project overview “ egor-co2 ”

27
Project overview “ EGOR-CO2” „Integration of CO 2 Sequestration with EGOR-CO2 technology (Enhanced Gas and Oil Recovery method).” Speaker: Stanisław NAGY 1 KIC InnoEnergy | CC Poland Plus, Meeting, Cracow, 11Apr2011| Speaker:Stanisław Nagy CC Poland PlusProjects Review Meeting 11-12 April 2011 Clean Coal Technologies

Upload: tyra

Post on 05-Jan-2016

59 views

Category:

Documents


0 download

DESCRIPTION

CC Poland PlusProjects Review Meeting 11-12 April 2011. Project overview “ EGOR-CO2 ” „ Integration of CO 2 Sequestration with EGOR-CO2 technology (Enhanced Gas and Oil Recovery method). ” Speaker: Stanisław NAGY. Clean Coal Technologies. Project summary. Project summary. Contents. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Project overview “  EGOR-CO2 ”

Project overview

“ EGOR-CO2”„Integration of CO2 Sequestration with EGOR-CO2 technology (Enhanced Gas and Oil

Recovery method).”

Speaker: Stanisław NAGY

1KIC InnoEnergy | CC Poland Plus, Meeting, Cracow, 11Apr2011| Speaker:Stanisław Nagy

CC Poland PlusProjects Review Meeting11-12 April 2011

Clean Coal Technologies

Page 2: Project overview “  EGOR-CO2 ”

Project summary

2KIC InnoEnergy | CC Poland Plus, Meeting, Cracow, 11Apr2011| Speaker:Stanisław Nagy

MASTER DATA

Topical Area: CO2 sequestration

Project type: R&D

Project Duration: 3 years

Total Budget (K€) 1329,8

Total KIC request (K€) 308,6

PARTNERS DATACC Typology

(Rough) % TOTAL

budget splitPartners name Ger Pol Sw

eBen

Fra Ibe Res Uni Ind Oth

1 AGH

52%

2 LOTOS

8%

3 EDF KIC level partner

3%

4 PGNiG

13%

5 University of Stavanger

24%

Page 3: Project overview “  EGOR-CO2 ”

Project summary

3KIC InnoEnergy | CC Poland Plus, Meeting, Cracow, 11Apr2011| Speaker:Stanisław Nagy

Page 4: Project overview “  EGOR-CO2 ”

1. Organisation of the project with workpackages.

2. Deliverables/products.

3. Timetable

4. Budget

5. Market analysis

6. Open issues

Contents

4KIC InnoEnergy | CC Poland Plus, Meeting, Cracow, 11Apr2011| Speaker:Stanisław Nagy

Page 5: Project overview “  EGOR-CO2 ”

55KIC InnoEnergy | CC Poland Plus, Meeting, Cracow, 11Apr2011| Speaker:Stanisław Nagy

Organisation of work packages

WP3: Analysis of the possibilities to devise an inland transport of the CO2 to the potential injection zone, injection site infrastructure optimization and the assessment of the productivity. (PGNiG, AGH) budget: 85 k€

WP0: Preparation of market analysis and assessment of business opportunities.(PGNiG, LOTOS, AGH) budget: 11 k€

WP1: Data collection and construction of the static model of the Zalecze & Zuchlow gas field at basin and reservoir scale. (PGNiG, AGH); budget:

105 k€

WP2: Flow simulation and elements of geomechanics. Integrity analysis of the existing wells. (AGH, PGNiG), budget: 245 k€

Page 6: Project overview “  EGOR-CO2 ”

6KIC InnoEnergy | CC Poland Plus, Meeting, Cracow, 11Apr2011| Speaker:Stanisław Nagy

WP7: Feasibility study (LOTOS, AGH), budget: 57 k€

Organisation of work packages

WP8: Skarv field characterization and analysis of the EOR-CO2 implementation on oil productivity (Univ. Stavanger, AGH), budget: 760 k€

WP4: Construction of geological & numerical model of B3 oil field with history match (AGH), budget: 115 k€

WP5: Analysis of possibilities to increase the recovery factor with the CO2-EOR method (AGH, LOTOS, EDF), budget: 181,4 k€

WP6: CO2 Injection monitoring design (AGH, Lotos), cost: 79 k€

Page 7: Project overview “  EGOR-CO2 ”

7KIC InnoEnergy | CC Poland Plus, Meeting, Cracow, 11Apr2011| Speaker:Stanisław Nagy

Interdependences between packagesWP1

WP2

WP3

WP5

WP4

WP6

WP7

WP8

Page 8: Project overview “  EGOR-CO2 ”

8KIC InnoEnergy | CC Poland Plus, Meeting, Cracow, 11Apr2011| Speaker:Stanisław Nagy

Project description- expectations

•improvement of oil recovery efficiency: recovery of significant amount of oil which arises in a reservoir after finishing the primary & secondary exploitation;

•minimizing risk of geologic sequestration

•answering the technical questions necessary for EOR method introduction in the industry: features of the technology is an increase of mobility and change of viscosity

