Page 1: PROPOSED REHABILITATION OF DR.AYUB FOOTBALL STADIUM … · DR.AYUB FOOTBALL STADIUM IN BAIDOA DISTRICT, SOUTHWEST STATE Drawing Title: SCALE: DATE: DRAWN BY: ENG. Duale REVIEWED BY:

GSPublisherVersion 0.0.100.100

PROPOSED REHABILITATION OFDR.AYUB FOOTBALL STADIUM IN

BAIDOA DISTRICT, SOUTHWEST STATE

Page 2: PROPOSED REHABILITATION OF DR.AYUB FOOTBALL STADIUM … · DR.AYUB FOOTBALL STADIUM IN BAIDOA DISTRICT, SOUTHWEST STATE Drawing Title: SCALE: DATE: DRAWN BY: ENG. Duale REVIEWED BY:

GSPublisherVersion 0.0.100.100

Sheet No. Content01/21

02/21

Site layout

Office building_ Floor Plan

Office building_foundation plan

Office building_ Ring beam layout

Office building_Electrical plan

Changing rooms_floor plan

Changing rooms_ Elevations

Office building_section view

Office building_Roof plan

Office building_Elevations

NOVEMBER 2018DRAWING INDEX

Changing rooms_ Electrical

Washrooms

3D Projection 01

3D Projection 02

3D Projection 033D Projection 04

Changing rooms_ Structural details

3D Projection 05

3D Projection 06

3D Projection 07

03/21

04/21

05/21

06/21

07/21

08/21

09/21

10/21

11/21

12/21

13/21

14/21

15/21

16/21

17/21

18/21

19/21

20/21

21/21 3D Projection 08

Offices Building

Changing rooms

Toilets

3D projections

Page 3: PROPOSED REHABILITATION OF DR.AYUB FOOTBALL STADIUM … · DR.AYUB FOOTBALL STADIUM IN BAIDOA DISTRICT, SOUTHWEST STATE Drawing Title: SCALE: DATE: DRAWN BY: ENG. Duale REVIEWED BY:

GSPublisherVersion 0.0.100.100

Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.

3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.

4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.

5. All reinforced concrete works to be done accordingto structural detail drawings

No: Date: Description:

REVISION

Implemented by:

Client:

THE FEDERAL REPUBLICOF SOMALIA

Project Title:

Sheet No.

PROPOSED REHABILITATION OFDR.AYUB FOOTBALL STADIUM IN

BAIDOA DISTRICT, SOUTHWEST STATE

Drawing Title:

SCALE:

DATE:

DRAWN BY: ENG. Duale

REVIEWED BY:

A3

AS SHOWN

NOVEMBER 2018

SOUTHWEST STATE,BAIDOA DISTRICT

100,000

67,500

30,000

21,800

52,600

5,400

50,000

8,600

4,000

200,000

150,000

150,000

Existing Boundarywall to be remained

A

C

B

E

D

F

LABEL

A Football Pitch

Proposed changing roomsBExisting spectators stand ( leave as it is)C

DProposed building officesEExisting washrooms (to be rehabilatated)

F Existing Guard house ( leave as it is)

F

Sept

ic ta

nk

Existing Boundarywall to be remained

MASTER PLAN

01/22

Page 4: PROPOSED REHABILITATION OF DR.AYUB FOOTBALL STADIUM … · DR.AYUB FOOTBALL STADIUM IN BAIDOA DISTRICT, SOUTHWEST STATE Drawing Title: SCALE: DATE: DRAWN BY: ENG. Duale REVIEWED BY:

GSPublisherVersion 0.0.100.100

Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.

3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.

4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.

5. All reinforced concrete works to be done accordingto structural detail drawings

No: Date: Description:

REVISION

Implemented by:

Client:

THE FEDERAL REPUBLICOF SOMALIA

Project Title:

Sheet No.

PROPOSED REHABILITATION OFDR.AYUB FOOTBALL STADIUM IN

BAIDOA DISTRICT, SOUTHWEST STATE

Drawing Title:

SCALE:

DATE:

DRAWN BY: ENG. Duale

REVIEWED BY:

A3

AS SHOWN

NOVEMBER 2018

SOUTHWEST STATE,BAIDOA DISTRICT

1a

1a

3

3

4

4

5

5

2

2

D D

C C

B B

A A

B1 B1

C1 C1

3a

3a

3b

3b

1

1

3,200 2,200 1,800 1,700 1,700 5,2001,000

5,200200

1,600200

1,500200

1,500200

5,0002,

800

1,40

03,

800

2,00

02,

200

200

5,00

020

04,

000

2,80

02,050 1,500 2,550

6001,200

6001,000

6002,450 1,500 1,950

1,25

01,

500

1,45

01,

950

1,50

01,

950

2,80

01,

400

3,80

02,

000

2,20

0

12,0

00

4,00

020

03,

600

200

1,80

020

02,

000

1,00

01,

200

800

1,50

095

01,

500

950

1,50

080

01,

200

1,00

0

1,000 3,200 2,200 1,800 1,700 1,700 5,200

2005,000

2005,000

2004,000

2002,000

1,950 1,500 3,700 1,500 1,950400

1,200400

2001,250 1,500 1,250

200

16,000

12,4

00

Y-Y1

Y-Y1

E-03

E-02

E-01

E-04

Office 3

Office 1

Offi

ce 2

Conf

eren

ce H

all

Washrooms

Corridor

Porch

W.C W.C W.C

Typical Floor Plan - offices building

UP

UP

UP

FLOOR PLAN

02/22

Page 5: PROPOSED REHABILITATION OF DR.AYUB FOOTBALL STADIUM … · DR.AYUB FOOTBALL STADIUM IN BAIDOA DISTRICT, SOUTHWEST STATE Drawing Title: SCALE: DATE: DRAWN BY: ENG. Duale REVIEWED BY:

GSPublisherVersion 0.0.100.100

Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.

