DISTRICT 1 PROGRAM REVIEW LIST - ALLOCATION CODE (000000) - SFY 2017
COUNTY ROUTE BMP PROJECT NAME PHASE PriorityEstimateStartSTATE PROJECT NO. MILES EndAuth. Start (R) End (R) Cost (R) REMARKS
PROJECT REFERENCE INFORMATION PROJECT CHANGE REQUESTS
DEV_RESPBY
CO001 12.74 QUEEN SHOALS RD FOC CON $143,485CLAY 10/28/16 AE3081T062302 0.02 12/31/16 A08/29/16 A DD-1CT
CO043/01 0.00 HURRICANE CREEK BR FOC
CON $137,191KANAWHA 10/13/16 AE320431T062300 0.02 03/06/18 A08/30/16 A DD-1CT
WV869 0.00 BUFFALO BRIDGE LIGHTING
CON $74,806PUTNAM 05/28/17 AU34086900000 0.58 08/28/18 A02/27/17 A DT-ICT
I 079 10.10 ELKVIEW - AMMA (I-79) FOC
CON $136,454KANAWHA 04/28/17 AE32079T062300 0.60 12/31/17 A02/28/17 A DD-1CT
US119 12.11 LITTLE CREEK VILLAGE DEV
ENG $3,000KANAWHA 04/04/17 AT620119121100 0.01 12/28/22 E04/04/17 A CD-I
$494,936(000000) SUB-TOTAL FOR SFY 2017 =
DISTRICT 1 PROGRAM REVIEW LIST - ALLOCATION CODE (000000) - SFY 2018
COUNTY ROUTE BMP PROJECT NAME PHASE PriorityEstimateStartSTATE PROJECT NO. MILES EndAuth. Start (R) End (R) Cost (R) REMARKS
PROJECT REFERENCE INFORMATION PROJECT CHANGE REQUESTS
DEV_RESPBY
WV003 33.48 WHITEOAK BR CON $1,651,350BOONE 09/10/17 AS3033334800 0.01 10/28/18 A07/13/17 A DD-ICT
I 079 14.00 ACCESS RD - WILLIS CREEK
CON $9,504,228KANAWHA 04/28/19 AS32079140000 1.60 12/28/20 E08/16/17 A DD-1CT
I 077 107.10 EDENS FORK - TUPPERS CR R
CON $11,966,547KANAWHA 01/30/18 AS320771071000 2.70 12/28/20 E08/16/17 A DD-1CT
CO038/01 0.03 MCCLANAHAN BR +1 CON $2,490,600PUTNAM 06/25/18 AS34038100300 0.08 12/28/20 E02/21/18 A DD-B-BCT
CO041 4.10 TICKVILLE BR CON $1,863,897MASON 09/01/18 AS3274141000 0.03 12/28/20 E03/01/18 A DD-BCT
I 077 101.40 TOM WILLIAMS FAMILY +3
CON $21,315,555KANAWHA 05/17/19 AS320771014000 0.15 12/28/20 E03/14/18 A DD-BCT
NA999 999.00 CHELYAN HQ ROOF CON $293,849KANAWHA 07/01/18 AG020ROOF100 0.00 03/28/19 A05/28/18 A OM-CT
$49,086,026(000000) SUB-TOTAL FOR SFY 2018 =
Page 1 of 45PRINTED 9/30/2020 AT 7:02:11 AM
The information presented in this document is representative of the Project Tracking System as 09/30/2020. Any change requests should be noted in the appropriate columns at the right edge of the each table. The State Fiscal Year (SFY) assignments are based on the Authorization dates.
Report ID: SSTIP-002
DISTRICT 1 PROGRAM REVIEW LIST - ALLOCATION CODE (000000) - SFY 2019
COUNTY ROUTE BMP PROJECT NAME PHASE PriorityEstimateStartSTATE PROJECT NO. MILES EndAuth. Start (R) End (R) Cost (R) REMARKS
PROJECT REFERENCE INFORMATION PROJECT CHANGE REQUESTS
DEV_RESPBY
US035 19.19 WV 869-MASON CO 40 CON $65,692,502PUTNAM 05/28/19 AU34035190103 14.60 08/28/20 E01/14/19 A DD-R-CCT
NA999 0.00 MCS&T PARKING LOT MICROSU
CON $243,086KANAWHA 04/28/19 EG020MCST1900 0.00 05/31/19 E02/06/19 A OM-I
US119 41.67 SPENCER RD CON $356,000KANAWHA 09/28/19 AS320119416700 2.29 08/28/20 E05/29/19 A CP-1PO
CO035/08 0.00 DAIRY RD +4 CON $169,957PUTNAM 07/28/19 AS340GDRL2000 2.50 02/28/20 A05/29/19 A CP-1PO
CO041 0.67 CLYMERS CREEK RD CON $334,000PUTNAM 09/28/19 AS3404106700 3.79 08/28/20 E05/29/19 A CP-1PO
CO009 0.00 HEWETT CK RD +1 CON $113,304BOONE 07/28/19 AS303GDRL2000 2.00 02/28/20 A05/29/19 A CP-1PO
CO001 4.91 RIDGEVIEW NELLIS RD CON $339,000BOONE 10/05/19 AS303149100 3.31 08/28/20 E05/29/19 A CP-1PO
CO060/02 0.00 STRAWBERRY RD +8 CON $225,000KANAWHA 11/15/19 AS32060200000 1.82 09/28/20 E05/29/19 A CP-1PO
CO022 0.00 WOODWARD DRIVE CON $188,000KANAWHA 09/28/19 AS3202200000 1.47 11/28/19 A05/29/19 A CP-1PO
CO079/03 3.50 CABIN CREEK RD CON $232,000KANAWHA 09/28/19 AS32079335000 1.50 09/28/20 E05/29/19 A CP-1PO
CO004/07 0.00 GUY MULLENS RD CON $104,000CLAY 11/28/19 AS3084700000 1.50 06/28/20 E05/29/19 A CP-1PO
CO010 0.00 DOC BAILEY RD +15 CON $566,522KANAWHA 07/28/19 AS320GDRL2000 10.00 11/28/19 A05/29/19 A CP-1PO
CO005 0.00 ELKHURST RD +1 CON $116,804CLAY 09/28/19 AS308GDRL2000 2.00 02/28/20 A05/29/19 A CP-1PO
CO001/01 1.08 VALLEY VIEW RD CON $135,000CLAY 08/28/19 AS3081110800 1.32 08/28/20 E05/29/19 A CP-1PO
CO015 3.85 SANDHILL RD CON $353,000MASON 07/01/19 AS3271538500 3.28 08/28/20 E05/29/19 A CP-1PO
CO016 0.00 JERICO RD +2 CON $169,957MASON 07/28/19 AS327GDRL2000 2.50 02/28/20 A05/29/19 A CP-1PO
CO045 0.04 LITTLE SANDY CK RD SITE 1
CON $215,470KANAWHA 07/01/19 AS3204500400 0.02 09/28/20 E06/27/19 A CP-1PO
Page 2 of 45PRINTED 9/30/2020 AT 7:02:11 AM
The information presented in this document is representative of the Project Tracking System as 09/30/2020. Any change requests should be noted in the appropriate columns at the right edge of the each table. The State Fiscal Year (SFY) assignments are based on the Authorization dates.
Report ID: SSTIP-002
CO035/09 0.45 SCHOWEN HILL RD SITE 2 CON $473,140PUTNAM 07/01/19 AS34035904500 0.06 08/28/20 E06/27/19 A CP-1PO
CO013/05 1.39 MT HOME RD SITE 1 CON $253,780CLAY 07/01/19 AS30813513900 0.03 06/28/20 E06/27/19 A CP-1PO
CO013/05 2.45 MT HOME SITE 2 CON $370,775CLAY 07/01/19 AS30813524500 0.03 06/28/20 E06/27/19 A CP-1PO
CO032 6.56 DERRICKS CREEK RD CON $273,125KANAWHA 07/01/19 AS3203265600 0.02 09/28/20 E06/27/19 A CP-1PO
CO016 1.05 JERICHO RD CON $243,600MASON 07/01/19 AS3271610500 0.02 08/28/20 E06/27/19 A CP-1PO
CO032 4.52 MARTIN'S PETERBILT ENG $2,000PUTNAM 06/28/19 AT640MPETE1900 0.36 12/31/22 E06/28/19 A CD-
$71,170,022(000000) SUB-TOTAL FOR SFY 2019 =
DISTRICT 1 PROGRAM REVIEW LIST - ALLOCATION CODE (000000) - SFY 2020
COUNTY ROUTE BMP PROJECT NAME PHASE PriorityEstimateStartSTATE PROJECT NO. MILES EndAuth. Start (R) End (R) Cost (R) REMARKS
PROJECT REFERENCE INFORMATION PROJECT CHANGE REQUESTS
DEV_RESPBY
CO069 0.20 DUTCH RIDGE SITE 1 CON $268,025KANAWHA 11/15/19 AS3206902000 0.04 09/28/20 E08/01/19 A CP-1PO
CO043 1.07 ELKVIEW COMMONS ENG $2,000KANAWHA 09/06/19 AT620ELKCM1900 0.20 12/31/22 E09/06/19 A CD-
CO022 2.73 HARVEY CHAPEL BRIDGE CON $466,240MASON 10/28/20 ES3272227300 0.01 12/28/20 E12/10/19 A DD-1CT
CO072 3.77 POTTS CHAPEL PONY TRUSS B
CON $466,554MASON 10/28/20 ES3277237700 0.01 12/02/20 E01/07/20 A DD-1CT
CO064 6.76 BIG BUZZARD GIRDER BRIDGE
CON $425,409MASON 08/28/20 ES3276467600 0.01 10/21/20 E01/07/20 A DD-1CT
CO085/24 0.01 CLINTON CAMP ROAD BRIDGE
CON $552,051BOONE 08/28/20 ES303852400100 0.01 08/31/20 E02/10/20 A DD-1CT
CO034/30 0.00 SCOTT DEPOT KROGER ENG $3,000PUTNAM 03/25/20 AS340343000000 0.00 01/28/24 E03/25/20 A CD-I
CO045/03 2.32 GUYAN CREEK BRIDGE CON $608,000MASON 06/28/20 ES32745323200 0.01 09/28/20 E04/28/20 E DD-1CT
US060 11.17 PARK PLACE DEVELOPMENT
ENG $2,000KANAWHA 04/28/20 AT62060111700 0.66 04/28/23 E04/28/20 A CD-
CO062 48.81 LETART CONCRETE T-BEAM
CON $800,000MASON 06/28/20 ES32762488100 0.02 09/28/20 E04/28/20 E DD-1CT
Page 3 of 45PRINTED 9/30/2020 AT 7:02:11 AM
The information presented in this document is representative of the Project Tracking System as 09/30/2020. Any change requests should be noted in the appropriate columns at the right edge of the each table. The State Fiscal Year (SFY) assignments are based on the Authorization dates.
Report ID: SSTIP-002
NA999 0.00 PURPLE HEART FLOWER SITES
CON $30,000KANAWHA 05/12/20 AS320PURFL2000 0.00 08/28/20 E05/06/20 A DD-1SF
CO019/04 0.10 TRACE CREEK CON $159,000KANAWHA 09/28/20 ES32019401000 0.01 06/28/21 E05/14/20 A DD-1PO
CO057 19.88 BLUE CREEK RD CON $271,000KANAWHA 09/28/20 ES32057198800 0.02 06/28/21 E05/14/20 A DD-1PO
CO003/02 2.81 HOLCOMB RIDGE RD CON $185,000CLAY 08/28/20 ES3083228100 0.04 08/28/21 E05/14/20 A DD-1PO
CO011 0.34 TRIPPLET RIDGE RD CON $224,000CLAY 06/28/20 ES3081103400 0.04 06/28/21 E05/14/20 A DD-1PO
CO024 0.33 SYCAMORE RD CON $361,000CLAY 06/28/20 ES3082403300 0.04 06/28/21 E05/14/20 A DD-1PO
CO048 5.29 GROVES-WATTSVILLE RD CON $121,000CLAY 06/28/20 ES3084852900 0.02 06/28/21 E05/14/20 A DD-1PO
CO015 14.44 MIDDLE FORK RD CON $130,700KANAWHA 06/28/20 ES32015144400 0.02 06/28/21 E05/14/20 A CP-1PO
CO029/02 0.01 WHITE OAK DRIVE BRIDGE
CON $558,321KANAWHA 10/28/20 ES32029200100 0.02 12/13/20 E05/21/20 A DD-1CT
WV025 10.56 7TH AVE O/H SIGN CON $120,000KANAWHA 07/28/20 ER32025105600 0.01 09/28/20 E05/28/20 E DT-ICT
CO085/23 0.01 POND FORK BRIDGE CON $400,000BOONE 07/28/20 ES303852300100 0.01 10/28/20 E05/28/20 E DD-1CT
CO078 2.37 SIXTEENMILE CREEK BRIDGE
CON $619,040MASON 10/28/20 ES3277823700 0.01 11/20/20 E06/16/20 A DD-1CT
CO079/09 0.01 CRAWFORD BOTTOM BRIDGE
CON $862,000KANAWHA 09/28/20 ES32079900100 0.01 12/28/20 E06/28/20 E DD-1CT
CO059 4.63 THOROFARE ROAD BRIDGE
CON $541,000KANAWHA 10/28/20 ES3205946300 0.01 03/28/21 E06/28/20 E DD-1CT
CO035/10 5.43 CAPEHART BRIDGE CON $1,353,000MASON 08/28/20 ES327351054300 0.02 11/28/20 E06/28/20 E DD-1CT
$9,528,340(000000) SUB-TOTAL FOR SFY 2020 =
DISTRICT 1 PROGRAM REVIEW LIST - ALLOCATION CODE (000000) - SFY 2021
COUNTY ROUTE BMP PROJECT NAME PHASE PriorityEstimateStartSTATE PROJECT NO. MILES EndAuth. Start (R) End (R) Cost (R) REMARKS
PROJECT REFERENCE INFORMATION PROJECT CHANGE REQUESTS
DEV_RESPBY
CO057 11.15 SANDERSON BRIDGE CON $985,815KANAWHA 12/28/20 ES32057111500 0.01 08/21/21 E07/14/20 A DD-1CT
Page 4 of 45PRINTED 9/30/2020 AT 7:02:12 AM
The information presented in this document is representative of the Project Tracking System as 09/30/2020. Any change requests should be noted in the appropriate columns at the right edge of the each table. The State Fiscal Year (SFY) assignments are based on the Authorization dates.
Report ID: SSTIP-002
CO004 5.44 LAUREL CREEK BRIDGE CON $1,125,000CLAY 09/28/20 ES308454400 0.01 09/28/21 E07/28/20 E DD-1CT
CO119/13 1.35 CRESTWOOD CON $125,000KANAWHA 07/28/20 AS3201191313500 0.03 09/26/20 A07/28/20 A DD-1PO
WV062 31.69 WEST COLUMBIA CON $250,000MASON 10/14/20 ES32762316900 0.25 11/30/20 E07/30/20 A CP-1SF
CO019/01 1.32 MOORE FORK RD CON $100,000CLAY 08/14/20 AS30819113200 1.32 10/09/20 E07/30/20 A CP-1SF
WV062 9.69 HOMETOWN SITE 2 CON $690,000PUTNAM 09/01/20 AS3406296900 0.10 09/18/20 A07/30/20 A DD-1DF
CO081 1.00 BELLE CR RD CON $325,000KANAWHA 10/21/20 ES3208110000 3.00 11/15/20 E07/30/20 A CP-1SF
CO024 0.40 UPPER SYCAMORE RD CON $100,000CLAY 09/28/20 AS3082404200 0.40 09/30/20 E07/30/20 A CP-1SF
CO077/01 0.00 FIELDS CR RD CON $800,000KANAWHA 09/08/20 AS32077100000 5.00 11/15/20 E07/30/20 A CP-1PO
WV094 2.75 SHORT CREEK SITE 2 CON $370,000BOONE 09/23/20 AS3039427400 0.03 10/30/20 E07/30/20 A DD-1PO
WV003 14.12 DRAWDY MOUNTAIN SITE 3
CON $270,000BOONE 09/21/20 AS3033141200 0.04 10/19/20 E07/30/20 A CP-1PO
CO075 0.12 ASHFORD RD CON $335,000KANAWHA 09/01/20 AS3207501600 0.02 09/18/20 A07/30/20 A DD-1PO
CO043 0.00 FRAME RD CON $500,000KANAWHA 09/21/20 AS3204300000 5.33 09/30/20 E07/30/20 A CP-1SF
CO032/03 0.00 RIVERBEND RD CON $275,000KANAWHA 10/21/20 ES32032300000 1.73 11/15/20 E07/30/20 A CP-1SF
CO026 5.53 LIME KILN RD CON $640,000PUTNAM 11/03/20 ES3402655300 0.08 12/14/20 E07/30/20 A DD-1DF
CO023 0.00 LEON BADEN RD CON $165,000MASON 09/21/20 AS3272300000 3.55 10/30/20 E07/30/20 A CP-1SF
CO035/09 0.45 SCHOWEN HILL RD SITE CON $550,000PUTNAM 08/18/20 AS34035901400 0.06 09/22/20 A07/30/20 A DD-1PO
WV017 11.48 BLAIR MOUNTAIN HWY CON $144,988BOONE 09/28/20 ES30317114800 0.32 11/30/20 E08/03/20 A DD-1CT
WV817 14.19 WINFIELD-FRAZIERS BOTTOM
CON $371,180PUTNAM 10/28/20 ES340817141900 1.77 12/30/20 E08/05/20 A DD-1CT
WV817 8.68 MORGANS LANDING-WINFIELD
CON $491,569PUTNAM 09/28/20 ES34081786800 1.97 10/30/20 E08/05/20 A DD-1CT
Page 5 of 45PRINTED 9/30/2020 AT 7:02:12 AM
The information presented in this document is representative of the Project Tracking System as 09/30/2020. Any change requests should be noted in the appropriate columns at the right edge of the each table. The State Fiscal Year (SFY) assignments are based on the Authorization dates.
