proposed external works car park i 8918 / p 106 · fgl 2.30 fgl 2.150 e2x3.27 ne pe g. total : 72...

1
The Old Library Albion Street, Lewes, East Sussex BN7 2ND DRAWING NUMBER: CAD FILE NAME: DATE DESCRIPTION email. [email protected] tel. 01273 480608 REVISION STATUS: CLIENT: /Volumes/Current Projects/Current Projects Master-Job Files/8900/8918 Willingdon Com Sch Sport Hall/Drawings/Archicad /8918 Willingdon RIBA2-22.pln LOCATION: Broad Road, Willingdon DRAWN BY: CHECKED BY: AT PROJECT NAME: NOTES This drawing is Copyright and shall not be produced nor used for any other purpose without the written permission of the Architects. Do not scale this drawing. The Contractor is responsible for checking all dimensions on site. Report any discrepancies, errors or omissions to the Architects immediately. The Contractor shall ensure that all goods, materials and workmanship conform with current British Agrément Certificates, British Standards and Building Regulations, and ensure that all works are executed in full compliance with all current Codes of Practice and Regulations in respect of Health & Safety. FOR PLANNING Willingdon Community School East Sussex County Council 8918 / P 106 SCALE: 1:100 DRAWING TITLE: Proposed External works - Car Park 2 SK DRAWINGS: This office is licensed to reproduce Ordnance Survey maps onto drawings but anyone doing so must ensure that this use is acknowledged by displaying the following on all copies of all paper maps: © Crown copyright. All rights reserved. Licence number AR 100006739 SHEET SIZE: A1 1:100 0 5m 10m 23.35 23.09 23.08 22.40 22.56 22.21 22.01 21.95 23.33 22.85 22.76 23.36 Ex 23.05 New 22.83 New 23.26 New 23.05 23.28 23.26 New 23.36 New 22.93 1,500 6,000 2,500 1,500 6,000 5,000 1,925 300 5,000 2,500 1,200 4,100 4,100 3,600 3,600 R 6.000 R 6.000 New boundary fence each side of new gate. Existing hedge removed to improve visability New linear Drain New linear Drain Knee high fence post and rail. 51 52 53 54 55 56 57 58 59 60 61 62 63 64 22.82 22.60 22.49 21.99 22.13 22.86 22.65 22.57 New Permeable Tarmac Surface New Gulley New Soft Landscaping Maintenance Access to Playing Field New Gulley Fall 1 : 60 1 : 40 Dropped Kerb Gas Box Meter Box Existing Path Existing Road Bank Raised to New Levels Existing Tarmac Fall 1 : 60 IC IC IC IC BUS STOP New Tarmac surfacing to bus stop areas New Tarmac surfacing to bus stop areas Existing tree to be removed Existing tree to be removed Existing tree to be removed Existing trees to be kept and protected during works. BUS STOP BUS STOP BUS STOP New Tarmac surfacing to bus stop areas New Railings to road New Railings to road New Railings to road FGL 22.750 FGL 22.450 FGL 22.30 FGL 22.150 22.92 22.78 Coventry Gullwing Cycle Shelter New 22.99 New 22.57 New 23.26 Ex 22.97 New 23.09 Step Step New Permeable paving. New Linear Drain New Seating 16 Nº 16 Nº 20 Nº 20 Nº New Soft Landscaping 23.35 23.09 23.08 22.40 22.56 22.21 22.01 21.95 23.33 22.85 22.76 23.36 Ex 23.05 New 22.83 New 23.26 New 23.05 23.28 23.26 New 23.36 New 22.93 1,500 6,000 2,500 1,500 6,000 5,000 1,925 300 5,000 2,500 1,200 4,100 4,100 3,600 3,600 R 6.000 R 6.000 New boundary fence each side of new gate. Existing hedge removed to improve visability New linear Drain New linear Drain Knee high fence post and rail. 51 52 53 54 55 56 57 58 59 60 61 62 63 64 22.82 22.60 22.49 21.99 22.13 22.86 22.65 22.57 New Permeable Tarmac Surface New Gulley New Soft Landscaping Maintenance Access to Playing Field New Gulley Fall 1 : 60 1 : 40 Dropped Kerb Gas Box Meter Box Existing Path Existing Road Bank Raised to New Levels Existing Tarmac Fall 1 : 60 IC IC