project overview ade and mcesa will design, develop and deploy data management system (dms)...

6
Project Overview ADE and MCESA will design, develop and deploy Data Management System (DMS) otherwise known as the REIL-ized Decision Support System (RDSS) for linking teacher and principal assignment data to student achievement data. (A.C.A. 2, 8, 9) (0) The RDSS will link performance of student achievement data to each eligible teacher’s and principal’s performance incentive to payroll and human resource system. (A.C.A. 6, 8) (0)(0) The RDSS will also provide an Identity Management Solution that rigorously validates the user’s credentials and ensures the user is exposed to data and functionality that they are authorized to view. (A.C.A 1, 2, 5) (0) The RDSS will capture and allow easy analysis of formative and summative assessments by item and strand. (A.C.A. 6, 7, 8, 9, 10) (0) The RDSS will house a scalable, sustainable, and agile student assessment delivery system. (A.C.A. 3, 4, 8, 9, 11 12) (0) This system will capture teacher and principal professional development data. (A.C.A. 8) (0) (0) (0) The RDSS will provide portals and other gateways that provide system administrators, teachers and principals the requisite level of transparency necessary to review accuracy of their specific information. (A.C.A. 1, 2, 5, 9) (0) Key Milestones Key Accomplishments Risks MCESA – REIL Program Milestone Target Accomplishment Target ODCT sign-off/approval BRD 9/1/11 ODCT Teacher screens mock-up approval 9/16/11 ODCT Teacher screens mock-up approval 9/20/11 Risk Mitigation Full scope has not yet been defined 1. Scheduling Program scope planning meetings. 2. Engaging all areas of IT infrastructure and MCEAS stakeholder top assure all requirements are capture and documented

Upload: audrey-hodges

Post on 31-Dec-2015

212 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Project Overview ADE and MCESA will design, develop and deploy Data Management System (DMS) otherwise known as the REIL-ized Decision Support System (RDSS)

Project OverviewADE and MCESA will design, develop and deploy Data Management System (DMS) otherwise known as the REIL-ized Decision Support System (RDSS) for linking teacher and principal assignment data to student achievement data. (A.C.A. 2, 8, 9) (0) The RDSS will link performance of student achievement data to each eligible teacher’s and principal’s performance incentive to payroll and human resource system. (A.C.A. 6, 8) (0)(0) The RDSS will also provide an Identity Management Solution that rigorously validates the user’s credentials and ensures the user is exposed to data and functionality that they are authorized to view. (A.C.A 1, 2, 5) (0) The RDSS will capture and allow easy analysis of formative and summative assessments by item and strand. (A.C.A. 6, 7, 8, 9, 10) (0) The RDSS will house a scalable, sustainable, and agile student assessment delivery system. (A.C.A. 3, 4, 8, 9, 11 12) (0) This system will capture teacher and principal professional development data. (A.C.A. 8) (0) (0) (0) The RDSS will provide portals and other gateways that provide system administrators, teachers and principals the requisite level of transparency necessary to review accuracy of their specific information. (A.C.A. 1, 2, 5, 9) (0)

Key Milestones

Key Accomplishments Risks

MCESA – REIL Program

Milestone Target

Accomplishment Target

ODCT sign-off/approval BRD 9/1/11

ODCT Teacher screens mock-up approval

9/16/11

ODCT Teacher screens mock-up approval

9/20/11

Risk Mitigation

Full scope has not yet been defined

1. Scheduling Program scope planning meetings.2. Engaging all areas of IT infrastructure and MCEAS stakeholder top assure all requirements are capture and documented

Page 2: Project Overview ADE and MCESA will design, develop and deploy Data Management System (DMS) otherwise known as the REIL-ized Decision Support System (RDSS)

Observation Data Capture Tool (ODCT)

Project OverviewThe purpose of the Observation Tool is to provide a standardized input solution to gather evaluators’ feedback and store it in a data repository to be primarily used to calculate 50% of the REIL score, as well as to provide raw data for other reporting and analysis. This will begin the process of automating what is now a manual paper-based feedback process.