Report ID: SSTIP-002
CO021 0.00 GUANO CR RD CON $190,000PUTNAM 10/28/20 ES3402100000 1.74 12/28/20 E08/13/20 A CP-1PO
CO001 8.36 MANILLA CR RD CON $270,000PUTNAM 09/14/20 AS340183600 3.30 09/28/20 A08/13/20 A CP-1PO
CO005 0.00 JIM RIDGE RD CON $310,000PUTNAM 09/14/20 AS340500000 3.18 09/23/20 A08/13/20 A CP-1PO
CO006 2.01 DUNLAP RD CON $90,000PUTNAM 09/15/20 AS340620100 1.24 09/18/20 A08/13/20 A CP-1PO
CO007 0.00 TURKEY BR RD CON $95,548PUTNAM 09/14/20 AS340700000 1.14 09/18/20 A08/13/20 A CP-1PO
CO012 0.00 STEEL RIDGE CON $575,000PUTNAM 09/14/20 AS3401200000 6.40 09/18/20 A08/13/20 A CP-1PO
CO034/08 1.95 MUD LICK RIGHT FORK CON $360,000PUTNAM 09/14/20 AS34034819500 5.08 12/28/20 E08/13/20 A CP-1PO
CO030 0.00 POINTDEXTER RD CON $130,000PUTNAM 10/28/20 ES3403000000 2.24 12/28/20 E08/13/20 A CP-1PO
CO019/03 0.00 TRACE FORK CON $180,000PUTNAM 10/28/20 ES34019300100 1.71 12/28/20 E08/13/20 A CP-1PO
CO058 1.04 ARBUCKLE THRU TRUSS BRIDG
CON $901,265MASON 11/28/20 ES3275810400 0.02 10/15/21 E09/03/20 A DD-1CT
CO007/08 0.00 LIMESTONE RD CON $220,000KANAWHA 09/25/20 AS3207800000 2.79 12/28/20 E09/09/20 A CP-1PO
CO076 1.74 DECOTA RD CON $420,000KANAWHA 09/25/20 AS3207617400 2.52 12/28/20 E09/09/20 A CP-1PO
WV003 38.18 SYLVESTER-WHITESVILLE CON $375,000BOONE 09/25/20 AS3033381800 2.14 12/28/20 E09/09/20 A CP-1PO
NA000 0.00 DISTRICT 1-SHOP BLDG CON $11,392,244KANAWHA 12/28/20 EG020HDQ603 0.00 04/28/22 E10/28/20 E DD-1CT
NA 0.00 CHARLESTON BICYCLE SIGNS
CON $16,200KANAWHA 10/28/20 EU320BIKE100 0.00 07/28/21 E10/28/20 E PR-I
NA000 0.00 DISTRICT 1-MULTI-PURPOSE
CON $4,000,000KANAWHA 01/28/21 EG020HDQ604 0.00 04/28/22 E10/28/20 E DD-1CT
NA000 0.00 DISTRICT 1-LAB BLDG CON $1,500,000KANAWHA 01/28/21 EG020HDQ605 0.00 11/28/21 E10/28/20 E DD-1CT
CO072 0.00 SLAUGHTERS CRK WASTEWATER
ENG $25,000KANAWHA 10/28/20 ET3207200000 0.81 02/28/21 E10/28/20 E CD-I
US060 10.48 S CHARLESTON SHEETZ ENG $1,000KANAWHA 10/28/20 ET620SHETZ200 0.26 03/28/21 E10/28/20 E CD-I
Page 6 of 45PRINTED 9/30/2020 AT 7:02:12 AM
The information presented in this document is representative of the Project Tracking System as 09/30/2020. Any change requests should be noted in the appropriate columns at the right edge of the each table. The State Fiscal Year (SFY) assignments are based on the Authorization dates.
Report ID: SSTIP-002
WV025 0.96 1ST AVE CON $820,000KANAWHA 10/28/20 ES3202509600 2.20 12/28/20 E10/28/20 E CP-1PO
CO024 2.35 SENG CREEK BRIDGE CON $1,090,000BOONE 12/28/20 ES3032423500 0.01 03/28/21 E10/28/20 E DD-1CT
NA000 0.00 HQ DEMO/PARKING LOT PAVIN
CON $1,000,000KANAWHA 01/28/21 EG020HDQ610 0.00 04/28/22 E11/28/20 E DD-1CT
CO019 0.01 PFC WF HARRISON MEM BR
CON $250,000KANAWHA 02/28/21 ES3201900200 0.02 02/28/23 E12/28/20 E DD-BCT
CO214/13 0.00 RHL BLVD CONN CON $16,950,000KANAWHA 03/28/21 EU3202141300000 0.43 04/28/26 E12/28/20 E DD-R-CCT
I 064 55.57 MONTROSE- OAKWOOD CON $2,400,000KANAWHA 03/28/21 ES32064555700 1.21 08/28/21 E12/28/20 E DD-1CT
WV003 39.58 WV 3 SENG CREEK BRIDGE
CON $1,951,738BOONE 03/28/21 ES3033395800 0.01 06/28/21 E01/28/21 E DD-ICT
NA000 0.00 RUFFNER BLDG DEMO CON $250,000KANAWHA 04/28/21 EG020HDQ611 0.00 12/28/21 E02/28/21 E DD-1CT
CO077/01 0.70 LOWER FIELDS CREEK BR CON $175,000KANAWHA 09/28/21 ES32077107000 0.02 03/28/22 E06/28/21 E DD-BCT
$54,551,547(000000) SUB-TOTAL FOR SFY 2021 =
DISTRICT 1 PROGRAM REVIEW LIST - ALLOCATION CODE (000000) - SFY 2024
COUNTY ROUTE BMP PROJECT NAME PHASE PriorityEstimateStartSTATE PROJECT NO. MILES EndAuth. Start (R) End (R) Cost (R) REMARKS
PROJECT REFERENCE INFORMATION PROJECT CHANGE REQUESTS
DEV_RESPBY
WV622 1.96 WV 622-CROSS LANES CON $16,000,000KANAWHA 01/28/24 EU32062219600 1.24 01/28/28 E11/28/23 E DD-RCT
$16,000,000(000000) SUB-TOTAL FOR SFY 2024 =
DISTRICT 1 PROGRAM REVIEW LIST - ALLOCATION CODE (A10099) - SFY 2017
COUNTY ROUTE BMP PROJECT NAME PHASE PriorityEstimateStartSTATE PROJECT NO. MILES EndAuth. Start (R) End (R) Cost (R) REMARKS
PROJECT REFERENCE INFORMATION PROJECT CHANGE REQUESTS
DEV_RESPBY
WV003 8.17 DANVILLE - PEYTONA CON $2,398,626BOONE 02/20/17 AS303381700 10.46 02/28/17 A07/08/16 A CP-1PO
WV003 32.06 ORGAS CON $490,080BOONE 08/10/16 AS3033320600 2.92 10/15/16 A07/27/16 A CP-1PO
WV062 29.55 LAKIN-MASON CON $379,501MASON 11/05/16 AS32762295500 3.61 11/29/16 A11/02/16 A CP-1PO
Page 7 of 45PRINTED 9/30/2020 AT 7:02:12 AM
The information presented in this document is representative of the Project Tracking System as 09/30/2020. Any change requests should be noted in the appropriate columns at the right edge of the each table. The State Fiscal Year (SFY) assignments are based on the Authorization dates.
Report ID: SSTIP-002
CO083/10 0.00 LOWER WHITTAKER DR CON $14,956KANAWHA 11/20/16 AS320831000000 0.14 11/30/16 A11/10/16 A CP-1PO
US060 8.93 UPTON LIGHT ENG $90,000KANAWHA 02/02/17 AS3206089300 0.28 12/28/19 A02/02/17 A CP-1
US060 5.70 SPRUCE STREET ENG $170,000KANAWHA 02/02/17 AS3206057000 0.34 12/28/19 A02/02/17 A CP-1
CO051/03 0.86 KEYSTONE DRIVE CON $77,092KANAWHA 02/28/17 AS32051308700 0.11 10/28/17 A02/13/17 A CP-1SF
$3,620,255(A10099) SUB-TOTAL FOR SFY 2017 =
DISTRICT 1 PROGRAM REVIEW LIST - ALLOCATION CODE (A10099) - SFY 2018
COUNTY ROUTE BMP PROJECT NAME PHASE PriorityEstimateStartSTATE PROJECT NO. MILES EndAuth. Start (R) End (R) Cost (R) REMARKS
PROJECT REFERENCE INFORMATION PROJECT CHANGE REQUESTS
DEV_RESPBY
I 064 42.43 TEAYS VALLEY-NITRO CON $670,503PUTNAM 05/20/18 AS34064424300 2.10 12/28/18 A05/16/18 A CP-1PO
$670,503(A10099) SUB-TOTAL FOR SFY 2018 =
DISTRICT 1 PROGRAM REVIEW LIST - ALLOCATION CODE (A10099) - SFY 2020
COUNTY ROUTE BMP PROJECT NAME PHASE PriorityEstimateStartSTATE PROJECT NO. MILES EndAuth. Start (R) End (R) Cost (R) REMARKS
PROJECT REFERENCE INFORMATION PROJECT CHANGE REQUESTS
DEV_RESPBY
WV817 12.93 WINFIELD RD CON $120,000PUTNAM 10/28/19 AS340817129300 0.62 08/28/20 E10/17/19 A CP-1PO
CO013/10 0.00 OAKWOOD RD CON $150,000KANAWHA 10/28/19 AS320131000000 1.49 12/28/19 A10/28/19 A CP-1OT
$270,000(A10099) SUB-TOTAL FOR SFY 2020 =
DISTRICT 1 PROGRAM REVIEW LIST - ALLOCATION CODE (A10099) - SFY 2021
COUNTY ROUTE BMP PROJECT NAME PHASE PriorityEstimateStartSTATE PROJECT NO. MILES EndAuth. Start (R) End (R) Cost (R) REMARKS
PROJECT REFERENCE INFORMATION PROJECT CHANGE REQUESTS
DEV_RESPBY
WV004 10.87 MAIN STREET CON $92,000CLAY 08/28/20 ES3084108700 0.44 09/28/20 E08/28/20 E CP-1PO
CO046 1.08 IVYDALE RIDGE RD CON $45,000CLAY 08/28/20 ES3084610800 0.30 09/28/20 E08/28/20 E CP-1PO
Page 8 of 45PRINTED 9/30/2020 AT 7:02:12 AM
The information presented in this document is representative of the Project Tracking System as 09/30/2020. Any change requests should be noted in the appropriate columns at the right edge of the each table. The State Fiscal Year (SFY) assignments are based on the Authorization dates.
Report ID: SSTIP-002
WV004 20.94 UPPER 2 MILE-IVYDALE RIDG
CON $100,000CLAY 08/28/20 ES3084209400 0.64 09/28/20 E08/28/20 E CP-1PO
US060 44.11 MONTGOMERY ROCKSLIDE
CON $45,000KANAWHA 08/28/20 ES32060441102 0.08 10/28/20 E08/28/20 E CP-1PO
$282,000(A10099) SUB-TOTAL FOR SFY 2021 =
DISTRICT 1 PROGRAM REVIEW LIST - ALLOCATION CODE (A13001) - SFY 2017
COUNTY ROUTE BMP PROJECT NAME PHASE PriorityEstimateStartSTATE PROJECT NO. MILES EndAuth. Start (R) End (R) Cost (R) REMARKS
PROJECT REFERENCE INFORMATION PROJECT CHANGE REQUESTS
DEV_RESPBY
I 064 49.50 INSTITUTE-DUNBAR CON $140,759KANAWHA 10/15/16 AS32064495000 4.20 11/15/16 A10/13/16 A CP-1PO
WV817 1.12 SCARY-JOHN AMOS PLANT
CON $171,041PUTNAM 11/15/16 AS34081711200 3.00 12/02/16 A11/10/16 A CP-1PO
WV062 24.17 POINT PLEASANT-LAKIN CON $174,918MASON 11/15/16 AS32762241700 1.83 12/02/16 A11/10/16 A CP-1PO
WV062 3.26 POCA-BANCROFT CON $120,950PUTNAM 11/15/16 AS3406232600 1.84 01/27/17 A11/10/16 A CP-1PO
$607,668(A13001) SUB-TOTAL FOR SFY 2017 =
DISTRICT 1 PROGRAM REVIEW LIST - ALLOCATION CODE (A13001) - SFY 2018
COUNTY ROUTE BMP PROJECT NAME PHASE PriorityEstimateStartSTATE PROJECT NO. MILES EndAuth. Start (R) End (R) Cost (R) REMARKS
PROJECT REFERENCE INFORMATION PROJECT CHANGE REQUESTS
DEV_RESPBY
CO001 0.00 BROWNS CREEK CON $567,823KANAWHA 10/15/17 AS320100000 4.82 03/28/18 A07/21/17 A CP-1PO
CO050/04 0.00 HARVEYS CREEK ROAD +2 CON $392,587PUTNAM 09/28/17 AS34050400000 4.93 11/28/17 A07/21/17 A DD-1PO
CO057 13.51 QUICK RD CON $174,902KANAWHA 10/15/17 AS32057135100 1.64 11/30/17 A07/21/17 A CP-1PO
CO036/02 0.00 LAUREL CREEK ROAD CON $139,240CLAY 08/01/17 AS30836200000 1.89 10/25/17 A07/21/17 A CP-1PO
CO007 2.03 KELLEYS CREEK CON $430,118KANAWHA 10/15/17 AS320720300 6.19 11/28/17 A07/21/17 A CP-1PO
CO026 5.85 CHAP ROAD CON $126,299BOONE 08/25/17 AS3032658500 0.92 01/15/18 A07/21/17 A CP-1PO
CO049 3.38 PINCH - QUICK CON $661,365KANAWHA 08/15/17 AS3204933800 5.85 10/25/17 A08/02/17 A CP-1PO
Page 9 of 45PRINTED 9/30/2020 AT 7:02:12 AM
The information presented in this document is representative of the Project Tracking System as 09/30/2020. Any change requests should be noted in the appropriate columns at the right edge of the each table. The State Fiscal Year (SFY) assignments are based on the Authorization dates.
Report ID: SSTIP-002
US060 7.53 HODGES RD-BROWNS CREEK RD
CON $1,151,396PUTNAM 12/28/18 AS3406075300 2.27 10/28/20 E01/25/18 A DD-1CT
WV002 18.91 SALT CREEK RD-HENDERSON
CON $374,630MASON 04/28/19 AS3272189100 0.86 12/28/21 E01/29/18 A DD-1CT
WV017 5.20 GREENVIEW-LOW GAP CON $675,850BOONE 07/01/18 AS3031752000 3.69 07/27/18 A01/29/18 A DD-1CT
WV817 4.13 JOHN AMOS-CANNERY LANE
CON $652,088PUTNAM 11/01/18 AS34081741300 2.82 12/12/18 A01/30/18 A DD-1CT
US119 22.38 UNO LN-BIG CHIMNEY BLVD
CON $817,441KANAWHA 07/01/18 AS320119223800 3.04 10/12/18 A04/16/18 A DD-1CT
WV114 2.12 AIRPORT RD-CAPITOL HIGH
CON $493,101KANAWHA 09/01/18 AS32011421200 1.71 12/28/19 A04/16/18 A DD-1CT
WV061 4.70 HANSFORD-CROWN HILL CON $612,742KANAWHA 07/20/18 AS3206147000 2.95 10/12/18 A04/16/18 A DD-1CT
US119 0.41 PENNSYLVANIA SOUTH CON $972,571KANAWHA 04/01/19 AS32011904100 0.61 06/24/20 A04/17/18 A DD-1CT
WV062 0.98 VARET RD - ARBUCKLE TRIBB
CON $1,324,213MASON 09/01/18 AS3276209800 3.05 10/12/18 A05/01/18 A DD-1CT
CO018 0.00 BLUE KNOB +1 CON $340,329CLAY 06/15/19 AS3081800000 3.76 09/15/19 A05/21/18 A CP-1PO
$9,906,695(A13001) SUB-TOTAL FOR SFY 2018 =
DISTRICT 1 PROGRAM REVIEW LIST - ALLOCATION CODE (A13001) - SFY 2019
COUNTY ROUTE BMP PROJECT NAME PHASE PriorityEstimateStartSTATE PROJECT NO. MILES EndAuth. Start (R) End (R) Cost (R) REMARKS
PROJECT REFERENCE INFORMATION PROJECT CHANGE REQUESTS
DEV_RESPBY
CO021 0.17 SISSONVILLE DRIVE CON $1,106,577KANAWHA 08/28/19 AS3202101700 2.89 10/28/20 E03/14/19 A DD-1CT
CO060/14 0.00 KANAWHA TERRACE CON $576,033KANAWHA 09/28/19 AS320601400000 1.53 10/28/20 E06/18/19 A DD-1CT
$1,682,610(A13001) SUB-TOTAL FOR SFY 2019 =
DISTRICT 1 PROGRAM REVIEW LIST - ALLOCATION CODE (A13001) - SFY 2020
COUNTY ROUTE BMP PROJECT NAME PHASE PriorityEstimateStartSTATE PROJECT NO. MILES EndAuth. Start (R) End (R) Cost (R) REMARKS
PROJECT REFERENCE INFORMATION PROJECT CHANGE REQUESTS
DEV_RESPBY
CO001 10.45 ASHFORD NELLIS RD CON $350,000BOONE 09/28/19 AS3031104500 2.40 08/28/20 E07/17/19 A CP-1PO
Page 10 of 45PRINTED 9/30/2020 AT 7:02:12 AM
The information presented in this document is representative of the Project Tracking System as 09/30/2020. Any change requests should be noted in the appropriate columns at the right edge of the each table. The State Fiscal Year (SFY) assignments are based on the Authorization dates.
Report ID: SSTIP-002
WV016 31.58 BIG OTTER-IVYDALE RD CON $650,000CLAY 09/28/19 AS30816315800 3.53 06/28/20 E07/17/19 A CP-1PO
CO160/07 0.00 WALNUT STREET CON $130,000KANAWHA 09/28/19 AS320160700000 0.50 08/28/20 E07/17/19 A DD-1PO
CO060/14 3.68 W MAIN ST CON $270,000KANAWHA 07/28/19 AS320601436800 1.23 12/28/19 A07/17/19 A DD-1PO
CO034/28 0.00 MT VERNON LANE CON $35,000PUTNAM 09/28/19 AS340342800000 0.10 08/28/20 E07/17/19 A CP-1PO
WV004 21.98 WV 4-IVYDALE RD CON $624,000CLAY 09/28/19 AS3084219800 3.22 06/28/20 E07/17/19 A CP-1PO
WV016 35.11 BIG OTTER CON $729,719CLAY 05/28/20 ES30816351100 2.70 08/28/20 E08/12/19 A DD-1CT
CO016/25 0.00 HARTLAND ROAD CON $125,000CLAY 11/28/19 AS308162500000 1.00 06/28/20 E10/28/19 A CP-1PO
WV062 7.84 ELEANOR-RED HOUSE CON $938,697PUTNAM 08/28/20 ES3406278400 3.92 09/28/20 E01/08/20 A DD-1CT
$3,852,416(A13001) SUB-TOTAL FOR SFY 2020 =
DISTRICT 1 PROGRAM REVIEW LIST - ALLOCATION CODE (A13001) - SFY 2021
COUNTY ROUTE BMP PROJECT NAME PHASE PriorityEstimateStartSTATE PROJECT NO. MILES EndAuth. Start (R) End (R) Cost (R) REMARKS
PROJECT REFERENCE INFORMATION PROJECT CHANGE REQUESTS
DEV_RESPBY
NA999 $$ 0.00 RESURF CON $2,000,000DISTRICT 01 07/28/20 EA381A132100 0.00 06/30/21 E07/28/20 E CP-1PO
CO622/24 0.01 JAIN DRIVE CON $31,000KANAWHA 08/28/20 ES3206222400100 0.11 11/28/20 E08/28/20 E CP-1PO
CO060/06 0.00 MALDEN DRIVE CON $80,000KANAWHA 08/28/20 ES32060600000 0.31 11/28/20 E08/28/20 E CP-1PO
CO015/04 0.00 BERRY HILLS ROAD CON $117,000KANAWHA 08/28/20 ES32015400000 0.75 10/28/20 E08/28/20 E CP-1PO
WV004 15.75 CLAY-IVYDALE RD CON $555,000CLAY 08/28/20 ES3084157500 3.85 11/28/20 E08/28/20 E CP-1PO
WV017 0.00 CLOTHIER-JEFFREY RD CON $788,000BOONE 01/28/21 ES3031700100 3.01 06/28/21 E09/28/20 E DD-1CT
WV004 25.20 IVYDALE-DUCK CON $350,000CLAY 10/28/20 ES3084252000 2.40 04/28/21 E09/28/20 E CP-1PO
CO018 0.00 LONG HOLLOW RD CON $335,000MASON 09/28/20 ES3271800000 3.72 02/28/21 E09/28/20 E CP-1PO
Page 11 of 45PRINTED 9/30/2020 AT 7:02:12 AM
The information presented in this document is representative of the Project Tracking System as 09/30/2020. Any change requests should be noted in the appropriate columns at the right edge of the each table. The State Fiscal Year (SFY) assignments are based on the Authorization dates.
