TRANSCRIPT
Contract No. 1/WSD/13 - Improvement of Fresh Water Supply to Cheung Chau
Quarterly Environmental Monitoring and Audit (EM&A) Report (No.5) –
April to June 2015 AUES
Z:\Jobs\2013\TCS00684(1-WSD-13)\600\Quanterly Report\No.5 - Apr to Jun 15\R00146v2.doc Action-United Environmental Services and Consulting
AUES PROJECT NO.: TCS/00684/13
WSD CONTRACT NO. 1/WSD/13 -
IMPROVEMENT OF FRESH WATER SUPPLY TO
CHEUNG CHAU
QUARTERLY ENVIRONMENTAL MONITORING AND
AUDIT (EM&A) REPORT (NO.4)–
APRIL TO JUNE 2015
PREPARED FOR
CHINA ROAD- CHINA PIPELINE JOINT VENTURE
Quality Index
Date Reference No. Prepared By Approved By
31 July 2015 TCS00684/13/600/R00146v1
Martin Li
Assistant Environmental
Consultant
T.W. Tam
Environmental Team Leader
Version Date Description
1 24 July 2015 First Submission
2 31 July 2015 Amended against IEC’s comment on 29 July 2015
Contract No. 1/WSD/13 - Improvement of Fresh Water Supply to Cheung Chau
Quarterly Environmental Monitoring and Audit (EM&A) Report (No.5) –
April to June 2015 AUES
Z:\Jobs\2013\TCS00684(1-WSD-13)\600\Quanterly Report\No.5 - Apr to Jun 15\R00146v2.doc Action-United Environmental Services and Consulting
EXECUTIVE SUMMARY
ES.01 Water Supplies Department (hereafter referred as “WSD”) is the Project Proponent and the
Permit Holder of Improvement of Fresh Water Supply to Cheung Chau (hereinafter referred as
“the Project”), which is a Designated Project to be implemented under Environmental Permit
number EP-392/2010/A which superseded EP-392/2010 on 19 December 2014 (hereinafter
referred as “the EP-392/2010/A” or “the EP”).
ES.02 Action-United Environmental Services and Consulting (AUES) has been appointed as the
independent Environmental Team (ET) to implement the relevant EM&A programme. In the
Project, China Road - China Pipeline Joint Venture (hereinafter “CRCPJV”) is the Main
Contractor, SMEC Asia Limited as an Independent Environmental Checker (IEC), and Black &
Veatch Hong Kong Limited is the representative engineer on site to manage the Project. The
Works is predicted to take about 24 months.
ES.03 As part of the project EM&A program, baseline monitoring was carried out by the ET in
accordance with the project EM&A Manual from 4 January to 31 January 2014 to determine
the ambient environmental conditions i.e. noise and marine water quality before commencement
of construction works. The Baseline Report summarized the key findings and the rationale
behind determining a set of Action and Limit Levels (A/L Levels) from the baseline data. It
was submitted on 13 February 2014 and verified by IEC and endorsed by EPD before impact
monitoring commencement on 28 March 2014.
ES.04 A set of A/L Levels serve as the yardsticks for assessing the acceptability of the environmental
impact during the construction phase impart monitoring. They are statistical in nature and
derived according to the criteria set out in the EM&A Manual and are given in the following
tables.
Table ES-1 Action and Limit Levels of Water Quality Monitoring
Impact
Station
Dissolved Oxygen (mg/L) Depth Average of
Turbidity (NTU)
Depth Average of
SS (mg/L) Depth Average of
Surface & Middle Bottom
Action
Level
Limit
Level
Action
Level
Limit
Level
Action
Level
Limit
Level
Action
Level
Limit
Level
W1 5.64 4.54 NA NA 5.87 8.81 7.00 8.00
W2 5.16 5.02 NA NA 5.50 5.66 7.00 8.00
W3 6.18 5.66 5.36 5.05 6.94 7.29 8.00 8.00
W4 5.94 4.95 5.71 5.54 7.50 8.03 7.85 11.57
W5 5.14 5.00 5.79 5.79 5.44 7.43 6.00 6.43
W6 5.92 4.26 6.04 4.49 6.82 7.10 8.00 9.59
W7 6.08 5.78 6.08 5.60 5.71 6.26 7.85 10.00
Table ES-2 Action and Limit Levels of Construction Noise Monitoring
Monitoring Location Action Level Limit Level in dB(A)
Time Period: 0700-1900 hours on normal weekdays
N1 When one or more documented
complaints are received 75 dB(A)
ES.05 This is the 5th Quarterly Environmental Monitoring and Audit Report for the Project, covering the
period from 1 April 2015 to 30 June 2015 (the Reporting Quarter).
ENVIRONMENTAL MONITORING AND AUDIT ACTIVITIES
ES.06 Environmental monitoring activities under the EM&A program in this Reporting Quarter are
summarized in the following table.
Contract No. 1/WSD/13 - Improvement of Fresh Water Supply to Cheung Chau
Quarterly Environmental Monitoring and Audit (EM&A) Report (No.5) –
April to June 2015 AUES
Z:\Jobs\2013\TCS00684(1-WSD-13)\600\Quanterly Report\No.5 - Apr to Jun 15\R00146v2.doc Action-United Environmental Services and Consulting
Table ES-3 Environmental Monitoring Activities in Reporting Quarter
Issues Environmental Monitoring Parameters / Inspection Occasions
Construction Noise Leq(30min) Daytime 13
Water Quality Marine Water Sampling 36
Inspection / Audit ET Regular Environmental Site Inspection 13
IEC Monthly Environmental Site Audit 3
BREACH OF ACTION AND LIMIT (A/L) LEVELS
ES.07 In this Reporting Quarter, no exceedance of construction noise and marine water quality
monitoring were recorded. No Notification of Exceedance (NOE) was issued. The statistics of
environmental exceedance, NOE issued and investigation of exceedance are summarized in the
following table.
Table ES-4 Summary NOE issued and investigation of exceedance in Reporting Quarter
Environmental Issues
Monitoring Parameters
Action Level
Limit Level
Event & Action
NOE Issued Investigation Corrective
Actions
Construction Noise
Leq(30min)
Daytime 0 0 0 - -
Water Quality DO 0 0 0 - -
Turbidity 0 0 0 -- -
SS 0 0 0 -- - Note: NOE – Notification of Exceedance
ENVIRONMENTAL COMPLAINT
ES.08 No environmental complaint was recorded or received in this Reporting Quarter.
NOTIFICATION OF SUMMONS AND SUCCESSFUL PROSECUTIONS
ES.09 No environmental summons or successful prosecutions were recorded in this Reporting Quarter.
REPORTING CHANGE
ES.10 There were no reporting changes made in this Reporting Quarter.
SITE INSPECTION BY EXTERNAL PARTIES
ES.11 Joint site inspection with EPD was held on 24 April 2015.
FUTURE KEY ISSUES
ES.12 As wet season is approached, water quality mitigation measures to prevent surface runoff into
nearby water bodies or public areas should paid attention. Silt curtain shall be regular to check
and repair if necessary. Moreover, noise mitigation measures should be properly maintained to
prevent construction noise as impacted surrounding resident.
Contract No. 1/WSD/13 - Improvement of Fresh Water Supply to Cheung Chau
Quarterly Environmental Monitoring and Audit (EM&A) Report (No.5) –
April to June 2015 AUES
Z:\Jobs\2013\TCS00684(1-WSD-13)\600\Quanterly Report\No.5 - Apr to Jun 15\R00146v2.doc Action-United Environmental Services and Consulting
TABLE OF CONTENTS
1.0 INTRODUCTION 1 PROJECT BACKGROUND 1 REPORT STRUCTURE 1
2.0 PROJECT ORGANIZATION AND CONSTRUCTION PROGRESS 2 PROJECT ORGANIZATION AND MANAGEMENT STRUCTURE 2 CONSTRUCTION PROGRESS 2 SUMMARY OF ENVIRONMENTAL SUBMISSIONS 2
3.0 SUMMARY OF MONITORING REQUIREMENTS 3 GENERAL 3 MONITORING PARAMETERS 3 MONITORING LOCATION 3 MONITORING FREQUENCY AND PERIOD 4 MONITORING EQUIPMENT 4 MONITORING METHODOLOGY 6 EQUIPMENT CALIBRATION 7 METEOROLOGICAL INFORMATION 7 DATA MANAGEMENT AND DATA QA/QC CONTROL 7 DETERMINATION OF ACTION/LIMIT (A/L) LEVELS 7
4.0 IMPACT MONITORING RESULTS 9 RESULTS OF WATER QUALITY MONITORING 9 RESULTS OF CONSTRUCTION NOISE MONITORING 10
5.0 WASTE MANAGEMENT 11 RECORDS OF WASTE QUANTITIES 11
6.0 SITE INSPECTION 12
7.0 ENVIRONMENTAL COMPLAINT AND NON-COMPLIANCE 16 ENVIRONMENTAL COMPLAINT, SUMMONS AND PROSECUTION 16
8.0 IMPLEMENTATION STATUS OF MITIGATION MEASURES 17 GENERAL REQUIREMENTS 17
9.0 CONCLUSIONS AND RECOMMENDATIONS 18 CONCLUSIONS 18 RECOMMENDATIONS 18
LIST OF TABLES
TABLE 2-1 STATUS OF ENVIRONMENTAL LICENSES AND PERMITS
TABLE 3-1 SUMMARY OF THE MONITORING PARAMETERS OF EM&A REQUIREMENTS
TABLE 3-2 LOCATION OF MARINE WATER QUALITY MONITORING STATION
TABLE 3-3 LOCATION OF CONSTRUCTION NOISE MONITORING STATION
TABLE 3-4 MONITORING EQUIPMENT USED IN EM&A PROGRAM
TABLE 3-5 ACTION AND LIMIT LEVELS FOR WATER QUALITY
TABLE 3-6 ACTION AND LIMIT LEVELS FOR CONSTRUCTION NOISE
TABLE 4-1 RESULTS SUMMARY OF DEPTH AVERAGE (SURFACE & MIDDLE LAYER) OF DO (MG/L)
TABLE 4-2 RESULTS SUMMARY OF BOTTOM DEPTH OF DO (MG/L)
TABLE 4-3 RESULTS SUMMARY OF DEPTH AVERAGE OF TURBIDITY (NTU)
TABLE 4-4 RESULTS SUMMARY OF DEPTH AVERAGE OF SUSPENDED SOLIDS (MG/L)
TABLE 4-5 SUMMARY OF WATER QUALITY EXCEEDANCE
Contract No. 1/WSD/13 - Improvement of Fresh Water Supply to Cheung Chau
Quarterly Environmental Monitoring and Audit (EM&A) Report (No.5) –
April to June 2015 AUES
Z:\Jobs\2013\TCS00684(1-WSD-13)\600\Quanterly Report\No.5 - Apr to Jun 15\R00146v2.doc Action-United Environmental Services and Consulting
TABLE 4-6 SUMMARY OF CONSTRUCTION NOISE MONITORING RESULTS – N1
TABLE 5-1 SUMMARY OF QUANTITIES OF INERT C&D MATERIALS
TABLE 5-2 SUMMARY OF QUANTITIES OF C&D WASTES
TABLE 6-1 SITE OBSERVATIONS
TABLE 7-1 STATISTICAL SUMMARY OF ENVIRONMENTAL COMPLAINTS
TABLE 7-2 STATISTICAL SUMMARY OF ENVIRONMENTAL SUMMONS
TABLE 7-3 STATISTICAL SUMMARY OF ENVIRONMENTAL PROSECUTION
TABLE 8-1 ENVIRONMENTAL MITIGATION MEASURES
LIST OF APPENDICES
APPENDIX A PROJECT SITE LAYOUT PLAN
APPENDIX B ORGANIZATION STRUCTURE AND CONTACT DETAILS OF RELEVANT PARTIES
APPENDIX C MASTER AND THREE MONTHS ROLLING CONSTRUCTION PROGRAMS
APPENDIX D MONITORING LOCATIONS DESIGNATED IN THE EM&A MANUAL
APPENDIX E EVENT AND ACTION PLAN
APPENDIX F GRAPHICAL PLOTS OF IMPACT MONITORING
APPENDIX G METEOROLOGICAL DATA
APPENDIX H MONTHLY SUMMARY WASTE FLOW TABLE
APPENDIX I IMPLEMENTATION SCHEDULE FOR ENVIRONMENTAL MITIGATION MEASURES (ISEMM)
Contract No. 1/WSD/13 - Improvement of Fresh Water Supply to Cheung Chau
Quarterly Environmental Monitoring and Audit (EM&A) Report (No.5) –
April to June 2015 AUES
Z:\Jobs\2013\TCS00684(1-WSD-13)\600\Quanterly Report\No.5 - Apr to Jun 15\R00146v2.doc 1
Action-United Environmental Services and Consulting
1.0 INTRODUCTION
PROJECT BACKGROUND
1.1 Water Supplies Department (hereafter referred as “WSD”) is the Project Proponent and the Permit
Holder of Improvement of Fresh Water Supply to Cheung Chau (hereinafter referred as “the
Project”), which is a Designated Project to be implemented under Environmental Permit number
EP-392/2010/A which superseded EP-392/2010 on 19 December 2014 (hereinafter referred as “the
EP-392/2010/A” or “the EP”).
1.2 The scope of the works comprises primarily the laying of a new submarine fresh water main across
the Adamasta Channel from Lantau Island to Cheung Chau by horizontal directional drilling
method to enhance the reliability of fresh water supply to Cheung Chau. The Works commenced
on 28 March 2014 and is predicted to undertaken about 24 months. The layout plan of project is
shown in Appendix A.
1.3 Action-United Environmental Services and Consulting (AUES) has been appointed as the
independent environmental team (ET) to implement the relevant EM&A programme of Water
Supplies Department (WSD) Contract No. 1/WSD/13 – Improvement of Fresh Water Supply to
Cheung Chau. In the Project, China Road - China Pipeline Joint Venture (hereinafter
“CRCPJV”) is a main-contractor, SMEC Asia Limited as an Independent Environmental Checker
(IEC), and Black & Veatch Hong Kong Limited is the representative engineer on site to manage the
Project.
1.4 According to the Particular Specification (PS) Section 25 and the EP-392/2010/A, overall scope of
environmental monitoring including construction noise and water quality, and site environmental
audit should be undertaken in accordance with the provided Environmental Monitoring and Audit
Manual by an independent Environmental Team (ET).
1.5 The baseline monitoring program was carried out during the period between 4 January and 31
January 2014 at the designated monitoring locations by the ET according to the EM&A Manual.
The “Baseline Monitoring Report (R0014 Version 3)” had submitted to EPD before
commencement of major construction works and approved by the IEC on 21 February 2014.
Further to CRCPJV’s instructions, the EM&A program was commenced on 1 April 2014 and the
monitoring schedule had been issued to relevant parties on 28 March 2014.
1.6 This is the 5th quarterly Environmental Monitoring and Audit Report for the Project, covering the
period from 1 April 2015 to 30 June 2015 (the Reporting Quarter).
REPORT STRUCTURE
1.7 The Quarterly Environmental Monitoring and Audit (EM&A) Report is structured into the
following sections:-
SECTION 1 INTRODUCTION
SECTION 2 PROJECT ORGANIZATION AND CONSTRUCTION PROGRESS
SECTION 3 SUMMARY OF MONITORING REQUIREMENTS
SECTION 4 IMPACT MONITORING RESULTS
SECTION 5 WASTE MANAGEMENT
SECTION 6 SITE INSPECTIONS
SECTION 7 ENVIRONMENTAL COMPLAINTS AND NON-COMPLIANCE
SECTION 8 IMPLEMENTATION STATUES OF MITIGATION MEASURES
SECTION 9 IMPACT FORECAST
SECTION 10 CONCLUSIONS AND RECOMMENDATION
Contract No. 1/WSD/13 - Improvement of Fresh Water Supply to Cheung Chau
Quarterly Environmental Monitoring and Audit (EM&A) Report (No.5) –
April to June 2015 AUES
Z:\Jobs\2013\TCS00684(1-WSD-13)\600\Quanterly Report\No.5 - Apr to Jun 15\R00146v2.doc 2
Action-United Environmental Services and Consulting
2.0 PROJECT ORGANIZATION AND CONSTRUCTION PROGRESS
PROJECT ORGANIZATION AND MANAGEMENT STRUCTURE
2.1 Organization structure and contact details of relevant parties with respect to on-site environmental
management are shown in Appendix B.
CONSTRUCTION PROGRESS
2.2 The master and three month rolling construction programs are enclosed in Appendix C and the
major construction activities undertaken in this Reporting Quarter are listed below:-
1 to 30 April 2015
Reaming operation by HDD;
Excavation and pipe laying for landmain construction at Cheung Kwai Road
Preparation of Exit Pit at Ha So Pai
1 to 31 May 2015
Reaming operation by HDD;
Excavation and pipe laying for landmain construction at Cheung Kwai Road
Preparation of Exit Pit at Ha So Pai
1 to 30 June 2015
Reaming operation by HDD;
Excavation and pipe laying for landmain construction at Cheung Kwai Road
Preparation of Exit Pit at Ha So Pai
SUMMARY OF ENVIRONMENTAL SUBMISSIONS
2.3 A summary of the relevant permits, licenses, and/or notifications on environmental protection for
this Project in this Reporting Quarter is presented in Table 2-1.
Table 2-1 Status of Environmental Licenses and Permits
Item Description License/Permit Status
1 Air pollution Control (Construction Dust) Notified EPD on 28/10/2013
Ref. no. 366253
2 Chemical waste Producer Registration Application date: 20/12/2013
Date approved: 30/01/2014
WPN: 8334-920-C3839-01
3 Water Pollution Control Ordinance
(Discharge License)
Application date: 03/01/2014
License no. WT00018191-2014
Valid to 28/02/2019
4 Billing Account for Disposal of Construction
Waste
Application no. :RS01134
Date approved: 1/11/2013
Account Number: 7018602
5 Construction Noise permit Permit Number: GW-RS0475-15
Valid from 11 May 2015 to 10 Nov 2015
6 Environmental Permit Issued by EPD on 19 Dec 2014
Permit Number: EP-392/2010/A
2.4 Baseline Monitoring Report (TCS00684/13/600/R0014Ver.3) for the Project was issued by the ETL
and verified by the IEC on 24 March 2014. The report was also submitted to the EPD for
endorsement.
Contract No. 1/WSD/13 - Improvement of Fresh Water Supply to Cheung Chau
Quarterly Environmental Monitoring and Audit (EM&A) Report (No.5) –
April to June 2015 AUES
Z:\Jobs\2013\TCS00684(1-WSD-13)\600\Quanterly Report\No.5 - Apr to Jun 15\R00146v2.doc 3
Action-United Environmental Services and Consulting
3.0 SUMMARY OF MONITORING REQUIREMENTS
GENERAL
3.1 The Environmental Monitoring and Audit requirements are set out in the Approved EM&A manual.
Environmental aspects such as the construction noise and marine water quality were identified as
the key issues during the construction phase of the Project. The detailed requirements are
presented in the sub-sections below.
MONITORING PARAMETERS
3.2 The EM&A baseline and impact monitoring program covers the following environmental issues:
• Construction noise; and
• Marine Water quality;
3.3 A summary of the monitoring parameters is presented in Table 3-1:
Table 3-1 Summary of the monitoring parameters of EM&A Requirements
Environmental Issue Parameters
Marine Water Quality
In-situ Measurements
• Dissolved Oxygen Concentration (mg/L);
• Dissolved Oxygen Saturation (% );
• Turbidity (NTU);
• pH value;
• Salinity (ppt);
• Water depth (m);
• Temperature (ºC); and
• # Total residual chlorine (TRC) (mg/L)
Laboratory Analysis
• Suspended Solids (mg/L)
Noise • Leq(30min) during normal working hours; and
• Leq(5min) during Restricted Hours.
# TRC monitoring would be carried out by the Main-Contractor.
MONITORING LOCATION
Water Quality
3.4 Two control stations (W8 and W9) and seven impact stations (W1-W7) were recommended in the
EM&A Manual Section 2.5. Detailed and co-ordinance of water quality monitoring stations is
described in Table 3-2 and the graphical is shown in Appendix D.
Table 3-2 Location of Marine Water Quality Monitoring Station
Station Description Co-ordinance
Easting Northing
W1 Impact Station – Marine waters near the proposed
launching site at Cheung Chau 820 704 808 688
W2 Impact Station – Marine waters near the proposed
launching site at Cheung Chau 820 656 808 631
W3 Impact Station – Marine waters along the proposed water
main alignment 820 445 809 036
W4 Impact Station – Marine waters along the proposed water
main alignment 820 072 809 297
W5 Impact Station – Marine waters near the proposed
reception site at Lantau 819 875 809 700
W6 Impact Station – Marine waters near the Cheung Sha Wan
Fish Culture Zone 819 174 810 917
W7 Impact Station – Marine waters between the works and
the Cheung Sha Wan Fish Culture Zone 820 055 810 523
Contract No. 1/WSD/13 - Improvement of Fresh Water Supply to Cheung Chau
Quarterly Environmental Monitoring and Audit (EM&A) Report (No.5) –
April to June 2015 AUES
Z:\Jobs\2013\TCS00684(1-WSD-13)\600\Quanterly Report\No.5 - Apr to Jun 15\R00146v2.doc 4
Action-United Environmental Services and Consulting
Station Description Co-ordinance
Easting Northing
W8 Control station – Marine waters of Adamasta Channel 821 328 810 240
W9 Control station – Marine waters of Adamasta Channel 819 045 807 953
Construction Noise
3.5 According to EM&A Manual Section 6.4, only one noise sensitive receiver (NSR) is designated for
the construction noise monitoring. The detailed construction noise monitoring station to under the
Project is described in Table 3-3 and graphical is shown in Appendix D.
Table 3-3 Location of Construction Noise Monitoring Station
Noise Monitoring
Station NSR ID Location
N1 NSR2 Village house at No. 1A Tai Kwan Wan San Tsuen
MONITORING FREQUENCY AND PERIOD
3.6 The requirements of impact monitoring are stipulated in Sections 2.6 and 2.7 of the EM&A Manual
and listed as follows.
Construction Noise Monitoring
Parameters : One set of Leq(30min) as 6 consecutive Leq(5min) between 0700-1900 hours on
normal weekdays
Frequency : Once every week
Duration : Throughout out the construction period
Water Quality (Marine) Monitoring
Parameters : In-situ measurements including water depth, temperature, DO, pH, turbidity
and salinity; and Suspended Solids is analyzed by HOKLAS-accredited
laboratory.
Frequency : Three days a week, at mid ebb and mid flood tides. The interval between 2
sets of monitoring will be more than 36 hours.
Sampling
Depth
: (i.) Three depths: 1m below water surface, 1m above sea bottom and at
mid-depth when the water depth exceeds 6m.
(ii.) If the water depth is between 3m and 6m, two depths: 1m below water
surface and 1m above sea bottom.
(iii.) If the water depth is less than 3m, 1 sample at mid-depth is taken
Duration : Throughout out the construction period
MONITORING EQUIPMENT
Water Quality Monitoring
i. Dissolved Oxygen and Temperature Measuring Equipment – The instrument should be a
portable and weatherproof dissolved oxygen (DO) measuring instrument complete with cable
and sensor, and use a DC power source. The equipment should be capable of measuring as
included a DO level in the range of 0 – 20mg L-1 and 0 – 200% saturation; and a temperature
of 0 – 45 degree Celsius.
ii. pH Meter – The instrument shall consist of a potentiometer, a glass electrode, a reference
electrode and a temperature-compensating device. It shall be readable to 0.1 pH in arrange
of 0 to 14.
iii. Turbidity (NTU) Measuring Equipment – The instrument should be a portable and
weatherproof turbidity measuring instrument using a DC power source. It should have a
photoelectric sensor capable of measuring turbidity between 0 - 1000 NTU.
Contract No. 1/WSD/13 - Improvement of Fresh Water Supply to Cheung Chau
Quarterly Environmental Monitoring and Audit (EM&A) Report (No.5) –
April to June 2015 AUES
Z:\Jobs\2013\TCS00684(1-WSD-13)\600\Quanterly Report\No.5 - Apr to Jun 15\R00146v2.doc 5
Action-United Environmental Services and Consulting
iv. Water Sampling Equipment – A water sampler should comprise a transparent PVC cylinder,
with a capacity of not less than 2 litres, which can be effectively sealed with latex cups at
both ends. The sampler should have a positive latching system to keep it open and prevent
premature closure until released by a messenger when the sampler is at the selected water
depth.
v. Water Depth Detector – A portable, battery-operated echo sounder should be used for the
determination of water depth at each designated monitoring station. This unit can either be
hand held or affixed to the bottom of the work boat.
vi. Salinity Measuring Equipment – A portable salinometer capable of measuring salinity in
the range of 0 - 40 parts per thousand (ppt) should be provided for measuring salinity of the
water at each monitoring location.
vii. Sample Containers and Storage – Water samples for SS should be stored in high density
polythene bottles with no preservative added, packed in ice (cooled to 4°C without being
frozen).
viii. Monitoring Position Equipment - A hand-held or boat-fixed type digital Differential Global
Positioning System (DGPS) with way point bearing indication and Radio Technical
Commission for maritime (RTCM) Type 16 error message ‘screen pop-up’ facilities (for
real-time auto-display of error messages and DGPS corrections from the Hong Kong
Hydrographic Office), or other equipment instrument of similar accuracy, should be provided
and used during marine water monitoring to ensure the monitoring vessel is at the correct
location before taking measurements.
ix. Suspended Solids Analysis – Analysis of suspended solids shall be carried out in a
HOKLAS or other international accredited laboratory.
Noise Monitoring
3.7 Sound level meter in compliance with the International Electrotechnical Commission Publications
651: 1979 (Type 1) and 804: 1985 (Type 1) specifications shall be used for carrying out the noise
monitoring. The sound level meter shall be checked using an acoustic calibrator. The wind
speed shall be checked with a portable wind speed meter capable of measuring the wind speed in m
s-1.
3.8 The monitoring equipment using for the EM&A program were proposed by the ET and verified by
the IEC prior to the commencement of the monitoring. Details of the equipment used for impact
monitoring are listed in Table 3-4 below.
Table 3-4 Monitoring Equipment Used in EM&A Program
Equipment Model
Construction Noise
Integrating Sound Level Meter B&K Type 2238
Calibrator B&K Type 4231
Portable Wind Speed Indicator Testo Anemometer
Water quality
A Digital Global Positioning System GPS12 Garmin
Water Depth Detector Eagle Sonar
Water Sampler A 2-litre transparent PVC cylinder with latex cups at
both ends
Thermometer & DO meter Horiba U-54 Multi-parameter Water Quality
Monitoring System/ YSI 6820/650MDS Sonde
Environmental Monitoring System
pH meter
Turbidimeter
Salinometer
Sample Container High density polythene bottles (provided by
laboratory)
Storage Container ‘Willow’ 33-litter plastic cool box with Ice pad
Suspended Solids HOKLAS-accredited laboratory (ALS Technichem
(HK) Pty Ltd)
Total residual chlorine Would be provided by CRCPJV later
Contract No. 1/WSD/13 - Improvement of Fresh Water Supply to Cheung Chau
Quarterly Environmental Monitoring and Audit (EM&A) Report (No.5) –
April to June 2015 AUES
Z:\Jobs\2013\TCS00684(1-WSD-13)\600\Quanterly Report\No.5 - Apr to Jun 15\R00146v2.doc 6
Action-United Environmental Services and Consulting
MONITORING METHODOLOGY
Water Quality
3.9 Water quality monitoring is conducted at the designated locations. The sampling produce with the
in-situ monitoring are presented as below:
Sampling Procedures
3.10 A Digital Global Positioning System (GPS) is used to identify the designated monitoring stations
prior to water sampling. A portable, battery-operated echo sounder is used for the determination
of water depth at each station. At each station, marine water sample is collected at three depths:
1m below water surface, 1m above sea bottom and at mid-depth when the water depth exceeds 6m.
Samples at 1m below water surface and 1m above sea bottom are collected when the water depth is
between 3m and 6m. Only 1 sample at mid-depth is taken when the water depth is below 3m.
3.11 The marine water sampler is lowered into the water body at the predetermined depth. The trigger
system of the sampler should been activated with a messenger. The opening ends of the sampler
then is closed accordingly and water sample is collected.
3.12 The sample container is rinsed with a portion of the water sample. The water sample then is
transferred to the high-density polythene bottles as provided by the laboratory, labeled with a
unique sample number and sealed with a screw cap.
3.13 Before commencement of the sampling, general information such as the date and time of sampling,
weather condition and tidal condition as well as the personnel responsible for the monitoring are to
be recorded on the monitoring field data sheet.
3.14 A ‘Willow’ 33-litter plastic cool box packed with ice is used to preserve the collected water
samples prior to arrival at the laboratory for chemical determination. The water temperature of
the cool box is maintained at a temperature as close to 40C as possible without being frozen.
Samples collected are delivered to the laboratory upon collection
In-situ Measurement
Positioning of Monitoring Locations
3.15 A digital Global Positioning System (GPS) is used during marine water monitoring to ensure the
monitoring vessel is at the correct location when taking measurement and samples.
Depth, Dissolved Oxygen (DO), Temperature, Turbidity, Salinity and pH value
3.16 The Horiba U-54 Multi-parameter Water Quality Monitoring System/ YSI 6820/650MDS Sonde
Environmental Monitoring System are used for marine water in-situ measures, which automates the
measurements and data logging of depth, temperature, dissolved oxygen, dissolved oxygen
saturation, turbidity, pH and salinity simultaneously. Before each round of monitoring, the
dissolved oxygen probe is calibrated by the wet bulb method and the turbidity and salinity probes
checked with distilled water.
Laboratory Analysis
3.17 All water samples are analyzed with Suspended Solids (SS) as specified in the EM&A Manual by a
local HOKLAS-accredited testing laboratory (ALS Technichem (HK) Pty Ltd HOKLAS
registration no. 66). SS analysis is determined by the laboratory upon receipt of the water samples
using HOKLAS accredited analytical methods namely ALS Method EA-025.
Construction Noise
3.18 Noise measurements were taken in terms of the A-weighted equivalent sound pressure level (Leq)
measured in decibels (dB). Supplementary statistical results (L10 and L90) were also obtained for
reference.
3.19 Sound level meters listed in Table 3-4 are complied with the International Electrotechnical
Contract No. 1/WSD/13 - Improvement of Fresh Water Supply to Cheung Chau
Quarterly Environmental Monitoring and Audit (EM&A) Report (No.5) –
April to June 2015 AUES
Z:\Jobs\2013\TCS00684(1-WSD-13)\600\Quanterly Report\No.5 - Apr to Jun 15\R00146v2.doc 7
Action-United Environmental Services and Consulting
Commission Publications 651: 1979 (Type 1) and 804: 1985 (Type 1) specifications, as
recommended in Technical Memorandum (TM) issued under the Noise Control Ordinance (NCO).
