proposed s.r.scheme of “ariisto heaven” june...
TRANSCRIPT
Proposed S.R.Scheme of “Ariisto Heaven”
Project is located on plot bearing CTS NO.
19/1 to 19/13 & 3/B, 3B-1, 3/C, 3/D, 3/E & 3/F
at Village Mulund, Mumbai
Maharashtra.
June 2017
PRE-FEASIBILITY REPORT Proposed S. R. Scheme of “Ariisto Heaven”
Project is located at Village Mulund, Maharashtra.
Category B1 Project
Submitted to
Expert Appraisal Committee (EAC)
Environmental Consultant
Building Environment (India) Pvt. Ltd
Office No. 603, Sai Sangam, Plot No. 85,
Sector- 15, C.B.D Belapur,
Navi Mumbai- 400 614
Tel No.: 022-27578554
Web: www.beipl.co.in
Submitted by
M/s. Ariisto Developers
Ariisto House, N.S. Phadke Road, Near East-
West Flyover, Andheri (East),
Mumbai – 400 069.
Proposed “Ariisto Heaven” at Mulund By M/s Ariisto Developers. 2017
1 BE/PFR-Ariisto Heaven/017/004 Rev.00
TABLE OF CONTENTS
1. EXECUTIVE SUMMARY 2
2. INTRODUCTION 7
3. PROJECT DESCRIPTION 8
4. SITE ANALYSIS 12
5. PLANNING BRIEF 13
6. PROPOSED INFRASTRUCTURE 14
7. REHABILITATION AND RESETTLEMENT PLAN 16
8. PROJECT SCHEDULE AND COST ESTIMATES 17
Proposed “Ariisto Heaven” at Mulund By M/s Ariisto Developers. 2017
2 BE/PFR-Ariisto Heaven/017/004 Rev.00
1. EXECUTIVE SUMMARY
Ariisto Developers is coming up with a SRA redevelopment project located on plot bearing CTS
NO. 19/1 to 19/13 & 3/B, 3B-1, 3/C, 3/D, 3/E & 3/F at Village Mulund, Mumbai Maharashtra.
The project location on Google is shown below in Figure no. 1.
Figure No.1 Plot Boundary Marked on Google Image
The total cost of the project estimated is 1331.08 crores. The project site comes under Municipal
Corporation of Greater Mumbai (M.C.G.M). As per the DCR, the development allowed on this
plot as per regulation No. 33(10), Scheme Under Reg. 33(14) (D), Scheme Under Reg. 32 i.e.
Commercial & Residential. The DP plan is shown below in Figure No.2.
Proposed “Ariisto Heaven” at Mulund By M/s Ariisto Developers. 2017
3 BE/PFR-Ariisto Heaven/017/004 Rev.00
Figure No.2 Plot Boundary Marked on Google Image
The project will be developed on total plot area of 132383.20 Sq.m. After deducting reservations,
the effective net plot area comes about 106489.20 Sq.m. The total Built-up area planned on the
site is 1051709.70 Sq.m. Their details are as given below:
Details Description
Building 2 One Building with 2 wings ( Wing A,B,C & D)
Wing A,B & D : 1 Basement + Ground + 5 Podia + 1 E deck Level + 2 Fire
check floors + 3 Service cum refuge floors + 4 refuge floors+ 41 floors + 2
Duplex floors.
Wing C: 1 Basement + Ground + 5 podia + E deck Level + 2 Fire check
floors + 3 Services floors + 5 refuge floors + 45 Floors.
Building 2A Policlinic : Ground + 3 Floors
Building 2B Public Utility : Ground + 1 Floors
Building 3 One Buildings with 4 wings (Wing A,B,C & D)
One Basement + Lower Ground + Upper Ground + Stilt + 5 podia + E deck
Level + Service Floor + Fire Check Floor + 26 Floors
Building 4 One Building with 2 Wings ( Wing A & B)
One basement + Ground + 9 Podia + 2 E - deck level + 2 Fire check floors +
Proposed “Ariisto Heaven” at Mulund By M/s Ariisto Developers. 2017
4 BE/PFR-Ariisto Heaven/017/004 Rev.00
1 Service floors + 1 refuge cum service floor + 5 refuge floors + 3 triplex
floors + 33 floors.