Report ID: SSTIP-002
CO025/64 0.00 LOWER MIDWAY DRIVE CON $84,000KANAWHA 09/28/20 ES320256400000 0.63 02/28/21 E09/28/20 E CP-1PO
CO025/62 0.00 PINE CIRCLE DRIVE CON $92,000KANAWHA 09/28/20 ES320256200000 0.66 02/28/21 E09/28/20 E CP-1PO
CO025/58 0.00 GREENBRIER LANE +2 CON $80,000KANAWHA 09/28/20 ES320255800000 0.41 02/28/21 E09/28/20 E CP-1PO
CO009 2.90 BOARD RUN RD CON $214,000MASON 09/28/20 ES327929000 2.10 02/28/21 E09/28/20 E CP-1PO
$4,726,000(A13001) SUB-TOTAL FOR SFY 2021 =
DISTRICT 1 PROGRAM REVIEW LIST - ALLOCATION CODE (A20001) - SFY 2017
COUNTY ROUTE BMP PROJECT NAME PHASE PriorityEstimateStartSTATE PROJECT NO. MILES EndAuth. Start (R) End (R) Cost (R) REMARKS
PROJECT REFERENCE INFORMATION PROJECT CHANGE REQUESTS
DEV_RESPBY
HA994 0.00 LEE ROAD +3 CON $60,000KANAWHA 08/15/16 AS32099400000 2.45 10/15/16 A08/04/16 A CP-1SF
NA999 0.00 D1 2016 SUMMER STONE STAB
CON $450,702DISTRICT 01 10/06/16 AS381STAB1701 50.77 12/20/16 A10/04/16 A CP-1SF
CO079/03 0.00 KAYFORD MT +3 CON $36,000KANAWHA 04/01/17 AS32079300000 11.39 08/25/17 A02/02/17 A CP-1SF
NA999 0.00 D1 2017 SPRING STONE STA
CON $225,458DISTRICT 01 06/11/17 AS381STAB1702 20.00 12/15/17 A04/11/17 A CP-1SF
$772,160(A20001) SUB-TOTAL FOR SFY 2017 =
DISTRICT 1 PROGRAM REVIEW LIST - ALLOCATION CODE (ABC001) - SFY 2021
COUNTY ROUTE BMP PROJECT NAME PHASE PriorityEstimateStartSTATE PROJECT NO. MILES EndAuth. Start (R) End (R) Cost (R) REMARKS
PROJECT REFERENCE INFORMATION PROJECT CHANGE REQUESTS
DEV_RESPBY
NA999 $$ 0.00 DISTRICT 1 2021 ABC BUDGE
CON $460,000DISTRICT 01 07/01/20 EA381ABC2100 0.00 06/30/21 E07/01/20 E -
$460,000(ABC001) SUB-TOTAL FOR SFY 2021 =
DISTRICT 1 PROGRAM REVIEW LIST - ALLOCATION CODE (ABC001) - SFY 2022
COUNTY ROUTE BMP PROJECT NAME PHASE PriorityEstimateStartSTATE PROJECT NO. MILES EndAuth. Start (R) End (R) Cost (R) REMARKS
PROJECT REFERENCE INFORMATION PROJECT CHANGE REQUESTS
DEV_RESPBY
Page 12 of 45PRINTED 9/30/2020 AT 7:02:12 AM
The information presented in this document is representative of the Project Tracking System as 09/30/2020. Any change requests should be noted in the appropriate columns at the right edge of the each table. The State Fiscal Year (SFY) assignments are based on the Authorization dates.
Report ID: SSTIP-002
NA999 $$ 0.00 DISTRICT 1 2022 ABC BUDGE
CON $8,000,000DISTRICT 01 07/01/21 EA381ABC2200 0.00 06/30/22 E07/01/21 E -
$8,000,000(ABC001) SUB-TOTAL FOR SFY 2022 =
DISTRICT 1 PROGRAM REVIEW LIST - ALLOCATION CODE (ABC001) - SFY 2023
COUNTY ROUTE BMP PROJECT NAME PHASE PriorityEstimateStartSTATE PROJECT NO. MILES EndAuth. Start (R) End (R) Cost (R) REMARKS
PROJECT REFERENCE INFORMATION PROJECT CHANGE REQUESTS
DEV_RESPBY
NA999 $$ 0.00 DISTRICT 1 2023 ABC BUDG
CON $8,000,000DISTRICT 01 07/01/22 EA381ABC2300 0.00 06/30/23 E07/01/22 E -
$8,000,000(ABC001) SUB-TOTAL FOR SFY 2023 =
DISTRICT 1 PROGRAM REVIEW LIST - ALLOCATION CODE (ABC001) - SFY 2024
COUNTY ROUTE BMP PROJECT NAME PHASE PriorityEstimateStartSTATE PROJECT NO. MILES EndAuth. Start (R) End (R) Cost (R) REMARKS
PROJECT REFERENCE INFORMATION PROJECT CHANGE REQUESTS
DEV_RESPBY
NA999 $$ 0.00 DISTRICT 1 2024 ABC BUDG
CON $8,000,000DISTRICT 01 07/01/23 EA381ABC2400 0.00 06/30/24 E07/01/23 E -
$8,000,000(ABC001) SUB-TOTAL FOR SFY 2024 =
DISTRICT 1 PROGRAM REVIEW LIST - ALLOCATION CODE (B10099) - SFY 2017
COUNTY ROUTE BMP PROJECT NAME PHASE PriorityEstimateStartSTATE PROJECT NO. MILES EndAuth. Start (R) End (R) Cost (R) REMARKS
PROJECT REFERENCE INFORMATION PROJECT CHANGE REQUESTS
DEV_RESPBY
CO064/04 0.28 WASHINGTON STREET EAST
CON $306,460KANAWHA 12/29/16 AS32064402800 0.00 05/20/17 A10/25/16 A DD-1CT
CO005 1.01 ELKHURST DRIVE CON $155,000CLAY 05/20/17 AS308510100 0.01 06/10/17 A04/05/17 A CP-1FA
US119 18.69 CORRIDOR G PIPE REPL CON $457,702BOONE 09/28/17 AS303119187000 0.01 05/22/18 A05/16/17 A DD-1CT
$919,162(B10099) SUB-TOTAL FOR SFY 2017 =
DISTRICT 1 PROGRAM REVIEW LIST - ALLOCATION CODE (B10099) - SFY 2018
COUNTY ROUTE BMP PROJECT NAME PHASE PriorityEstimateStartSTATE PROJECT NO. MILES EndAuth. Start (R) End (R) Cost (R) REMARKS
PROJECT REFERENCE INFORMATION PROJECT CHANGE REQUESTS
DEV_RESPBY
Page 13 of 45PRINTED 9/30/2020 AT 7:02:13 AM
The information presented in this document is representative of the Project Tracking System as 09/30/2020. Any change requests should be noted in the appropriate columns at the right edge of the each table. The State Fiscal Year (SFY) assignments are based on the Authorization dates.
Report ID: SSTIP-002
CO085 0.16 HUGHES CREEK CON $6,000KANAWHA 06/05/18 AS3208501700 0.42 09/28/19 A06/05/18 A CP-1
$6,000(B10099) SUB-TOTAL FOR SFY 2018 =
DISTRICT 1 PROGRAM REVIEW LIST - ALLOCATION CODE (B10099) - SFY 2020
COUNTY ROUTE BMP PROJECT NAME PHASE PriorityEstimateStartSTATE PROJECT NO. MILES EndAuth. Start (R) End (R) Cost (R) REMARKS
PROJECT REFERENCE INFORMATION PROJECT CHANGE REQUESTS
DEV_RESPBY
NA999 0.00 HURRICANE WEIGH STATION
CON $55,000PUTNAM 08/06/19 AS340WEIGH100 0.00 12/28/20 E08/06/19 A CP-1OT
WV062 11.84 BRIGHTON RD CON $305,000MASON 08/28/20 ES32762118400 0.05 10/28/20 E10/23/19 A CP-1PO
$360,000(B10099) SUB-TOTAL FOR SFY 2020 =
DISTRICT 1 PROGRAM REVIEW LIST - ALLOCATION CODE (B10099) - SFY 2021
COUNTY ROUTE BMP PROJECT NAME PHASE PriorityEstimateStartSTATE PROJECT NO. MILES EndAuth. Start (R) End (R) Cost (R) REMARKS
PROJECT REFERENCE INFORMATION PROJECT CHANGE REQUESTS
DEV_RESPBY
NA999 0.00 MATERIALS CONST SERVICES
ENG $211,623DISTRICT 01 08/28/20 ET681MCS1900 0.00 10/28/20 E08/28/20 E CP-1
US035 0.00 KELLY HOSCHAR PROP ROW $250,000PUTNAM 08/28/20 ES340KHP100 0.00 02/28/21 E08/28/20 E RW-1
NA999 0.00 BIG BLUE BRIDGE ENG $5,000KANAWHA 08/28/20 ES220BBB100 0.00 08/28/21 E08/28/20 E DD-E
NA999 0.00 SMALL STRUCTURE INSP SERV
ENG $204,673DISTRICT 01 08/28/20 ET681SSIS1900 0.00 10/28/20 E08/28/20 E CP-1
NA999 0.00 CITY OF RAND ENG $80,000KANAWHA 08/28/20 ES220RAND2100 1.20 08/28/21 E08/28/20 E DD-R-C
NA999 0.00 RESURFACING INSPECTION SE
ENG $249,894DISTRICT 01 08/28/20 ET681RIS1900 0.00 10/28/20 E08/28/20 E CP-1
WV622 2.94 BIG TYLER RD CON $25,000KANAWHA 11/28/20 ES32062229402 0.18 03/28/21 E09/28/20 E DD-1CT
$1,026,190(B10099) SUB-TOTAL FOR SFY 2021 =
Page 14 of 45PRINTED 9/30/2020 AT 7:02:13 AM
The information presented in this document is representative of the Project Tracking System as 09/30/2020. Any change requests should be noted in the appropriate columns at the right edge of the each table. The State Fiscal Year (SFY) assignments are based on the Authorization dates.
Report ID: SSTIP-002
DISTRICT 1 PROGRAM REVIEW LIST - ALLOCATION CODE (B11001) - SFY 2017
COUNTY ROUTE BMP PROJECT NAME PHASE PriorityEstimateStartSTATE PROJECT NO. MILES EndAuth. Start (R) End (R) Cost (R) REMARKS
PROJECT REFERENCE INFORMATION PROJECT CHANGE REQUESTS
DEV_RESPBY
NA999 0.00 D1 2017 B11 GUARDRAIL CON $294,928DISTRICT 01 05/10/17 AS381GDRL1700 1.20 07/25/17 A12/07/16 A CP-1PO
$294,928(B11001) SUB-TOTAL FOR SFY 2017 =
DISTRICT 1 PROGRAM REVIEW LIST - ALLOCATION CODE (B11001) - SFY 2018
COUNTY ROUTE BMP PROJECT NAME PHASE PriorityEstimateStartSTATE PROJECT NO. MILES EndAuth. Start (R) End (R) Cost (R) REMARKS
PROJECT REFERENCE INFORMATION PROJECT CHANGE REQUESTS
DEV_RESPBY
NA999 0.00 D1 2018 B11 GUARDRAIL CON $149,061DISTRICT 01 02/01/18 AS381GDRL1800 1.20 06/28/18 A01/24/18 A CP-1PO
$149,061(B11001) SUB-TOTAL FOR SFY 2018 =
DISTRICT 1 PROGRAM REVIEW LIST - ALLOCATION CODE (B11001) - SFY 2019
COUNTY ROUTE BMP PROJECT NAME PHASE PriorityEstimateStartSTATE PROJECT NO. MILES EndAuth. Start (R) End (R) Cost (R) REMARKS
PROJECT REFERENCE INFORMATION PROJECT CHANGE REQUESTS
DEV_RESPBY
NA999 0.00 D1 2019 B11 GUARDRAIL CON $200,000DISTRICT 01 07/24/18 AS381GDRL1900 1.20 07/28/19 A07/24/18 A CP-1PO
$200,000(B11001) SUB-TOTAL FOR SFY 2019 =
DISTRICT 1 PROGRAM REVIEW LIST - ALLOCATION CODE (B11001) - SFY 2020
COUNTY ROUTE BMP PROJECT NAME PHASE PriorityEstimateStartSTATE PROJECT NO. MILES EndAuth. Start (R) End (R) Cost (R) REMARKS
PROJECT REFERENCE INFORMATION PROJECT CHANGE REQUESTS
DEV_RESPBY
NA999 0.00 D1 2020 B11 GUARDRAIL CON $215,000DISTRICT 01 08/28/20 ES381GDRL2000 1.20 12/28/20 E03/16/20 A CP-1PO
$215,000(B11001) SUB-TOTAL FOR SFY 2020 =
DISTRICT 1 PROGRAM REVIEW LIST - ALLOCATION CODE (B11001) - SFY 2021
COUNTY ROUTE BMP PROJECT NAME PHASE PriorityEstimateStartSTATE PROJECT NO. MILES EndAuth. Start (R) End (R) Cost (R) REMARKS
PROJECT REFERENCE INFORMATION PROJECT CHANGE REQUESTS
DEV_RESPBY
Page 15 of 45PRINTED 9/30/2020 AT 7:02:13 AM
The information presented in this document is representative of the Project Tracking System as 09/30/2020. Any change requests should be noted in the appropriate columns at the right edge of the each table. The State Fiscal Year (SFY) assignments are based on the Authorization dates.
Report ID: SSTIP-002
NA999 $$ 0.00 STATE FUNDED GDRL(DIST)
CON $50,000DISTRICT 01 07/01/20 EA381B112100 0.00 06/28/21 E07/01/20 E CP-1PO
$50,000(B11001) SUB-TOTAL FOR SFY 2021 =
DISTRICT 1 PROGRAM REVIEW LIST - ALLOCATION CODE (B12001) - SFY 2018
COUNTY ROUTE BMP PROJECT NAME PHASE PriorityEstimateStartSTATE PROJECT NO. MILES EndAuth. Start (R) End (R) Cost (R) REMARKS
PROJECT REFERENCE INFORMATION PROJECT CHANGE REQUESTS
DEV_RESPBY
CO001/21 3.30 PORTER CREEK CULVERT CON $65,000CLAY 07/01/18 AS30812133000 0.01 09/16/19 A05/21/18 A DB-1DB
$65,000(B12001) SUB-TOTAL FOR SFY 2018 =
DISTRICT 1 PROGRAM REVIEW LIST - ALLOCATION CODE (B12001) - SFY 2021
COUNTY ROUTE BMP PROJECT NAME PHASE PriorityEstimateStartSTATE PROJECT NO. MILES EndAuth. Start (R) End (R) Cost (R) REMARKS
PROJECT REFERENCE INFORMATION PROJECT CHANGE REQUESTS
DEV_RESPBY
NA999 $$ 0.00 STATE FUNDED STRUC LESS T
CON $100,000DISTRICT 01 07/01/20 EA381B122100 0.00 06/28/21 E07/01/20 E CP-1SF
$100,000(B12001) SUB-TOTAL FOR SFY 2021 =
DISTRICT 1 PROGRAM REVIEW LIST - ALLOCATION CODE (B13090) - SFY 2019
COUNTY ROUTE BMP PROJECT NAME PHASE PriorityEstimateStartSTATE PROJECT NO. MILES EndAuth. Start (R) End (R) Cost (R) REMARKS
PROJECT REFERENCE INFORMATION PROJECT CHANGE REQUESTS
DEV_RESPBY
CO023/15 0.00 SHOOTING RANGE RD (KAN ST
CON $175,000KANAWHA 08/28/19 AS320231500000 1.59 12/28/19 A05/03/19 A CP-1PO
$175,000(B13090) SUB-TOTAL FOR SFY 2019 =
DISTRICT 1 PROGRAM REVIEW LIST - ALLOCATION CODE (B13090) - SFY 2020
COUNTY ROUTE BMP PROJECT NAME PHASE PriorityEstimateStartSTATE PROJECT NO. MILES EndAuth. Start (R) End (R) Cost (R) REMARKS
PROJECT REFERENCE INFORMATION PROJECT CHANGE REQUESTS
DEV_RESPBY
CO042 2.75 KANAWHA STATE FOREST RD
CON $350,000KANAWHA 11/28/19 AS3204227500 0.02 09/28/20 E07/30/19 A CP-1PO
$350,000(B13090) SUB-TOTAL FOR SFY 2020 =
Page 16 of 45PRINTED 9/30/2020 AT 7:02:13 AM
The information presented in this document is representative of the Project Tracking System as 09/30/2020. Any change requests should be noted in the appropriate columns at the right edge of the each table. The State Fiscal Year (SFY) assignments are based on the Authorization dates.
Report ID: SSTIP-002
DISTRICT 1 PROGRAM REVIEW LIST - ALLOCATION CODE (B14090) - SFY 2017
COUNTY ROUTE BMP PROJECT NAME PHASE PriorityEstimateStartSTATE PROJECT NO. MILES EndAuth. Start (R) End (R) Cost (R) REMARKS
PROJECT REFERENCE INFORMATION PROJECT CHANGE REQUESTS
DEV_RESPBY
WV061 16.48 WV 94 - I 77 OP CON $1,928,888KANAWHA 10/28/16 AS32061164800 3.99 07/25/17 A08/29/16 A DD-1CT
CO073 11.49 UPPER CAMPBELLS CREEK BRI
CON $339,700KANAWHA 03/15/17 AS32073114900 0.04 04/20/18 A01/18/17 A DB-1CT
$2,268,588(B14090) SUB-TOTAL FOR SFY 2017 =
DISTRICT 1 PROGRAM REVIEW LIST - ALLOCATION CODE (B14090) - SFY 2020
COUNTY ROUTE BMP PROJECT NAME PHASE PriorityEstimateStartSTATE PROJECT NO. MILES EndAuth. Start (R) End (R) Cost (R) REMARKS
PROJECT REFERENCE INFORMATION PROJECT CHANGE REQUESTS
DEV_RESPBY
CO081 5.82 KELLY CREEK BRIDGE + 1 CON $1,089,105KANAWHA 11/10/19 AS3208158200 0.10 10/31/20 E08/22/19 A DD-1CT
$1,089,105(B14090) SUB-TOTAL FOR SFY 2020 =
DISTRICT 1 PROGRAM REVIEW LIST - ALLOCATION CODE (B18001) - SFY 2018
COUNTY ROUTE BMP PROJECT NAME PHASE PriorityEstimateStartSTATE PROJECT NO. MILES EndAuth. Start (R) End (R) Cost (R) REMARKS
PROJECT REFERENCE INFORMATION PROJECT CHANGE REQUESTS
DEV_RESPBY
CO008/01 0.00 HAMPSHIRE DRIVE CON $148,329KANAWHA 09/28/17 AS3208100000 2.49 11/28/17 A08/02/17 A CP-1PO
CO072 0.00 MILLSTONE CON $195,295MASON 09/28/17 AS3277200000 2.45 01/15/18 A08/02/17 A CP-1PO
CO029/06 0.00 HORSELICK CON $138,326MASON 09/28/17 AS32729600100 2.02 11/28/17 A08/02/17 A CP-1PO
CO002/07 0.00 PLEASANT RIDGE ROAD CON $144,582MASON 09/28/17 AS3272700000 2.00 01/15/18 A08/02/17 A CP-1PO
CO001 4.17 QUEEN SHOALS RD SITE 2 CON $662,767CLAY 12/15/17 AS308141700 0.15 04/15/18 A08/31/17 A CP-1DF
CO001 5.95 QUEEN SHOALS RD SITE 1 CON $152,445CLAY 01/20/18 AS308159800 0.02 05/15/18 A08/31/17 A CP-1DF
CO019 2.81 HURRICANE CREEK ROAD CON $344,830PUTNAM 09/28/17 AS3401928100 0.04 01/15/18 A08/31/17 A CP-1PO
Page 17 of 45PRINTED 9/30/2020 AT 7:02:13 AM
The information presented in this document is representative of the Project Tracking System as 09/30/2020. Any change requests should be noted in the appropriate columns at the right edge of the each table. The State Fiscal Year (SFY) assignments are based on the Authorization dates.