3.20 During the monitoring, all noise measurements were performed with the meter set to FAST
response and on the A-weighted equivalent continuous sound pressure level (Leq). Leq(30min) in six
consecutive Leq(5min) measurements were used as the monitoring parameter for the time period
between 0700-1900 hours on weekdays; and also Leq(15min) in three consecutive Leq(5min)
measurements is used as monitoring parameter for other time periods (e.g. during restricted hours),
if necessary.
3.21 During the measurement, the sound level meter is mounted on a tripod with a height of 1.2m above
ground and placed at the assessment point and oriented such that the microphone is pointed to the
site with the microphone facing perpendicular to the line of sight. The windshield is fitted for all
measurements. The assessment point is normally set as free-field situation for the measurement.
3.22 Prior of noise measurement, the accuracy of the sound level meter is checked using an acoustic
calibrator generating a known sound pressure level at a known frequency. The checking was
performed before and after the noise measurement.
EQUIPMENT CALIBRATION
3.23 The sound level meter and calibrator are calibrated and certified by a laboratory accredited under
HOKLAS or any other international accreditation scheme at yearly basis.
3.24 The Multi-parameter Water Quality Monitoring System is calibrated by HOKLAS accredited
laboratory of three month intervals.
METEOROLOGICAL INFORMATION
3.25 The meteorological information during the construction phase is obtained from Cheung Chau
Station of the Hong Kong Observatory (HKO).
DATA MANAGEMENT AND DATA QA/QC CONTROL
3.26 The impact monitoring data are handled by the ET’s systematic data recording and management,
which complies with in-house Quality Management System. Standard Field Data Sheets (FDS) are
used in the impact monitoring program.
3.27 The monitoring data recorded in the equipment e.g. noise meter and Multi-parameter Water Quality
Monitoring System are downloaded directly from the equipment at the end of each monitoring day.
The downloaded monitoring data are input into a computerized database properly maintained by
the ET. The laboratory results are input directly into the computerized database and QA/QC
checked by personnel other than those who input the data. For monitoring activities require
laboratory analysis, the local laboratory follows the QA/QC requirements as set out under the
HOKLAS scheme for all laboratory testing.
DETERMINATION OF ACTION/LIMIT (A/L) LEVELS
3.28 According to the approved Environmental Monitoring and Audit Manual, the construction noise
and water quality criteria were set up, namely Action and Limit levels are listed in Tables 3-5 and
3-6 as below.
Contract No. 1/WSD/13 - Improvement of Fresh Water Supply to Cheung Chau
Quarterly Environmental Monitoring and Audit (EM&A) Report (No.5) –
April to June 2015 AUES
Z:\Jobs\2013\TCS00684(1-WSD-13)\600\Quanterly Report\No.5 - Apr to Jun 15\R00146v2.doc 8
Action-United Environmental Services and Consulting
Table 3-5 Action and Limit Levels for Water Quality
Impact
Station
Dissolved Oxygen (mg/L) Depth Average of
Turbidity (NTU)
Depth Average of
SS (mg/L) Depth Average of
Surface & Middle Bottom
Action
Level
Limit
Level
Action
Level
Limit
Level
Action
Level
Limit
Level
Action
Level
Limit
Level
W1 5.64 4.54 NA NA 5.87 8.81 7.00 8.00
W2 5.16 5.02 NA NA 5.50 5.66 7.00 8.00
W3 6.18 5.66 5.36 5.05 6.94 7.29 8.00 8.00
W4 5.94 4.95 5.71 5.54 7.50 8.03 7.85 11.57
W5 5.14 5.00 5.79 5.79 5.44 7.43 6.00 6.43
W6 5.92 4.26 6.04 4.49 6.82 7.10 8.00 9.59
W7 6.08 5.78 6.08 5.60 5.71 6.26 7.85 10.00
Table 3-6 Action and Limit Levels for Construction Noise
Monitoring Location Action Level Limit Level in dB(A)
Time Period: 0700-1900 hours on normal weekdays
N1 When one or more documented
complaints are received 75 dB(A)
If works are to be carried out during restricted hours, the conditions stipulated in the construction noise permit issued by the NCA have to be followed.
3.29 Should non-compliance of the environmental quality criteria occurs, remedial actions will be
triggered according to the Event and Action Plan enclosed in Appendix E.
Contract No. 1/WSD/13 - Improvement of Fresh Water Supply to Cheung Chau
Quarterly Environmental Monitoring and Audit (EM&A) Report (No.5) –
April to June 2015 AUES
Z:\Jobs\2013\TCS00684(1-WSD-13)\600\Quanterly Report\No.5 - Apr to Jun 15\R00146v2.doc 9
Action-United Environmental Services and Consulting
4.0 IMPACT MONITORING RESULTS
4.1 Further to CRCPJV’s notification, the EM&A program was commenced on 1 April 2014. The
works undertaken during the reporting quarter has been illustrated in Appendix C. The
monitoring results are presented in the following sub-sections. The graphical plots of the trends in
monitored parameters over the Reporting Quarter are presented in Appendix F.
RESULTS OF WATER QUALITY MONITORING
4.2 In this Reporting Quarter, 36 monitoring days have been carried out at the designated monitoring
locations.
4.3 Monitoring results of the three key parameters, dissolved oxygen (DO), turbidity and suspended
solids, in this Reporting Quarter are summarized in Tables 4-1 to 4-4.
Table 4-1 Results Summary of Depth Average (Surface & Middle Layer) of DO (mg/L)
Tidal W1 W2 W3 W4 W5 W6 W7 W8 W9
Mid-Ebb
Average 6.91 6.84 6.96 7.06 7.02 7.21 7.05 6.96 7.00
Min 5.83 5.87 6.18 6.12 5.73 5.93 6.10 5.72 5.42
Max 8.93 9.00 8.15 8.33 8.54 9.77 8.62 8.78 8.73
Mid-Flood
Average 7.11 7.05 7.10 7.06 7.10 7.16 7.12 6.91 7.16
Min 5.74 5.74 6.18 5.95 6.02 5.93 6.08 5.76 5.97
Max 12.20 12.30 9.29 8.63 10.41 9.15 9.13 8.95 9.08
Table 4-2 Results Summary of Bottom Depth of DO (mg/L)
Tidal W1 W2 W3 W4 W5 W6 W7 W8 W9
Mid-Ebb
Average NA NA 6.17 6.26 6.88 6.57 6.41 6.17 6.16
Min NA NA 5.39 5.73 5.80 6.06 6.08 5.07 3.20
Max NA NA 7.53 7.73 8.54 8.36 8.21 7.88 7.95
Mid-Flood
Average NA NA 6.29 6.34 6.81 6.63 6.43 6.10 6.29
Min NA NA 5.36 5.72 5.84 6.04 6.08 5.00 5.29
Max NA NA 8.53 7.53 8.55 10.58 8.26 8.01 7.90
Table 4-3 Results Summary of Depth Average of Turbidity (NTU)
Tidal W1 W2 W3 W4 W5 W6 W7 W8 W9
Mid-Ebb
Average 2.32 2.48 2.53 2.46 2.15 1.92 2.13 2.48 2.47
Min 0.20 0.15 0.13 0.12 0.10 0.13 0.13 0.33 0.33
Max 5.30 5.35 5.25 5.38 5.13 4.75 5.55 8.70 6.83
Mid-Flood
Average 2.19 2.30 2.49 2.51 2.24 1.88 1.99 2.32 2.59
Min 0.15 0.10 0.38 0.18 0.23 0.32 0.15 0.17 0.32
Max 5.30 5.50 5.32 5.28 5.35 5.87 5.30 6.80 7.47
Table 4-4 Results Summary of Depth Average of Suspended Solids (mg/L)
Tidal W1 W2 W3 W4 W5 W6 W7 W8 W9
Mid-Ebb
Average 3.64 3.75 3.46 3.36 3.36 3.32 3.05 3.05 3.36
Min 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Max 6.00 6.50 6.50 6.50 6.00 5.67 6.00 5.67 7.80
Mid-Flood
Average 3.39 3.61 3.41 3.23 3.35 3.30 3.19 3.27 3.70
Min 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.33 1.00
Max 6.50 7.00 6.00 6.67 6.00 7.50 7.17 7.33 8.83
Remark: If the monitoring result is less than 1, the average was calculated by assuming the monitored value
to be 1.
4.4 During the Reporting Quarter, field measurements showed that temperatures of marine water were
within 22.40C to 23.30C; the salinity concentrations within 17.50 to 32.47 ppt and pH values
within 6.72 to 8.97.
4.5 A summary of exceedances for the three parameters: dissolved oxygen (DO), turbidity and
suspended solids is shown in Table 4-5.
Contract No. 1/WSD/13 - Improvement of Fresh Water Supply to Cheung Chau
Quarterly Environmental Monitoring and Audit (EM&A) Report (No.5) –
April to June 2015 AUES
Z:\Jobs\2013\TCS00684(1-WSD-13)\600\Quanterly Report\No.5 - Apr to Jun 15\R00146v2.doc 10
Action-United Environmental Services and Consulting
Table 4-5 Summary of Water Quality Exceedance
Station
DO
(Ave of Top &
mid-depth)
DO
Bottom Depth
Turbidity
(Depth Ave.)
SS
(Depth Ave)
Total
Exceedance
Action Limit Action Limit Action Limit Action Limit Action Limit
W1 0 0 0 0 0 0 0 0 0 0
W2 0 0 0 0 0 0 0 0 0 0
W3 0 0 0 0 0 0 0 0 0 0
W4 0 0 0 0 0 0 0 0 0 0
W5 0 0 0 0 0 0 0 0 0 0
W6 0 0 0 0 0 0 0 0 0 0
W7 0 0 0 0 0 0 0 0 0 0
No of
Exceedance 0 0 0 0 0 0 0 0 0 0
4.6 In this Reporting Quarter, no Action/Limit Level exceedance in water quality was recorded.
RESULTS OF CONSTRUCTION NOISE MONITORING
4.7 The sound level was set in a free field situation during construction noise measurement. Therefore,
a façade correction of +3dB(A) has been added according to acoustical principles and EPD
guidelines.
4.8 In this Reporting Quarter, a total of 13 events of construction noise measurements were conducted.
A summary of construction noise monitoring at the identified locations during the Reporting
Quarter are summarized in Table 4-6.
Table 4-6 Summary of Construction Noise Monitoring Results – N1
Station Corrected Leq(30min) (dB(A))*
Max Min
N1 74 64
Record Date 8 June 2015 30 June 2015
(*) A façade correction of +3 dB(A) has been added according to acoustical principles and EPD guidelines.
4.9 As showed in the above table, the results were well below 75dB(A), also no noise complaint
(which is an Action Level exceedance) was received by the RE, WSD, EPD and the Contractor.
Hence, no Action or Limit Level exceedance was triggered during in this quarter. The graphical
plot is shown in Appendix F.
4.10 The meteorological information during reporting quarter extracted from Cheung Chau Station of
the Hong Kong Observatory (HKO) shows in Appendix G.
Contract No. 1/WSD/13 - Improvement of Fresh Water Supply to Cheung Chau
Quarterly Environmental Monitoring and Audit (EM&A) Report (No.5) –
April to June 2015 AUES
Z:\Jobs\2013\TCS00684(1-WSD-13)\600\Quanterly Report\No.5 - Apr to Jun 15\R00146v2.doc 11
Action-United Environmental Services and Consulting
5.0 WASTE MANAGEMENT
5.1 Waste management was carried out by an on-site Environmental Officer or an Environmental
Supervisor from time to time.
RECORDS OF WASTE QUANTITIES
All types of waste arising from the construction work are classified into the following:
Construction & Demolition (C&D) Material;
Chemical Waste;
General Refuse; and
Excavated Soil.
5.2 The quantities of waste for disposal in this Reporting Period are summarized in Table 5-1 and 5-2
and the Monthly Summary Waste Flow Table is shown in Appendix H. Whenever possible,
materials were reused on-site as far as practicable.
Table 5-1 Summary of Quantities of Inert C&D Materials
Type of Waste Quantity Disposal Location
Apr 15 May 15 Jun 15
C&D Materials (Inert) (‘000 m3) 0 0 0 -
Reused in this Contract (Inert)
(‘000 m3) 0 0 0 -
Reused in other Projects (Inert)
(‘000 m3) 0 0 0 -
Disposal as Public Fill (Inert)
(‘000 m3) 1.470 0.990 1.030
Outlaying Island Transfer
facility (Cheung Chau
Station)
Table 5-2 Summary of Quantities of C&D Wastes
Type of Waste Quantity Disposal Location
Apr 15 May 15 Jun 15
Recycled Metal (‘000kg) 0 0 0 -
Recycled Paper / Cardboard
Packing (‘000kg) 0 0 0 -
Recycled Plastic (‘000kg) 0 0 0 -
Chemical Wastes (‘000kg) 0 0 0 -
General Refuses (‘000 m3) 0.050 0.050 0.070
Outlaying Island Transfer
facility (Cheung Chau
Station)
5.3 There was no site effluent discharged but the estimated volume of surface runoff was less than
50m3 in this quarterly period.
Contract No. 1/WSD/13 - Improvement of Fresh Water Supply to Cheung Chau
Quarterly Environmental Monitoring and Audit (EM&A) Report (No.5) –
April to June 2015 AUES
Z:\Jobs\2013\TCS00684(1-WSD-13)\600\Quanterly Report\No.5 - Apr to Jun 15\R00146v2.doc 12
Action-United Environmental Services and Consulting
6.0 SITE INSPECTION
6.1 According to the Environmental Monitoring and Audit Manual, the environmental site inspection
should been formulation by ET Leader. Regular environmental site inspections had been carried
out by the ET to confirm the environmental performance. 13 weekly site inspections were carried
out on 8, 14, 21, and 28 April 2015; 5, 12, 22, and 26 May 2015; and 3, 9, 18, 23 and 30 June
2015 with the Representatives of the Engineer and the Contractor to evaluate the site environmental
performance in this Reporting Quarter. Furthermore, joint site inspection with EPD and IEC also
undertaken on 21 April 2015, 22 May 2015 and 18 June 2015. No non-compliance was noted.
However, minor deficiencies were observed during weekly site inspection or joint site inspection.
6.2 Observations for the site inspections within this Reporting Quarter are summarized in Table 6-1.
Table 6-1 Site Observations
Date Findings / Deficiencies Follow-Up Status
31 March 2015 - The Contractor was reminded to place
the free-standing chemical containers
near the HDD equipment to drip tray
to prevent land contamination.
- The Contractor was reminded to
provide drip tray to free-standing
chemical at Ha So Pai to prevent land
contamination. The Contractor was
also reminded the storage of chemical
should be located at Cheung Chau
Site.
The free-standing chemical container
near the HDD equipment has been
removed from site.
To be follow-up in next inspection
8 April 2015 - The Contractor was reminded to better
cover the dusty stockpile with
impervious sheet to reduce dust
generation.
- The Contractor was reminded to
provide drip tray to free-standing
chemical at Ha So Pai to prevent land
contamination. The Contractor was
also reminded the storage of chemical
should be located at Cheung Chau
Site.
The dusty stockpile has been well
covered with tarpaulin sheet.
To be follow-up in next inspection
14 April 2015 - The Contractor was reminded to
provide drip tray to free-standing
chemical at Ha So Pai to prevent land
contamination. The Contractor was
also reminded the storage of chemical
should be located at Cheung Chau
Site.
To be follow-up in next inspection
Contract No. 1/WSD/13 - Improvement of Fresh Water Supply to Cheung Chau
Quarterly Environmental Monitoring and Audit (EM&A) Report (No.5) –
April to June 2015 AUES
Z:\Jobs\2013\TCS00684(1-WSD-13)\600\Quanterly Report\No.5 - Apr to Jun 15\R00146v2.doc 13
Action-United Environmental Services and Consulting
21 April 2015 - The Contractor was reminded to cover
the empty chemical containers with
impervious sheet to prevent
contamination of rainwater runoff.
- The Contractor was reminded to
provide drip tray to free-standing
chemical at Ha So Pai to prevent land
contamination. The Contractor was
also reminded the storage of chemical
should be located at Cheung Chau
Site.
The empty chemical containers were
removed from site.
Drip tray was provided for the
free-standing chemical at Ha So Pai.
The Contractor was reminded the
storage of chemical should be located
at Cheung Chau Site.
28 April 2015 - The Contractor was reminded to check
the WetSep system regularly to ensure
all the runoff water collected is
well-treated before discharge from site
during wet season.
NA
5 May 2015 - No environmental issue was observed
during the site inspection.
NA
12 May 2015 - The Contractor was reminded to place
the chemical waste container into the
designated chemical storage area with
drip tray provided to prevent land
contamination.
To To be follow up in next inspection.
22 May 2015 - No temporary platform was observed
underneath the machineries at Ha So
Po. The Contractor should provide a
temporary platform to minimise the
footprint on the rocky shore.
- The silt curtain at Ha So Pai was
displaced due to adverse weather
condition. The Contractor was
reminded to repair the silt curtain to
maintain its function.
- The Contractor was reminded to place
the chemical waste container into the
designated chemical storage area with
drip tray provided to prevent land
contamination.
To be follow up in next inspection.
26 May 2015 - No temporary platform was observed
underneath the machineries at Ha So
Po. The Contractor should provide a
temporary platform to minimise the
footprint on the rocky shore.
- The Contractor should place the
chemical waste container into the
designated chemical storage area with
drip tray provided to prevent land
contamination.
- The silt curtain at Ha So Pai was
displaced due to adverse weather
condition. The Contractor was
reminded to repair the silt curtain to
To be follow up in next reporting
period.
Contract No. 1/WSD/13 - Improvement of Fresh Water Supply to Cheung Chau
Quarterly Environmental Monitoring and Audit (EM&A) Report (No.5) –
April to June 2015 AUES
Z:\Jobs\2013\TCS00684(1-WSD-13)\600\Quanterly Report\No.5 - Apr to Jun 15\R00146v2.doc 14
Action-United Environmental Services and Consulting
maintain its function.
3 June 2015 Observation:
- The Contractor should place the
chemical waste container into the
designated chemical storage area with
drip tray provided to prevent land
contamination. (12 May 2015)
- No temporary platform was observed
underneath the machineries at Ha So
Po. The Contractor should provide a
temporary platform to minimise the
footprint on the rocky shore. (22 May
2015)
- The silt curtain at Ha So Pai was
displaced due to adverse weather
condition. The Contractor was
reminded to repair the silt curtain to
maintain its function. (22 May 2015)
Reminder:
- The Contractor was reminded to repair
the damaged soft pipe at the sump pit
to ensure no overflow from the sump
pit and all the site runoff are treated by
the WetSep prior discharging into the
marine water.
To be follow up in next inspection.
To be follow up in next inspection.
To be follow up in next inspection.
The soft pipe has been repaired.
9 June 2015 Observation:
- The Contractor should place the
chemical waste container into the
designated chemical storage area with
drip tray provided to prevent land
contamination. (12 May 2015)
- No temporary platform was observed
underneath the machineries at Ha So
Po. The Contractor should provide a
temporary platform to minimise the
footprint on the rocky shore. (22 May
2015)
- The silt curtain at Ha So Pai was
displaced due to adverse weather
condition. The Contractor was
reminded to repair the silt curtain to
maintain its function. (22 May 2015)
To be follow up in next inspection.
To be follow up in next inspection.
To be follow up in next inspection.
18 June 2015 Observation:
- The Contractor should place the
chemical waste container into the
designated chemical storage area with
drip tray provided to prevent land
contamination. (12 May 2015)
- No temporary platform was observed
underneath the machineries at Ha So
Po. The Contractor should provide a
temporary platform to minimise the
The chemical waste containers have
been removed from site.
Temporary steel platform was
provided at Ha So Pai. However, the
Contractor was reminded to provide a
Contract No. 1/WSD/13 - Improvement of Fresh Water Supply to Cheung Chau
Quarterly Environmental Monitoring and Audit (EM&A) Report (No.5) –
April to June 2015 AUES
Z:\Jobs\2013\TCS00684(1-WSD-13)\600\Quanterly Report\No.5 - Apr to Jun 15\R00146v2.doc 15
Action-United Environmental Services and Consulting
footprint on the rocky shore. (22 May
2015)
- The silt curtain at Ha So Pai was
displaced due to adverse weather
condition. The Contractor was
reminded to repair the silt curtain to
maintain its function. (22 May 2015)
Reminder:
- Free-standing chemical without
secondary containment were observed.
The Contractor was reminded to
provide secondary containment such
as drip tray for the free-standing
chemical to prevent land
contamination.
elevated and dismountable platform
before start of construction work at
Ha So Pai as stipulate in EP condition
3.2.
The silt curtain at Ha So Pai has been
repaired.
The free-standing chemical have been
removed from site.
23 June 2015 - No environmental issue was observed
during the site inspection.
NA
30 June 2015 Reminder:
- The Contractor was reminded to keep
the U-channel clean.
To be follow up in next reporting
period.
Contract No. 1/WSD/13 - Improvement of Fresh Water Supply to Cheung Chau
Quarterly Environmental Monitoring and Audit (EM&A) Report (No.5) –
April to June 2015 AUES
Z:\Jobs\2013\TCS00684(1-WSD-13)\600\Quanterly Report\No.5 - Apr to Jun 15\R00146v2.doc 16
Action-United Environmental Services and Consulting
7.0 ENVIRONMENTAL COMPLAINT AND NON-COMPLIANCE
ENVIRONMENTAL COMPLAINT, SUMMONS AND PROSECUTION
7.1 No environmental complaint, summons and prosecution was received in this reporting period. The
statistical summary table of environmental complaint is presented in Tables 7-1, 7-2 and 7-3.
Table 7-1 Statistical Summary of Environmental Complaints
Reporting Period Environmental Complaint Statistics
Frequency Cumulative Complaint Nature
28 March to December
2014 0 0 NA
January to March 2015 0 0 NA
April 2015 0 0 NA
May 2015 0 0 NA
June 2015 0 0 NA
Table 7-2 Statistical Summary of Environmental Summons
Reporting Period Environmental Summons Statistics
Frequency Cumulative Complaint Nature
28 March to December
2014 0 0 NA
January to March 2015 0 0 NA
April 2015 0 0 NA
May 2015 0 0 NA
June 2015 0 0 NA
Table 7-3 Statistical Summary of Environmental Prosecution
Reporting Period Environmental Prosecution Statistics
Frequency Cumulative Complaint Nature
28 March to December
2014 0 0 NA
January to March 2015 0 0 NA
April 2015 0 0 NA
May 2015 0 0 NA
June 2015 0 0 NA
Contract No. 1/WSD/13 - Improvement of Fresh Water Supply to Cheung Chau
Quarterly Environmental Monitoring and Audit (EM&A) Report (No.5) –
April to June 2015 AUES
Z:\Jobs\2013\TCS00684(1-WSD-13)\600\Quanterly Report\No.5 - Apr to Jun 15\R00146v2.doc 17
Action-United Environmental Services and Consulting
8.0 IMPLEMENTATION STATUS OF MITIGATION MEASURES
GENERAL REQUIREMENTS
8.1 The environmental mitigation measures that recommended in the Implementation Schedule for
Environmental Mitigation Measures (ISEMM) in the approved EM&A Manual covered the issues
of dust, noise, water and waste and they are showed Appendix I.
8.2 CRCPJV had been implementing the required environmental mitigation measures according to the
Environmental Monitoring and Audit Manual subject to the site condition. Environmental
mitigation measures generally implemented by CRCPJV in this Reporting Quarter are summarized
in Table 8-1.
Table 8-1 Environmental Mitigation Measures
Issues Environmental Mitigation Measures
Water Quality Wastewater were appropriately treated by treatment facilities; Drainage channels were provided to convey run-off into the treatment
facilities; and Drainage systems were regularly and adequately maintained.
Air Quality Regular watering to reduce dust emissions from all exposed site surface, particularly during dry weather;
Frequent watering for particularly dusty construction areas and areas close to air sensitive receivers;
Cover all excavated or stockpile of dusty material by impervious sheeting or sprayed with water to maintain the entire surface wet;
Public roads around the site entrance/exit had been kept clean and free from dust; and
Tarpaulin covering of any dusty materials on a vehicle leaving the site.
Noise Good site practices to limit noise emissions at the sources; Use of quite plant and working methods; Use of site hoarding or other mass materials as noise barrier to screen noise
at ground level of NSRs; Use of shrouds/temporary noise barriers to screen noise from relatively
static PMEs; Scheduling of construction works outside school examination period in
critical area; and Alternative use of plant items within one worksite, where practicable.
Waste and
Chemical
Management
Excavated material should be reused on site as far as possible to minimize off-site disposal. Scrap metals or abandoned equipment should be recycled if possible;
Waste arising should be kept to a minimum and be handled, transported and disposed of in a suitable manner;
The Contractor should adopt a trip ticket system for the disposal of C&D materials to any designed public filling facility and/or landfill; and
Chemical waste shall be handled in accordance with the Code of Practice on the Packaging, Handling and Storage of Chemical Wastes.
General The site was generally kept tidy and clean.
Contract No. 1/WSD/13 - Improvement of Fresh Water Supply to Cheung Chau
Quarterly Environmental Monitoring and Audit (EM&A) Report (No.5) –
April to June 2015 AUES
Z:\Jobs\2013\TCS00684(1-WSD-13)\600\Quanterly Report\No.5 - Apr to Jun 15\R00146v2.doc 18
Action-United Environmental Services and Consulting
9.0 CONCLUSIONS AND RECOMMENDATIONS
CONCLUSIONS
9.1 This is 5th quarterly EM&A report presenting the monitoring results and inspection findings for the
Reporting Period from 1 April 2015 to 30 June 2015.
9.2 No noise complaint (which is an Action Level exceedance) was received and no construction noise
measurement results that exceeded the Limit Level were recorded in the Reporting Quarter. No
NOEs or the associated corrective actions were therefore issued.
9.3 In this Reporting Quarter, no Action/Limit Level exceedance for marine water quality sampling
was recorded.
9.4 No documented complaint, notification of summons or successful prosecution was received by the
Project.
9.5 The ET had carried out site inspection on 8, 14, 21, and 28 April 2015; 5, 12, 22, and 26 May
2015; and 3, 9, 18, 23 and 30 June 2015 with the Representatives of the Engineer and the
Contractor. Furthermore, joint site inspection with IEC also undertaken on 21 April 2015, 22
May 2015 and 18 June 2015. No non-compliance was noted; however minor deficiencies were
observed during site inspection. The deficiencies has rectified within the specified deadlines.
The environmental performance of the Project was therefore considered satisfactory.
RECOMMENDATIONS
9.6 As the wet season has come, muddy water or other water pollutants from sites surface flowing to
sea water bodies or public area will be a key environment issue. Hence, water quality mitigation
measures to prevent surface runoff into nearby water bodies or public areas should be paid special
attention to. Moreover, noise mitigation measures should be properly maintained to prevent
construction noise from impacting the surrounding residents.
9.7 To control the site performance on waste management, the CRCPJV shall ensure that all solid and
liquid waste management works are fully in compliance with the relevant license/permit
requirements, such as the effluent discharge licence and the chemical waste producer registration.
CRCPJV is also reminded to implement the recommended environmental mitigation measures
according to the Environmental Monitoring and Audit Manual.
9.8 Baseline monitoring of noise and water quality was conducted during typical Hong Kong dry
season (November to April next the year). It is important that influence of the seasonal changes
is taken into account when interpreting monitoring data of all environmental issues obtained in the
coming rainy season. Review of the baseline conditions may need to be conducted regularly in
particular during times of seasonal changes. If the baseline changes are evident, the
environmental performance criteria should be re-established under agreement of the ER and IEC
and submitted to the EPD for endorsement.
Contract No. 1/WSD/13 - Improvement of Fresh Water Supply to Cheung Chau
Quarterly Environmental Monitoring and Audit (EM&A) Report (No.5) –
April to June 2015 AUES
Z:\Jobs\2013\TCS00684(1-WSD-13)\600\Quanterly Report\No.5 - Apr to Jun 15\R00146v2.doc Action-United Environmental Services and Consulting
Appendix A
Project Site Layout Plan
Contract No. 1/WSD/13 - Improvement of Fresh Water Supply to Cheung Chau
Quarterly Environmental Monitoring and Audit (EM&A) Report (No.5) –
April to June 2015 AUES
Z:\Jobs\2013\TCS00684(1-WSD-13)\600\Quanterly Report\No.5 - Apr to Jun 15\R00146v2.doc Action-United Environmental Services and Consulting
Appendix B
Organization Structure and Contact Details of Relevant Parties
Contract No. 1/WSD/13 - Improvement of Fresh Water Supply to Cheung Chau
Quarterly Environmental Monitoring and Audit (EM&A) Report (No.5) –
April to June 2015 AUES
Z:\Jobs\2013\TCS00684(1-WSD-13)\600\Quanterly Report\No.5 - Apr to Jun 15\R00146v2.doc Action-United Environmental Services and Consulting
Environmental Management Organization
Authority of Environmental
Protection
EPD
Independent Environmental
Checker
SMEC
Vivian Chan
Employer / Environmental Permit
Holder
WSD
The Engineer Representative
B&V
Ernest Chan
Environmental Team (the ET)
Environmental Team Leader
AUES
T.W. Tam
Environmental Consultant
AUES
Ben Tam
Environmental Officer
CRCP
Nash Wong
Project Manager
CRCP
Raymond Mau
Assistant Environmental
Officer
CRCP
Site Agent
CRCP
Gordon Ng
Environmental Consultant
AUES
Nicola Hon
Project Director
CRCP
Wang Yan Hua
Environmental Supervisor
CRCP
Wen Xu
Contract No. 1/WSD/13 - Improvement of Fresh Water Supply to Cheung Chau
Quarterly Environmental Monitoring and Audit (EM&A) Report (No.5) –
April to June 2015 AUES
Z:\Jobs\2013\TCS00684(1-WSD-13)\600\Quanterly Report\No.5 - Apr to Jun 15\R00146v2.doc Action-United Environmental Services and Consulting
Contact Details of Key Personnel
Organization Project Role Name of Key Staff Tel No. Fax No.
