    PROJECT TO MANUFACTURE LPG TUBEFOR AIR COMPRESSOR / LPG TUBE/ WATERPIPE (LOW VOLUME HOSE)

    Project to manufacture LPG tube for air compressor / LPG Tube/

    Water pipe (Low volume Hose), Diesel pipe etc. Project for only

    G.I. wire. Braided Rubber Tube. Raw material for project i.e.

    Rubber Tube different inner/outer diameter is available early in

    Rubber Tube mfg. Co. & G.I. wire or if required polyester coated

    yarn is also available very easily.

    MARKET ;For sale of finish product G.I. wire braided rubber tube there isopen market in Delhi (Ajmeri Gate at least 20 big traders),

    Mumbai(Nagdevi Street), Chennai, Kanpur, lucknow, banglore,

    Rajkot and everywhere. Generator, gas tube trader are using bulk

    quantity of G.I. Braided tube. If we start crimping and end fitting

    of Rubber Braided cut pieces we can sale directly to manufacturer

    of machine i.e. generator or other machine using diesel/ gas

    pipeline

    TECHNICAL KNOW HOW FOR PLANT AND

    MACHINERYMachinery for braiding G.I. wire on rubber tube is easily available

    on order to special purpose machine manufacturer in India or can

    be imported if required. Operator to operate braiding machine can

    be trained within one day so no labour or technical problem is

    there to run the plant smoothly.

    LAND AND BUILDINGCovered area for 15 Braiding Machine and 3 bobbin winding

    machine is required 300 sq meters and power 35 KW 3 phase

    electrical power .

  • 8/3/2019 Project to Manufacture LPG Tube for Air Compressor

    2/3

    On rent available approx. 25000/- per month

    COST OF PLANT AND MACHINERY

    Total 17,00,000

    RAW MATERIAL FOR 1 MONTHRubber tube 15 ton X 45,000/- = 6,75,000

    G.I. wire 15 ton X 85,000/- = 12,75,000

    Total 19,50,000

    MONTHLY EXPENSES1 Rent of shed 25,000/-

    2 power bill 35 KW 20,000/-

    3 A Skilled operator 2 X 8,000 = 16,000

    B Helper 4 X 6,000 = 24,000/-

    C Office assistant 2 X 8,000 = 16,000/-

    4 Sales expenses 2,000 per ton X 30 = 60,000

    5 Misc. expenses 10,000

    Total 1,71,000

    1 Braiding Machine 24 spindle vertical type 133

    mm spur gear diameter with drum motor 2hp

    starter and gear box etc. complete 15 no.

    1,05,000 X

    15=15,75,000

    2 Bobbin winder with motor 20,000 X 3 =

    60,000

    3 Electrification of plant 40,000

    4 Office furniture etc. 20,000

    5 Misc. expenses 5,000

  • 8/3/2019 Project to Manufacture LPG Tube for Air Compressor

    3/3

    Per month sale price of 30 ton braided tube 85,000 X 30 ton =

    25,50,000

    Total manufacturing cost of 30 ton braided tube1 Raw material 19,50,000/-

    2 Monthly expenses 1,71,000/-

    3 Cartage for 30 ton 60,000/-

    Total 21,81,000

    Profit = sale price cost price25,50,000-21,81,000

    = 3,69,000

    Interest of 36,50,000 Capital invested plant and material @ 14 %

    annually=42,583 monthly

    Say 45,000Net profit 3,69,000-45,000= 3,24,000/-