property/building maintenance · steel 120.31 126.79 6.48 5% ... concrete batching 1% plastic...
TRANSCRIPT
![Page 1: Property/building maintenance · Steel 120.31 126.79 6.48 5% ... Concrete batching 1% Plastic product manufacturing 1% Chemical storage 7% Boiler making or ... Councillors 15/03/08](https://reader035.vdocument.in/reader035/viewer/2022071214/6042f36bfc384029b86cca08/html5/thumbnails/1.jpg)
68
Mackay Regional Council Annual Report 2008 - 2009 69
Property/building maintenance
Building Maintenance Requests Received
Building maintenance requests received
Libraries 7%
Community halls 12%
Administration buildings 32%
Anciliary buildings 12%
Other buildings 14%
Community housing 23%
7
46 51 58 62
88103
121 126145
71
132126
3
25 38 3241
55 65
219
122 11984
181
124
9 5 8 9 9 10 6
3116 9 12 18
80
50
100
150
200
250
Jun-08 Jul-08 Aug-08 Sep-08 Oct-08 Nov-08 Dec-08 Jan-09 Feb-09 Mar-09 Apr-09 May-09 Jun-09
Received
Actioned
Average days
Building Maintenance Requests Received and Actioned
Building maintenance requests received and actioned
3>> Engineering Services
Capital Works Program budget 2008-09 2008/2009 budget
Urban arterial $8.738 million
LATM traffic and road safety $0.954 million
Rural roads upgrade $0.065 million
General works $2.016 million
Master drainage $7.939 million
Unspecified works $0.350 million
Shoulder treatment $1.462 million
Pavement improvements $2.818 million
Bridge replacement $2.187 million
Footpaths and bikeways $2.398 million
Boat ramps $1.044 million
Mirani and Sarina works $3.308 million
Special projects $1.066 million
Total $34.345 million
Capital Works Program
DEPARTMENTAL S
NAPSHOT
Farrellys Road water main upgrade
![Page 2: Property/building maintenance · Steel 120.31 126.79 6.48 5% ... Concrete batching 1% Plastic product manufacturing 1% Chemical storage 7% Boiler making or ... Councillors 15/03/08](https://reader035.vdocument.in/reader035/viewer/2022071214/6042f36bfc384029b86cca08/html5/thumbnails/2.jpg)
70
Mackay Regional Council Annual Report 2008 - 2009 71
Parks
Item Quantity
Toilets cleaned 32,137
Barbecues cleaned 14,456
Campers 32,178
Requests attended 1891
Requests received 2356
Requests outstanding 2302
Mowed area 27,450,209 square metres
Trees pruned 5402
Garden area serviced 38151.5 square metres
Burials at Mt Bassett 405
Burials at Mt Bassett (ashes) 61
Burials at Mackay Cemetery 31
Burials at Mackay Cemetery (ashes) 17
Burials at Walkerston Cemetery 173
Burials at Walkerston (ashes) 37
Burials at Mirani Cemetery 17
Burials at Marian Cemetery 14
Burials at Sarina Cemetery 34
ABS building approval figures for 2007/08 and 2008/09
Area 07/08 $m 08/09 $m Difference
Mackay Regional Council 488 398 18.5% decrease
Townsville City Council 1,248 862 30.9% decrease
Rockhampton Regional Council 481 262 45.6% decrease
Cairns Regional Council 868 455 47.6% decrease
4>> Mackay Water and Waste Services (formerly Commercial Services)
Waste services - kerbside collection services
Type of collection service 2007/08 2008/09 Difference
Per cent difference
Waste collection 43,532 44,416 884 2%
Recycling collection 41,558 42,243 685 2%
Kerbside recycling
Recyclable type 2007/08 2008/09 Change Per cent
Glass 554.22 588.28 34.06 6%
Paper and cardboard 4319.84 3817.27 -502.57 -12%
High-density polyethylene (HDPE) 112.01 108.09 -3.92 -3%
Polyethylene terephthalate (PET) 126.17 124.18 -1.99 -2%
Aluminum 137.02 140.26 3.24 2%
Steel 120.31 126.79 6.48 5%
Mixed plastics 173.84 171.24 -2.60 -1%
Annual Total 5543.41 5076.11 -467.30 -8%
DEPARTMENTAL S
NAPSHOT
Materials Recovery Facility at Paget
![Page 3: Property/building maintenance · Steel 120.31 126.79 6.48 5% ... Concrete batching 1% Plastic product manufacturing 1% Chemical storage 7% Boiler making or ... Councillors 15/03/08](https://reader035.vdocument.in/reader035/viewer/2022071214/6042f36bfc384029b86cca08/html5/thumbnails/3.jpg)
72
Mackay Regional Council Annual Report 2008 - 2009 73
Kerbside collection in the Mackay Regional Council areaKerbside collection in the Mackay Regional Council area
0.00
1000.00
2000.00
3000.00
4000.00
5000.00
6000.00
Tonnes Mixed plastics
Steel
Aluminium
P.E.T.
H.D.P.E.
Paper and cardboard
Glass
2007/2008 2008/2009
Green waste recycling
Green waste tonnes 2007/2008 2008/2009 Change %
Tonnes recycled 11,453 9227.05 2225.95 -19%
* There has been a significant reduction of green waste processed for recycling. Major contributing factors include recovery operations in 2008 following the February flood distorted the amount of green waste received for processing in 2007/08 and green waste generated by private businesses with their own processes does not necessarily end up at Mackay Regional Council’s facilities.