Bunglow One Building with Ground + 1 floors
Building 4B ( Public
Transit camp PTC)
One building with Ground + 24 Floors
Building 4C
(Rehabilitation)
One Building Ground + 23 Floors
Building 5 One Building with 2 wings A & B Ground + 5 podia + 12 Upper floors
Project Infrastructures
Power Requirement: Electricity will be sourced from MSEDCL.
As per earlier EC:
Connected Load: 55545 KW
Maximum Demand: 18493 KW
i. Water Requirement:
Construction Phase
Total water requirement estimated is 50 KLD. The water demand will be met by local
authority and water tankers.
Operation Phase
As per EC:
Source: MCGM /Recycled water / RWH / tanker
Total Water Demand: 2241 KLD
•Domestic: 1299 KLD
•Flushing: 655 KLD
•Gardening: 275 KLD
Swimming Pool: 12 KLD
Proposed Water Requirement:
Source: MCGM /Recycled water / RWH / tanker
Total Water Demand: 3913 KLD
Domestic: 2566 KLD
Flushing: 1283 KLD
ii. Manpower Requirement:
Construction Phase
Proposed “Ariisto Heaven” at Mulund By M/s Ariisto Developers. 2017
5 BE/PFR-Ariisto Heaven/017/004 Rev.00
During the construction phase about 500 persons will be deployed on the site from nearby
places. Influx of these people was temporary in nature.
Operation Phase
On completion of the project, residents will occupy their property. Total population is expected to
be 28515.
iii. Wastewater Management:
As per EC: Total 1689 KLD of wastewater will be generated from the project site. After
recycling treated sewage will be used for flushing, gardening & car washing.
Proposed: Total 3465 KLD of wastewater will be generated from the project site. After
recycling treated sewage will be used for flushing, gardening & car washing.
v. Solid Waste Management
Construction Phase
During the construction phase, soak pits and septic tanks will be provided for disposal of
waste water. Temporary sanitary toilets will also be provided during peak labor force.
As per EC:
The total quantities of solid waste that will be generated in the project will be 6423 Kg/day.
Out of which 1944 Kg/day will be non-biodegradable and 4479 Kg/day will be biodegradable
Proposed:
The total quantities of solid waste that will be generated in the project will be 13698 Kg/day.
Out of which 3850 Kg/day will be non-biodegradable and 8982 Kg/day will be biodegradable.
Biodegradable waste will be treated in OWC. Non Bio-degradable waste will be handed over
to authorized local vendor for recycling.
vi. Noise
The construction noise localized, intermittent in nature. This has subsided with the completion
of the foundation work. The resultant ambient air noise levels will be within the tolerable
levels. The operation will be restricted to day time. Adequate measures taken to keep noise
and vibrations under control. No heat or light emission.
Background Study
Environmental Monitoring is planned for better understanding the baseline conditions and
pollution levels so that impacts can be assessed and addressed in environment management plan.
The detailed report will be furnished in EIA.
Proposed “Ariisto Heaven” at Mulund By M/s Ariisto Developers. 2017
6 BE/PFR-Ariisto Heaven/017/004 Rev.00
i. Environmental Attributes
The baseline data collection will be carried out as per EIA notification 2006, CPCB guidelines
and EIA Guidelines Manuals 2010. Results will be depicted in EIA report.
ii. Air Dispersion Modeling
Air Modeling will be carried out for dispersion assessment of pollutants from stack emissions.
Results will be depicted in the EIA report.
Safety
Employee’s safety is well maintained by good working practices. PPE will be provided to workers
during construction phase. A well-planned Security Service will be hired. The general safety rules
to be followed by all staff and workers will be documented and made aware to all personnel by the
Safety Officer.
Training will be given at a regular interval to the employees & workers in First Aid, Fire-fighting,
and for action during the emergencies. The records of all accidents will be maintained and cause
of the accident will be investigated and preventive measures will be taken to prevent
reoccurrences.
