5 16 17 18 19 7 8 9 11 12 13 14 15 1 4 3 2 Provincial/Federal Environmental Assessment Status: EA Provincial EA Status Federal EA Status Route Status EA L a k e O n t a r i o YORK TORONTO WELLINGTON HALTON PEEL DURHAM KAWARTHA LAKES SIMCOE DUFFERIN WATERLOO HAMILTON NIAGARA Lake Simcoe Data Sources: Ontario Ministry of Natural Resources, Ministry of Transportation, National Topographic Data Base Copyright: Neptis Foundation, 2004 Produced by: The Cartography Office, Department of Geography, University of Toronto 0 50 25 km The Niagara Mid-Peninsula Highway Options C, F, G, D2 Guelph-Kitchener Highway 7 expansion Regional Boundary 400 Series Highways Major Roads and Highways Urban Area (2000) Designated Urban Area Oak Ridges Moraine Niagara Escarpment Designated Greenlands Agricultural Land (1,2,3) Selected Environmentally Significant Areas of Concern Proposed 400 Series Highway Extensions Toronto Region Mimico Creek Mimico Creek Watershed Watershed Niagara Niagara Escarpment Escarpment Holland Holland Marsh Marsh R R R Conceptual Idea Under Construction Provincial and Federal Environmental Assessment GTA East-West Corridor 6 10 401 407 404 400 427 410 QEW DVP 403 403 407 Minesing Minesing Swamp Swamp Under Construction Planned Or Awaiting Construction Proposed Route Conceptual Route Route Status: Approved EA Submitted, decision pending EA In Development Referenced/proposed in MTO documents Unknown, may not be required Process P P P P EA Final approval of the provincial environmental assessment of a new controlled access highway between Guelph and Kitchener- Waterloo was deferred at the request of MTO as a result of concerns raised by local municipalities and environmental groups. Highway 404 northward extension Davis Drive to Hwy 12 The extension of Highway 404 along the south shore of Lake Simcoe to Highway 12 received provincial environmental assessment approval in August 2002. Bradford By-Pass/404-400 link The Bradford By-Pass, linking Highways 404 and 400, received provincial environmental assessment approval in August 2002. Highway 407 eastward extension To Hwy 35/115, Whitby link Courtice link Terms of reference for the provincial environmental assessment of the proposed eastward extension of Highway 407 to Highway 35/115 are under development. Highway 410 northward extension Phases 1, 2, 3 Highway 10 toward Collingwood The extension of Highway 410 beyond Phase 3 is conceptual at this stage, but extension towards Collingwood is referenced in MTO planning documents. Highway 427 northward extension Concepts 1,2,3,4 This proposed highway, for which environmental assessment terms of reference are being developed, would run from the north end of Highway 427 to north of Barrie. The proposed Mid-Peninsula Highway would run from the Canada-US border to the Hamilton-Burlington area. The environmental assessment of the project was subject to a legal challenge by the City of Burlington and is under revision. The GTA East-West Corridor, linking the area of the 410/407 intersection to the area of Kitchener-Waterloo-Guelph is referenced in the MTO's Strategic Plans, but is conceptual at this stage. T HIS MAP SHOWS the major highway development projects in the Toronto Region, initiated or proposed between 1995 and 2003 by the Ontario Ministry of Transportation and the Province's SuperBuild Corporation. The Pembina Institute and Neptis Foundation have undertaken this project to provide information on the location and status of these projects, and to prompt discussion of their implications, both individual and cumulative, for future development patterns in the region. Additional information on the work of the Neptis Foundation and the Pembina Institute on urban issues can be accessed at www.neptis.org and www.pembina.org. Barrie Collingwood Brampton Burlington Oakville Hamilton Newmarket Pickering Ajax Oshawa Guelph Kitchener- Waterloo Bradford Caledon Whitby Clarington March 18, 2004 St. Catherines Fort Erie Oak Ridges Oak Ridges Moraine Moraine 35/115 12 5 6 11 12 13 14 15 16 18 17 19 Highway Symbol 1 2 3 4 7 8 9 10

Upload: others

Post on 26-Jun-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Proposed 400 Series Highway Extensions T H I S M A P S H O ...web4.uwindsor.ca › units › law › CARC › main.nsf › 54ef3e94e5fe816e… · Final approval of the provincial

5

16

17

1819

78

9

11

12

13

14

15

1

4

3

2

Provincial/Federal Environmental Assessment Status:

EA

Provin

cial E

A Sta

tus

Fede

ral E

A Sta

tus

Route

Statu

s

EA

L a k e O n t a r i o

YORK

TORONTO

WELLINGTON

HALTON

PEEL

DURHAM

KAWARTHALAKES

SIMCOE

DUFFERIN

WATERLOO

HAMILTON

NIAGARA

LakeSimcoe

Data Sources:Ontario Ministry of Natural Resources, Ministry of Transportation, National Topographic Data Base

Copyright: Neptis Foundation, 2004

Produced by:The Cartography Office, Department of Geography,University of Toronto

0 5025 kmThe Niagara Mid-Peninsula Highway Options C, F, G, D2

Guelph-Kitchener Highway 7 expansion

Regional Boundary400 Series HighwaysMajor Roads and HighwaysUrban Area (2000)Designated Urban AreaOak Ridges MoraineNiagara EscarpmentDesignated GreenlandsAgricultural Land (1,2,3)Selected Environmentally Significant Areas of Concern

Proposed 400 Series Highway Extensions Toronto Region

Mimico Creek Mimico Creek WatershedWatershed

NiagaraNiagaraEscarpmentEscarpment

HollandHollandMarshMarsh

R

R R

ConceptualIdea

UnderConstruction

Pro

vinc

ial a

nd F

eder

alE

nviro

nmen

tal A

sses

smen

t

GTA East-West Corridor

6

10

401

407

404400

427410

QEW

DVP

403

403

407

MinesingMinesingSwampSwamp

Under ConstructionPlanned Or Awaiting ConstructionProposed RouteConceptual Route

Route Status:

ApprovedEA Submitted, decision pendingEA In DevelopmentReferenced/proposed in MTO documentsUnknown, may not be required

Pro

cess

P

P

P

P

EA

Final approval of the provincial environmental assessment of a new controlled access highway between Guelph and Kitchener-Waterloo was deferred at the request of MTO as a result of concerns raised by local municipalities and environmental groups.

Highway 404 northward extension Davis Drive to Hwy 12 The extension of Highway 404 along the south shore of Lake Simcoe to Highway 12 received provincial environmental assessment approval in August 2002.

Bradford By-Pass/404-400 linkThe Bradford By-Pass, linking Highways 404 and 400, received provincial environmental assessment approval in August 2002.

Highway 407 eastward extension To Hwy 35/115, Whitby link Courtice linkTerms of reference for the provincial environmental assessment of the proposed eastward extension of Highway 407 to Highway 35/115 are under development.

Highway 410 northward extension Phases 1, 2, 3 Highway 10 toward CollingwoodThe extension of Highway 410 beyond Phase 3 is conceptual at this stage, but extension towards Collingwood is referenced in MTO planning documents.

Highway 427 northward extension Concepts 1,2,3,4This proposed highway, for which environmental assessment terms of reference are being developed, would run from the north end of Highway 427 to north of Barrie.

The proposed Mid-Peninsula Highway would run from the Canada-US border to the Hamilton-Burlington area. The environmental assessment of the project was subject to a legal challenge by the City of Burlington and is under revision.

The GTA East-West Corridor, linking the area of the 410/407 intersection to the area of Kitchener-Waterloo-Guelph is referenced in the MTO's Strategic Plans, but is conceptual at this stage.

THIS MAP SHOWS the major highway development projects in the Toronto Region, initiated or proposed between 1995 and 2003 by the Ontario Ministry of Transportation and the Province's SuperBuild Corporation. The Pembina Institute and Neptis Foundation have undertaken this project to provide information on the location and status of these projects, and to prompt discussion of their implications, both individual and cumulative, for future development patterns in the region. Additional information on the work of the Neptis Foundation and the Pembina Institute on urban issues can be accessed at www.neptis.org and www.pembina.org.

Barrie

Collingwood

Brampton

Burlington

Oakville

Hamilton

Newmarket

Pickering Ajax

Oshawa

Guelph

Kitchener-Waterloo

Bradford

Caledon

Whitby

Clarington

March 18, 2004

St. Catherines

Fort Erie

Oak RidgesOak RidgesMoraineMoraine

35/115

12

5

6

11 12 13 14

15

16

1817

19

HighwaySymbol

1 2 3 4

7 8 9

10

Page 2: Proposed 400 Series Highway Extensions T H I S M A P S H O ...web4.uwindsor.ca › units › law › CARC › main.nsf › 54ef3e94e5fe816e… · Final approval of the provincial

References

Citizens Opposed to Paving the Escarpment (COPE). The Mid-Peninsula Highway and COPE. Available March 18, 2004: .