Waste received at Hogan’s Pocket landfill
MonthWaste received
in tonnes 2007/08Waste received
in tonnes 2008/09
July 6217.38 7197.06
August 6192.62 6784.82
September 5944.7 7112.38
October 6569.8 7165.08
November 6844.22 6509.72
December 6747.24 7087.29
January 6912.94 6694.04
February 7222.62 6227.5
March 7329.16 7028.78
April 7746.22 6223.11
May 7128.18 6554.4
June 6663.76 6494.23
Total 81,518.84 81,078.41
Hogan’s Pocket monthly tonnagesHogan’s Pocket Monthly Tonnages
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
Jul Sep Oct Nov Dec Jan Feb Mar May Jun
2006 - 2007
2007 - 2008
2008 - 2009
Tonnes
Aug Apr
DEPARTMENTAL S
NAPSHOT
Paget Waste Management Centre> For more information, also refer to the Mackay Water Services Annual Performance Report from page 93.
![Page 4: Property/building maintenance · Steel 120.31 126.79 6.48 5% ... Concrete batching 1% Plastic product manufacturing 1% Chemical storage 7% Boiler making or ... Councillors 15/03/08](https://reader035.vdocument.in/reader035/viewer/2022071214/6042f36bfc384029b86cca08/html5/thumbnails/4.jpg)
74
Mackay Regional Council Annual Report 2008 - 2009 75
5>> Development Services
Local laws
Number of dogs impounded and released in 2008/2009
Number of Dogs Impounded and Released
0 200 400 600 800 1000
Impounded Released
945
805
Environmental health
Health governance activities
Health Governance Activities
Skin penetration 1%
Flammable liquids 8%
Caravan parks 2%
Food 43%
Footpath dining 1%
Accommodation 6%
Swimming pools 4%
Temporary foods 15%
Vendors 1%
Outdoor events 2%
Malodours 1%
Mosquito 5%Noise 1%
Nuisances 2%Sewerage 1% Other 4%
Monthly Hectares Treated
0
1000
2000
3000
4000
5000
July Aug Sept Oct Nov Dec
0
1000
2000
3000
4000
5000
Jan Feb Mar April May Jun
2006/07
2007/08
2008/09
2006/07
2007/08
2008/09
Mosquito control
Monthly hectares treated
DEPARTMENTAL S
NAPSHOT
![Page 5: Property/building maintenance · Steel 120.31 126.79 6.48 5% ... Concrete batching 1% Plastic product manufacturing 1% Chemical storage 7% Boiler making or ... Councillors 15/03/08](https://reader035.vdocument.in/reader035/viewer/2022071214/6042f36bfc384029b86cca08/html5/thumbnails/5.jpg)
76
Mackay Regional Council Annual Report 2008 - 2009 77
Environmental protection activitiesEnvironmental Protection Activities
Concrete batching 1%
Plastic product manufacturing 1%
Chemical storage 7%
Boiler making orengineering 19%
Motor vehicle workshop 37%
Surface coating 5%
Over spray 2%
Dust 1%
Noise 3%
Water 5%
Other 4%
Metal recovery 1%
Metal forming 1%
Abrasive blasting 5%
Wooden product manufacturing 2%
Operating without an approval 2 %
Odour 3%
Pest management
Pest Management Activities
Parthenium weed 9%
Sicklepod 8%
Dingoes / Wild dogs 38%
Feral pigs 18%
Salvinia 1%
Giant rats tail grass 14%
Singapore Daisy 3%
Lantana 3%
Tobacco weed 1%
Other plants 3%
Foxes 1%Rabbits 1%
Shoal Point
![Page 6: Property/building maintenance · Steel 120.31 126.79 6.48 5% ... Concrete batching 1% Plastic product manufacturing 1% Chemical storage 7% Boiler making or ... Councillors 15/03/08](https://reader035.vdocument.in/reader035/viewer/2022071214/6042f36bfc384029b86cca08/html5/thumbnails/6.jpg)
78
Mackay Regional Council Annual Report 2008 - 2009 79
>> Policies
Borrowing policyLoans are used to fund major capital and infrastructure works so that repayments are spread over a number of years - usually the expected life of the asset. The Borrowings Policy deals with new borrowings, the purpose of the borrowings and repayment terms. Proposed borrowings and repayments are as follows:
Project 2008-2009 Loan 2009-2010 Loan 2010-2011 Loan Repayment term
General $8,365,000 $24,953,000 $30,000,000 9 to 20 years
Water $7,334,820 $7,000,000 $8,000,000 20 years
Sewerage $4,889,140 $9,350,000 - 20 years
Cleansing $430,000 $700,000 $14,500,000 15 to 20 years
Total $21,018,960 $42,003,000 $52,500,000
Purposes of borrowings The type of projects that are funded by loan borrowings are those that will not have a financial impact over a number of years. This method ensures that ratepayers are not burdened with unrealistic expenditure levels. The repayment for these capital works creates an asset for council, which can then be repaid over the years relating to the life of the asset, where appropriate.
Revenue Policy The Revenue Policy, adopted annually at the budget meeting in July, governs council’s revenue raising activities. The policy provides details on how rates are levied and explains the differential rating system that more fairly shares the burden of rates including differential categories. All water, sewerage and waste charges are based on this policy, as well as special levies, rate remissions, payments and discounts, and overheads on private work. Copies of the Revenue Policy are available from www.mackay.qld.gov.au
Special rates and chargesUnder Section 534 1 (a and e) council is required to provide details of action taken in relation to, and expenditure on, a service facility or activity - for which the local government made and levied a special rate or charge for the financial year and a summary of all rebates and concessions allowed by the local government in relation to rates.
Special Rate (City Centre Management) A Special Rate was levied on properties within the City Centre Precinct for ‘City Centre Management’. The revenue from these rates was used as core funding for the promotion, revitalisation and enhancement of the City Centre area.
Special Charge (Rural Fire Services)Where requested by a Rural Fire Brigade (or group thereof) council levies a Special Charge to provide assistance with their operations. All funds levied (less an administration charge) are paid to the relevant Rural Fire Brigade or group.
