Project Management for Sustainable Reduction of AT&C Losses Project Management for sustainable reduction of AT&C Losses By Pramod Kumar Mishra National Conference on ‘Maladies in Distribution Sector and its Remedies’ Date: 29-30 August 2019 Venue: Vishwa Yuva Kendra, Teen Murthi Marg, Chanakyapuri, New Delhi

Upload: others

Post on 30-Apr-2020

9 views

Category:

Documents


17 download

TRANSCRIPT

Page 1: Project Management for Sustainable Reduction of AT&C Losses€¦ · Budget (Capex, Opex Material/Service) Planning and tracking of Utilization Reconciliation and closure Impact assessment

Project Management for Sustainable Reduction of AT&C Losses

Project Management for sustainable reduction of AT&C Losses

By

Pramod Kumar Mishra

National Conference on ‘Maladies in Distribution Sector and its Remedies’Date: 29-30 August 2019

Venue: Vishwa Yuva Kendra, Teen Murthi Marg, Chanakyapuri, New Delhi

Page 2: Project Management for Sustainable Reduction of AT&C Losses€¦ · Budget (Capex, Opex Material/Service) Planning and tracking of Utilization Reconciliation and closure Impact assessment

BRPL Profile

Particular UoM FY2019

Area Sq. km 750

Customer Base Lacs 26

Customer Density #/Sq. km 3330

Divisions Nos. 21

Peak Demand (July 19) MW 3211

Energy input MU 13300 (~43% of Delhi)

• Distribution of electricity to South & Western part of Delhi

• JV of Govt. of Delhi (49%) and Reliance Infrastructure Ltd (51%).

• BRPL has successfully met the maximum power demand, which has increased ~200% since FY-03

BRPL Profile

TPDDL

BRPL

BYPL

2

0

500

1000

1500

2000

2500

3000

3500

FY03 FY05 FY07 FY09 FY11 FY13 FY15 FY17 FY19 FY20

1272143515361681

1920

233825502669

30813211

BRPL Pead Demand Met

Page 3: Project Management for Sustainable Reduction of AT&C Losses€¦ · Budget (Capex, Opex Material/Service) Planning and tracking of Utilization Reconciliation and closure Impact assessment

51.50%

47.50%

45.10%

40.60%

35.50%

29.90%27.90%

20.60% 20.50%18.80% 18.10% 17.70% 16.90%

13.70%12.70%

10.70%9.40%

8.06%

0.00%

10.00%

20.00%

30.00%

40.00%

50.00%

60.00%

Actual Target

FY02 FY19* Rel Reduction

51.5% 8.06% 84%

Steep Loss reduction post‐ privatizationSteep Loss reduction post‐ privatization

3

Page 4: Project Management for Sustainable Reduction of AT&C Losses€¦ · Budget (Capex, Opex Material/Service) Planning and tracking of Utilization Reconciliation and closure Impact assessment

Formulation of Loss Reduction policies and strategy

Target setting and tracking at Sub Division level

Identification of Loss avenues and interventions

Budget (Capex, Opex Material/Service) Planning and tracking of Utilization

Reconciliation and closure

Impact assessment of activities performed

Training and development of field manpower

ROLE OF PMO

Key objective is sustainable reduction of AT&C Losses

Project Management for Loss Reduction (LR)

4

Page 5: Project Management for Sustainable Reduction of AT&C Losses€¦ · Budget (Capex, Opex Material/Service) Planning and tracking of Utilization Reconciliation and closure Impact assessment

Project Management - Coordination and Tracking

• CEO concall with key stakeholders twice a week (Tuesday and

Thursday 11 AM), facilitation and resolution of field issues.

• Update on activities undertaken during the day in 10 PM HOD

Concall

• Mobile APP “Mission 7%” based tracking of activities –

generation and closure of leads in APP, user defined reports.

