PROJECT DETAILS The project requires construction of new 138 kV transmission lines as well as the removal and salvage of existing transmission lines including: Construction of a new 138 kV transmission line from AltaLink Substation 42S located at the intersection of Sarcee Trail and Glenmore Trail to ENMAX Substation 35 located north of 90 Avenue SW in the southwest corner of Glenmore Park Construction of a new 138 kV transmission line from ENMAX Substation 35 to ENMAX Substation 6 located at 16300 – 37 Street SW Removal and salvage of an existing 138 kV line between AltaLink Substation 42S and ENMAX Substation 30 located at 11111 – 37 Street SW and a section of transmission line south of ENMAX Substation 30 once ENMAX Substation 35 and the new proposed transmission lines are energized. SOUTHWEST CALGARY RING ROAD (SWCRR) PROPOSED 138 KV TRANSMISSION LINE RELOCATION PROJECT OVERVIEW Alberta Transportation has started planning for the construction of the SW portion of the road that will complete the Calgary Ring Road. The completion of the SWCRR requires the relocation of several utilities that are directly impacted by the road construction. The Province is working collaboratively with the impacted utility companies to help facilitate their planning and design. The road design for the SWCRR conflicts with existing transmission infrastructure. Alberta Transportation has requested ENMAX Power (ENMAX) to relocate its transmission lines away from the road alignment and into the new Power Line Component of the newly established Transportation Utility Corridor (TUC) along the SWCRR. This land was transferred from the Tsuu T’ina Nation to the Government of Alberta to accommodate a portion of the SWCRR and TUC. STAKEHOLDER NEWSLETTER | SEPTEMBER 2015 TRANSPORTATION UTILITY CORRIDOR (TUC) In the mid-1970s, the Government of Alberta established Restricted Development Areas (RDAs) around Calgary. The lands included in these RDAs were designated to accommodate linear transportation and utility facilities. These uses include ring roads (and associated interchanges), stormwater management facilities, petroleum pipelines, power transmission lines and municipal regional water, sanitary and storm sewer lines.

Upload: vumien

Post on 03-Feb-2018

232 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: PROPOSED 138 KV TRANSMISSION LINE RELOCATION · PDF fileThe project requires construction of new 138 kV transmission lines as well as the ... 138 kV transmission line from AltaLink

PROJECT DETAILS

The project requires construction of new 138 kV transmission lines as well as the removal and salvage of existing transmission lines including:

• Construction of a new 138 kV transmission line from AltaLink Substation 42S located at the intersection of Sarcee Trail and Glenmore Trail to ENMAX Substation 35 located north of 90 Avenue SW in the southwest corner of Glenmore Park

• Construction of a new 138 kV transmission line from ENMAX Substation 35 to ENMAX Substation 6 located at 16300 – 37 Street SW

• Removal and salvage of an existing 138 kV line between AltaLink Substation 42S and ENMAX Substation 30 located at 11111 – 37 Street SW and a section of transmission line south of ENMAX Substation 30 once ENMAX Substation 35 and the new proposed transmission lines are energized.

SOUTHWEST CALGARY RING ROAD (SWCRR)PROPOSED 138 KV TRANSMISSION LINE RELOCATION

PROJECT OVERVIEW

Alberta Transportation has started planning for the construction of the SW portion of the road that will complete the Calgary Ring Road. The completion of the SWCRR requires the relocation of several utilities that are directly impacted by the road construction. The Province is working collaboratively with the impacted utility companies to help facilitate their planning and design.

The road design for the SWCRR conflicts with existing transmission infrastructure. Alberta Transportation has requested ENMAX Power (ENMAX) to relocate its transmission lines away from the road alignment and into the new Power Line Component of the newly established Transportation Utility Corridor (TUC) along the SWCRR. This land was transferred from the Tsuu T’ina Nation to the Government of Alberta to accommodate a portion of the SWCRR and TUC.

STAKEHOLDER NEWSLETTER | SEPTEMBER 2015

TRANSPORTATION UTILITY CORRIDOR (TUC)

In the mid-1970s, the Government of Alberta

established Restricted Development Areas (RDAs)

around Calgary. The lands included in these RDAs were

designated to accommodate linear transportation and

utility facilities. These uses include ring roads (and

associated interchanges), stormwater management

facilities, petroleum pipelines, power transmission

lines and municipal regional water, sanitary and storm

sewer lines.

Page 2: PROPOSED 138 KV TRANSMISSION LINE RELOCATION · PDF fileThe project requires construction of new 138 kV transmission lines as well as the ... 138 kV transmission line from AltaLink