Rebates and concessions Council has five different rebates and concessions in relation to rates. These are Pensioner Rates Concession, Rates Remission for non-profit community organisations, Rates Remission - Conservation Strategy, Rates Relief Policy and Undetected Water Leak Relief. Full details of these rebates and concessions are available within the Revenue Policy from www.mackay.qld.gov.au.
Councillors’ Remuneration PolicyCouncillors’ remuneration is determined by the Local Government Remuneration Tribunal who set remuneration levels for all councils across the State. This determination is reviewed from time to time with the last review taking affect from January 1, 2009. P
OLIC
IES
Victoria Street, Mackay
![Page 7: Property/building maintenance · Steel 120.31 126.79 6.48 5% ... Concrete batching 1% Plastic product manufacturing 1% Chemical storage 7% Boiler making or ... Councillors 15/03/08](https://reader035.vdocument.in/reader035/viewer/2022071214/6042f36bfc384029b86cca08/html5/thumbnails/7.jpg)
80
Mackay Regional Council Annual Report 2008 - 2009 81
List of registers Council maintains a list of registers that are available on request. These include:
Section of the Local Government Act
Name of register
248 Register of interests (access restrictions apply)
433 Register of electoral gifts
472 Register of delegations by Local Government
846 Register of accreditations and complaints
895 Register of local laws
921 Map and register of roads
1071E Register of regulatory fees
1132 Register of delegations by the CEO
1139 Register of interests of other persons (access restrictions apply)
Sandfly Creek, Mackay
![Page 8: Property/building maintenance · Steel 120.31 126.79 6.48 5% ... Concrete batching 1% Plastic product manufacturing 1% Chemical storage 7% Boiler making or ... Councillors 15/03/08](https://reader035.vdocument.in/reader035/viewer/2022071214/6042f36bfc384029b86cca08/html5/thumbnails/8.jpg)
Mackay Regional Council Annual Report 2008 - 2009 83
82
COUNCIL
LORS’ ATTENDANCES A
ND A
LLOWANCES
>> Councillors’ attendances and allowances
Councillors’ allowances Under Section 534 (1g[i]) of the LGA, council must provide the total remuneration paid by it to each of its councillors under the remuneration schedule during the year.
Remuneration paid to councillors for the period 15/03/08 to 30/06/09
Councillors 15/03/08 to 30/06/08 01/07/08 to 30/06/09
Cr Col Meng $40,463 $155,352
Cr Darryl Camilleri $26,002 $107,260
Cr Wendy Cameron $23,471 $96,820
Cr Kevin Casey $23,471 $96,820
Cr George Christensen $23,471 $96,820
Cr Deirdre Comerford $23,471 $96,820
Cr Diane Hatfield $23,471 $96,820
Cr Karen May $23,471 $96,820
Cr David Perkins $23,471 $96,820
Cr Paul Steindl $23,471 $96,820
Cr Greg Thomsen $23,471 $96,820
Under Section 534 of the LGA, the expenses incurred by and the facilities provided to each of its councillors under the Local Government’s Expenses Reimbursement Policy during the year must be disclosed.
Superannuation contributions paid by council to councillors
Councillors Superannuation
Cr Col Meng $18,515
Cr Darryl Camilleri $15,991
Cr Wendy Cameron $14,435
Cr Kevin Casey $14,435
Cr George Christensen $14,435
Cr Deirdre Comerford $14,435
Cr Diane Hatfield -
Cr Karen May $14,435
Cr David Perkins $14,435
Cr Paul Steindl -
Cr Greg Thomsen $14,435
Councillors’ attendances Under Section 534 (1h) of the LGA, council must provide details of the number of meetings attended by each councillor during the year. These details are illustrated in the table below.
Councillors OrdinarySpecial
meetings
Cr Col Meng 37 1
Cr Darryl Camilleri 38 1
Cr Wendy Cameron 38 1
Cr Kevin Casey 38 1
Cr George Christensen 32 1
Cr Deirdre Comerford 38 1
Cr Diane Hatfield 37 1
Cr Karen May 31 1
Cr David Perkins 37 1
Cr Paul Steindl 39 1
Cr Greg Thomsen 35 1
Total council meetings for the year 39 1
![Page 9: Property/building maintenance · Steel 120.31 126.79 6.48 5% ... Concrete batching 1% Plastic product manufacturing 1% Chemical storage 7% Boiler making or ... Councillors 15/03/08](https://reader035.vdocument.in/reader035/viewer/2022071214/6042f36bfc384029b86cca08/html5/thumbnails/9.jpg)
84
Mackay Regional Council Annual Report 2008 - 2009 85
Breakdown of councillors’ expenses and reimbursements
Councillors/expenses
Professional development, conferences,
meals and accommodation
Travel and incidentals
Reimbursement of private vehicle
usageProvision
of facilities
Cr Col Meng $11,906 $4544 - $23,167
Cr Darryl Camilleri $1168 $2376 - $1912
Cr Wendy Cameron $3430 - $7983 $3126
Cr Kevin Casey $4513 $734 $5267 $1598
Cr George Christensen $2332 $1595 $1612 $3761
Cr Deirdre Comerford $2668 $1353 - $1116
Cr Diane Hatfield $2136 $1603 - $1270
Cr Karen May $4059 $571 - $2138
Cr David Perkins $4397 $556 - $2957
Cr Paul Steindl $2759 $1180 $15,296 $1674
Cr Greg Thomsen $3040 $4268 $1715 $2044
Printing and stationery - - - $3348
Councillor inductions and training workshops
$13,464 - - -
>> Councillors’ Reimbursement PolicyThe councillors’ Reimbursement Policy (as required under section 534 of the LGA) ensures accountability and transparency in the reimbursement of expenses incurred by councillors and ensures that councillors are provided with reasonable facilities to assist them in carrying out their civic duties. The policy is as follows:
Payment of expenses Expenses will be paid to a councillor through administrative processes approved by Mackay Regional Council’s Chief Executive Officer (CEO) subject to the limits outlined in this policy, or council endorsement by resolution.
