promeec 3 projects for 2006-2007 - achievement and future plan – asean ee&c ssn
DESCRIPTION
ECCJ. PROMEEC 3 Projects for 2006-2007 - Achievement and Future Plan – ASEAN EE&C SSN. June 6, 2007 Yoshitaka Ushio General Manager, International Engineering Dept. The Energy Conservation Center, Japan. ECCJ. Confirmation of Target and Basic Approach for Phase - 2. ECCJ. - PowerPoint PPT PresentationTRANSCRIPT
The Energy conservation Center Japan
PROMEEC 3 Projects for 2006-2007 - Achievement and Future Plan –
ASEAN EE&C SSN
June 6, 2007
Yoshitaka UshioGeneral Manager, International Engineering Dept.
The Energy Conservation Center, Japan
ECCJECCJ
2
The Energy conservation Center Japan
1. Confirmation of Target and Basic Approach for Phase - 2
ECCJECCJ
3
The Energy conservation Center Japan
Importance of Self Effort
ECCJECCJTime
LearningFrom ECCJ
UnexpectedConditions
Various C
hanges
Energy Situations
Economy
Policy
Energy / B
usiness
Market
Sustainable BasisTo Be Built By
“Continued SELF EFFORT”Le
vel o
f c
apa
bili
ty t
o P
rom
ote
EE
&C
Phase - 1 Phase - 2
4
The Energy conservation Center Japan
Target for Phase - 2Effective Digestion and Ensured Sustainability to
Implement / Disseminate What ASEAN Learned
ECCJECCJ
1. Enhanced OJT Based on(1) Well Organized Local Core Team for Survey / Energy Audit / Seminar (2) Better Preparation for Survey / Energy Audit(3) Preparatory Activities (Pre-survey, etc.)
2. Preparation of Tools for Implementation(1) Accumulation of Achievements / Experiences (2) Standardized Data, Information and Guideline(3) Easier Access and User-friendliness
3. Effective & Harmonized Inter-Project Activities
5
The Energy conservation Center Japan
Member Status
Focal Point & ACE Leader with
ACE to coordinate
Available Local* Expert
ECCJ
Assistance
Phase – 2 : Formation to Implement Local Activities Based on “Enhanced OJT”
FutureCore Team
ForImplementation &
Dissemination
(*) “Local” means “National” and/or “Regional “.
Basic Required Scheme for Site Activities withFlexible Assistance by ECCJ
ECCJECCJ
6
The Energy conservation Center Japan
“ASEAN Energy Management System” Developing to Sustain Phase-2 Activity
Sustainable System Provision of Tools& Information for E.M.
Achievement and Experience BasedProject Activities
Regist.Experts
ECCJECCJ
InformationService
AdvisoryService
TrainingService
“ASEAN EnergyManagement System”
Coordination
Campaign/Award System
EnergyAuditOne-Stop
to System
ECCJECCJ
ASEANCustomers
ASEAN Network ofCooperators
7
The Energy conservation Center Japan
2. Achievement in 2006 - 2007
8
The Energy conservation Center Japan
Project Team of ECCJ
Mr. T. Nuibe
Major IndustriesMr. T. Kawase (L)Mr. H. Tanaka (L)Mr. K. TakedaMr. F. Ogawa *
BuildingsMr. Y. Ushio (L)Mr. A. Kobayashi**Mr. H. Amano
Energy ManagementMr. K. Yoshida (L)Mr. T. SatoMr. F. Ogawa *Mr. A. Kobayashi**
CoordinationK. Yoshida
9
The Energy conservation Center Japan
Country Lao PDR Thailand Myanmar
Industrial Sub-sector
Cement (2) Iron & Steel (1) Oil Refinery (1)
Cement (1)
Focal Point
Local Expert 24 Participants
With Ptm & ACE
17 Participants
With ACE
14 participants
With Ptm & ACE
ECCJ
Features of Activities
Concentrated on “Cement
Ind.”
Concentrated on “Steel Ind.”
Follow-up (Oil Refinery) &
“Cement Ind.”
