New Hartford Central Schools Report Card | Page 2 www.newhartfordschools.org @NHCSD @NHCSD PROPOSED CAPITAL PROJECT Vote Set for December 14, 2021 Health, Energy & Academics Capital Project Projected Timeline Dec. 14, 2021 | Capital Project Referendum Vote 2022-2023 | SED Review/Approved Bid Phase Spring 2023-Winter 2025 | Construction Phase 2022 | Design Phase Capital Project Information The New Hartford Central School District Board of Education passed a resolution during the October 19, 2021 meeting. The cost of the project is estimated at $39,815,000 million and is anticipated to have no additional impact on the local tax share. The resolution states adopting the scope of a capital project, which it anticipates bringing to taxpayers for a vote on December 14, 2021.The Board refers to this initiative as the Health, Energy and Academics Proj- ect. The school facilities are an essential and valuable community asset to the New Hartford community. They not only serve as the center for a highly regarded academic program, but as the main resource for community continuing education programs, athletic and extracurricular events, and community meetings. The facilities are highly utilized and the investment in the facilities is significant. Steps must be taken to preserve the facilities and to update them to meet the changes required by curricular needs. Renovations are needed for health and safety reasons, to preserve existing facilities, to continue curriculum programs adopted and to improve building accessibility. The work will be performed at the following locations: Perry Jr. High, Senior High School, Myles Elementary, Hughes Elementary and Bradley Elementary.

Upload: others

Post on 16-Feb-2022

4 views

Category:

Documents


0 download

TRANSCRIPT

New Hartford Central Schools Report Card | Page 2 www.newhartfordschools.org@NHCSD @NHCSD

PROPOSED CAPITAL PROJECT

Vote Set for December 14, 2021Health, Energy & Academics Capital Project

Projected Timeline

Dec. 14, 2021 | Capital Project Referendum Vote

2022-2023 | SED Review/Approved Bid Phase

Spring 2023-Winter 2025 | Construction Phase

2022 | Design Phase

Capital Project InformationThe New Hartford Central School District Board of Education passed a resolution during the October 19, 2021 meeting. The cost of the project is estimated at $39,815,000 million and is anticipated to have no additional impact on the local tax share. The resolution states adopting the scope of a capital project, which it anticipates bringing to taxpayers for a vote on December 14, 2021.The Board refers to this initiative as the Health, Energy and Academics Proj-ect. The school facilities are an essential and valuable community asset to the New Hartford community. They not only serve as the center for a highly regarded academic program, but as the main resource for community continuing education programs, athletic and extracurricular events, and community meetings. The facilities are highly utilized and the investment in the facilities is significant. Steps must be taken to preserve the facilities and to update them to meet the changes required by curricular needs. Renovations are needed for health and safety reasons, to preserve existing facilities, to continue curriculum programs adopted and to improve building accessibility.The work will be performed at the following locations: Perry Jr. High, Senior High School, Myles Elementary, Hughes Elementary and Bradley Elementary.

New Hartford Central Schools Report Card | Page 3 www.newhartfordschools.org@NHCSD @NHCSD

• Re-roofing• Window wall/window replacement• Asbestos abatement• Classroom upgrades• HVAC system upgrades• Door and hardware replacement• Update science labs• Ceiling replacement• Boiler/hot water replacement• Lighting upgrades• Gymnasium upgrades• Address drainage around the building• Sidewalks/access around building• Repave road to Hughes Elementary• Swimming pool improvements• Kitchen improvements• Bathroom ADA improvements

Roof Replacement

Necessary roof replacement and repair is scheduled for Perry Junior High as it is past the warranty period and useful life expectancy. The new roof will also help lower energy costs with added insulation.

Perry Athletic Complex

• Varsity softball field with dugouts• Modified softball field• Track improvements• Re-grade modified football field inside track, add drainage,

new goal posts, bleachers• Replace scoreboard at track• Modified baseball field improvements• Perimeter fencing

Perry Junior High

School

The changes at Perry Junior High School includes the following:

New Hartford Central Schools Report Card | Page 4 www.newhartfordschools.org@NHCSD @NHCSD

Bradley Elementary Will see an LED Entrance Sign along with LED lighting upgrades as a result of this.

Hughes ElementaryHughes Elementary will undergo a re-roofing project.

Myles ElementaryMyles Elementary will also undergo a re-roofing project.

New Hartford

Elementary Schools

Each Elementary School (Bradley,

Hughes and Myles) is included in this phase of the

Capital Project.

Food Storage Building and Bus GarageThe Food Storage Building and Bus Garage will both undergo a re-roofing project.

Bus Garage Food Storage

New Hartford Central Schools Report Card | Page 5 www.newhartfordschools.org@NHCSD @NHCSD

New Hartford Sr. High School

Various improvements to the athletic fields/department, pool area renovations & AC installation

New Hartford Sr. High School

• Athletics improvements• Replace turf• Resurface track• Add steeple chase• Jump pit improvements• Perimeter fencing upgrade• Bleacher improvements• Baseball field backstop/netting• Baseball dugouts• Outfield drainage• Tennis court improvements• Stadium lighting upgrades• Pavement and sidewalk improvements• Air conditioning in the Science Wing• Pool dehumidification/heater• Gym flooring and bleacher upgrades

This project is the first phase of a project which aims to focus on HEALTH, ENERGY EFFICIENCY & ACADEMICS

within the NEW HARTFORD CENTRAL SCHOOL DISTRICT.

The vote for this Capital Project will be on DECEMBER 14, 2021 | 7 A.M.- 8 P.M.