Report ID: SSTIP-002
CO010 0.03 DOC BAILEY ROAD +2 CON $157,898KANAWHA 04/01/18 AS3201000300 2.17 05/20/18 A10/25/17 A CP-1PO
CO043/05 0.02 JAKES RUN ROAD CON $69,263KANAWHA 05/15/18 AS32043500200 1.46 05/25/18 A10/25/17 A CP-1PO
CO006 0.00 FALLING ROCK CON $275,865CLAY 04/15/18 AS308600000 2.20 05/20/18 A10/25/17 A CP-1PO
CO025/06 0.03 KINGS STREET CON $100,000KANAWHA 09/28/17 AS32025600300 0.93 11/28/17 A10/25/17 A CP-1PO
CO114/03 0.00 MEADOWBROOK DRIVE CON $20,302KANAWHA 03/15/18 AS320114300000 0.23 04/20/18 A10/25/17 A CP-1PO
CO009 1.89 HEWETT CREEK ROAD +3 CON $470,000BOONE 07/23/18 AS303918900 6.78 08/03/18 A10/25/17 A CP-1PO
CO119/36 0.02 INDIAN GRAVE ROAD CON $25,956BOONE 05/15/18 AS3031193600200 0.12 05/30/18 A10/25/17 A CP-1PO
CO005/12 0.05 KOONTZ DRIVE +4 CON $128,019KANAWHA 03/15/18 AS32051200500 1.58 05/15/18 A10/25/17 A CP-1PO
CO114/01 0.00 AIRPORT ROAD CON $116,836KANAWHA 11/15/17 AS320114100000 0.87 02/15/18 A10/25/17 A CP-1PO
CO011 7.37 DUNDON WIDEN ROAD CON $508,093CLAY 07/10/18 AS3081173700 6.00 07/20/18 A03/02/18 A CP-1PO
CO048 0.00 GROVES CREEK CON $715,827CLAY 05/25/18 AS3084800000 5.40 09/15/18 A03/02/18 A CP-1PO
CO054 0.00 WILSON RIDGE CON $172,086CLAY 03/15/18 AS3085400000 1.45 09/01/18 A03/02/18 A CP-1PO
CO001 11.72 LOWER SYCAMORE CON $464,621CLAY 04/15/18 AS3081117200 5.05 05/20/18 A03/04/18 A CP-1PO
CO052/02 0.00 UPPER PINCH CON $235,000KANAWHA 09/28/18 AS32052200000 2.55 10/05/18 A03/04/18 A CP-1PO
CO065 5.00 LEATHERWOOD +2 CON $540,000KANAWHA 09/28/18 AS3206550000 5.54 10/25/18 A03/04/18 A CP-1PO
WV016 7.63 INDORE-BICKMORE CON $667,173CLAY 07/23/18 AS3081676300 3.29 08/15/18 A03/04/18 A CP-1PO
CO114/02 0.00 BROOK HILL CON $54,437KANAWHA 04/15/18 AS320114200000 0.80 05/20/18 A03/04/18 A CP-1PO
CO053 3.50 WILLS CREEK CON $334,197KANAWHA 05/15/18 AS3205335000 7.36 05/30/18 A03/04/18 A CP-1PO
CO063 0.00 THREE MILE BLUE CREEK CON $72,618KANAWHA 04/01/18 AS3206300000 1.21 05/20/18 A03/04/18 A CP-1PO
Page 18 of 45PRINTED 9/30/2020 AT 7:02:13 AM
The information presented in this document is representative of the Project Tracking System as 09/30/2020. Any change requests should be noted in the appropriate columns at the right edge of the each table. The State Fiscal Year (SFY) assignments are based on the Authorization dates.
Report ID: SSTIP-002
CO048 0.19 MILL CREEK CON $360,000KANAWHA 09/20/18 AS3204801900 2.85 09/27/18 A03/04/18 A CP-1PO
CO053 8.31 WILLS CREEK ROAD SITE 2 CON $270,350KANAWHA 04/28/18 AS3205383200 0.04 07/01/18 A04/02/18 A CP-1DF
CO018 2.85 EMMONS CON $192,128KANAWHA 06/28/18 AS3201828500 1.89 07/28/18 A04/16/18 A CP-1PO
CO010 3.44 18 MILE CREEK CON $248,593PUTNAM 06/15/18 AS3401034400 2.35 07/01/18 A04/16/18 A CP-1PO
CO072/01 0.00 LITTLE CREEK CON $120,000KANAWHA 09/28/20 ES32072100000 0.81 12/28/20 E04/16/18 A CP-1PO
CO052 2.82 MIDDLE TRACE CON $178,000PUTNAM 06/15/18 AS3405228200 1.79 07/20/18 A04/16/18 A CP-1PO
CO025/05 0.93 DUTCH HOLLOW ROAD CON $83,708KANAWHA 04/25/18 AS32025509300 1.24 05/30/18 A04/16/18 A CP-1PO
CO012/02 2.13 ROCKCREST ROAD SITE 1 CON $219,414KANAWHA 04/10/18 AS32012221300 0.02 06/13/18 A04/17/18 A CP-1DF
CO119/57 1.55 BIG PINNACLE BRANCH ROAD
CON $303,255BOONE 05/15/18 AS3031195715500 0.04 08/28/18 A04/17/18 A CP-1DF
CO043/16 0.57 LEFT FORK BIG FORK ROAD
CON $94,698KANAWHA 06/28/18 AS320431605700 0.02 07/28/18 A04/17/18 A CP-1DF
CO012/02 2.13 ROCKCREST ROAD SITE 2 CON $242,756KANAWHA 04/10/18 AS32012220000 0.02 06/03/18 A04/17/18 A CP-1DF
CO010 0.75 18 MILE CREEK ROAD CON $161,153PUTNAM 05/28/18 AS3401007500 0.02 07/28/18 A04/17/18 A CP-1DF
CO016 0.00 LOW GAP ROAD CON $190,000BOONE 07/01/18 AS3031600000 1.30 07/25/18 A05/01/18 A CP-1PO
CO021 13.00 SISSONVILLE RD CON $475,810KANAWHA 07/05/18 AS32021130000 2.57 07/10/18 A05/16/18 A CP-1PO
CO045/03 2.32 GUYAN CREEK BRIDGE ENG $50,000MASON 06/04/18 AS32745323200 0.01 04/28/20 E06/04/18 A DD-1
CO085/23 0.01 POND FORK BRIDGE ENG $50,000BOONE 06/04/18 AS303852300100 0.01 05/28/20 E06/04/18 A DD-1
CO035/10 5.43 CAPEHART BRIDGE ENG $75,000MASON 06/04/18 AS327351054300 0.02 06/28/20 E06/04/18 A DD-1
CO085/24 0.01 CLINTON CAMP ROAD BRIDGE
ENG $50,000BOONE 06/04/18 AS303852400100 0.01 12/17/19 A06/04/18 A DD-1
CO058 1.04 ARBUCKLE THRU TRUSS BRIDG
ENG $75,000MASON 06/04/18 AS3275810400 0.02 02/26/20 A06/04/18 A DD-1
Page 19 of 45PRINTED 9/30/2020 AT 7:02:13 AM
The information presented in this document is representative of the Project Tracking System as 09/30/2020. Any change requests should be noted in the appropriate columns at the right edge of the each table. The State Fiscal Year (SFY) assignments are based on the Authorization dates.
Report ID: SSTIP-002
NA999 0.00 DMV CONSULTANT SERVICES
ENG $646,107DISTRICT 01 06/04/18 AT681CONSL1700 0.00 12/28/20 E06/04/18 A DD-1
WV003 12.90 FOSTER-RACINE ROAD CON $425,000BOONE 06/06/19 AS3033129000 0.04 06/20/19 A06/06/18 A CP-1DF
CO003/02 2.85 HOLCOMB RIDGE ROAD CON $450,000CLAY 08/15/18 AS3083228500 0.04 08/25/18 A06/06/18 A CP-1DF
WV114 5.35 CHARLESTON-MILLKEN ROAD
CON $180,000KANAWHA 09/03/18 AS32011453500 0.01 09/13/18 A06/06/18 A CP-1DF
CO033 2.73 POCATALICO RIVER RD #2 CON $185,000KANAWHA 03/06/19 AS3203327300 0.02 03/15/19 A06/06/18 A CP-1DF
CO045 0.72 LITTLE SANDY CK RD #2 CON $530,000KANAWHA 09/17/18 AS3204507200 0.10 09/26/18 A06/06/18 A CP-1DF
CO039 0.28 AARONS FORK ROAD CON $100,000KANAWHA 09/01/18 AS3203902800 0.02 09/10/18 A06/06/18 A CP-1DF
CO046 2.54 IVYDALE BRIDGE ROAD CON $450,000CLAY 06/23/18 AS3084625400 0.04 07/28/18 A06/06/18 A CP-1PO
CO037 1.92 PATTERSON FORK ROAD CON $90,000KANAWHA 02/01/19 AS3203719200 0.02 02/15/19 A06/06/18 A CP-1DF
CO031 3.96 SILVER STREET SITE 2 CON $350,000PUTNAM 04/01/19 AS3403139600 0.04 05/22/19 A06/06/18 A CP-1DF
CO033 2.27 POCATALICO RIVER RD #1 CON $195,000KANAWHA 02/15/19 AS3203322700 0.04 03/05/19 A06/06/18 A CP-1DF
CO031 3.90 SILVER STREET SITE 1 CON $170,000PUTNAM 06/25/19 AS3403139000 0.04 08/28/20 E06/06/18 A CP-1DF
WV087 2.29 WV 87-FLATROCK CON $375,000MASON 08/28/18 AS3278722900 0.08 09/15/18 A06/06/18 A CP-1DF
$14,500,737(B18001) SUB-TOTAL FOR SFY 2018 =
DISTRICT 1 PROGRAM REVIEW LIST - ALLOCATION CODE (B18001) - SFY 2019
COUNTY ROUTE BMP PROJECT NAME PHASE PriorityEstimateStartSTATE PROJECT NO. MILES EndAuth. Start (R) End (R) Cost (R) REMARKS
PROJECT REFERENCE INFORMATION PROJECT CHANGE REQUESTS
DEV_RESPBY
CO062 48.81 LETART CONCRETE T-BEAM
ENG $280,000MASON 07/12/18 AS32762488100 0.02 04/28/20 E07/12/18 A DD-1
CO031/05 0.00 IVY DURST RD CON $288,000MASON 09/06/18 AS32731500000 2.53 09/11/18 A08/23/18 A CP-1PO
CO010 1.18 ABONAJAH RD CON $250,000CLAY 09/20/18 AS3081011800 1.88 09/21/18 A08/23/18 A CP-1PO
Page 20 of 45PRINTED 9/30/2020 AT 7:02:13 AM
The information presented in this document is representative of the Project Tracking System as 09/30/2020. Any change requests should be noted in the appropriate columns at the right edge of the each table. The State Fiscal Year (SFY) assignments are based on the Authorization dates.
Report ID: SSTIP-002
CO029/13 0.00 JEFFERS RIDGE RD CON $74,000MASON 09/04/18 AS327291300000 1.48 09/06/18 A08/23/18 A CP-1PO
CO035/03 0.00 CUSTER RIDGE RD CON $207,431PUTNAM 08/29/18 AS34035200000 2.31 08/31/18 A08/23/18 A CP-1PO
CO020/01 0.00 SMITH RD +1 CON $460,000KANAWHA 09/17/18 AS32020100000 3.39 11/20/18 A08/23/18 A CP-1PO
CO028 0.00 SPRUCE LAUREL RD CON $305,000BOONE 09/25/18 AS3032800000 3.00 09/27/18 A08/23/18 A CP-1PO
CO046/04 0.00 HAMON DRIVE CON $48,852PUTNAM 08/27/18 AS34046400000 0.69 08/29/18 A08/23/18 A CP-1PO
CO004 5.44 LAUREL CREEK BRIDGE ENG $200,000CLAY 10/05/18 AS308454400 0.01 06/28/20 E10/05/18 A DD-1
CO004 5.44 LAUREL CREEK BRIDGE ROW $35,000CLAY 10/05/18 AS308454400 0.01 06/28/20 E10/05/18 A DD-1
CO029/02 0.01 WHITE OAK DRIVE BRIDGE
ENG $250,000KANAWHA 10/22/18 AS32029200100 0.02 03/25/20 A10/22/18 A DD-1
CO085/24 0.01 CLINTON CAMP ROAD BRIDGE
ROW $20,000BOONE 10/30/18 AS303852400100 0.01 12/17/19 A10/30/18 A DD-1
CO024 2.35 SENG CREEK BRIDGE ROW $40,000BOONE 10/30/18 AS3032423500 0.01 10/28/20 E10/30/18 A DD-1
CO024 2.35 SENG CREEK BRIDGE ENG $225,000BOONE 10/30/18 AS3032423500 0.01 10/28/20 E10/30/18 A DD-1
CO057 11.15 SANDERSON BRIDGE ENG $250,000KANAWHA 10/30/18 AS32057111500 0.01 03/11/20 A10/30/18 A DD-1
CO057 11.15 SANDERSON BRIDGE ROW $25,000KANAWHA 10/30/18 AS32057111500 0.01 03/11/20 A10/30/18 A DD-1
CO085/23 0.01 POND FORK BRIDGE ROW $20,000BOONE 10/30/18 AS303852300100 0.01 05/28/20 E10/30/18 A DD-1
CO059 4.63 THOROFARE ROAD BRIDGE
ENG $200,000KANAWHA 10/30/18 AS3205946300 0.01 06/28/20 E10/30/18 A DD-1
CO059 4.63 THOROFARE ROAD BRIDGE
ROW $30,000KANAWHA 10/30/18 AS3205946300 0.01 06/28/20 E10/30/18 A DD-1
CO029/02 0.01 WHITE OAK DRIVE BRIDGE
ROW $25,000KANAWHA 10/30/18 AS32029200100 0.02 03/25/20 A10/30/18 A DD-1
CO022 2.73 HARVEY CHAPEL BRIDGE ENG $200,000MASON 10/30/18 AS3272227300 0.01 09/11/19 A10/30/18 A DD-1
CO078 2.37 SIXTEENMILE CREEK BRIDGE
ROW $20,000MASON 10/30/18 AS3277823700 0.01 12/19/19 A10/30/18 A DD-1
Page 21 of 45PRINTED 9/30/2020 AT 7:02:13 AM
The information presented in this document is representative of the Project Tracking System as 09/30/2020. Any change requests should be noted in the appropriate columns at the right edge of the each table. The State Fiscal Year (SFY) assignments are based on the Authorization dates.
Report ID: SSTIP-002
CO078 2.37 SIXTEENMILE CREEK BRIDGE
ENG $200,000MASON 10/30/18 AS3277823700 0.01 12/19/19 A10/30/18 A DD-1
CO072 3.77 POTTS CHAPEL PONY TRUSS B
ROW $30,000MASON 10/30/18 AS3277237700 0.01 09/24/19 A10/30/18 A DD-1
CO072 3.77 POTTS CHAPEL PONY TRUSS B
ENG $200,000MASON 10/30/18 AS3277237700 0.01 09/27/19 A10/30/18 A DD-1
CO064 6.76 BIG BUZZARD GIRDER BRIDGE
ROW $30,000MASON 10/30/18 AS3276467600 0.01 12/02/19 A10/30/18 A DD-1
CO064 6.76 BIG BUZZARD GIRDER BRIDGE
ENG $200,000MASON 10/30/18 AS3276467600 0.01 12/02/19 A10/30/18 A DD-1
CO062 48.81 LETART CONCRETE T-BEAM
ROW $35,000MASON 10/30/18 AS32762488100 0.02 04/28/20 E10/30/18 A DD-1
CO058 1.04 ARBUCKLE THRU TRUSS BRIDG
ROW $20,000MASON 10/30/18 AS3275810400 0.02 02/26/20 A10/30/18 A DD-1
CO045/03 2.32 GUYAN CREEK BRIDGE ROW $20,000MASON 10/30/18 AS32745323200 0.01 04/28/20 E10/30/18 A DD-1
CO035/10 5.43 CAPEHART BRIDGE ROW $20,000MASON 10/30/18 AS327351054300 0.02 06/28/20 E10/30/18 A DD-1
CO022 2.73 HARVEY CHAPEL BRIDGE ROW $30,000MASON 10/30/18 AS3272227300 0.01 09/11/19 A10/30/18 A DD-1
CO079/09 0.01 CRAWFORD BOTTOM BRIDGE
ENG $250,000KANAWHA 10/30/18 AS32079900100 0.01 06/28/20 E10/30/18 A DD-1
CO079/09 0.01 CRAWFORD BOTTOM BRIDGE
ROW $30,000KANAWHA 10/30/18 AS32079900100 0.01 06/28/20 E10/30/18 A DD-1
CO041 1.78 COOPERS CREEK SITE 2 ENG $88,722KANAWHA 11/28/18 AS3204117800 0.01 08/28/20 E11/28/18 A DD-1
CO041 0.67 COOPERS CREEK SITE 1 ENG $92,414KANAWHA 11/28/18 AS3204115300 0.01 12/02/19 A11/28/18 A DD-1
CO081 0.52 KELLEYS CREEK ROAD ENG $92,162KANAWHA 11/28/18 AS3208105200 0.01 12/28/21 E11/28/18 A DD-1
CO026 3.17 BROWNS BRANCH ROAD ENG $104,062BOONE 11/28/18 AS3032631700 0.01 08/28/20 E11/28/18 A DD-1
CO024 0.14 KANAWHA TWO MILE ENG $88,814KANAWHA 11/28/18 AS3202401400 0.01 08/28/20 E11/28/18 A DD-1
CO033/03 1.74 SCARY CREEK ENG $91,568PUTNAM 11/28/18 AS34033317400 0.01 12/02/19 A11/28/18 A DD-1
CO011 0.52 RABEL MOUNTAIN ROAD ENG $87,788KANAWHA 11/28/18 AS3201116600 0.01 08/28/20 E11/28/18 A DD-1
Page 22 of 45PRINTED 9/30/2020 AT 7:02:13 AM
The information presented in this document is representative of the Project Tracking System as 09/30/2020. Any change requests should be noted in the appropriate columns at the right edge of the each table. The State Fiscal Year (SFY) assignments are based on the Authorization dates.