3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.

4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.

5. All reinforced concrete works to be done accordingto structural detail drawings

No: Date: Description:

REVISION

Implemented by:

Client:

THE FEDERAL REPUBLICOF SOMALIA

Project Title:

Sheet No.

PROPOSED REHABILITATION OFDR.AYUB FOOTBALL STADIUM IN

BAIDOA DISTRICT, SOUTHWEST STATE

Drawing Title:

SCALE:

DATE:

DRAWN BY: ENG. Duale

REVIEWED BY:

A3

AS SHOWN

NOVEMBER 2018

SOUTHWEST STATE,BAIDOA DISTRICT

1

1

1a

1a

2

2

3

3

3a

3a

3b

3b

4

4

5

5

A

A

B

B

B1

B1

C

C

C1

C1

D

D

5

5

4

4

3b

3b

3a

3a

3

3

2

2

1a

1a

1

1

D

D

C1

C1

C

C

B1

B1

B

B

A

A

1,0003,200 2,200 1,800 1,700 1,700 5,200

17,000

2,800 1,400 3,800 2,000 2,200

12,400

1,20

0

1,500

200

750

200

2,700800

3,900

2,35

0

3,40

0

1,500

300

2,20

0

1,200 P.VP.V P.VP.V

P.V P.V P.V P.V

+0.00(G.Level)

+0.45(G.Floor Level)

+3.85(Roof Level)

+0.00(G.Level)

+0.45(G.Floor Level)

+3.85(Roof Level)

E-01

E-02

E-03

E-04

Elevations - offices building

ELEVATIONS

03/22

Page 6: PROPOSED REHABILITATION OF DR.AYUB FOOTBALL STADIUM … · DR.AYUB FOOTBALL STADIUM IN BAIDOA DISTRICT, SOUTHWEST STATE Drawing Title: SCALE: DATE: DRAWN BY: ENG. Duale REVIEWED BY:

GSPublisherVersion 0.0.100.100

Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.

3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.

4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.

5. All reinforced concrete works to be done accordingto structural detail drawings

No: Date: Description:

REVISION

Implemented by:

Client:

THE FEDERAL REPUBLICOF SOMALIA

Project Title:

Sheet No.

PROPOSED REHABILITATION OFDR.AYUB FOOTBALL STADIUM IN

BAIDOA DISTRICT, SOUTHWEST STATE

Drawing Title:

SCALE:

DATE:

DRAWN BY: ENG. Duale

REVIEWED BY:

A3

AS SHOWN

NOVEMBER 2018

SOUTHWEST STATE,BAIDOA DISTRICT

ABB1CC1D2,200 2,000 3,800 1,400 2,800

2,20

0

3,40

0

200x200mm RCCLintel beam Passage

WHBWC

Office1

12mm thick chip-boardceiling on 50X50mmcypress brandering at 600mm centres

Corrugated GI sheets gauge 28, fixed oncelcurised cypress structure: 50x50mmBattens on 200X50mm Rafters @700mm,on 100X50mm Wall-plate bolted @1200mm centres; structure to SE details. GIlining on ridges and cut-outs

Timber doorto schedule 10cm thick Ground floor slab

with 6mm bars @ 20cm centres in bothdirections on 1000 gauge polythenedamp proof membrane (dpm ) on 5cmthick sand blinding on 15cm thick wellcompacted hardcore all to Eng's approva

200mm thick masonary blockwall with exterior qualityemulsion paint on wood - floatrender to approval.

200x300mm white glazedceramic wall tiles up to2200mm high

Aluminum window tothe inside to schedule

200mm thick masonaryblock wall with exteriorquality emulsion paint onwood - float render toapproval.

Section view

SECTION VIEW

04/22

Page 7: PROPOSED REHABILITATION OF DR.AYUB FOOTBALL STADIUM … · DR.AYUB FOOTBALL STADIUM IN BAIDOA DISTRICT, SOUTHWEST STATE Drawing Title: SCALE: DATE: DRAWN BY: ENG. Duale REVIEWED BY:

GSPublisherVersion 0.0.100.100

Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.

3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.

4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.

5. All reinforced concrete works to be done accordingto structural detail drawings

No: Date: Description:

REVISION

Implemented by:

Client:

THE FEDERAL REPUBLICOF SOMALIA

Project Title:

Sheet No.

