project list 2011
DESCRIPTION
Project listTRANSCRIPT
Prairie Region Project List: Calgary Structures
Aman Singh Page 1 May 2011
Category Project Description
Ori
gin
Ap
pro
val
Project Notes/Updates/Results
Engineering Jim M.
Steam Curing Chamber - West Jim M.
Box Girder Form Installation Jim M. Installation completed. Box girders are in production
Engineering Jim M.
Aman
Concrete Distribution Bucket Jim M.
Analysis ROI on KRB Shear Machine David J.
Coordination
Coordination
30T Spreader beam design for Heavy Structural Bay
Design, Drafting completed. As per Jim's instructions wait till second quarter for fabrication.
Engineering/ Construction
….Going to look at the feasibility of reversing wheel track to avoid freezing up in winter conditions. Camtech has offered a drip lip solution to redirect the condensate back into the steam chamber. More metal track area is in contact with live steam thus possibly avoiding ice buildup. Jim and I are going to look at these options closely.
Engineering/ Construction
Fabrication of integral steps on NU and D-Tee forms
NU form steps fabricated. Need to design the retractable steps for D-Tee as casting m/c goes by.
Engineering/ Construction
Condensate recovery system for curing chambers
Received two pre-fabricated larger capacity tanks for condensate recovery. Waiting for maintenance dept. for hookup
Design/ Construction
Local fabrication of bucket completed. Cost is 50% of the cost of previous supplied buckets (net $4000 savings).
Completed. Savings $139660/year
Analysis/ Purchase
Purchase of S65 aerial lift for plant usage
Aman (CI Savings)
Obtained quote from Western One. S65-$51900 & S85-$81400. Waiting to hear back from Wilf M. Need to obtain more quotations for S85
Development permit for the East Steam Curing Chamber
City of Calgary
Received correspondence from City of Calgary to submit more detailed drawings. Asked drafting dept assistance.
Development permit for the West Steam Curing Chamber
City of Calgary
Received correspondence from City of Calgary to submit more detailed drawings. Asked drafting dept assistance.
Prairie Region Project List: Calgary Structures
Aman Singh Page 2 May 2011
Coordination Aman
Category Project Description
Ori
gin
Ap
pro
val
Project Notes/Updates/Results
Coordination Boiler room Dealkalizer Jim M.
Coordination Second Batch Plant Addition Jim M. AFCE
Development Lifting device Inspection Program Aman
Analysis ROI on D-Tee tarp roller Aman
Analysis
Analysis Aman
Engineering Jim M.
Jim M. AFCE
New Haarup mixer installation Jim M.
Boiler room main steam line Flow Meter
Quote received from Spirax Sarco for vortex type flowmeter ($4741)
Going to reassess steam consumption once second curing chamber is up and running for De-Alkalizer sizing
Met with Harrup rep. and took measurement inside the batch plant to ensure fit. Received specs sheet from Plant Systems and questioned on few items on the spec sheet.
Draft version given to Jodie Helpar for feedback (Deadline was March - Objective 2011). No feedback yet. Waiting for the feedback from Judie Helpard.
Savings generated by vertical storage of NU cage
Floor Emp.
ROI/CI savings on plant improved lighting
Westburn looked at the 50th ave facility on Apr 12th. Waiting to receive recommendations from Westburn.
Check and re-rate SWL for all lifting bars in use
14 bars total, 13 design checked and now due for MPI and visual inspection. 4 spreader bars repaired and due for post inspection. Going to coordinate more repairs.
Engineering/ Analysis
Strand pulling inside the box girder form
Order material required to prepull strand directly inside the box girder form. Need to do an ROI analysis. Latest followup with Jim indicated that it is not implemented yet.
Engineering/Coordination
Working on required hardware to install and comission new haarup 4500 mixer coming in August. (water storage tank, mixer foundation pedestals)
Prairie Region Project List: Calgary Structures
Aman Singh Page 3 May 2011
Sta
tus
Du
e D
ate
Com
ple
tion
ü
ü
ü
30-Jun-11
30-Jun-11
Prairie Region Project List: Calgary Structures
Aman Singh Page 4 May 2011
Sta
tus
Du
e D
ate
Com
ple
tion
15-May-11
30-May-11
30-May-11
30-Jun-11
Prairie Region Project List: Calgary Products
Aman Singh Page 5 May, 2011
Category Project Description
Ori
gin
Ap
pro
val
Project Notes/Updates/Results
Design Gantry Craneway Extension Ken R.
Coordination
Coordination Plant HVAC issues
40' East and 50' West extension completed. One brace needs to be moved. Waiting for warm weather.
Obtaining demolition permit for Packaging plant
TLC/ Target
Demolition permit obtained. Demolition started Feb 23. Paperwork sent to Tracy at TLC. Formal completion report pending.
City of Calgary
Obtained plant drawings from Tricycle and forwarded to HVAC consultant. Submitted the designed system drawing to City of Calgary and also to Tricycle Lane for comments. Next step is to invite quotes for awarding the contract.
Prairie Region Project List: Calgary Products
Aman Singh Page 6 May, 2011
Sta
tus
Du
e D
ate
Com
ple
tion
ü
ü
30-May-11
Prairie Region Project List: Calgary Culvert
Aman Singh Page 7 May, 2011
Category Project Description
Ori
gin
Ap
pro
val
Project Notes/Updates/Results
Kevin L. Going to start this project
Tony W.
Coordination Welding shop ventilation Issues Kevin L.
Kevin L.
Coil handling bar design Kevin L.
Steel storage racking - Load Rating KevinL.