Portable Fire Extinguishers will be provided at prominent places. Signs indicators for all fire
safety, safe evacuation plan will be provided. Under ground water storage tank of adequate
capacity will be provided exclusively for Fire Fighting. On-site emergency plan will be in place.
Accordingly, Personal protection equipment will be given and use will be insisted. Consulting
Physician will be retained to attain the site. Safety measures will be considered in storage and in
transportation of construction materials as well.
Proposed “Ariisto Heaven” at Mulund By M/s Ariisto Developers. 2017
7 BE/PFR-Ariisto Heaven/017/004 Rev.00
2. INTRODUCTION
Ariisto Developers is coming up with a SRA redevelopment project located on plot bearing CTS
NO. 19/1 to 19/13 & 3/B, 3B-1, 3/C, 3/D, 3/E & 3/F at Village Mulund, Mumbai Maharashtra.
The aforesaid development falls in the Category B1 of Projects and Activity Number 8(a) –
“Building Construction Projects” as per the “List of Projects or Activities requiring Prior
Environmental Clearance” given in the EIA Notification dated 14th September, 2006 &
subsequent amendments.
The Environmental Impact Assessment (EIA) will be based on one season environmental
monitoring data. The EIA will be carried out as per the EIA guidelines and requirements of
Ministry of Environment and Forests. The impacts from the proposed project will be investigated
by establishing baseline conditions, identification, prediction and evaluation of impacts of the
component of the project.
Proposed “Ariisto Heaven” at Mulund By M/s Ariisto Developers. 2017
8 BE/PFR-Ariisto Heaven/017/004 Rev.00
3. PROJECT DESCRIPTION
Ariisto Developers is coming up with a SRA redevelopment project located on plot bearing CTS
NO. 19/1 to 19/13 & 3/B, 3B-1, 3/C, 3/D, 3/E & 3/F at Village Mulund, Mumbai Maharashtra.
The project site comes under Municipal Corporation of Greater Mumbai (M.C.G.M). The total
cost of the project estimated is 1331.08 Crores.
The project will be developed on total plot area of 132383.20 Sq.m. After deducting reservations,
the effective net plot area comes about 106489.20 Sq.m. The total Built-up area planned on the
site is 1051709.70 Sq.m. Their details are as given below:
Details Description
Building 2 One Building with 2 wings ( Wing A,B,C & D)
Wing A,B & D : 1 Basement + Ground + 5 Podia + 1 E deck Level + 2 Fire
check floors + 3 Service cum refuge floors + 4 refuge floors+ 41 floors + 2
Duplex floors.
Wing C: 1 Basement + Ground + 5 podia + E deck Level + 2 Fire check
floors + 3 Services floors + 5 refuge floors + 45 Floors.
Building 2A Policlinic : Ground + 3 Floors
Building 2B Public Utility : Ground + 1 Floors
Building 3 One Buildings with 4 wings (Wing A,B,C & D)
One Basement + Lower Ground + Upper Ground + Stilt + 5 podia + E deck
Level + Service Floor + Fire Check Floor + 26 Floors
Building 4 One Building with 2 Wings ( Wing A & B)
One basement + Ground + 9 Podia + 2 E - deck level + 2 Fire check floors +
1 Service floors + 1 refuge cum service floor + 5 refuge floors + 3 triplex
floors + 33 floors.
Bunglow One Building with Ground + 1 floors
Building 4B ( Public
Transit camp PTC)
One building with Ground + 24 Floors
Building 4C
(Rehabilitation)
One Building Ground + 23 Floors
Building 5 One Building with 2 wings A & B Ground + 5 podia + 12 Upper floors
i. Location Details
Plot bearing CTS NO. 19/1 to 19/13 & 3/B, 3B-1, 3/C, 3/D, 3/E & 3/F at Village Mulund,
Mumbai Maharashtra. The geographical coordinates of the site are given below:
Latitude: 19o 11’ 02.89” N
Longitude: 72o 56’ 29.44” E
Proposed “Ariisto Heaven” at Mulund By M/s Ariisto Developers. 2017
9 BE/PFR-Ariisto Heaven/017/004 Rev.00
The project location on Google is shown below.