PROPOSED REHABILITATION OFDR.AYUB FOOTBALL STADIUM IN

BAIDOA DISTRICT, SOUTHWEST STATE

Drawing Title:

SCALE:

DATE:

DRAWN BY: ENG. Duale

REVIEWED BY:

A3

AS SHOWN

NOVEMBER 2018

SOUTHWEST STATE,BAIDOA DISTRICT

1a

1a

3

3

4

4

5

5

2

2

D D

C C

B B

A A

B1 B1

C1 C1

3a

3a

3b

3b

1

1

Corrugated GI sheets gauge 28, fixedon celcurised cypressstructure: 50x50mm Battens on200X50mm Rafters @700mm, on100X50mm Wall-plate bolted @1200mm centres; structure to SEdetails. GI lining on ridges and cut-outs

Gauge 28, 250mm girth bent twiceGI gutters fixed with andincluding brackets on 150X25mmHW facia (painted)

Roof Plan - offices building

FALL FALL

FALL

FALL FALL

FALL

FALL

FALL

FALL

FALL

FALL

FALL

FALL

FALL

ROOF PLAN

05/22

Page 8: PROPOSED REHABILITATION OF DR.AYUB FOOTBALL STADIUM … · DR.AYUB FOOTBALL STADIUM IN BAIDOA DISTRICT, SOUTHWEST STATE Drawing Title: SCALE: DATE: DRAWN BY: ENG. Duale REVIEWED BY:

GSPublisherVersion 0.0.100.100

Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.

3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.

4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.

5. All reinforced concrete works to be done accordingto structural detail drawings

No: Date: Description:

REVISION

Implemented by:

Client:

THE FEDERAL REPUBLICOF SOMALIA

Project Title:

Sheet No.

PROPOSED REHABILITATION OFDR.AYUB FOOTBALL STADIUM IN

BAIDOA DISTRICT, SOUTHWEST STATE

Drawing Title:

SCALE:

DATE:

DRAWN BY: ENG. Duale

REVIEWED BY:

A3

AS SHOWN

NOVEMBER 2018

SOUTHWEST STATE,BAIDOA DISTRICT

1a

1a

3

3

4

4

5

5

2

2

D D

C C

B B

B1 B1

C1 C1

3a

3a

3b

3b

1

1

A A

1,0003,200 2,200 1,800 1,700 1,700 5,200

5,000400

1,400400

1,300400

1,300400

4,800

16,200

11,8

00

3,80

040

03,

400

400

1,60

040

01,

800

2,40

040

04,

800

400

3,80

0

2,80

01,

400

3,80

02,

000

2,20

0

4,20

05,

600

2,80

0

12,6

00

2,44

0

16,2001,000 1,200

5,000400

4,800400

4,8001,000

3,200 2,200 1,800 1,700 1,700 5,200

A142

BRC MESH

A142

BRC MESHA142

BRC MESH

A142

BRC MESH

A142

BRC MESHA142

BRC MESH

A142

BRC MESH

Foundation plan - offices building

FOUNDATION PLAN

06/22

Page 9: PROPOSED REHABILITATION OF DR.AYUB FOOTBALL STADIUM … · DR.AYUB FOOTBALL STADIUM IN BAIDOA DISTRICT, SOUTHWEST STATE Drawing Title: SCALE: DATE: DRAWN BY: ENG. Duale REVIEWED BY:

GSPublisherVersion 0.0.100.100

Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.

3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.

4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.

5. All reinforced concrete works to be done accordingto structural detail drawings

No: Date: Description:

REVISION

Implemented by:

Client:

THE FEDERAL REPUBLICOF SOMALIA

Project Title:

Sheet No.

PROPOSED REHABILITATION OFDR.AYUB FOOTBALL STADIUM IN

BAIDOA DISTRICT, SOUTHWEST STATE

Drawing Title:

SCALE:

DATE:

DRAWN BY: ENG. Duale

REVIEWED BY:

A3

AS SHOWN

NOVEMBER 2018

SOUTHWEST STATE,BAIDOA DISTRICT

1a

1a

3

3

4

4

5

5

2

2

D D

C C

B B

B1 B1

C1 C1

3a

3a

3b

3b

1

1

A A

1,0003,200 2,200 1,800 1,700 1,700 5,200

16,000

4,20

05,

400

2,80

0

2,80

01,

400

3,80

02,

000

2,20

0

2,80

01,

400

3,80

02,

000

2,20

0

12,4

00

1,0003,200 2,200 1,800 1,700 1,700 5,200

17,000

5,200

4,00

0

1,600

2,00

0

1,500 1,500

1,80

0

5,000

7,200

3,60

0

2,000

5,000

4,00

05,200

2,60

0

5,00

0

4,000

5,000

12,0

00

RING BEAM 01 RING BEAM 01 RING BEAM 01 RING BEAM 01

RING BEAM 01 RING BEAM 01 RING BEAM 01 RING BEAM 01

RING BEAM 03 RING BEAM 03

RING BEAM 02

RING BEAM 04

RING BEAM 05

RIN

G B

EAM

07

RIN

G B

EAM

06

RIN

G B

EAM

08

RIN

G B

EAM

06

RIN

G B

EAM

07

RIN

G B

EAM

09

RIN

G B

EAM

10

RIN

G B

EAM

10

RIN

G B

EAM

10

RIN

G B

EAM

10

RIN

G B

EAM

10

RIN

G B

EAM

10

RIN

G B

EAM

11

RIN

G B

EAM

11

Ring beam - offices building

RING BEAM

07/22

Page 10: PROPOSED REHABILITATION OF DR.AYUB FOOTBALL STADIUM … · DR.AYUB FOOTBALL STADIUM IN BAIDOA DISTRICT, SOUTHWEST STATE Drawing Title: SCALE: DATE: DRAWN BY: ENG. Duale REVIEWED BY:

GSPublisherVersion 0.0.100.100

Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.

3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.

4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.