5

Page 6: Project Management for Sustainable Reduction of AT&C Losses€¦ · Budget (Capex, Opex Material/Service) Planning and tracking of Utilization Reconciliation and closure Impact assessment

Project Management - Coordination and Tracking

• Daily analysis and ranking of executed activities

• Weekly coordination meeting (Wednesday 3 PM) of O&M,

Business, Enf., MMG, Surveillance, PMO simultaneously at

Circle locations

• Proactive facilitation by Circle wise PMO SPOC for LR

6

Page 7: Project Management for Sustainable Reduction of AT&C Losses€¦ · Budget (Capex, Opex Material/Service) Planning and tracking of Utilization Reconciliation and closure Impact assessment

Project Management - Coordination and Tracking

• Planning at Sub cluster level (group of 6-10 DTs) / locality

• Target Setting and tracking at Sub Division SDO level – Lead

and Lag variables

• Daily system based tracking

• Weekly LR Champion

• Allocation of Vendors at Sub Division Level – Choice 1, 2, 3

• Monthly Vendor Score Card and action7

Page 8: Project Management for Sustainable Reduction of AT&C Losses€¦ · Budget (Capex, Opex Material/Service) Planning and tracking of Utilization Reconciliation and closure Impact assessment

Start

Creation of Scheme BoQ

Enf. Activity

Req.

Budget Allocation

Site verification to ascertain the nos. and type of activities required

Sub Cluster Rolling Loss > Company Loss Level

Execution of Scheme in Field

Quality Check, reporting of NCs

Self Certification of work done and Safety by

DH/CH

Work done as per approved

BoQ?

Approval of Deviation

No

Yes

Close

LR Scheme Req.

Yes

No

No

Uploading of Activates in

DTM module

YesEnforcement

ProcessCSR Process

Material Reconciliation

Processing of Vendor bill

Approval of Scheme

Yes

No

Vendor Allocation

Removal of Non

Conformities

Yes

No

Process of Loss Reduction Activities

8

Page 9: Project Management for Sustainable Reduction of AT&C Losses€¦ · Budget (Capex, Opex Material/Service) Planning and tracking of Utilization Reconciliation and closure Impact assessment

Organisational Restructuring

Division Operation

Business FunctionOperation &

Maintenance Function

• Meter to Cash Cycleo Meter Reading &

Billingo Recoveryo Disconnection

• New Connection• Customer Services

• Maintaining Power Supply

• Preventive Maintenance• Augmentation of Existing

Network• Network Planning

Focused on strengthening of network and supply reliability

Focused on new connection and Meter to Cash Cycle

LR Centric Organisation Structure

LR Function

• Strategy for loss reduction in high loss pockets

• Identification of types of LR activates required and quanitity

• Execution and monitoring of LR activities at field level

Focused on Reduction and Sustenance of Losses

9

Upto 2004 – All 3 Vertical together (typical Xen structure); 2004- Business and O&M separated; 2015 – LR Function carved out from Business and O&M and is separate vertical under O&M

Page 10: Project Management for Sustainable Reduction of AT&C Losses€¦ · Budget (Capex, Opex Material/Service) Planning and tracking of Utilization Reconciliation and closure Impact assessment

Only utility in India with 100% Single Phase Meter Downloading

Electronic meter with :

Downloads

Tamper resistant

High Accuracy

Inbuilt Data / History storage

ToD Complaint

Electronic Meters Automatic Meter Reader Optical Downloading DT Metering

Automatic Meter Reading (AMR)

Pre paid Metering

DT Metering

Advanced Metering Infrastructure (AMI)

Metering Technology

10

Page 11: Project Management for Sustainable Reduction of AT&C Losses€¦ · Budget (Capex, Opex Material/Service) Planning and tracking of Utilization Reconciliation and closure Impact assessment

11

To achieve AT&C losses of 12.88% by FY 2015-16

BSES has the most evolved Enforcement Analytics in the Country

Analytics for Theft Control

Page 12: Project Management for Sustainable Reduction of AT&C Losses€¦ · Budget (Capex, Opex Material/Service) Planning and tracking of Utilization Reconciliation and closure Impact assessment

Pre-Audit Check: Post-Audit

• Check for abnormal consumption

• Post-audit check after bill generation on Amount

• Bill is put on HOLD & released after amendments

Bill generated Bill Dispatched

• Consumers are sent energy conservation tips

Complete system access available with Regulator for check

Total BillCurrent

DemandArrears

Meter Reading Data

Tariff from DERC

Subsidies from GONCTD

SAP – ISU Billing logic

Process : Billing

• Logical Checks in hand-held devices

12

During Meter reading

Page 13: Project Management for Sustainable Reduction of AT&C Losses€¦ · Budget (Capex, Opex Material/Service) Planning and tracking of Utilization Reconciliation and closure Impact assessment