Actual Team Formation & Features- Major Industries for 2006 – 2007 -
ECCJECCJ
10
The Energy conservation Center Japan
ECCJECCJ
Host Country + ASEAN + ACE + ECCJ = TotalCountry
Seminar-Workshop
Brunei
Indonesia
Cambodia
Philippines
Thailand
Lao PDR
Myanmar
49 + 5 + 2 + 3 = 60
41 + 4 + 2 + 3 = 50
49 + 3 + 2 + 3 = 57
92 + 3 + 2 + 3 = 100
52 + 4 + 1 + 3 = 60
48 + 4 + 5 + 3 = 60
34 + 3 + 1 + 3 = 41
Summary of Seminar-WorkshopSummary of Seminar-Workshop
2006Ave. = 56
2005Ave. = 65
Numbers of Seminar Participants, 2005 & 2006
11
The Energy conservation Center Japan
ECCJECCJ
Presentation Items from ASEAN Countries
Cement Ind.
IndustryCountry EE&C Activities
MalaysiaIron/Steel Ind
Thailand
Lao PDR Hydro-power Same presentation done in 2005
General
2-stg recuperator, VSD for water pump, Screw air compressor
Overview of MIEEIP project (PTM), Food, Glass, Textile, Iron/Steel
Philippines
Food Ind.
Iron/Steel Ind
Vietnam
Indonesia
Myanmar
Cement Ind.
Ceramics Ind
Iron/Steel Ind.Pulp/Paper Ind.
Oil Refining
Iron/Steel Ind
Same presentation done in 2005
VRM, 5-stg NSP, Damper→VSD, Process A/M, Air leak repair (Kiln), O2 meter for Air leak, Air press 7Bar→6.8
Insulation, cond.recovery, steam leak, Solenoid valves, etc
Daylight, cooling tower fan blade, air compressor replace, etc
Slab preheat, slab hot charge, billet insulation cover, etc
Same presentation done in 2004
Same presentation done in 2004
Lower tower pressure, tower off gas recovery
12
The Energy conservation Center Japan
Country Brunei Darussalam
Philippines Vietnam
Building Category
Hotel (1)
Office (1)
Office (2) Hospital (1)
Supermarket (1)
Focal Point
Local Expert 20 Participants
With ACE
11 Participants
With ACE
15 Participants
With ACE
ECCJ
Features of Activities
Great Progress in Improvement
Pre-Audit by DOE
Pre-Audit by ECC-HCC
Actual Team Formation & Features- Buildings for 2006 – 2007 -
ECCJECCJ
13
The Energy conservation Center Japan
Seminar-Workshop (1) Number of the Participants
Brunei Philippines Vietnam
Date of S-W 2006.9.09 2006.10.11 2006.11.09
Number of Participants
60 60 85
No. of Presentation by Host Countries
2 3 1
No. of Presentation by Other ASEAN
4 4 3
No. of Presentation by ECCJ & ACE
4 4 4ECCJECCJ
14
The Energy conservation Center Japan
Seminar-Workshop Presentations by the Guests from ASEAN
ECCJECCJ Thank you very much for the supports
15
The Energy conservation Center Japan
Country
Activity
BD CM ID LP ML MY PH SP TH VN
Intensive Seminar-Workshop
42 28 57 38 46 26 30
Visits to Factories & Buildings etc.
