project sponsor: hardinge inc. team members: brian heeran (team leader) owen brown matt buonanno
DESCRIPTION
Multidisciplinary Engineering Senior Design Hardinge Universal Turret Project 05412 2005 Critical Design Review May 13, 2005. Project Sponsor: Hardinge Inc. Team Members: Brian Heeran (Team Leader) Owen Brown Matt Buonanno Eric Newcomb Steven Paul Brice Wert Robert Yarbrough. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Project Sponsor: Hardinge Inc. Team Members: Brian Heeran (Team Leader) Owen Brown Matt Buonanno](https://reader034.vdocument.in/reader034/viewer/2022051402/56815d9b550346895dcbc0aa/html5/thumbnails/1.jpg)
Multidisciplinary Engineering Senior Design
Hardinge Universal TurretProject 05412 2005 Critical Design Review
May 13, 2005
Project Sponsor: Hardinge Inc.
Team Members: Brian Heeran (Team Leader)
Owen BrownMatt BuonannoEric NewcombSteven PaulBrice Wert
Robert Yarbrough
Kate Gleason College of EngineeringRochester Institute of Technology
Team Mentor: Dr. James Taylor
![Page 2: Project Sponsor: Hardinge Inc. Team Members: Brian Heeran (Team Leader) Owen Brown Matt Buonanno](https://reader034.vdocument.in/reader034/viewer/2022051402/56815d9b550346895dcbc0aa/html5/thumbnails/2.jpg)
Slide 2 of 27
Background Information
![Page 3: Project Sponsor: Hardinge Inc. Team Members: Brian Heeran (Team Leader) Owen Brown Matt Buonanno](https://reader034.vdocument.in/reader034/viewer/2022051402/56815d9b550346895dcbc0aa/html5/thumbnails/3.jpg)
Slide 3 of 27
Senior Design 2 - Plan
• Detailed Design (3/7 – 3/28)• Iterative Problem Solving (3/29 – 4/8)• Component Fabrication (4/12 – 4/29)• Prototype Assembly (4/27 – 5/11)• Hardinge Review (5/13)
ID Task Name
1 Detailed Design2 Iterative Problem Solving3 Component Fabrication4 Prototype Assembly5 Hardinge Review
3/7 3/283/29 4/8
4/12 4/294/27 5/12
5/13 5/13
M F T S W S T M F T S W S T M F T S W S T M F T S W S T MFeb 27, '05 Mar 13, '05 Mar 27, '05 Apr 10, '05 Apr 24, '05 May 8, '05 May 22, '05 Jun 5, '05 Jun 19, '05
![Page 4: Project Sponsor: Hardinge Inc. Team Members: Brian Heeran (Team Leader) Owen Brown Matt Buonanno](https://reader034.vdocument.in/reader034/viewer/2022051402/56815d9b550346895dcbc0aa/html5/thumbnails/4.jpg)
Slide 4 of 27
Project Intent
• Sustain Hardinge Inc. as an industry leader in turret manufacturing.– New technology
• Improved reliability and flexibility of future designs.– Fewer parts– Versatile motor
![Page 5: Project Sponsor: Hardinge Inc. Team Members: Brian Heeran (Team Leader) Owen Brown Matt Buonanno](https://reader034.vdocument.in/reader034/viewer/2022051402/56815d9b550346895dcbc0aa/html5/thumbnails/5.jpg)
Slide 5 of 27
Traditional Motors vs. Torque Motors
Direct drive with torque motor
Motor
1FW3..
Gear box
Customer machine
Customer machine
Traditional drive with motor and gear box
Large outside diameter allows for more poles, and windings thus allowing for higher torques.Large diameter means higher torque can be generated with the same power input.
![Page 6: Project Sponsor: Hardinge Inc. Team Members: Brian Heeran (Team Leader) Owen Brown Matt Buonanno](https://reader034.vdocument.in/reader034/viewer/2022051402/56815d9b550346895dcbc0aa/html5/thumbnails/6.jpg)
Slide 6 of 27
Project Overview
• Project Scope:– Establish the feasibility of Torque Motor
Integration.– Design a Turret Index Model capable of being
manufactured.– Design for adequate cooling of the Torque
Motor.
![Page 7: Project Sponsor: Hardinge Inc. Team Members: Brian Heeran (Team Leader) Owen Brown Matt Buonanno](https://reader034.vdocument.in/reader034/viewer/2022051402/56815d9b550346895dcbc0aa/html5/thumbnails/7.jpg)
Slide 7 of 27
Desired Outcomes• Technical
– Include the use of a torque motor.
– Design with as few parts as possible.
– Included current top plate locking mechanism used by Hardinge in their Quest series turret.
