Project Management Tools and Techniques
Sleep in Hotel SuitesFeasibility Study
By
Adam Carducci
![Page 2: Project Management Tools and Techniques](https://reader035.vdocument.in/reader035/viewer/2022081605/58eece151a28ab737d8b45b1/html5/thumbnails/2.jpg)
Scope, Cost, and Time The project consist of a conceptual estimate
for factoring in the cost controls to begin the design process of a Sleep in Hotel.
Summary of Work Requested Risk Management and Controls, Financial
Controls, Risk Response, Audit Background The Stakeholder wishes to purchase land in
order to own and build a Sleep Inn & Suites Hotel Franchise. The Facility Owner wishes to collaborate a specific plan design based on the Sleep In & Suites Franchise.
Conduct a Feasibility study
![Page 3: Project Management Tools and Techniques](https://reader035.vdocument.in/reader035/viewer/2022081605/58eece151a28ab737d8b45b1/html5/thumbnails/3.jpg)
![Page 4: Project Management Tools and Techniques](https://reader035.vdocument.in/reader035/viewer/2022081605/58eece151a28ab737d8b45b1/html5/thumbnails/4.jpg)
![Page 5: Project Management Tools and Techniques](https://reader035.vdocument.in/reader035/viewer/2022081605/58eece151a28ab737d8b45b1/html5/thumbnails/5.jpg)
Process Groups
![Page 6: Project Management Tools and Techniques](https://reader035.vdocument.in/reader035/viewer/2022081605/58eece151a28ab737d8b45b1/html5/thumbnails/6.jpg)
Task Order
Project Team Task Daily Cost Multiplier Days (Qty) Extended Sub Total
2,800.00$ Code Classification Project Tasks1.1A Fixed 1.11A Risk Management and Controls 30 84,000.00$ 1.1A Fixed 1.12A Risk Management and Controls 43 120,400.00$ 1.1B Fixed 1.1B Financial Controls 54 151,200.00$ 1.1C Fixed 1.1C Information Distrabution 12 33,600.00$ 1.1D Fixed 1.1D Procurment Planning 14 39,200.00$ 1.2A Fixed 1.2A Scope Definition 30 84,000.00$ 1.2B Fixed 1.2B Scope Planning 33 92,400.00$ 1.2C Fixed 1.2C Scope Verification 23 64,400.00$ 1.2D Fixed 1.2D Scope Change Control 21 58,800.00$ 1.3A Fixed 1.3A Risk Managment Planning 30 84,000.00$ 1.3B Fixed 1.3B Risk Identification 43 120,400.00$ 1.3C Fixed 1.3C Qualitive Risk Analysis 23 64,400.00$ 1.3D Fixed 1.3D Risk Response 21 58,800.00$ 1.4A Fixed 1.4A Activity Definition 30 84,000.00$ 1.4B Fixed 1.4B Activity Duration Estimating 43 120,400.00$ 1.4C Fixed 1.4C Cost Estimating 43 120,400.00$ 1.4D Fixed 1.4D Audit 14 39,200.00$
507 1,419,600.00$
Project Controls
![Page 7: Project Management Tools and Techniques](https://reader035.vdocument.in/reader035/viewer/2022081605/58eece151a28ab737d8b45b1/html5/thumbnails/7.jpg)
MS Project
![Page 8: Project Management Tools and Techniques](https://reader035.vdocument.in/reader035/viewer/2022081605/58eece151a28ab737d8b45b1/html5/thumbnails/8.jpg)
Earned Value Management
![Page 9: Project Management Tools and Techniques](https://reader035.vdocument.in/reader035/viewer/2022081605/58eece151a28ab737d8b45b1/html5/thumbnails/9.jpg)
Base Line Cost
![Page 10: Project Management Tools and Techniques](https://reader035.vdocument.in/reader035/viewer/2022081605/58eece151a28ab737d8b45b1/html5/thumbnails/10.jpg)
Change Management and Change Request Plan