5. All reinforced concrete works to be done accordingto structural detail drawings

No: Date: Description:

REVISION

Implemented by:

Client:

THE FEDERAL REPUBLICOF SOMALIA

Project Title:

Sheet No.

PROPOSED REHABILITATION OFDR.AYUB FOOTBALL STADIUM IN

BAIDOA DISTRICT, SOUTHWEST STATE

Drawing Title:

SCALE:

DATE:

DRAWN BY: ENG. Duale

REVIEWED BY:

A3

AS SHOWN

NOVEMBER 2018

SOUTHWEST STATE,BAIDOA DISTRICT

IOMMOG114

516-AAZ-MOG114

PROPOSED REHABILITATIONOF LOWYA CADE WARD -ABDUL AZIZ DISTRICT.

-ABDUL AZIZ DISTRICT-

JULY 2013

AHMED KIRISH

ALI HUSSEIN

PETER M.M.

N.T.S

IOM GRANT NO:A3

PROJECT. CLIENT. IMPLEMENTING AGENCY. SCALE

DATE

DRAWN BY:

DRAWING TITLE:

DRAWING NO:

PROJECT NO:SHEET NO:

DAN GUUD

REVIEWED AND APPROVED BY:

ECOTECH LIMITED

P.O. Box 5527-00100,Nairobi - KenyaTel: +254 712 388815Fax: +254 20 250809Email: [email protected]: www.ecotech.co.keLocation: Ecotech House, Woodlands Road, off Lenana Road, Nairobi - Kenya

BENADIR REGIONALADMINISTRATION,MOGADISHU,SOMALIA

CONSULTANT:-

IOM GRANT NO:

NOTES.

All drawings and concepts remain the propertyof ecotech limited

- All dimensions are in mm unless stated otherwise

- Any discrepancies in the drawings should be reported to the consultants before the contractor commences work on site.

ss

wp

s

SYMBOL MEANING

CEILING MOUNTEDLIGHT FIXTURE.CEILING MOUNTEDLIGHT FIXTURE (PENDANT)

WALL MOUNTED LIGHT FIXTURE

RECESSED SPOT LIGHT

FLUORESCENT LIGHT FIXTURE

FLUORESCENT LIGHT FIXTUREUNDER FALSE CEILING

WIRING CONNECTION

SINGLE PLEX RECEPTACLE

DUPLEX RECEPTACLE

SPECIAL RECEPTACLE & OUTLET(WITH PILOT LIGHT)

FLUORESCENT LIGHT FIXTURE WITHSHAVER SOCKET & LOCALISED SWITCHFLUORESCENT LIGHT FIXTURE WITHLOCALISED SWITCH

WATER PROOF RECEPTACLE (SINGLE)

CONSUMER UNIT

TELEPHONE/TV JACK

ALARM KEYPAD

DOORBELL PUSH BUTTON

DOORBELL TRANSFORMER

S3

S2

S

3 gang switch

2 gang switch

Single pole switch

Flood lamp

S SS

OFFICE 01 OFFICE 02 OFFICE 03 OFFICE 04 OFFICE 05

N E W C A N O P Y

SS

T-1 T-2

S3

31371-516-ELEC-09

ELECTRICAL DETAILS ELECTRICAL

09/09

16,000

4,20

05,

400

5,300 10,600

12,4

00

Electrical plan- offices building

S

S

S

S2S

S

S S S

S

S3

ELECTRICAL PLAN

08/22

Page 11: PROPOSED REHABILITATION OF DR.AYUB FOOTBALL STADIUM … · DR.AYUB FOOTBALL STADIUM IN BAIDOA DISTRICT, SOUTHWEST STATE Drawing Title: SCALE: DATE: DRAWN BY: ENG. Duale REVIEWED BY:

GSPublisherVersion 0.0.100.100

Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.

3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.

4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.

5. All reinforced concrete works to be done accordingto structural detail drawings

No: Date: Description:

REVISION

Implemented by:

Client:

THE FEDERAL REPUBLICOF SOMALIA

Project Title:

Sheet No.

PROPOSED REHABILITATION OFDR.AYUB FOOTBALL STADIUM IN

BAIDOA DISTRICT, SOUTHWEST STATE

Drawing Title:

SCALE:

DATE:

DRAWN BY: ENG. Duale

REVIEWED BY:

A3

AS SHOWN

NOVEMBER 2018

SOUTHWEST STATE,BAIDOA DISTRICT

EntrenceEntrence UP

A A

B B

C C

1

1

2

2

3

3

5

5

6

6

4

4

A A

B B

C C

1

1

2

2

3

3

5

5

6

6

4

4

1,900200

5,000200

4,000200

5,000200

1,900

850600

2,250 1,500 3,550 1,500 3,500 1,500 2,300600

850

5,00

0

2,30

020

02,

100

5,00

0

2,30

020

02,

100

1,900200

5,000200

4,000200

5,000200

1,900

2001,300 2,200 1,500 3,850 900 3,800 1,500 2,250 1,300

2001,700

2,100 5,200 4,200 5,200 2,100

2,50

02,

300

2,50

02,

300

2,100 5,200 4,200 5,200 2,10019,000

Y-Y

Y-Y

E-01

E-04

E-03

E-02

Roof Plan - Changing rooms

Team Room Team RoomRefrees RoomW.C. W.C.