• Performance– Equal or exceed current
industry leader performance attributes such as index time, repeatability, and static stiffness.
– Demonstrate increased reliability of assembly.
– Incorporate adequate cooling of the torque motor.
![Page 8: Project Sponsor: Hardinge Inc. Team Members: Brian Heeran (Team Leader) Owen Brown Matt Buonanno](https://reader034.vdocument.in/reader034/viewer/2022051402/56815d9b550346895dcbc0aa/html5/thumbnails/8.jpg)
Slide 8 of 27
Final Design
![Page 9: Project Sponsor: Hardinge Inc. Team Members: Brian Heeran (Team Leader) Owen Brown Matt Buonanno](https://reader034.vdocument.in/reader034/viewer/2022051402/56815d9b550346895dcbc0aa/html5/thumbnails/9.jpg)
Slide 9 of 27
Analysis of Design• Output from finite element
software based on an indexing load of 633 N-m Torque. – Max Von Mises Stress
found to be 47.3 MPa.– Yield Strength of
1018- CD steel 370 MPa.
– Factor of Safety of 7.8.
![Page 10: Project Sponsor: Hardinge Inc. Team Members: Brian Heeran (Team Leader) Owen Brown Matt Buonanno](https://reader034.vdocument.in/reader034/viewer/2022051402/56815d9b550346895dcbc0aa/html5/thumbnails/10.jpg)
Slide 10 of 27
Development of Machining Experience
• Standard Stock Sizes & Availability• Bearing Lead Time & Availability• Availability of Fasteners & Taps
– English & Metric• SHCS• Flat Head w/ Chamfer• Hex Head
![Page 11: Project Sponsor: Hardinge Inc. Team Members: Brian Heeran (Team Leader) Owen Brown Matt Buonanno](https://reader034.vdocument.in/reader034/viewer/2022051402/56815d9b550346895dcbc0aa/html5/thumbnails/11.jpg)
Slide 11 of 27
Assembly Components
• Side Walls (2x)– Supports Torque
Motor and Stator-Up Plate by securing it to the Base Plate
![Page 12: Project Sponsor: Hardinge Inc. Team Members: Brian Heeran (Team Leader) Owen Brown Matt Buonanno](https://reader034.vdocument.in/reader034/viewer/2022051402/56815d9b550346895dcbc0aa/html5/thumbnails/12.jpg)
Slide 12 of 27
Assembly Components
• Stator-Up Plate– Affixes Torque motor
and Side Walls to Base Plate
– Main Drive shaft assembly passage
![Page 13: Project Sponsor: Hardinge Inc. Team Members: Brian Heeran (Team Leader) Owen Brown Matt Buonanno](https://reader034.vdocument.in/reader034/viewer/2022051402/56815d9b550346895dcbc0aa/html5/thumbnails/13.jpg)
Slide 13 of 27
Assembly Components
• House Front– Supports part of
locking coupler, exposure to CNC Environment
![Page 14: Project Sponsor: Hardinge Inc. Team Members: Brian Heeran (Team Leader) Owen Brown Matt Buonanno](https://reader034.vdocument.in/reader034/viewer/2022051402/56815d9b550346895dcbc0aa/html5/thumbnails/14.jpg)
Slide 14 of 27
Assembly Components
• Interface Plate– Connects Top Plate
to Main Drive Shaft
![Page 15: Project Sponsor: Hardinge Inc. Team Members: Brian Heeran (Team Leader) Owen Brown Matt Buonanno](https://reader034.vdocument.in/reader034/viewer/2022051402/56815d9b550346895dcbc0aa/html5/thumbnails/15.jpg)
Slide 15 of 27
Assembly Components
• Main Drive Shaft– Shaft feature changes
for manufacturability– Location and company
with more aggressive machining capabilities than RIT
– Final determination: Hardinge Inc.
![Page 16: Project Sponsor: Hardinge Inc. Team Members: Brian Heeran (Team Leader) Owen Brown Matt Buonanno](https://reader034.vdocument.in/reader034/viewer/2022051402/56815d9b550346895dcbc0aa/html5/thumbnails/16.jpg)
Slide 16 of 27
Assembly Components
• Hydraulic Block– Supports Variable
Axial Guide and locking coupler while including potential expandability features for Hardinge Inc.
