Name of the Organization: GiffordIndia Pvt. Ltd.
Location: Mohan co-operative estate,New Delhi
Mentor: Mr. Chandan Dhar(Principalengineer, Highways)
Department: Highway engineering.
-
8/2/2019 Project Semester_amit Garg
3/18
PROJECTS I HAD THE OPPORTUNITY
TO BE A PART OF..
CONSULTANCY SERVICESFORTHE
REHABILITATIONAND WIDENINGTO 2 LANE/2LANEWITHPAVEDSHOULDERSCONFIGURATIONAND STRENGTHENINGOF MUZAFFARPURTO
BARAUNI
SECTION
OF
NH-28IN
THE
STATE
OF
BIHAR.
-
8/2/2019 Project Semester_amit Garg
4/18
PROJECTS I HAD THE OPPORTUNITY
TO BE A PART OF.. Pre Bid Engineering Services For the 4 laning of
Patna-Buxar section of NH-30&84 in the Stateof Bihar.
Pre Bid Engineering Services For the 4 laning ofSolapur to MK-Border section of NH-9 in thestate of Maharashtra.
Pre Bid Engineering Services For the Widening
And Strengthening of 2 lane to 2 lane withpaved shoulder configuration of Muzaffarpur-Barauni section of NH-28.
-
8/2/2019 Project Semester_amit Garg
5/18
STEPS TO BE FOLLOWED DURING DESIGN
ROAD AND STRUCTURE INVENTORY
GEOTECHNICAL TESTING
TRAFFIC STUDIES
SETTING UP OF CONTROL POINTS
-
8/2/2019 Project Semester_amit Garg
6/18
STEPS TO BE FOLLOWED DURING DESIGN
PREPARATION OF STRIP CHART
DETAILED TOPOGRAPHICAL SURVEY
FINAL DESIGN USING THE ABOVE
RESULTS
-
8/2/2019 Project Semester_amit Garg
7/18
NH-28 (MUZAFFARPUR TO BARAUNI)
-
8/2/2019 Project Semester_amit Garg
8/18
NH-28 (MUZAFFARPUR TO BARAUNI)
The Project Road starts at Muzaffarpurfrom existing km 519.600 and ends at km627.000 .
The total length of the project is 107.4 Kmand passes through major towns of
Muzaffarpur, Dholi, Tajpur, Mushrigharari,Dalsingharai, Fateha and Teghra
-
8/2/2019 Project Semester_amit Garg
9/18
TASKS ASSIGNED TO ME
Site Engineer to supervise the Road
Inventory.
Supervising the GeotechnicalInvestigation.
Co-ordinating with the Survey team.
-
8/2/2019 Project Semester_amit Garg
10/18
SITE ENGINEER
Network Inventory: Visual Inspection andDimensional Measurement
Verification of available ROW and encroachments if
any
Consists of features like imp. road junctions,embankment height, adjacent land use pattern etc.
All measurements were made with respect to theexisting Km Stone
http://road%20inventory%20nh%2088.xlsx/http://road%20inventory%20nh%2088.xlsx/ -
8/2/2019 Project Semester_amit Garg
11/18
SITE ENGINEER
Pavement Condition: Visual Inspectionof the Quality of the road
Consists of visible deficiencies likeCracking, Potholing, Rutting, Ravelling,
Shoulder condition etc.
http://pavement%20condition.xlsx/http://pavement%20condition.xlsx/ -
8/2/2019 Project Semester_amit Garg
12/18
SOME COMMON DEFECTS
CRACKING
POTHOLES
RAVELLIN
G
PATCHIN
G
-
8/2/2019 Project Semester_amit Garg
13/18
Instruments Used:
GPS: To Establish Control Points at intervalsof about 5 Km
Auto Level: To Establish the Elevations of theControl Points with respect to the Bench Mark
Total Station: To Collect the Co-ordinates ofthe essential features along the projectcorridor
TOPOGRAPHIC SURVEY:-
-
8/2/2019 Project Semester_amit Garg
14/18
TOPOGRAPHIC SURVEY:-
GPS: Calculates its position by precisely timing
the signals sent by the satellites.
Total Station: Calculates angles, distances and
elevations with respect to the position of Total
Station.
-
8/2/2019 Project Semester_amit Garg
15/18
GEOTECHNICAL TESTING
Existing pavement thickness
Geotechnical testing of existing subgrade
Test sample from the Toe of the Embankment
Borrow Area testing
-
8/2/2019 Project Semester_amit Garg
16/18
Performed for Overlay Design
Strength measured correspondingto Deflection
IRC:81
BENKELMAN BEAM DEFLECTION TEST
-
8/2/2019 Project Semester_amit Garg
17/18
DIFFICULTIES FACED
High Embankment
Heavy traffic
Lack of Co-operation by local public
-