proposed external works car park i 8918 / p 106 · fgl 2.30 fgl 2.150 e2x3.27 ne pe g. total : 72...
TRANSCRIPT
The Old LibraryAlbion Street, Lewes, East Sussex BN7 2ND
DRAWING NUMBER:
CA
D F
ILE
NA
ME
:
DATE DESCRIPTION
email. [email protected]. 01273 480608
REVISION
STATUS:
CLIENT:
/Vol
umes
/Cur
rent
Pro
ject
s/C
urre
nt P
roje
cts
Mas
ter-J
ob F
iles/
8900
/891
8 W
illin
gdon
Com
Sch
Spo
rt H
all/D
raw
ings
/Arc
hica
d /8
918
Will
ingd
on R
IBA
2-22
.pln
LOCATION: Broad Road, Willingdon
DRAWN BY:CHECKED BY:
AT
PROJECT NAME:
NOTES
This drawing is Copyright and shall not be produced nor used for any other purposewithout the written permission of the Architects.
Do not scale this drawing.
The Contractor is responsible for checking all dimensions on site.Report any discrepancies, errors or omissions to the Architects immediately.
The Contractor shall ensure that all goods, materials and workmanship conform withcurrent British Agrément Certificates, British Standards and Building Regulations,and ensure that all works are executed in full compliance with all current Codes ofPractice and Regulations in respect of Health & Safety.
FOR PLANNING
Willingdon Community School
East Sussex County Council
8918 / P 106
SCALE: 1:100
DRAWING TITLE: Proposed External works -Car Park 2
SK
DRAWINGS:
This office is licensed to reproduce Ordnance Survey maps onto drawings butanyone doing so must ensure that this use is acknowledged by displaying thefollowing on all copies of all paper maps:© Crown copyright. All rights reserved. Licence number AR 100006739
SHEET SIZE: A1
1:1000 5m 10m
23.35
23.09
23.08
22.40
22.56
22.21
22.01
21.95
23.33
22.85
22.76
23.36
Ex23.05
New22.83
New23.26
New23.05
23.28
23.26
New23.36
New22.93
1,500
6,000
2,500
1,500
6,000
5,000
1,925
300
5,000
2,500
1,20
0
4,1004,100
3,600
3,600
R 6.000R 6.000
New boundary fenceeach side of newgate.
Existing hedgeremoved to improvevisability
New linear Drain
New linear Drain
Knee high fencepost and rail.
51
52
53
54
55
56
57
58
59
60
61
62
63
64
22.82
22.60
22.49
21.99
22.13
22.86
22.65
22.57
New PermeableTarmac Surface
NewGulley
New SoftLandscaping
Maintenance Access toPlaying Field
New Gulley
Fall 1 : 60
1 : 40Dropped Kerb
Gas BoxMeter Box
Existing Path
Existing Road
Bank Raised to New Levels
Existing TarmacFall 1
: 60
IC
IC
ICIC
BUS STOP
New Tarmacsurfacing to busstop areas
New Tarmacsurfacing to busstop areas
Existing tree tobe removed
Existing tree tobe removed
Existing tree tobe removed
Existing trees tobe kept andprotected duringworks.
BUS STOPBUS STOP
BUS STOP
New Tarmacsurfacing to busstop areas
New Railings to road
New Railings to road
New Railings to road
FGL 22.750
FGL 22.450
FGL 22.30
FGL 22.150
22.92
22.78
Coventry Gullwing Cycle Shelter
New22.99
New22.57
New23.26
Ex 22.97New 23.09
Step
Step
New Permeable paving.
New Linear Drain
New Seating
16 Nº
16 Nº
20 Nº20 Nº
New Soft Landscaping
23.35
23.09
23.08
22.40
22.56
22.21
22.01
21.95
23.33
22.85
22.76
23.36
Ex23.05
New22.83
New23.26
New23.05
23.28
23.26
New23.36
New22.93
1,500
6,000
2,500
1,500
6,000
5,000
1,925
300
5,000
2,500
1,20
0
4,1004,100
3,600
3,600
R 6.000R 6.000
New boundary fenceeach side of newgate.
Existing hedgeremoved to improvevisability
New linear Drain
New linear Drain
Knee high fencepost and rail.
51
52
53
54
55
56
57
58
59
60
61
62
63
64
22.82
22.60
22.49
21.99
22.13
22.86
22.65
22.57
New PermeableTarmac Surface
NewGulley
New SoftLandscaping
Maintenance Access toPlaying Field
New Gulley
Fall 1 : 60
1 : 40Dropped Kerb
Gas BoxMeter Box
Existing Path
Existing Road
Bank Raised to New Levels
Existing TarmacFall 1
: 60
IC
IC
ICIC
BUS STOP
New Tarmacsurfacing to busstop areas
New Tarmacsurfacing to busstop areas
Existing tree tobe removed
Existing tree tobe removed
Existing tree tobe removed
Existing trees tobe kept andprotected duringworks.