Expense categories (i) Professional developmentCouncil will reimburse expenses incurred for mandatory professional development and discretionary professional development deemed essential for the councillors’ roles. The Mayor attends the Local Government Association Queensland (LGAQ), Urban Local Government Association (ULGA), Australian Local Government Association (ALGA) and any other relevant conferences/seminars/workshops as the primary delegate (council shall appoint the other delegates). Councillors can attend workshops, courses, seminars and conferences that are related to the role of a councillor. Approval to attend is made by council resolution and therefore councillors should advise the CEO of their desire to attend an event. The CEO will provide a report to council seeking approval on behalf of the councillor.
Discretionary professional developmentEach councillor can attend (at their own discretion) workshops, courses, seminars and conferences that improve the skills relevant to their role. This training is initially limited to $5000 per councillor over the current term of office, but will be reviewed annually when setting the budget. There is no requirement for a council resolution to approve these attendances, however, the councillor would need to submit a request to the CEO (prior to attendance) and provide all relevant documentation within 14 days of attending the event to ensure their expenses are reimbursed. Any professional development requiring overseas travel requires council approval.
(ii) Travel as required to represent councilCouncil will reimburse local, interstate and, in some cases, intrastate and overseas travel expenses (such as flights, motor vehicle, accommodation, meals and associated registration fees) deemed necessary to achieve the business of council where a councillor is an official representative of council and the activity/event and travel has been endorsed by resolution of council.
Council will pay for reasonable expenses incurred for overnight accommodation when a councillor is required to stay outside the Mackay Regional Council area. All councillor travel approved by council will be booked and paid for by council. This includes transfers to and from airports (eg taxis, trains and buses).
(iii) Private vehicle usage Councillors’ private vehicle usage will be reimbursed if the usage is for official council business. This includes travel to and from councillors’ principal place of residence to:
> attend official council business/meetings/functions/community events and public meetings in the role of councillor
> investigate issues/complaints regarding council services raised by residents/rate payers and visitors to the region.
Councillors making a claim for reimbursement of private vehicle usage can do so by submitting the appropriate form detailing the relevant travel based on log book details. The amount reimbursed will be based on the published Australian Tax Office business-use-of-motor-vehicle-cents-per-kilometre method, and kilometre rate applicable at the time of travel. Councillors will be provided with an appropriate log book to assist in this process. C
OUNCIL
LORS’ REIM
BURSEMENT P
OLIC
Y
![Page 10: Property/building maintenance · Steel 120.31 126.79 6.48 5% ... Concrete batching 1% Plastic product manufacturing 1% Chemical storage 7% Boiler making or ... Councillors 15/03/08](https://reader035.vdocument.in/reader035/viewer/2022071214/6042f36bfc384029b86cca08/html5/thumbnails/10.jpg)
86
Mackay Regional Council Annual Report 2008 - 2009 87
(iv) Meals Council will reimburse reasonable costs of meals for a councillor when the councillor has incurred the cost personally and the meal was not provided within the registration cost of the approved activity/event, upon production of a valid tax invoice.
(v) Incidental daily allowance An incidental daily allowance of up to $20 will be paid to councillors to cover incidental costs incurred while they are travelling and staying away from home overnight. Councillors claiming this allowance should do so on the appropriate form within 14 days of the conclusion of the event to the CEO for reimbursement.
(vi) Hospitality Councillors may have occasion to incur hospitality expenses while conducting council business apart from civic receptions organised by council. The Mayor may particularly require additional reimbursement when entertaining dignitaries outside of official events. To allow for this expense, the following amounts can be claimed: $500 per annum for councillors and up to $6000 per annum for the Mayor (based on the category assigned to council by the Local Government Remuneration Tribunal.
(vii) Accommodation Councillors may need to stay away from home overnight while attending to council business. When attending conferences, councillors should take advantage of the package provided by conference organisers (if applicable) and therefore stay in the recommended accommodation unless prior approval has been granted by the CEO. All councillor accommodation for council business will be booked and paid for by council. Suitable accommodation will be sought within a reasonable distance to the venue that the councillor is to attend. Should more than one councillor attend the same event, council will book and pay for a separate room for each attending councillor.
Provision of facilitiesCouncil will provide facilities for the use of councillors in the conduct of their respective roles with council. All facilities provided remain the property of council and must be returned when the councillor’s term expires. The facilities provided by council to councillors are to be used only for council business unless prior approval has been granted by resolution of council.
Facility categories (a) Administrative tools and access to council office amenities Councillors will be provided with the following: > suitable office space at the administration building, Gordon Street, Mackay, and council
meeting rooms for daily use
> secretarial support for Mayor and councillors located at the administration building, Gordon Street, Mackay
> desktop and/or laptop computer
> use of council landline telephone and internet access
> fax and/or scanner
> printer, photocopier, paper shredder, filing cabinet
> stationery
> hands-free mobile telecommunications device for councillors’ private vehicle
> any other administrative necessities, which council resolves are necessary to meet the business of council.
(b) Home office Council recognises that by using contemporary communication technologies (such as the internet for the electronic distribution of agendas and minutes) that some councillors would be required to travel long distances, therefore, it is necessary to provide home-office facilities to councillors. Accordingly, council will supply and pay for - an internet connection (broadband or dial-up), phone line for internet connection, fax/printer/modem and scanner suitable for connection to a council-supplied laptop - for each councillor residence. C
OUNCIL
LORS’ REIM
BURSEMENT P
OLIC
Y
(c) Maintenance costs of council-owned equipment Council is responsible for the ongoing maintenance and reasonable wear-and-tear costs of council-owned equipment that is supplied to councillors for official-business use. This includes the replacement of any facilities that fall under council’s Asset Replacement Program.