Report ID: SSTIP-002
CO015 9.11 SANDHILL RD CON $335,000MASON 07/02/19 AS3271591100 2.90 07/03/19 A04/30/19 A CP-1PO
CO026 0.62 THOMAS RIDGE RD CON $185,000MASON 07/08/19 AS3272606200 4.18 07/09/19 A04/30/19 A CP-1PO
WV214 5.12 RUTHDALE RD CON $233,000KANAWHA 06/28/19 AS32021451200 1.61 08/28/20 E04/30/19 A CP-1PO
CO060/02 3.76 STRAWBERRY RD CON $138,000KANAWHA 07/10/19 AS32060237600 0.83 07/10/19 A04/30/19 A CP-1PO
CO063/06 0.00 ROBINSON ST+1 CON $140,000KANAWHA 07/11/19 AS32063600000 0.36 10/28/20 E04/30/19 A CP-1PO
CO020 0.00 SIX MILE RD CON $457,000BOONE 09/15/19 AS3032000000 4.76 08/28/20 E04/30/19 A CP-1PO
CO034/07 0.00 SCOTT RIDGE RD CON $215,000PUTNAM 05/28/19 AS34034700000 2.35 08/28/20 E04/30/19 A CP-1PO
$6,866,813(B18001) SUB-TOTAL FOR SFY 2019 =
DISTRICT 1 PROGRAM REVIEW LIST - ALLOCATION CODE (B18001) - SFY 2020
COUNTY ROUTE BMP PROJECT NAME PHASE PriorityEstimateStartSTATE PROJECT NO. MILES EndAuth. Start (R) End (R) Cost (R) REMARKS
PROJECT REFERENCE INFORMATION PROJECT CHANGE REQUESTS
DEV_RESPBY
CO041 1.78 COOPERS CREEK SITE 2 ROW $20,000KANAWHA 11/26/19 AS3204117800 0.01 02/28/21 E11/26/19 A DD-1
CO081 0.52 KELLEYS CREEK ROAD ROW $10,000KANAWHA 11/26/19 AS3208105200 0.01 12/28/21 E11/26/19 A DD-1
CO024 0.14 KANAWHA TWO MILE ROW $10,000KANAWHA 11/26/19 AS3202401400 0.01 02/28/21 E11/26/19 A DD-1
CO026 3.17 BROWNS BRANCH ROAD ROW $20,000BOONE 11/26/19 AS3032631700 0.01 08/28/20 E11/26/19 A DD-1
CO041 0.67 COOPERS CREEK SITE 1 ROW $10,000KANAWHA 11/26/19 AS3204115300 0.01 12/02/19 A11/26/19 A DD-1
CO011 0.52 RABEL MOUNTAIN ROAD ROW $17,000KANAWHA 11/26/19 AS3201116600 0.01 02/28/21 E11/26/19 A DD-1
CO033/03 1.74 SCARY CREEK CON $315,314PUTNAM 08/28/20 ES34033317400 0.01 09/28/20 E01/08/20 A DD-1CT
CO041 0.67 COOPERS CREEK SITE 1 CON $224,804KANAWHA 10/28/20 ES3204115300 0.01 12/28/20 E01/08/20 A DD-1CT
$627,118(B18001) SUB-TOTAL FOR SFY 2020 =
Page 23 of 45PRINTED 9/30/2020 AT 7:02:14 AM
The information presented in this document is representative of the Project Tracking System as 09/30/2020. Any change requests should be noted in the appropriate columns at the right edge of the each table. The State Fiscal Year (SFY) assignments are based on the Authorization dates.
Report ID: SSTIP-002
DISTRICT 1 PROGRAM REVIEW LIST - ALLOCATION CODE (B18001) - SFY 2021
COUNTY ROUTE BMP PROJECT NAME PHASE PriorityEstimateStartSTATE PROJECT NO. MILES EndAuth. Start (R) End (R) Cost (R) REMARKS
PROJECT REFERENCE INFORMATION PROJECT CHANGE REQUESTS
DEV_RESPBY
NA999 0.00 DMV CONSULTANT SERVICES
ENG $750,000DISTRICT 01 08/28/20 ET681CONSL1702 0.00 01/28/21 E08/28/20 E DD-1
CO024 0.14 KANAWHA TWO MILE CON $200,000KANAWHA 11/28/20 ES3202401400 0.01 08/28/21 E09/28/20 E DD-1CT
CO026 3.17 BROWNS BRANCH ROAD CON $200,000BOONE 12/28/20 ES3032631700 0.01 06/28/21 E09/28/20 E DD-1CT
CO041 1.78 COOPERS CREEK SITE 2 CON $200,000KANAWHA 12/28/20 ES3204117800 0.01 03/28/21 E09/28/20 E DD-1CT
CO011 0.52 RABEL MOUNTAIN ROAD CON $200,000KANAWHA 11/28/20 ES3201116600 0.01 05/28/21 E09/28/20 E DD-1CT
$1,550,000(B18001) SUB-TOTAL FOR SFY 2021 =
DISTRICT 1 PROGRAM REVIEW LIST - ALLOCATION CODE (B18001) - SFY 2022
COUNTY ROUTE BMP PROJECT NAME PHASE PriorityEstimateStartSTATE PROJECT NO. MILES EndAuth. Start (R) End (R) Cost (R) REMARKS
PROJECT REFERENCE INFORMATION PROJECT CHANGE REQUESTS
DEV_RESPBY
CO081 0.52 KELLEYS CREEK ROAD CON $200,000KANAWHA 04/28/22 ES3208105200 0.01 07/28/22 E12/28/21 E DD-1CT
$200,000(B18001) SUB-TOTAL FOR SFY 2022 =
DISTRICT 1 PROGRAM REVIEW LIST - ALLOCATION CODE (B20001) - SFY 2017
COUNTY ROUTE BMP PROJECT NAME PHASE PriorityEstimateStartSTATE PROJECT NO. MILES EndAuth. Start (R) End (R) Cost (R) REMARKS
PROJECT REFERENCE INFORMATION PROJECT CHANGE REQUESTS
DEV_RESPBY
NA999 0.00 D1 2016 SUMMER SF PAVERS
CON $514,655DISTRICT 01 09/15/16 AS381SFPAV1701 12.37 12/20/16 A08/31/16 A CP-1PO
NA999 0.00 D1 2017 SPRING SF PAVERS
CON $836,142DISTRICT 01 04/15/17 AS381SFPAV1702 3.82 12/28/17 A04/04/17 A CP-1SF
$1,350,797(B20001) SUB-TOTAL FOR SFY 2017 =
Page 24 of 45PRINTED 9/30/2020 AT 7:02:14 AM
The information presented in this document is representative of the Project Tracking System as 09/30/2020. Any change requests should be noted in the appropriate columns at the right edge of the each table. The State Fiscal Year (SFY) assignments are based on the Authorization dates.
Report ID: SSTIP-002
DISTRICT 1 PROGRAM REVIEW LIST - ALLOCATION CODE (B20001) - SFY 2018
COUNTY ROUTE BMP PROJECT NAME PHASE PriorityEstimateStartSTATE PROJECT NO. MILES EndAuth. Start (R) End (R) Cost (R) REMARKS
PROJECT REFERENCE INFORMATION PROJECT CHANGE REQUESTS
DEV_RESPBY
NA999 0.00 D1 2017 SUMMER SF PAVERS
CON $300,637DISTRICT 01 09/28/17 AS381SFPAV1801 12.37 10/28/18 A08/03/17 A CP-1PO
$300,637(B20001) SUB-TOTAL FOR SFY 2018 =
DISTRICT 1 PROGRAM REVIEW LIST - ALLOCATION CODE (B20001) - SFY 2019
COUNTY ROUTE BMP PROJECT NAME PHASE PriorityEstimateStartSTATE PROJECT NO. MILES EndAuth. Start (R) End (R) Cost (R) REMARKS
PROJECT REFERENCE INFORMATION PROJECT CHANGE REQUESTS
DEV_RESPBY
NA999 0.00 D1 2018 SUMMER SF PAVERS
CON $1,280,000DISTRICT 01 02/28/19 AS381SFPAV1901 22.86 06/28/20 A10/28/18 A CP-1PO
$1,280,000(B20001) SUB-TOTAL FOR SFY 2019 =
DISTRICT 1 PROGRAM REVIEW LIST - ALLOCATION CODE (B20001) - SFY 2020
COUNTY ROUTE BMP PROJECT NAME PHASE PriorityEstimateStartSTATE PROJECT NO. MILES EndAuth. Start (R) End (R) Cost (R) REMARKS
PROJECT REFERENCE INFORMATION PROJECT CHANGE REQUESTS
DEV_RESPBY
CO010 0.00 MUD RIVER RD +7 CON $1,000,000DISTRICT 01 05/28/20 AS381SFPAV2000 14.94 06/28/20 A09/24/19 A CP-1PO
$1,000,000(B20001) SUB-TOTAL FOR SFY 2020 =
DISTRICT 1 PROGRAM REVIEW LIST - ALLOCATION CODE (B20001) - SFY 2021
COUNTY ROUTE BMP PROJECT NAME PHASE PriorityEstimateStartSTATE PROJECT NO. MILES EndAuth. Start (R) End (R) Cost (R) REMARKS
PROJECT REFERENCE INFORMATION PROJECT CHANGE REQUESTS
DEV_RESPBY
NA999 $$ 0.00 SF PAVER ALLOCATION CON $200,000DISTRICT 01 07/01/20 EA381B202100 0.00 06/28/21 E07/01/20 E CP-1SF
$200,000(B20001) SUB-TOTAL FOR SFY 2021 =
DISTRICT 1 PROGRAM REVIEW LIST - ALLOCATION CODE (B30001) - SFY 2017
COUNTY ROUTE BMP PROJECT NAME PHASE PriorityEstimateStartSTATE PROJECT NO. MILES EndAuth. Start (R) End (R) Cost (R) REMARKS
PROJECT REFERENCE INFORMATION PROJECT CHANGE REQUESTS
DEV_RESPBY
Page 25 of 45PRINTED 9/30/2020 AT 7:02:14 AM
The information presented in this document is representative of the Project Tracking System as 09/30/2020. Any change requests should be noted in the appropriate columns at the right edge of the each table. The State Fiscal Year (SFY) assignments are based on the Authorization dates.
Report ID: SSTIP-002
CO060/15 0.35 SIMMONS CREEK ROAD CON $180,000KANAWHA 04/01/17 AS320601503500 0.03 10/28/17 A04/01/17 A CP-1DF
CO114/01 0.46 AIRPORT ROAD CON $176,000KANAWHA 07/01/17 AS320114104600 0.03 07/01/17 A06/15/17 A CP-1DF
$356,000(B30001) SUB-TOTAL FOR SFY 2017 =
DISTRICT 1 PROGRAM REVIEW LIST - ALLOCATION CODE (B30001) - SFY 2018
COUNTY ROUTE BMP PROJECT NAME PHASE PriorityEstimateStartSTATE PROJECT NO. MILES EndAuth. Start (R) End (R) Cost (R) REMARKS
PROJECT REFERENCE INFORMATION PROJECT CHANGE REQUESTS
DEV_RESPBY
WV061 3.48 HANDLEY-PRATT ROAD CON $92,220KANAWHA 10/28/17 AS3206134800 0.01 11/15/17 A08/02/17 A CP-1PO
CO041 2.21 CYLMERS CREEK ROAD CON $128,568PUTNAM 08/05/17 AS3404122100 0.02 11/15/17 A08/02/17 A CP-1PO
CO023 1.62 LEON-BADEN ROAD CON $274,612MASON 09/30/17 AS3272316200 0.02 11/20/17 A08/02/17 A CP-1PO
CO119/64 0.10 CLARK DRIVE CON $55,745KANAWHA 11/10/17 AS3201196401000 0.01 11/30/17 A08/02/17 A CP-1PO
CO114/01 0.79 AIRPORT ROAD CON $44,500KANAWHA 08/05/17 AS320114107900 0.01 02/15/18 A08/02/17 A CP-1PO
CO029 3.95 ROCKY STEP ROAD CON $196,500PUTNAM 08/02/17 AS3402939500 0.02 10/20/18 A08/02/17 A CP-1PO
WV034 24.03 RED HOUSE-CONFIDENCE ROAD
CON $284,785PUTNAM 03/15/18 AS34034240300 0.02 12/28/19 A08/02/17 A CP-1PO
$1,076,930(B30001) SUB-TOTAL FOR SFY 2018 =
DISTRICT 1 PROGRAM REVIEW LIST - ALLOCATION CODE (B30001) - SFY 2019
COUNTY ROUTE BMP PROJECT NAME PHASE PriorityEstimateStartSTATE PROJECT NO. MILES EndAuth. Start (R) End (R) Cost (R) REMARKS
PROJECT REFERENCE INFORMATION PROJECT CHANGE REQUESTS
DEV_RESPBY
US060 44.13 MONTGOMERY ROCKSLIDE
CON $61,400KANAWHA 08/30/18 AS32060441300 0.05 09/15/18 A07/30/18 A CP-1DF
CO005 3.46 MANILLA CREEK RD CON $147,000PUTNAM 11/28/18 AS340534600 0.02 08/28/20 E08/17/18 A CP-1DF
CO016/25 0.77 HARTLAND RD CON $394,115CLAY 08/28/19 AS308162507700 0.03 02/28/20 A05/31/19 A CP-1PO
Page 26 of 45PRINTED 9/30/2020 AT 7:02:14 AM
The information presented in this document is representative of the Project Tracking System as 09/30/2020. Any change requests should be noted in the appropriate columns at the right edge of the each table. The State Fiscal Year (SFY) assignments are based on the Authorization dates.
Report ID: SSTIP-002
$602,515(B30001) SUB-TOTAL FOR SFY 2019 =
DISTRICT 1 PROGRAM REVIEW LIST - ALLOCATION CODE (B30001) - SFY 2020
COUNTY ROUTE BMP PROJECT NAME PHASE PriorityEstimateStartSTATE PROJECT NO. MILES EndAuth. Start (R) End (R) Cost (R) REMARKS
PROJECT REFERENCE INFORMATION PROJECT CHANGE REQUESTS
DEV_RESPBY
CO083 4.10 PAINT CREEK RD CON $90,000KANAWHA 09/28/19 AS3208341000 0.01 09/28/20 E08/06/19 A CP-1PO
CO020/01 1.81 SMITH ROAD CON $280,000KANAWHA 09/28/19 AS32020118100 0.02 12/28/19 A08/09/19 A CP-1PO
CO114/01 0.26 AIRPORT ROAD SITE 3 CON $160,000KANAWHA 08/28/20 ES320114102600 0.02 09/28/20 E05/28/20 A CP-1DF
WV004 2.05 PROCIOUS RD +1 CON $250,000CLAY 06/28/20 ES308420500 0.03 10/28/20 E06/02/20 A CP-1DF
$780,000(B30001) SUB-TOTAL FOR SFY 2020 =
DISTRICT 1 PROGRAM REVIEW LIST - ALLOCATION CODE (B30001) - SFY 2021
COUNTY ROUTE BMP PROJECT NAME PHASE PriorityEstimateStartSTATE PROJECT NO. MILES EndAuth. Start (R) End (R) Cost (R) REMARKS
PROJECT REFERENCE INFORMATION PROJECT CHANGE REQUESTS
DEV_RESPBY
NA999 $$ 0.00 SLIDE ALLOC PROJ(DIST) CON $700,000DISTRICT 01 07/01/20 EA381B302100 0.00 06/28/21 E07/01/20 E CP-1DF
CO060/01 0.38 SIMMS RD CON $200,000KANAWHA 09/28/20 ES32060103800 0.02 12/28/20 E09/28/20 E CP-1PO
US060 34.50 CEDAR GROVE RD ENG $50,000KANAWHA 10/28/20 ES32060345000 0.10 02/28/21 E10/28/20 E CP-1
US060 34.50 CEDAR GROVE RD ROW $50,000KANAWHA 10/28/20 ES32060345000 0.10 02/28/21 E10/28/20 E CP-1
US060 34.50 CEDAR GROVE RD CON $750,000KANAWHA 03/28/21 ES32060345000 0.10 12/28/21 E03/28/21 E CP-1SF
$1,750,000(B30001) SUB-TOTAL FOR SFY 2021 =
DISTRICT 1 PROGRAM REVIEW LIST - ALLOCATION CODE (B30002) - SFY 2018
COUNTY ROUTE BMP PROJECT NAME PHASE PriorityEstimateStartSTATE PROJECT NO. MILES EndAuth. Start (R) End (R) Cost (R) REMARKS
PROJECT REFERENCE INFORMATION PROJECT CHANGE REQUESTS
DEV_RESPBY
Page 27 of 45PRINTED 9/30/2020 AT 7:02:14 AM
The information presented in this document is representative of the Project Tracking System as 09/30/2020. Any change requests should be noted in the appropriate columns at the right edge of the each table. The State Fiscal Year (SFY) assignments are based on the Authorization dates.
Report ID: SSTIP-002
US119 7.92 TURTLETOWNSLIDE CON $100,000BOONE 09/28/17 AS30311979200 0.01 12/28/17 A08/31/17 A CP-2PO
$100,000(B30002) SUB-TOTAL FOR SFY 2018 =
DISTRICT 1 PROGRAM REVIEW LIST - ALLOCATION CODE (B31001) - SFY 2017
COUNTY ROUTE BMP PROJECT NAME PHASE PriorityEstimateStartSTATE PROJECT NO. MILES EndAuth. Start (R) End (R) Cost (R) REMARKS
PROJECT REFERENCE INFORMATION PROJECT CHANGE REQUESTS
DEV_RESPBY
CO005/03 1.00 BOWLES RIDGE ROAD CON $163,710PUTNAM 04/01/17 AS3405310000 0.06 06/28/17 A03/09/17 A CP-1PO
WV087 3.33 WV 87-BRADEN ROAD CON $122,853MASON 04/01/17 AS3278733300 0.04 06/28/17 A03/09/17 A CP-1PO
CO013 4.20 POPLAR FORK ROAD SITE 2
CON $88,750PUTNAM 07/10/17 AS3401343100 0.06 11/20/17 A03/09/17 A CP-1PO
CO031 4.25 POCA RIVER ROAD CON $190,487PUTNAM 04/18/17 AS3403142500 0.06 07/10/17 A03/09/17 A CP-1PO
CO013 4.20 POPLAR FORK ROAD SITE 1
CON $299,350PUTNAM 07/10/17 AS3401342000 0.06 11/15/17 A03/09/17 A CP-1PO
$865,150(B31001) SUB-TOTAL FOR SFY 2017 =
DISTRICT 1 PROGRAM REVIEW LIST - ALLOCATION CODE (B31001) - SFY 2019
COUNTY ROUTE BMP PROJECT NAME PHASE PriorityEstimateStartSTATE PROJECT NO. MILES EndAuth. Start (R) End (R) Cost (R) REMARKS
PROJECT REFERENCE INFORMATION PROJECT CHANGE REQUESTS
DEV_RESPBY
CO037 0.99 TURKEY CREEK RD CON $68,000PUTNAM 12/28/18 AS3403709900 0.02 01/28/19 A08/17/18 A CP-1DF
WV034 22.70 REDHOUSE-CONFIDENCE RD
CON $302,000PUTNAM 12/04/18 AS34034227000 0.04 12/28/19 A08/17/18 A CP-1DF
CO119/77 0.09 ROSELANE RD CON $87,000KANAWHA 04/28/19 AS3201197700900 0.02 12/28/19 A08/17/18 A CP-1DF
CO015 8.75 SANDHILL RD CON $235,000MASON 12/28/18 AS3271587500 0.04 08/28/20 E08/17/18 A CP-1DF
CO057 23.84 BLUE CREEK RD CON $194,000KANAWHA 11/28/19 AS32057238400 0.04 07/28/20 E08/17/18 A CP-1DF
CO011 10.90 TRIPLETT RIDGE RD CON $341,000CLAY 05/28/20 ES30811109000 0.02 12/28/20 E08/17/18 A CP-1DF
WV214 3.27 CHILDRESS RD CON $471,000KANAWHA 04/28/19 AS32021432700 0.05 12/28/19 A08/17/18 A CP-1DF
Page 28 of 45PRINTED 9/30/2020 AT 7:02:14 AM
The information presented in this document is representative of the Project Tracking System as 09/30/2020. Any change requests should be noted in the appropriate columns at the right edge of the each table. The State Fiscal Year (SFY) assignments are based on the Authorization dates.
