PROJECT FILE INDEXS. NoItem DescriptionPage No
1 Schedule issued by the Principal
2 Project description report prepared by the faculty
3 Registration Performa
4 Abstract
5 Identification of Training Requirement
6 Conduct or Training
7 Requirement document
8 Presentation 1 Hard copy
9 first three chapters of Draft Project Report (Ref. 4 (C ) of SOP) edited by internal Guide
10 Design Specification
11 Presentation 2 Hard copy
12 Chapter 4 and 5 of Draft Project Report edited by internal Guide
13 Chapter 6 and 7 of Draft Project Report edited by internal Guide
14 Final Project Report
15 Record of meeting with Internal Guide as per format A
16 Weekly Progress Report as per format B
17 Task Report as per format C
18 Report of Internal Guide visit to Industry for External Project
19 Conversion of project work into paper
MLR INSTITUTE OF TECHNOLOGYLaxma Reddy Avenue, Dundigal, Quthbullapur (M), Hyderabad 500043FINAL YEAR PROJECT WORK
(Batch 2011-2015)Branch:Aeronautical Engineering
Batch : 2012-16Project Title:
Internal Guide:
GP No.:
Roll No.: Records of meeting with Internal Guide
DateRoll Nos Present / AbsentSign of Internal GuideSign of HOD
MLR INSTITUTE OF TECHNOLOGYLaxma Reddy Avenue, Dundigal, Quthbullapur (M), Hyderabad 500043FINAL YEAR PROJECT WORK
(Batch 2012-2016)Branch:Aeronautical Engineering
Batch : 2012-16Project Title:
Internal Guide: GP No.:
Roll No.: Weekly Project Assessment
Week NoActivity ScheduledWork Progress% completionSign of Internal GuideSign of HOD
MLR INSTITUTE OF TECHNOLOGYLaxma Reddy Avenue, Dundigal, Quthbullapur (M), Hyderabad 500043FINAL YEAR PROJECT WORK
((Batch 2012-16)Branch:Aeronautical Engineering
Batch : 2012-16Project Title:
Internal Guide: GP No.:
Roll No.: Task report
Week No.DateTask DescriptionTarget DateComplete Date
MINI PROJECT WORK
(Batch 2015-16)
Department
of
Aeronautical engineering
Name of the Team Guide:
Designation:
ABSTRACT
NAME OF THE TEAM MEMBERS
1.________________Ht.No: __________
2.________________Ht.No: ___________
3.________________ Ht.No: ___________
TEAM / GROUP NO:
Identification of training requirements
Presentation-1
Hard copy
Design specification
Presentation-2
Hard copy
Chapter 4 & 5 draft project report edited by internal guide
Records of meeting with internal guide
Weekly progress report
Task report
Report of internal guide visit to industry for external project
Conduct or training
Requirements Documents
Chapters 1, 2 &3 draft project report edited by internal guide
Chapter 6 &7 draft project report edited by internal guide
Final Project report
Conversion of project work into paper
Format A
Format B
Format C
Project schedule
Project description report
Registration performa