•Diagnosis of the EOR and EGR processes and their consequences

•confirmation of logistical solutions of CO2 transportation

Page 9: Project overview “  EGOR-CO2 ”

9KIC InnoEnergy | CC Poland Plus, Meeting, Cracow, 11Apr2011| Speaker:Stanisław Nagy

Project description – necessary workplan

Page 10: Project overview “  EGOR-CO2 ”

10KIC InnoEnergy | CC Poland Plus, Meeting, Cracow, 11Apr2011| Speaker:Stanisław Nagy

Project description

WORKPACKAGE No.1 (AGH, PGNiG)

Data collection and construction of the static model of the Zalecze & Zuchlow gas field at basin and reservoir scale

T1.2 Construction of the static model at basin and reservoir scale

WORKPACKAGE No.2 (AGH, PGNiG)

Flow simulation and elements of geomechanics. Integrity analysis of the existing wells

T2.1 Flow simulation and elements of geomechanics

T2.2 Integrity analysis of all existing wells

T1.1 Data collection and verification of the data quality

Page 11: Project overview “  EGOR-CO2 ”

11KIC InnoEnergy | CC Poland Plus, Meeting, Cracow, 11Apr2011| Speaker:Stanisław Nagy

Project description

WORKPACKAGE No.3 (PGNiG, AGH)

Analysis of the possibilities to devise an inland transport of the CO2 to the potential injection zone, injection site infrastructure optimization and the assessment of the productivity

T3.1 Elaboration of the most convenient and effective ways of transportation of the CO2

T3.2 Injection infrastructure optimization

T3.3 Influence of the miscibility zone appearance on productivity

Page 12: Project overview “  EGOR-CO2 ”

12KIC InnoEnergy | CC Poland Plus, Meeting, Cracow, 11Apr2011| Speaker:Stanisław Nagy

Project description

WORKPACKAGE No.4 (AGH)

Construction of geological & numerical model of B3 oil field with history match

T4.1 Data collection and analysis

T4.2 Geomechanical analysis of reservoir and caprock strata

T4.3 Construction of numerical model of B3 field

WORKPACKAGE No.5 (AGH, LOTOS, EDF)

Analysis of possibilities to increase the recovery factor with the CO2-EOR method

T5.1 Analysis of technical state of underground and surface infrastructure

T5.2 . Lab analysis with emphasis to sealing of structure after filling it with CO2 (chemical reaction/ long term laboratory work/simulation)

Page 13: Project overview “  EGOR-CO2 ”

13KIC InnoEnergy | CC Poland Plus, Meeting, Cracow, 11Apr2011| Speaker:Stanisław Nagy

Project description

WORKPACKAGE No.5 (AGH, LOTOS, EDF)

Analysis of possibilities to increase the recovery factor with the CO2-EOR method

T5.3 Infill drilling opportunities - analysis and new drilling projects

T5.4 Short & long Impact of CO2 injection on Sea and Air Environment

WORKPACKAGE No.6 (AGH, LOTOS)

New CO2 Injection monitoring design

T6.1 Project of passive seismic monitoring

T6.2 Optic parameters permanent downhole measuring system

T 6.3 Water surface monitoring system

Page 14: Project overview “  EGOR-CO2 ”

14KIC InnoEnergy | CC Poland Plus, Meeting, Cracow, 11Apr2011| Speaker:Stanisław Nagy

Project description

WORKPACKAGE No.7 (AGH, LOTOS)Feasibility studyT 7.1 Standard monitoring of process

T 7.2 Analysis of transport opportunity from Lotos Refinary Plant

T 7.3 Multivariant final economic analysis

WORKPACKAGE No.8 (Univ. Stavanger, AGH)

Skarv field characterization and analysis of the EOR-CO2 implementation on oil productivity

T8.1 Methods of tight gas production at the Gro fieldA) Use of CO2 injection for the purpose of the fracturing process of

the tight gas field

T8.2 Carbon dioxide injection as a tool to increase oil/gas production

Page 15: Project overview “  EGOR-CO2 ”

15KIC InnoEnergy | CC Poland Plus, Meeting, Cracow, 11Apr2011| Speaker:Stanisław Nagy

Project description

WORKPACKAGE No.8 (Univ. Stavanger, AGH)

Skarv field characterization and analysis of the EOR-CO2 implementation on oil productivity

T8.1 Methods of tight gas production at the Gro fieldA) Use of CO2 injection for the purpose of the fracturing process of the

tight gas field

T8.2 Carbon dioxide injection as a tool to increase oil/gas production B) Comparison of advantages of the usage IOR/IGR vs EOR/EGR

T 8.3 Increase of oil recovery factor by means of natural gas injection at the Skarv field

C) Increase of oil recovery factor by means of CO2 injection at the Skarv field

Page 16: Project overview “  EGOR-CO2 ”

16KIC InnoEnergy | CC Poland Plus, Meeting, Cracow, 11Apr2011| Speaker:Stanisław Nagy

Deliverables

No. Deliverables

D 0.1. Portfolio of economic opportunities and internal development capabilities.