BUS STOPBUS STOP
BUS STOP
New Tarmacsurfacing to busstop areas
New Railings to road
New Railings to road
New Railings to road
FGL 22.750
FGL 22.450
FGL 22.30
FGL 22.150
22.92
22.78
Coventry Gullwing Cycle Shelter
New22.99
New22.57
New23.26
Ex 22.97New 23.09
Step
Step
New Permeable paving.
New Linear Drain
New Seating
16 Nº
16 Nº
20 Nº20 Nº
23.35
23.09
23.08
22.40
22.56
22.21
22.01
21.95
23.33
22.85
22.76
23.36
Ex23.05
New22.83
New23.26
New23.05
23.28
23.26
New23.36
New23.36
New22.93
1,500
6,000
2,500
1,500
6,000
5,000
1,925
300
5,000
2,500
1,20
0
4,1004,100
3,600
3,600
R 6.000R 6.000
New boundary fenceeach side of newgate.
Existing hedgeremoved to improvevisability
New linear Drain
New linear Drain
Knee high fencepost and rail.
51
52
53
54
55
56
57
58
59
60
61
62
63
64
22.82
22.60
22.49
21.99
22.13
22.86
22.65
22.57
Tarmac Surface
NewGulley
New SoftLandscaping
Maintenance Access toPlaying Field
New Gulley
Fall 1 : 60
1 : 40Dropped Kerb
Gas BoxMeter Box
Existing Path
Existing Road
Existing TarmacFall 1
: 60
IC
IC
ICIC
BUS STOP
New Tarmacsurfacing to busstop areas
New Tarmacsurfacing to busstop areas
Existing tree tobe removed
Existing tree tobe removed
Existing tree tobe removed
Existing trees tobe kept andprotected duringworks.
BUS STOPBUS STOP
BUS STOP
New Tarmacsurfacing to busstop areas
New Railings to road
New Railings to road
New Railings to road
FGL 22.750
FGL 22.450
FGL 22.30
FGL 22.150
22.92
22.78
New22.99
New22.57
New23.26
Ex 22.97New 23.09
Step
Step
New Permeable paving.
New Linear Drain
New Seating
16 Nº
16 Nº
20 Nº20 Nº
23.35
23.09
23.08
22.40
22.56
22.21
22.01
21.95
23.33
22.85
22.76
23.36
Ex23.05
New22.83
New23.26
New23.05
23.28
23.26
New23.36
New22.93
1,500
6,000
2,500
1,500
6,000
5,000
1,925
300
5,000
2,500
1,20
0
4,1004,100
3,600
3,600
R 6.000R 6.000
New boundary fenceeach side of newgate.
Existing hedgeremoved to improve
visability
New 1.8m weldmesh fence.
New linear Drain
New linear Drain
Existing BoundaryFence Line
New linear Drain
Knee high fencepost and rail.
51
52
53
54
55
56
57
58
59
60
61
62
63
64
22.82
22.60
22.49
21.99
22.13
22.65
22.57
New SoftLandscaping
Tarmac Surface
NewGulley
New SoftLandscaping
Maintenance Access toPlaying Field
New Gulley
Fall 1 : 60
1 : 40Dropped Kerb
New SoftLandscaping
Existing Entrance Adjusted For NewVehicular Access
Gas BoxMeter Box
Existing Path
Existing Road
Existing TarmacFall 1
: 60
IC
IC
ICIC
BUS STOP
New Tarmacsurfacing to busstop areas
New Tarmacsurfacing to busstop areas
Existing tree tobe removed
Existing tree tobe removed
Existing tree tobe removed
Existing tree tobe removed
Existing trees tobe kept andprotected duringworks.
BUS STOPBUS STOP
BUS STOP
New Tarmacsurfacing to busstop areas
Existing Gate
Cycle Access
New Railings to road
New Railings to road
New Railings to road
New SoftLandscaping
FGL 22.750
FGL 22.450
FGL 22.30
FGL 22.150
22.92
22.78
Ex23.27
New22.99
New22.57
New23.26
Ex 22.97New 23.09
Step
Step
New Permeable paving.
Total : 72 Cycles
New Linear Drain
New Seating
16 Nº
16 Nº
20 Nº20 Nº
New Kerb Line
New SoftLandscaping
400x400 Tactile paving
Dropped Kerb
Kerb
Dropped Kerb
400x400 Tactile pavingKerb
N
Site Location : 50°48' 41.7816"N 0°14' 28.3499"E
PROPOSED EXTERNAL WORKS CAR PARK ISCALE 1:100
R
RR
R
R
R
RR
R
R
R
R
R
R
R
New Vehicular Gate
Area for Future Cycle Parking