Energy Audit to assess the gap

13

Page 14: Project Management for Sustainable Reduction of AT&C Losses€¦ · Budget (Capex, Opex Material/Service) Planning and tracking of Utilization Reconciliation and closure Impact assessment

LT level Sub-clusters for Loss Monitoring

14

Sub-cluster Features: • DT grouping of same area• Geographical based• No of DTs in group- 5~15 nos• Not overlap with zones of

respective divisionWhy Sub-cluster is required: • Possibility of Energy sharing

among DTs • Tagging issues- minimized• Specific Strategies – for

critical sub-clusters

Page 15: Project Management for Sustainable Reduction of AT&C Losses€¦ · Budget (Capex, Opex Material/Service) Planning and tracking of Utilization Reconciliation and closure Impact assessment

Major LR Initiatives

15

Technical initiatives

• New Grids, HT and LT feeders

• DT Addition/ Augmentation for overloaded DT, HVDS

• Balancing of Load at all voltage levels; Shunt Capacitors at LV

• LT Less system for AP connections

• Pole Metering; Group Metering,

• HVDS Bushing mounted DB

• New armoured street light Ckts in HVDS area

• Heat Shrink Coatings on theft prone points in network

• Chemical Joints; Application of Conductive paste on LT bushings to reduce contact resistance

Specialised / Commercial Initiatives

• Meter Relocation, Old Meter Replacement; MS box with shearing nut arrangement

• Bare conductor with armour cable; Armour cable in place of heavily punctured AB cable span, armoured cast tape to secure joints.

• Enforcement activities - Curbing E-Rickshaw theft, Odd Hour/ Surprise raids, Lady Guards

• Facilitator engagement to support team on the ground

• Surveillance of ations taken and generation of LR leads

• Mobile APP "Mission 8%"

Community Engagement Initiatives

• Engagement of local ladies "Jyoti" in JJs

• Free LED against replacement of Old I/C bulbs

• Adult Literacy and Vocational Training Centers

• Self Defence Training for Girls

• Children Awareness Campaign

• Medical Health Check-up Camps; Sports activities

• Settlement of Enforcement dues on easy terms to encourage new connection

• Nukkad Natak ; Short Movies on losses and its impact

Page 16: Project Management for Sustainable Reduction of AT&C Losses€¦ · Budget (Capex, Opex Material/Service) Planning and tracking of Utilization Reconciliation and closure Impact assessment

Specialised LR Initiatives

16

Meter Relocation Meter Replacement

Application of Armoured cables

Smart Pole Metering

LT Less system for AP connections

New Street light Circuits

Specialized Connector Installation

Heat Shrink / Armour Cast Tape

Coatings

Page 17: Project Management for Sustainable Reduction of AT&C Losses€¦ · Budget (Capex, Opex Material/Service) Planning and tracking of Utilization Reconciliation and closure Impact assessment

Specialised LR Initiatives

17

Bushing mounted DB in HVDS Areas

• Old DBs are more accessible to consumer reach• Mainly raising the height of DB towards LT bushing• Effective since the new installation is near to HT bushing and deterrent for breaking

New Street light Circuits• Laying of Theft proof Armoured cables in street light circuits• Application of auto controller helps in timely controlling of lighting points

Page 18: Project Management for Sustainable Reduction of AT&C Losses€¦ · Budget (Capex, Opex Material/Service) Planning and tracking of Utilization Reconciliation and closure Impact assessment

Specialised LR Initiatives

18

Smart Pole Metering

• Pole metering unit with on-line communication • Each Pole unit has 9 meters with real time data to central servers• Very successful since results in high energy growthChallenges: Collection and Scattered location

LT Less system for AP connections• Theft through LT bare conductors in Agriculture connections• LT Less schemes ensures no direct taping through LV Mains. • Also reduces Technical losses

Page 19: Project Management for Sustainable Reduction of AT&C Losses€¦ · Budget (Capex, Opex Material/Service) Planning and tracking of Utilization Reconciliation and closure Impact assessment

Specialised LR Initiatives

19

Specialized Connector Installation • Satellite Connectors are installed where Pole DBs are accessible for theft.• Pole DBs will be removed and connections are energized through specialized connectors

Heat Shrink / Armour Cast Tape Coatings

• Used in High Theft Pockets where Direct tapping is prominent• Direct theft is mainly through open joints at Pole DB or piercing connector• Coatings are very effective as difficult to tamper.