IC IC BUS STOP New Tarmac surfacing to bus stop areas New Tarmac surfacing to bus stop areas Existing tree to be removed Existing tree to be removed Existing tree to be removed Existing trees to be kept and protected during works. BUS STOP BUS STOP BUS STOP New Tarmac surfacing to bus stop areas New Railings to road New Railings to road New Railings to road FGL 22.750 FGL 22.450 FGL 22.30 FGL 22.150 22.92 22.78 Coventry Gullwing Cycle Shelter New 22.99 New 22.57 New 23.26 Ex 22.97 New 23.09 Step Step New Permeable paving. New Linear Drain New Seating 16 Nº 16 Nº 20 Nº 20 Nº 23.35 23.09 23.08 22.40 22.56 22.21 22.01 21.95 23.33 22.85 22.76 23.36 Ex 23.05 New 22.83 New 23.26 New 23.05 23.28 23.26 New 23.36 New 23.36 New 22.93 1,500 6,000 2,500 1,500 6,000 5,000 1,925 300 5,000 2,500 1,200 4,100 4,100 3,600 3,600 R 6.000 R 6.000 New boundary fence each side of new gate. Existing hedge removed to improve visability New linear Drain New linear Drain Knee high fence post and rail. 51 52 53 54 55 56 57 58 59 60 61 62 63 64 22.82 22.60 22.49 21.99 22.13 22.86 22.65 22.57 Tarmac Surface New Gulley New Soft Landscaping Maintenance Access to Playing Field New Gulley Fall 1 : 60 1 : 40 Dropped Kerb Gas Box Meter Box Existing Path Existing Road Existing Tarmac Fall 1 : 60 IC IC IC IC BUS STOP New Tarmac surfacing to bus stop areas New Tarmac surfacing to bus stop areas Existing tree to be removed Existing tree to be removed Existing tree to be removed Existing trees to be kept and protected during works. BUS STOP BUS STOP BUS STOP New Tarmac surfacing to bus stop areas New Railings to road New Railings to road New Railings to road FGL 22.750 FGL 22.450 FGL 22.30 FGL 22.150 22.92 22.78 New 22.99 New 22.57 New 23.26 Ex 22.97 New 23.09 Step Step New Permeable paving. New Linear Drain New Seating 16 Nº 16 Nº 20 Nº 20 Nº 23.35 23.09 23.08 22.40 22.56 22.21 22.01 21.95 23.33 22.85 22.76 23.36 Ex 23.05 New 22.83 New 23.26 New 23.05 23.28 23.26 New 23.36 New 22.93 1,500 6,000 2,500 1,500 6,000 5,000 1,925 300 5,000 2,500 1,200 4,100 4,100 3,600 3,600 R 6.000 R 6.000 New boundary fence each side of new gate. Existing hedge removed to improve visability New 1.8m weld mesh fence. New linear Drain New linear Drain Existing Boundary Fence Line New linear Drain Knee high fence post and rail. 51 52 53 54 55 56 57 58 59 60 61 62 63 64 22.82 22.60 22.49 21.99 22.13 22.65 22.57 New Soft Landscaping Tarmac Surface New Gulley New Soft Landscaping Maintenance Access to Playing Field New Gulley Fall 1 : 60 1 : 40 Dropped Kerb New Soft Landscaping Existing Entrance Adjusted For New Vehicular Access Gas Box Meter Box Existing Path Existing Road Existing Tarmac Fall 1 : 60 IC IC IC IC BUS STOP New Tarmac surfacing to bus stop areas New Tarmac surfacing to bus stop areas Existing tree to be removed Existing tree to be removed Existing tree to be removed Existing tree to be removed Existing trees to be kept and protected during works. BUS STOP BUS STOP BUS STOP New Tarmac surfacing to bus stop areas Existing Gate Cycle Access New Railings to road New Railings to road New Railings to road New Soft Landscaping FGL 22.750 FGL 22.450 FGL 22.30 FGL 22.150 22.92 22.78 Ex 23.27 New 22.99 New 22.57 New 23.26 Ex 22.97 New 23.09 Step Step New Permeable paving. Total : 72 Cycles New Linear Drain New Seating 16 Nº 16 Nº 20 Nº 20 Nº New Kerb Line New Soft Landscaping 400x400 Tactile paving Dropped Kerb Kerb Dropped Kerb 400x400 Tactile paving Kerb N Site Location : 50°48' 41.7816"N 0°14' 28.3499"E PROPOSED EXTERNAL WORKS CAR PARK I SCALE 1:100 R R R R R R R R R R R R R R R New Vehicular Gate Area for Future Cycle Parking