Government of Ontario Environmental Assessment Activities. EA Project Updates. Available March 18, 2004:

.Higgins, Glen. Central Region Planner, Ontario Ministry of Transportation's Planning and

Environment Division (416-235-5416). Personal interview, September 15, 2003, January 7, 2004.

Highway 407. Available March 18, 2004: .King's Highway 7 Route Map Website. Available March 18, 2004:

.Ontario Environmental Assessment Act, R.S.O. 1990, CHAPTER E.18. Available March 18, 2004:

.Ontario Environmental Assessment Activities. Highway 7 (Kitchener to Guelph).

Available March 18, 2004: .

Ontario: Ernie Eves, Premier. Eves Government Extending Highway 410 To Ease Gridlock In Brampton-Caledon Area. Available, as of September 15, 2003:

Ontario Ministry of Finance. Ontario Government has a Plan to Address Gridlock (May 14, 2001). Available March 18, 2004: .

Ontario Ministry of the Environment's (MOE) website. What Are Class EA's? Available March 18, 2004: .

Ontario Ministry of Transportation. Backgrounder Renseignements. Available, as of September 15, 2003: .

----- Central Ontario Strategic Transportation Directions. January, 2002.----- Eves government amends Mid-Peninsula Terms of Reference. Available March 18, 2004:

.----- Eves government moves forward on Highway 404 extension and the Bradford Bypass.

Available March 18, 2004: .

----- Highway 427 Extension: Executive Summary. Proposed Study Area for the Highway 427 Individual Environmental Assessment. 13. Available March 18, 2004:

.----- Simcoe Area Transportation Needs Assessment. June , 2002. Available March 18, 2004

.Ontario SuperBuild. Addressing the Gridlock Supporting Transit Expansion. Available, as of

September 19, 2003: Opton, Brian. Ontario Ministry of Transportation (416-235-3969). Personal Interview,

September 16, 2003. Sieradzki, Susan. Ontario Ministry of Transportation, Planning and Environment Department

(416-235-5549). Personal interviews, September 15 & 18, 2003, February 9, 2004.Steel, Audrey. Ontario Ministry of Transportation, Planning and Environment Department

(416-235-5546). Personal interviews, September 15 & 18, 2003.SuperBuild. “Some of Ontario's Investments in Transportation”, SuperBuild Progress Report 2003. 23.

Available March 18, 2004: .

Tschirhart, Chris. Ontario Ministry of Transportation, Planning and Environment Department (416-235-5547). Personal interviews, September 15 & 18, 2003.

TSH Engineers Architects Planners, Gartner Lee Limited, McCormick Rankin Corporation, URS Canada. Highway 407 East Completion, Draft EA Terms of Reference. Presentation given On February 3, 2004 to Clarington 407 Community Advisory Committee.

http://www.cope-nomph.org/about.shtml

http://www.ene.gov.on.ca/envision/env_reg/ea/english/EAs/hwy404.htm

http://www.407eastea.com/index.html

http://www.thekingshighway.ca/MAPS/Hwy7map.htm

http://192.75.156.68/DBLaws/Statutes/English/90e18_e.htm#P551_44798

http://www.ene.gov.on.ca/envision/env_reg/ea/english/EAs/hwy7.HTM

http://www.premier.gov.on.ca/english/news/410HWY062303.asp.

http://www.gov.on.ca/FIN/english/media/2001/nre-407.htm

http://www.ene.gov.on.ca/envision/env_reg/ea/english/General_info/What_are_Class_EAs.htm

http://www.cope-nomph.org/map.shtml

http://www.mto.gov.on.ca/english/news/provincial/2003/062703.htm

http://ogov.newswire.ca/ontario/GPOE/2002/10/04/c8050.html?lmatch=&lang=_e.html

http://www.supportdocuments.com/427/427_nov_English.pdf

http://www.mto.gov.on.ca/english/pubs/research/simcoeNA.htm

http://www.superbuild.gov.on.ca/userfiles/HTML/nts_2_25904_1.html

http://www.superbuild.gov.on.ca/userfiles/page_attachments/Library/2/ProgressReport2003.pdf

Proposed 400 Series Highway ExtensionsToronto Region, March 18, 2004