completed. Under fabrication in Calgary as per Warren's request

Welding fume extraction in the main shop

Not enough CFM on the existing fan to exhaust the welding fumes. Asked Warren Peters to send me pictures of the existing system including duct work to calculate Fan requirements. No reply yet from Warren Peters

Page 18: Project List 2011

Prairie Region Project List: Winnipeg Culvert

Aman Singh Page 18 May, 2011

Sta

tus

Du

e D

ate

Com

ple

tion

ü

ü

ü

Page 19: Project List 2011
Page 20: Project List 2011
Page 21: Project List 2011