Entre

nce300x300mm cer.

tiles f.f300x300mm cer.

tiles f.f300x300mm cer.

tiles f.fEn

trenc

e

P.V

P.V

P.V

P.V P.V

P.VP.VP.VP.VP.V

Typical Floor Plan - Changing rooms

FALLFALLFALL

FALL FA

LL

FALLFALLFALL

FLOOR PLAN

09/22

Page 12: PROPOSED REHABILITATION OF DR.AYUB FOOTBALL STADIUM … · DR.AYUB FOOTBALL STADIUM IN BAIDOA DISTRICT, SOUTHWEST STATE Drawing Title: SCALE: DATE: DRAWN BY: ENG. Duale REVIEWED BY:

GSPublisherVersion 0.0.100.100

Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.

3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.

4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.

5. All reinforced concrete works to be done accordingto structural detail drawings

No: Date: Description:

REVISION

Implemented by:

Client:

THE FEDERAL REPUBLICOF SOMALIA

Project Title:

Sheet No.

PROPOSED REHABILITATION OFDR.AYUB FOOTBALL STADIUM IN

BAIDOA DISTRICT, SOUTHWEST STATE

Drawing Title:

SCALE:

DATE:

DRAWN BY: ENG. Duale

REVIEWED BY:

A3

AS SHOWN

NOVEMBER 2018

SOUTHWEST STATE,BAIDOA DISTRICT

A

A

B

B

C

C

C

C

C

C

B

B

B

B

A

A

A

A

2

2

3

3

4

4

5

5

1

1

6

6

6

6

5

5

4

4

3

3

2

2

1

1

3,400

2,100 5,200 4,200 5,200 2,100

1,300

3,00

0

3,40

045

0

1,500

1,20

0

900

2150 1,

200

1,00

0

1,20

0

19,000

19,0002,100 5,200 4,200 5,200 2,100

600

60020

0

1,500 3,500 1,500 3,550 1,500

1,20

0

2,500 2,300

5,000

700

2,300

3,40

03,

000

2,500

450

+0.00m

+0.45m

+3.85m

ROOF SPECIFICATION- pitch 25 deg Five box profile 28 guage roofing- 100x50mm rafters at 600mm c/c 50x50mm- 100x50mm ties and struts- 100x75mm wall plate- 200mm thick fascia board and gutter to S.E- all timber to be cured and painted with 2 coats of paint- 12mm thick chipboard ceiling

VRC Roof beam

200x200mm lintel beam

200mm thick block walling

VRC Ground beam

+0.45m

+0.00m

Foundation depth to bedetermined on site FOUNDATION SPECIFICATION

100mm thick plain concrete slab40cm width foundation wallinghardcore fill consolidated at 300mm level

Section X-X

Front elevation

+0.00(G.Level)

+0.45(G.Floor Level)

+3.85(Roof Level)

Rear elevation

Side elevation

ELEVATIONS

10/22

Page 13: PROPOSED REHABILITATION OF DR.AYUB FOOTBALL STADIUM … · DR.AYUB FOOTBALL STADIUM IN BAIDOA DISTRICT, SOUTHWEST STATE Drawing Title: SCALE: DATE: DRAWN BY: ENG. Duale REVIEWED BY:

GSPublisherVersion 0.0.100.100

Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.

3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.

4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.

5. All reinforced concrete works to be done accordingto structural detail drawings

No: Date: Description:

REVISION

Implemented by:

Client:

THE FEDERAL REPUBLICOF SOMALIA

Project Title:

Sheet No.

PROPOSED REHABILITATION OFDR.AYUB FOOTBALL STADIUM IN

BAIDOA DISTRICT, SOUTHWEST STATE

Drawing Title:

SCALE:

DATE:

DRAWN BY: ENG. Duale

REVIEWED BY:

A3

AS SHOWN

NOVEMBER 2018

SOUTHWEST STATE,BAIDOA DISTRICT

A A

B B

C C

1

1

2

2

3

3

5

5

6

6

4

4

EntrenceEntrence UP

A A

B B

C C

1

1

2

2

3

3

5

5

6

6

4

4

2,100 5,200 4,200 5,200 2,100

2,100 5,200 4,200 5,200 2,100

1,700

2,100 5,200 4,200 5,200 2,100

19,000

2,100 5,200 4,200 5,200 2,100

1,700400

4,800400

3,800400

4,800400

1,700

19,200

2,10

040

01,

900

5,20

0

2,10

040

01,

900

5,20

0

1,100 4005,400

4003,800

4005,400

400 1,100

19,200

2,50

02,

300

2,50

02,

300

2,50

02,

300

2,50

02,

300

1,900 5,000 4,000 5,000 1,900

2,10

02,

300

5,600

4,60

0

1,300 1,300

19,000

5,00

0

5,00

0

RING BEAM 01 RING BEAM 01 RING BEAM 01 RING BEAM 01

RING BEAM 01 RING BEAM 01 RING BEAM 01 RING BEAM 01

RING BEAM 02 RING BEAM 02

RIN

G B

EAM

03

RIN

G B

EAM

03

RIN

G B

EAM

03

RIN

G B

EAM

03

RIN

G B

EAM

04

RIN

G B

EAM

05

RIN

G B

EAM

04

RIN

G B

EAM

05

A142

BRC MESH

A142

BRC MESH

A142

BRC MESH

FOUNDATION PLAN

RING BEAM LAYOUT

STRUCTURALPLAN

11/22

Page 14: PROPOSED REHABILITATION OF DR.AYUB FOOTBALL STADIUM … · DR.AYUB FOOTBALL STADIUM IN BAIDOA DISTRICT, SOUTHWEST STATE Drawing Title: SCALE: DATE: DRAWN BY: ENG. Duale REVIEWED BY:

GSPublisherVersion 0.0.100.100

Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.