Key Milestones

Key Accomplishments Risk

Milestone Target

ODCT R1 V1 2/14/12

UAT Approval 2/10/12

Accomplishment Target

Visual Design Document Approval

12/5/11

Interim Tool Release 12/7/11

Enter UAT for R1V1 1/24/12

Risk

Page 3: Project Overview ADE and MCESA will design, develop and deploy Data Management System (DMS) otherwise known as the REIL-ized Decision Support System (RDSS)

Video BankProject OverviewThe purpose of the Video Bank is to enable evaluators of teachers to view videos exemplifying how a teacher would perform in a given subject, grade and proficiency•Provide video instruction with mini-quiz type capabilities •Meta-data tagging of videos for search and indexing•Uploading of custom videos with ability to vet through with MCESA focus group(s)•Capability of Hi/Low bandwidth videos / playback•Provide more in-depth video training along with assessment•3 Levels of Videos: Basic Training Videos, Evaluation Rubric•Videos, Computer Based Training Video’s (CBT)•Ability to interface with other modules within the RDSS

Key Milestones

Key Accomplishments Risk/Mitigation

Milestone Target

Tool Selection 2/17/12

Video Bank Symposium 3/20/12

Accomplishment Target

BRD draft 2/10/12

Revised BRD draft 2/17/12

Video Bank DAR Completed

Review DAR with MCESA 2/13/12

Risk Mitigation

Tool selection has not yet been made

Decision will be made following review of DAR

Page 4: Project Overview ADE and MCESA will design, develop and deploy Data Management System (DMS) otherwise known as the REIL-ized Decision Support System (RDSS)

AccomplishmentsAccomplishments week ending 2/3

• Held meetings with Lisa Levy and Powerschool, SchoolMaster, Infinite Campus. Determined the ability of their SIS to handle the changes requested by MCESA-REIL Project. Sent Minutes out to all.

• Held meeting with Al Dullum to dissect first round of BRD requirements. Scheduled a meeting for next week to break down Dashboards.

• Sent first draft of requirements to Al, assigning him task of breaking down some of them further.

• Provided new BSA team from ALEAS documentation and explanation of the MCESA program. Copied them on all meeting minutes.

• Met with Alex Jones to discuss data perspective of project.

Key Milestones

Key Accomplishments Risk/Mitigation

Milestone Target

Student-Teacher Link Fri 1/27/12

Course Mapping 3/16/12

ETL/SOA 4/20/12

Accomplishment Target

BRD draft 2/7/12

Met with 3 key SIS vendors this week to discuss SIS involvement in Data Management solution

2/3/2012

Sent 1st draft BRD for review to MCESA

2/2/12

Risk Mitigation

Multiple SIS implementation versions – Significant development on each system possible

Data sharing agreements with partner districts

Data Management Solution (formerly ETL/SOA)

Page 5: Project Overview ADE and MCESA will design, develop and deploy Data Management System (DMS) otherwise known as the REIL-ized Decision Support System (RDSS)

Project OverviewA system that links student achievement data to teacher and principal payroll and human resource systems: •RDSS or Data Management System (DMS) brings together multiple district systems, including educational services, business services, and human resources, in order to support educator development, reward accomplishments, and inform retention and tenure decisions for the purpose of improved student learning.

Key Milestones

Key Accomplishments Risk/Mitigation

Milestone Target

Dashboards v1 3/1/12

Dashboards v2 6/15/12

RDSS set-up 6/29/12

Accomplishment Target

BRD draft 11/14/11

Revised BRD draft TBD

BSA assigned 1/9/12

Risk Mitigation

RDSS

Page 6: Project Overview ADE and MCESA will design, develop and deploy Data Management System (DMS) otherwise known as the REIL-ized Decision Support System (RDSS)

Project OverviewA scalable, sustainable and agile student assessment delivery (customizable) system- This system should allow test data validation and auditing capabilities by focus groups that are assigned by customer. The system should allow testing items for both non-secure and secure items; the system should allow traditionally non-tested areas to be customized by Item and Strand. The system should allow tests to be created by subject, grade, and course. The system should also allow K-12 test ranges to be archived and retrievable within the system for printing and review purposes.

Key Milestones

Key Accomplishments Risk/Mitigation

Milestone Target

Assessment Delivery System 7/27/12

Custom Assessments 7/27/12

Test Item Bank 3/9/12

Accomplishment Target

BRD draft 10/21/11

DRAFT BRD to the MCESA/AELAS Team for review

2/3/12

Brief discussion with Al regarding high level process flow – gave him a draft diagram that I created to verify the process

2/1/12

Risk Mitigation

MCESA stakeholders scheduling

Assessments