B&V Engineer’s Representative Ernest Chan 2981 1149 3485 4114
SMEC Independent Environmental
Checker Vivian Chan 3995 8120 3995 8101
CRCP Project Director Wang Yan Hua 2981 1686 2981 1689
CRCP Site Agent Gordon Ng 2981 1686 2981 1689
CRCP Environmental Officer Nash Wong 2981 1686 2981 1689
CRCP Environmental Supervisor Wen Xu 2981 1686 2981 1689
AUES Environmental Team Leader T. W. Tam 2959 6059 2959 6079
AUES Environmental Consultant Nicola Hon 2959 6059 2959 6079
AUES Environmental Consultant Ben Tam 2959 6059 2959 6079
AUES Assistant Environmental
Consultant Martin Li 2959 6059 2959 6079
General Enquiries Hotline: 56958167
Legend:
WSD (Employer) –Water Supplies Department
B&V (Engineer) – Black & Veatch Hong Kong Limited
CRCP (Main Contractor) – China Road – China Pipeline JV
SMEC (IEC) – SMEC Asia Limited
AUES (ET) – Action-United Environmental Services & Consulting
Contract No. 1/WSD/13 - Improvement of Fresh Water Supply to Cheung Chau
Quarterly Environmental Monitoring and Audit (EM&A) Report (No.5) –
April to June 2015 AUES
Z:\Jobs\2013\TCS00684(1-WSD-13)\600\Quanterly Report\No.5 - Apr to Jun 15\R00146v2.doc Action-United Environmental Services and Consulting
Appendix C
Master and Three Months Rolling Construction Programs
Act
ivity
IDD
escr
iptio
nC
alen
dar
Ear
lyS
tart
Late
Sta
rtO
rigin
alD
urat
ion
Ear
lyFi
nish
Late
Fini
shO
CT20
13 N20
14D
2015
J20
16F
2017
MA
MJ
JA
SO
ND
JF
MA
MJ
JA
SO
ND
JF
MA
MJ
JA
SO
ND
JF
MA
MJ
Gen
eral
Pro
vis
ion
s
GE
P00
0300
Tem
p ac
com
m fo
r PM
, Sup
ervi
sor &
Con
tract
orC
al_1
24O
CT
13 A
24O
CT
13 A
1095
23O
CT
1623
OC
T16
GE
P00
0400
Com
pute
r fac
ilitie
s fo
r PM
& S
uper
viso
rC
al_1
24O
CT
13 A
24O
CT
13 A
1095
23O
CT
1623
OC
T16
GE
P00
0500
Mar
ine
trans
port
for P
M &
Sup
ervi
sor
Cal
_124
OC
T13
A24
OC
T13
A10
9523
OC
T16
23O
CT
16
GE
P00
0600
Site
sta
ff/ho
tline
/tem
p fa
cilit
ies/
site
cle
anC
al_1
24O
CT
13 A
24O
CT
13 A
1095
23O
CT
1623
OC
T16
GE
P00
0700
Pro
visi
on o
f uni
form
Cal
_128
FEB
14 A
28FE
B14
A10
9523
OC
T16
23O
CT
16
Maj
or
Su
bm
issi
on
s
MJS
0003
00Te
mp
exit
pit M
TS
- ap
prov
alC
al_1
029
JUN
1507
JUL1
5
MJS
0006
50H
DD
MS
of p
ipe
inst
alla
tion
- app
rova
lC
al_1
029
JUN
1505
SE
P15
MJS
0006
70H
DD
MS
of A
RO
for M
S p
ipe
- app
rova
lC
al_1
029
JUN
1502
JUL1
5
MJS
0006
90H
DD
MS
of c
atho
dic
prot
ect f
or M
S p
ipe
-app
rova
lC
al_1
006
JUL1
509
JUL1
5
MJS
0007
30M
S o
f cle
anin
g an
d te
st o
n w
ater
mai
n - a
ppro
val
Cal
_10
06JU
L15
19D
EC
15
MJS
0007
65H
DD
MS
of g
roun
d tre
atm
ent -
app
rova
lC
al_1
029
JUN
1504
AU
G15
Maj
or
Su
ble
ttin
g
MS
L001
800
MS
Pip
e an
d jo
int t
estin
g - a
war
dC
al_1
30JU
N15
22A
UG
150
MS
L001
900
MS
Pip
e an
d jo
int t
estin
g - a
ppro
val
Cal
_10
13JU
L15
05S
EP
15
Maj
or
Ov
erse
as P
rocu
rem
ent
MO
P00
1440
MS
pip
e &
fitti
ng m
anuf
& d
elv
Cal
_130
JUN
1508
AU
G15
7007
SE
P15
17O
CT
15
MO
P00
1500
MS
pip
e &
fitti
ngs
sam
plin
g &
test
Cal
_10
07S
EP
1517
OC
T15
MO
P00
2000
Pip
e th
rust
erC
al_1
029
JUN
1508
AU
G15
Gen
eral
Saf
ety
& E
nv
iro
nm
enta
l Pro
vis
ion
s
SS
E00
0100
Impl
emen
t saf
ety
prov
isio
ns (S
SE
MC
end
of @
mth
)C
al_1
24O
CT
13 A
24O
CT
13 A
1096
23O
CT
1623
OC
T16
SS
E00
0200
Impl
emen
t env
iro p
rovi
sion
s (S
SE
MC
end
of @
mth
)C
al_1
24O
CT
13 A
24O
CT
13 A
1096
23O
CT
1623
OC
T16
Sec
1 P
ort
ion
D S
ite
Pre
par
atio
n
SE
1100
300
Form
tem
p ex
it pi
tC
al_2
19A
UG
1526
AU
G15
3023
SE
P15
03O
CT
15
SE
1100
500
Fixi
ng th
e dr
agin
g m
achi
neC
al_2
19A
UG
1526
AU
G15
727
AU
G15
03S
EP
15
Sec
1 H
DD
Wo
rks
SE
1201
500
2nd
shot
- ho
le o
peni
ng to
28"
by
FRC
al_2
09M
AR
15 A
09M
AR
15 A
161
26A
UG
1527
AU
G15
SE
1201
700
Bor
e ho
le c
lean
ing
Cal
_225
AU
G15
26A
UG
156
01S
EP
1502
SE
P15
SE
1201
800
Set
up
wel
ding
sta
tion
Cal
_225
AU
G15
26A
UG
157
03S
EP
1503
SE
P15
�������������� ������������������
��������������������� ������������
������������������ ������������
�����������������������������������������
��������������
��������������
������������
���� �����������������������������
���� ���� !
��� ����������������
���� �������"������������ ���������������
����������#���"��������$������������������
���� ���#���"��������������������
���������"�%����������#����$��"
���������"�%����������#����������
��������������#��������"���
��������������#���������#�������
�������������
&�������������'����������(��)
����"�
&������������������������(��)
����"�
,����������������
,����#�����"��#��#��������
-�"����������������#���-./�0'�,
1��������������#
�������$��"��#�������
Sta
rt d
ate
23O
CT
13Fi
nis
h d
ate
23O
CT
16D
ata
dat
e30
JUN
15R
un
dat
e02
JUL
15P
age
nu
mb
er
1Ac
Pri
mav
era
Sys
tem
s, I
nc.
Con
trac
t N
o. 1
/WS
D/1
3Im
prov
emen
t of
Fre
sh W
ater
Sup
ply
to
Che
ung
Cha
u
CR
BC
-CP
P J
V3
MR
P����������� ����������������������������
File
: A05
2
Earl
y b
arTa
rge
t b
arP
rog
res
s b
arS
tart
mile
sto
ne
po
int
Fin
ish
mile
sto
ne
po
in
Act
ivity
IDD
escr
iptio
nC
alen
dar
Ear
lyS
tart
Late
Sta
rtO
rigin
alD
urat
ion
Ear
lyFi
nish
Late
Fini
shO
CT20
13 N20
14D
2015
J20
16F
2017
MA
MJ
JA
SO
ND
JF
MA
MJ
JA
SO
ND
JF
MA
MJ
JA
SO
ND
JF
MA
MJ
SE
1202
000
Set
up
drag
ing
mac
hine
at P
ortio
n D
Cal
_225
AU
G15
26A
UG
157
03S
EP
1503
SE
P15
SE
1202
100
Pus
hing
sta
tion
T&
CC
al_2
03S
EP
1503
SE
P15
205
SE
P15
05S
EP
15
SE
1202
300
Sub
mar
ine
stee
l pip
e pu
shin
gC
al_2
05S
EP
1505
SE
P15
8518
DE
C15
19D
EC
15
Sec
1 E
xcav
atio
n P
erm
it &
TTA
SE
1300
110
Tra
ffic
engg
ser
vice
sC
al_1
09D
EC
13 A
09D
EC
13 A
470
13JU
L15
23O
CT
16
SE
1300
910
Impl
emen
t pha
se 1
to p
hase
10
TT
M (P
ortio
n G
)C
al_1
30JU
L14
A30
JUL1
4 A
313
13JU
L15
23JU
L15
SE
1301
910
Impl
emen
t pha
se 1
1 an
d 12
TT
M (P
ortio
n F)
Cal
_129
DE
C14
A29
DE
C14
A95
13JU
L15
29FE
B16
Sec
1 M
ain
Lay
ing
on
Ch
eun
g C
hau
SE
1401
000
Land
mai
ns in
pha
se 1
0 (L
=6m
)C
al_2
20M
AR
15 A
20M
AR
15 A
709
JUL1
511
JUL1
5
SE
1401
200
Land
mai
ns in
pha
se 1
2 (P
ortio
n F)
Cal
_227
FEB
15 A
27FE
B15
A25
13JU
L15
26FE
B16
Sec
2 L
ands
capi
ngS
E20
0005
0T
ree
pres
erv,
prot
ect &
sur
vey
Cal
_124
OC
T13
A24
OC
T13
A72
923
OC
T15
23O
CT
15
�������"��#��#�������������������
������#����������� ��
0������������������������#
��������##���������
&���������������2���������23��� �(������4+
&���������������22���"�2-��� �(������,+
5��"���������������23�(567�+
5��"���������������2-�(������,+
����������������������������'
Sta
rt d
ate
23O
CT
13Fi
nis
h d
ate
23O
CT
16D
ata
dat
e30
JUN
15R
un
dat
e02
JUL
15P
age
nu
mb
er
2Ac
Pri
mav
era
Sys
tem
s, I
nc.
Con
trac
t N
o. 1
/WS
D/1
3Im
prov
emen
t of
Fre
sh W
ater
Sup
ply
to
Che
ung
Cha
u
CR
BC
-CP
P J
V3
MR
P����������� ����������������������������
File
: A05
2
Earl
y b
arTa
rge
t b
arP
rog
res
s b
arS
tart
mile
sto
ne
po
int
Fin
ish
mile
sto
ne
po
in
Contract No. 1/WSD/13 - Improvement of Fresh Water Supply to Cheung Chau
Quarterly Environmental Monitoring and Audit (EM&A) Report (No.5) –
April to June 2015 AUES
Z:\Jobs\2013\TCS00684(1-WSD-13)\600\Quanterly Report\No.5 - Apr to Jun 15\R00146v2.doc Action-United Environmental Services and Consulting
Appendix D
Monitoring Locations Designated in the EM&A Manual
Contract No. 1/WSD/13 - Improvement of Fresh Water Supply to Cheung Chau Baseline Monitoring Report AUES
Z:\Jobs\2013\TCS00684(1-WSD-13)\600\Baseline Report\R0014 rev3.doc Action-United Environmental Services and Consulting
Photo�1:�View�from�the�light�pole�(proposed�N1a)�to�the�NSR�N1.
Photo�2:�View�from�the�light�pole�(proposed�N1a)�to�the�construction�site
Contract No. 1/WSD/13 - Improvement of Fresh Water Supply to Cheung Chau
Quarterly Environmental Monitoring and Audit (EM&A) Report (No.5) –
April to June 2015 AUES
Z:\Jobs\2013\TCS00684(1-WSD-13)\600\Quanterly Report\No.5 - Apr to Jun 15\R00146v2.doc Action-United Environmental Services and Consulting
Appendix E
Event and Action Plan
Agr
eem
ent N
o. C
E 1
/200
8 (W
S)
EM
&A
Man
ual
Impr
ovem
ent o
f Fre
sh W
ater
Sup
ply
to C
heun
g C
hau
Fin
al- I
nves
tigat
ion
2831
/B&
V/0
20/I
ssue
3
Janu
ary
2010
[283
1_EM
&A_
chap
2_v3
_jan
10.d
oc]
2-10
B&
V
Tab
le 2
.6
Eve
nt a
nd A
ctio
n Pl
an fo
r W
ater
Qua
lity
Eve
ntE
T L
eade
rIE
CE
RC
ontr
acto
r
Act
ion
Leve
l be
ing
exce
eded
by
one
sa
mpl
ing
day
1.R
epea
t in-
site
mea
sure
men
t to
conf
irm fi
ndin
gs.
2.Id
entif
y so
urce
(s) o
f im
pact
. 3.
Info
rm IE
C a
nd C
ontra
ctor
. 4.
Che
ck m
onito
ring
data
, all
plan
t, eq
uipm
ent a
nd
Con
tract
or’s
wor
king
met
hods
. 5.
Dis
cuss
miti
gatio
n m
easu
res w
ith IE
C a
nd
Con
tract
or.
6.R
epea
t mea
sure
men
t on
next
day
of e
xcee
danc
e.
1.D
iscu
ss w
ith E
T an
d C
ontra
ctor
on
the
miti
gatio
n m
easu
res.
2.R
evie
w p
ropo
sals
on
miti
gatio
n m
easu
res.
subm
itted
by
Con
tract
or a
nd
advi
se th
e ER
acc
ordi
ngly
. 3.
Ass
ess t
he e
ffec
tiven
ess o
f the
im
plem
ente
d m
itiga
tion
mea
sure
s.
1.D
iscu
ss w
ith IE
C o
n th
e pr
opos
ed m
itiga
tion
mea
sure
s. 2.
Mak
e ag
reem
ent o
n th
e m
itiga
tion
mea
sure
s to
be
impl
emen
ted.
3.
Ass
ess e
ffec
tiven
ess o
f the
impl
emen
ted
miti
gatio
n m
easu
res.
1.In
form
the
ER a
nd c
onfir
m n
otifi
catio
n of
the
non-
com
plia
nce
in w
ritin
g.
2.R
ectif
y un
acce
ptab
le p
ract
ice.
3.
Che
ck a
ll pl
ant a
nd e
quip
men
t. 4.
Con
side
r cha
nges
of w
orki
ng m
etho
ds.
5.D
iscu
ss w
ith E
T an
d IE
C a
nd p
ropo
se m
itiga
tion
mea
sure
s to
IEC
and
ER
. 6.
Impl
emen
t the
agr
eed
miti
gatio
n m
easu
res.
Act
ion
Leve
l be
ing
exce
eded
by
mor
e th
an
one
cons
ecut
ive
sam
plin
g da
ys
1.R
epea
t in-
situ
mea
sure
men
t to
conf
irm fi
ndin
gs;
2.Id
entif
y so
urce
(s) o
f im
pact
. 3.
Info
rm IE
C a
nd C
ontra
ctor
. 4.
Che
ck m
onito
ring
data
, all
plan
t, eq
uipm
ent a
nd
Con
tract
or’s
wor
king
met
hods
. 5.
Dis
cuss
miti
gatio
n m
easu
res w
ith IE
C a
nd
Con
tract
or.
6.En
sure
miti
gatio
n m
easu
res a
re im
plem
ente
d.
7.Pr
epar
e to
incr
ease
the
mon
itorin
g fr
eque
ncy
to
daily
.8.
Rep
eat m
easu
rem
ent o
n ne
xt d
ay o
f exc
eeda
nce.
1.D
iscu
ss w
ith E
T an
d C
ontra
ctor
on
the
miti
gatio
n m
easu
res.
2.R
evie
w p
ropo
sals
on
miti
gatio
n m
easu
res
subm
itted
by
Con
tract
or a
nd
advi
se th
e ER
acc
ordi
ngly
. 3.
Ass
ess t
he e
ffec
tiven
ess o
f the
im
plem
ente
d m
itiga
tion
mea
sure
s.
1.D
iscu
ss w
ith IE
C o
n th
e pr
opos
ed m
itiga
tion
mea
sure
s. 2.
Mak
e ag
reem
ent o
n th
e m
itiga
tion
mea
sure
s to
be
impl
emen
ted.
3.
Ass
ess t
he e
ffec
tiven
ess o
f the
impl
emen
ted
miti
gatio
n m
easu
res.
1.In
form
the
ER a
nd c
onfir
m n
otifi
catio
n of
the
non-
com
plia
nce
in w
ritin
g.
2.R
ectif
y un
acce
ptab
le p
ract
ice.
3.
Che
ck a
ll pl
ant a
nd e
quip
men
t. 4.
Con
side
r cha
nges
of w
orki
ng m
etho
ds.
5.D
iscu
ss w
ith E
T an
d IE
C a
nd p
ropo
se m
itiga
tion
mea
sure
s to
IEC
and
ER
with
in 3
wor
king
day
s. 6.
Impl
emen
t the
agr
eed
miti
gatio
n m
easu
res.
Lim
it Le
vel
bein
g ex
ceed
ed
by o
ne
sam
plin
g da
y
1.R
epea
t in-
situ
mea
sure
men
t to
conf
irm fi
ndin
gs.
2.Id
entif
y so
urce
(s) o
f im
pact
. 3.
Info
rm IE
C, c
ontra
ctor
, AFC
D a
nd E
PD.
4.C
heck
mon
itorin
g da
ta, a
ll pl
ant,
equi
pmen
t and
C
ontra
ctor
’s w
orki
ng m
etho
ds.
5.D
iscu
ss m
itiga
tion
mea
sure
s with
IEC
, ER
and
C
ontra
ctor
.6.
Ensu
re m
itiga
tion
mea
sure
s are
impl
emen
ted;
7.
Incr
ease
the
mon
itorin
g fr
eque
ncy
to d
aily
unt
il no
ex
ceed
ance
of L
imit
Leve
l.
1.D
iscu
ss w
ith E
T an
d C
ontra
ctor
on
the
miti
gatio
n m
easu
res.
2.R
evie
w p
ropo
sals
on
miti
gatio
n m
easu
res
subm
itted
by
Con
tract
or a
nd
advi
se th
e ER
acc
ordi
ngly
. 3.
Ass
ess t
he e
ffec
tiven
ess o
f the
im
plem
ente
d m
itiga
tion
mea
sure
s.
1.D
iscu
ss w
ith IE
C, E
T an
d C
ontra
ctor
on
the
prop
osed
miti
gatio
n m
easu
res.
2.R
eque
st C
ontra
ct to
crit
ical
ly re
view
the
wor
king
m
etho
ds.
3.M
ake
agre
emen
t on
the
miti
gatio
n m
easu
res t
o be
im
plem
ente
d.
4.A
sses
s the
eff
ectiv
enes
s of t
he im
plem
ente
d m
itiga
tion
mea
sure
s.
1.In
form
the
ER a
nd c
onfir
m n
otifi
catio
n of
the
non-
com
plia
nce
in w
ritin
g.
2.R
ectif
y un
acce
ptab
le p
ract
ice.
3.
Che
ck a
ll pl
ant a
nd e
quip
men
t. 4.
Con
side
r cha
nges
of w
orki
ng m
etho
ds.
5.D
iscu
ss w
ith E
T, IE
C a
nd E
R a
nd p
ropo
se
miti
gatio
n m
easu
res t
o IE
C a
nd E
R w
ithin
3
wor
king
day
s. 6.
Impl
emen
t the
agr
eed
miti
gatio
n m
easu
res.
Agr
eem
ent N
o. C
E 1
/200
8 (W
S)
EM
&A
Man
ual
Impr
ovem
ent o
f Fre
sh W
ater
Sup
ply
to C
heun
g C
hau
Fin
al- I
nves
tigat
ion
2831
/B&
V/0
20/I
ssue
3
Janu
ary
2010
[283
1_EM
&A_
chap
2_v3
_jan
10.d
oc]
2-11
B&
V
Eve
ntE
T L
eade
rIE
CE
RC
ontr
acto
r
Lim
it Le
vel
bein
g ex
ceed
ed
by m
ore
than
on
e co
nsec
utiv
e sa
mpl
ing
days
1.R
epea
t in-
situ
mea
sure
men
t to
conf
irm fi
ndin
gs.
2.Id
entif
y so
urce
(s) o
f im
pact
. 3.
Info
rm IE
C, c
ontra
ctor
, AFC
D a
nd E
PD.
4.C
heck
mon
itorin
g da
ta, a
ll pl
ant,
equi
pmen
t and
C
ontra
ctor
’s w
orki
ng m
etho
ds.
5.D
iscu
ss m
itiga
tion
mea
sure
s with
IEC
, ER
and
C
ontra
ctor
.6.
Ensu
re m
itiga
tion
mea
sure
s are
impl
emen
ted.
7.
Incr
ease
the
mon
itorin
g fr
eque
ncy
to d
aily
unt
il no
ex
ceed
ance
of L
imit
Leve
l for
two
cons
ecut
ive
days
.
1.D
iscu
ss w
ith E
T an
d C
ontra
ctor
on
the
miti
gatio
n m
easu
res.
2.R
evie
w p
ropo
sals
on
miti
gatio
n m
easu
res
subm
itted
by
Con
tract
or a
nd
advi
se th
e ER
acc
ordi
ngly
. 3.
Ass
ess t
he e
ffec
tiven
ess o
f the
im
plem
ente
d m
itiga
tion
mea
sure
s.
1.D
iscu
ss w
ith IE
C, E
T an
d C
ontra
ctor
on
the
prop
osed
miti
gatio
n m
easu
res.
2.R
eque
st C
ontra
ctor
to c
ritic
ally
revi
ew th
e w
orki
ng m
etho
ds.
3.M
ake
agre
emen
t on
the
miti
gatio
n m
easu
res t
o be
im
plem
ente
d.
4.A
sses
s the
eff
ectiv
enes
s of t
he im
plem
ente
d m
itiga
tion
mea
sure
s. 5.
Con
side
r and
inst
ruct
, if n
eces
sary
, the
Con
tract
or
to sl
ow d
own
or to
stop
all
or p
art o
f the
wor
k un
til n
o ex
ceed
ance
of L
imit
Leve
l.
1.In
form
the
ER a
nd c
onfir
m n
otifi
catio
n of
the
non-
com
plia
nce
in w
ritin
g.
2.R
ectif
y un
acce
ptab
le p
ract
ice.
3.
Che
ck a
ll pl
ant a
nd e
quip
men
t. 4.
Con
side
r cha
nges
of w
orki
ng m
etho
ds.
5.D
iscu
ss w
ith E
T, IE
C a
nd E
R a
nd p
ropo
se
miti
gatio
n m
easu
res t
o IE
C a
nd E
R w
ithin
3
wor
king
day
s. 6.
Impl
emen
t the
agr
eed
miti
gatio
n m
easu
res.
7.A
s dire
cted
by
the
ER, t
o sl
ow d
own
or to
stop
all
or p
art o
f the
wor
k or
con
stru
ctio
n ac
tiviti
es.
Agre
emen
t No.
CE
1/20
08 (W
S)
EM
&A
Man
ual
Impr
ovem
ent o
f Fre
sh W
ater
Sup
ply
to C
heun
g Ch
au
Fina
l - I
nves
tigat
ion
2831
/B&
V/02
0/Is
sue
3 Ja
nuar
y 20
10 [2
831_EM
&A_chap6_v3_jan10.doc]
6-5
B&V
Tab
le 6
.3
Eve
nt/A
ctio
n Pl
an fo
r C
onst
ruct
ion
Noi
se M
onito
ring
A
CTI
ON
EV
ENT
ET L
eade
r IE
C
ER
C
ontr
acto
r A
ctio
n Le
vel
1.
Not
ify IE
C, C
ontra
ctor
and
ER
2.
C
arry
ou
t in
vest
igat
ion
and
iden
tify
sour
ce
3.
Rep
ort t
he re
sults
of i
nves
tigat
ion
to th
e IE
C, C
ontra
ctor
and
ER
4.
D
iscu
ss
with
th
e C
ontra
ctor
an
d fo
rmul
ate
rem
edia
l mea
sure
s 5.
In
crea
se m
onito
ring
freq
uenc
y 6.
C
heck
co
mpl
ianc
e to
A
ctio
n/Li
mit
Leve
ls a
fter
appl
icat
ion
of m
itiga
tion
mea
sure
s
1.
Rev
iew
th
e an
alys
ed
resu
lts
subm
itted
by
the
ET L
eade
r 2.
R
evie
w t
he p
ropo
sed
rem
edia
l m
easu
res
by th
e C
ontra
ctor
and
ad
vise
th
e ER
&
ET
ac
cord
ingl
y 3.
Su
perv
ise
the
impl
emen
tatio
n of
rem
edia
l mea
sure
s
1.
Con
firm
rec
eipt
of
notif
icat
ion
of
com
plai
nt in
writ
ing
2.
Not
ify C
ontra
ctor
3.
C
heck
mon
itorin
g da
ta s
ubm
itted
by
the
ET
4.
Req
uire
C
ontra
ctor
to
pr
opos
e re
med
ial m
easu
res
for
the
anal
ysed
no
ise
prob
lem
5.
En
sure
re
med
ial
mea
sure
s ar
e pr
oper
ly im
plem
ente
d
1.
Sub
mit
nois
e m
itiga
tion
prop
osal
s to
ER a
nd I
EC w
ithin
thr
ee w
orki
ng
days
of n
otifi
catio
n 2.
Li
aise
with
the
ER
to
ensu
re t
he
effe
ctiv
enes
s of
th
e ag
reed
m
itiga
tion
3.
Am
end
prop
osal
if re
quire
d 4.
Im
plem
ent
nois
e m
itiga
tion
prop
osal
s
Lim
it Le
vel
1.
Not
ify IE
C, E
R, E
PD a
nd C
ontra
ctor
2.
Id
entif
y So
urce
3.
R
epea
t m
easu
rem
ent
to
conf
irm
findi
ngs
4.
Incr
ease
mon
itorin
g fr
eque
ncy
5.
Car
ry
out
anal
ysis
of
C
ontra
ctor
’s
wor
king
pr
oced
ures
to
de
term
ine
poss
ible
miti
gatio
n to
be
impl
emen
ted
6.
Info
rm I
EC, E
R a
nd E
PD th
e ca
uses
&
actio
ns ta
ken
for t
he e
xcee
danc
es
7.
Ass
ess
effe
ctiv
enes
s of
C
ontra
ctor
’s
rem
edia
l ac
tions
and
kee
p IE
C,
EPD
an
d ER
info
rmed
of t
he re
sults
8.
If
exc
eeda
nce
stop
s, ce
ase
addi
tiona
l m
onito
ring
1.
Che
ck
mon
itorin
g da
ta
subm
itted
by
ET
2.
Dis
cuss
am
ongs
t ER
, ET
Le
ader
and
Con
tract
or o
n th
e po
tent
ial r
emed
ial a
ctio
ns
3.
Rev
iew
Con
tract
or’s
rem
edia
l ac
tions
whe
neve
r ne
cess
ary
to
assu
re t
heir
effe
ctiv
enes
s an
d ad
vise
th
e ER
&
ET
ac
cord
ingl
y 4.
Su
perv
ise
the
impl
emen
tatio
n of
rem
edia
l mea
sure
s
1.
Con
firm
rec
eipt
of
notif
icat
ion
of
exce
edan
ce
2.
Not
ify C
ontra
ctor
3.
C
heck
mon
itorin
g da
ta s
ubm
itted
by
the
ET
4.
Req
uire
C
ontra
ctor
to
pr
opos
e re
med
ial m
easu
res
for
the
anal
ysed
no
ise
prob
lem
5.
D
iscu
ss
with
ET
, IE
C
and
Con
tract
or
on
prop
osed
re
med
ial
actio
ns to
be
impl
emen
ted
6.
Ensu
re
rem
edia
l m
easu
res
are
prop
erly
impl
emen
ted
7.
Ass
ess
the
effe
ctiv
enes
s of
th
e re
med
ial
actio
ns
and
keep
th
e C
ontra
ctor
info
rmed
8.
If
exc
eeda
nce
cont
inue
s, co
nsid
er
wha
t po
rtion
of
th
e w
ork
is
resp
onsi
ble
and
inst
ruct
th
e C
ontra
ctor
to
stop
tha
t po
rtion
of
wor
k un
til th
e ex
ceed
ance
is a
bate
d
1.
Take
im
med
iate
ac
tion
to
avoi
d fu
rther
exc
eeda
nce
2.
Subm
it pr
opos
als
for
rem
edia
l ac
tions
to
ER
w
ithin
3
wor
king
da
ys o
f not
ifica
tion
3.
Liai
se w
ith t
he E
R t
o en
sure
the
ef
fect
iven
ess
of
the
agre
ed
miti
gatio
n 4.
A
men
d pr
opos
al if
requ
ired
5.
Impl
emen
t the
agr
eed
prop
osal
s 6.
R
esub
mit
prop
osal
s if
prob
lem
stil
l no
t und
er c
ontro
l 7.
St
op t
he r
elev
ant
porti
on o
f w
orks
as
det
erm
ined
by
the
ER u
ntil
the
exce
edan
ce is
aba
ted
Contract No. 1/WSD/13 - Improvement of Fresh Water Supply to Cheung Chau
Quarterly Environmental Monitoring and Audit (EM&A) Report (No.5) –
April to June 2015 AUES
Z:\Jobs\2013\TCS00684(1-WSD-13)\600\Quanterly Report\No.5 - Apr to Jun 15\R00146v2.doc Action-United Environmental Services and Consulting
Appendix F
Graphical Plots of Impact Monitoring
Contract No. 1/WSD/13 - Improvement of Fresh Water Supply to Cheung Chau
Quarterly Environmental Monitoring and Audit (EM&A) Report (No.5) –
April to June 2015 AUES
Z:\Jobs\2013\TCS00684(1-WSD-13)\600\Quanterly Report\No.5 - Apr to Jun 15\R00146v2.doc Action-United Environmental Services and Consulting
Marine Water Quality – Mid-ebb
Contract No. 1/WSD/13 - Improvement of Fresh Water Supply to Cheung Chau
Quarterly Environmental Monitoring and Audit (EM&A) Report (No.5) –
April to June 2015 AUES
Z:\Jobs\2013\TCS00684(1-WSD-13)\600\Quanterly Report\No.5 - Apr to Jun 15\R00146v2.doc Action-United Environmental Services and Consulting
Contract No. 1/WSD/13 - Improvement of Fresh Water Supply to Cheung Chau
Quarterly Environmental Monitoring and Audit (EM&A) Report (No.5) –
April to June 2015 AUES
Z:\Jobs\2013\TCS00684(1-WSD-13)\600\Quanterly Report\No.5 - Apr to Jun 15\R00146v2.doc Action-United Environmental Services and Consulting
Marine Water Quality – Mid-flood
Contract No. 1/WSD/13 - Improvement of Fresh Water Supply to Cheung Chau
Quarterly Environmental Monitoring and Audit (EM&A) Report (No.5) –
April to June 2015 AUES
Z:\Jobs\2013\TCS00684(1-WSD-13)\600\Quanterly Report\No.5 - Apr to Jun 15\R00146v2.doc Action-United Environmental Services and Consulting
Contract No. 1/WSD/13 - Improvement of Fresh Water Supply to Cheung Chau
Quarterly Environmental Monitoring and Audit (EM&A) Report (No.5) –
April to June 2015 AUES
Z:\Jobs\2013\TCS00684(1-WSD-13)\600\Quanterly Report\No.5 - Apr to Jun 15\R00146v2.doc Action-United Environmental Services and Consulting
Noise
Contract No. 1/WSD/13 - Improvement of Fresh Water Supply to Cheung Chau
Quarterly Environmental Monitoring and Audit (EM&A) Report (No.5) –
April to June 2015 AUES
Z:\Jobs\2013\TCS00684(1-WSD-13)\600\Quanterly Report\No.5 - Apr to Jun 15\R00146v2.doc Action-United Environmental Services and Consulting
Appendix G
Meteorological Data
Contract No. 1/WSD/13 - Improvement of Fresh Water Supply to Cheung Chau
Quarterly Environmental Monitoring and Audit (EM&A) Report (No.5) –
April to June 2015 AUES
Z:\Jobs\2013\TCS00684(1-WSD-13)\600\Quanterly Report\No.5 - Apr to Jun 15\R00146v2.doc Action-United Environmental Services and Consulting
Weather Condition –April 2015
April 2015 was characterized by sunny, warm and relative dry weather, in particular during the
second half of the month. Overall, the total duration of sunshine in April 2015 was 159.2 hours,
57.5 hours above the normal figure of 101.7 hours. The mean temperature of the month was
23.6 degrees, 1.0 degree higher than the normal figure of 22.6 degrees. The monthly mean
relative humidity was 77 percent, the third lowest for April since 1961.
