proposal for arctic long term international standards program denis tikhomirov gazprom vniigaz llc
TRANSCRIPT
International Standards Roadmap(suggested priorities)
2
Working group Deliverables 2012 2013 2014 2015 2016 2017 2018
RN01: Recommendation
for structuring, editing and
publishing of phase IV
deliverables
PNGI – Ice loads in structural design
PNGI – Topside facilities, add. tech. requirements
PNGI – Arctic operations – Working environment
PNGI – Arctic operations – Escape, evacuation and rescue
PNGI – Arctic operations – Onshore logistics
PNGI – Arctic operations – Offshore logistics
PNGI – Arctic operations – Staff management
PNGI – Arctic operations – Maintenance of structures
PNGI – Offshore structures corrosion protection
PNGI – Arctic operations – Plant security
PNGI – Arctic operations – Ice management
Amendments to ISO 13702, ISO 15138, IEC 60079, IEC 61892-7
Proposal for Arctic Long Term International Standards Program2
Bridging and Handover of Activities
Barents 2020Project plenary meeting
(Oslo, May 2011)
ISO TC 67 MCAHG Arctic Operations
(San Francisco, June 2011)
ISOTC67 Plenary meeting
(Moscow, September 2011)
Proposal for Arctic Long Term International Standards Program3
Proposal For Priority ISO Standards Development
• Russian E&P companies are having a strong need in these standards to provide safe and effective operations at Prirazlomnoye and Shtokman fields
• GOST R/TC 23 already has plans to develop a number of priority standards based on Barents 2020 project deliverables:1. Ice management:
– GOST R “Ice management. Data collection”– GOST R “Ice management. Oceanological, hydrological
and geological survey information supply”– GOST R “Ice management. Ice conditions, monitoring
and forecasting”– GOST R “Ice management. Training. Specific
requirements”2. GOST R “Arctic operations. Maintenance service”3. GOST R “Arctic operations. Escape, evacuation and rescue”4. GOST R “Arctic Operations. Plant Security”
Proposal for Arctic Long Term International Standards Program4
Arctic Standards Development in Russia
• Establishing of a new subcommittee (SC9) “Arctic operations” under responsibility of GOST R/TC 23 is almost finished
• List of primary projects includes 15 documents (slide 4)
• These standards are to be developed by GOST R/TC 23/SC 9in 2012 – 2015
• VNIIGAZ is assigned as a major developer of Arctic E&P and operations national standards in Russia
Proposal for Arctic Long Term International Standards Program5
Initiatives Discussed at the Barents 2020 Plenary Meeting
• To propose above standards as a NWIPs to ISO/TC 67
• Russia is ready to lead the process of Arctic standards development
• To establish a new subcommittee “Arctic operations” under responsibility of ISO/TC67
• VNIIGAZ is ready to hold the secretariat of new SC
• Twinning with Barents 2020 participating countries is to be considered
Proposal for Arctic Long Term International Standards Program6