8/10/2019 PROPOSAL FOR A STAMPING PLANT
1/18
MINOR PROJECT
ON
PROPOSAL
FOR A STAMPING PLANT
Group no : 5Guided By Presented By
Mr. Niraj Bhatnagar Deepak Bakshi(077104
Rohit Singh Bisht(03
Himesh Razdan(0761
Gautam Kumar Chau
-
8/10/2019 PROPOSAL FOR A STAMPING PLANT
2/18
ConceptValidation
Production Feasibility Definition of material taking intoaccount
STAMPING PLANT PLANNING
PROCUREMENT OF TOOL AND MACHINERY
Punch die procurement Machinery procurement Other facilities
PROCRDURE PLANNING
TO GET THE BANKS PROPOSAL
PROCEDURE
-
8/10/2019 PROPOSAL FOR A STAMPING PLANT
3/18
PRODUCT
Type Washer 1 Washer 2 Washer 3 Washer 4 Washer 5 Washer 6 Washer 7 Wa
Dia OD22 ID11 OD24 ID13 OD28 ID15 OD30 ID17 OD34 ID19 OD37 ID21 OD39
Thickness 2 2.5 2.5 3 3 4 4
Washer
Standard washers are produced with steel as material
Proper tolerance and Quality standards are maintained using proper tool and machinery
-
8/10/2019 PROPOSAL FOR A STAMPING PLANT
4/18
MARKET TRENDS
0
1
2
3
4
5
6
2009 2010 2011 20
Swarna Fastener DM Enterprise
P r o
d u c t i o n
o f w a s h e r s
( t o n
) x 1 0 ^ 5
Leading Fastener Industries Swarana Fasteners (Delhi) and DM Enter
-
8/10/2019 PROPOSAL FOR A STAMPING PLANT
5/18
Total Area = 8*15 sq. meters= 120 sq. meters Symbol For a worker
Plant Layout with Material Flow
Process Flow
-
8/10/2019 PROPOSAL FOR A STAMPING PLANT
6/18
Strip feed
Lower Part Upper Part
S.NO. PART MATERIAL COST(Rs)
1 Punch HcHCr(D2 grade) 3000
2 Die HcHCr(D2 grade) 2500
3 Support Plate EN38 10000
4 Base plate and top plate Mild Steel 15000
5 Extra(Spring ,guide poles , bushes) According to requirement 5000
Total cost=Rs.31000
DIE DESIGN AND STRIP LAYOUT
Inner Dia dOuter Dia DPitch Step 1.Width of stri
-
8/10/2019 PROPOSAL FOR A STAMPING PLANT
7/18
Press MachineSpecs On the basis of which Press Machine has been selected Cost Tonnage Required = 2.5 [(Shearing area x Shear strength of material) +Stripping Force]
10 ton SPM required = for the production of 144000 washers (By one machine) a year (with working
hours 6x250 in a year)Min SPM Required 40
MACHINERY SELECTION
FeederMax Width ( Required width is 60 mm )Max Thickness ( Required thickness is 2 mm )
SPM (Required SPM is 40 )
De coilerMax Weight ( Required weight is weight ofMax Width ( Required Width is 60 mm
Turret Punch PressTurret punch press is also a possibility where wedon't need any de coiler and feeder and alsothere cascading in stamping process can be done
-
8/10/2019 PROPOSAL FOR A STAMPING PLANT
8/18
PRESS SELECTIONManufacturer Tonnage Strokes per
minuteDimension Price ( RS ) Power
RequiredBasant Press
Pvt. Ltd.30 65 32x30x50 2,55,000 3 HP
Basant PressPvt. Ltd.
50 55 39x39x75 2,95,000 5 HP
Revatech AndSons
50 35 57x34x86 3,10,000 4.5 HP
Revatech AndSons
40 35 40x41x80 2,90,000 3.5 HP
Sri Krishna
Hydro Project30 60 39x42x75 2,45,500 3 HP
Ravi PowerPress
50 45 40x41x80 3,05000 4.5 HP
Power Press
Turret punch Press
P
Turre
Tonnage 200 Ton Hit Rate 500 SPMStroke Length 27mm
Max Thickness 6mm
-
8/10/2019 PROPOSAL FOR A STAMPING PLANT
9/18
Feeder
Manufacturer
Type withMax
Weight
Max.Width
Powe
Press roomautomation
Pvt.Ltd(vd5)
SingleJaw
500 kg
150 mm 0.5 H
Hertzcontrol Pvt.