Weather Condition – May 2015
May 2015 was the fourth hottest May since records began in 1884. Its monthly mean
temperature of 27.5 degrees was 1.6 degrees higher than the normal figure of 25.9 degrees.
Affected by active troughs of low pressure in the second half of the month, May 2015 was
actually cloudier than usual and rather rainy as well. Bright sunshine during the month
amounted to 93.5 hours only, about 33 percent below the normal figure of 140.4 hours, the
seventh lowest for May on record. The monthly total rainfall was 513.0 millimetres, a surplus
of 68 percent against the normal figure of 304.7 millimetres. The accumulated rainfall of 679.6
millimetres since 1 January was about 6 percent above the normal figure of 640.8 millimetres for
the same period.
Weather Condition –June 2015
June 2015 was the hottest June in Hong Kong since records began in 1884. The monthly mean
temperature of 29.7 degrees was 1.8 degrees above the normal figure of 27.9 degrees and broke
the previous record of 29.0 degrees set in 2014 by a wide margin of 0.7 degree. Both the
monthly mean minimum temperature of 27.7 degrees and the monthly mean maximum
temperature of 32.3 degrees ranked the highest for June. The extremely hot weather in June
2015 in Hong Kong was partly attributed to the westward extension of the subtropical ridge of
high pressure from the western North Pacific to southern China during the month. The
prevailing southerly flow and the above-normal sea surface temperature over the northern part of
the South China Sea also contributed to the sweltering weather.
*The detailed meterological data for each successive day can be referred to in the Monthly EM&A Reports (April,
May, June 2015).
Contract No. 1/WSD/13 - Improvement of Fresh Water Supply to Cheung Chau
Quarterly Environmental Monitoring and Audit (EM&A) Report (No.5) –
April to June 2015 AUES
Z:\Jobs\2013\TCS00684(1-WSD-13)\600\Quanterly Report\No.5 - Apr to Jun 15\R00146v2.doc Action-United Environmental Services and Consulting
Appendix H
Monthly Summary Waste Flow Table
Contract No. 1/WSD/13 - Improvement of Fresh Water Supply to Cheung Chau
Quarterly Environmental Monitoring and Audit (EM&A) Report (No.5) –
April to June 2015 AUES
Z:\Jobs\2013\TCS00684(1-WSD-13)\600\Quanterly Report\No.5 - Apr to Jun 15\R00146v2.doc Action-United Environmental Services and Consulting
Appendix I
Implementation Schedule for Environmental Mitigation Measures
(ISEMM)
Agre
emen
t No.
CE
1/20
08 (W
S)
EM&
A M
anua
l Im
prov
emen
t of F
resh
Wat
er S
uppl
y to
Che
ung
Chau
Fi
nal
- Inv
estig
atio
n
283
1/B&
V/02
1/Is
sue
3
Janu
ary
2010
[283
1_EM
&A_
apa_
v3_j
an10
.doc
]A
PA-7
B&
V
Tab
le A
.2
Im
plem
enta
tion
Sche
dule
of W
ater
Qua
lity
Miti
gatio
n M
easu
res
Impl
emen
tatio
nSt
ages
*E
IA Ref
EM
&A
Ref
Rec
omm
ende
d M
itiga
tion
Mea
sure
s
Obj
ectiv
es o
f the
R
ecom
men
ded
Mea
sure
s and
Mai
n C
once
rns t
o ad
dres
sed
Loc
atio
n /
Tim
ing
Impl
emen
tatio
nA
gent
DC
O
Rel
evan
tL
egis
latio
n &
G
uide
lines
Wat
er Q
ualit
y - C
onst
ruct
ion
Phas
e
Gen
eral
�
3.7
.2
2.9.
2Th
e C
ontra
ctor
sha
ll ob
serv
e an
d co
mpl
y w
ith th
e W
ater
Pol
lutio
n C
ontro
l O
rdin
ance
(W
PCO
) an
d its
sub
sidi
ary
regu
latio
ns.
The
Con
tract
or s
hall
carr
y ou
t th
e w
orks
in
such
a m
anne
r as
to
min
imis
e ad
vers
e im
pact
s on
the
wat
er q
ualit
y du
ring
exec
utio
n of
the
wor
ks.
In p
artic
ular
the
C
ontra
ctor
sha
ll ar
rang
e hi
s m
etho
d of
wor
king
to
min
imis
e th
e ef
fect
s on
the
wat
er q
ualit
y w
ithin
an
d ou
tsid
e th
e si
te a
nd o
n th
e tra
nspo
rt ro
utes
.
To m
inim
ize
adve
rse
wat
er q
ualit
y im
pact
du
ring
cons
truct
ion
All
wor
ks si
te /
durin
gco
nstru
ctio
n
Con
stru
ctio
nC
ontra
ctor
�
Wat
er P
ollu
tion
Con
trol O
rdin
ance
3.7.
3 2.
9.3
The
Con
tract
or s
hall
follo
w t
he p
ract
ices
, and
be
resp
onsi
ble
for
the
desi
gn, c
onst
ruct
ion,
ope
ratio
n an
d m
aint
enan
ce o
f al
l th
e m
itiga
tion
mea
sure
s be
low
and
as
spec
ified
in
ProP
ECC
PN
1/9
4 -
Con
stru
ctio
n Si
te D
rain
age.
The
des
ign
of t
he
miti
gatio
n m
easu
res
shal
l be
sub
mitt
ed b
y th
e C
ontra
ctor
to
th
e En
gine
er
for
appr
oval
. A
ll di
scha
rge
from
th
e co
nstru
ctio
n w
orks
sh
ould
m
eet
the
disc
harg
e st
anda
rds
stip
ulat
ed u
nder
the
W
PCO
“Te
chni
cal M
emor
andu
m o
n St
anda
rds
for
Efflu
ents
Dis
char
ged
into
Dra
inag
e an
d Se
wer
age
Syst
ems,
Inla
nd a
nd C
oast
al W
ater
s”.
To m
inim
ize
adve
rse
wat
er q
ualit
y im
pact
du
ring
cons
truct
ion
All
wor
ks si
te /
durin
gco
nstru
ctio
n
Con
stru
ctio
nC
ontra
ctor
�
ProP
ECC
PN
1/9
4
Agre
emen
t No.
CE
1/20
08 (W
S)
EM&
A M
anua
l Im
prov
emen
t of F
resh
Wat
er S
uppl
y to
Che
ung
Chau
Fi
nal
- Inv
estig
atio
n
283
1/B&
V/02
1/Is
sue
3
Janu
ary
2010
[283
1_EM
&A_
apa_
v3_j
an10
.doc
]A
PA-8
B&
V
Impl
emen
tatio
nSt
ages
*E
IA Ref
EM
&A
Ref
Rec
omm
ende
d M
itiga
tion
Mea
sure
s
Obj
ectiv
es o
f the
R
ecom
men
ded
Mea
sure
s and
Mai
n C
once
rns t
o ad
dres
sed
Loc
atio
n /
Tim
ing
Impl
emen
tatio
nA
gent
DC
O
Rel
evan
tL
egis
latio
n &
G
uide
lines
Site
Pre
para
tion
/ Cle
aran
ce
�
3.7.
4 2.
9.4
Prop
er
cons
truct
ion
site
dr
aina
ge
man
agem
ent
mea
sure
s sh
ould
be
impl
emen
ted
to c
ontro
l si
te
runo
ff a
nd d
rain
age,
and
the
reby
pre
vent
hig
h se
dim
ent
load
ings
fro
m r
each
ing
near
by w
ater
bo
dies
. Site
run
off
and
was
tew
ater
sho
uld
not
be
disc
harg
ed
into
ne
arby
w
ater
bo
dies
w
ithou
t pr
oper
trea
tmen
t.
To
min
imiz
e ad
vers
e w
ater
qu
ality
im
pact
du
ring
cons
truct
ion
All
wor
ks si
te /
durin
gco
nstru
ctio
n
Con
stru
ctio
nC
ontra
ctor
�
ProP
ECC
PN
1/9
4
3.7.
5 2.
9.5
Turb
id
wat
er
from
co
nstru
ctio
n si
tes
mus
t be
tre
ated
to m
inim
ise
the
solid
s co
nten
t bef
ore
bein
g di
scha
rged
. A
dvic
e on
the
han
dlin
g an
d di
spos
al
of si
te d
isch
arge
is g
iven
in th
e Pr
oPEC
C N
ote
PN
1/94
– “
Con
stru
ctio
n Si
te D
rain
age”
.
To m
inim
ize
adve
rse
wat
er q
ualit
y im
pact
du
ring
cons
truct
ion
All
wor
ks si
te /
durin
gco
nstru
ctio
n
Con
stru
ctio
nC
ontra
ctor
�
ProP
ECC
PN
1/9
4
3.7.
6 2.
9.6
In g
ener
al, s
urfa
ce r
unof
f fr
om c
onst
ruct
ion
site
s sh
ould
be
di
scha
rged
in
to
wat
er
bodi
es
via
adeq
uate
ly d
esig
ned
silt
rem
oval
fac
ilitie
s su
ch a
s sa
nd t
raps
, si
lt tra
ps a
nd s
edim
enta
tion
tank
s. C
hann
els
or e
arth
bun
ds o
r sa
nd b
ag b
arrie
rs
shou
ld b
e pr
ovid
ed o
n si
te t
o pr
oper
ly d
irect
st
orm
wat
er
to
such
si
lt re
mov
al
faci
litie
s. Su
ffic
ient
nu
mbe
rs
of
pum
ps
and
tank
s of
ad
equa
te
capa
city
sh
ould
be
pr
ovid
ed
on-s
ite.
Perim
eter
cha
nnel
s at
site
bou
ndar
ies
shou
ld b
e pr
ovid
ed t
o in
terc
ept
stor
m r
un-o
ff f
rom
out
side
th
e si
te s
o th
at i
t w
ill n
ot w
ash
acro
ss t
he s
ite.
Cat
chpi
ts
and
perim
eter
ch
anne
ls
shou
ld
be
To m
inim
ize
adve
rse
wat
er q
ualit
y im
pact
du
ring
cons
truct
ion
All
wor
ks si
te /
durin
gco
nstru
ctio
n
Con
stru
ctio
nC
ontra
ctor
�
ProP
ECC
PN
1/9
4
Agre
emen
t No.
CE
1/20
08 (W
S)
EM&
A M
anua
l Im
prov
emen
t of F
resh
Wat
er S
uppl
y to
Che
ung
Chau
Fi
nal
- Inv
estig
atio
n
283
1/B&
V/02
1/Is
sue
3
Janu
ary
2010
[283
1_EM
&A_
apa_
v3_j
an10
.doc
]A
PA-9
B&
V
Impl
emen
tatio
nSt
ages
*E
IA Ref
EM
&A
Ref
Rec
omm
ende
d M
itiga
tion
Mea
sure
s
Obj
ectiv
es o
f the
R
ecom
men
ded
Mea
sure
s and
Mai
n C
once
rns t
o ad
dres
sed
Loc
atio
n /
Tim
ing
Impl
emen
tatio
nA
gent
DC
O
Rel
evan
tL
egis
latio
n &
G
uide
lines
cons
truct
ed in
adv
ance
of e
arth
wor
ks.
3.7.
7 2.
9.7
Silt
rem
oval
fa
cilit
ies
and
dive
rsio
n ch
anne
ls
shou
ld b
e m
aint
aine
d an
d th
e de
posi
ted
silt
and
grit
shou
ld b
e re
mov
ed re
gula
rly, e
spec
ially
at t
he
onse
t of a
nd a
fter e
ach
rain
stor
m to
ens
ure
prop
er
func
tioni
ng o
f the
se fa
cilit
ies a
t all
times
.
To m
inim
ize
adve
rse
wat
er q
ualit
y im
pact
du
ring
cons
truct
ion
All
wor
ks si
te /
durin
gco
nstru
ctio
n
Con
stru
ctio
nC
ontra
ctor
�
ProP
ECC
PN
1/9
4
3.7.
8 2.
9.8
Mea
sure
s sh
ould
be
take
n to
pre
vent
the
was
hing
aw
ay o
f co
nstru
ctio
n m
ater
ials
, soi
l, si
lt or
deb
ris
into
the
nea
rby
wat
er b
odie
s. O
pen
stoc
kpile
s su
scep
tible
to
eros
ion
shou
ld b
e co
vere
d w
ith
tarp
aulin
or
si
mila
r fa
bric
an
d pr
ovid
ed
with
co
ntai
nmen
t su
ch a
s bu
nds,
sand
bag
bar
riers
or
equi
vale
nt m
easu
res,
espe
cial
ly d
urin
g th
e w
et
seas
on
(Apr
il –
Sept
embe
r)
or
whe
n he
avy
rain
stor
m i
s pr
edic
ted.
Run
off
to w
ater
cour
ses
shou
ld b
e in
terc
epte
d by
min
imis
ing
flat e
xpos
ed
area
s of
per
mea
ble
soil,
and
by
form
ing
pits
or
dive
rsio
n ch
anne
ls i
nto
whi
ch r
unof
f ca
n flo
w t
o su
itabl
e tre
atm
ent f
acili
ties b
efor
e di
scha
rge.
To m
inim
ize
adve
rse
wat
er q
ualit
y im
pact
du
ring
cons
truct
ion
All
wor
ks si
te /
durin
gco
nstru
ctio
n
Con
stru
ctio
nC
ontra
ctor
�
ProP
ECC
PN
1/9
4
Dri
lling
Wor
ks
�
Laun
chin
g si
te a
t Che
ung
Cha
u �
3.7.
9 2.
9.9
The
prop
osed
la
unch
ing
site
at
C
heun
g C
hau
shou
ld b
e pa
ved
with
a s
light
fal
l tow
ards
land
to
prev
ent
site
run
off
from
dire
ctly
flo
win
g to
the
To m
inim
ize
adve
rse
wat
er q
ualit
y im
pact
fro m
Prop
osed
laun
chin
g si
te a
t C
heun
g C
hau
/
Con
stru
ctio
nC
ontra
ctor
�
Wat
er P
ollu
tion
Con
trol O
rdin
ance
Agre
emen
t No.
CE
1/20
08 (W
S)
EM&
A M
anua
l Im
prov
emen
t of F
resh
Wat
er S
uppl
y to
Che
ung
Chau
Fi
nal
- Inv
estig
atio
n
283
1/B&
V/02
1/Is
sue
3
Janu
ary
2010
[283
1_EM
&A_
apa_
v3_j
an10
.doc
]A
PA-1
0B
&V
Impl
emen
tatio
nSt
ages
*E
IA Ref
EM
&A
Ref
Rec
omm
ende
d M
itiga
tion
Mea
sure
s
Obj
ectiv
es o
f the
R
ecom
men
ded
Mea
sure
s and
Mai
n C
once
rns t
o ad
dres
sed
Loc
atio
n /
Tim
ing
Impl
emen
tatio
nA
gent
DC
O
Rel
evan
tL
egis
latio
n &
G
uide
lines
sea.
The
laun
chin
g si
te sh
ould
be
prov
ided
with
an
adeq
uate
ly
desi
gned
si
te
drai
nage
sy
stem
to
co
ntai
n an
d tre
at
pollu
ted
site
ru
noff
an
d w
aste
wat
er.
Ade
quat
e nu
mbe
rs
of
tank
w
ith
suff
icie
nt c
apac
ity s
houl
d be
pro
vide
d on
-site
to
colle
ct,
stor
e an
d tre
at d
rillin
g flu
ids,
cutti
ngs
and/
or
chem
ical
s. Th
ese
tank
s sh
ould
be
su
rrou
nded
by
bund
s an
d re
gula
rly i
nspe
cted
and
m
aint
aine
d to
avo
id le
akag
e.
drill
ing
wor
ksdu
ring
cons
truct
ion
3.7.
10
2.9.
10D
urin
g di
rect
iona
l dr
illin
g,
exca
vate
d sp
oil
(cut
tings
) w
ill b
e ca
rrie
d as
a s
lurr
y w
ith t
he
drill
ing
fluid
to
emer
ge a
t C
heun
g C
hau.
The
sl
urry
shou
ld b
e tre
ated
to re
mov
e th
e cu
tting
s an
d re
cycl
ed
as
drill
ing
fluid
. C
uttin
gs
shou
ld
be
stor
ed in
con
tain
ers
prio
r to
rem
oval
and
dis
posa
l as
con
stru
ctio
n &
dem
oliti
on m
ater
ial t
o pu
blic
fill
rece
ptio
n fa
cilit
ies.
To m
inim
ize
adve
rse
wat
er q
ualit
y im
pact
fro m
drill
ing
wor
ks
Prop
osed
laun
chin
g si
te a
t C
heun
g C
hau
/ du
ring
cons
truct
ion
Con
stru
ctio
nC
ontra
ctor
�
Wat
er P
ollu
tion
Con
trol O
rdin
ance
3.7.
11
2.9.
11If
tem
pora
ry s
tora
ge o
f cu
tting
s is
req
uire
d fo
r la
ter
reus
e, t
his
shou
ld b
e un
derta
ken
in C
heun
g C
hau.
Car
e sh
ould
be
take
n in
the
sto
rage
of
cutti
ngs
espe
cial
ly d
urin
g th
e w
et s
easo
n an
d th
e st
orag
e ar
ea s
houl
d be
cov
ered
and
bun
ded
to
prev
ent s
ilty
runo
ff e
nter
ing
wat
er b
odie
s.
To m
inim
ize
adve
rse
wat
er q
ualit
y im
pact
fro m
drill
ing
wor
ks
Prop
osed
laun
chin
g si
te a
t C
heun
g C
hau
/ du
ring
cons
truct
ion
Con
stru
ctio
nC
ontra
ctor
�
Wat
er P
ollu
tion
Con
trol O
rdin
ance
Agre
emen
t No.
CE
1/20
08 (W
S)
EM&
A M
anua
l Im
prov
emen
t of F
resh
Wat
er S
uppl
y to
Che
ung
Chau
Fi
nal
- Inv
estig
atio
n
283
1/B&
V/02
1/Is
sue
3
Janu
ary
2010
[283
1_EM
&A_
apa_
v3_j
an10
.doc
]A
PA-1
1B
&V
Impl
emen
tatio
nSt
ages
*E
IA Ref
EM
&A
Ref
Rec
omm
ende
d M
itiga
tion
Mea
sure
s
Obj
ectiv
es o
f the
R
ecom
men
ded
Mea
sure
s and
Mai
n C
once
rns t
o ad
dres
sed
Loc
atio
n /
Tim
ing
Impl
emen
tatio
nA
gent
DC
O
Rel
evan
tL
egis
latio
n &
G
uide
lines
3.7.
12
2.9.
12A
sche
mat
ic la
yout
pla
n of
the
prop
osed
laun
chin
g si
te a
nd d
rain
age
mea
sure
s at
Che
ung
Cha
u is
sh
own
in F
igur
e 3.
3 to
dem
onst
rate
the
laun
chin
g si
te h
as a
dequ
ate
land
are
a to
set
up th
e ne
cess
ary
cons
truct
ion
equi
pmen
t, au
xilia
ry e
quip
men
t, si
te
offic
es a
nd d
rillin
g flu
id c
onta
inm
ent,
reco
very
an
d tre
atm
ent s
yste
ms.
In g
ener
al, t
he s
ite w
ill b
e di
vide
d in
to c
lean
are
a an
d di
rty a
rea.
The
cle
an
area
will
be
used
to h
ouse
the
site
off
ices
, sto
rage
ar
ea a
nd o
ther
non
-pol
lutin
g us
es. T
he d
irty
area
w
ill b
e th
e m
ain
drill
ing
wor
ks s
ite c
onsi
stin
g of
th
e dr
illin
g rig
, ent
ry p
it, m
ud ta
nk, d
rillin
g pi
pes
stor
age,
dr
illin
g flu
id
recy
clin
g an
d tre
atm
ent
syst
ems,
stoc
kpili
ng
area
an
d w
aste
wat
er
treat
men
t sys
tem
s.
To m
inim
ize
adve
rse
wat
er q
ualit
y im
pact
fro m
drill
ing
wor
ks
Prop
osed
laun
chin
g si
te a
t C
heun
g C
hau
/ du
ring
cons
truct
ion
Con
stru
ctio
nC
ontra
ctor
�
Wat
er P
ollu
tion
Con
trol O
rdin
ance
3.7.
13
2.9.
13Th
e en
tire
dirty
are
a sh
ould
be
surr
ound
ed b
y a
0.5
m t
all
conc
rete
bun
d to
ful
ly c
onta
in a
nd
prev
ent
site
ru
noff
fr
om
disc
harg
ing
into
th
e m
arin
e w
ater
s un
treat
ed a
s w
ell
as t
o pr
even
t su
rfac
e ru
noff
from
ent
erin
g th
e si
te. T
he e
ntry
pit
shou
ld b
e fu
rther
sur
roun
ded
by a
0.3
m t
all
conc
rete
bun
d fo
r ad
ded
prot
ectio
n to
con
tain
and
av
oid
spill
age
of d
rillin
g flu
id.
All
site
run
off
shou
ld
be
dive
rted
to
an
adeq
uate
ly d
esig
ned
was
tew
ater
tre
atm
ent
syst
em f
or t
reat
men
t be
fore
di
scha
rge.
To m
inim
ize
adve
rse
wat
er q
ualit
y im
pact
fro m
drill
ing
wor
ks
Prop
osed
laun
chin
g si
te a
t C
heun
g C
hau
/ du
ring
cons
truct
ion
Con
stru
ctio
nC
ontra
ctor
�
Wat
er P
ollu
tion
Con
trol O
rdin
ance
Agre
emen
t No.
CE
1/20
08 (W
S)
EM&
A M
anua
l Im
prov
emen
t of F
resh
Wat
er S
uppl
y to
Che
ung
Chau
Fi
nal
- Inv
estig
atio
n
283
1/B&
V/02
1/Is
sue
3
Janu
ary
2010
[283
1_EM
&A_
apa_
v3_j
an10
.doc
]A
PA-1
2B
&V
Impl
emen
tatio
nSt
ages
*E
IA Ref
EM
&A
Ref
Rec
omm
ende
d M
itiga
tion
Mea
sure
s
Obj
ectiv
es o
f the
R
ecom
men
ded
Mea
sure
s and
Mai
n C
once
rns t
o ad
dres
sed
Loc
atio
n /
Tim
ing
Impl
emen
tatio
nA
gent
DC
O
Rel
evan
tL
egis
latio
n &
G
uide
lines
3.7.
14
2.9.
14Th
e pe
rimet
er
of
the
clea
n ar
ea
shou
ld
be
surr
ound
ed w
ith 3
00 m
m u
-cha
nnel
to c
olle
ct a
nd
dive
rt al
l si
te
runo
ff
for
treat
men
t be
fore
di
scha
rge.
Bun
d sh
ould
be
prov
ided
to
prev
ent
surr
ound
ing
surf
ace
runo
ff fr
om e
nter
ing
the
site
.
To m
inim
ize
adve
rse
wat
er q
ualit
y im
pact
fro m
drill
ing
wor
ks
Prop
osed
laun
chin
g si
te a
t C
heun
g C
hau
/ du
ring
cons
truct
ion
Con
stru
ctio
nC
ontra
ctor
�
Wat
er P
ollu
tion
Con
trol O
rdin
ance
3.7.
15
2.9.
15A
fter
sepa
ratin
g th
e cu
tting
s, be
nton
ite
slur
ry
shou
ld b
e re
-circ
ulat
ed f
or r
euse
in
the
drill
ing
wor
ks.
By
adop
ting
a fo
rwar
d re
amin
g ap
proa
ch
all
slur
ry t
reat
men
t an
d dr
illin
g flu
id r
ecyc
ling
syst
ems
shou
ld
be
loca
ted
and
man
aged
on
C
heun
g C
hau.
To m
inim
ize
adve
rse
wat
er q
ualit
yim
pact
fro m
drill
ing
wor
ks
Prop
osed
laun
chin
g si
te a
t C
heun
g C
hau
/ du
ring
cons
truct
ion
Con
stru
ctio
nC
ontra
ctor
�
Wat
er P
ollu
tion
Con
trol O
rdin
ance
Rece
ptio
n Si
te a
t Lan
tau
�
3.7.
16
2.9.
16Th
e pi
lot
hole
and
rea
min
g sh
ould
be
stop
ped
appr
oxim
atel
y 50
m s
hort
of th
e fin
al e
xit p
oint
at
Chi
Ma
Wan
in
orde
r to
pre
vent
any
rel
ease
of
slur
ry i
n to
the
mar
ine
envi
ronm
ent.
Prio
r to
dr
illin
g th
e fin
al 5
0 m
, the
rea
med
hol
e sh
ould
be
thor
ough
ly
clea
ned
with
w
ater
to
re
mov
e al
l cu
tting
s an
d dr
illin
g flu
id.
The
final
50
m o
f dr
illin
g sh
ould
be
com
plet
ed u
sing
wat
er i
nste
ad
of b
ento
nite
in
orde
r to
pre
vent
the
rel
ease
of
bent
onite
at t
he e
xit p
it. A
ppro
xim
atel
y 0.
3 m
hig
h co
ncre
te b
und
shou
ld b
e co
nstru
cted
aro
und
the
exit
pit
to c
onta
in t
he d
rillin
g flu
id,
whi
ch i
s m
ainl
y si
lty w
ater
and
gen
erat
ed w
hen
the
drill
he
ad b
ores
thro
ugh
the
rock
at L
anta
u du
ring
the
To m
inim
ize
adve
rse
wat
er q
ualit
y im
pact
fro m
drill
ing
wor
ks
Prop
osed
rece
ptio
n si
te a
t La
ntau
/ du
ring
cons
truct
ion
Con
stru
ctio
nC
ontra
ctor
�
Wat
er P
ollu
tion
Con
trol O
rdin
ance
Agre
emen
t No.
CE
1/20
08 (W
S)
EM&
A M
anua
l Im
prov
emen
t of F
resh
Wat
er S
uppl
y to
Che
ung
Chau
Fi
nal
- Inv
estig
atio
n
283
1/B&
V/02
1/Is
sue
3
Janu
ary
2010
[283
1_EM
&A_
apa_
v3_j
an10
.doc
]A
PA-1
3B
&V
Impl
emen
tatio
nSt
ages
*E
IA Ref
EM
&A
Ref
Rec
omm
ende
d M
itiga
tion
Mea
sure
s
Obj
ectiv
es o
f the
R
ecom
men
ded
Mea
sure
s and
Mai
n C
once
rns t
o ad
dres
sed
Loc
atio
n /
Tim
ing
Impl
emen
tatio
nA
gent
DC
O
Rel
evan
tL
egis
latio
n &
G
uide
lines
final
dr
illin
g pr
oces
s. Th
e ex
act
leve
l of
th
e co
ncre
te b
und
shou
ld b
e de
term
ined
on
site
to
ensu
re t
hat
it w
ill n
ot b
e lo
wer
tha
n th
e gr
ound
le
vel o
f the
laun
chin
g si
te a
t Che
ung
Cha
u.
3.7.
17
2.9.
17Th
e us
e of
con
tain
men
t st
ruct
ure
such
as
earth
bu
nd,
sand
bag
bar
riers
wra
pped
with
geo
text
ile
fabr
ic o
r si
mila
r m
ater
ial,
dive
rsio
n ch
anne
ls o
r ot
her
sim
ilar
tech
niqu
es
shou
ld
be
inst
alle
d su
rrou
ndin
g th
e si
te b
ound
ary
at L
anta
u du
ring
the
wet
sea
son
to in
terc
ept s
torm
run
off
from
out
side
th
e si
te s
o th
at it
will
not
was
h ac
ross
the
site
(or
in
to th
e ex
it pi
t).
To m
inim
ize
adve
rse
wat
er q
ualit
y im
pact
fro m
drill
ing
wor
ks
Prop
osed
rece
ptio
n si
te a
t La
ntau
/ du
ring
cons
truct
ion
Con
stru
ctio
nC
ontra
ctor
�
Wat
er P
ollu
tion
Con
trol O
rdin
ance
3.7.
18
2.9.
18To
pro
vide
fur
ther
pro
tect
ion,
silt
cur
tain
sho
uld
be i
nsta
lled
befo
re c
omm
ence
men
t of
wor
ks a
t La
ntau
to m
inim
ize
the
wat
er q
ualit
y im
pact
. The
de
sign
and
ins
talla
tion
shou
ld b
e ce
rtifie
d by
the
En
viro
nmen
tal
Team
(E
T),
verif
ied
by
the
Inde
pend
ent
Envi
ronm
enta
l C
heck
er (
IEC
) an
d ap
prov
ed b
y th
e En
gine
er t
o en
sure
the
int
ende
d pr
otec
tion
can
be a
chie
ved.
The
Con
tract
or s
houl
d re
gula
rly i
nspe
ct a
nd m
aint
ain
the
silt
curta
in t
o en
sure
its e
ffec
tiven
ess.