3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.

4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.

5. All reinforced concrete works to be done accordingto structural detail drawings

No: Date: Description:

REVISION

Implemented by:

Client:

THE FEDERAL REPUBLICOF SOMALIA

Project Title:

Sheet No.

PROPOSED REHABILITATION OFDR.AYUB FOOTBALL STADIUM IN

BAIDOA DISTRICT, SOUTHWEST STATE

Drawing Title:

SCALE:

DATE:

DRAWN BY: ENG. Duale

REVIEWED BY:

A3

AS SHOWN

NOVEMBER 2018

SOUTHWEST STATE,BAIDOA DISTRICT

Team Room Team RoomRefrees Room

W.C. W.C.

Entr

ence

P.V

P.V

P.V

P.V P.V

P.VP.VP.VP.VP.V

4ft. Flourescent Light

1 gang 1 way switch

2 gang 1 way switch

Consumer unit

Twin sockets with switches

Lighting power circuit

Lighting circuit

Power circuit

LEGEND

CEILING MOUNTED LIGHT FIXTURE.

Power Layout

Entr

ence

Team Room Team RoomRefrees Room

W.C. W.C.

Entr

ence

P.V

P.V

P.V

P.V P.V

P.VP.VP.VP.VP.V

Lighting Layout

Entr

ence

ELECTRICAL

12/22

Page 15: PROPOSED REHABILITATION OF DR.AYUB FOOTBALL STADIUM … · DR.AYUB FOOTBALL STADIUM IN BAIDOA DISTRICT, SOUTHWEST STATE Drawing Title: SCALE: DATE: DRAWN BY: ENG. Duale REVIEWED BY:

GSPublisherVersion 0.0.100.100

Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.

3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.

4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.

5. All reinforced concrete works to be done accordingto structural detail drawings

No: Date: Description:

REVISION

Implemented by:

Client:

THE FEDERAL REPUBLICOF SOMALIA

Project Title:

Sheet No.

PROPOSED REHABILITATION OFDR.AYUB FOOTBALL STADIUM IN

BAIDOA DISTRICT, SOUTHWEST STATE

Drawing Title:

SCALE:

DATE:

DRAWN BY: ENG. Duale

REVIEWED BY:

A3

AS SHOWN

NOVEMBER 2018

SOUTHWEST STATE,BAIDOA DISTRICT

1

1

2

2

3

3

4

4

5

5

6

6

7

7

A A

B B

C C

A

A

B

B

C

C

1

1

2

2

3

3

4

4

5

5

6

6

7

7

C

C

B

B

A

A

7

7

6

6

5

5

4

4

3

3

2

2

1

1

1,200200

1,200200

1,200 1,400200

1,200200

1,200500 600

800600

800600

800600

800600

800600 500

1,400 1,400 1,400 1,400 1,400 1,4008,600

1,200200

1,200200

1,200 1,400200

1,200200

1,200

500 600800

600800

600800

600800

600800

600 500

1,400 1,400 1,400 1,400 1,400 1,400

8,600

200

2,350

200

2001,050

1,250

2,550

2,750

1,250

4,000

200

2,350

200

1,250

2,550

2,750

4,000

2,550 1,2501,400 1,400 1,400 1,400 1,400 1,400

1,250 2,5501,400 1,400 1,400 1,400 1,400 1,400

600800

600800

600800

600800

600800

600

600

500 500

200

3,000

2,400

200

1,050

3,000

4,000

200

2,400

1,085

XXE-01

E-03

E-02

E-04

Fall

Remove the destroyedvent blocks and providenew ones with sameshape and size

Carefully remove theexisting Iron sheet roof andreplace to new Iron sheet

Elevation -01

Elevation -03

Install new metalcasement windows

N.G.L

12.0 deg Roof with five boxprofile G.I sheets

plastered and painted wallto Archs' approval

200mm thick concretehollow block walling

12.0 deg Roof with five boxprofile G.I sheets

Latrine

Pit latrine

800mmx2200mmSteel casement door

Typical Floor Plan

Roof Plan

Section X-X

Elevation 02

WASHROOMS

13/22

Page 16: PROPOSED REHABILITATION OF DR.AYUB FOOTBALL STADIUM … · DR.AYUB FOOTBALL STADIUM IN BAIDOA DISTRICT, SOUTHWEST STATE Drawing Title: SCALE: DATE: DRAWN BY: ENG. Duale REVIEWED BY:

GSPublisherVersion 0.0.100.100

Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.

3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.

4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.

5. All reinforced concrete works to be done accordingto structural detail drawings

No: Date: Description:

REVISION

Implemented by:

Client:

THE FEDERAL REPUBLICOF SOMALIA

Project Title:

Sheet No.

PROPOSED REHABILITATION OFDR.AYUB FOOTBALL STADIUM IN

BAIDOA DISTRICT, SOUTHWEST STATE

Drawing Title:

SCALE:

DATE:

DRAWN BY: ENG. Duale

REVIEWED BY:

A3

AS SHOWN

NOVEMBER 2018

SOUTHWEST STATE,BAIDOA DISTRICT

200

600

200

300

100F1

(150

0)

F2

100

E

200 50

0

200 800 200 D 200 800 200

E

A B C

10 mm waterproof rendering150 mm base concrete

slab reinforced with BRC142 on well compacted

hardcore to S.E . approval

To sub-soil irrigation

T W L

Invert level ofincoming drain

G.L

190 mm masonry with10 mm rendering on bothsides .