(d) Uniforms and safety equipment Council will provide to a councillor:
> uniform allowance as per staff policy
> celebration polo shirt (as issued to each Mackay Regional Council staff member as part of the normal agreed uniform of council)
> Necessary safety equipment for use on official business (eg safety helmet, boots and safety glasses).
(e) Use of council vehicles on council business Councillors will have access to a suitable council vehicle for official business. A councillor wishing to use a council vehicle for council business use must submit a request to the CEO at least two days prior, except in exceptional circumstances as determined between the councillor concerned, Mayor and CEO.
(f) Private use of council vehicles The Mayor will be provided with a fully maintained Land Cruiser Sahara (or equivalent) including all running costs provided for unlimited and unrestricted use by the Mayor for council business and private purposes in recognition of the duties required to be performed by the Mayor and the irregular hours required to attend council, community and civic responsibilities.
(g) Telecommunication needs: mobile phones Either of the following options for mobile phones shall be available to councillors:
> Mobile phone provided by council Where a councillor is provided with a mobile phone by council, all costs attributed to council-business use shall be paid by council (including total plan costs).
> Mobile phone provided by councillor When a councillor uses his/her own personal mobile phone for business use, council shall reimburse the councillor 90 per cent of the total phone account each month. This includes plan costs and actual calls made. The respective councillor is to provide the CEO with a copy of their monthly account for reimbursement. (Note: Councillors may request that council take over their number – and plan if so required – for the term of office.)
(h) Insurance cover Councillors will be covered under relevant council insurance policies while discharging civic duties. Specifically, insurance cover will be provided for public liability, professional indemnity, councillors’ liability and personal accident. Council will pay the excess for injury claims made by a councillor resulting from the conduct of official council business and on any claim made under insurance cover. Council will cover costs incurred through injury, investigation, hearings or legal proceedings into the conduct of a councillor, or arising out of (or in connection with) the councillor’s performance of his/her civic functions. If it is found the councillor breached the provisions of the Local Government Act 1993, the councillor will reimburse council with all associated costs incurred by council.
(i) Fuel costs All fuel used in a council-owned vehicle on official council business will be provided or paid for by council.
(j) Car parking amenities Council will provide councillors with car-parking spaces at all council premises, as provided for council staff. Councillors will be reimbursed for parking costs they have paid while attending to official council business (eg. secured vehicle parking at the airport).
(k) API card Councillors will become API members.
![Page 11: Property/building maintenance · Steel 120.31 126.79 6.48 5% ... Concrete batching 1% Plastic product manufacturing 1% Chemical storage 7% Boiler making or ... Councillors 15/03/08](https://reader035.vdocument.in/reader035/viewer/2022071214/6042f36bfc384029b86cca08/html5/thumbnails/11.jpg)
Mackay Regional Council Annual Report 2008 - 2009 89
88
>> Representative committeesCouncillor membership boards,
special purpose advisory committees and external committees
Committee Councillor
Affordable Housing Working Party Cr George ChristensenCr Darryl CamilleriCr Diane Hatfield
Artspace Mackay Foundation Executive Committee Cr Col Meng
Asset Management Steering Committee Cr Darryl Camilleri
Audit Advisory Committee Cr Col MengCr Darryl CamilleriCr Deirdre Comerford
Brewers Park Sportsground Committee Cr Paul Steindl
Business and Arts Connecting Communities Cr Wendy CameronCr Karen May
Coal to Coast Festival – Sarina Cr David PerkinsCr Karen May
Community Grants Advisory Committee Cr George ChristensenCr Wendy CameronCr Diane Hatfield
Crime Stoppers Cr George Christensen
DBCT Community Working Group Cr Karen MayCr Wendy Cameron
Events Precinct Steering Committee Cr Darryl Camilleri
Flood Recovery Task Force Cr Darryl Camilleri
Heritage Advisory Committee Cr Diane HatfieldCr Wendy Cameron
JCU Community Consultation Cr Darryl Camilleri
Local Area Multicultural Partnership Committee Cr George Christensen
Local Authorities Waste Management Advisory Committee Cr Greg Thomsen(Proxy - Cr Paul Steindl)
Local Disaster Management Group Cr Col MengCr Darryl CamilleriCr Karen May
Mackay Area Fish Stocking Association Cr David Perkins
Mackay Base Hospital Community Reference Group Cr Darryl Camilleri
Mackay District Disaster Management Group Cr Col Meng
REPRESENTATIV
E C
OMMIT
TEES
Sarina beaches
![Page 12: Property/building maintenance · Steel 120.31 126.79 6.48 5% ... Concrete batching 1% Plastic product manufacturing 1% Chemical storage 7% Boiler making or ... Councillors 15/03/08](https://reader035.vdocument.in/reader035/viewer/2022071214/6042f36bfc384029b86cca08/html5/thumbnails/12.jpg)
90
Mackay Regional Council Annual Report 2008 - 2009 91
Committee Councillor
Mackay Development Advisory Board Cr Col MengCr Darryl CamilleriCr David Perkins
Mackay Local Marine Advisory Committee Cr Karen May
Mackay Matsuura Sister City Advisory Committee Cr David PerkinsCr Paul Steindl
Mackay Physical Activity Reference Group Cr Paul SteindlCr Wendy Cameron
Mackay Region Boating Facilities (Qld Transport) Cr Kevin Casey
Mackay Region Economic Development Advisory Committee Cr David PerkinsCr Deirdre Comerford
Mackay Tourism Cr David Perkins
