PROPOSAL FOR NEW AIRSPACE DESIGN OUTCOME OF PBN IMPLEMENTATION – STAKEHOLDERS CONSULTATION MEETING ULAANBAATAR 2015 Gangerel.B PBN IMPLEMENTATION WORKING GROUP

Upload: daniella-burke

Post on 21-Dec-2015

215 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PROPOSAL FOR NEW AIRSPACE DESIGN OUTCOME OF PBN IMPLEMENTATION – STAKEHOLDERS CONSULTATION MEETING ULAANBAATAR 2015 Gangerel.B PBN IMPLEMENTATION WORKING

PROPOSAL FOR NEW AIRSPACE DESIGN

OUTCOME OF PBN IMPLEMENTATION – STAKEHOLDERS CONSULTATION MEETING

ULAANBAATAR 2015

Gangerel.BPBN IMPLEMENTATION WORKING GROUP

Page 2: PROPOSAL FOR NEW AIRSPACE DESIGN OUTCOME OF PBN IMPLEMENTATION – STAKEHOLDERS CONSULTATION MEETING ULAANBAATAR 2015 Gangerel.B PBN IMPLEMENTATION WORKING

Civil Aviation Authority of Mongolia

NAV SPECIFICATION Assumptions Fleet capability Navigation specification

ROUTE STRUCTURE Design Benefit

SECTORISATION

CONTENT

IMPLEMENTATION PLAN

Page 3: PROPOSAL FOR NEW AIRSPACE DESIGN OUTCOME OF PBN IMPLEMENTATION – STAKEHOLDERS CONSULTATION MEETING ULAANBAATAR 2015 Gangerel.B PBN IMPLEMENTATION WORKING

NAV SPECIFICATION

Page 4: PROPOSAL FOR NEW AIRSPACE DESIGN OUTCOME OF PBN IMPLEMENTATION – STAKEHOLDERS CONSULTATION MEETING ULAANBAATAR 2015 Gangerel.B PBN IMPLEMENTATION WORKING

Civil Aviation Authority of Mongolia

KEY ASSUMPTIONS

VOR/DME coverage partial-RNAV5 DME/DME coverage partial-RNAV2, RNAV 5 7 MSSR operational (above 6150m /FL200)

almost 100% without western area; 10 ADS-B(more) installed, not integrated, not

mandated; 5more to be installed in 2015-2016; 100% VHF coverage above 6150m/FL200

Entry/Exit points Current planning: Same existing Entry/Exit Future: Possible new Entry/Exit

No special use airspace constraint

Page 5: PROPOSAL FOR NEW AIRSPACE DESIGN OUTCOME OF PBN IMPLEMENTATION – STAKEHOLDERS CONSULTATION MEETING ULAANBAATAR 2015 Gangerel.B PBN IMPLEMENTATION WORKING

Civil Aviation Authority of Mongolia

FLIGHT STATISTICS

VHHH8%

EDDF7%

EGLC6%

LFPG5%

EHAM4%

EFHK3%

ZBAA15%ZSPD

13%

RKSI10%

OTHER29%

Flights by destination

RNAV

int'l landing7%

domes-tic9%

over-flight84%

Type of flights

Ref: ATFM survey 2013

Page 6: PROPOSAL FOR NEW AIRSPACE DESIGN OUTCOME OF PBN IMPLEMENTATION – STAKEHOLDERS CONSULTATION MEETING ULAANBAATAR 2015 Gangerel.B PBN IMPLEMENTATION WORKING

Civil Aviation Authority of Mongolia

AIRLINES

AIR C

HINA

CATHAY PACIF

IC A

IRW

AYS LTD

KOREAN AIR

LINES C

O.,LTD

AEROFLOT

LUFTHANSA

KLM R

OYAL DUTCH A

IRLI

NES

AIR F

RANCE

BRITIS

H AIR

WAYS

CHINA S

OUTHERN AIR

LINES

FINNAIR

CHINA E

ASTERN AIR

LINES

ASIANA A

IRLI

NES INC.

NORDWIN

D

AIRBRID

GECARGO AIR

LINES L

LC

UNITED C

ONTINENTAL

HOLDIN

GS0

2000

4000

6000

8000

10000

12000

Co-operated with:161 airliners of 45 countries.