D 1.1 Static model data verification

D 1.2 Basin scale and reservoir static model

D 2.1 Flow dynamic and deformation of the storage complex based on thermo-hydraulic and geomechanical simulations

D 2.2 Integrity analysis of all existing wells

D 3.1 Transportation plan

D 3.2 Site infrastructure development project.

D 4.1 Geologic model of B3 oil field

D 6.1. New monitoring program.

D 7.1 Final report and efficiency of process estimation

D 7.2 Economic evaluation report

D 8.1. PhD and MSc programms

Page 17: Project overview “  EGOR-CO2 ”

17KIC InnoEnergy | CC Poland Plus, Meeting, Cracow, 11Apr2011| Speaker:Stanisław Nagy

KIC added value

• the introduction of innovative seismic monitoring system for industry purposes

• transportation plan

•site developement plan

•technology for increased exploitation of oil/gas (monograph, 3 papers)

•PhD and MSc programms considering recovery methods (1-2 PhD, 3 MSc)

Page 18: Project overview “  EGOR-CO2 ”

18KIC InnoEnergy | CC Poland Plus, Meeting, Cracow, 11Apr2011| Speaker:Stanisław Nagy

Timing/deliverables

Page 19: Project overview “  EGOR-CO2 ”

19KIC InnoEnergy | CC Poland Plus, Meeting, Cracow, 11Apr2011| Speaker:Stanisław Nagy

Budget

Page 20: Project overview “  EGOR-CO2 ”

20KIC InnoEnergy | CC Poland Plus, Meeting, Cracow, 11Apr2011| Speaker:Stanisław Nagy

Budget - financing

KIC level network partner KIC level network partner

Sources of Budget, in k€ AG

H

PGNiG Lot

os EDF

Univ.

Stavan

ger

TOTAL 2011 AG

H

PGNiG Lot

os EDF

Univ.

Stavan

ger

TOTAL REST

TOTAL PROJECT

Partner in-kind 30 30 23 83 60 70 16,8 146,8 229,8Partner in-cash 0 0 0EIT requested contribution 40 15 10 8 20 93 100 45 20 5,6 45 215,6 308,6National funding 85 85 115 115 200Regional funding 0 0 0European funding 38 25 63 90 65 155 218Other sources 87 90 177 275 230 505 682

Total 250 70 40 31 110 501 580 170 90 22,4 275 1137,4 1638,4

Poland Plus Poland Plus

Page 21: Project overview “  EGOR-CO2 ”

21KIC InnoEnergy | CC Poland Plus, Meeting, Cracow, 11Apr2011| Speaker:Stanisław Nagy

Budget

Page 22: Project overview “  EGOR-CO2 ”

22KIC InnoEnergy | CC Poland Plus, Meeting, Cracow, 11Apr2011| Speaker:Stanisław Nagy

Budget

Page 23: Project overview “  EGOR-CO2 ”

23KIC InnoEnergy | CC Poland Plus, Meeting, Cracow, 11Apr2011| Speaker:Stanisław Nagy

Market analysis (WP0) – PGNiG, Lotos

Title: Preparation of market analysis and assessment of business opportunities.

T0.1. External market analysis.a.Market analysis: the estimation of the current and future market size will be proceeded. The market capacity, potential demand and absorptivity of the new technology is going to be assessed. The prospective consumers and their motives will be determined, taking under consideration the distribution channels to the recipient.

b. Recognition of the competition structure will be performed and the risk evaluated, if new competitors are expected to appear. The value of project competitiveness will be underlined.

Page 24: Project overview “  EGOR-CO2 ”

24KIC InnoEnergy | CC Poland Plus, Meeting, Cracow, 11Apr2011| Speaker:Stanisław Nagy

Market analysis (WP0)

Title: Preparation of market analysis and assessment of business opportunities.

T0.2. Consortium's internal analysis.a.Assessment of material and immaterial resources capabilities of the partners partaking in the project (devices, materials, etc.), especially from among immaterial resources the importance of management capacity, institutions, reputation, etc.

b. The characteristics of the consortium's opportunities: recognition of strengths and weaknesses, which have an impact on chances of success depending on external circumstances, threats, formal legal issues risk.

c. The capabilities and outlook on generating new patents, recovered oil profit, extension of exploitation liveliness by developing new technology.

Page 25: Project overview “  EGOR-CO2 ”

25KIC InnoEnergy | CC Poland Plus, Meeting, Cracow, 11Apr2011| Speaker:Stanisław Nagy

Launching new products in a market

Questions: What- service/product? Who may be interested in? What for? How?

1. Creation and testing. Implementation for partner’s purpose.

2. Commercialization

• finding the discriminatory features

mainly energy companiesprofit, safety reasons

Page 26: Project overview “  EGOR-CO2 ”

26KIC InnoEnergy | CC Poland Plus, Meeting, Cracow, 11Apr2011| Speaker:Stanisław Nagy

Questions?

Page 27: Project overview “  EGOR-CO2 ”

27KIC InnoEnergy | CC Poland Plus, Meeting, Cracow, 11Apr2011| Speaker:Stanisław Nagy

Thank you for your attention