Mackay Water Recycling Project Advisory Committee Cr Col MengCr Deirdre Comerford
Mackay Sarina Coastal Project Cr Karen May
Mackay Whitsunday REDC Cr Col Meng
Mackay Whitsunday Regional Roads Group Cr Col Meng
Mobility and Access Advisory Committee Cr George Christensen
Natural Environment Advisory Committee Cr Karen MayCr Wendy CameronCr Paul Steindl
North Queensland Sports Foundation Cr Paul Steindl
Pine Islet Lighthouse Preservation Society Incorporated Cr Greg Thomsen
Pioneer Catchment and Landcare Group Inc Cr Wendy CameronCr Karen May
Pioneer River Improvement Trust Cr Kevin CaseyCr Wendy Cameron
Pioneer Valley Tourism and Development Association Cr David Perkins
Planning & Development Impact Meetings Cr Diane Hatfield
Ports Corporation Community Reference Group Cr Karen May
Rates Steering Committee Cr Darryl CamilleriCr Paul Steindl
Reef Catchments Cr Karen May
Regional Arts Development Fund Cr Karen MayCr Wendy Cameron
Reserve for Natural Resource Management (Slade Point) Cr Karen May
REPRESENTATIV
E C
OMMIT
TEES
Committee Councillor
Rural Affairs Advisory Committee Cr Wendy CameronCr Deirdre ComerfordCr George Christensen
Safe Communities Cr Diane HatfieldCr Wendy Cameron
Sarina Rural Skills Centre Management Board Cr Wendy Cameron
Sarina Community Development Committee Cr Wendy CameronCr George ChristensenCr David Perkins
Sarina Districts “Field of Dreams” Committee Cr David PerkinsCr Karen MayCr Wendy Cameron
Sarina Historical Centre Committee Cr George Christensen
Sarina Landcare Integrated Catchment Management Association Cr Karen MayCr Wendy Cameron
Sarina Meals on Wheels Cr Karen May
Sarina Primary Health Care Council Cr Karen May
Sarina Town Revitalisation Cr David PerkinsCr Karen MayCr Wendy Cameron
SARTOUR Cr David PerkinsCr Karen May
Significant Investment in Capital in Health (SICH) Cr Darryl Camilleri
Smart Housing Cr Diane HatfieldCr Deirdre ComerfordCr Darryl Camilleri
Stormwater Quality Management Committee Cr Deirdre ComerfordCr Kevin Casey
Sustainable Futures Advisory Committee Cr Karen MayCr Deirdre ComerfordCr Greg Thomsen
Sugar Shed Advisory Committee Cr David PerkinsCr Darryl CamilleriCr Karen May
Traffic, Regulated Parking and Bicycle Advisory Committee Cr Kevin CaseyCr Karen MayCr Wendy Cameron
Transport Advisory Committee Cr George ChristensenCr Karen MayCr Wendy Cameron
WHaMB ROC Cr Col Meng
WHaM Regional and Transport Planning Program Cr Col Meng (Cr Diane Hatfield as observer)
Whitsunday Hinterland & Mackay Regional Planning Advisory Committee Cr Col Meng
![Page 13: Property/building maintenance · Steel 120.31 126.79 6.48 5% ... Concrete batching 1% Plastic product manufacturing 1% Chemical storage 7% Boiler making or ... Councillors 15/03/08](https://reader035.vdocument.in/reader035/viewer/2022071214/6042f36bfc384029b86cca08/html5/thumbnails/13.jpg)
Mackay Water Services Annual Performance Report 2008 - 2009 93
Mackay Water Services
Annual Performance Report 2008 - 2009
Vision and Mission statements
VisionMackay Water Services will be an innovative water service provider which is recognised for its commercial performance, provides regional leadership, has the respect of its customers and industry regulators and prides itself on its sustainability.
MissionMackay Water Services is committed to delivering sustainable water services to the Mackay region in an efficient and commercially responsible manner.
Overview of 2008/09 financial yearMackay Water Services is a commercialised business unit of Mackay Regional Council that provides water and sewerage services to its residential, commercial and industrial customers. This business unit employs about 150 staff and has an annual budget of $87,849,727. Its operations are carried out according to the annual Performance Plan that defines council’s expectations in terms of performance, reporting, level of service and policy compliance.
The delivery of water and sewerage infrastructure increased significantly in 2008/09 compared to previous years. Highlights for the reporting year included the operational completion of the Mackay Water Recycling Project and the construction and replacement of about five kilometres of water main throughout the region.
Other achievements included:
> master plan and 10-year capital plan for water and wastewater was updated
> zero time lost or medical injury treatment required for the Alliance team (which maintains the record of zero time lost or medical injury treatment required since inception)
> Sarina Sewerage Report, master plan and modelling finalised
> Update of the Mackay Sewer Hydraulic Model progressed
> Mackay Water Recycling Project commissioned
> significant capital program delivered.
92
![Page 14: Property/building maintenance · Steel 120.31 126.79 6.48 5% ... Concrete batching 1% Plastic product manufacturing 1% Chemical storage 7% Boiler making or ... Councillors 15/03/08](https://reader035.vdocument.in/reader035/viewer/2022071214/6042f36bfc384029b86cca08/html5/thumbnails/14.jpg)
Mackay Water Services Annual Performance Report 2008 - 2009 95
Mackay Water Recycling ProjectThe $154 million Mackay Water Recycling Project (MWRP) progressed significantly during the 2008/09 financial year and reached final completion in June 2009. This project is the largest regional water reuse scheme of its type in Australia and provides significant environmental benefits for the region.
A major initiative of Mackay Regional Council, the MWRP allows 90 per cent of Mackay’s wastewater to be recycled, which also serves to protect the Great Barrier Reef. This facility provides recycled water to 7000 hectares of agricultural land in the Chelona/Homebush area in which 2000 hectares of land had been affected by salt water intrusion and a further 2000 hectares were under threat. This project was jointly funded by council, the State Government and the Federal Government (under the National Water Initiative).