Report ID: SSTIP-002
$1,698,000(B31001) SUB-TOTAL FOR SFY 2019 =
DISTRICT 1 PROGRAM REVIEW LIST - ALLOCATION CODE (B31001) - SFY 2020
COUNTY ROUTE BMP PROJECT NAME PHASE PriorityEstimateStartSTATE PROJECT NO. MILES EndAuth. Start (R) End (R) Cost (R) REMARKS
PROJECT REFERENCE INFORMATION PROJECT CHANGE REQUESTS
DEV_RESPBY
CO083 4.07 PAINT CREEK RD CON $273,000KANAWHA 09/28/19 AS3208340700 0.02 09/28/20 E08/20/19 A CP-1PO
NA999 0.00 BOONE COUNTY PATCHING
CON $432,000DISTRICT 01 05/28/20 AS381PATCH2000 6.00 07/28/20 A05/14/20 A CP-1SF
$705,000(B31001) SUB-TOTAL FOR SFY 2020 =
DISTRICT 1 PROGRAM REVIEW LIST - ALLOCATION CODE (B31001) - SFY 2021
COUNTY ROUTE BMP PROJECT NAME PHASE PriorityEstimateStartSTATE PROJECT NO. MILES EndAuth. Start (R) End (R) Cost (R) REMARKS
PROJECT REFERENCE INFORMATION PROJECT CHANGE REQUESTS
DEV_RESPBY
WV002 34.47 RIPLEY ROAD ROW $5,000MASON 08/28/20 ES3272344700 0.08 11/28/20 E08/28/20 E DD-1
WV002 34.47 RIPLEY ROAD CON $475,000MASON 12/28/20 ES3272344700 0.08 03/28/21 E10/28/20 E DD-1CT
$480,000(B31001) SUB-TOTAL FOR SFY 2021 =
DISTRICT 1 PROGRAM REVIEW LIST - ALLOCATION CODE (B32001) - SFY 2020
COUNTY ROUTE BMP PROJECT NAME PHASE PriorityEstimateStartSTATE PROJECT NO. MILES EndAuth. Start (R) End (R) Cost (R) REMARKS
PROJECT REFERENCE INFORMATION PROJECT CHANGE REQUESTS
DEV_RESPBY
WV094 0.13 LENS CREEK RD CON $471,550KANAWHA 12/28/19 AS3209401300 0.07 08/28/20 E11/05/19 A CP-1PO
WV002 34.66 PT PLEASANT-RAVENSWOOD RD
CON $299,500MASON 12/28/19 AS3272346600 0.03 08/28/20 E11/05/19 A CP-1PO
CO007 5.02 MAYSEL LAUREL RIDGE RD
CON $660,000CLAY 05/28/20 ES308750200 0.06 12/28/20 E11/05/19 A CP-1PO
WV622 10.07 LANHAM COMPRESSOR RD
CON $355,100KANAWHA 08/28/20 ES320622100700 0.04 09/28/20 E11/05/19 A CP-1PO
WV094 2.55 SHORT CREEK RD CON $255,000BOONE 12/28/19 AS3039425500 0.04 12/28/20 E11/05/19 A CP-1PO
Page 29 of 45PRINTED 9/30/2020 AT 7:02:14 AM
The information presented in this document is representative of the Project Tracking System as 09/30/2020. Any change requests should be noted in the appropriate columns at the right edge of the each table. The State Fiscal Year (SFY) assignments are based on the Authorization dates.
Report ID: SSTIP-002
WV062 7.59 HOMETOWN PARK CON $255,650PUTNAM 12/28/19 AS3406275900 0.04 08/28/20 E11/05/19 A CP-1PO
WV622 0.22 GOFF MTN CON $215,000KANAWHA 08/28/20 ES32062202200 0.02 10/28/20 E03/26/20 A CP-1DF
CO040/01 0.92 UPPER COW CREEK CON $95,000PUTNAM 08/28/20 ES34040109200 0.01 12/28/20 E03/26/20 A CP-1DF
CO029 5.69 ROCKY STEP CON $120,000PUTNAM 08/28/20 ES3402956900 0.01 10/28/20 E03/26/20 A CP-1DF
CO027 0.20 HEIZER CREEK CON $105,000PUTNAM 08/28/20 ES3402702000 0.01 10/28/20 E03/26/20 A CP-1DF
CO029 2.48 CRAB CREEK CON $230,000MASON 08/28/20 ES3272924800 0.02 10/28/20 E03/26/20 A CP-1DF
CO010 0.84 DOC BAILEY CON $145,000KANAWHA 04/28/20 ES3201008400 0.02 06/28/20 E03/26/20 A CP-1DF
$3,206,800(B32001) SUB-TOTAL FOR SFY 2020 =
DISTRICT 1 PROGRAM REVIEW LIST - ALLOCATION CODE (B32001) - SFY 2021
COUNTY ROUTE BMP PROJECT NAME PHASE PriorityEstimateStartSTATE PROJECT NO. MILES EndAuth. Start (R) End (R) Cost (R) REMARKS
PROJECT REFERENCE INFORMATION PROJECT CHANGE REQUESTS
DEV_RESPBY
CO064/02 4.68 LITTLE BLUE CREEK CON $220,000KANAWHA 08/28/20 ES32064246800 0.02 09/28/20 E08/28/20 E CP-1DF
$220,000(B32001) SUB-TOTAL FOR SFY 2021 =
DISTRICT 1 PROGRAM REVIEW LIST - ALLOCATION CODE (B70002) - SFY 2020
COUNTY ROUTE BMP PROJECT NAME PHASE PriorityEstimateStartSTATE PROJECT NO. MILES EndAuth. Start (R) End (R) Cost (R) REMARKS
PROJECT REFERENCE INFORMATION PROJECT CHANGE REQUESTS
DEV_RESPBY
NA999 0.00 SECONDARY ROAD MAINT INIT
CON $926,972DISTRICT 01 10/25/19 AS381SRMI2000 0.00 06/28/20 A10/21/19 A CP-1PO
$926,972(B70002) SUB-TOTAL FOR SFY 2020 =
DISTRICT 1 PROGRAM REVIEW LIST - ALLOCATION CODE (C09090) - SFY 2017
COUNTY ROUTE BMP PROJECT NAME PHASE PriorityEstimateStartSTATE PROJECT NO. MILES EndAuth. Start (R) End (R) Cost (R) REMARKS
PROJECT REFERENCE INFORMATION PROJECT CHANGE REQUESTS
DEV_RESPBY
Page 30 of 45PRINTED 9/30/2020 AT 7:02:14 AM
The information presented in this document is representative of the Project Tracking System as 09/30/2020. Any change requests should be noted in the appropriate columns at the right edge of the each table. The State Fiscal Year (SFY) assignments are based on the Authorization dates.
Report ID: SSTIP-002
CO003/09 0.05 ORGAS BRIDGE CON $1,632,816BOONE 02/15/17 AS3033900500 0.03 06/06/18 A08/28/16 A DD-ICT
CO031 1.14 WATERLOO BRIDGE CON $899,055MASON 05/15/17 AS3273111400 0.09 08/30/18 A09/13/16 A DD-R-CCT
$2,531,871(C09090) SUB-TOTAL FOR SFY 2017 =
DISTRICT 1 PROGRAM REVIEW LIST - ALLOCATION CODE (C10099) - SFY 2017
COUNTY ROUTE BMP PROJECT NAME PHASE PriorityEstimateStartSTATE PROJECT NO. MILES EndAuth. Start (R) End (R) Cost (R) REMARKS
PROJECT REFERENCE INFORMATION PROJECT CHANGE REQUESTS
DEV_RESPBY
WV003 39.58 WV 3 SENG CREEK BRIDGE
ENG $135,000BOONE 09/08/16 AS3033395800 0.01 08/01/17 A09/08/16 A DD-I
WV003 26.44 COMFORT PEDESTRIAN BRIDGE
ENG $35,000BOONE 11/28/16 AS3033264400 0.01 01/25/18 A11/28/16 A DD-I
CO038/01 0.03 MCCLANAHAN BR +1 ENG $50,000PUTNAM 01/08/17 AS34038100300 0.08 01/26/18 A01/08/17 A DD-B-B
WV003 39.58 WV 3 SENG CREEK BRIDGE
ROW $162,000BOONE 02/24/17 AS3033395800 0.01 07/26/17 A02/24/17 A DD-I
WV003 26.44 COMFORT PEDESTRIAN BRIDGE
ROW $90,000BOONE 06/28/17 AS3033264400 0.01 01/25/18 A06/28/17 A DD-I
$472,000(C10099) SUB-TOTAL FOR SFY 2017 =
DISTRICT 1 PROGRAM REVIEW LIST - ALLOCATION CODE (C10099) - SFY 2018
COUNTY ROUTE BMP PROJECT NAME PHASE PriorityEstimateStartSTATE PROJECT NO. MILES EndAuth. Start (R) End (R) Cost (R) REMARKS
PROJECT REFERENCE INFORMATION PROJECT CHANGE REQUESTS
DEV_RESPBY
WV094 0.37 SHORT CREEK BRIDGE ROW $710,000BOONE 09/06/17 AS3039403700 0.01 05/17/19 A09/06/17 A DD-I
CO038/01 0.03 MCCLANAHAN BR +1 ROW $80,000PUTNAM 01/26/18 AS34038100300 0.08 01/26/18 A01/26/18 A DD-B-B
WV003 26.44 COMFORT PEDESTRIAN BRIDGE
CON $51,427BOONE 05/01/18 AS3033264400 0.01 06/08/18 A02/20/18 A DD-ICT
$841,427(C10099) SUB-TOTAL FOR SFY 2018 =
Page 31 of 45PRINTED 9/30/2020 AT 7:02:14 AM
The information presented in this document is representative of the Project Tracking System as 09/30/2020. Any change requests should be noted in the appropriate columns at the right edge of the each table. The State Fiscal Year (SFY) assignments are based on the Authorization dates.
Report ID: SSTIP-002
DISTRICT 1 PROGRAM REVIEW LIST - ALLOCATION CODE (C10099) - SFY 2019
COUNTY ROUTE BMP PROJECT NAME PHASE PriorityEstimateStartSTATE PROJECT NO. MILES EndAuth. Start (R) End (R) Cost (R) REMARKS
PROJECT REFERENCE INFORMATION PROJECT CHANGE REQUESTS
DEV_RESPBY
CO052 2.31 MIDDLE TRACE FORK BR ENG $26,803PUTNAM 01/02/19 AS3405223100 0.09 01/02/19 A01/02/19 A CP-1
CO052 2.31 MIDDLE TRACE FORK BR ROW $1,854PUTNAM 01/02/19 AS3405223100 0.09 01/02/19 A01/02/19 A CP-1
CO052 2.31 MIDDLE TRACE FORK BR CON $500,000PUTNAM 06/28/19 AS3405223100 0.09 08/28/20 E01/02/19 A CP-1DB
$528,657(C10099) SUB-TOTAL FOR SFY 2019 =
DISTRICT 1 PROGRAM REVIEW LIST - ALLOCATION CODE (C10099) - SFY 2020
COUNTY ROUTE BMP PROJECT NAME PHASE PriorityEstimateStartSTATE PROJECT NO. MILES EndAuth. Start (R) End (R) Cost (R) REMARKS
PROJECT REFERENCE INFORMATION PROJECT CHANGE REQUESTS
DEV_RESPBY
CO019 0.01 PFC WF HARRISON MEM BR
ENG $500,000KANAWHA 10/07/19 AS3201900200 0.02 11/28/20 E10/07/19 A DD-B
CO003/20 0.01 ALESHIRE PEDESTRIAN BRIDG
CON $165,250BOONE 01/28/20 AS30332000100 0.05 07/29/20 A10/21/19 A DD-ICT
CO019 0.01 PFC WF HARRISON MEM BR
ROW $155,000KANAWHA 05/13/20 AS3201900200 0.02 11/28/20 E05/13/20 A DD-B
$820,250(C10099) SUB-TOTAL FOR SFY 2020 =
DISTRICT 1 PROGRAM REVIEW LIST - ALLOCATION CODE (C10099) - SFY 2021
COUNTY ROUTE BMP PROJECT NAME PHASE PriorityEstimateStartSTATE PROJECT NO. MILES EndAuth. Start (R) End (R) Cost (R) REMARKS
PROJECT REFERENCE INFORMATION PROJECT CHANGE REQUESTS
DEV_RESPBY
CO009 6.19 TORNADO BR O/L ROW $30,000KANAWHA 10/28/20 ES320961900 0.07 11/28/20 E10/28/20 E DD-1
CO026/03 0.01 EASTWOOD LAND BR ENG $400,000BOONE 10/28/20 ES20326300100 0.02 10/28/21 E10/28/20 E DD-R
CO077/01 0.70 LOWER FIELDS CREEK BR ENG $25,000KANAWHA 01/28/21 ES32077107000 0.02 05/28/21 E01/28/21 E DD-B
CO077/01 0.70 LOWER FIELDS CREEK BR ROW $10,000KANAWHA 03/28/21 ES32077107000 0.02 05/28/21 E03/28/21 E DD-B
Page 32 of 45PRINTED 9/30/2020 AT 7:02:14 AM
The information presented in this document is representative of the Project Tracking System as 09/30/2020. Any change requests should be noted in the appropriate columns at the right edge of the each table. The State Fiscal Year (SFY) assignments are based on the Authorization dates.
Report ID: SSTIP-002
CO019 8.54 HURRICANE CR BR NO 854
ENG $400,000PUTNAM 04/28/21 ES2401985400 0.03 10/28/23 E04/28/21 E DD-R
WV622 5.51 ROCKY FK CHANNEL BM BR
ENG $400,000KANAWHA 04/28/21 ES22062255100 0.02 10/28/24 E04/28/21 E DD-R
$1,265,000(C10099) SUB-TOTAL FOR SFY 2021 =
DISTRICT 1 PROGRAM REVIEW LIST - ALLOCATION CODE (C23001) - SFY 2017
COUNTY ROUTE BMP PROJECT NAME PHASE PriorityEstimateStartSTATE PROJECT NO. MILES EndAuth. Start (R) End (R) Cost (R) REMARKS
PROJECT REFERENCE INFORMATION PROJECT CHANGE REQUESTS
DEV_RESPBY
US119 12.36 JILL MICAH HESS MEMORIAL
CON $75,708BOONE 08/20/16 AS303119123600 0.29 07/10/17 A07/13/16 A DB-1PO
WV004 21.86 BIG OTTER CREEK BRIDGE CON $45,504CLAY 08/16/16 AS3084218600 0.03 11/20/16 A08/16/16 A DB-1PO
$121,212(C23001) SUB-TOTAL FOR SFY 2017 =
DISTRICT 1 PROGRAM REVIEW LIST - ALLOCATION CODE (C23001) - SFY 2018
COUNTY ROUTE BMP PROJECT NAME PHASE PriorityEstimateStartSTATE PROJECT NO. MILES EndAuth. Start (R) End (R) Cost (R) REMARKS
PROJECT REFERENCE INFORMATION PROJECT CHANGE REQUESTS
DEV_RESPBY
CO009 4.25 SMITH CREEK SLAB CON $37,398KANAWHA 10/15/17 AS320942600 0.01 06/28/18 A09/20/17 A CP-1DB
CO080 6.52 ROCKY FORK BEAM SPAN CON $2,321MASON 11/15/18 AS3278065200 0.01 10/03/19 A01/03/18 A DB-1SF
CO052 3.61 BLUE CREEK ARCH CON $36,751KANAWHA 01/08/18 AS3205236100 0.01 06/28/18 A01/03/18 A DB-1SF
$76,470(C23001) SUB-TOTAL FOR SFY 2018 =
DISTRICT 1 PROGRAM REVIEW LIST - ALLOCATION CODE (C23001) - SFY 2019
COUNTY ROUTE BMP PROJECT NAME PHASE PriorityEstimateStartSTATE PROJECT NO. MILES EndAuth. Start (R) End (R) Cost (R) REMARKS
PROJECT REFERENCE INFORMATION PROJECT CHANGE REQUESTS
DEV_RESPBY
CO001/02 0.49 ROBINSON CHURCH BR REHAB
CON $94,054KANAWHA 02/28/19 AS3201204900 0.03 10/03/19 A08/13/18 A DB-1DB
CO065 4.87 FALLING ROCK CREEK BR CON $54,970KANAWHA 09/28/19 AS3206548700 0.01 10/03/19 A08/13/18 A DB-1DB
Page 33 of 45PRINTED 9/30/2020 AT 7:02:14 AM
The information presented in this document is representative of the Project Tracking System as 09/30/2020. Any change requests should be noted in the appropriate columns at the right edge of the each table. The State Fiscal Year (SFY) assignments are based on the Authorization dates.
Report ID: SSTIP-002
CO010 1.70 OREN J JOHNSON MB CON $48,985PUTNAM 12/28/18 AS3401017000 0.02 01/09/19 A12/28/18 A CP-1DB
CO032 1.06 DERRICK CREEK BR CON $40,769KANAWHA 02/28/19 AS3203210600 0.04 10/03/19 A02/28/19 A CP-1DB
$238,778(C23001) SUB-TOTAL FOR SFY 2019 =
DISTRICT 1 PROGRAM REVIEW LIST - ALLOCATION CODE (C23001) - SFY 2020
COUNTY ROUTE BMP PROJECT NAME PHASE PriorityEstimateStartSTATE PROJECT NO. MILES EndAuth. Start (R) End (R) Cost (R) REMARKS
PROJECT REFERENCE INFORMATION PROJECT CHANGE REQUESTS
DEV_RESPBY
CO039 9.13 LEATHERWOOD CREEK CULV
CON $80,000KANAWHA 12/28/19 AS3203991300 0.01 09/28/20 E09/24/19 A CP-1DB
CO036 8.14 LOWER FIVEMILE CREEK BR
CON $65,000MASON 12/28/19 AS3273681400 0.01 08/28/20 E09/24/19 A CP-1DB
CO119/09 0.02 TURTLE CREEK T-BEAM BRIDG
CON $65,000BOONE 12/01/19 AS303119900200 0.01 02/28/20 A09/26/19 A CP-1DB
CO021/16 2.28 GRAPEVINE BOX BEAM CON $65,000KANAWHA 02/28/20 AS320211622800 0.01 08/28/20 E10/23/19 A CP-1DB
CO004/01 0.01 JULIAN FOOT BRIDGE ENG $25,000BOONE 12/11/19 AS3034100100 0.05 10/28/20 E12/11/19 A CP-1
CO004/01 0.01 JULIAN FOOT BRIDGE ROW $75,000BOONE 12/11/19 AS3034100100 0.05 10/28/20 E12/11/19 A CP-1
$375,000(C23001) SUB-TOTAL FOR SFY 2020 =
DISTRICT 1 PROGRAM REVIEW LIST - ALLOCATION CODE (C23001) - SFY 2021
COUNTY ROUTE BMP PROJECT NAME PHASE PriorityEstimateStartSTATE PROJECT NO. MILES EndAuth. Start (R) End (R) Cost (R) REMARKS
PROJECT REFERENCE INFORMATION PROJECT CHANGE REQUESTS
DEV_RESPBY
NA999 $$ 0.00 CAT 3 ALLOC PROJ(DIST) CON $250,000DISTRICT 01 07/01/20 EA381C232100 0.00 06/28/21 E07/01/20 E CP-1DF
CO004/01 0.01 JULIAN FOOT BRIDGE CON $75,000BOONE 10/28/20 ES3034100100 0.05 03/28/21 E09/28/20 E CP-1CT
$325,000(C23001) SUB-TOTAL FOR SFY 2021 =
Page 34 of 45PRINTED 9/30/2020 AT 7:02:14 AM
The information presented in this document is representative of the Project Tracking System as 09/30/2020. Any change requests should be noted in the appropriate columns at the right edge of the each table. The State Fiscal Year (SFY) assignments are based on the Authorization dates.
