    PROJECT SEMESTER

  • 8/2/2019 Project Semester_amit Garg

    2/18

    Name of the Organization: GiffordIndia Pvt. Ltd.

    Location: Mohan co-operative estate,New Delhi

    Mentor: Mr. Chandan Dhar(Principalengineer, Highways)

    Department: Highway engineering.

  • 8/2/2019 Project Semester_amit Garg

    3/18

    PROJECTS I HAD THE OPPORTUNITY

    TO BE A PART OF..

    CONSULTANCY SERVICESFORTHE

    REHABILITATIONAND WIDENINGTO 2 LANE/2LANEWITHPAVEDSHOULDERSCONFIGURATIONAND STRENGTHENINGOF MUZAFFARPURTO

    BARAUNI

    SECTION

    OF

    NH-28IN

    THE

    STATE

    OF

    BIHAR.

  • 8/2/2019 Project Semester_amit Garg

    4/18

    PROJECTS I HAD THE OPPORTUNITY

    TO BE A PART OF.. Pre Bid Engineering Services For the 4 laning of

    Patna-Buxar section of NH-30&84 in the Stateof Bihar.

    Pre Bid Engineering Services For the 4 laning ofSolapur to MK-Border section of NH-9 in thestate of Maharashtra.

    Pre Bid Engineering Services For the Widening

    And Strengthening of 2 lane to 2 lane withpaved shoulder configuration of Muzaffarpur-Barauni section of NH-28.

  • 8/2/2019 Project Semester_amit Garg

    5/18

    STEPS TO BE FOLLOWED DURING DESIGN

    ROAD AND STRUCTURE INVENTORY

    GEOTECHNICAL TESTING

    TRAFFIC STUDIES

    SETTING UP OF CONTROL POINTS

  • 8/2/2019 Project Semester_amit Garg

    6/18

    STEPS TO BE FOLLOWED DURING DESIGN

    PREPARATION OF STRIP CHART

    DETAILED TOPOGRAPHICAL SURVEY

    FINAL DESIGN USING THE ABOVE

    RESULTS

  • 8/2/2019 Project Semester_amit Garg

    7/18

    NH-28 (MUZAFFARPUR TO BARAUNI)

  • 8/2/2019 Project Semester_amit Garg

    8/18

    NH-28 (MUZAFFARPUR TO BARAUNI)

    The Project Road starts at Muzaffarpurfrom existing km 519.600 and ends at km627.000 .

    The total length of the project is 107.4 Kmand passes through major towns of

    Muzaffarpur, Dholi, Tajpur, Mushrigharari,Dalsingharai, Fateha and Teghra

  • 8/2/2019 Project Semester_amit Garg

    9/18

    TASKS ASSIGNED TO ME

    Site Engineer to supervise the Road

    Inventory.

    Supervising the GeotechnicalInvestigation.

    Co-ordinating with the Survey team.

  • 8/2/2019 Project Semester_amit Garg

    10/18

    SITE ENGINEER

    Network Inventory: Visual Inspection andDimensional Measurement

    Verification of available ROW and encroachments if

    any

    Consists of features like imp. road junctions,embankment height, adjacent land use pattern etc.

    All measurements were made with respect to theexisting Km Stone

    http://road%20inventory%20nh%2088.xlsx/http://road%20inventory%20nh%2088.xlsx/
  • 8/2/2019 Project Semester_amit Garg

    11/18

    SITE ENGINEER

    Pavement Condition: Visual Inspectionof the Quality of the road

    Consists of visible deficiencies likeCracking, Potholing, Rutting, Ravelling,

    Shoulder condition etc.

    http://pavement%20condition.xlsx/http://pavement%20condition.xlsx/
  • 8/2/2019 Project Semester_amit Garg

    12/18

    SOME COMMON DEFECTS

    CRACKING

    POTHOLES

    RAVELLIN

    G

    PATCHIN

    G

  • 8/2/2019 Project Semester_amit Garg

    13/18

    Instruments Used:

    GPS: To Establish Control Points at intervalsof about 5 Km

    Auto Level: To Establish the Elevations of theControl Points with respect to the Bench Mark

    Total Station: To Collect the Co-ordinates ofthe essential features along the projectcorridor

    TOPOGRAPHIC SURVEY:-

  • 8/2/2019 Project Semester_amit Garg

    14/18

    TOPOGRAPHIC SURVEY:-

    GPS: Calculates its position by precisely timing

    the signals sent by the satellites.

    Total Station: Calculates angles, distances and

    elevations with respect to the position of Total

    Station.

  • 8/2/2019 Project Semester_amit Garg

    15/18

    GEOTECHNICAL TESTING

    Existing pavement thickness

    Geotechnical testing of existing subgrade

    Test sample from the Toe of the Embankment

    Borrow Area testing

  • 8/2/2019 Project Semester_amit Garg

    16/18

    Performed for Overlay Design

    Strength measured correspondingto Deflection

    IRC:81

    BENKELMAN BEAM DEFLECTION TEST

  • 8/2/2019 Project Semester_amit Garg

    17/18

    DIFFICULTIES FACED

    High Embankment

    Heavy traffic

    Lack of Co-operation by local public