To m
inim
ize
adve
rse
wat
er q
ualit
y im
pact
fro m
drill
ing
wor
ks
Prop
osed
rece
ptio
n si
te a
t La
ntau
/ du
ring
cons
truct
ion
Con
stru
ctio
nC
ontra
ctor
�
Wat
er P
ollu
tion
Con
trol O
rdin
ance
Man
agem
ent P
lans
and
Mon
itori
ng
�
3.7.
20
2.9.
20Th
e C
ontra
ctor
sh
ould
su
bmit
a D
rain
age
To m
inim
ize
adve
rse
All
wor
ks si
te /
Con
stru
ctio
n
�
Wat
er P
ollu
tion
Agre
emen
t No.
CE
1/20
08 (W
S)
EM&
A M
anua
l Im
prov
emen
t of F
resh
Wat
er S
uppl
y to
Che
ung
Chau
Fi
nal
- Inv
estig
atio
n
283
1/B&
V/02
1/Is
sue
3
Janu
ary
2010
[283
1_EM
&A_
apa_
v3_j
an10
.doc
]A
PA-1
4B
&V
Impl
emen
tatio
nSt
ages
*E
IA Ref
EM
&A
Ref
Rec
omm
ende
d M
itiga
tion
Mea
sure
s
Obj
ectiv
es o
f the
R
ecom
men
ded
Mea
sure
s and
Mai
n C
once
rns t
o ad
dres
sed
Loc
atio
n /
Tim
ing
Impl
emen
tatio
nA
gent
DC
O
Rel
evan
tL
egis
latio
n &
G
uide
lines
Man
agem
ent
Plan
de
taili
ng
the
tem
pora
ry
drai
nage
m
easu
res
alon
g w
ith
the
prop
osed
m
easu
res
to a
mel
iora
te th
e po
tent
ial w
ater
qua
lity
impa
cts
to
the
Envi
ronm
enta
l Te
am
(ET)
fo
r ce
rtific
atio
n,
the
Inde
pend
ent
Envi
ronm
enta
l C
heck
er (I
EC) f
or v
erifi
catio
n an
d to
the
Engi
neer
fo
r ap
prov
al
befo
re
com
men
cem
ent
of
the
cons
truct
ion
wor
ks.
wat
er q
ualit
y im
pact
du
ring
cons
truct
ion
durin
gco
nstru
ctio
nC
ontra
ctor
C
ontro
l Ord
inan
ce
3.7.
21
2.9.
21Th
e C
ontra
ctor
sho
uld
also
sub
mit
a D
rillin
g Fl
uid
Man
agem
ent
Plan
out
linin
g ex
pect
ed v
olum
e of
w
ater
, the
type
of s
oil a
nd a
n es
timat
ed q
uant
ity o
f be
nton
ite,
full
deta
ils
of p
lans
for
mon
itorin
g dr
illin
g flu
id f
low
(ou
t an
d re
turn
) an
d pr
essu
re,
was
tew
ater
di
scha
rge,
sl
urry
co
ntai
nmen
t, tre
atm
ent,
recy
clin
g an
d tra
nspo
rt,
and
the
appr
oved
dis
posa
l si
te.
The
pla
n sh
ould
als
o co
ntai
n de
tails
of
cont
inge
ncy
plan
s fo
r de
alin
g w
ith fr
ac-o
ut o
r oth
er in
adve
rtent
rele
ase
of s
lurr
y.
Con
tinge
ncy
plan
s sh
ould
incl
ude
the
prov
isio
n of
st
andb
y pu
mps
, con
tain
men
t boo
ms,
vacu
um u
nit
and
tank
s on
site
to
cont
ain
and
rem
ove
turb
id,
mud
dy w
ater
shou
ld in
cide
ntal
frac
-out
s occ
ur.
To m
inim
ize
adve
rse
wat
er q
ualit
y im
pact
du
ring
cons
truct
ion
in
parti
cula
r dur
ing
drill
ing
wor
ks
All
wor
ks si
te /
durin
gco
nstru
ctio
n
Con
stru
ctio
nC
ontra
ctor
�
Wat
er P
ollu
tion
Con
trol O
rdin
ance
3.7.
22
2.9.
22R
egul
ar
mon
itorin
g of
su
spen
ded
solid
s an
d tu
rbid
ity s
houl
d be
con
duct
ed d
urin
g co
nstru
ctio
n w
orks
. A
ny e
xcee
danc
e of
wat
er q
ualit
y in
the
ne
arby
wat
er b
odie
s ca
used
by
site
run
off
shou
ld
be re
ctifi
ed in
acc
orda
nce
with
EM
&A
pro
gram
me
To m
inim
ize
adve
rse
wat
er q
ualit
y im
pact
du
ring
cons
truct
ion
All
wor
ks si
te /
durin
gco
nstru
ctio
n
Con
stru
ctio
nC
ontra
ctor
�
Wat
er P
ollu
tion
Con
trol O
rdin
ance
Agre
emen
t No.
CE
1/20
08 (W
S)
EM&
A M
anua
l Im
prov
emen
t of F
resh
Wat
er S
uppl
y to
Che
ung
Chau
Fi
nal
- Inv
estig
atio
n
283
1/B&
V/02
1/Is
sue
3
Janu
ary
2010
[283
1_EM
&A_
apa_
v3_j
an10
.doc
]A
PA-1
5B
&V
Impl
emen
tatio
nSt
ages
*E
IA Ref
EM
&A
Ref
Rec
omm
ende
d M
itiga
tion
Mea
sure
s
Obj
ectiv
es o
f the
R
ecom
men
ded
Mea
sure
s and
Mai
n C
once
rns t
o ad
dres
sed
Loc
atio
n /
Tim
ing
Impl
emen
tatio
nA
gent
DC
O
Rel
evan
tL
egis
latio
n &
G
uide
lines
for t
his P
roje
ct.
Con
cret
ing
Wor
k �
3.7.
23
2.9.
23R
unof
f sho
uld
be c
aref
ully
cha
nnel
led
and
treat
ed
to
prev
ent
conc
rete
-con
tam
inat
ed
wat
er
from
en
terin
g w
ater
bod
ies.
Adj
ustm
ent
of p
H c
an b
e ac
hiev
ed b
y ad
ding
a s
uita
ble
neut
ralis
ing
reag
ent
to w
aste
wat
er p
rior t
o di
scha
rge.
To
min
imiz
e ad
vers
e w
ater
qu
ality
im
pact
du
ring
cons
truct
ion
(in
parti
cula
r co
ncre
ting
wor
ks)
All
wor
ks si
te /
durin
gco
nstru
ctio
n
Con
stru
ctio
nC
ontra
ctor
�
Wat
er P
ollu
tion
Con
trol O
rdin
ance
3.7.
24
2.9.
24A
ny e
xcee
danc
e of
the
acc
epta
ble
rang
e of
pH
le
vels
in n
earb
y w
ater
bod
ies c
ause
d by
site
runo
ff
cont
aini
ng
conc
rete
sh
ould
be
m
onito
red
and
rect
ified
und
er t
he E
M&
A p
rogr
amm
e fo
r th
is
Proj
ect.
To m
inim
ize
adve
rse
wat
er q
ualit
y im
pact
du
ring
cons
truct
ion
(in
parti
cula
r con
cret
ing
wor
ks)
All
wor
ks si
te /
durin
gco
nstru
ctio
n
Con
stru
ctio
nC
ontra
ctor
�
Wat
er P
ollu
tion
Con
trol O
rdin
ance
Site
Wor
ksho
p or
Dep
ot
�
Gen
eral
Con
stru
ctio
n W
orks
�
3.7.
25
2.9.
25Si
te
wor
ksho
p or
de
pot
incl
udin
g st
orag
e of
ch
emic
als a
nd c
hem
ical
was
te sh
ould
be
loca
ted
at
the
prop
osed
laun
chin
g si
te in
Che
ung
Cha
u on
ly.
No
wor
ksho
p or
dep
ot s
houl
d be
loc
ated
at
the
prop
osed
rece
ptio
n si
te in
Lan
tau.
To m
inim
ize
adve
rse
wat
er q
ualit
y im
pact
du
ring
cons
truct
ion
All
wor
ks si
te /
durin
gco
nstru
ctio
n
Con
stru
ctio
nC
ontra
ctor
�
Wat
er P
ollu
tion
Con
trol O
rdin
ance
3.7.
26
2.9.
26A
ny
Con
tract
or
gene
ratin
g w
aste
oi
l or
ot
her
chem
ical
s as
a
resu
lt of
hi
s ac
tiviti
es
shou
ld
To m
inim
ize
adve
rse
wat
er q
ualit
y im
pact
A
ll w
orks
site
/ du
ring
Con
stru
ctio
nC
ontra
ctor
�
Wat
er P
ollu
tion
Con
trol O
rdin
ance
Agre
emen
t No.
CE
1/20
08 (W
S)
EM&
A M
anua
l Im
prov
emen
t of F
resh
Wat
er S
uppl
y to
Che
ung
Chau
Fi
nal
- Inv
estig
atio
n
283
1/B&
V/02
1/Is
sue
3
Janu
ary
2010
[283
1_EM
&A_
apa_
v3_j
an10
.doc
]A
PA-1
6B
&V
Impl
emen
tatio
nSt
ages
*E
IA Ref
EM
&A
Ref
Rec
omm
ende
d M
itiga
tion
Mea
sure
s
Obj
ectiv
es o
f the
R
ecom
men
ded
Mea
sure
s and
Mai
n C
once
rns t
o ad
dres
sed
Loc
atio
n /
Tim
ing
Impl
emen
tatio
nA
gent
DC
O
Rel
evan
tL
egis
latio
n &
G
uide
lines
regi
ster
as
a ch
emic
al w
aste
pro
duce
r and
pro
vide
a
safe
des
igna
ted
stor
age
area
for
che
mic
als
on
site
. The
sto
rage
site
sho
uld
be lo
cate
d aw
ay fr
om
exis
ting
wat
er b
odie
s.
durin
g co
nstru
ctio
nco
nstru
ctio
n
3.7.
27
2.9.
27A
ll co
mpo
unds
in
wor
ks a
reas
sho
uld
be l
ocat
ed
on a
reas
of h
ard
stan
ding
surf
ace
with
pro
visi
on o
f di
vers
ion
chan
nels
and
set
tlem
ent
pond
s w
here
ne
cess
ary
to a
llow
int
erce
ptio
n an
d co
ntro
lled
rele
ase
of s
ettle
d /
treat
ed w
ater
. H
ard
stan
ding
co
mpo
unds
sho
uld
drai
n vi
a an
oil
inte
rcep
tor.
The
oil
inte
rcep
tor
shou
ld b
e re
gula
rly i
nspe
cted
an
d cl
eane
d to
avo
id w
ash-
out o
f oil
durin
g st
orm
co
nditi
ons.
A b
ypas
s sh
ould
be
prov
ided
to a
void
ov
erlo
ad o
f th
e in
terc
epto
r's c
apac
ity. T
o pr
even
t sp
illag
e of
fu
els
or
othe
r ch
emic
als
to
wat
er
bodi
es, a
ll fu
el ta
nks
and
stor
age
area
s sh
ould
be
site
d on
sea
led
area
s w
ithin
a b
und
of a
cap
acity
eq
ual
to 1
10%
of
the
stor
age
capa
city
of
the
larg
est
tank
. W
here
te
mpo
rary
st
orag
e of
ch
emic
als
or fu
el d
rum
s ou
tsid
e th
e st
orag
e ar
ea is
ne
cess
ary,
drip
tray
sho
uld
be p
rovi
ded.
Dis
posa
l of
the
was
te o
il sh
ould
be
carr
ied
out b
y a
licen
sed
colle
ctor
. Goo
d ho
usek
eepi
ng p
ract
ices
sho
uld
be
impl
emen
ted
to m
inim
ise
care
less
spi
llage
and
to
keep
the
stor
age
and
the
wor
k sp
ace
in a
tidy
and
cl
ean
cond
ition
. A
ppro
pria
te t
rain
ing
incl
udin
g sa
fety
cod
es a
nd re
leva
nt m
anua
ls s
houl
d be
giv
en
to
the
pers
onne
l w
ho
regu
larly
ha
ndle
th
e ch
emic
als o
n si
te.
To m
inim
ize
adve
rse
wat
er q
ualit
y im
pact
du
ring
cons
truct
ion
All
wor
ks si
te /
durin
gco
nstru
ctio
n
Con
stru
ctio
nC
ontra
ctor
�
Wat
er P
ollu
tion
Con
trol O
rdin
ance
Agre
emen
t No.
CE
1/20
08 (W
S)
EM&
A M
anua
l Im
prov
emen
t of F
resh
Wat
er S
uppl
y to
Che
ung
Chau
Fi
nal
- Inv
estig
atio
n
283
1/B&
V/02
1/Is
sue
3
Janu
ary
2010
[283
1_EM
&A_
apa_
v3_j
an10
.doc
]A
PA-1
7B
&V
Impl
emen
tatio
nSt
ages
*E
IA Ref
EM
&A
Ref
Rec
omm
ende
d M
itiga
tion
Mea
sure
s
Obj
ectiv
es o
f the
R
ecom
men
ded
Mea
sure
s and
Mai
n C
once
rns t
o ad
dres
sed
Loc
atio
n /
Tim
ing
Impl
emen
tatio
nA
gent
DC
O
Rel
evan
tL
egis
latio
n &
G
uide
lines
Emer
genc
y C
ontin
genc
y Pl
an
�
3.7.
28
2.9.
28Th
e C
ontra
ctor
sh
ould
pr
epar
e an
Em
erge
ncy
Con
tinge
ncy
Plan
(sp
ill r
espo
nse
plan
) fo
r th
e Pr
ojec
t to
cont
ain
and
rem
ove
acci
dent
al s
pilla
ge
of d
rillin
g flu
ids,
chem
ical
s an
d al
l ha
zard
ous
mat
eria
ls o
n-si
te i
nclu
ding
fue
ls a
t sh
ort
notic
e an
d to
pre
vent
or
to m
inim
ize
the
quan
titie
s of
co
ntam
inan
ts
from
en
terin
g th
e ne
arby
w
ater
bo
dies
and
aff
ectin
g th
e se
nsiti
ve h
abita
ts.
The
Con
tract
or
shou
ld
subm
it th
e Em
erge
ncy
Con
tinge
ncy
Plan
to
th
e ET
fo
r re
view
&
co
mm
ent
and
to t
he E
ngin
eer
for
appr
oval
. Th
e Pl
an
shou
ld
incl
ude,
bu
t no
t lim
ited
to,
the
follo
win
g:
(i)po
tent
ial e
mer
genc
y si
tuat
ions
(ii
)ch
emic
als
or h
azar
dous
mat
eria
ls u
sed
on-
site
(and
thei
r loc
atio
n)
(iii)
emer
genc
y re
spon
se te
am
(iv)
emer
genc
y ac
tion
plan
s and
pro
cedu
res
(v)
list o
f em
erge
ncy
tele
phon
e ho
tline
s (v
i)lo
catio
ns a
nd t
ypes
of
emer
genc
y re
spon
se
equi
pmen
t(v
ii)tra
inin
g pl
an a
nd e
mer
genc
y dr
ill
(viii
)sc
hedu
les f
or re
view
and
aud
it.
To p
reve
nt o
rm
inim
ize
the
quan
titie
s of
cont
amin
ants
ent
erin
g th
e ne
arby
wat
er
bodi
es a
nd a
ffec
ting
the
habi
tats
in c
ase
of
acci
dent
al sp
illag
e of
ch
emic
als a
nd
haza
rdou
s mat
eria
ls
All
wor
ks si
te /
durin
gco
nstru
ctio
n
Con
stru
ctio
nC
ontra
ctor
�
Wat
er P
ollu
tion
Con
trol O
rdin
ance
Agre
emen
t No.
CE
1/20
08 (W
S)
EM&
A M
anua
l Im
prov
emen
t of F
resh
Wat
er S
uppl
y to
Che
ung
Chau
Fi
nal
- Inv
estig
atio
n
283
1/B&
V/02
1/Is
sue
3
Janu
ary
2010
[283
1_EM
&A_
apa_
v3_j
an10
.doc
]A
PA-1
8B
&V
Impl
emen
tatio
nSt
ages
*E
IA Ref
EM
&A
Ref
Rec
omm
ende
d M
itiga
tion
Mea
sure
s
Obj
ectiv
es o
f the
R
ecom
men
ded
Mea
sure
s and
Mai
n C
once
rns t
o ad
dres
sed
Loc
atio
n /
Tim
ing
Impl
emen
tatio
nA
gent
DC
O
Rel
evan
tL
egis
latio
n &
G
uide
lines
Gen
eral
G
uida
nce
for
Han
dlin
g Sp
illag
e /
Leak
age
�
3.7.
29
2.9.
29In
the
even
t tha
t acc
iden
tal s
pilla
ge o
r le
akag
e of
ha
zard
ous
subs
tanc
es
/ ch
emic
al
was
tes
take
s pl
ace,
the
res
pons
e pr
oced
ures
as
liste
d be
low
sh
ould
be
follo
wed
. It
shou
ld b
e no
ted
that
the
pr
oced
ures
be
low
ar
e no
t ex
haus
tive.
Th
e C
ontra
ctor
sh
ould
pr
opos
e ot
her
resp
onse
pr
oced
ures
in
the
emer
genc
y co
ntin
genc
y pl
an
base
d on
act
ual
site
con
ditio
ns a
s w
ell
as t
he
parti
cula
r ty
pes
and
quan
titie
s of
che
mic
als
or
haza
rdou
s sub
stan
ces u
sed,
han
dled
and
stor
ed o
n-si
te.
�C
onta
ct p
erso
n in
cha
rge
or n
omin
ated
per
son
imm
edia
tely
and
initi
ate
actio
n pl
ans
base
d on
th
e em
erge
ncy
cont
inge
ncy
plan
. �
Oil
leak
age
or s
pilla
ge s
houl
d be
con
tain
ed
and
clea
ned
up im
med
iate
ly. W
aste
oil
shou
ld
be
colle
cted
an
d st
ored
fo
r re
cycl
ing
or
disp
osal
in
ac
cord
ance
w
ith
the
Was
te
Dis
posa
l Ord
inan
ce.
�In
stru
ct u
ntra
ined
per
sonn
el t
o ke
ep a
t a
safe
di
stan
ce w
ell a
way
from
the
spill
age
area
. �
If th
e sp
illag
e / l
eaka
ge is
sev
ere
or is
cau
sing
ha
zard
to
life,
ini
tiate
em
erge
ncy
evac
uatio
n an
d ca
ll th
e em
erge
ncy
serv
ices
. �
Onl
y tra
ined
per
sons
equ
ippe
d w
ith s
uita
ble
prot
ectiv
e cl
othi
ng a
nd e
quip
men
t sh
ould
be
allo
wed
to
en
ter
and
clea
n up
th
e w
aste
To p
reve
nt o
rm
inim
ize
the
quan
titie
s of
cont
amin
ants
ent
erin
g th
e ne
arby
wat
er
bodi
es a
nd a
ffec
ting
the
habi
tats
in c
ase
of
acci
dent
al sp
illag
e of
ch
emic
als a
nd
haza
rdou
s mat
eria
ls
All
wor
ks si
te /
durin
gco
nstru
ctio
n
Con
stru
ctio
nC
ontra
ctor
�
Wat
er P
ollu
tion
Con
trol O
rdin
ance
Agre
emen
t No.
CE
1/20
08 (W
S)
EM&
A M
anua
l Im
prov
emen
t of F
resh
Wat
er S
uppl
y to
Che
ung
Chau
Fi
nal
- Inv
estig
atio
n
283
1/B&
V/02
1/Is
sue
3
Janu
ary
2010
[283
1_EM
&A_
apa_
v3_j
an10
.doc
]A
PA-1
9B
&V
Impl
emen
tatio
nSt
ages
*E
IA Ref
EM
&A
Ref
Rec
omm
ende
d M
itiga
tion
Mea
sure
s
Obj
ectiv
es o
f the
R
ecom
men
ded
Mea
sure
s and
Mai
n C
once
rns t
o ad
dres
sed
Loc
atio
n /
Tim
ing
Impl
emen
tatio
nA
gent
DC
O
Rel
evan
tL
egis
latio
n &
G
uide
lines
spill
age
/ lea
kage
are
a.
�W
here
the
spi
llage
/ l
eaka
ge i
s co
ntai
ned
in
the
encl
osed
sto
rage
are
a, t
he w
aste
can
be
trans
ferr
ed b
ack
into
sui
tabl
e co
ntai
ners
by
suita
ble
hand
held
equ
ipm
ent,
such
as
hand
op
erat
ed p
umps
, sc
oops
or
shov
els.
If t
he
spill
age
/ le
akag
e qu
antit
y is
sm
all,
it ca
n be
co
vere
d an
d m
ixed
with
sui
tabl
e ab
sorb
ing
mat
eria
ls s
uch
as a
bsor
bent
tiss
ue p
aper
, pad
s, dr
y so
ft sa
nd o
r ve
rmic
ulite
. Th
e re
sulta
nt
slur
ry s
houl
d be
trea
ted
as c
hem
ical
was
te a
nd
trans
ferr
ed to
suita
ble
cont
aine
rs fo
r dis
posa
l. �
For
spill
age
/ le
akag
e in
to
near
by
wat
er
bodi
es, i
mm
edia
te a
ctio
n is
requ
ired
to c
onta
in
the
spill
age
/ le
akag
e. A
ppro
pria
te s
truct
ural
, ph
ysic
al
barr
ier
or
seco
ndar
y co
ntai
nmen
t (e
.g. c
onta
inm
ent
boom
s) s
houl
d be
dep
loye
d to
con
tain
the
spi
ll an
d if
poss
ible
to
prev
ent
cont
amin
ated
w
ater
fr
om
disp
ersi
ng
away
fr
om
the
sour
ce.
Suita
ble
liqui
d ab
sorb
ing
mat
eria
ls s
uch
as a
bsor
bent
tiss
ue p
aper
, pad
s or
rol
ls s
houl
d be
use
d to
rec
over
the
spi
lt su
bsta
nces
. Th
e re
sulta
nt
slur
ry
shou
ld
be
treat
ed a
s ch
emic
al w
aste
and
tra
nsfe
rred
to
suita
ble
cont
aine
rs fo
r dis
posa
l. �
For
spill
age
/ le
akag
e in
ot
her
area
s, im
med
iate
act
ion
is r
equi
red
to c
onta
in t
he
spill
age
/ le
akag
e. S
uita
ble
liqui
d ab
sorb
ing
mat
eria
ls s
uch
as a
bsor
bent
tiss
ue p
aper
, pad
s, dr
y so
ft sa
nd o
r ve
rmic
ulite
sho
uld
be u
sed
to
cove
r th
e sp
ill. T
he r
esul
tant
slu
rry
shou
ld b
e
Agre
emen
t No.
CE
1/20
08 (W
S)
EM&
A M
anua
l Im
prov
emen
t of F
resh
Wat
er S
uppl
y to
Che
ung
Chau
Fi
nal
- Inv
estig
atio
n
283
1/B&
V/02
1/Is
sue
3
Janu
ary
2010
[283
1_EM
&A_
apa_
v3_j
an10
.doc
]A
PA-2
0B
&V
Impl
emen
tatio
nSt
ages
*E
IA Ref
EM
&A
Ref
Rec
omm
ende
d M
itiga
tion
Mea
sure
s
Obj
ectiv
es o
f the
R
ecom
men
ded
Mea
sure
s and
Mai
n C
once
rns t
o ad
dres
sed
Loc
atio
n /
Tim
ing
Impl
emen
tatio
nA
gent
DC
O
Rel
evan
tL
egis
latio
n &
G
uide
lines
treat
ed a
s ch
emic
al w
aste
and
tra
nsfe
rred
to
suita
ble
cont
aine
rs fo
r dis
posa
l. �
Are
as
that
ha
ve
been
co
ntam
inat
ed
by
chem
ical
was
te s
pilla
ge /
lea
kage
sho
uld
be
clea
ned.
Whi
le w
ater
is
a so
lubl
e so
lven
t fo
r aq
ueou
s ch
emic
al w
aste
s an
d w
ater
sol
uble
or
gani
c w
aste
, ke
rose
ne o
r tu
rpen
tine
shou
ld
be u
sed
for
orga
nic
chem
ical
was
tes
that
are
no
t so
lubl
e in
wat
er.
The
was
te f
rom
the
cl
eanu
p op
erat
ion
shou
ld
be
treat
ed
and
disp
osed
of a
s che
mic
al w
aste
. �
In in
cide
nts
whe
re th
e sp
illag
e / l
eaka
ge m
ay
resu
lt in
sig
nific
ant
cont
amin
atio
n of
an
area
or
ris
k of
po
llutio
n,
the
Envi
ronm
enta
l Pr
otec
tion
Dep
artm
ent
and
othe
r re
leva
nt
depa
rtmen
ts sh
ould
be
info
rmed
imm
edia
tely
.
Pres
ence
of A
dditi
onal
Pop
ulat
ion
(Wor
kers
)
�
3.7.
30
2.9.
30Se
wag
e ar
isin
g fr
om t
he a
dditi
onal
con
stru
ctio
n w
orke
rs o
n si
te s
houl
d be
col
lect
ed i
n a
suita
ble
stor
age
faci
lity,
suc
h as
por
tabl
e ch
emic
al to
ilets
. A
n ad
equa
te n
umbe
r of
por
tabl
e to
ilets
sho
uld
be
prov
ided
fo
r th
e co
nstru
ctio
n w
orkf
orce
. Th
e po
rtabl
e to
ilets
shou
ld b
e m
aint
aine
d in
a st
ate
that
w
ill
not
dete
r th
e w
orke
rs
from
us
ing
them
. W
aste
wat
er c
olle
cted
sho
uld
be d
isch
arge
d in
to
foul
sew
ers a
nd c
olle
cted
by
licen
sed
colle
ctor
s.
To
min
imiz
e ad
vers
e w
ater
qu
ality
im
pact
du
ring
cons
truct
ion
All
wor
ks si
te /
durin
gco
nstru
ctio
n
Con
stru
ctio
nC
ontra
ctor
�
ProP
ECC
PN
1/9
4
Wat
er P
ollu
tion
Con
trol O
rdin
ance
3.7.
31
2.9.
31Th
e co
llect
ed w
aste
wat
er f
rom
sew
age
faci
litie
s an
d al
so fr
om e
atin
g ar
eas
or w
ashi
ng fa
cilit
ies
of
site
off
ices
sho
uld
be d
ispo
sed
to f
oul
sew
er.
If
To m
inim
ize
adve
rse
wat
er q
ualit
y im
pact
A
ll w
orks
site
/ du
ring
cons
truct
ion
Con
stru
ctio
nC
ontra
ctor
�
ProP
ECC
PN
1/9
4
Agre
emen
t No.
CE
1/20
08 (W
S)
EM&
A M
anua
l Im
prov
emen
t of F
resh
Wat
er S
uppl
y to
Che
ung
Chau
Fi
nal
- Inv
estig
atio
n
283
1/B&
V/02
1/Is
sue
3
Janu
ary
2010
[283
1_EM
&A_
apa_
v3_j
an10
.doc
]A
PA-2
1B
&V
Impl
emen
tatio
nSt
ages
*E
IA Ref
EM
&A
Ref
Rec
omm
ende
d M
itiga
tion
Mea
sure
s
Obj
ectiv
es o
f the
R
ecom
men
ded
Mea
sure
s and
Mai
n C
once
rns t
o ad
dres
sed
Loc
atio
n /
Tim
ing
Impl
emen
tatio
nA
gent
DC
O
Rel
evan
tL
egis
latio
n &
G
uide
lines
ther
e is
no
foul
sew
er in
the
vici
nity
, a s
eptic
tank
an
d so
akaw
ay s
yste
m o
r for
larg
er fl
ow, a
sew
age
treat
men
t pl
ant
shou
ld b
e pr
ovid
ed. A
ll do
mes
tic
sew
age
disc
harg
es (
exce
pt i
nto
foul
sew
er)
are
cont
rolle
d un
der t
he W
PCO
. The
Con
tract
or m
ust
appl
y fo
r a
disc
harg
e lic
ence
fro
m E
PD a
nd m
ust
com
ply
with
the
ter
ms
and
cond
ition
s of
a v
alid
W
PCO
lice
nce.
durin
g co
nstru
ctio
nW
ater
Pol
lutio
n C
ontro
l Ord
inan
ce
Ster
iliza
tion
of
Wat
er
Mai
n Pr
ior
to
Com
mis
sion
ing
�
3.7.
32
2.9.
32Ef
fluen
t fr
om
the
ster
iliza
tion
of
wat
er
mai
n sh
ould
be
tre
ated
in
clud
ing
dech
lorin
atio
n by
ph
ysic
al
proc
ess
e.g.
ad
sorp
tion
by
activ
ated
ca
rbon
fil
ter,
or
chem
ical
pr
oces
s e.
g.
neut
ralis
atio
n by
dec
hlor
inat
ion
agen
t do
sing
to
ensu
re
com
plia
nce
with
th
e di
scha
rge
requ
irem
ents
stip
ulat
ed in
the
TM-D
SS. A
dequ
ate
tank
s w
ith s
uffic
ient
cap
acity
sho
uld
be p
rovi
ded
to a
llow
pro
per
treat
men
t of
the
eff
luen
t pr
ior
to
disc
harg
e.
To
min
imiz
e ad
vers
e w
ater
qu
ality
im
pact
du
ring
cons
truct
ion
in
parti
cula
r du
ring
steril
izat
ion
of
the
com
plet
ed w
ater
mai
n
All
wor
ks si
te /
durin
gco
nstru
ctio
n
Con
stru
ctio
nC
ontra
ctor
�
ProP
ECC
PN
1/9
4
Wat
er P
ollu
tion
Con
trol O
rdin
ance
3.7.
33
2.9.
33Th
e st
erili
zatio
n of
th
e w
ater
m
ain
and
the
dech
lorin
atio
n pr
oces
s sh
ould
be
cond
ucte
d at
the
laun
chin
g si
te a
t C
heun
g C
hau.
As
the
site
at
Che
ung
Cha
u is
de
sign
ated
fo
r se
cond
ary
recr
eatio
nal
cont
act,
the
ster
iliza
tion
of t
he m
ain
shou
ld b
e sc
hedu
led
durin
g th
e dr
y se
ason
. Th
e
To
min
imiz
e ad
vers
e w
ater
qu
ality
im
pact
du
ring
cons
truct
ion
in
parti
cula
r du
ring
steril
izat
ion
of
the
com
plet
ed w
ater
mai
n
All
wor
ks si
te /
durin
gco
nstru
ctio
n
Con
stru
ctio
nC
ontra
ctor
�
ProP
ECC
PN
1/9
4
Wat
er P
ollu
tion
Con
trol O
rdin
ance
Agre
emen
t No.