3 4 3 4 2 2 4
Activities for Award System
1st BOJ (EM) 1 1 1 1 1 1 1 1 1
Research Forum in Japan
1 1 1 1 1 1 1 1 1
Actual Activities & Number of Participants and Visits to Companies
- Energy Management for 2006 – 2007 -
ECCJECCJ
16
The Energy conservation Center Japan
Actual Schedule of PROMEEC for2006 – 2007 (3 Projects) (As of Feb. 27, 2007)
ECCJECCJ
Project / Activities 2006 2007 RemarksApril May June July August September October November December January February March
(Overall)A. Development of Detailed Project Plans / Preparatory WorkB. Contract with ACEC. Inception WorkshopD. Implantation of ProjectsE. Post WorkshopF. Preparation of Report
(3-Project Management)
(1) Planning / Preparation / Evaluation(2) Coordination Meeting in Indonesia or Japan(3) Inception Workshop 2/27-2/28 3/14-3/16
(4) Post Workshop 7/6&7/7
1. PROMEEC (Major Industries)Lao PDR
(1) Preparation : Detailed Plan / Arrangement for 1st Site Activity Myanmar(2) 1st Site Activity (Follow-up Survey (1) / Local Workshop (1)) 10/2 10/6 Thailand(3) 2nd Site Activity (Follow-up Survey (2) / Local Workshop (2)) Lao PDR 11/13 11/25 2/27-2/28
(4) Summary and Post Workshop Thailand
(5) Preparation of Report Myanmar
2. PROMEEC (Buildings)Brunei Darussalam
(1) Preparation : Detailed Plan / Arrangement for 1st Site Activity Philippines(2) 1st Site Activity (Follow-up Survey (1) / Local Workshop (1)) BOJ(5/23&24) 9/4 9/9 10/9 10/13 Vietnam(3) 2nd Site Activity (Follow-up Survey (2) / Local Workshop (2)) Lao PDR Brunei Phlippines 11/6-11/10 2/27-2/28
(4) Summary and Post Workshop Vietnam
(5) Preparation of Report
3. PROMEEC (Energy Management)Brunei Darussalam
(1) Preparation : Detailed Plan / Arrangement for 1st Site Activity Cambpdia(2) 1st Site Activity (Intensive Workshop, etc.) (1) 9/11 9/22 Malaysia/Phlippines/Brunei/Indonesia Indonesia(3) 2nd Site Activity (Intensive Workshop, etc.) (2) Cambodia/Lao PDR/Vietnam 11/20 12/1 Lao PDR(4) 1st BOJ on Award System Malaysia(5) 2nd Research Forum in Japan on Award System Hanoi (9/20-21) 2/27-2/28 Philippines(6) Summary and Post Workshop 12/12-12/14 Vietnam(7) Preparation of Report
(Nomination of BOJ Members for Award System) (9 countries)
ASEAN Award System of Best Practice in E.M.
17
The Energy conservation Center Japan
Summary of Achievement in 2006 – 2007 (1)
1. Main SuccessSuccessful Progress in Local Activities Based on Organized
Local Team with Their Efforts and in Preparation of Tools for Energy Management
(1) Teams Consisted of National & Regional Engineers(2) Pre-Audit in Building Project(3) Actual Improvements Realizing in Factories and Buildings
Energy-Audited in The Past(3) Preparation of Tools for E.M. with The Target to Establish
“ASEAN E.M. System”(4) Start-up The 1st ASEAN Award of Best Practices in Energy
Management
ECCJECCJ
18
The Energy conservation Center Japan
Summary of Achievement in 2006 – 2007 (2)
2. Required Future Improvement IdentifiedEnsured basis of actual implementation through the following
with some specific targets(1) Further enhance OJT in site Activities with more
involvement of local persons(2) Deepen understanding of process principle for industries(3) Proceed with in-depth analyses having wider viewpoints
based understanding of the concept on environmentally friendly sustainable buildings
(4) Introduce training & workshop to disseminate / improve In-
house Database and Technical Directory
ECCJECCJ
19
The Energy conservation Center Japan
3. Proposed Future Plans after 2007
ECCJECCJ
20
The Energy conservation Center Japan
ECCJECCJ
1. Follow-up survey / Energy Audit / Workshop under Enhanced OJT at 3 Countries (max):
(Purpose) Enhanced implementation & dissemination of improvements
Country A - Industry 1
Country B - Industry 2 Country C - Industry 3 - One country one industry. Audit place should be conveniently
within or near the capital city for saving of time. - Industry is to be proposed, but preferably selected from rather
light industry, for example, textile, food, ceramics and plastics.
2. Preparation of “Technical Directory for major industry” (with ECCJ/ACE – EE&C-SSN)
- Successful cases resulted from PROMEEC activities should be registered.