![Page 17: Project Sponsor: Hardinge Inc. Team Members: Brian Heeran (Team Leader) Owen Brown Matt Buonanno](https://reader034.vdocument.in/reader034/viewer/2022051402/56815d9b550346895dcbc0aa/html5/thumbnails/17.jpg)
Slide 17 of 27
Assembly Components
• Variable Axial Guide– Locates within
Hydraulic Block– Provides bearing
surface, bearing retaining attributes and centricity control for Main Drive Shaft
![Page 18: Project Sponsor: Hardinge Inc. Team Members: Brian Heeran (Team Leader) Owen Brown Matt Buonanno](https://reader034.vdocument.in/reader034/viewer/2022051402/56815d9b550346895dcbc0aa/html5/thumbnails/18.jpg)
Slide 18 of 27
Assembly Components
• Bearing Block (Upper & Lower)– Second major
bearing surface in line with Variable Axial Guide
![Page 19: Project Sponsor: Hardinge Inc. Team Members: Brian Heeran (Team Leader) Owen Brown Matt Buonanno](https://reader034.vdocument.in/reader034/viewer/2022051402/56815d9b550346895dcbc0aa/html5/thumbnails/19.jpg)
Slide 19 of 27
Final Assembly
![Page 20: Project Sponsor: Hardinge Inc. Team Members: Brian Heeran (Team Leader) Owen Brown Matt Buonanno](https://reader034.vdocument.in/reader034/viewer/2022051402/56815d9b550346895dcbc0aa/html5/thumbnails/20.jpg)
Slide 20 of 27
Torque Motor Implementation
• Powering– Etel Inc. high voltage motor driver
• Encoding– Sick/Stegmann incremental encoder
• Thermal Overload Protection– Analog and Digital sensors within Stator,
providing temperature feedback
![Page 21: Project Sponsor: Hardinge Inc. Team Members: Brian Heeran (Team Leader) Owen Brown Matt Buonanno](https://reader034.vdocument.in/reader034/viewer/2022051402/56815d9b550346895dcbc0aa/html5/thumbnails/21.jpg)
Slide 21 of 27
Torque Motor Cooling
• Max power produced: 1000 W (approx)• Cooling options
– Ventilation slots• Simple, inexpensive• Slots placed in base and top of housing
– Small AC powered fans• Fans mounted on top of housing
![Page 22: Project Sponsor: Hardinge Inc. Team Members: Brian Heeran (Team Leader) Owen Brown Matt Buonanno](https://reader034.vdocument.in/reader034/viewer/2022051402/56815d9b550346895dcbc0aa/html5/thumbnails/22.jpg)
Slide 22 of 27
Torque Motor Cooling
• Further Options– Custom heat pipes
• Expensive• Decreased reliability
– Cooling sleeve• Extremely Expensive• Electron Channel Technology
![Page 23: Project Sponsor: Hardinge Inc. Team Members: Brian Heeran (Team Leader) Owen Brown Matt Buonanno](https://reader034.vdocument.in/reader034/viewer/2022051402/56815d9b550346895dcbc0aa/html5/thumbnails/23.jpg)
Slide 23 of 27
Outcomes• Desired
– Preparation for pilot builds.
• Detailed Drawings• Machining• Cooling• Torque Motor Integration
• Actual – Completed prototype
assembly.– Further completed
formal documentation for use by project sponsor for future builds and testing.
![Page 24: Project Sponsor: Hardinge Inc. Team Members: Brian Heeran (Team Leader) Owen Brown Matt Buonanno](https://reader034.vdocument.in/reader034/viewer/2022051402/56815d9b550346895dcbc0aa/html5/thumbnails/24.jpg)
Slide 24 of 27
Recommendations for Project Sponsor
• Develop detailed testing procedures for:– Cooling– Variable Tool load Conditions– Worst Case Scenarios– Stiffness
• Investigate inverse torque motor operation (switching stator & rotor orientation).
![Page 25: Project Sponsor: Hardinge Inc. Team Members: Brian Heeran (Team Leader) Owen Brown Matt Buonanno](https://reader034.vdocument.in/reader034/viewer/2022051402/56815d9b550346895dcbc0aa/html5/thumbnails/25.jpg)
Slide 25 of 27
Conclusions
• The project culminated with:– An assembled prototype.– Investigated cooling options.– Project poised for future investigations.
![Page 26: Project Sponsor: Hardinge Inc. Team Members: Brian Heeran (Team Leader) Owen Brown Matt Buonanno](https://reader034.vdocument.in/reader034/viewer/2022051402/56815d9b550346895dcbc0aa/html5/thumbnails/26.jpg)
Slide 26 of 27
Acknowledgements
• Special Thanks to:– Dr. James Taylor (Faculty Mentor)– Dr. Jacquie Mozrall (Faculty Coordinator)– Mr. John Bonzo (ISE Facilities Manager)– Mr. Dave Hathaway (ME Facilities Manager)– Mr. Rob Kraynik (Senior Mechanical Technician)– Mr. Steve Kosciol (Senior Mechanical Technician)