G.L G.L G.L

OutletMH

600x450mm mh cover & frame1200 mm R.C. Cover Slab

InletMH

PLAN

H

G

H

SECTION G - G SECTION H -H

G

TYPEDIMENSIONS IN MM

ACAPACITYIN LITRES

No. OFPERSONS

DESLUDGINGINTERVAL

(YRS ) B C D E F1 F2

A

B

E

D

C

800

4000

3000

6000

9000

800

12000

800

15000

1200

10 1000

1600

1600

1000

20

30

40

50

2

2

2

2

2

800

800

1400

1400

800

1200

1400

1400

3000

3600

3600

4000

1400

1800

2000

2400

1200

1500

1500

1500

1500

1400

1400

1400

1300

1200

1 . Cover slab to be reinforced with 10 mm dia. bar at100 mm c/c ( conc. 20 / 20 mix 1 :2:4)

2. Base slab to be conc . class mix 1 :3:63. Outlet and inlet pipes to be 100 mm dia. cast iron.4. Scum buffle to be 100 mm thick reinforced with 2 No.

100 mm at both ends conc 80(20)5. Dividing wall to be 100 mm thick conc. class 20(20)

reinforced with weld mesh No. 65.

NOTES,

SEPTIC TANK

14/22

Page 17: PROPOSED REHABILITATION OF DR.AYUB FOOTBALL STADIUM … · DR.AYUB FOOTBALL STADIUM IN BAIDOA DISTRICT, SOUTHWEST STATE Drawing Title: SCALE: DATE: DRAWN BY: ENG. Duale REVIEWED BY:

GSPublisherVersion 0.0.100.100

Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.

3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.

4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.

5. All reinforced concrete works to be done accordingto structural detail drawings

No: Date: Description:

REVISION

Implemented by:

Client:

THE FEDERAL REPUBLICOF SOMALIA

Project Title:

Sheet No.

PROPOSED REHABILITATION OFDR.AYUB FOOTBALL STADIUM IN

BAIDOA DISTRICT, SOUTHWEST STATE

Drawing Title:

SCALE:

DATE:

DRAWN BY: ENG. Duale

REVIEWED BY:

A3

AS SHOWN

NOVEMBER 2018

SOUTHWEST STATE,BAIDOA DISTRICT

3D 01

15/22

Page 18: PROPOSED REHABILITATION OF DR.AYUB FOOTBALL STADIUM … · DR.AYUB FOOTBALL STADIUM IN BAIDOA DISTRICT, SOUTHWEST STATE Drawing Title: SCALE: DATE: DRAWN BY: ENG. Duale REVIEWED BY:

GSPublisherVersion 0.0.100.100

Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.

3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.

4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.

5. All reinforced concrete works to be done accordingto structural detail drawings

No: Date: Description:

REVISION

Implemented by:

Client:

THE FEDERAL REPUBLICOF SOMALIA

Project Title:

Sheet No.

PROPOSED REHABILITATION OFDR.AYUB FOOTBALL STADIUM IN

BAIDOA DISTRICT, SOUTHWEST STATE

Drawing Title:

SCALE:

DATE:

DRAWN BY: ENG. Duale

REVIEWED BY:

A3

AS SHOWN

NOVEMBER 2018

SOUTHWEST STATE,BAIDOA DISTRICT

3D 02

16/22

Page 19: PROPOSED REHABILITATION OF DR.AYUB FOOTBALL STADIUM … · DR.AYUB FOOTBALL STADIUM IN BAIDOA DISTRICT, SOUTHWEST STATE Drawing Title: SCALE: DATE: DRAWN BY: ENG. Duale REVIEWED BY:

GSPublisherVersion 0.0.100.100

Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.

3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.

4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.

5. All reinforced concrete works to be done accordingto structural detail drawings

No: Date: Description:

REVISION

Implemented by:

Client:

THE FEDERAL REPUBLICOF SOMALIA

Project Title:

Sheet No.

PROPOSED REHABILITATION OFDR.AYUB FOOTBALL STADIUM IN

BAIDOA DISTRICT, SOUTHWEST STATE

Drawing Title:

SCALE:

DATE:

DRAWN BY: ENG. Duale

REVIEWED BY:

A3

AS SHOWN

NOVEMBER 2018

SOUTHWEST STATE,BAIDOA DISTRICT

3D 03

17/22

Page 20: PROPOSED REHABILITATION OF DR.AYUB FOOTBALL STADIUM … · DR.AYUB FOOTBALL STADIUM IN BAIDOA DISTRICT, SOUTHWEST STATE Drawing Title: SCALE: DATE: DRAWN BY: ENG. Duale REVIEWED BY:

GSPublisherVersion 0.0.100.100

Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.

3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.

4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.

5. All reinforced concrete works to be done accordingto structural detail drawings

No: Date: Description:

REVISION

Implemented by:

Client:

THE FEDERAL REPUBLICOF SOMALIA

Project Title:

Sheet No.

