proposal assesment at pltu

12
7/30/2019 Proposal Assesment at Pltu http://slidepdf.com/reader/full/proposal-assesment-at-pltu 1/12 TITLE : Document  Type : Project ID : Page 1 of 12 Document Number ASSESMENT  VALVES  PLTU  LONTAR Revision : Status : Replace & Service  Date : 19/09/2012 ASSESMENT VALVES PLTU LONTAR TELUK NAGABANTEN PT. WASKITA NIAGA PRIMA I 19/09/2012 Ass Ags JJ.LG No Date Status Issued Checked Approved Revision Memo COMPANY Survey PLTU LONTAR

Upload: hutabarat

Post on 14-Apr-2018

221 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Proposal Assesment at Pltu

7/30/2019 Proposal Assesment at Pltu

http://slidepdf.com/reader/full/proposal-assesment-at-pltu 1/12

TITLE :

Document Type : ‐

Project ID :  Page 1 of 12

Document Number

ASSESMENT VALVES

 PLTU

 LONTAR

Revision :  Status :  Replace & Service

 Date :  19/09/2012

ASSESMENT VALVES

PLTU LONTAR

TELUK NAGA‐BANTEN

PT. WASKITA NIAGA PRIMA 

I 19/09/2012 Ass Ags JJ.LG

No Date Status Issued Checked ApprovedRevision Memo COMPANY

Survey PLTU ‐ LONTAR

Page 2: Proposal Assesment at Pltu

7/30/2019 Proposal Assesment at Pltu

http://slidepdf.com/reader/full/proposal-assesment-at-pltu 2/12

TITLE :

Document Type : ‐

Project ID :  Page 2 of 12

Inspection of  PLTU LONTAR valves at Teluk nagam, Date: 19‐September‐2012  has finded a few result:

ASSESMENT VALVES

 PLTU

 LONTAR

PT. WASKITA NIAGA PRIMA 

Document Number

Revision :  Status :  Replace & Service

 Date :  19/09/2012

I.Globe valve size DN 20 , PN 16: 2. Globe valves DN 32 dan DN 40 PN 16 :

I 19/09/2012 Ass Ags JJ.LG

No Date Status Issued Checked Approved

PLTU ‐ LONTAR

Revision Memo COMPANY

Survey

Page 3: Proposal Assesment at Pltu

7/30/2019 Proposal Assesment at Pltu

http://slidepdf.com/reader/full/proposal-assesment-at-pltu 3/12

TITLE :

Document Type : ‐

Project ID :  Page 3 of 12

3. Globe valves size DN 20 PN 25 :

Revision :  Status :  Replace & Service

 Date :  19/09/2012

PT. WASKITA NIAGA PRIMA 

Document Number

ASSESMENT VALVES

 PLTU

 LONTAR

4. Butterfly valves DN 100  PN 10 / 16 :

I 19/09/2012 Ass Ags JJ.LG

No Date Status Issued Checked Approved

Survey PLTU ‐ LONTAR

Revision Memo COMPANY

Page 4: Proposal Assesment at Pltu

7/30/2019 Proposal Assesment at Pltu

http://slidepdf.com/reader/full/proposal-assesment-at-pltu 4/12

TITLE :

Document Type : ‐

Project ID :  Page 4 of 12

5. Globe valve sea water DN 200 PN 10 / 16 :

Revision :  Status :  Replace & Service

 Date :  19/09/2012

ASSESMENT VALVES PLTU LONTAR

Document Number

PT. WASKITA NIAGA PRIMA 

6. PSV DN 40 PN 16, This psv open is bonnet type, in open pressure was leak out from bonnet and will be

  replaced with close bonnet type. See the picture :

I 19/09/2012 Ass Ags JJ.LG

No Date Status Issued Checked ApprovedRevision Memo COMPANY

Survey PLTU ‐ LONTAR

Leak out from here

Page 5: Proposal Assesment at Pltu

7/30/2019 Proposal Assesment at Pltu

http://slidepdf.com/reader/full/proposal-assesment-at-pltu 5/12

TITLE :

Document Type : ‐

Project ID :  Page 5 of 12

7. Inspection of  Boiler valves, PLTU LONTAR are Plant design from China same like PLTU Labuan that have

  11 ea Boiler valves, and 1 ea EBV from  Unit 1 until 3.

  We have recommendation all PSV unit on Boiler must be certification every 3 years so they want PT.WNP

  make recommendation for certification of  Boiler valves olso pricing about EVT and Hydrouset test.

  If  sparepart who will be need it.

  Contact persons :

No1 Setyo Harsono

2 Juneven Sabar Siregar

3 Riyanto Dharu N

4

5

ASSESMENT VALVES PLTU LONTAR

Revision :  Status :  Replace & Service

 Date :  19/09/2012

[email protected]

[email protected]

PT. WASKITA NIAGA PRIMA 

Document Number

0811123312

085692216049

0811124651 namin.hida at indonesia ower.co.id

Name Position HP EmailSPV Logistik 085217414443 [email protected]

SPV Planner 081311440073 [email protected]

Nanang Supriyatna

Namin Hida at

SPV Pemaliharaan Machine

SPV  Pemeliharaan Control

Mana er

18 "

PLTU LONTAR did't have the Valves Data every plant area

11 ea PSV Picture  :

1. DA 24327

I 19/09/2012 Ass Ags JJ.LG

No Date Status Issued Checked Approved

Survey PLTU ‐ LONTAR

Revision Memo COMPANY

. . .

