Residential and Commercial Developments
Location: Carolina, P.R.
Client: San José Lagoon Development
Contact: Mr. León Rubín Tel. (787) 370−2423
Cost ($000): $750
Completion Date: 2004A small gazebo was used to safely install telephone, cable and electrical panels.
General view of buildings one to five at Point Estates Lagoon
Project Description:
Point States Lagoon is a residential project consisting of 84 apartments in San José Bay Side in Carolina. Arequirement to obtain permits to install an electrical primary distribution, cable, telephone and intercom distribution tosupply the necessities of this project was made by the project owner who contracted our services to prepare thedesign to comply with this requirements.
Electrical In−site primary and secondary distributionPoint States Lagoon
Location: Peñuelas, P.R.
Client: Galexda Development Corp.
Contact: José E. Pérez Tel. (787) 566−0583
Cost ($000): $6,000
Completion Date: 2008
Project Description:
Complete Electrical Design for Mansiones de Puerto Galexda. The owner contracted our services to prepare the offsite and exterior electrical primary distribution, secondary distribution, telephone and cable tv drawings.
Communications, Electrical, Lighting, Primary and Secondary Distribution Design
Houses in Construction Houses in Construction
Mansiones de Puerto Galexda
Location: Various
Client: PREPA Networks
Contact: José D. Casillas Tel. (787) 625−9950
Cost ($000): $500
Completion Date: 2006
Project Description:
Complete Design for three (3) communications shelters in the metropolitan area
Communications Shelters
Finished shelter in Carolina
PREPA Network
Location: Toa Alta, P.R.
Client: JN Bracero & Associates
Contact: Erick Bracero Tel. (787) 703−3942
Cost ($000): $1,250
Completion Date: 2005
Project Description:
Paseos del Plata is a residential project consisting of 54 residences in Bo. Ortiz, Sector Bucarabones in Toa Alta. The owner contracted our services to prepare the offsite and exterior electrical primary distribution, secondary distribution, telephone and cable tv drawings.
Typical House Main Street
Electrical In−site primary and secondary distributionPaseos del Plata
Location: San Juan, P.R.
Client: Sr. Juan Arriaga
Contact: Sr. Juan Arriaga Tel. (787) 603−1913
Cost ($000): $50
Completion Date: 2002New transclosure beside faculty parking Panoramic view of Immaculate College
Project Description:
Immaculate College is a group of buildings located at Ponce de León Avenue in Santurce. These buildings havebeen served from a one phase transformer. Since the transformer was not enough to satisfy the loadnecessities, they requested our services to design and install a primary three phase substation.
Electrical design for New SubstationColegio La Inmaculada
Location: Santurce, P.R.
Client: Juan Arriaga
Contact: Sr. Juan Arriaga Tel. (787) 603−1913
Cost ($000): $50
Completion Date: 2001 Pad Mounted Transformer ˘ Installed in a platform to facilitate access to pedestrians.
Project Description:
San Vicente de Paúl College consist of a group of buildings located at Bolívar Street in Santurce. These buildings have been served from a 100 KVA /7.62 kV, one phase transformer. Since the capacity of the transformer was not enough to serve the existing and future load, they requested our services to the design a primary three phase substation. H2O also designed the platform to locate the transformer.
Electrical Design for new substation
Platform and Stair Access
San Vicente de Paul
Location: Gurabo, P.R.
Client: TICS Construction
Contact: José F. Padilla Tel. (787) 250−7400
Cost ($000): $200
Completion Date: 1999
Residential Development Entrance Other view of the poles
Project Description:
Electrical design for a new 8.32 kV distribution line to serve a residential project in Bo. Hato Nuevo in Gurabo.
New 8.32 kV Distribution LineResidential Project
Location: Caguas, P.R.
Client: Mr. Edwin Soto
Contact: Mr. Edwin Soto Tel. (787) 250−8181
Cost ($000): $ 20
Completion Date: 2001Electrical SubstationFront view of the location
Project Description:
Design of a three phase substation for the facilities of Perfect Cleaning Services.
Electrical Design for New Substation at Perfect Cleaning ServicesPerfect Cleaning Services
Location: Various, P.R.
Client: AT&T
Contact: Rafael Meléndez Tel. (787) 565−8231
Cost ($000): $50
Completion Date: 2000Proposed site Existing meter bank to be studied
AT&T Communications Sites
Project Description:
Electrical design for AT&T new cellular sites and load and demand studies of energy consumption.
AT&T
Location: Carolina, P.R.
Client: Harold Hart & Assoc.
