proposed design for laguardia's new central terminal
TRANSCRIPT
GGrand Central P
kwy.
FlushingBay
BoweryBay
Runway 13/31
Runway 13/31Ru
nway
4/2
2
Runw
ay 4
/22
Runway 13/31Ru
nway
4/2
2
EastElmhurstJackson
HeightsGrand Central P
kwy.
Area to beredeveloped
Existingparkinggarage
ExistingTerminal
B
Hangars2, 4
Hangar1
Hangar3
Hangar5
JacksonHeights East
Elmhurst
Runway 13/31
Runway 13/31
Runway 13/31
FlushingBay
Hangar3
Hangar5
WestGarage
TerminalC
East Fieldlighting
vault
Taxiholdlot
Heating &refrigeration plant Terminal
D
TerminalTerminalbuildingbuilding
Proposedterminalbuilding
Proposed rampcontrol tower
Proposed building
Proposed airsideapron/parking area
Proposed restrictedvehicle service road
Proposed roadway
The Port Authority plans to demolish the existing terminal, parking garage, three hangars(1, 2 and 4) and cut down 200 trees.
SOURCES: PORT AUTHORITY OF NEW YORK AND NEW JERSEY; AECOM