Upload: others

Post on 16-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PROPOSED EXTERNAL WORKS CAR PARK I 8918 / P 106 · FGL 2.30 FGL 2.150 E2x3.27 Ne Pe g. Total : 72 Cycles 1ºN 0 N N ew K rb Lin New Soft Landscaping 400x400 Tactile paving Dropped

The Old LibraryAlbion Street, Lewes, East Sussex BN7 2ND

DRAWING NUMBER:

CA

D F

ILE

NA

ME

:

DATE DESCRIPTION

email. [email protected]. 01273 480608

REVISION

STATUS:

CLIENT:

/Vol

umes

/Cur

rent

Pro

ject

s/C

urre

nt P

roje

cts

Mas

ter-J

ob F

iles/

8900

/891

8 W

illin

gdon

Com

Sch

Spo

rt H

all/D

raw

ings

/Arc

hica

d /8

918

Will

ingd

on R

IBA

2-22

.pln

LOCATION: Broad Road, Willingdon

DRAWN BY:CHECKED BY:

AT

PROJECT NAME:

NOTES

This drawing is Copyright and shall not be produced nor used for any other purposewithout the written permission of the Architects.

Do not scale this drawing.

The Contractor is responsible for checking all dimensions on site.Report any discrepancies, errors or omissions to the Architects immediately.

The Contractor shall ensure that all goods, materials and workmanship conform withcurrent British Agrément Certificates, British Standards and Building Regulations,and ensure that all works are executed in full compliance with all current Codes ofPractice and Regulations in respect of Health & Safety.

FOR PLANNING

Willingdon Community School

East Sussex County Council

8918 / P 106

SCALE: 1:100

DRAWING TITLE: Proposed External works -Car Park 2

SK

DRAWINGS:

This office is licensed to reproduce Ordnance Survey maps onto drawings butanyone doing so must ensure that this use is acknowledged by displaying thefollowing on all copies of all paper maps:© Crown copyright. All rights reserved. Licence number AR 100006739

SHEET SIZE: A1

1:1000 5m 10m

23.35

23.09

23.08

22.40

22.56

22.21

22.01

21.95

23.33

22.85

22.76

23.36

Ex23.05

New22.83

New23.26

New23.05

23.28

23.26

New23.36

New22.93

1,500

6,000

2,500

1,500

6,000

5,000

1,925

300

5,000

2,500

1,20

0

4,1004,100

3,600

3,600

R 6.000R 6.000

New boundary fenceeach side of newgate.

Existing hedgeremoved to improvevisability

New linear Drain

New linear Drain

Knee high fencepost and rail.

51

52

53

54

55

56

57

58

59

60

61

62

63

64

22.82

22.60

22.49

21.99

22.13

22.86

22.65

22.57

New PermeableTarmac Surface

NewGulley

New SoftLandscaping

Maintenance Access toPlaying Field

New Gulley

Fall 1 : 60

1 : 40Dropped Kerb

Gas BoxMeter Box

Existing Path

Existing Road

Bank Raised to New Levels

Existing TarmacFall 1

: 60

IC

IC

ICIC

BUS STOP

New Tarmacsurfacing to busstop areas

New Tarmacsurfacing to busstop areas

Existing tree tobe removed

Existing tree tobe removed

Existing tree tobe removed

Existing trees tobe kept andprotected duringworks.

BUS STOPBUS STOP

BUS STOP

New Tarmacsurfacing to busstop areas

New Railings to road

New Railings to road

New Railings to road

FGL 22.750

FGL 22.450

FGL 22.30

FGL 22.150

22.92

22.78

Coventry Gullwing Cycle Shelter

New22.99

New22.57

New23.26

Ex 22.97New 23.09

Step

Step

New Permeable paving.

New Linear Drain

New Seating

16 Nº

16 Nº

20 Nº20 Nº

New Soft Landscaping

23.35

23.09

23.08

22.40

22.56

22.21

22.01

21.95

23.33

22.85

22.76

23.36

Ex23.05

New22.83

New23.26

New23.05

23.28

23.26

New23.36

New22.93

1,500

6,000

2,500

1,500

6,000

5,000

1,925

300

5,000

2,500

1,20

0

4,1004,100

3,600

3,600

R 6.000R 6.000

New boundary fenceeach side of newgate.

Existing hedgeremoved to improvevisability

New linear Drain

New linear Drain

Knee high fencepost and rail.

51

52

53

54

55

56

57

58

59

60

61

62

63

64

22.82

22.60

22.49

21.99

22.13

22.86

22.65

22.57

New PermeableTarmac Surface

NewGulley

New SoftLandscaping

Maintenance Access toPlaying Field

New Gulley

Fall 1 : 60

1 : 40Dropped Kerb

Gas BoxMeter Box

Existing Path

Existing Road

Bank Raised to New Levels

Existing TarmacFall 1

: 60

IC

IC

ICIC

BUS STOP

New Tarmacsurfacing to busstop areas

New Tarmacsurfacing to busstop areas

Existing tree tobe removed

Existing tree tobe removed

Existing tree tobe removed

Existing trees tobe kept andprotected duringworks.