Contact: Eng. José Manota
Cost ($000): $300
Completion Date: 1999 Main entrance at Los Colobos store
Prescription Pharmacy Area at K−Mart Carolina
Project Description:
Electrical Interior Design Drawings for the Kmart pharmacy located at Los Colobos Shopping Center in Carolina.
Electrical Interior Design DrawingsKmart
Electrical High Voltage Lines Relocation
Location: Trujillo Alto P.R.
Client: Consulting Engineering Group
Contact: Javier Llavona Tel. (787) 525−6237
Cost ($000): $350
Completion Date: 1999
Poles to be relocated Area with lines relocated
Electrical Design for the relocation of various electrical lines
Project Description:
Electrical design for the relocation of 38, 13.2 and 8.32 kV aerial lines for the construction of the new Government Center in Trujillo Alto
Centro de Gobierno
Location: Trujillo Alto, P.R.
Client: Brighton Homes
Contact: Enrique López Tel. (787) 775−2200
Cost ($000): $100
Completion Date: 2001
Poles to be relocated Walk−up view
Electrical Design for the relocation of a 115 kV aerial line
Project Description:
Electrical design for the relocation of a 115 kV aerial lines for the construction of the new walk−up development, Vista Serena.
Vista Serena Development
Location: Río Piedras, P.R.
Client: EAP Group Practice
Contact: Antonio Molina Tel. (787) 753−2778
Cost ($000): $200
Completion Date: 2000
Poles to be relocated Area with lines relocated
Electrical Design for the relocation of a 115 kV aerial line
Project Description:
Electrical design for the relocation of a 115 kV aerial lines for the construction of the new residential development, Monteverde Real.
Monte Verde Real Development
Underground Electrical Design
Location: San Juan, P.R.
Client: PREPA
Contact: Eng. Florentino Pérez Tel. (787) 521−6598
Cost ($000): $8,000
Completion Date: 2006
Project Description:
PREPA contracted our services to prepare the design of the underground of all transmission and distribution lines at Fernández Juncos Ave. from the Old Naval Base at the Isla Grande up to Víctor López Street. Phase I − $3,470,299 from Old Base at Isla Grande up to Condado StreetPhase II − $3,140,172 from Hipódromo Street up to Víctor López StreetPhase III − from Víctor López Street up to Rosales Street, costs to be disclosed
Design, Supervision, Inspection and Project Management of the Underground of the electrical distribution system
Electrical Substation Primary Junction Box in Manhole
Fernández Juncos Underground
Location: San Juan, P.R.
Client: PREPA
Contact: Eng. Florentino Pérez Tel. (787) 521−6598
Cost ($000): To Be Disclosed
Completion Date: 2003
Project Description:
PREPA contracted our services to prepare the design of the underground of all transmission and distribution lines at Fernández Juncos Avenue in Hipódromo and Figueroa Street
Design, Supervision, Inspection and Project Management of the Underground of the electrical distribution system
Existing Transclosure Existing Meter Bank
Hipódromo & Figueroa Street Underground
Location: Yauco, P.R.
Client: Yauco Municipality
Contact: Hon. Abel Nazario Tel. (787) 856−1345
Cost ($000): To Be Disclosed
Completion Date: 2007
Project Description:
This is the first phase of a Master Plan that Major Abel Nazario is proposing to continue with the underground of the existing infraestructure in Yauco. The second phase will be on Santo Domingo and the 25th July Street.
Muñoz Rivera, Mejias Street Underground at La Trocha Sector, Yauco
Proposed Master Plan Existing Electrical Lines
Yauco Municipality Underground
Location: Yauco, P.R.
Client: Yauco Municipality
Contact: Hon. Abel Nazario Tel. (787) 856−1345
Cost ($000): To Be Disclosed
Completion Date: 2008
Project Description:
This is the third phase of a Master Plan that Major Abel Nazario is proposing to continue with the underground of the existing infraestructure in Yauco. This phase covers Ave. Barbosa, 25 de Julio, Santo Domingo and Vivaldi Streets.
Ave. Barbosa, 25 de Julio, Santo Domingo and Vivaldi Streets, Yauco
Proposed Master Plan Existing Electrical Lines
Yauco Municipality Underground, Phase III
Specialized Designs and Generation Projects
Location: Various, P.R.
Client: PREPA
Contact: Eng. Dolores Reyes Tel. (787) 521−6448
Cost ($000): $150,000
Completion Date: 2008Tower Transportation
Project Description:
In conjunction with POWER Engineers, Inc. (POWER) we were contracted by PREPA to prepare the design of the new 230 kV transmission line from Costa Sur Generating Plant to Aguas Buenas Transmission Center. We created a team which includes John Chance Land Surveyors, Aerofoto International, Agr. Julio Soto and APRO.