CE
1/20
08 (W
S)
EM&
A M
anua
l Im
prov
emen
t of F
resh
Wat
er S
uppl
y to
Che
ung
Chau
Fi
nal
- Inv
estig
atio
n
283
1/B&
V/02
1/Is
sue
3
Janu
ary
2010
[283
1_EM
&A_
apa_
v3_j
an10
.doc
]A
PA-2
2B
&V
Impl
emen
tatio
nSt
ages
*E
IA Ref
EM
&A
Ref
Rec
omm
ende
d M
itiga
tion
Mea
sure
s
Obj
ectiv
es o
f the
R
ecom
men
ded
Mea
sure
s and
Mai
n C
once
rns t
o ad
dres
sed
Loc
atio
n /
Tim
ing
Impl
emen
tatio
nA
gent
DC
O
Rel
evan
tL
egis
latio
n &
G
uide
lines
Con
tract
or
shou
ld
subm
it fo
r th
e En
gine
er
appr
oval
, det
ails
of t
he d
echl
orin
atio
n pr
oces
s an
d an
y ch
emic
als i
nclu
ding
dos
age
to b
e us
ed.
3.7.
34
2.9.
34Th
e C
ontra
ctor
sho
uld
prov
ide
a de
chlo
rinat
ion
plan
t of s
uffic
ient
cap
acity
to c
onta
in a
nd tr
eat t
he
ster
ilisi
ng w
ater
with
hig
h ch
lorin
e co
ncen
tratio
n be
fore
dis
char
ge.
Det
ails
of
the
spec
ifica
tion
of
the
dech
lorin
atio
n pl
ant s
houl
d be
subm
itted
to th
e En
gine
er f
or a
ppro
val.
They
sho
uld
incl
ude
but
not l
imite
d to
the
follo
win
g:
�th
e no
min
al f
low
rat
e sh
all
not
be l
ess
than
36
cub
ic m
eter
per
hou
r; �
the
plan
t sh
all
be c
apab
le o
f de
chlo
rinat
ing
wat
er w
ith c
hlor
ine
leve
l up
to 4
0 m
g/lit
re;
�th
e m
axim
um c
hlor
ine
leve
l of
dech
lorin
ated
w
ater
shal
l be
<0.2
mg/
litre
; �
the
reco
mm
ende
d co
ntac
t tim
e if
dech
lorin
atio
n by
ads
orpt
ion
with
act
ivat
ed
carb
on fi
lter i
s pro
pose
d;
�a
wat
er m
eter
or o
ther
mea
surin
g de
vice
sha
ll be
in
stal
led
at
the
inle
t pi
pe
of
the
dech
lorin
atio
n pl
ant
to m
easu
re t
he a
mou
nt
of w
ater
trea
ted,
in c
ubic
met
res;
and
�
sens
ors
and
data
lo
gger
s fo
r co
ntin
uous
m
easu
rem
ent
and
reco
rd o
f ch
lorin
e le
vel
shal
l be
inst
alle
d at
the
inle
t and
out
let p
ipe
of th
e de
chlo
rinat
ion
plan
t.
To
min
imiz
e ad
vers
e w
ater
qu
ality
im
pact
du
ring
cons
truct
ion
in
parti
cula
r du
ring
steril
izat
ion
of
the
com
plet
ed w
ater
mai
n
All
wor
ks si
te /
durin
gco
nstru
ctio
n
Con
stru
ctio
nC
ontra
ctor
�
ProP
ECC
PN
1/9
4
Wat
er P
ollu
tion
Con
trol O
rdin
ance
Agre
emen
t No.
CE
1/20
08 (W
S)
EM&
A M
anua
l Im
prov
emen
t of F
resh
Wat
er S
uppl
y to
Che
ung
Chau
Fi
nal
- Inv
estig
atio
n
283
1/B&
V/02
1/Is
sue
3
Janu
ary
2010
[283
1_EM
&A_
apa_
v3_j
an10
.doc
]A
PA-2
3B
&V
Impl
emen
tatio
nSt
ages
*E
IA Ref
EM
&A
Ref
Rec
omm
ende
d M
itiga
tion
Mea
sure
s
Obj
ectiv
es o
f the
R
ecom
men
ded
Mea
sure
s and
Mai
n C
once
rns t
o ad
dres
sed
Loc
atio
n /
Tim
ing
Impl
emen
tatio
nA
gent
DC
O
Rel
evan
tL
egis
latio
n &
G
uide
lines
3.7.
35
2.9.
35In
-situ
test
ing
of to
tal r
esid
ual c
hlor
ine
shou
ld b
e co
nduc
ted
ever
y ho
ur a
t th
e di
scha
rge
poin
t to
en
sure
the
chlo
rine
conc
entra
tion
does
not
exc
eed
the
stip
ulat
ed m
axim
um le
vel w
hen
dech
lorin
ated
w
ater
is b
eing
dis
char
ged.
To
min
imiz
e ad
vers
e w
ater
qu
ality
im
pact
du
ring
cons
truct
ion
in
parti
cula
r du
ring
steril
izat
ion
of
the
com
plet
ed w
ater
mai
n
All
wor
ks si
te /
durin
gco
nstru
ctio
n
Con
stru
ctio
nC
ontra
ctor
�
ProP
ECC
PN
1/9
4
Wat
er P
ollu
tion
Con
trol O
rdin
ance
3.7.
36
2.9.
36If
the
dec
hlor
inat
ed w
ater
exc
eed
the
allo
wed
co
ncen
tratio
n, d
isch
arge
mus
t be
sus
pend
ed a
nd
the
wat
er s
houl
d be
circ
ulat
ed t
o a
stan
dby
tank
fo
r fur
ther
dec
hlor
inat
ion
and
test
ing.
The
loca
tion
of
the
sam
plin
g po
int
will
de
pend
s on
th
e di
scha
rge
poin
t to
be p
ropo
sed
by th
e C
ontra
ctor
. Th
e C
ontra
ctor
sh
ould
su
bmit
deta
ils
of
the
prop
osed
sa
mpl
ing
loca
tion,
fr
eque
ncy
and
equi
pmen
t fo
r ve
rific
atio
n by
the
ET
Lead
er a
nd
appr
oval
by
the
Engi
neer
bef
ore
com
men
cem
ent
of t
he s
teril
izat
ion
wor
k of
the
com
plet
ed w
ater
m
ain.
The
pro
pose
d sa
mpl
ing
loca
tion(
s) s
houl
d be
subm
itted
to E
PD fo
r ref
eren
ce.
To
min
imiz
e ad
vers
e w
ater
qu
ality
im
pact
du
ring
cons
truct
ion
in
parti
cula
r du
ring
steril
izat
ion
of
the
com
plet
ed w
ater
mai
n
All
wor
ks si
te /
durin
gco
nstru
ctio
n
Con
stru
ctio
nC
ontra
ctor
�
ProP
ECC
PN
1/9
4
Wat
er P
ollu
tion
Con
trol O
rdin
ance
Wat
er Q
ualit
y - O
pera
tiona
l Pha
se
Nil
��
*
D=D
esig
n, C
=Con
stru
ctio
n, O
=Ope
ratio
nN
/A
Not
app
licab
le
Agre
emen
t No.
CE
1/20
08 (W
S)
EM&
A M
anua
l Im
prov
emen
t of F
resh
Wat
er S
uppl
y to
Che
ung
Chau
Fi
nal
- Inv
estig
atio
n
283
1/B&
V/02
1/Is
sue
3
Janu
ary
2010
[283
1_EM
&A_
apa_
v3_j
an10
.doc
]A
PA-2
7B
&V
Tab
le A
.4
Im
plem
enta
tion
Sche
dule
of W
aste
Man
agem
ent M
easu
res
Impl
emen
tatio
nSt
ages
*E
IA Ref
EM
&A
Ref
Rec
omm
ende
d M
itiga
tion
Mea
sure
sO
bjec
tives
of t
he
Rec
omm
ende
dM
easu
res a
nd M
ain
Con
cern
s to
addr
esse
d
Loc
atio
n /
Tim
ing
Impl
emen
tatio
nA
gent
DC
O
Rel
evan
tL
egis
latio
n &
G
uide
lines
Was
te -
Con
stru
ctio
n Ph
ase
Gen
eral
�
7.6.
1 5.
1.1
The
HK
SAR
Gov
ernm
ent's
con
struc
tion
and
dem
oliti
on w
aste
man
agem
ent p
olic
y fo
llow
s the
sa
me
hier
arch
y as
for o
ther
was
tes,
i.e. i
n or
der o
f de
sirab
ility
: avo
idan
ce, m
inim
isatio
n, re
cycl
ing,
tre
atm
ent a
nd sa
fe d
ispos
al o
f was
te. D
urin
g th
e co
nstru
ctio
n pe
riod
the
Con
tract
or, E
ngin
eer a
nd
envi
ronm
enta
l spe
cial
ists
(Env
ironm
enta
l Tea
m,
Inde
pend
ent E
nviro
nmen
tal C
heck
) sho
uld
wor
k cl
osel
y to
geth
er w
ith a
vie
w to
redu
ce th
e vo
lum
es
of m
ater
ials
requ
iring
rem
oval
and
fina
l dis
posa
l.
To re
duce
the
volu
mes
of
mat
eria
ls re
quiri
ng
rem
oval
and
fina
l di
spos
al
All
wor
ks si
te /
durin
gco
nstru
ctio
n
Con
stru
ctio
nC
ontra
ctor
,En
gine
er,
Envi
ronm
enta
lTe
am a
nd
Inde
pend
ent
Envi
ronm
enta
lC
heck
��
Envi
ronm
enta
l Im
pact
Ass
essm
ent
Ord
inan
ce
Tech
nica
lM
emor
andu
m o
n EI
A P
roce
ss
7.6.
2 5.
1.2
Upo
n ap
poin
tmen
t, th
e m
ain
Con
tract
or o
f eac
h co
nstru
ctio
n co
ntra
ct sh
ould
pre
pare
and
im
plem
ent a
n En
viro
nmen
tal M
anag
emen
t Pla
n (E
MP)
in a
ccor
danc
e w
ith E
TWB
TC
W N
o.
19/2
005
– “E
nviro
nmen
tal M
anag
emen
t on
Con
stru
ctio
n Si
tes”
whi
ch sh
ould
des
crib
e th
e ar
rang
emen
ts fo
r avo
idan
ce, r
euse
, rec
over
y,
recy
clin
g, st
orag
e, c
olle
ctio
n, tr
eatm
ent a
nd
disp
osal
of d
iffer
ent c
ateg
orie
s of w
aste
to b
e ge
nera
ted
from
the
cons
truct
ion
activ
ities
. The
EM
P sh
ould
inco
rpor
ate
site
spec
ific
fact
ors,
such
as
the
desi
gnat
ion
of a
reas
for s
egre
gatio
n an
d te
mpo
rary
stor
age
of re
usab
le a
nd re
cycl
able
m
ater
ials
. The
was
te m
anag
emen
t pla
n no
w
beco
mes
par
t of t
he E
MP.
The
EM
P sh
ould
be
subm
itted
to th
e En
gine
er fo
r app
rova
l. Th
e
Was
te re
duct
ion,
reus
e, re
cycl
ing
and
prop
er
disp
osal
of w
aste
All
wor
ks si
te /
durin
gco
nstru
ctio
n
Con
stru
ctio
nC
ontra
ctor
��
Was
te D
ispo
sal
Ord
inan
ce
ETW
B T
CW
No.
19
/200
5
Agre
emen
t No.
CE
1/20
08 (W
S)
EM&
A M
anua
l Im
prov
emen
t of F
resh
Wat
er S
uppl
y to
Che
ung
Chau
Fi
nal
- Inv
estig
atio
n
283
1/B&
V/02
1/Is
sue
3
Janu
ary
2010
[283
1_EM
&A_
apa_
v3_j
an10
.doc
]A
PA-2
8B
&V
Impl
emen
tatio
nSt
ages
*E
IA Ref
EM
&A
Ref
Rec
omm
ende
d M
itiga
tion
Mea
sure
sO
bjec
tives
of t
he
Rec
omm
ende
dM
easu
res a
nd M
ain
Con
cern
s to
addr
esse
d
Loc
atio
n /
Tim
ing
Impl
emen
tatio
nA
gent
DC
O
Rel
evan
tL
egis
latio
n &
G
uide
lines
Con
tract
or sh
ould
impl
emen
t the
was
te
man
agem
ent p
ract
ices
in th
e EM
P th
roug
hout
the
cons
truct
ion
stag
e of
the
Proj
ect.
The
EMP
shou
ld
be re
view
ed re
gula
rly a
nd u
pdat
ed (p
refe
rabl
y m
onth
ly) b
y th
e C
ontra
ctor
. The
EM
P sh
ould
take
in
to a
ccou
nt th
e re
com
men
ded
miti
gatio
n m
easu
res
in th
e ap
prov
ed E
IA R
epor
t.
7.6.
3 5.
1.3
The
Con
tract
or sh
ould
refe
r to
the
Con
stru
ctio
n an
d D
emol
ition
Mat
eria
l Man
agem
ent P
lan
(C&
DM
MP)
to b
e co
nduc
ted
durin
g th
e de
sign
st
age
of th
is P
roje
ct to
faci
litat
e hi
m in
the
prep
arat
ion
of th
e EM
P. T
he C
&D
MM
P sh
ould
be
endo
rsed
by
WSD
’s V
ettin
g C
omm
ittee
and
ap
prov
ed b
y th
e Pu
blic
Fill
Com
mitt
ee (P
FC).
WSD
’s V
ettin
g C
omm
ittee
will
mon
itor t
he
impl
emen
tatio
n of
the
C&
DM
MP
and
repo
rt to
Pu
blic
Fill
Com
mitt
ee in
acc
orda
nce
with
ETW
B
TCW
No.
33/
2002
dur
ing
cons
truct
ion.
Was
te re
duct
ion,
reus
e, re
cycl
ing
and
prop
er
disp
osal
of w
aste
All
wor
ks si
te /
durin
gco
nstru
ctio
n
Con
stru
ctio
nC
ontra
ctor
��
Was
te D
ispo
sal
Ord
inan
ce
ETW
B T
CW
No.
19
/200
5
7.6.
4 5.
1.4
The
Con
tract
or sh
ould
nom
inat
e an
app
ropr
iate
pe
rson
, suc
h as
site
age
nt o
r env
ironm
enta
l off
icer
, to
be
resp
onsi
ble
for g
ood
site
pra
ctic
es,
arra
ngem
ent f
or c
olle
ctio
n an
d ef
fect
ive
disp
osal
of
all w
aste
s gen
erat
ed a
t the
site
to a
n ap
prov
ed
faci
lity.
Tra
inin
g of
con
stru
ctio
n st
aff s
houl
d be
un
derta
ken
by th
e C
ontra
ctor
abo
ut th
e co
ncep
t of
site
cle
anlin
ess a
nd a
ppro
pria
te w
aste
man
agem
ent
proc
edur
es. T
he C
ontra
ctor
shou
ld d
evel
op a
nd
prov
ide
tool
box
talk
for o
n-si
te so
rting
of C
&D
m
ater
ials
to e
nhan
ce w
orke
r’s a
war
enes
s in
hand
ling,
sorti
ng, r
euse
and
recy
clin
g of
C&
D
Was
te re
duct
ion,
reus
e, re
cycl
ing
and
prop
er
disp
osal
of w
aste
All
wor
k si
tes /
durin
gco
nstru
ctio
n
Con
stru
ctio
nC
ontra
ctor
��
Was
te D
ispo
sal
Ord
inan
ce
ETW
B T
CW
No.
19
/200
5
Agre
emen
t No.
CE
1/20
08 (W
S)
EM&
A M
anua
l Im
prov
emen
t of F
resh
Wat
er S
uppl
y to
Che
ung
Chau
Fi
nal
- Inv
estig
atio
n
283
1/B&
V/02
1/Is
sue
3
Janu
ary
2010
[283
1_EM
&A_
apa_
v3_j
an10
.doc
]A
PA-2
9B
&V
Impl
emen
tatio
nSt
ages
*E
IA Ref
EM
&A
Ref
Rec
omm
ende
d M
itiga
tion
Mea
sure
sO
bjec
tives
of t
he
Rec
omm
ende
dM
easu
res a
nd M
ain
Con
cern
s to
addr
esse
d
Loc
atio
n /
Tim
ing
Impl
emen
tatio
nA
gent
DC
O
Rel
evan
tL
egis
latio
n &
G
uide
lines
mat
eria
ls. R
equi
rem
ents
for s
taff
trai
ning
shou
ld b
e in
clud
ed in
the
EMP.
7.6.
5 5.
1.5
Goo
d pl
anni
ng a
nd si
te m
anag
emen
t pra
ctic
e sh
ould
be
empl
oyed
to e
limin
ate
over
ord
erin
g or
m
ixin
g of
con
stru
ctio
n m
ater
ials
to re
duce
was
tage
. Pr
oper
stor
age
and
site
pra
ctic
es w
ill m
inim
ise
the
dam
age
or c
onta
min
atio
n of
con
stru
ctio
n m
ater
ials
. R
egul
ar c
lean
ing
and
mai
nten
ance
of t
he w
aste
st
orag
e ar
ea sh
ould
be
prov
ided
.
Was
te re
duct
ion,
reus
e, re
cycl
ing
and
prop
er
disp
osal
of w
aste
All
wor
k si
tes /
durin
gco
nstru
ctio
n
Con
stru
ctio
nC
ontra
ctor
��
Was
te D
ispo
sal
Ord
inan
ce
ETW
B T
CW
No.
19
/200
5
7.6.
6 5.
1.6
Whe
re w
aste
gen
erat
ion
is u
navo
idab
le, t
he
pote
ntia
l for
recy
clin
g or
reus
e sh
ould
be
rigor
ousl
y ex
plor
ed. I
f was
tes c
anno
t be
recy
cled
, di
spos
al ro
utes
des
crib
ed in
the
EMP
shou
ld b
e fo
llow
ed. A
reco
ding
syst
em fo
r the
am
ount
of
was
te g
ener
ated
, rec
ycle
d an
d di
spos
ed (i
nclu
ding
th
e di
spos
al si
tes)
shou
ld b
e im
plem
ente
d. In
ord
er
to m
onito
r the
dis
posa
l of C
&D
mat
eria
l and
solid
w
aste
s at p
ublic
filli
ng fa
cilit
ies a
nd la
ndfil
ls a
nd to
co
ntro
l fly
-tipp
ing,
a tr
ip-ti
cket
syst
em sh
ould
be
incl
uded
. One
may
mak
e re
fere
nce
to E
TWB
TC
W
No.
31/
2004
for d
etai
ls.
Was
te re
duct
ion,
reus
e, re
cycl
ing
and
prop
er
disp
osal
of w
aste
All
wor
k si
tes /
durin
gco
nstru
ctio
n
Con
stru
ctio
nC
ontra
ctor
��
Was
te D
ispo
sal
Ord
inan
ce
ETW
B T
CW
No.
19
/200
5, 3
1/20
04
7.6.
7 5.
1.7
Impo
rted
soft
fill a
nd ro
cks,
if re
quire
d, sh
ould
be
sour
ce fr
om C
EDD
’s fi
ll ba
nk, o
ther
pro
ject
s or
othe
r app
rove
d so
urce
s ins
tead
of u
sing
new
m
ater
ials
. App
rova
l fro
m th
e En
gine
er a
nd a
ll ot
her
rele
vant
par
ties s
houl
d be
obt
aine
d by
the
Con
tract
or b
efor
e im
porta
tion
of th
e fil
l mat
eria
ls.
Was
te re
duct
ion,
reus
e, re
cycl
ing
and
prop
er
disp
osal
of w
aste
All
wor
k si
tes /
durin
gco
nstru
ctio
n
Con
stru
ctio
nC
ontra
ctor
��
Was
te D
ispo
sal
Ord
inan
ce
ETW
B T
CW
No.
19
/200
5
Agre
emen
t No.
CE
1/20
08 (W
S)
EM&
A M
anua
l Im
prov
emen
t of F
resh
Wat
er S
uppl
y to
Che
ung
Chau
Fi
nal
- Inv
estig
atio
n
283
1/B&
V/02
1/Is
sue
3
Janu
ary
2010
[283
1_EM
&A_
apa_
v3_j
an10
.doc
]A
PA-3
0B
&V
Impl
emen
tatio
nSt
ages
*E
IA Ref
EM
&A
Ref
Rec
omm
ende
d M
itiga
tion
Mea
sure
sO
bjec
tives
of t
he
Rec
omm
ende
dM
easu
res a
nd M
ain
Con
cern
s to
addr
esse
d
Loc
atio
n /
Tim
ing
Impl
emen
tatio
nA
gent
DC
O
Rel
evan
tL
egis
latio
n &
G
uide
lines
7.6.
8 5.
1.8
The
mai
n st
agin
g ar
ea o
f the
wor
ks sh
ould
be
loca
ted
at th
e pr
opos
ed la
unch
ing
site
in C
heun
g C
hau.
Sto
rage
of e
quip
men
t, m
ater
ials
, che
mic
al
was
te a
nd g
ener
al re
fuse
as w
ell a
s the
dril
ling
fluid
recy
clin
g sy
stem
shou
ld a
lso
be lo
cate
d in
C
heun
g C
hau.
Was
te re
duct
ion,
reus
e, re
cycl
ing
and
prop
er
disp
osal
of w
aste
All
wor
k si
tes /
durin
gco
nstru
ctio
n
Con
stru
ctio
nC
ontra
ctor
��
Was
te D
ispo
sal
Ord
inan
ce
ETW
B T
CW
No.
19
/200
5
On-
site
Sor
ting,
Reu
se a
nd R
ecyc
ling
�
7.6.
9 5.
1.9
All
was
te m
ater
ials
shou
ld b
e se
greg
ated
into
ca
tego
ries c
over
ing:
�ex
cava
ted
mat
eria
ls su
itabl
e fo
r pub
lic fi
lling
fa
cilit
ies;
�re
mai
ning
C&
D w
aste
for l
andf
ill;
�sp
ent b
ento
nite
for p
ublic
filli
ng fa
cilit
ies
�ch
emic
al w
aste
; and
�ge
nera
l ref
use
for l
andf
ill.
Was
te re
duct
ion,
reus
e, re
cycl
ing
and
prop
er
disp
osal
of w
aste
All
wor
k si
tes /
durin
gco
nstru
ctio
n
Con
stru
ctio
nC
ontra
ctor
��
Was
te D
ispo
sal
Ord
inan
ce
ETW
B T
CW
No.
19
/200
5
7.6.
10
5.1.
10Pr
oper
seg
rega
tion
and
disp
osal
of
cons
truct
ion
was
te s
houl
d be
im
plem
ente
d. S
epar
ate
cont
aine
rs
shou
ld b
e pr
ovid
ed fo
r ine
rt an
d no
n-in
ert w
aste
s.
Was
te r
educ
tion,
reu
se,
recy
clin
g an
d pr
oper
di
spos
al o
f was
te
All
wor
k si
tes /
durin
gco
nstru
ctio
n
Con
stru
ctio
nC
ontra
ctor
��
Was
te D
ispo
sal
Ord
inan
ce
ETW
B T
CW
No.
19
/200
5
Agre
emen
t No.
CE
1/20
08 (W
S)
EM&
A M
anua
l Im
prov
emen
t of F
resh
Wat
er S
uppl
y to
Che
ung
Chau
Fi
nal
- Inv
estig
atio
n
283
1/B&
V/02
1/Is
sue
3
Janu
ary
2010
[283
1_EM
&A_
apa_
v3_j
an10
.doc
]A
PA-3
1B
&V
Impl
emen
tatio
nSt
ages
*E
IA Ref
EM
&A
Ref
Rec
omm
ende
d M
itiga
tion
Mea
sure
sO
bjec
tives
of t
he
Rec
omm
ende
dM
easu
res a
nd M
ain
Con
cern
s to
addr
esse
d
Loc
atio
n /
Tim
ing
Impl
emen
tatio
nA
gent
DC
O
Rel
evan
tL
egis
latio
n &
G
uide
lines
7.6.
11
5.1.
11Th
e re
use
of e
xcav
ated
mat
eria
ls w
ithin
this
Pro
ject
sh
ould
be
ad
opte
d as
fa
r as
pr
actic
able
. Th
e op
portu
nity
of r
eusi
ng th
e m
ater
ial i
n ot
her p
roje
cts
in C
heun
g C
hau
shou
ld a
lso
be e
xplo
red.
Was
te r
educ
tion,
reu
se,
recy
clin
g an
d pr
oper
di
spos
al o
f was
te
All
wor
k si
tes /
durin
g de
taile
d de
sign
and
co
nstru
ctio
n
Det
aile
d D
esig
n En
gine
er /
Con
stru
ctio
nC
ontra
ctor
����
W
aste
Dis
posa
l O
rdin
ance
ETW
B T
CW
No.
19
/200
5
7.6.
12
5.1.
12So
rting
is im
porta
nt to
rec
over
mat
eria
ls f
or r
euse
an
d re
cycl
ing.
Spe
cific
are
a sh
ould
be
allo
cate
d fo
r on
-site
sor
ting
of C
&D
mat
eria
ls a
nd to
pro
vide
a
tem
pora
ry s
tora
ge a
rea
for
thos
e so
rted
mat
eria
ls
such
as
met
als,
conc
rete
, tim
ber,
plas
tics,
glas
s, ex
cava
ted
spoi
ls, b
ricks
/ til
es a
nd w
aste
pap
ers.
If
area
is li
mite
d, a
ll C
&D
mat
eria
ls sh
ould
at l
east
be
sorte
d on
-site
int
o in
ert
and
non-
iner
t co
mpo
nent
. N
on-in
ert m
ater
ials
(C
&D
was
te)
such
as
bam
boo,
tim
ber,
vege
tatio
n,
pack
agin
g w
aste
an
d ot
her
orga
nic
mat
eria
ls s
houl
d be
reu
sed
and
recy
cled
w
here
ver
poss
ible
and
dis
pose
d of
to
desi
gnat
ed
land
fill o
nly
as a
last
reso
rt. In
ert m
ater
ials
(pub
lic
fill)
such
as
co
ncre
te,
ston
e,
clay
, br
ick,
so
il,
asph
alt a
nd th
e lik
e sh
ould
be
sepa
rate
d an
d re
use
in th
is o
r oth
er p
roje
cts
(sub
ject
to a
ppro
val b
y th
e re
leva
nt p
artie
s in
acc
orda
nce
with
the
ETW
B
TCW
No.
31/
2004
) be
fore
dis
pose
d of
at a
pub
lic
fillin
g fa
cilit
y op
erat
ed b
y C
ivil
Engi
neer
ing
and
Dev
elop
men
t Dep
artm
ent (
CED
D).
Stee
l and
oth
er
met
als
shou
ld b
e re
cove
red
from
dem
oliti
on w
aste
st
ream
and
recy
cled
.
Was
te r
educ
tion,
reu
se,
recy
clin
g an
d pr
oper
di
spos
al o
f was
te
All
wor
k si
tes /
durin
gco
nstru
ctio
n
Con
stru
ctio
nC
ontra
ctor
��
Was
te D
ispo
sal
Ord
inan
ce
ETW
B T
CW
No.
19
/200
5, 3
1/20
04
Agre
emen
t No.
CE
1/20
08 (W
S)
EM&
A M
anua
l Im
prov
emen
t of F
resh
Wat
er S
uppl
y to
Che
ung
Chau
Fi
nal
- Inv
estig
atio
n
283
1/B&
V/02
1/Is
sue
3
Janu
ary
2010
[283
1_EM
&A_
apa_
v3_j
an10
.doc
]A
PA-3
2B
&V
Impl
emen
tatio
nSt
ages
*E
IA Ref
EM
&A
Ref
Rec
omm
ende
d M
itiga
tion
Mea
sure
sO
bjec
tives
of t
he
Rec
omm
ende
dM
easu
res a
nd M
ain
Con
cern
s to
addr
esse
d
Loc
atio
n /
Tim
ing
Impl
emen
tatio
nA
gent
DC
O
Rel
evan
tL
egis
latio
n &
G
uide
lines
7.6.
13
5.1.
13Th
e re
use
of in
ert m
ater
ials
suc
h as
soi
l, ro
ck a
nd
brok
en c
oncr
ete
shou
ld b
e m
axim
ised
. W
aste
sh
ould
be
se
para
ted
into
fin
e,
soft
and
hard
m
ater
ials
. W
ith th
e us
e of
a c
rush
er c
oars
e m
ater
ial
can
be c
rush
ed t
o m
ake
it su
itabl
e fo
r us
e as
fill
m
ater
ial
whe
re f
ill i
s re
quire
d in
the
wor
ks.
This
m
inim
ises
th
e us
e of
im
porte
d m
ater
ial
and
max
imis
es u
se o
f the
C&
D m
ater
ial p
rodu
ced.
Was
te r
educ
tion,
reu
se,
recy
clin
g an
d pr
oper
di
spos
al o
f was
te
All
wor
k si
tes /
durin
gco
nstru
ctio
n
Con
stru
ctio
nC
ontra
ctor
��
Was
te D
ispo
sal
Ord
inan
ce
ETW
B T
CW
No.
19
/200
5
7.6.
14
5.1.
14Pr
ior
to
expo
rt of
m
ater
ial
from
th
e si
te,
the
pote
ntia
l fo
r it
to b
e re
used
sho
uld
be a
sses
sed.
M
ost
C&
D m
ater
ial
can
easi
ly b
e re
used
with
m
inim
um p
roce
ssin
g. W
aste
sep
arat
ion
met
hods
sh
ould
be
follo
wed
to
ensu
re t
hat
C&
D w
aste
is
sepa
rate
d at
sou
rce.
Su
itabl
e so
ft m
ater
ials
sho
uld
be
used
fo
r la
ndsc
apin
g an
d gr
adin
g of
em
bank
men
ts.
Fine
mat
eria
l sh
ould
be
sepa
rate
d ou
t and
use
d as
tops
oil.
Was
te r
educ
tion,
reu
se,
recy
clin
g an
d pr
oper
di
spos
al o
f was
te
All
wor
k si
tes /
durin
gco
nstru
ctio
n
Con
stru
ctio
nC
ontra
ctor
��
Was
te D
ispo
sal
Ord
inan
ce
ETW
B T
CW
No.
19
/200
5
7.6.
15
5.1.
15Th
e fe
asib
ility
of u
sing
rec
ycle
d ag
greg
ates
in li
eu
of v
irgin
mat
eria
ls s
houl
d be
rigo
rous
ly c
onsi
dere
d du
ring
the
deta
iled
desi
gn a
nd c
onst
ruct
ion
stag
es
as s
tipul
ated
in
WB
TC N
o. 1
2/20
02 a
nd E
TWB
TC
W N
o. 2
4/20
04. I
n ge
nera
l, re
cycl
ed a
ggre
gate
s ar
e su
itabl
e fo
r us
e as
fill
mat
eria
ls in
ear
thw
orks
, ro
ad
sub-
base
fo
rmat
ion,
an
d dr
aina
ge
wor
ks.