BUS STOPBUS STOP

BUS STOP

New Tarmacsurfacing to busstop areas

New Railings to road

New Railings to road

New Railings to road

FGL 22.750

FGL 22.450

FGL 22.30

FGL 22.150

22.92

22.78

Coventry Gullwing Cycle Shelter

New22.99

New22.57

New23.26

Ex 22.97New 23.09

Step

Step

New Permeable paving.

New Linear Drain

New Seating

16 Nº

16 Nº

20 Nº20 Nº

23.35

23.09

23.08

22.40

22.56

22.21

22.01

21.95

23.33

22.85

22.76

23.36

Ex23.05

New22.83

New23.26

New23.05

23.28

23.26

New23.36

New23.36

New22.93

1,500

6,000

2,500

1,500

6,000

5,000

1,925

300

5,000

2,500

1,20

0

4,1004,100

3,600

3,600

R 6.000R 6.000

New boundary fenceeach side of newgate.

Existing hedgeremoved to improvevisability

New linear Drain

New linear Drain

Knee high fencepost and rail.

51

52

53

54

55

56

57

58

59

60

61

62

63

64

22.82

22.60

22.49

21.99

22.13

22.86

22.65

22.57

Tarmac Surface

NewGulley

New SoftLandscaping

Maintenance Access toPlaying Field

New Gulley

Fall 1 : 60

1 : 40Dropped Kerb

Gas BoxMeter Box

Existing Path

Existing Road

Existing TarmacFall 1

: 60

IC

IC

ICIC

BUS STOP

New Tarmacsurfacing to busstop areas

New Tarmacsurfacing to busstop areas

Existing tree tobe removed

Existing tree tobe removed

Existing tree tobe removed

Existing trees tobe kept andprotected duringworks.

BUS STOPBUS STOP

BUS STOP

New Tarmacsurfacing to busstop areas

New Railings to road

New Railings to road

New Railings to road

FGL 22.750

FGL 22.450

FGL 22.30

FGL 22.150

22.92

22.78

New22.99

New22.57

New23.26

Ex 22.97New 23.09

Step

Step

New Permeable paving.

New Linear Drain

New Seating

16 Nº

16 Nº

20 Nº20 Nº

23.35

23.09

23.08

22.40

22.56

22.21

22.01

21.95

23.33

22.85

22.76

23.36

Ex23.05

New22.83

New23.26

New23.05

23.28

23.26

New23.36

New22.93

1,500

6,000

2,500

1,500

6,000

5,000

1,925

300

5,000

2,500

1,20

0

4,1004,100

3,600

3,600

R 6.000R 6.000

New boundary fenceeach side of newgate.

Existing hedgeremoved to improve

visability

New 1.8m weldmesh fence.

New linear Drain

New linear Drain

Existing BoundaryFence Line

New linear Drain

Knee high fencepost and rail.

51

52

53

54

55

56

57

58

59

60

61

62

63

64

22.82

22.60

22.49

21.99

22.13

22.65

22.57

New SoftLandscaping

Tarmac Surface

NewGulley

New SoftLandscaping

Maintenance Access toPlaying Field

New Gulley

Fall 1 : 60

1 : 40Dropped Kerb

New SoftLandscaping

Existing Entrance Adjusted For NewVehicular Access

Gas BoxMeter Box

Existing Path

Existing Road

Existing TarmacFall 1

: 60

IC

IC

ICIC

BUS STOP

New Tarmacsurfacing to busstop areas

New Tarmacsurfacing to busstop areas

Existing tree tobe removed

Existing tree tobe removed

Existing tree tobe removed

Existing tree tobe removed

Existing trees tobe kept andprotected duringworks.

BUS STOPBUS STOP

BUS STOP

New Tarmacsurfacing to busstop areas

Existing Gate

Cycle Access

New Railings to road

New Railings to road

New Railings to road

New SoftLandscaping

FGL 22.750

FGL 22.450

FGL 22.30

FGL 22.150

22.92

22.78

Ex23.27

New22.99

New22.57

New23.26

Ex 22.97New 23.09

Step

Step

New Permeable paving.

Total : 72 Cycles

New Linear Drain

New Seating

16 Nº

16 Nº

20 Nº20 Nº

New Kerb Line

New SoftLandscaping

400x400 Tactile paving

Dropped Kerb

Kerb

Dropped Kerb

400x400 Tactile pavingKerb

N

Site Location : 50°48' 41.7816"N 0°14' 28.3499"E

PROPOSED EXTERNAL WORKS CAR PARK ISCALE 1:100

R

RR

R

R

R

RR

R

R

R

R

R

R

R

New Vehicular Gate

Area for Future Cycle Parking