Ref: ATFM survey 2013

Page 7: PROPOSAL FOR NEW AIRSPACE DESIGN OUTCOME OF PBN IMPLEMENTATION – STAKEHOLDERS CONSULTATION MEETING ULAANBAATAR 2015 Gangerel.B PBN IMPLEMENTATION WORKING

Civil Aviation Authority of Mongolia

TYPE OF AIRCRAFT

B744 B77W A332 B772 A333 A343 B763 A346 B77L B752 B748 MD11 A388 A3200

2000

4000

6000

8000

10000

12000

14000

16000

Ref: ATFM survey 2013

Page 8: PROPOSAL FOR NEW AIRSPACE DESIGN OUTCOME OF PBN IMPLEMENTATION – STAKEHOLDERS CONSULTATION MEETING ULAANBAATAR 2015 Gangerel.B PBN IMPLEMENTATION WORKING

Civil Aviation Authority of Mongolia

International Routes (At or above RVSM LevelsFL8900-14600)

RNAV 10No RADAR SurveillanceVHF DCPC95km (50NM) Separation

RNAV 5 RADAR Surveillance VHF DCPC Surveillance Based Separation

Domestic Routes (Below RVSM Levels)Conventional

NAV SPECIFICATION

Page 9: PROPOSAL FOR NEW AIRSPACE DESIGN OUTCOME OF PBN IMPLEMENTATION – STAKEHOLDERS CONSULTATION MEETING ULAANBAATAR 2015 Gangerel.B PBN IMPLEMENTATION WORKING

ROUTE STRUCTURE

Page 10: PROPOSAL FOR NEW AIRSPACE DESIGN OUTCOME OF PBN IMPLEMENTATION – STAKEHOLDERS CONSULTATION MEETING ULAANBAATAR 2015 Gangerel.B PBN IMPLEMENTATION WORKING

Civil Aviation Authority of Mongolia

MORIT

GINOM

DARNO

BAMUK

NIGOR

LETBIAMUTA SERNA SULOK

INTIK

POLHO

NIXAL

NOPUS

TEBUS

13.2%

22.1%

2.1%

5.4%

7.6%

1.2%

9.3%

0.3%

1.1%

28.3%

8.1%

1.2%

OVERFLIGHT TRAFFIC DISTRIBUTION ON EXISTING AIR ROUTES

Page 11: PROPOSAL FOR NEW AIRSPACE DESIGN OUTCOME OF PBN IMPLEMENTATION – STAKEHOLDERS CONSULTATION MEETING ULAANBAATAR 2015 Gangerel.B PBN IMPLEMENTATION WORKING

Civil Aviation Authority of Mongolia

GINOM

DARNO

BAMUK

NIGOR

LETBIAMUTA SERNA SULOK

INTIK

POLHO

NIXAL

MORIT

NOPUS

TEBUS

13.2%

22.1%

5.4%

1.2%

9.3%

1.1%

28.3%

8.1%

1.2%RNAV5RNAV5- CrossingRNAV10 (95KM/VHF DCPC)

13.2%

ROUTE STRUCTURE

Page 12: PROPOSAL FOR NEW AIRSPACE DESIGN OUTCOME OF PBN IMPLEMENTATION – STAKEHOLDERS CONSULTATION MEETING ULAANBAATAR 2015 Gangerel.B PBN IMPLEMENTATION WORKING

Civil Aviation Authority of Mongolia

EXPECTED IMPROVEMENTS

№ CURRENT ROUTES PERCENTAGE OF TRAFFIC BENEFIT

1NIXAL DARNO 28.3 4KM2SERNA POLHO 22.1 1KM3GINOM NTIK 13.2 5KM4NIGOR MORIT 9.3 1KM5 INTIK DARNO 7.6 7KM6 INTIK AMUTA 8.1 26KM7SULOK POLHO 5.4 0KM8GINOM POLHO 2.1 -1KM9NIGOR NIXAL 1.2 28KM