Work undertaken on the MWRP during the 2008/09 financial year included:
> Mackay Regional Council put in place Recycled Water Agreements with 32 growers and each grower has prepared a Farm Recycled Water Management Plan
> thirty-two growers now have access to recycled water
> the Mt Bassett treatment plant was decommissioned
> the existing 600mm rising main running from Mt Bassett to the Sydney Street pump station has been reversed and a second rising main (known as the southern rising main running 12 kilometres from the pump station to Bakers Creek) was established
> North Mackay pump station was upgraded to provide a capacity of 90 litres per second (l/s) Sydney Street pump station was upgraded to a capacity of 1070 l/s.
Background on the MWRPThe Tenix Alliance John Holland Joint Venture (TAJHJV) began building the facility in December 2006. The contract included design and construction of two water-recycling facilities, wastewater transfer systems, a 2200ML effluent lagoon, a recycled-water transfer main and 15-year operation period of the new facilities.
Ogilvie Constructions, who came on board in May 2007, was contracted to the Recycled Water Distribution Scheme to construct 27 on-farm storages and 22 kilometres of pipelines.
Mackay Regional Council Mayor Col Meng, Prime Minister Kevin Rudd, Federal Member for Dawson James Bidgood, Parliamentary Secretary for Water Dr Mike Kelly and Queensland Primary Industries Minister Tim Mulherin inspect the MWRP - photo contributed by Daily Mercury.
The new Mackay water recycling plant at Bakers Creek
94
![Page 15: Property/building maintenance · Steel 120.31 126.79 6.48 5% ... Concrete batching 1% Plastic product manufacturing 1% Chemical storage 7% Boiler making or ... Councillors 15/03/08](https://reader035.vdocument.in/reader035/viewer/2022071214/6042f36bfc384029b86cca08/html5/thumbnails/15.jpg)
96
Mackay Water Services Annual Performance Report 2008 - 2009 97
Capital programThe key drivers determining Mackay Water Services’ capital program are customer service, environmental and social standards, population growth and Mackay’s strategic plan. Major capital works undertaken to achieve these outcomes up to June 30, 2009 include:
> Marryatt Street rising main constructed
> Rural View water main extended
> major upgrades commenced at Coles Road, Beaconsfield Road and Gordon Street sewage pump stations
> seven pump stations replaced
River Street water main upgradeIn July, 2008, Mackay Infrastructure Alliance completed a $1.4 million upgrade of the River Street trunk water main. Driven by the construction of the Bluewater Quay, the 60-year-old line was replaced with a new 450mm trunk and 150mm service main with connections from Wood Street to Carlyle Street.
Farrellys Road water main upgradeUnder way in December 2008, this water main upgrade involved the installation of a new Ø250 mPVC water main along Farrellys Road from Broadsound Road to Southgate Drive. The new section of main will greatly improve water pressure in the Paget area by interconnecting the Ø200 water main in Broadsound Road to the Ø300 water main in Connors Road.
The project – which was ongoing at June 30, 2009 – included:
> the installation of 500m of Ø250 mPVC pipe
> one culvert crossing
> two road crossings
> three offsets around existing services
> four water main cut-ins.
Bedford Road upgradeThis upgrade involved the installation of water and sewer mains on Bedford Road from Glenpark Street to Andergrove Road.
The project included:
> the installation of 750m of Ø250 mPVC water main
> installation of 500m of Ø150 uPVC sewer main
> eight road crossings
> seven fire hydrant cut-ins
> five sluice-valve cut-ins
Trade wasteCouncil continued to implement its Trade Waste Management Plan and new businesses were issued with trade waste approvals prior to discharging trade waste. Existing businesses were also assessed for compliance and issued with approvals. The activities led to improved quality of the sewerage received at wastewater recycling facilities. Planning on the Trade Waste Improvement Strategy for the Mackay’s City Heart also continued. The amalgamation of Mackay City, Sarina and Mirani shires in March 2008 resulted in a unified Trade Waste Policy and Management Plan across the entire region. In order to streamline the approvals process for commercial and industrial business, council aligned its plumbing inspection and trade waste functions.
Treatment plant highlights> Sarina plant staff reviewed the safety and
environmental impacts of the plant at a risk-management workshop aimed at improving service delivery.
> Safety railings were installed and the access steps modified at Sarina treatment plant.
> Marian and Mirani plants underwent infrastructure upgrades to increase the potable water supply to both areas.
Mount Bassett Wastewater Treatment PlantThe main focus for 2008/09 was on decommissioning the Mount Bassett treatment plant which occurred in December 2008. This treatment plant had reached capacity and the facility emitted high levels of odour. Technology at the treatment plant was dated, operation and maintenance costs were high and the facility was unsuitably located in relation to town planning.
To replace the Mount Bassett facility, treatment plants were construction at Bakers Creek and Bucasia. These facilities provided a new, sustainable wastewater treatment system for Mackay. To further cater for future growth, capital upgrade works at the Nebo Road treatment plant also began.
Scientific and analytical servicesThe Water Services’ laboratory (located at the Nebo Road treatment plant) took possession of some new equipment including an inductively coupled plasma spectrophotometer, gas chromatograph – mass spectrometer and a discrete analyser, to increase the range of materials that can be tested and the volume of samples that can be processed. The laboratory’s scientific team continued to provide support to council and local businesses, who otherwise may have been forced to send work to Brisbane or Townsville.