Plot Boundary Marked on Google Image
ii. Connectivity:
Places Aerial Distance
Mulund Railway Station 0.17 km
Chhatrapati Shivaji Int’l Airport 12.5 km
Kasturba Hospital 0.52 kms
Kenia & Anchor English School 1.10 kms
Tulsiwadi Police Station 0.20 kms
Mulund Fire Station 1.30 kms
(These are aerial distances as measured on Google Earth)
iii. Details of Alternative Site Considered
No alternative site is been considered for project development.
iv. Project Area Details
Gross Plot Area: 132383.20 Sq.m
Net Plot Area: 106489.20 Sq.m
Built-up Area: 1051709.70 Sq.m
v. Process Details
Not Applicable
vi. Flow Chart Showing Project Layout
Not Applicable.
Proposed “Ariisto Heaven” at Mulund By M/s Ariisto Developers. 2017
10 BE/PFR-Ariisto Heaven/017/004 Rev.00
vii. Power: Please refer for the details which are already given in Chapter 1 ‘Executive
Summary’.
viii. Water: Please refer for the details which are already given in Chapter 1 ‘Executive
Summary’.
ix. Manpower: Please refer for the details which are already given in Chapter 1 ‘Executive
Summary’.
x. Raw Material Requirement
Not Applicable.
xi. Waste Management/ Disposal
Please refer for the details which are already given in Chapter 1 ‘Executive Summary’.
Proposed “Ariisto Heaven” at Mulund By M/s Ariisto Developers. 2017
11 BE/PFR-Ariisto Heaven/017/004 Rev.00
Environmental Impact Assessment (EIA) is a well planned process to predict the environmental
consequences of any kind of development, which is a result of human activities and to suggest
appropriate measures in order to reduce adverse effects and also to augment positive effects. The
EIA procures a rational and ethical approach for sustainable development. However, it is more
scientific process because it not only tells the past, present and the future consequences of going
on development, but also predicts the future events which likely to change due to some reasons, In
terms of the EIA notification of the MoEF dated 14th September 2006, the generic structure of EIA
documents shall be as under:-
Introduction
Project Description
Description of the Environment on the basis of Baseline data
Analysis of Alternatives (Technology & Site)
Anticipated Environmental Impact & mitigation Measures
Environmental Monitoring Program
Additional studies
Project benefits
Environmental Cost benefits Analysis
EMP
Summary & Conclusion
Disclosure of Consultant Engaged
CSR Activity
Proposed “Ariisto Heaven” at Mulund By M/s Ariisto Developers. 2017
12 BE/PFR-Ariisto Heaven/017/004 Rev.00
4. SITE ANALYSIS
i. Connectivity
Please refer for the details which are already given in Chapter 3 ‘Project Description’.
ii. Land form and Land Use
As per the DP Plan the site is under commercial and residential zone. The proposed project
will be residential & commercial in nature
iii. Land Ownership
Land ownership is with Ariisto Developers
iv. Existing Land Use Pattern
As per the DP Plan the site is under commercial and residential zone. Presently slums exist
on the site.
v. Existing Infrastructure
The site surroundings are quite developed. The site has excellent connectivity in terms of
Rail and Road transport.
vi. Soil Classification
Not Available
vii. Climate data secondary source
The climate is tropical wet and dry climate. Most months of the rainy season are marked
by significant rainfall. Mumbai's climate can be best described as moderately hot with high
level of humidity. Its coastal nature and tropical location ensures temperatures won't
fluctuate much throughout the year. The mean maximum average temperatures in about 32
°C (90 °F) in summer and 30 °C (86 °F) in winter, while the average minimums are 25 °C
(77 °F) in summer and 20.5 °C (68.9 °F) in winter. Mumbai experiences four distinct
seasons: Winter (December–Feb); Summer (March–May); Monsoon (June–Sep); and
Post-Monsoon (Oct–Dec)
viii. Social Infrastructure Available
The social infrastructure surrounding project site is quite developed.