Rec
ycle
d ag
greg
ates
can
als
o be
use
d in
con
cret
e (u
p to
Gra
de 3
5) fo
r mas
s co
ncre
te w
alls
and
oth
er
min
or s
truct
ures
suc
h as
pla
nter
box
es,
toe
wal
l
Was
te r
educ
tion,
reu
se,
recy
clin
g an
d pr
oper
di
spos
al o
f was
te
All
wor
k si
tes /
durin
gco
nstru
ctio
n
Con
stru
ctio
nC
ontra
ctor
��
Was
te D
ispo
sal
Ord
inan
ce
ETW
B T
CW
No.
19
/200
5, 2
4/20
04
WB
TC N
o.
12/2
002
Agre
emen
t No.
CE
1/20
08 (W
S)
EM&
A M
anua
l Im
prov
emen
t of F
resh
Wat
er S
uppl
y to
Che
ung
Chau
Fi
nal
- Inv
estig
atio
n
283
1/B&
V/02
1/Is
sue
3
Janu
ary
2010
[283
1_EM
&A_
apa_
v3_j
an10
.doc
]A
PA-3
3B
&V
Impl
emen
tatio
nSt
ages
*E
IA Ref
EM
&A
Ref
Rec
omm
ende
d M
itiga
tion
Mea
sure
sO
bjec
tives
of t
he
Rec
omm
ende
dM
easu
res a
nd M
ain
Con
cern
s to
addr
esse
d
Loc
atio
n /
Tim
ing
Impl
emen
tatio
nA
gent
DC
O
Rel
evan
tL
egis
latio
n &
G
uide
lines
plan
ters
and
pav
emen
t, et
c.
Site
Cle
aran
ce /
Dem
oliti
on M
ater
ials
Exca
vate
d M
ater
ials
7.6.
16
5.1.
16A
ll C
&D
mat
eria
ls s
houl
d be
sor
ted
on-s
ite i
nto
iner
t and
non
-iner
t co
mpo
nent
s by
the
Con
tract
or.
Non
ine
rt m
ater
ials
(C
&D
was
te)
such
as
woo
d,
glas
s an
d pl
astic
sho
uld
be r
euse
d an
d re
cycl
ed
befo
re d
ispo
sal
to a
des
igna
ted
land
fill
as a
las
t re
sort
(cur
rent
ly a
ssum
e to
be
the
WEN
T La
ndfil
l) vi
a th
e C
heun
g C
hau
Ref
use
Tran
sfer
Sta
tion.
Iner
t m
ater
ials
(pub
lic fi
ll) s
houl
d be
reus
ed o
n-si
te o
r in
othe
r pr
ojec
ts
appr
oved
by
re
leva
nt
parti
es
in
acco
rdan
ce w
ith t
he E
TWB
TC
W N
o. 3
1/20
04
befo
re d
ispo
sed
of a
t pub
lic fi
ll re
cept
ion
faci
litie
s. St
eel
and
othe
r m
etal
s if
any
shou
ld b
e re
cove
red
from
C&
D m
ater
ials
and
recy
cled
.
Was
te r
educ
tion,
reu
se,
recy
clin
g an
d pr
oper
di
spos
al o
f was
te
All
wor
k si
tes /
durin
gco
nstru
ctio
n
Con
stru
ctio
nC
ontra
ctor
��
Was
te D
ispo
sal
Ord
inan
ce
ETW
B T
CW
No.
19
/200
5, 3
1/20
04
7.6.
17
5.1.
17G
ood
qual
ity r
eusa
ble
tops
oil s
houl
d be
sto
ckpi
led
for
late
r la
ndsc
apin
g w
orks
. St
ockp
iles
shou
ld b
e le
ss th
an 2
m in
hei
ght,
form
ed to
a s
afe
angl
e of
re
pose
and
hyd
rose
eded
or
cove
red
with
tar
paul
in
to p
reve
nt e
rosi
on d
urin
g th
e ra
iny
seas
on a
nd t
o m
inim
ise
dust
gen
erat
ion.
Was
te r
educ
tion,
reu
se,
recy
clin
g an
d pr
oper
di
spos
al o
f was
te
All
wor
k si
tes /
durin
gco
nstru
ctio
n
Con
stru
ctio
nC
ontra
ctor
��
Was
te D
ispo
sal
Ord
inan
ce
ETW
B T
CW
No.
19
/200
5
7.6.
18
5.1.
18C
ontro
l m
easu
res
for
tem
pora
ry s
tock
pile
s on
-site
sh
ould
be
take
n in
ord
er t
o m
inim
ize
the
nois
e,
Was
te r
educ
tion,
reu
se,
recy
clin
g an
d pr
oper
A
ll w
ork
site
s /du
ring
Con
stru
ctio
nC
ontra
ctor
��
Was
te D
ispo
sal
Ord
inan
ce
Agre
emen
t No.
CE
1/20
08 (W
S)
EM&
A M
anua
l Im
prov
emen
t of F
resh
Wat
er S
uppl
y to
Che
ung
Chau
Fi
nal
- Inv
estig
atio
n
283
1/B&
V/02
1/Is
sue
3
Janu
ary
2010
[283
1_EM
&A_
apa_
v3_j
an10
.doc
]A
PA-3
4B
&V
Impl
emen
tatio
nSt
ages
*E
IA Ref
EM
&A
Ref
Rec
omm
ende
d M
itiga
tion
Mea
sure
sO
bjec
tives
of t
he
Rec
omm
ende
dM
easu
res a
nd M
ain
Con
cern
s to
addr
esse
d
Loc
atio
n /
Tim
ing
Impl
emen
tatio
nA
gent
DC
O
Rel
evan
tL
egis
latio
n &
G
uide
lines
gene
ratio
n of
dus
t, po
llutio
n of
wat
er a
nd v
isua
l im
pact
. The
se m
easu
res i
nclu
de:
�su
rfac
e of
sto
ckpi
led
soil
shou
ld b
e re
gula
rly
wet
ted
with
w
ater
es
peci
ally
du
ring
dry
seas
on;
�di
stur
banc
e of
st
ockp
iled
soil
shou
ld
be
min
imiz
ed;
�st
ockp
iled
soil
shou
ld b
e pr
oper
ly c
over
ed w
ith
tarp
aulin
esp
ecia
lly w
hen
heav
y ra
in s
torm
s ar
e pr
edic
ted;
�st
ockp
iling
are
as s
houl
d be
enc
lose
d w
here
sp
ace
is a
vaila
ble;
�st
ockp
iling
loc
atio
n sh
ould
be
away
fro
m t
he
wat
er b
odie
s; a
nd
�an
inde
pend
ent
surf
ace
wat
er d
rain
age
syst
em
equi
pped
with
silt
tra
ps s
houl
d be
ins
talle
d at
th
e st
ockp
iling
are
a.
disp
osal
of w
aste
co
nstru
ctio
n ET
WB
TC
W N
o.
19/2
005
7.6.
19
5.1.
19Th
e id
entif
icat
ion
of f
inal
dis
posa
l si
tes
for
C&
D
mat
eria
ls g
ener
ated
by
the
cons
truct
ion
wor
ks w
ill
be c
onsi
dere
d du
ring
the
deta
iled
desi
gn s
tage
of
the
Proj
ect
whe
n th
e vo
lum
e an
d ty
pes
of C
&D
m
ater
ials
can
be
mor
e ac
cura
tely
est
imat
ed.
The
Publ
ic
Fill
Com
mitt
ee
of
CED
D
shou
ld
be
cons
ulte
d on
des
igna
ted
outle
ts (
e.g.
pub
lic f
ill
rece
ptio
n fa
cilit
y) fo
r pub
lic fi
ll, w
hils
t EPD
shou
ld
Was
te r
educ
tion,
reu
se,
recy
clin
g an
d pr
oper
di
spos
al o
f was
te
All
wor
k si
tes /
durin
gco
nstru
ctio
n
Con
stru
ctio
nC
ontra
ctor
��
Was
te D
ispo
sal
Ord
inan
ce
ETW
B T
CW
No.
19
/200
5, 3
4/20
02
WB
TC N
o.
12/2
000
Agre
emen
t No.
CE
1/20
08 (W
S)
EM&
A M
anua
l Im
prov
emen
t of F
resh
Wat
er S
uppl
y to
Che
ung
Chau
Fi
nal
- Inv
estig
atio
n
283
1/B&
V/02
1/Is
sue
3
Janu
ary
2010
[283
1_EM
&A_
apa_
v3_j
an10
.doc
]A
PA-3
5B
&V
Impl
emen
tatio
nSt
ages
*E
IA Ref
EM
&A
Ref
Rec
omm
ende
d M
itiga
tion
Mea
sure
sO
bjec
tives
of t
he
Rec
omm
ende
dM
easu
res a
nd M
ain
Con
cern
s to
addr
esse
d
Loc
atio
n /
Tim
ing
Impl
emen
tatio
nA
gent
DC
O
Rel
evan
tL
egis
latio
n &
G
uide
lines
be c
onsu
lted
on l
andf
ills
for
C&
D w
aste
. Th
e pu
blic
fill
to
be d
ispo
sed
to p
ublic
fill
rec
eptio
n fa
cilit
ies
mus
t con
sist
ent
irely
of
iner
t con
stru
ctio
n m
ater
ials
. Dis
posa
l of
C&
D w
aste
to la
ndfil
l mus
t no
t ha
ve
mor
e th
an
50%
by
w
eigh
t of
in
ert
mat
eria
l. Th
e C
&D
was
te d
eliv
ered
for
lan
dfill
di
spos
al sh
ould
con
tain
no
free
wat
er a
nd th
e liq
uid
cont
ent s
houl
d no
t exc
eed
70%
by
wei
ght.
7.6.
20
5.1.
20In
ord
er to
avo
id d
ust o
r odo
ur im
pact
s, an
y ve
hicl
e le
avin
g a
wor
ks a
rea
carr
ying
C&
D w
aste
or p
ublic
fil
l sh
ould
hav
e th
eir
load
cov
ered
bef
ore
leav
ing
the
cons
truct
ion
site
.
Was
te r
educ
tion,
reu
se,
recy
clin
g an
d pr
oper
di
spos
al o
f was
te
All
wor
k si
tes /
durin
gco
nstru
ctio
n
Con
stru
ctio
nC
ontra
ctor
��
Was
te D
ispo
sal
Ord
inan
ce
ETW
B T
CW
No.
19
/200
5
WB
TC N
o.
19/2
001
7.6.
21
5.1.
21C
&D
mat
eria
ls s
houl
d be
dis
pose
d of
at d
esig
nate
d pu
blic
fill
rec
eptio
n fa
cilit
ies
or la
ndfil
ls. R
euse
of
publ
ic fi
ll m
ater
ials
at o
ther
con
stru
ctio
n pr
ojec
ts is
su
bjec
t to
the
app
rova
l of
the
rel
evan
t pr
ojec
t pr
opon
ents
, En
gine
er
and/
or
othe
r re
leva
nt
auth
oriti
es,
such
as
La
ndsD
, Pl
anD
, et
c.
Furth
erm
ore,
un
auth
oriz
ed
disp
osal
of
C
&D
m
ater
ials
in
parti
cula
r on
priv
ate
agric
ultu
ral
land
is
pr
ohib
ited
and
may
be
su
bjec
t to
re
leva
nt
enfo
rcem
ent a
nd re
gula
ting
actio
ns. T
he C
ontra
ctor
sh
all r
efer
and
stri
ctly
follo
w th
e tri
p-tic
ket s
yste
m
for
the
disp
osal
of
C&
D m
ater
ials
as
stip
ulat
ed in
Was
te r
educ
tion,
reu
se,
recy
clin
g an
d pr
oper
di
spos
al o
f was
te
All
wor
k si
tes /
durin
gco
nstru
ctio
n
Con
stru
ctio
nC
ontra
ctor
��
Was
te D
ispo
sal
Ord
inan
ce
ETW
B T
CW
No.
19
/200
5, 3
1/20
04
Agre
emen
t No.
CE
1/20
08 (W
S)
EM&
A M
anua
l Im
prov
emen
t of F
resh
Wat
er S
uppl
y to
Che
ung
Chau
Fi
nal
- Inv
estig
atio
n
283
1/B&
V/02
1/Is
sue
3
Janu
ary
2010
[283
1_EM
&A_
apa_
v3_j
an10
.doc
]A
PA-3
6B
&V
Impl
emen
tatio
nSt
ages
*E
IA Ref
EM
&A
Ref
Rec
omm
ende
d M
itiga
tion
Mea
sure
sO
bjec
tives
of t
he
Rec
omm
ende
dM
easu
res a
nd M
ain
Con
cern
s to
addr
esse
d
Loc
atio
n /
Tim
ing
Impl
emen
tatio
nA
gent
DC
O
Rel
evan
tL
egis
latio
n &
G
uide
lines
the
ETW
B T
CW
No.
31/
2004
.
Bent
onite
�
7.6.
22
5.1.
22B
ento
nite
slu
rry
used
in
the
drill
ing
wor
ks s
houl
d be
trea
ted
and
recy
cled
at t
he w
orks
are
a in
Che
ung
Cha
u.
Any
be
nton
ite
that
is
no
t su
itabl
e fo
r re
cycl
ing
shou
ld
be
suita
bly
dew
ater
ed
befo
re
disp
osed
of a
t pub
lic fi
ll re
cept
ion
faci
litie
s.
Was
te r
educ
tion,
reu
se,
recy
clin
g an
d pr
oper
di
spos
al o
f was
te
All
wor
k si
tes /
durin
gco
nstru
ctio
n
Con
stru
ctio
nC
ontra
ctor
��
Was
te D
ispo
sal
Ord
inan
ce
ETW
B T
CW
No.
19
/200
5
WB
TC N
o.
19/2
001
Che
mic
al W
aste
7.6.
23
5.1.
23W
here
the
cons
truct
ion
proc
esse
s pro
duce
che
mic
al
was
te, t
he C
ontra
ctor
mus
t reg
iste
r w
ith E
PD a
s a
chem
ical
w
aste
pr
oduc
er.
Was
tes
clas
sifie
d as
ch
emic
al w
aste
s ar
e lis
ted
in t
he W
aste
Dis
posa
l (C
hem
ical
W
aste
) (G
ener
al)
Reg
ulat
ion.
Th
ese
was
tes
are
subj
ect t
o st
ringe
nt d
ispo
sal r
oute
s. EP
D
requ
ires
info
rmat
ion
on th
e pa
rticu
lars
of t
he w
aste
ge
nera
tion
proc
esse
s in
clud
ing
the
type
s of
was
te
prod
uced
, the
ir lo
catio
n, q
uant
ities
and
gen
erat
ion
rate
s. A
no
min
ated
co
ntac
t pe
rson
m
ust
be
regi
ster
ed w
ith E
PD.
An
upda
ted
list
of l
icen
sed
chem
ical
was
te c
olle
ctor
can
be
obta
ined
fro
m
EPD
.
Was
te r
educ
tion,
reu
se,
recy
clin
g an
d pr
oper
di
spos
al
of
chem
ical
w
aste
All
wor
k si
tes /
durin
gco
nstru
ctio
n
Con
stru
ctio
nC
ontra
ctor
��
Was
te D
ispo
sal
(Che
mic
al W
aste
) (G
ener
al)
Reg
ulat
ion
Cod
e of
Pra
ctic
e on
the
Pack
agin
g La
belli
ng a
nd
Stor
age
of
Che
mic
al W
aste
7.6.
24
5.1.
24St
orag
e, ha
ndlin
g, tr
ansp
ort a
nd d
ispos
al o
f che
mic
al
Was
te r
educ
tion,
reu
se,
All
wor
k si
tes /
durin
gC
onst
ruct
ion
��
Was
te D
ispo
sal
(Che
mic
al W
aste
)
Agre
emen
t No.
CE
1/20
08 (W
S)
EM&
A M
anua
l Im
prov
emen
t of F
resh
Wat
er S
uppl
y to
Che
ung
Chau
Fi
nal
- Inv
estig
atio
n
283
1/B&
V/02
1/Is
sue
3
Janu
ary
2010
[283
1_EM
&A_
apa_
v3_j
an10
.doc
]A
PA-3
7B
&V
Impl
emen
tatio
nSt
ages
*E
IA Ref
EM
&A
Ref
Rec
omm
ende
d M
itiga
tion
Mea
sure
sO
bjec
tives
of t
he
Rec
omm
ende
dM
easu
res a
nd M
ain
Con
cern
s to
addr
esse
d
Loc
atio
n /
Tim
ing
Impl
emen
tatio
nA
gent
DC
O
Rel
evan
tL
egis
latio
n &
G
uide
lines
was
te sh
ould
be
arra
nged
in a
ccor
danc
e w
ith th
e Co
de
of P
ract
ice
on th
e Pa
ckag
ing,
Lab
ellin
g an
d St
orag
e of
Che
mic
al W
aste
s pub
lishe
d by
EPD
, and
shou
ld b
e co
llect
ed b
y a
licen
sed
chem
ical
was
te c
olle
ctor
.
recy
clin
g an
d pr
oper
di
spos
al
of
chem
ical
w
aste
cons
truct
ion
Con
tract
or
(Gen
eral
)R
egul
atio
n
Cod
e of
Pra
ctic
e on
the
Pack
agin
g La
belli
ng a
nd
Stor
age
of
Che
mic
al W
aste
7.6.
25
5.1.
25Su
itabl
e co
ntai
ners
sho
uld
be u
sed
for
spec
ific
type
s of
che
mic
al w
aste
s, co
ntai
ners
sho
uld
be
prop
erly
la
belle
d (E
nglis
h an
d C
hine
se
in
acco
rdan
ce
with
in
stru
ctio
ns
pres
crib
ed
in
Sche
dule
2
of
the
Reg
ulat
ions
), re
sist
ance
to
co
rros
ion,
sto
red
safe
ly a
nd c
lose
ly s
ecur
e. S
tore
d vo
lum
e sh
ould
not
be
kept
mor
e th
an 4
50 l
iters
un
less
the
spe
cific
atio
n ha
s be
en a
ppro
ved
by t
he
EPD
. St
orag
e ar
ea s
houl
d be
enc
lose
d by
thr
ee
side
s by
a w
all,
parti
tion
of f
ence
that
is a
t lea
st 2
m
he
ight
or
he
ight
of
ta
llest
co
ntai
ner
with
ad
equa
te v
entil
atio
n an
d sp
ace.
Was
te r
educ
tion,
reu
se,
recy
clin
g an
d pr
oper
di
spos
al
of
chem
ical
w
aste
All
wor
k si
tes /
durin
gco
nstru
ctio
n
Con
stru
ctio
nC
ontra
ctor
��
Was
te D
ispo
sal
(Che
mic
al W
aste
) (G
ener
al)
Reg
ulat
ion
Cod
e of
Pra
ctic
e on
the
Pack
agin
g La
belli
ng a
nd
Stor
age
of
Che
mic
al W
aste
7.6.
26
5.1.
26H
ard
stan
ding
, im
perm
eabl
e su
rfac
es d
rain
ing
via
oil
inte
rcep
tors
sho
uld
be p
rovi
ded
in w
orks
are
a co
mpo
unds
. In
terc
epto
rs
shou
ld
be
regu
larly
em
ptie
d to
pre
vent
rel
ease
of
oils
and
gre
ase
into
th
e su
rfac
e w
ater
dra
inag
e sy
stem
afte
r ac
cide
ntal
sp
illag
es. T
he i
nter
cept
or s
houl
d ha
ve a
byp
ass
to
prev
ent
flush
ing
durin
g pe
riods
of
heav
y ra
in. O
il an
d fu
el b
unke
rs s
houl
d be
bun
ded
and/
or e
nclo
sed
Was
te r
educ
tion,
reu
se,
recy
clin
g an
d pr
oper
di
spos
al
of
chem
ical
w
aste
Wor
k si
tes /
Dur
ing
cons
truct
ion
Con
stru
ctio
nC
ontra
ctor
��
Was
te D
ispo
sal
(Che
mic
al W
aste
) (G
ener
al)
Reg
ulat
ion
Cod
e of
Pra
ctic
e on
the
Pack
agin
g La
belli
ng a
nd
Stor
age
of
Agre
emen
t No.
CE
1/20
08 (W
S)
EM&
A M
anua
l Im
prov
emen
t of F
resh
Wat
er S
uppl
y to
Che
ung
Chau
Fi
nal
- Inv
estig
atio
n
283
1/B&
V/02
1/Is
sue
3
Janu
ary
2010
[283
1_EM
&A_
apa_
v3_j
an10
.doc
]A
PA-3
8B
&V
Impl
emen
tatio
nSt
ages
*E
IA Ref
EM
&A
Ref
Rec
omm
ende
d M
itiga
tion
Mea
sure
sO
bjec
tives
of t
he
Rec
omm
ende
dM
easu
res a
nd M
ain
Con
cern
s to
addr
esse
d
Loc
atio
n /
Tim
ing
Impl
emen
tatio
nA
gent
DC
O
Rel
evan
tL
egis
latio
n &
G
uide
lines
on
thre
e si
des
to
prev
ent
disc
harg
e du
e to
ac
cide
ntal
spi
llage
s or
bre
ache
s of
tan
ks. B
undi
ng
shou
ld b
e of
suf
ficie
nt c
apac
ity t
o ac
com
mod
ate
110%
of t
he v
olum
e of
the
larg
est c
onta
iner
or 2
0%
of th
e to
tal v
olum
e of
was
te, w
hich
ever
is la
rges
t. W
aste
col
lect
ed f
rom
any
gre
ase
traps
sho
uld
be
colle
cted
and
dis
pose
d of
by
a lic
ense
d co
ntra
ctor
.
Che
mic
al W
aste
7.6.
27
5.1.
27Lu
bric
ants
, w
aste
oils
and
oth
er c
hem
ical
was
tes
are
likel
y to
be
gene
rate
d du
ring
the
mai
nten
ance
of
ve
hicl
es
and
mec
hani
cal
equi
pmen
t. U
sed
lubr
ican
ts
shou
ld
be
colle
cted
an
d st
ored
in
in
divi
dual
con
tain
ers
whi
ch a
re f
ully
lab
elle
d in
En
glis
h an
d C
hine
se a
nd s
tore
d in
a d
esig
nate
d se
cure
pla
ce. I
f pos
sibl
e, s
uch
was
te s
houl
d be
sen
t to
oil
recy
clin
g co
mpa
nies
, an
d th
e em
pty
oil
drum
s col
lect
ed b
y ap
prop
riate
com
pani
es fo
r reu
se
or re
fill.
Was
te r
educ
tion,
reu
se,
recy
clin
g an
d pr
oper
di
spos
al
of
chem
ical
w
aste
All
wor
k si
tes /
durin
gco
nstru
ctio
n
Con
stru
ctio
nC
ontra
ctor
��
Was
te D
ispo
sal
(Che
mic
al W
aste
) (G
ener
al)
Reg
ulat
ion
Cod
e of
Pra
ctic
e on
the
Pack
agin
g La
belli
ng a
nd
Stor
age
of
Che
mic
al W
aste
7.6.
28
5.1.
28Th
e re
gist
ered
che
mic
al w
aste
pro
duce
r (i.
e. t
he
cont
ract
or) h
as to
arr
ange
for t
he c
hem
ical
was
te to
be
col
lect
ed b
y lic
ense
d co
llect
ors.
The
licen
sed
colle
ctor
sho
uld
regu
larly
take
che
mic
al w
aste
to a
lic
ense
d ch
emic
al w
aste
trea
tmen
t fac
ility
(su
ch a
s th
e C
hem
ical
Was
te T
reat
men
t Cen
tre in
Tsi
ng Y
i).
A
trip
ticke
t sy
stem
op
erat
es
to
cont
rol
the
mov
emen
t of c
hem
ical
was
tes.
Was
te r
educ
tion,
reu
se,
recy
clin
g an
d pr
oper
di
spos
al
of
chem
ical
w
aste
All
wor
k si
tes /
durin
gco
nstru
ctio
n
Con
stru
ctio
nC
ontra
ctor
��
Was
te D
ispo
sal
(Che
mic
al W
aste
) (G
ener
al)
Reg
ulat
ion
Cod
e of
Pra
ctic
e on
the
Pack
agin
g La
belli
ng a
nd
Stor
age
of
Che
mic
al W
aste
Agre
emen
t No.
CE
1/20
08 (W
S)
EM&
A M
anua
l Im
prov
emen
t of F
resh
Wat
er S
uppl
y to
Che
ung
Chau
Fi
nal
- Inv
estig
atio
n
283
1/B&
V/02
1/Is
sue
3
Janu
ary
2010
[283
1_EM
&A_
apa_
v3_j
an10
.doc
]A
PA-3
9B
&V
Impl
emen
tatio
nSt
ages
*E
IA Ref
EM
&A
Ref
Rec
omm
ende
d M
itiga
tion
Mea
sure
sO
bjec
tives
of t
he
Rec
omm
ende
dM
easu
res a
nd M
ain
Con
cern
s to
addr
esse
d
Loc
atio
n /
Tim
ing
Impl
emen
tatio
nA
gent
DC
O
Rel
evan
tL
egis
latio
n &
G
uide
lines
7.6.
29
5.1.
29N
o lu
bric
ants
, oi
ls,
solv
ents
or
pa
int
prod
ucts
sh
ould
be
allo
wed
to d
isch
arge
into
wat
er c
ours
es,
eith
er
by
dire
ct
disc
harg
e,
or
as
cont
amin
ants
ca
rrie
d in
su
rfac
e w
ater
ru
noff
fr
om
the
cons
truct
ion
site
.
Was
te r
educ
tion,
reu
se,
recy
clin
g an
d pr
oper
di
spos
al
of
chem
ical
w
aste
All
wor
k si
tes /
durin
gco
nstru
ctio
n
Con
stru
ctio
nC
ontra
ctor
��
Was
te D
ispo
sal
(Che
mic
al W
aste
) (G
ener
al)
Reg
ulat
ion
Cod
e of
Pra
ctic
e on
the
Pack
agin
g La
belli
ng a
nd
Stor
age
of
Che
mic
al W
aste
7.6.
30
5.1.
30C
hem
ical
was
te s
houl
d be
sto
red
in t
he w
orks
co
mpo
und
at C
heun
g C
hau,
no
chem
ical
was
te
shou
ld b
e st
ored
in th
e w
orks
site
at L
anta
u.
To m
inim
ize
impa
cts o
n La
ntau
So
uth
Coun
try
Park
The
wor
k si
te a
t La
ntau
/ d
urin
g co
nstru
ctio
n
Con
stru
ctio
nC
ontra
ctor
��
EIA
O-T
M
7.6.
31
5.1.
31Th
e C
ontra
ctor
sh
ould
pr
epar
e an
Em
erge
ncy
Con
tinge
ncy
Plan
(sp
ill r
espo
nse
plan
) fo
r th
e Pr
ojec
t to
cont
ain
and
rem
ove
acci
dent
al sp
illag
e of
dr
illin
g flu
ids,
chem
ical
s an
d al
l ha
zard
ous
mat
eria
ls o
n-si
te in
clud
ing
fuel
s at
sho
rt no
tice
and
to
prev
ent
or
to
min
imiz
e th
e qu
antit
ies
of
cont
amin
ants
fr
om
ente
ring
the
near
by
wat
er
bodi
es a
nd a
ffec
ting
the
sens
itive
hab
itats
. Det
ails
of
the
requ
irem
ents
are
pre
sent
ed i
n C
hapt
er 3
of
the
EIA
.
To
min
imiz
e im
pact
s fro
m a
ccid
enta
l spi
llage
of
dr
illin
g flu
ids
and
chem
ical
s on-
site
All
wor
k si
tes /
durin
gco
nstru
ctio
n
Con
stru
ctio
nC
ontra
ctor
��
EIA
O-T
M
Gen
eral
Wor
ks W
aste
Agre
emen
t No.
CE
1/20
08 (W
S)
EM&
A M
anua
l Im
prov
emen
t of F
resh
Wat
er S
uppl
y to
Che
ung
Chau
Fi
nal
- Inv
estig
atio
n
283
1/B&
V/02
1/Is
sue
3
Janu
ary
2010
[283
1_EM
&A_
apa_
v3_j
an10
.doc
]A
PA-4
0B
&V
Impl
emen
tatio
nSt
ages
*E
IA Ref
EM
&A
Ref
Rec
omm
ende
d M
itiga
tion
Mea
sure
sO
bjec
tives
of t
he
Rec
omm
ende
dM
easu
res a
nd M
ain
Con
cern
s to
addr
esse
d
Loc
atio
n /
Tim
ing
Impl
emen
tatio
nA
gent
DC
O
Rel
evan
tL
egis
latio
n &
G
uide
lines
Con
cret
e W
aste
7.6.
32
5.1.
32D
ry
conc
rete
w
aste
(c
onsi
dere
d as
pu
blic
fil
l) sh
ould
be
sorte
d ou
t fr
om t
he o
ther
was
tes
and
recy
cled
for
reu
se o
r so
rted
out
for
disp
osal
at
desi
gnat
ed p
ublic
filli
ng fa
cilit
ies.
Was
te r
educ
tion,
reu
se,
recy
clin
g an
d pr
oper
di
spos
al o
f was
te
All
wor
k si
tes /
durin
gco
nstru
ctio
n
Con
stru
ctio
nC
ontra
ctor
��
Was
te D
ispo
sal
Ord
inan
ce
ETW
B T
CW
No.
19
/200
5, 3
3/20
02
Woo
den
Mat
eria
ls
7.6.
33
5.1.
33A
ll w
oode
n m
ater
ials
use
d on
-site
sho
uld
be k
ept
sepa
rate
from
oth
er w
aste
s to
avo
id d
amag
e an
d to
fa
cilit
ate
reus
e. T
imbe
r w
hich
can
not
be r
euse
d sh
ould
be
sorte
d ou
t fr
om o
ther
was
te a
nd s
tore
d se
para
tely
fr
om
all
iner
t w
aste
be
fore
be
ing
disp
osed
of t
o la
ndfil
l.
Was
te r
educ
tion,
reu
se,
recy
clin
g an
d pr
oper
di
spos
al o
f was
te
All
wor
k si
tes /
durin
gco
nstru
ctio
n
Con
stru
ctio
nC
ontra
ctor
��
Was
te D
ispo
sal
Ord
inan
ce
ETW
B T
CW
No.
19
/200
5, 3
3/20
02
7.6.
34
5.1.