PROMEEC (Major Industries)Proposed Activities in 2007-2008 (1)
21
The Energy conservation Center Japan
ECCJECCJ
2. Preparation of “Technical Directory for major industry” (continued)
- Revise web-page so that readers can access more easily to the subjects.
Expansion with Inputs from PROMEEC activities and from Invited “Technology Suppliers”
3. Discussion and study to develop In-house Database including Benchmark / Guideline for individual industries
- Strengthen PR activity on every opportunity so as to make industry recognize a significance of DB/BM/GLthrough Training / Workshop for Participants of Activities
PROMEEC (Major Industries)Proposed Activities in 2007-2008 (2)
22
The Energy conservation Center Japan
1. Follow-up Survey / Additional Energy Audit in 4 ASEAN Countries (Singapore and other 3 countries)
- OJT for the local engineers (More involvement of the local engineers and giving the opportunity for the engineers from other ASEAN countries to join the audits)
- Identification of the present energy consumption and their own benchmark (Target)
- Identification of the barriers and the actual implemented measures recommended by their own team or the Japanese experts through the energy audit
- Recommendations for EE & C - Identification of Barrier and Measures <Each country to propose how to implement these activities or the other
alternatives> 2. Local Seminar-Workshop for dissemination in Singapore and other 3
countries (Inviting the presenters from the host Country (at least 2 successful cases) and other ASEAN Countries (4 cases))
ECCJECCJ
PROMEEC (Buildings)Proposed Activities in 2007-2008 (1)
23
The Energy conservation Center Japan
3. Development of Technical Directory by all the ASEAN countries(Previous PROMEEC audit results, the information and data from the ASEAN Energy Award, etc.) including information from Invited “Technology Suppliers”
4. Improvement / Utilization of In-house Database / Benchmark / Guideline for Building by all the ASEAN countries (Previous PROMEEC audit results, the information and data from the ASEAN Energy Award, etc.)
5. Continued Joint Activities with “ASEAN Benchmarking”
6. Continued activities for the support to the evaluation by BOJ for ASEAN EE & C Award System of Best Practice and Energy Management for Buildings
ECCJECCJ
PROMEEC (Buildings)Proposed Activities in 2007-2008 (2)
24
The Energy conservation Center Japan
Basic Direction of Activities(1) Smooth Operation of “ASEAN Award System of Best
Practices in Energy Management for Industries and Buildings
(2) Start-up The System to Utilize The Existing Implementing Organizations
(3) Preparation / Development of Handbooks and Directories as Follows
1) “Energy Management Handbook” (Completion) 2) Preparation for Trial Use of The E.M. Handbook with In-
House Database and Technical Directory at Cooperation Factories and Buildings
3) Development of e-Directory and Other Handbooks(4) Preparation of One-Stop Guidance, etc.
ECCJECCJ
PROMEEC (Energy Management)Proposed Activities in 2007-2008 (1)
25
The Energy conservation Center Japan
The Following Activities at 6 Countries (Max.)1. Intensive Seminar-Workshop(1) Introduce and Discuss Functions / Programs of “ASEAN E.M.