Report ID: SSTIP-002
DISTRICT 1 PROGRAM REVIEW LIST - ALLOCATION CODE (C26001) - SFY 2017
COUNTY ROUTE BMP PROJECT NAME PHASE PriorityEstimateStartSTATE PROJECT NO. MILES EndAuth. Start (R) End (R) Cost (R) REMARKS
PROJECT REFERENCE INFORMATION PROJECT CHANGE REQUESTS
DEV_RESPBY
CO015/04 7.10 BUFFALO CREEK BRIDGE ENG $37,487CLAY 07/01/16 AS30815471000 0.01 11/28/18 A07/01/16 A DB-1
CO001/12 0.62 ADONIJAH FORK BR CON $585,697CLAY 02/01/17 AS30811206200 0.08 07/01/17 A08/09/16 A DD-1CT
CO119/07 0.07 LICK CREEK BRIDGE CON $391,947BOONE 07/15/17 AS303119700700 0.01 03/28/18 A03/17/17 A DB-1DB
CO016/06 4.24 SYCAMORE CREEK BR CON $513,740CLAY 07/01/17 AS30816642400 0.07 12/15/17 A04/19/17 A DD-1CT
$1,528,871(C26001) SUB-TOTAL FOR SFY 2017 =
DISTRICT 1 PROGRAM REVIEW LIST - ALLOCATION CODE (C26001) - SFY 2018
COUNTY ROUTE BMP PROJECT NAME PHASE PriorityEstimateStartSTATE PROJECT NO. MILES EndAuth. Start (R) End (R) Cost (R) REMARKS
PROJECT REFERENCE INFORMATION PROJECT CHANGE REQUESTS
DEV_RESPBY
CO013/14 0.10 POT BRANCH BRIDGE ROW $100,000KANAWHA 07/01/17 AS320131401000 0.02 08/28/20 E07/01/17 A DB-1
CO009 1.91 MEADOW FORK BRIDGE ENG $40,000BOONE 07/01/17 AS303919100 0.02 12/06/19 A07/01/17 A DB-1
CO009 1.91 MEADOW FORK BRIDGE ROW $25,000BOONE 07/01/17 AS303919100 0.02 12/06/19 A07/01/17 A DB-1
CO013/14 0.10 POT BRANCH BRIDGE ENG $85,000KANAWHA 07/01/17 AS320131401000 0.02 08/28/20 E07/01/17 A DB-1
CO007 6.31 TURKEY BRANCH BR CON $247,016PUTNAM 08/15/18 AS340763100 0.08 10/03/19 A05/16/18 A CP-1DB
CO030 1.22 FROG CREEK BRIDGE ENG $412KANAWHA 05/21/18 AS3203012200 0.01 08/17/18 A05/21/18 A CP-1
$497,428(C26001) SUB-TOTAL FOR SFY 2018 =
DISTRICT 1 PROGRAM REVIEW LIST - ALLOCATION CODE (C26001) - SFY 2019
COUNTY ROUTE BMP PROJECT NAME PHASE PriorityEstimateStartSTATE PROJECT NO. MILES EndAuth. Start (R) End (R) Cost (R) REMARKS
PROJECT REFERENCE INFORMATION PROJECT CHANGE REQUESTS
DEV_RESPBY
Page 35 of 45PRINTED 9/30/2020 AT 7:02:15 AM
The information presented in this document is representative of the Project Tracking System as 09/30/2020. Any change requests should be noted in the appropriate columns at the right edge of the each table. The State Fiscal Year (SFY) assignments are based on the Authorization dates.
Report ID: SSTIP-002
CO030 1.22 FROG CREEK BRIDGE CON $300,000KANAWHA 09/08/18 AS3203012200 0.01 09/28/20 E09/08/18 A CP-1DB
CO011 0.46 ALUM CREEK BRS CON $145,192KANAWHA 04/01/19 AS3201104600 0.30 10/28/20 E09/18/18 A DD-1CT
CO029 4.53 LITTLE HURRICANE CREEK BR
ENG $30,000PUTNAM 10/05/18 AS3402945300 0.02 11/28/19 A10/05/18 A DB-1
CO029 4.53 LITTLE HURRICANE CREEK BR
ROW $25,000PUTNAM 10/05/18 AS3402945300 0.02 11/28/19 A10/05/18 A DB-1
CO119/03 0.82 LEFT FORK BRIDGE CON $70,541BOONE 03/25/19 AS303119308200 0.01 08/10/20 A10/30/18 A DB-1CT
CO058 4.01 CAPEHART BR CON $713,878MASON 05/28/19 AS3275840100 0.06 10/28/20 E01/14/19 A DB-1CT
CO024 0.51 BONHAM BRIDGE CON $43,442KANAWHA 07/28/19 AS3202405100 0.09 07/29/20 A05/01/19 A DD-1-CCT
$1,328,053(C26001) SUB-TOTAL FOR SFY 2019 =
DISTRICT 1 PROGRAM REVIEW LIST - ALLOCATION CODE (C26001) - SFY 2020
COUNTY ROUTE BMP PROJECT NAME PHASE PriorityEstimateStartSTATE PROJECT NO. MILES EndAuth. Start (R) End (R) Cost (R) REMARKS
PROJECT REFERENCE INFORMATION PROJECT CHANGE REQUESTS
DEV_RESPBY
CO015/04 7.10 BUFFALO CREEK BRIDGE CON $519,006CLAY 11/10/19 AS30815471000 0.01 08/28/20 E07/25/19 A DB-1CT
CO050 7.39 BUZZARD CREEK BR CON $839,710PUTNAM 08/28/20 ES3405073900 0.08 12/23/20 E12/09/19 A DB-1CT
CO029 4.53 LITTLE HURRICANE CREEK BR
CON $200,000PUTNAM 12/19/19 AS3402945300 0.02 08/28/20 E12/19/19 A DB-1DB
CO009 1.91 MEADOW FORK BRIDGE CON $747,320BOONE 10/28/20 ES303919100 0.02 11/20/20 E03/24/20 A DB-1CT
$2,306,036(C26001) SUB-TOTAL FOR SFY 2020 =
DISTRICT 1 PROGRAM REVIEW LIST - ALLOCATION CODE (C26001) - SFY 2021
COUNTY ROUTE BMP PROJECT NAME PHASE PriorityEstimateStartSTATE PROJECT NO. MILES EndAuth. Start (R) End (R) Cost (R) REMARKS
PROJECT REFERENCE INFORMATION PROJECT CHANGE REQUESTS
DEV_RESPBY
NA999 $$ 0.00 CAT 6 ALLOC PROJ(DIST) CON $3,750,000DISTRICT 01 07/01/20 EA381C262100 0.00 06/28/21 E07/01/20 E CP-1DF
HA902/22 0.03 MORRIS LANE BRIDGE ENG $30,000KANAWHA 08/28/20 ES3209022200300 0.02 04/28/21 E08/28/20 E DB-1
Page 36 of 45PRINTED 9/30/2020 AT 7:02:15 AM
The information presented in this document is representative of the Project Tracking System as 09/30/2020. Any change requests should be noted in the appropriate columns at the right edge of the each table. The State Fiscal Year (SFY) assignments are based on the Authorization dates.
Report ID: SSTIP-002
HA902/22 0.03 MORRIS LANE BRIDGE ROW $25,000KANAWHA 08/28/20 ES3209022200300 0.02 04/28/21 E08/28/20 E DB-1
CO015 13.21 MIDDLE FORK BRIDGE ENG $80,000KANAWHA 08/28/20 ES32015132100 0.02 04/28/21 E08/28/20 E DB-1
CO015 13.21 MIDDLE FORK BRIDGE ROW $20,000KANAWHA 08/28/20 ES32015132100 0.02 04/28/21 E08/28/20 E DB-1
CO013/14 0.10 POT BRANCH BRIDGE CON $500,000KANAWHA 09/28/20 ES320131401000 0.02 08/28/21 E09/28/20 E DB-1CT
CO005 1.68 MANILLA CREEK BRIDGE CON $400,000PUTNAM 01/28/21 ES340516800 0.02 05/28/21 E11/28/20 E DB-1CT
HA902/22 0.03 MORRIS LANE BRIDGE CON $400,000KANAWHA 07/28/21 ES3209022200300 0.02 07/28/22 E05/28/21 E DB-1CT
CO015 13.21 MIDDLE FORK BRIDGE CON $200,000KANAWHA 07/28/21 ES32015132100 0.02 07/28/22 E06/28/21 E DB-1DB
$5,405,000(C26001) SUB-TOTAL FOR SFY 2021 =
DISTRICT 1 PROGRAM REVIEW LIST - ALLOCATION CODE (C26001) - SFY 2022
COUNTY ROUTE BMP PROJECT NAME PHASE PriorityEstimateStartSTATE PROJECT NO. MILES EndAuth. Start (R) End (R) Cost (R) REMARKS
PROJECT REFERENCE INFORMATION PROJECT CHANGE REQUESTS
DEV_RESPBY
CO044 1.25 O'BRION CREEK BRIDGE ROW $20,000CLAY 07/01/21 ES3084412500 0.02 04/28/22 E07/01/21 E DB-1
CO044 1.25 O'BRION CREEK BRIDGE ENG $30,000CLAY 07/01/21 ES3084412500 0.02 04/28/22 E07/01/21 E DB-1
CO044 1.25 O'BRION CREEK BRIDGE CON $400,000CLAY 07/01/22 ES3084412500 0.02 06/28/23 E05/28/22 E DB-1CT
$450,000(C26001) SUB-TOTAL FOR SFY 2022 =
DISTRICT 1 PROGRAM REVIEW LIST - ALLOCATION CODE (C26090) - SFY 2017
COUNTY ROUTE BMP PROJECT NAME PHASE PriorityEstimateStartSTATE PROJECT NO. MILES EndAuth. Start (R) End (R) Cost (R) REMARKS
PROJECT REFERENCE INFORMATION PROJECT CHANGE REQUESTS
DEV_RESPBY
CO021 1.36 KANAWHA TWOMILE BRIDGE
ENG $684,000KANAWHA 10/04/16 AS3202113600 0.09 04/02/18 A10/04/16 A DD-R-C
CO011/01 0.05 CANE HILL BRIDGE ENG $200,000PUTNAM 11/02/16 AS34011100500 0.14 06/24/19 A11/02/16 A DD-I
CO021 1.36 KANAWHA TWOMILE BRIDGE
ROW $150,000KANAWHA 02/24/17 AS3202113600 0.09 03/27/18 A02/24/17 A DD-R-C
Page 37 of 45PRINTED 9/30/2020 AT 7:02:15 AM
The information presented in this document is representative of the Project Tracking System as 09/30/2020. Any change requests should be noted in the appropriate columns at the right edge of the each table. The State Fiscal Year (SFY) assignments are based on the Authorization dates.
Report ID: SSTIP-002
$1,034,000(C26090) SUB-TOTAL FOR SFY 2017 =
DISTRICT 1 PROGRAM REVIEW LIST - ALLOCATION CODE (C26090) - SFY 2018
COUNTY ROUTE BMP PROJECT NAME PHASE PriorityEstimateStartSTATE PROJECT NO. MILES EndAuth. Start (R) End (R) Cost (R) REMARKS
PROJECT REFERENCE INFORMATION PROJECT CHANGE REQUESTS
DEV_RESPBY
CO011/01 0.05 CANE HILL BRIDGE ROW $115,000PUTNAM 01/17/18 AS34011100500 0.14 06/12/19 A01/17/18 A DD-I
$115,000(C26090) SUB-TOTAL FOR SFY 2018 =
DISTRICT 1 PROGRAM REVIEW LIST - ALLOCATION CODE (C26090) - SFY 2019
COUNTY ROUTE BMP PROJECT NAME PHASE PriorityEstimateStartSTATE PROJECT NO. MILES EndAuth. Start (R) End (R) Cost (R) REMARKS
PROJECT REFERENCE INFORMATION PROJECT CHANGE REQUESTS
DEV_RESPBY
CO046 0.01 JC CRUIKSHANK MEMORIAL BR
ENG $750,000CLAY 08/23/18 AS2084600100 0.09 06/28/19 E08/23/18 A DD-R-C
$750,000(C26090) SUB-TOTAL FOR SFY 2019 =
DISTRICT 1 PROGRAM REVIEW LIST - ALLOCATION CODE (C28001) - SFY 2017
COUNTY ROUTE BMP PROJECT NAME PHASE PriorityEstimateStartSTATE PROJECT NO. MILES EndAuth. Start (R) End (R) Cost (R) REMARKS
PROJECT REFERENCE INFORMATION PROJECT CHANGE REQUESTS
DEV_RESPBY
I 079 15.46 I-79 WILLS CREEK OP BR CON $268,165KANAWHA 09/01/16 AS32079154700 0.10 11/15/17 A07/27/16 A DB-1PO
US119 12.36 JILL MICAH HESS MEMORIAL
CON $46,667BOONE 10/15/16 AS303119123900 0.29 07/10/17 A10/04/16 A DB-1PO
$314,832(C28001) SUB-TOTAL FOR SFY 2017 =
DISTRICT 1 PROGRAM REVIEW LIST - ALLOCATION CODE (C28001) - SFY 2018
COUNTY ROUTE BMP PROJECT NAME PHASE PriorityEstimateStartSTATE PROJECT NO. MILES EndAuth. Start (R) End (R) Cost (R) REMARKS
PROJECT REFERENCE INFORMATION PROJECT CHANGE REQUESTS
DEV_RESPBY
I 077 113.44 WHITE CHAPEL BRIDGE +2 CON $35,077KANAWHA 10/28/17 AS320771134400 0.03 09/28/18 A07/18/17 A CP-1PO
CO015 6.53 OLDTOWN BRIDGE +5 CON $82,579MASON 08/25/17 AS3271565300 0.02 09/28/17 A07/18/17 A CP-1PO
Page 38 of 45PRINTED 9/30/2020 AT 7:02:15 AM
The information presented in this document is representative of the Project Tracking System as 09/30/2020. Any change requests should be noted in the appropriate columns at the right edge of the each table. The State Fiscal Year (SFY) assignments are based on the Authorization dates.
Report ID: SSTIP-002
CO038 0.36 NEW CANE FORK BR CON $9,750KANAWHA 03/14/18 AS3203803600 0.01 05/15/18 A03/04/18 A DB-1PO
CO016/01 0.60 RUTH LYNN LANE BR CON $8,156KANAWHA 03/12/18 AS32016106000 0.01 04/11/19 A03/04/18 A DB-1PO
CO073/29 0.01 STONE ACRES BR CON $11,930KANAWHA 04/20/18 AS320732900100 0.01 05/31/18 A03/14/18 A CP-1PO
US119 11.34 GRIFFITH MEM BRIDGES CON $206,776KANAWHA 03/20/18 AS320119113400 0.09 10/28/19 A03/14/18 A CP-1PO
CO057 14.15 BLUE CREEK BR CON $25,592KANAWHA 03/20/18 AS32057141500 0.01 12/28/18 A03/14/18 A CP-1PO
CO079/08 0.25 WEALTHY ACRES BR CON $26,883KANAWHA 03/20/18 AS32079802500 0.03 05/20/18 A03/14/18 A CP-1PO
$406,743(C28001) SUB-TOTAL FOR SFY 2018 =
DISTRICT 1 PROGRAM REVIEW LIST - ALLOCATION CODE (C28001) - SFY 2019
COUNTY ROUTE BMP PROJECT NAME PHASE PriorityEstimateStartSTATE PROJECT NO. MILES EndAuth. Start (R) End (R) Cost (R) REMARKS
PROJECT REFERENCE INFORMATION PROJECT CHANGE REQUESTS
DEV_RESPBY
CO079/01 0.01 JACKS BRANCH BRIDGE +1 CON $26,869BOONE 12/01/18 AS30379100100 0.01 02/13/19 A11/15/18 A DB-1PO
CO076 4.19 LEEWOOD BRIDGE +2 CON $32,899KANAWHA 11/28/18 AS3207641900 0.02 12/31/18 A11/27/18 A CP-1PO
$59,768(C28001) SUB-TOTAL FOR SFY 2019 =
DISTRICT 1 PROGRAM REVIEW LIST - ALLOCATION CODE (C28061) - SFY 2017
COUNTY ROUTE BMP PROJECT NAME PHASE PriorityEstimateStartSTATE PROJECT NO. MILES EndAuth. Start (R) End (R) Cost (R) REMARKS
PROJECT REFERENCE INFORMATION PROJECT CHANGE REQUESTS
DEV_RESPBY
I 064 54.37 I-64 KANAWHA TURNPIKE O/P
CON $1,407,112KANAWHA 06/28/17 AS32064543700 0.18 04/28/18 A09/20/16 A OM-ICT
$1,407,112(C28061) SUB-TOTAL FOR SFY 2017 =
DISTRICT 1 PROGRAM REVIEW LIST - ALLOCATION CODE (C28061) - SFY 2020
COUNTY ROUTE BMP PROJECT NAME PHASE PriorityEstimateStartSTATE PROJECT NO. MILES EndAuth. Start (R) End (R) Cost (R) REMARKS
PROJECT REFERENCE INFORMATION PROJECT CHANGE REQUESTS
DEV_RESPBY
Page 39 of 45PRINTED 9/30/2020 AT 7:02:15 AM
The information presented in this document is representative of the Project Tracking System as 09/30/2020. Any change requests should be noted in the appropriate columns at the right edge of the each table. The State Fiscal Year (SFY) assignments are based on the Authorization dates.