18 "18 "

18 "

Page 6: Proposal Assesment at Pltu

7/30/2019 Proposal Assesment at Pltu

http://slidepdf.com/reader/full/proposal-assesment-at-pltu 6/12

TITLE :

Document Type : ‐

Project ID :  Page 6 of 12

2. DA 24326

Status :  Replace & Service

 Date :  19/09/2012

PT. WASKITA NIAGA PRIMA 

Document Number

ASSESMENT VALVES PLTU LONTAR

Revision : 

18 "

3. DA 

24328

I 19/09/2012 Ass Ags JJ.LG

No Date Status Issued Checked Approved

Survey PLTU ‐ LONTAR

Revision Memo COMPANY

Page 7: Proposal Assesment at Pltu

7/30/2019 Proposal Assesment at Pltu

http://slidepdf.com/reader/full/proposal-assesment-at-pltu 7/12

TITLE :

Document Type : ‐

Project ID :  Page 7 of 12

4 DA 24336

ASSESMENT VALVES

 PLTU

 LONTAR

Revision :  Status :  Replace & Service

 Date :  19/09/2012

PT. WASKITA NIAGA PRIMA 

Document Number

18 "

5 DA 24335

I 19/09/2012 Ass Ags JJ.LG

No Date Status Issued Checked Approved

Survey PLTU ‐ LONTAR

Revision Memo COMPANY

Page 8: Proposal Assesment at Pltu

7/30/2019 Proposal Assesment at Pltu

http://slidepdf.com/reader/full/proposal-assesment-at-pltu 8/12

TITLE :

Document Type : ‐

Project ID :  Page 8 of 12

6 DA 24348

Document Number

ASSESMENT VALVES

 PLTU

 LONTAR

Revision :  Status :  Replace & Service

 Date :  19/09/2012

PT. WASKITA NIAGA PRIMA 

18 "

7 DA 243349

I 19/09/2012 Ass Ags JJ.LG

No Date Status Issued Checked Approved

Survey PLTU ‐ LONTAR

Revision Memo COMPANY

Page 9: Proposal Assesment at Pltu

7/30/2019 Proposal Assesment at Pltu

http://slidepdf.com/reader/full/proposal-assesment-at-pltu 9/12

TITLE :

Document Type : ‐

Project ID :  Page 9 of 12

8 DA 24344

 Date :  19/09/2012

PT. WASKITA NIAGA PRIMA 

Document Number

ASSESMENT VALVES

 PLTU

 LONTAR

Revision :  Status :  Replace & Service

18 "

9 DA 24347

I 19/09/2012 Ass Ags JJ.LG

No Date Status Issued Checked Approved

Survey PLTU ‐ LONTAR

Revision Memo COMPANY

Page 10: Proposal Assesment at Pltu

7/30/2019 Proposal Assesment at Pltu

http://slidepdf.com/reader/full/proposal-assesment-at-pltu 10/12

TITLE :

Document Type : ‐

Project ID :  Page 10 of 12

10. DA 24346

Revision :  Status :  Replace & Service

 Date :  19/09/2012

PT. WASKITA NIAGA PRIMA 

Document Number

ASSESMENT VALVES

 PLTU

 LONTAR

18 "

11 DA 24343

I 19/09/2012 Ass Ags JJ.LG

No Date Status Issued Checked Approved

Survey PLTU ‐ LONTAR

Revision Memo COMPANY

Spreader

Page 11: Proposal Assesment at Pltu

7/30/2019 Proposal Assesment at Pltu

http://slidepdf.com/reader/full/proposal-assesment-at-pltu 11/12

TITLE :

Document Type : ‐

Project ID :  Page 11 of 12

12 DA 24341

PT. WASKITA NIAGA PRIMA 

Document Number

ASSESMENT VALVES

 PLTU

 LONTAR

Revision :  Status :  Replace & Service

 Date :  19/09/2012

18 "

EBV and Isolation Valve Still goodCondition 

I 19/09/2012 Ass Ags JJ.LG

No Date Status Issued Checked Approved

Survey PLTU ‐ LONTAR

Revision Memo COMPANY

Spreader

Page 12: Proposal Assesment at Pltu

7/30/2019 Proposal Assesment at Pltu

http://slidepdf.com/reader/full/proposal-assesment-at-pltu 12/12

TITLE :

Document Type : ‐

Project ID :  Page 12 of 12

8.  PLTU LONTAR need a like control valve can reduce pressure from high to low pressure(like CCI valve),

  Contact person is Pak Burhan, Mobille phone : 087802016160

  For the specification of  valve Pak Burhan will be send email later.

CONCEQUENCE FOR THIS NOW:

1.  PLTU LONTAR want PT.Waskita Niaga Prima submit price of  valves ( new valves ).

2. 

Costing about

 EVT

 and

 Hydroset

 Boiler

 Valves.

3.  Costing of  service valves ( after get data from PLTU‐Lontar)

Revision :  Status :  Replace & Service

PT. WASKITA NIAGA PRIMA 

Document Number

ASSESMENT VALVES PLTU LONTAR

 Date :  19/09/2012

18 "

I 19/09/2012 Ass Ags JJ.LG

No Date Status Issued Checked Approved

Survey PLTU ‐ LONTAR

Revision Memo COMPANY

Spreader