Complete design
Tower Installation
230 kV Transmission Line from Costa Sur to Aguas Buenas
Project Description:
Design of control and protection system and full system integration services. Amgen awarded us a contract to prepare the design of their new 115kV GIS Substation at Juncos. The design included complete specifications, diagrams, grounding system and protection and control system.
Location: Juncos, PR
Client: AMGEN
Contact: Eng. Luis F. Riollano
Cost ($000): $4,700
Completion Date: 2009
Full design of control and protection system. Full system integration services
Aerial Site Photo
AMGEN GIS
Inspection and Project Management
Location: Various, P.R.
Client: PREPA
Contact: Iván Cepeda Tel. (787) 521−6553
Completion Date: 2008
Project Description:
With the support of POWER Engineers, Inc. (POWER) we assists PREPA on the administration, engineering,safety monitoring, inspection, testing and commissioning required for managing the six (6) stages of the 115kV underground loop.
Project and Construction Management, Administration and Engineering Services115 kV Underground Loop
Phase I − Monacillos Transmission Center to Hato Rey Transmission CenterContractor − Bermúdez & LongoApproximately Costs − $25,307,652
Directional Drilling Installation Trench Installation
Phase IIA, IIB ˘ Hato Rey Transmission Center−Martin Peña GIS − Viaducto Transmission CenterContractor ˘ Lord ElectricApproximately Costs − $16,316,318
Concrete Pouring
GIS Substation
Phase IIC, IID ˘ Viaducto Transmission Center−Isla Grande GIS− San Juan Steam PlantContractor ˘ Lord ElectricApproximately Costs − $29,098,870
San Juan Steam Plant backfilling and compaction of trench at the entrance
38 kV Cables Cutting
Phase IIIA − San Juan Steam Plant to Palo SecoContractor ˘ Lord ElectricApproximately Costs − $14,007,944
Trench Installation Manhole Installation
Phase IIIB ˘ Palo Seco to Bayamón Transmission CenterContractor ˘ Lord ElectricApproximately Costs − $18,168,870
Reactors Conduit Installation
Duct Installation
Phase IV ˘ Bayamón Transmission Center to Monacillos Transmission CenterContractor ˘ Bermúdez & LongoApproximately Costs − $31,500,600
GIS Substation Splices Installation
Location: San Juan, P.R.
Client: PREPA
Contact: Eng. Iván Cepeda Tel. (787) 521−6553
Cost ($000s): $8,000
Completion Date: 2006
Conduit installation Manhole installation
Project Description:
PREPA contracted us to provide the inspection and construction management for the Underground of all the transmission and distribution lines at Fernández Juncos Ave. From the old Naval Base at the Isla Grande up to Del Parque Street. PREPA awarded the project to contractor Bermúdez & Longo.
Supervision, Inspection and Project Management of the Underground of the electrical distribution systemFernández Juncos Underground
Location: Ponce, P.R.
Client: PREPA
Contact: Iván Cepeda Tel. (787) 521−6553
Cost ($000): $20,970
Completion Date: 2007
Project Description:
We assisted PREPA on the administration, engineering, safety monitoring inspection required for managing thefirst phase of the Ponce en Marcha underground. This project has sanitary, water, telephone, cable tv andelectrical infrastructure.
Water meter connections Conduits installation
Project and Construction Management, Administration and Engineering ServicesPonce en Marcha
Location: Ponce, P.R.
Client: PREPA
Contact: Iván Cepeda Tel. (787) 521−6553
Cost ($000): $17,925
Completion Date: 2010
Project Description:
We assisted PREPA on the administration, engineering, safety monitoring inspection required for managing thesecond phase of the Ponce en Marcha underground. This project has sanitary, water, telephone, cable tv andelectrical infrastructure.
Conduits installation in Victoria Street
Vacuum Switch in Molina Street
Project and Construction Management, Administration and Engineering ServicesPonce en Marcha−Phase II
Location: San Juan, P.R.
Client: PREPA
Contact: Eng. Iván Rivera Tel. (787) 485−4411
Cost ($000): $3,100
Completion Date: 2010 Site Preparation
Project Description:
On February 14, 2008, Puerto Rico Electric Power Authority (PREPA) awarded us the contract to perform the Administration, Engineering, Monitoring and Inspection Services for the Construction of the new underground at San Francisco and Del Cristo Street at Old San Juan This project was awarded to Edison Electrical Contractors for $3.1 million of dollars. The project begins on March 2009 due to some problems with the permits and availability from San Juan Municipality.