Ltd
DoubleJaw
500 x 2Kg
150 mm 0.5 xHP
De coiler
Combination Units Can also be used instead of using twoseparate machines
Manufacturer MaxWeight
MaxWidth
MaxThickness
Dimension(mm) Cost(RS)
Press RoomAutomation
& FeedFixtures(India)
Pvt. Ltd
2000kg
150mm
0.5 to2.5 mm
2000 x 1000x 1400
1,50,000
ManuInternational
Pvt. Ltd
1050kg
150mm
1.5-5mm
1500 x 1000x 1100
2,10,000
Manufacturer(Model)
Type Max. Width Max.Thickness
SPM Dimension Cost(Rs)
Jay shantipneumatic
feeder(Extramild series)
Pneumatic
100 mm 2.5 mm 140 100 x100 cm
45,180
Jay shantipneumatic
feeder(Extramild series)
Pneumatic 100 mm 2 mm 100 150 x150 cm 39,250
-
8/10/2019 PROPOSAL FOR A STAMPING PLANT
10/18
Other Tool Room Machines
Lathe Machine Drill Machine
Bhavya Machine Tools Bhavya Machine Tools
Specs
8 Variable speedCentre Height 165 mmMax Swing Over Bed 330mmCross Slide Travel 225mmLed Screw TPI 4 TPI
Specs
Drilling Capacity 25 mm8 Variable SpeedSpindle RPM 110-2880Max Drill Radius 910mm
Milling Machine
List of MaS No
1 2
2 2 Co
3 4
5
Other FRacks, Bin
Bhavya Machine Tools
Specs
Table Dim 800 x 175 mm6 Variable Spindle SpeedVertical Travel 450mmHorizontal travel 400mm
Fork Lifter
Conveyer
-
8/10/2019 PROPOSAL FOR A STAMPING PLANT
11/18
PRODUCT COST
DIAMETER MATERIAL
COST INTEREST &
DEPRECIATION ELECTRICITY
COST RENT SALARY PACKAGING
COST PROMOTION
AL COST
REPAIR &MAINTENAN
CE TRANSPORTATI
ON COST
ID11 0.47 0.03 0.016 0.03 0.16 0.030 0.07 0.09 0.1ID12 0.50 0.03 0.016 0.03 0.16 0.040 0.07 0.09 0.1ID14 0.76 0.03 0.016 0.035 0.16 0.050 0.07 0.09 0.1ID16 0.86 0.03 0.016 0.035 0.16 0.050 0.07 0.09 0.1ID18 0.96 0.03 0.016 0.035 0.16 0.050 0.07 0.09 0.1ID20 1.58 0.03 0.016 0.035 0.16 0.060 0.07 0.09 0.1ID22 1.79 0.03 0.016 0.035 0.16 0.060 0.07 0.09 0.1
ID24 1.94 0.03 0.016 0.035 0.16 0.060 0.07 0.09 0.1
Material Cost = Strip Thickness x Width x Material density x per kg cost / Total no washers per day
Electricity Cost = Net Power Consumption x Per unit Cost / Total no of Washers per day
Salaries = Sum of all Employers/ Total no of washers per day
Rent =Rent per Day / Total no of Washer per day
Interest And depreciation = Interest + Dep. Per Day / Total no of Washer per day
-
8/10/2019 PROPOSAL FOR A STAMPING PLANT
12/18
BREAK EVEN ANALYSIS
TOTAL COST(TC)TC=F+V
TC=F+QC.(1) TOTAL REVENUE( TR)TR=QP.......................(2)
WhereF=Fixed costV=Variable costQ=no. of unitsC=unit assembling cost
P=unit selling cost
Fixed cost=machine cost + rent + promotion+ maintenance=2,310,000+1,200,000+2,31,000=6,141,000
Unit assembling cost(C)=material +electricity+ wages+ tra= 1.3275+0.0165+0.16+0.1= 1.604
AT break even point(profit=0)Total Revenue=Total CostQP=F+QCorQ=F/(P-C)
Number of units at BEPQ=F/(P-C)
=6,141,000/(2.15-1.604)=11,457,090 units
Revenue=QP=11,457,090*2.15
=24632744
-
8/10/2019 PROPOSAL FOR A STAMPING PLANT
13/18
BREAK EVEN POINTREPRESENTATION
For Profit(TR>TC)Profit=TR-TC
=Q1-(F+Q1*=12,000,000-= 2,91,000
Margin of Safety(MO
MOS=(sales at Q1)-=[(Q1-Q)]*P=[12,000,000-1= 5,42,910
-
8/10/2019 PROPOSAL FOR A STAMPING PLANT
14/18
OUR TARGET
Grow with value customer together
Do effective things with the effective way
Help customer solve supply problem
Supply High quality part with competitive cost.
-
8/10/2019 PROPOSAL FOR A STAMPING PLANT
15/18
LIST OF PROPOSED INVESTORS
Bank NamABN baAxis baBank ofICICI bIDBI baPunjab State baYes ban.........m
-
8/10/2019 PROPOSAL FOR A STAMPING PLANT
16/18
Project Plan12-Aug 1-Sep 21-Sep 11-Oct 31-Oct 20-Nov 10-Dec
TEAM PLANING
LITERATURE SURVEY
MARKET SURVEY
DESIGNING
COST ANALYSIS
FINAL LAYOUT OF PROPOSAL
FINAL REPORT
-
8/10/2019 PROPOSAL FOR A STAMPING PLANT
17/18
Tool design by Cyril Donaldson, Donaldson MN. Fundamentals of press working by David Alkire Smith Bralla, James G. (1999). Design for Manufacturability Handbook .McGraw-Hill. Carlon fastener Survey, Google Survey for fastener Database of Swarna Fasteners and DM Enterprises www.wikipedia .com Google Database PROJECT PROFILE ON M.S. AND HIGH TENSILE NUTS AND BOLTS By Micro, Small & Mediu
Enterprises Project Profile on the establishment of Nails producing Plant By Development Studies Associates (DSA) FORECASTING FUNDAMENTALS
REFERENCES
-