project transportation impacts 051319 final · 2019-05-13 · lori kaczka 801.581.3756 astrid...
TRANSCRIPT
UHC Rehab Hospital (21601)July 2018-August 2019Mike Wessman
1
2
4
May 2019-August 2019
February 2019-August 2020
June 2016-August 2019
Krin Kirajas
Harry Corsi
University Union BusTerminal (22283)
Huntsman Cancer Institute Proton Therapy (22195)
UHC Ambulatory CareComplex (21946)
Updated: 05/13/2019
Project Transportation ImpactsSouth Campus Housing andDining Building (22034)November 2018-June 2020Lori KaczkaWasatch Drive RoadRebuild Phase I (22147)May 2018-May 2019Astrid ParedesWasatch Drive RoadRebuild Phase II (22147)May 2019-August 2019Astrid Paredes
September 2018-May 2019Mark Grabl
June 2018-August 2019Astrid Paredes
May 2019-August 2019Astrid Paredes
May 2019-August 2019Astrid Paredes
Astrid Paredes
SW Chiller Plant DistributionExpansion (22174)January 2019-May 2019Jon Jefferson
N
HTW Repair (22252)May 2019-July 2019Brett Petersen
Lorem ipsum
1
Limited Wasatch Drive road impacts
Alternating one-way trafficon North Medical Drive
2 Lot 22 and partialsidewalk closure
3A
3B
3A Roadway and sidewalk reroutingduring roundabout construction
5
North portion of Lot 24 and north access road permanently closed
East Portion of Lot 24 closed and limitedStudent Life Way road impacts (late summer)
4
Lot 27 partially open for parking, EBC portionunder construction Apr-Aug.5
6
6
3B
7
New sidewalk7
Union bus layover improvements8
8
9
10
9
10
21 parking stalls in Lot 66 closed, BST trail detour
Medical Center Parking Terrace access only via south ramp, east ramp closed
Soccer/LaCrosse Field andStadium (22085)
Wasatch East ParkingLot (22179)
HPER Mall Playfield andStormwater (22177)
Mario Capecchi DriveSidewalk (22018)
South Fieldhouse sidewalk closed,partial road impacts
11
11
For additional project information please contact:
Mike Wessman 801.585.5775 Lori Kaczka 801.581.3756 Astrid Paredes 801.581.7580 Mark Grable 801.581.6093 Krin Kirijas 801.213.2836 Harry Corsi 801.581.5933 Jon Jefferson 801.581.3259 Brett Petersen 801.581.8083
12
12 Campus Center Drive closure,detour via Central Garage