34R
eusa
ble
stee
l or
con
cret
e pa
nel
shut
ters
, fe
ncin
g an
d ho
ardi
ng a
nd s
ignb
oard
sho
uld
be u
sed
as a
pr
efer
red
alte
rnat
ive
to i
tem
s m
ade
of w
ood,
to
min
imis
e w
asta
ge o
f w
ood.
Atte
ntio
n sh
ould
be
paid
to
W
BTC
N
o.
19/2
001
- M
etal
lic
Site
H
oard
ings
and
Sig
nboa
rds
to re
duce
the
amou
nt o
f tim
ber
used
on
co
nstru
ctio
n si
tes.
Met
allic
al
tern
ativ
es t
o tim
ber
are
read
ily a
vaila
ble
and
shou
ld b
e us
ed r
athe
r th
an n
ew t
imbe
r. P
reca
st
conc
rete
uni
ts s
houl
d be
ado
pted
whe
reve
r fea
sibl
e to
min
imiz
e th
e us
e of
tim
ber f
orm
wor
k.
Was
te r
educ
tion,
reu
se,
recy
clin
g an
d pr
oper
di
spos
al o
f was
te
All
wor
k si
tes /
durin
gco
nstru
ctio
n
Con
stru
ctio
nC
ontra
ctor
��
Was
te D
ispo
sal
Ord
inan
ce
ETW
B T
CW
No.
19
/200
5, 3
3/20
02
Agre
emen
t No.
CE
1/20
08 (W
S)
EM&
A M
anua
l Im
prov
emen
t of F
resh
Wat
er S
uppl
y to
Che
ung
Chau
Fi
nal
- Inv
estig
atio
n
283
1/B&
V/02
1/Is
sue
3
Janu
ary
2010
[283
1_EM
&A_
apa_
v3_j
an10
.doc
]A
PA-4
1B
&V
Impl
emen
tatio
nSt
ages
*E
IA Ref
EM
&A
Ref
Rec
omm
ende
d M
itiga
tion
Mea
sure
sO
bjec
tives
of t
he
Rec
omm
ende
dM
easu
res a
nd M
ain
Con
cern
s to
addr
esse
d
Loc
atio
n /
Tim
ing
Impl
emen
tatio
nA
gent
DC
O
Rel
evan
tL
egis
latio
n &
G
uide
lines
7.6.
35
5.1.
35O
nly
was
te m
ater
ial n
eed
be ta
ken
to a
land
fill.
It sh
ould
be
sepa
rate
d fr
om re
cycl
able
woo
d an
d st
eel
mat
eria
ls.
As
for
all
was
te t
ypes
the
se m
ater
ials
sh
ould
be
reus
ed o
n-si
te o
r ot
her
appr
oved
site
s be
fore
di
spos
al
is
cons
ider
ed
as
an
optio
n.
Dis
posa
l to
land
fill s
houl
d on
ly b
e co
nsid
ered
as
a fin
al
optio
n.
C
ontra
ctor
s ar
e re
spon
sibl
e fo
r st
orag
e of
re-u
seab
le m
ater
ials
on-
site
.
Was
te r
educ
tion,
reu
se,
recy
clin
g an
d pr
oper
di
spos
al o
f was
te
All
wor
k si
tes /
durin
gco
nstru
ctio
n
Con
stru
ctio
nC
ontra
ctor
��
Was
te D
ispo
sal
Ord
inan
ce
ETW
B T
CW
No.
19
/200
5, 3
3/20
02
Mun
icip
al W
aste
7.6.
36
5.1.
36G
ener
al r
efus
e ge
nera
ted
on-s
ite s
houl
d be
sto
red
in e
nclo
sed
bins
or
skip
s an
d co
llect
ed s
epar
atel
y fr
om o
ther
con
stru
ctio
n an
d ch
emic
al w
aste
s an
d di
spos
ed o
f at
des
igna
ted
land
fill.
A t
empo
rary
re
fuse
col
lect
ion
poin
t sh
ould
be
set
up b
y th
e co
ntra
ctor
to
faci
litat
e th
e co
llect
ion
of r
efus
e by
lic
ense
d co
ntra
ctor
s. Th
e re
mov
al o
f w
aste
fro
m
the
site
sho
uld
be a
rran
ged
on a
dai
ly o
r at l
east
on
ever
y se
cond
day
by
the
Con
tract
or t
o m
inim
ise
any
pote
ntia
l odo
ur im
pact
s, m
inim
ise
the
pres
ence
of
pes
ts, v
erm
in a
nd o
ther
sca
veng
ers
and
prev
ent
unsi
ghtly
acc
umul
atio
n of
was
te.
Was
te r
educ
tion,
reu
se,
recy
clin
g an
d pr
oper
di
spos
al o
f was
te
All
wor
k si
tes /
durin
gco
nstru
ctio
n
Con
stru
ctio
nC
ontra
ctor
��
Was
te D
ispo
sal
Ord
inan
ce
ETW
B T
CW
No.
19
/200
5
7.6.
37
5.1.
37Fo
r the
wor
ks w
ithin
Lan
tau
Sout
h Co
untry
Par
k, th
e Co
ntra
ctor
sh
ould
en
sure
th
at
all
gene
ral
refu
se
incl
udin
g fo
od
scra
ps
and
pack
agin
g m
ater
ials
gene
rate
d by
the
wor
kers
are
pro
perly
pac
ked
and
rem
oved
from
site
dai
ly a
t the
end
of e
ach
wor
k sh
ift.
To m
inim
ize
impa
cts o
n La
ntau
So
uth
Coun
try
Park
The
wor
k si
te a
t La
ntau
/ d
urin
g co
nstru
ctio
n
Con
stru
ctio
nC
ontra
ctor
��
EIA
O-T
M
Agre
emen
t No.
CE
1/20
08 (W
S)
EM&
A M
anua
l Im
prov
emen
t of F
resh
Wat
er S
uppl
y to
Che
ung
Chau
Fi
nal
- Inv
estig
atio
n
283
1/B&
V/02
1/Is
sue
3
Janu
ary
2010
[283
1_EM
&A_
apa_
v3_j
an10
.doc
]A
PA-4
2B
&V
Impl
emen
tatio
nSt
ages
*E
IA Ref
EM
&A
Ref
Rec
omm
ende
d M
itiga
tion
Mea
sure
sO
bjec
tives
of t
he
Rec
omm
ende
dM
easu
res a
nd M
ain
Con
cern
s to
addr
esse
d
Loc
atio
n /
Tim
ing
Impl
emen
tatio
nA
gent
DC
O
Rel
evan
tL
egis
latio
n &
G
uide
lines
No
refu
se sh
ould
be
left
in th
e w
orks
are
a at
Lan
tau.
7.6.
38
5.1.
38Th
e re
cycl
able
com
pone
nt o
f th
e m
unic
ipal
was
te
gene
rate
d by
the
wor
kfor
ce,
such
as
alum
iniu
m
cans
, pap
er a
nd c
lean
sed
plas
tic c
onta
iner
s sh
ould
be
se
para
ted
from
ot
her
was
te.
Prov
isio
n an
d co
llect
ion
of r
ecyc
ling
bins
for
diff
eren
t ty
pes
of
recy
clab
le
was
te
shou
ld
be
set
up
by
the
Con
tract
or.
The
cont
ract
or
shou
ld
also
be
re
spon
sibl
e fo
r ar
rang
ing
recy
clin
g co
mpa
nies
to
colle
ct th
ese
mat
eria
ls.
Was
te r
educ
tion,
reu
se,
recy
clin
g an
d pr
oper
di
spos
al o
f was
te
All
wor
k si
tes /
durin
gco
nstru
ctio
n
Con
stru
ctio
nC
ontra
ctor
��
Was
te D
ispo
sal
Ord
inan
ce
ETW
B T
CW
No.
19
/200
5
7.6.
39
5.1.
39Th
e bu
rnin
g of
ref
use
on-s
ite i
s pr
ohib
ited
unde
r th
e A
ir Po
llutio
n C
ontro
l O
rdin
ance
(A
PCO
) (C
ap.3
11).
Was
te r
educ
tion,
reu
se,
recy
clin
g an
d pr
oper
di
spos
al
of
was
te
as
wel
l as
ai
r po
llutio
n co
ntro
l
All
wor
k si
tes /
durin
gco
nstru
ctio
n
Con
stru
ctio
nC
ontra
ctor
��
Was
te D
ispo
sal
Ord
inan
ce
ETW
B T
CW
No.
19
/200
5
Air
Pollu
tion
Con
trol O
rdin
ance
Was
te –
Ope
ratio
n Ph
ase
Nil
��
*
D=D
esig
n, C
=Con
stru
ctio
n, O
=Ope
ratio
nN
/A
Not
app
licab
le
Agre
emen
t No.
CE
1/20
08 (W
S)
EM&
A M
anua
l Im
prov
emen
t of F
resh
Wat
er S
uppl
y to
Che
ung
Chau
Fi
nal
- Inv
estig
atio
n
283
1/B&
V/02
1/Is
sue
3
Janu
ary
2010
[283
1_EM
&A_
apa_
v3_j
an10
.doc
]A
PA-4
3B
&V
Tab
le A
.5
Im
plem
enta
tion
Sche
dule
of C
onst
ruct
ion
Noi
se M
itiga
tion
Mea
sure
s
Impl
emen
tatio
nSt
ages
*E
IA Ref
EM
&A
Ref
Rec
omm
ende
d M
itiga
tion
Mea
sure
sO
bjec
tives
of t
he
Rec
omm
ende
dM
easu
res a
nd M
ain
Con
cern
s to
addr
esse
d
Loc
atio
n /
Tim
ing
Impl
emen
tatio
nA
gent
DC
O
Rel
evan
tL
egis
latio
n &
G
uide
lines
Noi
se -
Con
stru
ctio
n Ph
ase
Leve
l 1 M
itiga
tion
– U
se o
f Qui
et P
lant
�
8.6.
2 6.
8.2
The
quie
t pl
ant
used
in
the
cons
truct
ion
nois
e ca
lcul
atio
n is
sho
wn
in T
able
8.4
and
App
endi
x8.
1 of
the
EIA
. The
Con
tract
or c
an p
ropo
se o
ther
su
itabl
e al
tern
ativ
e eq
uipm
ent
with
si
mila
r or
lo
wer
soun
d po
wer
leve
l.
To p
rote
ct N
SRs f
rom
no
ise
durin
g co
nstru
ctio
n
All
wor
ks si
te /
durin
gco
nstru
ctio
n
Con
stru
ctio
nC
ontra
ctor
�
Envi
ronm
enta
l Im
pact
Ass
essm
ent
Ord
inan
ce
Tech
nica
lM
emor
andu
m o
n EI
A P
roce
ss
8.6.
3 6.
8.3
The
use
of q
uiet
pla
nt is
con
side
red
to b
e th
e m
ost
effe
ctiv
e w
ays
of a
llevi
atin
g co
nstru
ctio
n no
ise
impa
ct. T
he C
ontra
ctor
sho
uld
use
quie
t pla
nt w
ith
soun
d po
wer
leve
l low
er th
an th
at s
tipul
ated
in th
e TM
-GW
as
the
Leve
l 1 m
itiga
tion
for c
onst
ruct
ion
nois
e.
To p
rote
ct N
SRs f
rom
no
ise
durin
g co
nstru
ctio
n
All
wor
ks si
te /
durin
gco
nstru
ctio
n
Con
stru
ctio
nC
ontra
ctor
�
Envi
ronm
enta
l Im
pact
Ass
essm
ent
Ord
inan
ce
Tech
nica
lM
emor
andu
m o
n EI
A P
roce
ss
8.6.
4 6.
8.4
The
use
of m
ini o
r lo
wer
pow
er r
atin
g eq
uipm
ent
(e.g
. m
ini
exca
vato
r) s
houl
d al
so b
e co
nsid
ered
w
here
pra
ctic
al. T
his
tech
niqu
e w
ould
be
feas
ible
an
d pr
actic
al a
t so
me
loca
tions
giv
en t
he l
imite
d sp
ace
avai
labl
e fo
r us
ing
larg
e si
ze c
onst
ruct
ion
equi
pmen
t an
d th
e sm
all
scal
e w
orks
inv
olve
d su
ch a
s th
e la
nd-b
ased
wat
er m
ain
in C
heun
g C
hau.
To p
rote
ct N
SRs f
rom
no
ise
durin
g co
nstru
ctio
n
All
wor
ks si
te /
durin
gco
nstru
ctio
n
Con
stru
ctio
nC
ontra
ctor
�
Envi
ronm
enta
l Im
pact
Ass
essm
ent
Ord
inan
ce
Tech
nica
lM
emor
andu
m o
n EI
A P
roce
ss
Agre
emen
t No.
CE
1/20
08 (W
S)
EM&
A M
anua
l Im
prov
emen
t of F
resh
Wat
er S
uppl
y to
Che
ung
Chau
Fi
nal
- Inv
estig
atio
n
283
1/B&
V/02
1/Is
sue
3
Janu
ary
2010
[283
1_EM
&A_
apa_
v3_j
an10
.doc
]A
PA-4
4B
&V
Impl
emen
tatio
nSt
ages
*E
IA Ref
EM
&A
Ref
Rec
omm
ende
d M
itiga
tion
Mea
sure
sO
bjec
tives
of t
he
Rec
omm
ende
dM
easu
res a
nd M
ain
Con
cern
s to
addr
esse
d
Loc
atio
n /
Tim
ing
Impl
emen
tatio
nA
gent
DC
O
Rel
evan
tL
egis
latio
n &
G
uide
lines
8.6.
5 6.
8.5
The
Con
tract
or s
houl
d ta
ke n
ote
of E
TWB
TC
W
No.
19/
2005
– E
nviro
nmen
tal
Man
agem
ent
on
Con
stru
ctio
n Si
tes
whi
ch s
ets
out
the
polic
y an
d pr
oced
ures
requ
iring
con
tract
ors
to, a
mon
g ot
hers
, ad
opt
Qua
lity
Pow
ered
M
echa
nica
l Eq
uipm
ent
(QPM
E).
To p
rote
ct N
SRs f
rom
no
ise
durin
g co
nstru
ctio
n
All
wor
ks si
te /
durin
gco
nstru
ctio
n
Con
stru
ctio
nC
ontra
ctor
�
Envi
ronm
enta
l Im
pact
Ass
essm
ent
Ord
inan
ce
Tech
nica
lM
emor
andu
m o
n EI
A P
roce
ss
ETW
B T
CW
No.
19
/200
5
8.6.
6
Tabl
e8.
4
6.8.
6
Tabl
e 6.
4
A l
ist
of q
uiet
pow
ered
mec
hani
cal
equi
pmen
t (P
ME)
rec
omm
ende
d fo
r us
e du
ring
cons
truct
ion
phas
e is
tabu
late
d in
Tab
le 8
.4 o
f the
EIA
.
To p
rote
ct N
SRs f
rom
no
ise
durin
g co
nstru
ctio
n
All
wor
ks si
te /
durin
gco
nstru
ctio
n
Con
stru
ctio
nC
ontra
ctor
�
Envi
ronm
enta
l Im
pact
Ass
essm
ent
Ord
inan
ce
Tech
nica
lM
emor
andu
m o
n EI
A P
roce
ss
ETW
B T
CW
No.
19
/200
5
Leve
l 2
Miti
gatio
n -
Use
of
Tem
pora
ry N
oise
Ba
rrie
rs
�
8.6.
8 6.
8.8
Sinc
e N
SR 2
(as
with
mos
t of t
he N
SRs
with
in th
e Pr
ojec
t are
a) a
re ty
pica
lly lo
w-r
ise
villa
ge h
ouse
s To
pro
tect
NSR
s fro
m
nois
e du
ring
cons
truct
ion
The
prop
osed
la
unch
ing
site
at
Che
ung
Cha
u as
Con
stru
ctio
nC
ontra
ctor
�
Envi
ronm
enta
l Im
pact
Ass
essm
ent
Ord
inan
ce
Agre
emen
t No.
CE
1/20
08 (W
S)
EM&
A M
anua
l Im
prov
emen
t of F
resh
Wat
er S
uppl
y to
Che
ung
Chau
Fi
nal
- Inv
estig
atio
n
283
1/B&
V/02
1/Is
sue
3
Janu
ary
2010
[283
1_EM
&A_
apa_
v3_j
an10
.doc
]A
PA-4
5B
&V
Impl
emen
tatio
nSt
ages
*E
IA Ref
EM
&A
Ref
Rec
omm
ende
d M
itiga
tion
Mea
sure
sO
bjec
tives
of t
he
Rec
omm
ende
dM
easu
res a
nd M
ain
Con
cern
s to
addr
esse
d
Loc
atio
n /
Tim
ing
Impl
emen
tatio
nA
gent
DC
O
Rel
evan
tL
egis
latio
n &
G
uide
lines
of n
ot m
ore
than
3 st
orey
s (N
SR 1
is o
ne st
orey
), it
wou
ld
be
effe
ctiv
e to
ha
ve
nois
e sc
reen
ing
stru
ctur
es o
r te
mpo
rary
noi
se b
arrie
rs p
urpo
sely
-bu
ilt a
long
the
site
bou
ndar
y to
pro
vide
add
ition
al
prot
ectio
n to
NSR
s cl
ose
to t
he c
onst
ruct
ion
site
bo
unda
ry. T
his
coul
d be
in th
e fo
rm o
f pur
pose
ly-
built
site
hoa
rdin
g co
nstru
cted
fro
m a
ppro
pria
te
mat
eria
ls w
ith a
min
imum
sup
erfic
ial d
ensi
ty o
f 7
kg/m
2 . Th
e no
ise
barr
ier
shou
ld h
ave
a ve
rtica
l he
ight
of
at l
east
4 m
with
a s
mal
l ca
ntile
vere
d up
per
porti
on
if ne
cess
ary
ensu
ring
that
th
e op
erat
ing
equi
pmen
t ca
n be
shi
elde
d fr
om t
he
view
of
the
NSR
s. Th
e te
mpo
rary
noi
se b
arrie
r sh
ould
hav
e no
gap
s or
ope
ning
at
join
ts.
The
Con
tract
or s
houl
d re
gula
rly i
nspe
ct a
nd m
aint
ain
the
nois
e ba
rrie
r to
ensu
re it
s eff
ectiv
enes
s.
show
n in
Fig
ure
8.2
of th
e EI
A /
durin
gco
nstru
ctio
n
Tech
nica
lM
emor
andu
m o
n EI
A P
roce
ss
8.6.
9 6.
8.9
For
the
cons
truct
ion
wor
ks
whi
ch
have
th
e po
tent
ial t
o ex
ceed
the
nois
e st
anda
rds
on n
earb
y N
SR a
nd w
hose
line
of s
ight
can
not b
e ef
fect
ivel
y bl
ocke
d by
the
tem
pora
ry n
oise
bar
rier,
mov
able
(m
obile
) ba
rrie
rs s
houl
d be
pro
vide
d. M
ovab
le
barr
iers
of
at l
east
2.5
m h
eigh
t w
ith a
sm
all
cant
ileve
red
uppe
r por
tion
and
skid
foot
ing
can
be
loca
ted
with
in a
few
met
ers
of s
tatio
nary
pla
nt
(e.g
. gen
erat
or) a
nd w
ithin
abo
ut 5
m o
r mor
e of
a
mob
ile e
quip
men
t (e
.g.
exca
vato
r),
such
tha
t th
e lin
e of
sigh
t to
the
NSR
is b
lock
ed b
y th
e ba
rrie
rs.
To p
rote
ct N
SRs f
rom
no
ise
durin
g co
nstru
ctio
n
All
wor
ks si
te fo
r N
SRs w
hose
line
of
sigh
t can
not b
e ef
fect
ivel
y bl
ocke
d by
the
tem
pora
ry n
oise
ba
rrie
rs /
durin
g co
nstru
ctio
n
Con
stru
ctio
nC
ontra
ctor
�
Envi
ronm
enta
l Im
pact
Ass
essm
ent
Ord
inan
ce
Tech
nica
lM
emor
andu
m o
n EI
A P
roce
ss
Agre
emen
t No.
CE
1/20
08 (W
S)
EM&
A M
anua
l Im
prov
emen
t of F
resh
Wat
er S
uppl
y to
Che
ung
Chau
Fi
nal
- Inv
estig
atio
n
283
1/B&
V/02
1/Is
sue
3
Janu
ary
2010
[283
1_EM
&A_
apa_
v3_j
an10
.doc
]A
PA-4
6B
&V
Impl
emen
tatio
nSt
ages
*E
IA Ref
EM
&A
Ref
Rec
omm
ende
d M
itiga
tion
Mea
sure
sO
bjec
tives
of t
he
Rec
omm
ende
dM
easu
res a
nd M
ain
Con
cern
s to
addr
esse
d
Loc
atio
n /
Tim
ing
Impl
emen
tatio
nA
gent
DC
O
Rel
evan
tL
egis
latio
n &
G
uide
lines
Goo
d Si
te P
ract
ices
�
8.6.
13
6.8.
13In
gen
eral
, pot
entia
l con
stru
ctio
n no
ise
impa
ct c
an
be
min
imis
ed
or
avoi
ded
by
impo
sing
a
com
bina
tion
of th
e fo
llow
ing
good
site
pra
ctic
es a
s m
itiga
tion
mea
sure
s:
(a)
Onl
y w
ell-m
aint
aine
d pl
ant
shou
ld
be
oper
ated
on-
site
and
pla
nt sh
ould
be
serv
iced
re
gula
rly d
urin
g th
e co
nstru
ctio
n pe
riod.
(b
)C
onst
ruct
ion
plan
t sh
ould
be
site
d aw
ay
from
NSR
s. (c
)M
achi
nes
and
plan
t th
at
may
be
in
in
term
itten
t us
e sh
ould
be
sh
ut
dow
n be
twee
n w
orks
per
iods
or s
houl
d be
thro
ttled
do
wn
to a
min
imum
. (d
)Eq
uipm
ent k
now
n to
em
it so
und
stro
ngly
in
one
dire
ctio
n sh
ould
be
orie
ntat
ed s
uch
that
th
e no
ise
is
dire
cted
aw
ay
from
ne
arby
N
SRs.
(e)
Mat
eria
l st
ockp
iles
and
othe
r st
ruct
ures
(s
uch
as s
ite o
ffic
es)
shou
ld b
e ef
fect
ivel
y ut
ilise
d to
sh
ield
on
-site
co
nstru
ctio
n ac
tiviti
es.
(f)
The
Con
tract
or
shal
l de
vise
, ar
rang
e m
etho
ds o
f w
orki
ng a
nd c
arry
ing
out
the
wor
ks in
suc
h m
anne
r as
to m
inim
ise
nois
e im
pact
s on
the
sur
roun
ding
env
ironm
ent,
and
shal
l pr
ovid
e ex
perie
nced
pe
rson
nel
with
sui
tabl
e tra
inin
g to
ens
ure
that
the
se
mea
sure
s are
impl
emen
ted
prop
erly
. (g
)In
the
even
t tha
t new
sch
ools
are
bui
lt ne
ar
To p
rote
ct N
SRs f
rom
no
ise
durin
g co
nstru
ctio
n
All
wor
ks si
te /
durin
gco
nstru
ctio
n
Con
stru
ctio
nC
ontra
ctor
�
Envi
ronm
enta
l Im
pact
Ass
essm
ent
Ord
inan
ce
Tech
nica
lM
emor
andu
m o
n EI
A P
roce
ss
Agre
emen
t No.
CE
1/20
08 (W
S)
EM&
A M
anua
l Im
prov
emen
t of F
resh
Wat
er S
uppl
y to
Che
ung
Chau
Fi
nal
- Inv
estig
atio
n
283
1/B&
V/02
1/Is
sue
3
Janu
ary
2010
[283
1_EM
&A_
apa_
v3_j
an10
.doc
]A
PA-4
7B
&V
Impl
emen
tatio
nSt
ages
*E
IA Ref
EM
&A
Ref
Rec
omm
ende
d M
itiga
tion
Mea
sure
sO
bjec
tives
of t
he
Rec
omm
ende
dM
easu
res a
nd M
ain
Con
cern
s to
addr
esse
d
Loc
atio
n /
Tim
ing
Impl
emen
tatio
nA
gent
DC
O
Rel
evan
tL
egis
latio
n &
G
uide
lines
the
wor
ks
area
, th
e C
ontra
ctor
sh
ould
m
inim
ize
cons
truct
ion
nois
e ex
posu
re to
the
scho
ols
(esp
ecia
lly
durin
g ex
amin
atio
n pe
riods
). Th
e C
ontra
ctor
sho
uld
liais
e w
ith
the
scho
ol a
nd th
e Ex
amin
atio
n A
utho
rity
to
asce
rtain
the
exa
ct d
ates
and
tim
es o
f al
l ex
amin
atio
n pe
riods
dur
ing
the
cour
se o
f the
co
ntra
ct a
nd to
avo
id n
oisy
act
iviti
es d
urin
g th
ese
perio
ds.
Publ
ic R
elat
ions
Str
ateg
y
�
8.6.
16
6.8.
16To
mai
ntai
n an
eff
ectiv
e co
mm
unic
atio
n ch
anne
l w
ith th
e pu
blic
, a 2
4-ho
ur h
otlin
e sy
stem
sho
uld
be
esta
blis
hed
by
the
proj
ect
offic
e fo
r th
e C
ontra
ctor
to r
ecei
ve a
ny e
nqui
ry a
nd c
ompl
aint
lo
dged
by
the
publ
ic i
n re
spec
t of
the
Pro
ject
. U
pon
rece
ipt
of
enqu
iry
/ co
mpl
aint
, th
e C
ontra
ctor
(or
its
Env
ironm
enta
l Te
am)
shou
ld
inve
stig
ate
the
caus
es o
f the
inci
dent
and
take
the
appr
opria
te
actio
n to
re
ctify
th
e si
tuat
ion.
Pe
riodi
c ne
wsl
ette
rs, i
nfor
mat
ion
leaf
lets
, not
ices
or
oth
er m
eans
of
com
mun
icat
ion
shou
ld b
e pr
ovid
ed t
o th
e af
fect
ed v
illag
es,
com
mun
ities
, an
d re
side
nts
advi
sing
them
the
curr
ent p
rogr
ess,
the
sche
dule
of
wor
ks i
n fu
ture
, th
e po
tent
ial
envi
ronm
enta
l im
pact
s ar
isin
g fr
om t
he w
orks
an
d th
e co
rres
pond
ing
miti
gatio
n m
easu
res.
It is
co
nsid
ered
that
suc
h a
clos
e re
latio
n be
twee
n th
e lo
cal
com
mun
ities
and
the
pro
ject
site
off
ice
coul
d en
sure
sp
eedy
re
solu
tion
of
any
To p
rom
ote
good
pu
blic
rela
tion
and
mai
ntai
n ef
fect
ive
com
mun
icat
ion
durin
g co
nstru
ctio
n
All
wor
ks si
te /
durin
gco
nstru
ctio
n
Proj
ect O
ffic
e (E
ngin
eer)
&
Con
stru
ctio
nC
ontra
ctor
�
Envi
ronm
enta
l Im
pact
Ass
essm
ent
Ord
inan
ce
Tech
nica
lM
emor
andu
m o
n EI
A P
roce
ss
Agre
emen
t No.
CE
1/20
08 (W
S)
EM&
A M
anua
l Im
prov
emen
t of F
resh
Wat
er S
uppl
y to
Che
ung
Chau
Fi
nal
- Inv
estig
atio
n
283
1/B&
V/02
1/Is
sue
3
Janu
ary
2010
[283
1_EM
&A_
apa_
v3_j
an10
.doc
]A
PA-4
8B
&V
Impl
emen
tatio
nSt
ages
*E
IA Ref
EM
&A
Ref
Rec
omm
ende
d M
itiga
tion
Mea
sure
sO
bjec
tives
of t
he
Rec
omm
ende
dM
easu
res a
nd M
ain
Con
cern
s to
addr
esse
d
Loc
atio
n /
Tim
ing
Impl
emen
tatio
nA
gent
DC
O
Rel
evan
tL
egis
latio
n &
G
uide
lines
envi
ronm
enta
l no
n-co
mpl
ianc
e an
d m
aint
ain
an
envi
ronm
enta
l st
anda
rd a
ccep
tabl
e to
the
loc
al
com
mun
ities
dur
ing
cons
truct
ion.
8.6.
19
6.8.
17A
ll th
e ab
ove
cons
truct
ion
nois
e m
itiga
tion
mea
sure
s sh
ould
be
im
plem
ente
d by
th
e C
ontra
ctor
dur
ing
the
cons
truct
ion
phas
e of
the
w
orks
. Th
e lo
catio
n of
th
e te
mpo
rary
no
ise
barr
iers
(inc
ludi
ng a
ny m
obile
bar
riers
) sho
uld
be
furth
er r
evie
wed
by
the
Con
tract
or d
urin
g th
e co
nstru
ctio
n st
age
base
d on
th
e la
test
co
nstru
ctio
n pr
ogra
mm
e an
d co
ntem
pora
ry
cond
ition
s, in
clud
ing
any
chan
ges
with
resp
ect t
o N
SRs.
The
Con
tract
or s
houl
d de
sign
, co
nstru
ct,
oper
ate
and
mai
ntai
n th
e m
itiga
tion
mea
sure
s th
roug
hout
the
cons
truct
ion
stag
e an
d as
requ
ired
by t
he E
ngin
eer.
Bef
ore
com
men
cem
ent
of t
he
wor
ks,
the
Con
tract
or
shou
ld
subm
it to
th
e En
gine
er f
or a
ppro
val
(as
part
of t
heir
met
hod
stat
emen
t) de
tails
of
the
miti
gatio
n m
easu
res
to
be e
mpl
oyed
und
er t
he w
orks
. The
Con
tract
or’s
pr
opos
ed m
itiga
tion
mea
sure
s sh
ould
als
o be
ce
rtifie
d by
the
ET
Lead
er a
nd v
erifi
ed b
y th
e IE
C
to
ensu
re
the
inte
nded
no
ise
redu
ctio
n ef
fect
iven
ess c
an b
e ac
hiev
ed.
To p
rote
ct N
SRs f
rom
no
ise
durin
g co
nstru
ctio
n an
d to
en
sure
the
Con
tract
or
will
pro
perly
im
plem
ent t
he
miti
gatio
n m
easu
res
All
wor
ks si
te /
durin
gco
nstru
ctio
n
Con
stru
ctio
nC
ontra
ctor
�
Envi
ronm
enta
l Im
pact
Ass
essm
ent
Ord
inan
ce
Tech
nica
lM
emor
andu
m o
n EI
A P
roce
ss
*
D=D
esig
n, C
=Con
stru
ctio
n, O
=Ope
ratio
nN
/A
Not
app
licab
le