River Street trunk drainage project
![Page 16: Property/building maintenance · Steel 120.31 126.79 6.48 5% ... Concrete batching 1% Plastic product manufacturing 1% Chemical storage 7% Boiler making or ... Councillors 15/03/08](https://reader035.vdocument.in/reader035/viewer/2022071214/6042f36bfc384029b86cca08/html5/thumbnails/16.jpg)
98
Mackay Water Services Annual Performance Report 2008 - 2009 99
WaterWise rebatesMackay Water Services continued its highly successful Water Rebate Scheme, offering residents rebates on the cost of purchasing WaterWise bathroom fittings. During 2008/09, more than $21,000 was paid out to residents who purchased WaterWise goods from their local hardware stores to the value of almost $87,000. Residents’ purchases included 20 water-efficient shower roses, 56 dual-flush cisterns and 36 rainwater tanks.
Water conservation measuresDuring 2008/09, water restrictions were enforced across all of Mackay Regional Council’s water supply areas. Level 1 restrictions applied to all areas except Eton, Calen, Kolijo, Bloomsbury, Sarina and the surrounding beaches and the Pioneer Valley which were all on higher restriction levels.
Water educationMackay Water Services continued its Water Education Program to help students learn about water conservation, water cycles and where water from their tap at home actually comes from. Council’s water education officer visited 12 schools and presented three water catchment activities at the Materials Recovery Facility.
Total regional water usage for 2008/09
Location Megalitres (rounded values)
Nebo Road WTP 12,209
Sarina WTP 331
Sarina bores 97
Sarina bores 109
Marwood bores 49
Marwood bores 170
Marwood bores 89
Marwood bores 54
Marwood bores 6
Koumala bores 12
Koumala bores 5
Location Megalitres (rounded values)
Armstrong Beach bore 52
Belly Keel bore 78
Marian 195
Mirani 107
Finch Hatton 32
Gargett/Pinnacle 35
Walkerston 363
Eton 52
Midge Point 438
Calen 40
Bloomsbury 6
Total water usage for the period 2008/09: 14,529 megalitres
Teemburra Dam The Pioneer River
![Page 17: Property/building maintenance · Steel 120.31 126.79 6.48 5% ... Concrete batching 1% Plastic product manufacturing 1% Chemical storage 7% Boiler making or ... Councillors 15/03/08](https://reader035.vdocument.in/reader035/viewer/2022071214/6042f36bfc384029b86cca08/html5/thumbnails/17.jpg)
Mackay Water Services Annual Performance Report 2008 - 2009
100
Mackay Water Services snapshot
Item 2008/09
Wastewater treatment plants 5
Urban water treatment plant sites 2
Rural water treatment sites 13
Total length of water main 1064.28km
Number of water pump stations 33
Number of water reservoirs 41
Total water supplied/annum 12,408ML
Average household consumption/annum
256kL
Average residential water bill/annum
$464.90
School visits 15
Total length of sewer main 814.27km
Average residential sewerage bill/annum
$540.00
Number of water connections 34,693
Number of sewer connections 32,733
Cross-subsidies evaluation
Water supply Residential Commercial Industrial
LRMC ($/kl)* 1.79 1.79 1.79
Revenue received ($/kl) 2.03 1.79 1.89
Price differential 0.24 0.00 0.10
Cross subsidy received No No No
*Based on independent assessment of water and sewerage pricing in 2003 (indexed by the average increase
in charges to 2009). Note: Long Run Marginal Cost (LRMC) was determined using the Turvey method.
Water access: $208.90Properties where a metered water supply has been connected will be charged on a per factor basis. Vacant land is allocated one factor per allotment.
Water consumption tariffs Council is responsible for providing water and sewerage infrastructure for existing and future users of these services.
Tarrif 1 0-50 kilolitres per half year $1.00/kl
Tarrif 2 Over 150 kilolitres per half year $1.50/kl
101
Customer Survey ResultsJuly 2008 - June 2009
Per
cent
age
VERY GOOD GOOD FAIR POOR VERY POOR
Satisfaction level
67.6
29.2
2.5 0.0 0.6
Attitude of staff receiving request
Per
cent
age
VERY GOOD GOOD FAIR POOR VERY POOR
Satisfaction level
68.6
27.9
2.9 0.0 0.7
Attitude of staff attending request
Per
cent
age
VERY GOOD GOOD FAIR POOR VERY POOR
Satisfaction level
73.5
18.4
4.2 1.6 2.3
Time taken to address request
Per
cent
age
VERY GOOD GOOD FAIR POOR VERY POOR
Satisfaction level
53.0
34.6
7.4 2.7 2.3
Appearance of completed work
Per
cent
age
VERY GOOD GOOD FAIR POOR VERY POOR
Satisfaction level
68.7
26.8
2.7 0.7 1.0
Degree work addresses request
Per
cent
age
VERY GOOD GOOD FAIR POOR VERY POOR
Satisfaction level
72.3
23.3
2.3 1.0 1.0
Overall satisfaction with response
Per
cent
age
VERY GOOD GOOD FAIR POOR VERY POOR
Satisfaction level
67.3
26.7
3.7 1.0 1.3
Survey average
STAR RATING
Customer survey results July 2008 - June 2009
![Page 18: Property/building maintenance · Steel 120.31 126.79 6.48 5% ... Concrete batching 1% Plastic product manufacturing 1% Chemical storage 7% Boiler making or ... Councillors 15/03/08](https://reader035.vdocument.in/reader035/viewer/2022071214/6042f36bfc384029b86cca08/html5/thumbnails/18.jpg)
102
Mackay Regional Council Annual Report 2008 - 2009Mackay Harbour Beach
![Page 19: Property/building maintenance · Steel 120.31 126.79 6.48 5% ... Concrete batching 1% Plastic product manufacturing 1% Chemical storage 7% Boiler making or ... Councillors 15/03/08](https://reader035.vdocument.in/reader035/viewer/2022071214/6042f36bfc384029b86cca08/html5/thumbnails/19.jpg)
PO Box 41, Mackay, Qld 4740
Ph 1300 MACKAY (1300 622 529) > Fax (07) 4944 2400
www.mackay.qld.gov.au