Supervision, Inspection and Project Management of the Underground of the electrical distribution systemUnderground at San Francisco & Del Cristo Street at Old San Juan
Location: San Juan, P.R.
Client: PREPA
Contact: Eng. Iván Rivera Tel. (787) 485−4411
Cost ($000): $3,100
Completion Date: 2010 Manhole Installation
Project Description:
On August 14, 2008, Puerto Rico Electric Power Authority (PREPA) awarded us the contract to perform theAdministration, Engineering, Monitoring and Inspection Services for the Construction of the new 38 kV undergroundline from Caparra to Cachete Substation. This project was awarded to BLDM for $3.1 million of dollars.
Supervision, Inspection and Project Management of the Underground of the electrical distribution system38 kV Underground Line from Caparra to Cachete Substation
Location: San Juan, P.R.
Client: PREPA
Contact: Eng. Iván Rivera, Tel. (787) 485−4411
Cost ($000): $457.571
Completion Date: June 2009 New Fence
Project Description:
On October 2, 2008, Puerto Rico Electric Power Authority (PREPA) awarded us the contract to perform the Administration, Engineering, Monitoring and Inspection Services for the Construction of a new perimeter fence at PREPA Vega Baja Office. This project was awarded to IND General Contractor Corp for $457,751.00 dollars.
Supervision, Inspection and Project Management of the Construction
Fence Construction
Perimeter Fence at PREPA Vega Baja Offices
Location: Ponce, P.R.
Client: BPPR
Contact: Arq. Sofia Marrero Tel. (787) 765−9800 x 5242
Cost ($000): $854
Completion Date: 2010Site Preparation
Project Description:
On February 14, 2008, Banco Popular of Puerto Rico awarded us the contract to perform the Administration, Engineering, Monitoring and Inspection Services for the Construction of the new underground BPPR Ponce Town Center Bank.
Supervision, Inspection and Project Management of the building constructionNew BPPR Ponce Town Center Bank
Location: San Juan, P.R.
Client: Sistema de Retiro−UPR
Contact: Sr. Willie Rosario Tel. (787) 751−4550
Cost ($000): $250
Completion Date: 2009 Existing Building BIDS
Project Description:
On October 20, 2007, Sistema de Retiro−Universidad de Puerto Rico awarded us the contract to perform the Administration, Engineering, Monitoring and Inspection Services for the Construction of the remodeling of the existing Marshall building in Río Piedras. We use BIDS magazine to open the bids process for this project. The project was show on Bids magazine, Vol. 27, No. 09 of March 10, 2008. This project was awarded on Ju1y 10, 2008 to Construction Management Consultant Group for $250,000.00.
Supervision, Inspection and Project Management of the building constructionNew UPR Retirement System Building
Location: San Juan, P.R.
Client: PREPA
Contact: Eng. Iván Rivera Tel. (787) 485−4411
Cost ($000): $2,600
Completion Date: 2008 Manhole Inspection Conduits Installation
Project Description:
On June 2007, PREPA awarded us the contract to perform the Administration, Engineering, Monitoring and Inspection Services for the Construction of two(2) new 38 kV underground lines in San Juan Steam Plant. The project was awarded to BLDM for $2.6 million of dollars and was finished on January 2008.
Supervision, Inspection and Project Management of the Underground of the electrical distribution systemUnderground Lines 8200 & 3900 in San Juan Steam Plant
Location: San Juan, P.R.
Client: PREPA
Contact: Eng. Iván Rivera Tel. (787) 485−4411
Cost ($000): $8,675
Completion Date: 2009 Project Sign Manhole Inspection
Project Description:
On May 15, 2007, PREPA awarded us the Administration, Monitoring and Inspection Services for theconstruction of the new 38kV Underground Line from Sábana Llana TC to Carolina Pueblo Substation. Theproject was awarded to BLDM for $8.675 million of dollars and was finished on January 2009.
Supervision, Inspection and Project Management of the Underground of the electrical distribution systemUnderground Lines from Sábana Llana TC to Carolina Pueblo Substation
Location: San Juan, P.R.
Client: Lord Electric
Contact: Ing. Javier PérezTel. (787) 758−4040
Cost ($000): $9,000
Completion Date: 2010Substation
Project Description:
Lord Electric awarded us the complete design of the new 40MVA @ 38kV Electrical Substation at Ft. Buchanan. The design has to comply with the US Corps of Engineers regulations. The design was Design and Build and included the design of three(3) new distribution feeders.
Complete design of a new 38kV substationNew 40MVA @ 38kV Electrical Substation
Feeders