Engineering Geotech Fabric Coil Handler Kevin L.
Engineering/ Construction
Larger diameter culvert stoppe arms redesign
Engineering/ Construction
Mill end removal from Helcor machine production line
Received quote for a floor mounted jib crane ($9,000). Took measurements for roof clearance checks. Requested dwg from manufacturer to ensure proper clearance below the hook. Not enough clr. to handle bigger culvert. Project stalled as investigating a practically feasible sloution
Visited the site with HVAC consultant (Kismet Engg). He is finalizing the quote based on the requirements that were observed in the site visits. Redesigned the ventilation system myself and have requested a contractor price to do all the duct working. Obtained quote from one contractor and forwarded to Kevin to decide.
Engineering/ Construction
Hydraulic drive unit for the culvert handling trolley
Designed the drive unit and have passed all cost info to Kevin for approval.
Engineering/ Construction
Design of I-beam for handling coils with forklift. Design completed and sent to Kevin for approval. Check for feedback
Engineering/ Construction
Load rated one steel storage racking and passed informatino to Kevin to mark ratings on the shelving itself. Two more units are still pending.Design check on the existing geotech fab roll handler (safe load rating)
Prairie Region Project List: Calgary Culvert
Aman Singh Page 8 May, 2011
Sta
tus
Du
e D
ate
Com
ple
tion
ü
ü
Prairie Region Project List: RedWater Culvert
Aman Singh Page 9 May, 2011
Category Project Description
Ori
gin
Ap
pro
val
Project Notes/Updates/Results
1T mobile gantry crane design, fab Dave N.
Welding shop HVAC issues Dave N.
Engineering/ Construction
Design, draft, fabrication done in Calgary. Waiting to be shipped to Redwater. Going to ship coming Monday.
Engineering/ Construction
OH&S pointed out the inadequate welding shop ventilation. Going to talk to Matt (plant mgr.) about the course of action. Visited plant and redesigning exhaust system for mill saw area. Going to install new exhaust fan in welding shop with a makeup air unit. Coil handling beam design passed to Matt also.
Prairie Region Project List: RedWater Culvert
Aman Singh Page 10 May, 2011
Sta
tus
Du
e D
ate
Com
ple
tion
ü
Prairie Region Project List: Saskatoon Culvert
Aman Singh Page 11 May, 2011
Category Project Description
Ori
gin
Ap
pro
val
Project Notes/Updates/Results
2T Jib Crane Modifications Brent C.Engineering/ Construction
Design, Drafting done and sent to Brent. As per last conversation, he is awaiting parts from fabrication shop.Project is considered complete from my side.
Prairie Region Project List: Saskatoon Culvert
Aman Singh Page 12 May, 2011
Sta
tus
Du
e D
ate
Com
ple
tion
ü
Prairie Region Project List: Acheson Precast
Aman Singh Page 13 May, 2011
Category Project Description
Ori
gin
Ap
pro
val
Project Notes/Updates/Results
Coordination NU Sheave Block Failure Test John M.
Engineering Lifting beams rerating/SWL checks Dan H.
Engineering Jib crane certification Dave M.
Recently did one test as per John Moody's instructed test procedure. One test still pending.
One visit made to Acheson. Took measurement on 7 lifting beams. Did design check on 2 so far. Those were overrated - informed Dave MacDonald about this. Pending two beams checked for SWL and e-mailed David McDonald (June 30).
Dave MacDonald sent a picture of the existing 2Ton jib crane in the dry cast dept. Not certified, no drawings available. Going to look at that in the next visit. Measuring existing jib will require extensive time as it is over the production line. No plan of action yet.
Prairie Region Project List: Acheson Precast
Aman Singh Page 14 May, 2011
Sta
tus
Du
e D
ate
Com
ple
tion
30-Jun-11
ü
Prairie Region Project List: Winnipeg Precast
Aman Singh Page 15 May, 2011
Category Project Description
Ori
gin
Ap
pro
val
Project Notes/Updates/Results
Consultation Welding shop fumes issues Don Grant
Engineering Don Grant Sent detail to Dan Ginter
Sent recommendation report. One ceiling suspended filtered unit on order. Price obtained for the other unit - Plymovent extraction arm with exhaust to atmosphere. Discussed this with Dan Ginter.
Changing orientation of pillow block on pile pouring machine
Prairie Region Project List: Winnipeg Precast
Aman Singh Page 16 May, 2011
Sta
tus
Du
e D
ate
Com
ple
tion
ü
ü
Prairie Region Project List: Winnipeg Culvert
Aman Singh Page 17 May, 2011
Category Project Description
Ori
gin
Ap
pro
val
Project Notes/Updates/Results
Consultation Warren
1Ton Lifter for mill end removal Warren
10Ton Lifter for Coil rolls Warren
Engineering Dave N.
Reduce consumption and recycle coolant on Helcor machine
Stock 5gal and 10gal tanks (manufacturer-Little Giant) recommended to Warren. Easier to install & use.
Design/ Construction
Design, Drafting completed. Under fabrication in Calgary as per Warren's request
Design/ Construction
Design, Drafting completed. Under fabrication in Calgary as per Warren's request
Welding fume extraction in the main shop
Not enough CFM on the existing fan to exhaust the welding fumes. Asked Warren Peters to send me pictures of the existing system including duct work to calculate Fan requirements. No reply yet from Warren Peters
Prairie Region Project List: Winnipeg Culvert
Aman Singh Page 18 May, 2011
Sta
tus
Du
e D
ate
Com
ple
tion
ü
ü
ü