Proposed “Ariisto Heaven” at Mulund By M/s Ariisto Developers. 2017
13 BE/PFR-Ariisto Heaven/017/004 Rev.00
5. PLANNING BRIEF
i. Planning Concept - SRA Project
ii. Population Projection - On completion of the project, total population is expected
to be 28515.
iii. Land use planning - As per the DP Plan the site is under commercial and
residential zone.
iv. Amenities or facilities
- Improved Residential Housing
- Improved Internal Roads
- Improved hygenic & sanitation conditions
- Balwadi, Welfare Centres & shops
- Onsite Solid waste and wastewater treatment facility
- Installation of Rain Water Harvesting System
Proposed “Ariisto Heaven” at Mulund By M/s Ariisto Developers. 2017
14 BE/PFR-Ariisto Heaven/017/004 Rev.00
6. PROPOSED INFRASTRUCTURE
The proposed project is under SRA scheme. It provides a well-designed residential housing and
improved hygienic and sanitation conditions. Also, supporting development will take place at the
site. The project will also have better internal roads, provision of Rainwater Harvesting system
and onsite Sewage Treatment and solid waste treatment facility.
i. Residential area –
Details Description
Building 2 One Building with 2 wings ( Wing A,B,C & D)
Wing A,B & D : 1 Basement + Ground + 5 Podia + 1 E deck Level + 2 Fire
check floors + 3 Service cum refuge floors + 4 refuge floors+ 41 floors + 2
Duplex floors.
Wing C: 1 Basement + Ground + 5 podia + E deck Level + 2 Fire check
floors + 3 Services floors + 5 refuge floors + 45 Floors.
Building 2A Policlinic : Ground + 3 Floors
Building 2B Public Utility : Ground + 1 Floors
Building 3 One Buildings with 4 wings (Wing A,B,C & D)
One Basement + Lower Ground + Upper Ground + Stilt + 5 podia + E deck
Level + Service Floor + Fire Check Floor + 26 Floors
Building 4 One Building with 2 Wings ( Wing A & B)
One basement + Ground + 9 Podia + 2 E - deck level + 2 Fire check floors +
1 Service floors + 1 refuge cum service floor + 5 refuge floors + 3 triplex
floors + 33 floors.
Bunglow One Building with Ground + 1 floors
Building 4B ( Public
Transit camp PTC)
One building with Ground + 24 Floors
Building 4C
(Rehabilitation)
One Building Ground + 23 Floors
Building 5 One Building with 2 wings A & B Ground + 5 podia + 12 Upper floors
iii. Green belt – RG area provided on ground is 30,388.10 Sq.m.
iv. Drinking water Management
The water demand will be met by MCGM water supply.
v. Sewerage System
Sewage shall be send to the STP and treated sewage would be used for gardening and non-potable
purposes. STPs with suitable capacity with appropriate technology will be installed depending on
the site conditions and requirement.
Proposed “Ariisto Heaven” at Mulund By M/s Ariisto Developers. 2017
15 BE/PFR-Ariisto Heaven/017/004 Rev.00
vi. Industrial Waste Management
Not Applicable
vii. Solid Waste Management
Construction Waste: Please refer for the details which are already given in Chapter 1 ‘Executive
Summary’.
Waste Generated during Operation Phase: Please refer for the details which are already given
in Chapter 1 ‘Executive Summary’.
viii. Power Requirement and Supply
Please refer for the details which are already given in Chapter 1 ‘Executive Summary’.
Proposed “Ariisto Heaven” at Mulund By M/s Ariisto Developers. 2017
16 BE/PFR-Ariisto Heaven/017/004 Rev.00
7. REHABILITATION AND RESETTLEMENT PLAN
Proposed “Ariisto Heaven” at Mulund By M/s Ariisto Developers. 2017
17 BE/PFR-Ariisto Heaven/017/004 Rev.00
8. PROJECT SCHEDULE AND COST ESTIMATES
i. Project Schedule The project will be built over a period of approx.10 years.
ii. Project cost estimates - Rs. 1331.08 Crores