Page 20: Project Management for Sustainable Reduction of AT&C Losses€¦ · Budget (Capex, Opex Material/Service) Planning and tracking of Utilization Reconciliation and closure Impact assessment

Application of armored Cast tape

20

Some Sample Work

Before After

Puncture in the LTAB Cable for Hooking

Application of Masking Tape at punctured spot

Page 21: Project Management for Sustainable Reduction of AT&C Losses€¦ · Budget (Capex, Opex Material/Service) Planning and tracking of Utilization Reconciliation and closure Impact assessment

Application of armored Cast tape

21

Some Sample Work

Before After

Puncture in the LTAB Cable for Hooking

Application of Masking Tape at punctured spot

Page 22: Project Management for Sustainable Reduction of AT&C Losses€¦ · Budget (Capex, Opex Material/Service) Planning and tracking of Utilization Reconciliation and closure Impact assessment

Application of armored Cast tape

22

Some Sample Work

Before After

Puncture in the LTAB Cable for Hooking

Application of Masking Tape at punctured spot

Page 23: Project Management for Sustainable Reduction of AT&C Losses€¦ · Budget (Capex, Opex Material/Service) Planning and tracking of Utilization Reconciliation and closure Impact assessment

23

How loss is sustained after execution of LR activities?

• Sustenance is seen in major of Division

• <10% in 61% consumer – N0

• 10-25% gain in about 10% Customers – N1

• 25-50% gain in about 9%; - N2

• 50-100% gain in 7% - N3

• In 13% cases gain were >100% over same

period last year – N4.

LR effectiveness = N1+N2+N3+N4

=39%

DT Energy growth is discounted while calculating Gain

Impact analysis and Sustenance of LR activities

23

Page 24: Project Management for Sustainable Reduction of AT&C Losses€¦ · Budget (Capex, Opex Material/Service) Planning and tracking of Utilization Reconciliation and closure Impact assessment

Flying squads for inspection and monitoring of BRPL network for

suspected electricity theft and Sustainability of LR activities performed

in high loss areas

• Identifies potential LR Leads

• On spot booking

• Sealing of open bus bars

• Faster is better – coordinate for early resolution of generated

leads.

• Check on quality, material used vs claimed and feedback

Surveillance and Inspection

24

Page 25: Project Management for Sustainable Reduction of AT&C Losses€¦ · Budget (Capex, Opex Material/Service) Planning and tracking of Utilization Reconciliation and closure Impact assessment

Selection of Division Details related to

LR activitiesMIS

• Onsite punching of individual LR activities – By field / Execution Team / Vendors• SDO / LR Manager / Engineer to ensure 100% entry of about 2000 jobs per day.

Loss Reduction (LR) Activity Entry Module

25

Page 26: Project Management for Sustainable Reduction of AT&C Losses€¦ · Budget (Capex, Opex Material/Service) Planning and tracking of Utilization Reconciliation and closure Impact assessment

LR Surveillance Entry Module

Selection of NCs related to Meter

Feedback Punching of NCs MIS Selection Criteria

26

Page 27: Project Management for Sustainable Reduction of AT&C Losses€¦ · Budget (Capex, Opex Material/Service) Planning and tracking of Utilization Reconciliation and closure Impact assessment

Wining the Confidence

27

Page 28: Project Management for Sustainable Reduction of AT&C Losses€¦ · Budget (Capex, Opex Material/Service) Planning and tracking of Utilization Reconciliation and closure Impact assessment

To Sum up…

28

0.00%

10.00%

20.00%

30.00%

40.00%

50.00%

60.00%

FY02 FY03 FY04 FY05 FY06 FY07 FY08 FY09 FY10 FY11 FY12 FY13 FY14 FY15 FY16* FY17* FY18* FY19* FY20*

Collection

New Connection

Technology

PMO

MMP

Securitizing network

Theft Control

Winning Confidence

Area FY19 % Reduction in FY19

South 6.68% 13.92%

West 6.63% 17.43%

Outer West 25.27% 19.21%

Page 29: Project Management for Sustainable Reduction of AT&C Losses€¦ · Budget (Capex, Opex Material/Service) Planning and tracking of Utilization Reconciliation and closure Impact assessment

Thank you for your time! Questions?

29

Contact detail

Pramod Kumar MishraHead Distribution Planning & PMO –LR; BSES Rajdhani Power limited011-39999461, Mobile - +91 9350110138; Email: [email protected]