PROPOSED REHABILITATION OFDR.AYUB FOOTBALL STADIUM IN

BAIDOA DISTRICT, SOUTHWEST STATE

Drawing Title:

SCALE:

DATE:

DRAWN BY: ENG. Duale

REVIEWED BY:

A3

AS SHOWN

NOVEMBER 2018

SOUTHWEST STATE,BAIDOA DISTRICT

3D 04

18/22

Page 21: PROPOSED REHABILITATION OF DR.AYUB FOOTBALL STADIUM … · DR.AYUB FOOTBALL STADIUM IN BAIDOA DISTRICT, SOUTHWEST STATE Drawing Title: SCALE: DATE: DRAWN BY: ENG. Duale REVIEWED BY:

GSPublisherVersion 0.0.100.100

Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.

3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.

4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.

5. All reinforced concrete works to be done accordingto structural detail drawings

No: Date: Description:

REVISION

Implemented by:

Client:

THE FEDERAL REPUBLICOF SOMALIA

Project Title:

Sheet No.

PROPOSED REHABILITATION OFDR.AYUB FOOTBALL STADIUM IN

BAIDOA DISTRICT, SOUTHWEST STATE

Drawing Title:

SCALE:

DATE:

DRAWN BY: ENG. Duale

REVIEWED BY:

A3

AS SHOWN

NOVEMBER 2018

SOUTHWEST STATE,BAIDOA DISTRICT

3D 05

19/22

Page 22: PROPOSED REHABILITATION OF DR.AYUB FOOTBALL STADIUM … · DR.AYUB FOOTBALL STADIUM IN BAIDOA DISTRICT, SOUTHWEST STATE Drawing Title: SCALE: DATE: DRAWN BY: ENG. Duale REVIEWED BY:

GSPublisherVersion 0.0.100.100

Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.

3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.

4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.

5. All reinforced concrete works to be done accordingto structural detail drawings

No: Date: Description:

REVISION

Implemented by:

Client:

THE FEDERAL REPUBLICOF SOMALIA

Project Title:

Sheet No.

PROPOSED REHABILITATION OFDR.AYUB FOOTBALL STADIUM IN

BAIDOA DISTRICT, SOUTHWEST STATE

Drawing Title:

SCALE:

DATE:

DRAWN BY: ENG. Duale

REVIEWED BY:

A3

AS SHOWN

NOVEMBER 2018

SOUTHWEST STATE,BAIDOA DISTRICT

3D 06

20/22

Page 23: PROPOSED REHABILITATION OF DR.AYUB FOOTBALL STADIUM … · DR.AYUB FOOTBALL STADIUM IN BAIDOA DISTRICT, SOUTHWEST STATE Drawing Title: SCALE: DATE: DRAWN BY: ENG. Duale REVIEWED BY:

GSPublisherVersion 0.0.100.100

Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.

3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.

4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.

5. All reinforced concrete works to be done accordingto structural detail drawings

No: Date: Description:

REVISION

Implemented by:

Client:

THE FEDERAL REPUBLICOF SOMALIA

Project Title:

Sheet No.

PROPOSED REHABILITATION OFDR.AYUB FOOTBALL STADIUM IN

BAIDOA DISTRICT, SOUTHWEST STATE

Drawing Title:

SCALE:

DATE:

DRAWN BY: ENG. Duale

REVIEWED BY:

A3

AS SHOWN

NOVEMBER 2018

SOUTHWEST STATE,BAIDOA DISTRICT

3D 07

21/22

Page 24: PROPOSED REHABILITATION OF DR.AYUB FOOTBALL STADIUM … · DR.AYUB FOOTBALL STADIUM IN BAIDOA DISTRICT, SOUTHWEST STATE Drawing Title: SCALE: DATE: DRAWN BY: ENG. Duale REVIEWED BY:

GSPublisherVersion 0.0.100.100

Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.

3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.

4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.

5. All reinforced concrete works to be done accordingto structural detail drawings

No: Date: Description:

REVISION

Implemented by:

Client:

THE FEDERAL REPUBLICOF SOMALIA

Project Title:

Sheet No.

PROPOSED REHABILITATION OFDR.AYUB FOOTBALL STADIUM IN

BAIDOA DISTRICT, SOUTHWEST STATE

Drawing Title:

SCALE:

DATE:

DRAWN BY: ENG. Duale

REVIEWED BY:

A3

AS SHOWN

NOVEMBER 2018

SOUTHWEST STATE,BAIDOA DISTRICT

3D 08

22/22

Page 25: PROPOSED REHABILITATION OF DR.AYUB FOOTBALL STADIUM … · DR.AYUB FOOTBALL STADIUM IN BAIDOA DISTRICT, SOUTHWEST STATE Drawing Title: SCALE: DATE: DRAWN BY: ENG. Duale REVIEWED BY:

GSPublisherVersion 0.0.100.100

Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.

3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.

4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.

5. All reinforced concrete works to be done accordingto structural detail drawings

No: Date: Description:

REVISION

Implemented by:

Client:

THE FEDERAL REPUBLICOF SOMALIA

Project Title:

Sheet No.

PROPOSED REHABILITATION OFDR.AYUB FOOTBALL STADIUM IN

BAIDOA DISTRICT, SOUTHWEST STATE

Drawing Title:

SCALE:

DATE:

DRAWN BY: ENG. Duale

REVIEWED BY:

A3

AS SHOWN

NOVEMBER 2018

SOUTHWEST STATE,BAIDOA DISTRICT

3D 10

22/22