STAKEHOLDER NEWSLETTER | SEPTEMBER 2015

GLENMORE TR SW

Tsuu T'ina Nation

35

GlenmoreReservoir

Bullhead Road

Wea

selh

ead

Road

Two Cro

ssin

g Road

Old A

gency Road

14 S

T SW

37 ST SW

ANDERSON RD SW

SARCEE TR SW

85 S

T SW

90 AV SW

SOUTHLAND DR SW

24 S

T SW

162 AV SW

CRO

WCH

ILD

TR

SW

50 AV SW

24 S

T SW

06

28

30

GLENMORE PARK

EVERGREEN

WOODBINE

OAKRIDGE

LAKEVIEW

FISH CREEK PARK

WOODLANDS

BRAESIDECEDARBRAE

ALTADORE

PALLISER

SIGNAL HILL

LINCOLN PARK

HAYSBORO

DISCOVERY RIDGEGLAMORGAN

PUMP HILL

MILLRISE

SHAWNESSY

BRIDLEWOOD

BAYVIEW

BEL-AIRE

SOMERSET

MAYFAIR

Map Legend

Altalink Substation

New Transmission Infrastructure

Transportation Utility Corridor

Transmission Infrastructure Removal

ENMAX Proposed Substation

ENMAX Existing Substation

Calgary City Limits

Existing Transmission Infrastructure

All changes will occur within the TUC, City of Calgary right-of-ways and ENMAX property.

SOUTHWEST CALGARY RING ROAD (SWCRR)PROPOSED 138 KV TRANSMISSION LINE RELOCATION

Page 3: PROPOSED 138 KV TRANSMISSION LINE RELOCATION · PDF fileThe project requires construction of new 138 kV transmission lines as well as the ... 138 kV transmission line from AltaLink

STAKEHOLDER NEWSLETTER | SEPTEMBER 2015

TRANSMISSION STRUCTURES

The proposed single circuit transmission structures will be self-supporting expandable steel monopoles with a height of 18 to 24 metres ( 58 to 78 feet). The transmission line running east west to connect to Substation 35 at 90 Avenue SW will be a double circuit line ranging in height from 22 to 27 metres ( 72 to 89 feet ). Distance between structures will be approximately 100 to 140 metres (325 to 459 feet)

Alberta Infrastructure advised ENMAX the TUC right of way for current and future line use is only 25 metres wide with a height restriction of 44 metres.

PROPOSED SCHEDULE

ENMAX plans to file the Facility Application (FA) with the Alberta Utilities Commission in late November 2015. Subject to approvals being granted, ENMAX expects construction to begin in June 2016 with a proposed in-service date of September 2017.

SEPTEMBER 2015 - NOVEMBER 2015 Initial Stakeholder Engagement

NOVEMBER 2015 ENMAX submits FA to the AUC

MAY 2016 Permit and Licence from AUC granted to ENMAX Power

JUNE 2016 Construction begins

SEPTEMBER 2017 In-service date

NOVEMBER 2015 - SEPTEMBER 2017 Ongoing Stakeholder Engagement

SOUTHWEST CALGARY RING ROAD (SWCRR)PROPOSED 138 KV TRANSMISSION LINE RELOCATION

Double Circuit Steel MonopoleSingle Circuit Steel Monopole

Page 4: PROPOSED 138 KV TRANSMISSION LINE RELOCATION · PDF fileThe project requires construction of new 138 kV transmission lines as well as the ... 138 kV transmission line from AltaLink

STAKEHOLDER NEWSLETTER | SEPTEMBER 2015

COMMITMENT TO COMMUNITY

ENMAX is committed to being a responsible corporate neighbour in the community. This commitment includes providing timely and meaningful engagement with stakeholders about this project.

We have developed a comprehensive public involvement program to provide opportunities for area residents, occupants and landowners to be informed about this proposal and to engage with ENMAX in dialogue from the planning phase through to construction.

ABOUT ENMAX CORPORATION

ENMAX, through its subsidiaries, makes, moves and sells electricity to residential, small business and large commercial customers and is headquartered in Calgary, Alberta, with offices in Edmonton. ENMAX Power Corporation owns and operates transmission and distribution infrastructure in Calgary and ENMAX Energy Corporation owns diverse electricity generation facilities throughout the province. Since 2007, ENMAX has been named one of Alberta’s Top Employers. ENMAX Energy is currently the retailer of choice for both The City of Calgary and The City of Edmonton.

MORE INFORMATION

Your input is very valuable to us. We will work with you to ensure you get answers to your questions and your concerns are understood. For more information about the proposed transmission line, please contact:

ENMAX POWER CORPORATION

Phone: (403) 514-1471

E-mail: [email protected]

Website: enmax.com/ringroad

For more information about the need for this project, please contact:

ALBERTA UTILITIES COMMISSION (AUC)

Phone: (780) 427 4903

Email: [email protected]

Website: auc.ab.ca

ALBERTA TRANSPORTATION

Phone: (780) 427-2731

(Toll free: dial 310-0000 before the 10 digit number)

Email: [email protected]

Website: sw-crr.ca

OPEN HOUSE

ENMAX representatives will be available at an open house to share information, gather your input and address any questions or concerns you may have on the proposed transmission project. We hope to see you there.

DATE Wednesday, October 7, 2015

LOCATION Southland Leisure Centre - Pool Viewing Area

TIME 4:00 – 8:00 pm

For more than 100 years, ENMAX has delivered safe and reliable electricity in Calgary. Moving electricity from the point where it is generated to our customers’ homes and businesses is split into two areas: transmission and distribution.

SOUTHWEST CALGARY RING ROAD (SWCRR)PROPOSED 138 KV TRANSMISSION LINE RELOCATION