System” with Training and Advice to Utilize Tools(2) Encourage Participants to Join Programs / Activities of
PROMEEC and “PROMEEC Family Network” 2. Visit to Factories and Buildings(1) Same Purpose as Item 1(2) Advice on Trial Use of E.M. Handbook or Follow-up at Awarded
Companies3. Research Forum in Japan(1) Improvement in Operation and Evaluation Guideline of The
Award System by Analyses of Results of The 1st Competition(2) Improvement in Functions, Programs and System of “ASEAN
E.M. System” Considering User-friendliness
ECCJECCJ
PROMEEC (Energy Management)Proposed Activities in 2007-2008 (2)
26
The Energy conservation Center Japan
Proposed Procedures & Conditions to Apply to the Countries for Local ActivitiesPurposeTo ensure the Building Local Core Teams for enhanced implementation and dissemination of the activities in future
Proposed Procedures as Follows1. Proposal by Focal Points with Requests for - Specific Project(s), and - Specific Industries (Major Industries), or - Specific Buildings (Buildings)2. The proposal to be submitted to ACE until May 31st,
2007 (with clarification of requests and compliance with PROMEEC required Conditions)
ECCJECCJ
27
The Energy conservation Center Japan
Required Conditions to Call Application of Countries for Local Activities
ECCJECCJ
Proposed Procedures as Follows (Continued)3. Selection of the countries & project categories) (Avoid to select the same country & project as
implemented in 2006 – 2007 for Major Industries and Buildings)
4. Discussion/Finalization (Inception Workshop)
Required Conditions for Proposal1. Ensured Organization of Local Core Teams - With clarification of the expected organization and roles of core Members - Local restrictions to discuss, if any2. Ensured Preparation for Follow-up Survey / Energy Audit and Seminar-Workshop
28
The Energy conservation Center Japan
Basic Plan and Schedule of PROMEECfor 2007 – 2008 (3 Projects)
ECCJECCJ
Project / Activities 2007 2008 RemarksApril May June July August September October November December January February March
(Overall)A. Development of Detailed Project Plans / Preparatory WorkB. Contract with ACEC. Preparation to Start ProjectsD. Inception WorkshopE. Implantation of ProjectsF. Post WorkshopG. Preparation of Report
(3-Project Management)
(1) Planning / Preparation / Evaluation(2) Coordination Meeting in Indonesia or Japan(3) Inception Workshop(4) Post Workshop
1. PROMEEC (Major Industries)
(1)
(2)
(3)
(4)(5)
2. PROMEEC (Buildings)
(1)
(2) (Ceremony)* ( ) ( ) * AMEM
(3)
(4)
(5)(6)
3. PROMEEC (Energy Management)
(1)
(2) (Ceremony)* ( ) ( ) * AMEM
(3)
(4)
(5)
(6)(7)
3rd Site Activity (Summary&Post Workshop)Preparation of Report
BOJ for Award System (Energy Management)1st Site Activities (Intensive Seminar-Workshop / Visits toCompanies)2nd Site Activities (Intensive Seminar-Workshop / Visitsto Companies)Research Forum in JP (Improvement in Award System /ASEAN EM System)
2nd Site Activity (Follow-up Survey & Audit / LocalWorkshop)3rd Site Activity (Summary&Post Workshop)Preparation of Report
Develop Detailed Plan / Arrange for Site Activity / DevelopSystem & Handbooks
Preparation of Report
Develop Detailed Plan, In-house DB/BM/GL / Arrange forSite ActivityBOJ for Award System (Buildings)1st Site Activity (Follow-up Survey & Audit / LocalWorkshop)
Develop Detailed Plan, In-house DB/BM/GL / Arrange forSite Activity1st Site Activity (Follow-up Survey & Audit / LocalWorkshop)2nd Site Activity (Follow-up Survey & Audit / LocalWorkshop)3rd Site Activity (Summary&Post Workshop)
29
The Energy conservation Center Japan
The Second East Asia Summit was convened in Cebu, the Philippines, on January 15, 2007
1. Promotion of Energy Efficiency and Conservation - Receive 1,000 trainees and dispatch 500 experts in five years. - Establish Asia Energy Conservation Collaboration Center.- Make full use of yen loan and JBIC loan facility.2. Promotion of Biomass Energy
3. Clean Use of Coal
4. Eradication of Energy Poverty
Japan’s initiative entitled ”Fueling Asia –Japan’s Cooperation Initiative for Clean Energy and Sustainable Growth” proposed by Prime Minister Abe
30
The Energy conservation Center Japan
Asia Energy Efficiency and Conservation Collaboration Center
Asia Energy Efficiency and Conservation Collaboration Center contributes to promoting the efficiency use of energy in Asian counties through international cooperation on information service and One-stop window service for a variety of inquiries related to energy efficiency and conservation.
Contact Us : http://www.asiaeec-col.eccj.or.jp/
31
The Energy conservation Center Japan
The Energy Conservation Center, JapanThe Energy Conservation Center, Japan
Thank You Very Much
New !! http://www.eccj.or.jp (“English” – “Reference”)Reports & Useful Tools developed through ECCJ’sInternational Cooperation