Report ID: SSTIP-002
CO060/14 3.64 JOSEPH HOMER LLOYD BRIDGE
ENG $10,000KANAWHA 10/10/19 AS320601436400 0.06 04/13/20 A10/10/19 A DD-1
CO060/14 3.64 JOSEPH HOMER LLOYD BRIDGE
CON $313,191KANAWHA 10/28/20 ES320601436400 0.06 12/27/20 E04/23/20 A DD-1CT
$323,191(C28061) SUB-TOTAL FOR SFY 2020 =
DISTRICT 1 PROGRAM REVIEW LIST - ALLOCATION CODE (C32001) - SFY 2020
COUNTY ROUTE BMP PROJECT NAME PHASE PriorityEstimateStartSTATE PROJECT NO. MILES EndAuth. Start (R) End (R) Cost (R) REMARKS
PROJECT REFERENCE INFORMATION PROJECT CHANGE REQUESTS
DEV_RESPBY
CO119/43 0.31 BENTLEY ROAD BRIDGE ENG $100,000BOONE 09/23/19 AS3031194303100 0.02 08/28/20 E09/23/19 A DD-1
CO014 2.00 EXTRA ARCH BRIDGE ROW $30,000PUTNAM 09/23/19 AS3401420000 0.02 08/28/20 E09/23/19 A DD-1
CO014 2.00 EXTRA ARCH BRIDGE ENG $50,000PUTNAM 09/23/19 AS3401420000 0.02 08/28/20 E09/23/19 A DD-1
CO119/43 0.31 BENTLEY ROAD BRIDGE ROW $25,000BOONE 09/23/19 AS3031194303100 0.02 08/28/20 E09/23/19 A DD-1
CO015/03 0.02 WALLOW HOLE BRIDGE ROW $25,000CLAY 09/23/19 AS30815300200 0.01 08/28/20 E09/23/19 A DD-1
CO015/03 0.02 WALLOW HOLE BRIDGE ENG $50,000CLAY 09/23/19 AS30815300200 0.01 08/28/20 E09/23/19 A DD-1
$280,000(C32001) SUB-TOTAL FOR SFY 2020 =
DISTRICT 1 PROGRAM REVIEW LIST - ALLOCATION CODE (I10099) - SFY 2020
COUNTY ROUTE BMP PROJECT NAME PHASE PriorityEstimateStartSTATE PROJECT NO. MILES EndAuth. Start (R) End (R) Cost (R) REMARKS
PROJECT REFERENCE INFORMATION PROJECT CHANGE REQUESTS
DEV_RESPBY
CO051/09 0.00 BARLOW DRIVE IAR CON $510,000KANAWHA 05/11/20 AS32051900000 0.94 10/28/21 E05/11/20 A CD-IOT
$510,000(I10099) SUB-TOTAL FOR SFY 2020 =
DISTRICT 1 PROGRAM REVIEW LIST - ALLOCATION CODE (I10099) - SFY 2021
COUNTY ROUTE BMP PROJECT NAME PHASE PriorityEstimateStartSTATE PROJECT NO. MILES EndAuth. Start (R) End (R) Cost (R) REMARKS
PROJECT REFERENCE INFORMATION PROJECT CHANGE REQUESTS
DEV_RESPBY
Page 40 of 45PRINTED 9/30/2020 AT 7:02:15 AM
The information presented in this document is representative of the Project Tracking System as 09/30/2020. Any change requests should be noted in the appropriate columns at the right edge of the each table. The State Fiscal Year (SFY) assignments are based on the Authorization dates.
Report ID: SSTIP-002
CO062/11 0.00 ELEANOR INDUSTRIAL PARK I
ROW $5,000PUTNAM 08/27/20 AU340621100000 0.48 10/28/20 E08/27/20 A DD-1
CO062/11 0.00 ELEANOR INDUSTRIAL PARK I
ENG $45,000PUTNAM 08/28/20 EU340621100000 0.48 10/28/20 E08/28/20 E DD-1
CO062/11 0.00 ELEANOR INDUSTRIAL PARK I
CON $350,000PUTNAM 04/28/21 EU340621100000 0.48 06/28/21 E12/28/20 E DD-1CT
$400,000(I10099) SUB-TOTAL FOR SFY 2021 =
DISTRICT 1 PROGRAM REVIEW LIST - ALLOCATION CODE (N10099) - SFY 2017
COUNTY ROUTE BMP PROJECT NAME PHASE PriorityEstimateStartSTATE PROJECT NO. MILES EndAuth. Start (R) End (R) Cost (R) REMARKS
PROJECT REFERENCE INFORMATION PROJECT CHANGE REQUESTS
DEV_RESPBY
NA 0.00 CHESAPEAKE- SAFETY/HEALTH
CON $78,335KANAWHA 08/10/16 AU320CHESA102 0.00 11/10/16 A08/10/16 A CP-G-DOT
CO051/03 0.86 KEYSTONE DR DEBRIS REMOVA
CON $4,386KANAWHA 12/15/16 AS32051308600 0.13 05/20/17 A11/02/16 A OM-1FA
NA 57.82 KANAWHA HFST ENG $10,000KANAWHA 04/19/17 AS320HFST100 1.06 05/05/17 A04/19/17 A DD-1
$92,721(N10099) SUB-TOTAL FOR SFY 2017 =
DISTRICT 1 PROGRAM REVIEW LIST - ALLOCATION CODE (N10099) - SFY 2018
COUNTY ROUTE BMP PROJECT NAME PHASE PriorityEstimateStartSTATE PROJECT NO. MILES EndAuth. Start (R) End (R) Cost (R) REMARKS
PROJECT REFERENCE INFORMATION PROJECT CHANGE REQUESTS
DEV_RESPBY
US035 17.95 SILVER BRIDGE CEREMONY
ENG $50,000MASON 09/01/17 AT627SLV501700 0.00 12/15/17 A09/01/17 A CP-1
CO041 4.10 TICKVILLE BR ENG $300,000MASON 10/25/17 AS3274141000 0.03 01/25/18 A10/25/17 A DD-B
I 077 101.40 TOM WILLIAMS FAMILY +3
ENG $550,000KANAWHA 10/25/17 AS320771014000 0.15 12/12/17 A10/25/17 A DD-B
I 077 101.40 TOM WILLIAMS FAMILY +3
ROW $40,000KANAWHA 12/12/17 AS320771014000 0.15 12/12/17 A12/12/17 A DD-B
WV061 21.38 MACCORKLE AVE IMPROVEMENT
ENG $556,800KANAWHA 02/02/18 AU22061213800 2.79 08/28/22 E02/02/18 A DD-B
WV002 1.89 APPLE GROVE PIE ENG $300,000MASON 02/06/18 AS227218900 5.80 11/28/20 E02/06/18 A DD-
US119 14.04 OAKWOOD ROAD IMPROVEMENTS
ENG $1,150,000KANAWHA 02/17/18 AU220119140402 3.50 12/28/20 E02/17/18 A DD-E
Page 41 of 45PRINTED 9/30/2020 AT 7:02:15 AM
The information presented in this document is representative of the Project Tracking System as 09/30/2020. Any change requests should be noted in the appropriate columns at the right edge of the each table. The State Fiscal Year (SFY) assignments are based on the Authorization dates.
Report ID: SSTIP-002
US119 14.04 OAKWOOD ROAD IMPROVEMENTS
ENG $1,970,000KANAWHA 02/17/18 AU220119140400 3.50 06/28/20 E02/17/18 A DD-B
US035 19.19 WV 869-MASON CO 40 ENG $650,000PUTNAM 03/08/18 AU34035190103 14.60 10/01/18 A03/08/18 A DD-R-C
US060 3.95 5TH STREET TRAFFIC SIGNAL
ROW $25,000KANAWHA 06/26/18 AU3206039500 0.01 06/26/18 A06/26/18 A DT-I
$5,591,800(N10099) SUB-TOTAL FOR SFY 2018 =
DISTRICT 1 PROGRAM REVIEW LIST - ALLOCATION CODE (N10099) - SFY 2019
COUNTY ROUTE BMP PROJECT NAME PHASE PriorityEstimateStartSTATE PROJECT NO. MILES EndAuth. Start (R) End (R) Cost (R) REMARKS
PROJECT REFERENCE INFORMATION PROJECT CHANGE REQUESTS
DEV_RESPBY
I 064 41.37 US35/I-64 I/C- NITRO I/C CON $17,000,000PUTNAM 08/07/18 AU340B64413715 3.79 10/28/21 E08/07/18 A CP-1SF
US119 7.62 BROUNLAND RD TRAFFIC SIGN
ENG $20,000KANAWHA 12/14/18 AU32011976200 0.31 07/24/19 A12/14/18 A DT-I
US119 15.15 ROCK CK I/C+1 ROW $3,100,000BOONE 01/30/19 AX303119151500 2.75 12/28/21 E01/30/19 A DD-R-C
CO114/06 0.48 HILCREST DRIVE CON $400,000KANAWHA 09/28/19 AS320114604800 0.05 08/28/20 E03/12/19 A CP-1PO
CO005 0.00 ELKHURST RD +1 CON $11,680CLAY 05/22/19 AS308BGDRL2015 2.00 04/28/20 E05/22/19 A CP-1SF
CO060/02 0.00 STRAWBERRY RD +8 CON $22,500KANAWHA 05/28/19 AS320B60200015 1.82 08/28/20 E05/28/19 A CP-1SF
CO041 0.67 CLYMERS CREEK RD CON $33,400PUTNAM 05/28/19 AS340B4106715 3.79 12/28/20 E05/28/19 A CP-1SF
US119 41.67 SPENCER RD CON $35,600KANAWHA 05/28/19 AS320B119416715 2.29 08/28/20 E05/28/19 A CP-1SF
CO001/01 1.08 VALLEY VIEW RD CON $13,500CLAY 05/28/19 AS308B1110815 1.32 04/28/20 E05/28/19 A CP-1SF
US035 19.19 WV 869-MASON CO 40 CON $6,569,250PUTNAM 05/28/19 AU340B35190115 14.60 12/28/20 E05/28/19 A CP-1SF
CO010 0.00 DOC BAILEY RD +15 CON $56,652KANAWHA 05/28/19 AS320BGDRL2015 10.00 08/28/20 E05/28/19 A CP-1SF
CO004/07 0.00 GUY MULLENS RD CON $10,400CLAY 05/28/19 AS308B4700015 1.50 04/28/20 E05/28/19 A CP-1SF
CO015 3.85 SANDHILL RD CON $35,300MASON 05/28/19 AS327B1538515 3.28 08/28/20 E05/28/19 A CP-1SF
Page 42 of 45PRINTED 9/30/2020 AT 7:02:15 AM
The information presented in this document is representative of the Project Tracking System as 09/30/2020. Any change requests should be noted in the appropriate columns at the right edge of the each table. The State Fiscal Year (SFY) assignments are based on the Authorization dates.
Report ID: SSTIP-002
CO001 4.91 RIDGEVIEW NELLIS RD CON $33,900BOONE 05/28/19 AS303B149115 3.31 08/28/20 E05/28/19 A CP-1SF
CO009 0.00 HEWETT CK RD +1 CON $11,330BOONE 05/28/19 AS303BGDRL2015 2.00 08/28/20 E05/28/19 A CP-1SF
CO079/03 3.50 CABIN CREEK RD CON $23,200KANAWHA 05/28/19 AS320B79335015 1.50 08/28/20 E05/28/19 A CP-1SF
CO016 0.00 JERICO RD +2 CON $16,996MASON 05/28/19 AS327BGDRL2015 2.50 08/28/20 E05/28/19 A CP-1SF
CO022 0.00 WOODWARD DRIVE CON $18,800KANAWHA 05/28/19 AS320B2200015 1.47 08/28/20 E05/28/19 A CP-1SF
CO069 0.20 DUTCH RIDGE SITE 1 CON $26,803KANAWHA 06/24/19 AS320B6902015 0.04 08/28/20 E06/24/19 A CP-1SF
CO045 0.04 LITTLE SANDY CK RD SITE 1
CON $37,047KANAWHA 06/24/19 AS320B4500415 0.02 08/28/20 E06/24/19 A CP-1SF
CO035/09 0.45 SCHOWEN HILL RD SITE 2 CON $47,314PUTNAM 06/24/19 AS340B35904515 0.06 12/28/20 E06/24/19 A CP-1SF
CO032 6.56 DERRICKS CREEK RD CON $36,813KANAWHA 06/24/19 AS320B3265615 0.02 08/28/20 E06/24/19 A CP-1SF
CO016 1.05 JERICHO RD CON $24,360MASON 06/24/19 AS327B1610515 0.02 08/28/20 E06/24/19 A CP-1SF
CO013/05 1.39 MT HOME RD SITE 1 CON $25,378CLAY 06/27/19 AS308B13513915 0.03 04/28/20 E06/27/19 A CP-1SF
CO013/05 2.45 MT HOME SITE 2 CON $37,076CLAY 06/27/19 AS308B13524515 0.03 04/28/20 E06/27/19 A CP-1SF
$27,647,299(N10099) SUB-TOTAL FOR SFY 2019 =
DISTRICT 1 PROGRAM REVIEW LIST - ALLOCATION CODE (N10099) - SFY 2020
COUNTY ROUTE BMP PROJECT NAME PHASE PriorityEstimateStartSTATE PROJECT NO. MILES EndAuth. Start (R) End (R) Cost (R) REMARKS
PROJECT REFERENCE INFORMATION PROJECT CHANGE REQUESTS
DEV_RESPBY
CO035/08 0.00 DAIRY RD +4 CON $16,996PUTNAM 07/28/19 AS340BGDRL2015 2.50 12/28/20 E07/28/19 A CP-1SF
US119 15.85 OAKWOOD I/S IMPROVEMENTS
ROW $50,000KANAWHA 09/26/19 AU320119158500 0.62 03/20/20 A09/26/19 A DD-R
CO059 4.63 THOROFARE ROAD BRIDGE
CON $54,000KANAWHA 05/06/20 AS320B5946315 0.01 10/28/20 E05/06/20 A CP-1SF
CO035/10 5.43 CAPEHART BRIDGE CON $135,300MASON 05/06/20 AS327B351054315 0.02 11/28/20 E05/06/20 A CP-1SF
Page 43 of 45PRINTED 9/30/2020 AT 7:02:15 AM
The information presented in this document is representative of the Project Tracking System as 09/30/2020. Any change requests should be noted in the appropriate columns at the right edge of the each table. The State Fiscal Year (SFY) assignments are based on the Authorization dates.
Report ID: SSTIP-002
CO029/02 0.01 WHITE OAK DRIVE BRIDGE
CON $75,798KANAWHA 05/06/20 AS320B29200115 0.02 12/28/20 E05/06/20 A CP-1SF
CO058 1.04 ARBUCKLE THRU TRUSS CON $65,000MASON 05/06/20 AS327B5810415 0.02 11/28/20 E05/06/20 A CP-1SF
CO045/03 2.32 GUYAN CREEK BRIDGE CON $60,800MASON 05/06/20 AS327B45323215 0.01 09/28/20 E05/06/20 A CP-1SF
CO079/09 0.01 CRAWFORD BOTTOM BRIDGE
CON $86,200KANAWHA 05/06/20 AS320B79900115 0.01 12/28/20 E05/06/20 A CP-1SF
CO004 5.44 LAUREL CREEK BRIDGE CON $112,500CLAY 05/06/20 AS308B454415 0.01 09/28/21 E05/06/20 A CP-1SF
CO078 2.37 SIXTEENMILE CREEK BRIDGE
CON $45,000MASON 05/06/20 AS327B7823715 0.01 02/28/21 E05/06/20 A CP-1SF
CO024 2.35 SENG CREEK BRIDGE CON $109,000BOONE 05/06/20 AS303B2423515 0.01 03/28/21 E05/06/20 A CP-1SF
CO085/23 0.01 POND FORK BRIDGE CON $40,000BOONE 05/06/20 AS303B852300115 0.01 10/28/20 E05/06/20 A CP-1SF
CO062 48.81 LETART CONCRETE T-BEAM
CON $80,000MASON 05/06/20 AS327B62488115 0.02 09/28/20 E05/06/20 A CP-1SF
CO057 11.15 SANDERSON BRIDGE CON $98,600KANAWHA 05/06/20 AS320B57111515 0.01 06/28/21 E05/06/20 A CP-1SF
CO019/04 0.10 TRACE CREEK CON $16,000KANAWHA 05/13/20 AS320B19401015 0.01 06/28/21 E05/13/20 A CP-1SF
CO011 0.34 TRIPPLET RIDGE RD CON $24,000CLAY 05/13/20 AS308B1103415 0.04 06/28/21 E05/13/20 A CP-1SF
CO024 0.33 SYCAMORE RD CON $32,000CLAY 05/13/20 AS308B2403315 0.04 06/28/21 E05/13/20 A CP-1SF
CO057 19.88 BLUE CREEK RD CON $24,000KANAWHA 05/13/20 AS320B57198815 0.02 06/28/21 E05/13/20 A CP-1SF
CO015 14.44 MIDDLE FORK RD CON $16,000KANAWHA 05/13/20 AS320B15144415 0.02 06/28/21 E05/13/20 A CP-1SF
CO048 5.29 GROVES-WATTSVILLE RD CON $8,000CLAY 05/13/20 AS308B4852915 0.02 06/28/21 E05/13/20 A CP-1SF
CO003/02 2.81 HOLCOMB RIDGE RD CON $16,000CLAY 05/13/20 AS308B3228115 0.04 06/28/21 E05/13/20 A CP-1SF
$1,165,194(N10099) SUB-TOTAL FOR SFY 2020 =
Page 44 of 45PRINTED 9/30/2020 AT 7:02:15 AM
The information presented in this document is representative of the Project Tracking System as 09/30/2020. Any change requests should be noted in the appropriate columns at the right edge of the each table. The State Fiscal Year (SFY) assignments are based on the Authorization dates.
Report ID: SSTIP-002
DISTRICT 1 PROGRAM REVIEW LIST - ALLOCATION CODE (N10099) - SFY 2021
COUNTY ROUTE BMP PROJECT NAME PHASE PriorityEstimateStartSTATE PROJECT NO. MILES EndAuth. Start (R) End (R) Cost (R) REMARKS
PROJECT REFERENCE INFORMATION PROJECT CHANGE REQUESTS
DEV_RESPBY
I 079 14.00 ACCESS RD - WILLIS CREEK
CON $195,370KANAWHA 08/28/20 ES320B79140015 1.60 06/28/21 E07/29/20 A CP-1SF
CO022 2.73 HARVEY CHAPEL BRIDGE CON $46,625MASON 08/28/20 AS327B2227315 0.01 03/28/21 E08/28/20 A CP-1SF
CO064 6.76 BIG BUZZARD GIRDER BRIDGE
CON $42,500MASON 08/28/20 AS327B6467615 0.01 03/28/21 E08/28/20 A CP-1SF
CO085/24 0.01 CLINTON CAMP ROAD BRIDGE
CON $55,000BOONE 08/28/20 AS303B852400115 0.01 03/28/21 E08/28/20 A CP-1SF
CO072 3.77 POTTS CHAPEL PONY TRUSS B
CON $46,650MASON 08/28/20 AS327B7237715 0.01 03/28/21 E08/28/20 A CP-1SF
I 064 55.57 MONTROSE- OAKWOOD ROW $25,000KANAWHA 10/28/20 ES32064555700 1.21 11/28/20 E10/28/20 E DD-1
I 064 55.57 MONTROSE- OAKWOOD ENG $60,000KANAWHA 10/28/20 ES32064555700 1.21 11/28/20 E10/28/20 E DD-1
CO041 4.10 TICKVILLE BR ROW $10,000MASON 12/28/20 ES3274141000 0.03 12/12/17 A12/28/20 E DD-B
US035 0.00 WETLAND MITIGATION CON $100,000PUTNAM 03/28/21 EU3403516010 0.00 09/28/21 E03/28/21 E DD-I-CCT
$581,145(N10099) SUB-TOTAL FOR SFY 2021 =