10POLHO DARNO 1.1 1KM

Page 13: PROPOSAL FOR NEW AIRSPACE DESIGN OUTCOME OF PBN IMPLEMENTATION – STAKEHOLDERS CONSULTATION MEETING ULAANBAATAR 2015 Gangerel.B PBN IMPLEMENTATION WORKING

Civil Aviation Authority of Mongolia

GINOM

DARNO

BAMUK

NIGOR

LETBIAMUTA SERNA SULOK

INTIK

POLHO

NIXAL

MORIT

NOPUS

TEBUS

13.2%

22.1%

5.4%

1.2%

9.3%

1.1%

28.3%

8.1%

1.2%RNAV5RNAV5- CrossingRNAV10 (95KM/VHF DCPC)

13.2%

FIRST PHASE

Page 14: PROPOSAL FOR NEW AIRSPACE DESIGN OUTCOME OF PBN IMPLEMENTATION – STAKEHOLDERS CONSULTATION MEETING ULAANBAATAR 2015 Gangerel.B PBN IMPLEMENTATION WORKING

SECTORISATION

Page 15: PROPOSAL FOR NEW AIRSPACE DESIGN OUTCOME OF PBN IMPLEMENTATION – STAKEHOLDERS CONSULTATION MEETING ULAANBAATAR 2015 Gangerel.B PBN IMPLEMENTATION WORKING

Due Facility Limitations, only 5 Sectors are possibleCurrent 5 Sectors will be maintained during Phase 15 sectors:

Altai (Non-surveillance) Central Dornod Muren Gobi

SECTORISATION

Page 16: PROPOSAL FOR NEW AIRSPACE DESIGN OUTCOME OF PBN IMPLEMENTATION – STAKEHOLDERS CONSULTATION MEETING ULAANBAATAR 2015 Gangerel.B PBN IMPLEMENTATION WORKING

Civil Aviation Authority of Mongolia

GINOM

DARNO

BAMUK

NIGOR

LETBIAMUTA SERNA SULOK

INTIK

POLHO

NIXAL

MORIT

NOPUS

TEBUS

13.2%

22.1%

5.4%

1.2%

9.3%

1.1%

28.3%

8.1%

5.4%RNAV5RNAV5- CrossingRNAV10 (95KM/VHF DCPC)

13.2%

28.3%

SECTORISATION

Page 17: PROPOSAL FOR NEW AIRSPACE DESIGN OUTCOME OF PBN IMPLEMENTATION – STAKEHOLDERS CONSULTATION MEETING ULAANBAATAR 2015 Gangerel.B PBN IMPLEMENTATION WORKING

IMPLEMENTATION PLAN

Page 18: PROPOSAL FOR NEW AIRSPACE DESIGN OUTCOME OF PBN IMPLEMENTATION – STAKEHOLDERS CONSULTATION MEETING ULAANBAATAR 2015 Gangerel.B PBN IMPLEMENTATION WORKING

Civil Aviation Authority of Mongolia

DETAILED IMPLEMENTATION PLAN

• Developed with assistance of RSO• Developed with assistance of RSO

• Plan officially Approved by DG of CAAM• Plan officially Approved by DG of CAAM

• First Phase: Planned Effective on AIRAC Sep 2015

• First Phase: Planned Effective on AIRAC Sep 2015

• En-route PBN Implementation Working Group set up

• En-route PBN Implementation Working Group set up

Page 19: PROPOSAL FOR NEW AIRSPACE DESIGN OUTCOME OF PBN IMPLEMENTATION – STAKEHOLDERS CONSULTATION MEETING ULAANBAATAR 2015 Gangerel.B PBN IMPLEMENTATION WORKING

Civil Aviation Authority of Mongolia

VALIDATE AIRSPACE CONCEPTCONTROLLER TRAININGOBTAIN MINISTRY APPROVAL FOR

NEW ENROUTE STRUCTURE

Important for planned effective date

ACTION PLAN

Page 20: PROPOSAL FOR NEW AIRSPACE DESIGN OUTCOME OF PBN IMPLEMENTATION – STAKEHOLDERS CONSULTATION MEETING ULAANBAATAR 2015 Gangerel.B PBN IMPLEMENTATION WORKING

Thank you for your attentionQuestions?