PROPOSED TERMS OF REFERENCE
For
AMENDMENT/EXPANSION IN RESIDENTIAL & COMMERCIAL PROJECT WITH SRA SCHEME
AT
On plot bearing C.S. Nos. 286(pt), 793(pt), 913, 1/914, 3/914 & 1629(pt) &6/1629ofLowerParelDivision,PandurangBhudhkarMarg,Worli,clubbedwithadjoining non‐slum plot including public parking bearing C.S Nos. 1/913, 1A/913,914,2/914,4/914,915and7E/1629(CrestSchemeplotno.250B)underClause7.7ofAppendixIVofDCR33(10)for“MahalaxmiSRACHSLtd.”MumbaiinG/SWardandclubbedschemesofProposedSlumRehabilitationSchemeonplotbearingC.S.No.200(pt), 201,3/159(pt),&205(pt)ofParel SewriDivisionfor “Ganeshwadi Utkarsh SRA CHS Ltd.” in F/S Ward , Proposed SlumRehabilitation Scheme on plot C S No. 1/362(pt) ofMatunga division at 18.30mtr. Sheikh Mishree Road, Antop Hill, Wadala Mumbai. Known as “Sheikh
MishreeSRACHS(Prop)”inF/NWard,Mumbai,Maharashtra.
PROPOSED BY
OMKARREALTORS&DEVELOPERSPVT.LTD.
ToRforAmendment/ExpansionofResidential&CommercialProjectatWorli,Mumbai
OMKARREALTORS&DEVELOPERSPVT.LTD. Page1
CONTENTS
1. INTRODUCTION .............................................................................................. 2 2. PROJECT DISCRIPTION ................................................................................ 5 3. ENVIRONMENTAL BASELINE STATUS ................................................... 11 4. IMPACT ASSESSMENT ................................................................................. 13 5. SPECIFIC STUDIES ....................................................................................... 14 6. ENVIRONMENTAL MONITORING PROGRAME ..................................... 14 7. RISK ANALYSIS AND DISASTER MANAGEMENT PLAN ....................... 15 8. PROJECT BENEFITS .................................................................................... 16 9. ENVIRONMENTAL MANAGEMENT PLAN (EMP) .................................. 16 10. EXECUTIVE SUMMARY OF EIA ................................................................. 17 11. CREDENTIALS OF CONSULTANTS ........................................................... 17
ToRforAmendment/ExpansionofResidential&CommercialProjectatWorli,Mumbai
OMKARREALTORS&DEVELOPERSPVT.LTD. Page2
TERMSOFREFERENCE
ObjectiveoftheEIAstudy:
The construction area of the proposed residential projectwith SRA Scheme is5,74,120.87 m2.AspertheEIANotification14thSept2006anditssubsequentamendments, the construction projects whose built up area is exceeding the1,50,000m2 requiresEnvironmental ImpactAssessment Study, hence thisToRbeingproposedtocarryouttodelineatetheimpactofproposeddevelopmentinthesurroundingareas.ThestudyareabeingconsideredfortheEIAstudyis10km from the project site as this an urban area. The project is located withinMunicipallimitsMumbai.ThemapofthestudyareaisattachedasAnnexureI.
The Terms of reference for conducting EIA study for the proposed project isdescribedinthefollowingsections.
1. INTRODUCTION
I. PREAMBLE
OmkarRealtors&DevelopersPvt.Ltd.isproposingamendmentinResidentialproject with SRA Scheme on plot bearing On plot bearing C.S. Nos. 286(pt),793(pt), 913, 1/914, 3/914 & 1629(pt) & 6/1629 of Lower Parel Division,Pandurang Bhudhkar Marg, Worli, clubbed with adjoining non‐slum plotincluding public parking bearing C.S Nos. 1/913, 1A /913, 914, 2/914, 4/914,915and7E/1629(CrestSchemeplotno.250B)underClause7.7ofAppendixIVofDCR33(10)for“MahalaxmiSRACHSLtd.”MumbaiinG/SWardandclubbedschemes of Proposed Slum Rehabilitation Scheme on plot bearing C.S.No.200(pt), 201, 3/159(pt), & 205(pt) of Parel Sewri Division for “GaneshwadiUtkarshSRACHSLtd.” inF/SWard , ProposedSlumRehabilitationSchemeonplotCSNo.1/362(pt)ofMatungadivisionat18.30mtr.SheikhMishreeRoad,AntopHill,WadalaMumbai.Knownas“SheikhMishreeSRACHS(Prop)”inF/N
Ward,Mumbai‐ 400025 which comes within themunicipal limits of Mumbai.ThelandissituatedinResidentialZoneasperDevelopmentPlanofMumbai.
WehavereceivedPriorEnvironmentalClearancevideletterNo.SEAC‐2009/CR.174/TC.2dt.20.05.2010.TheECwasamendedvideNo.SEAC‐2212/CR188/TC‐2 dated 01.12.2014, 24.03.2015 and vide No. SEIAA‐2015/CR‐71/TC 3 dated13.10.15.TheECwasobtainedforPlotareaof37,674.29m2;TotalBuiltupareaof4,61,086.45m2
WehadappliedtoMoEF&CCforamendmentinECon06.07.2017.TheprojectisrecommendedforEnvironmentalClearancebyEACinits22ndEACmeetingheldon12.09.2017fortotalconstructionareaof5,86,423.71m2
Now, the amendment/expansion in EC is required due to change in planning,reductioninheightofbuildingsandadditionofoneresidentialbuilding.Duetothisthereisreductionintotalconstructionby12,302.84m2.
ToRforAmendment/ExpansionofResidential&CommercialProjectatWorli,Mumbai
OMKARREALTORS&DEVELOPERSPVT.LTD. Page3
ThepurposeofthisEnvironmentalImpactAssessment(EIA)studyistoprovideinformationonthenatureandextentofenvironmentalimpactsarisingfromtheconstructionanduseofproposedbuildingsandrelatedactivitieswithaviewtodefine an Environmental Management Plan (EMP) to minimize adverseenvironmentalimpacts.
II. PROJECTLOCATION
The proposed site of Residential complex is planned at Lower Parel Division,Worli, in Mumbai, located on 19°00’30.15”N latitude and 72°49’24.98”Elongitude.
The proposed project is accessible from Pandurang BudhkarMarg and SudamKalu Ahire Marg. The proposed site is located at about 1.3 km away fromElphinstoneRoadRailwayStation.Theproposedproject isplanned in theplotadmeasuringapproximately37,674.29Sq.mt.area.
ThelocationmapindicatingproposedcomplexanditssurroundingsaredepictedinFigure1.
ToRforAmendment/ExpansionofResidential&CommercialProjectatWorli,Mumbai
OMKARREALTORS&DEVELOPERSPVT.LTD. Page4
Figure1:LocationPlan
ToRforAmendment/ExpansionofResidential&CommercialProjectatWorli,Mumbai
OMKARREALTORS&DEVELOPERSPVT.LTD. Page5
III. OBJECTIVESOFTHESTUDY
TheobjectivesoftheEIAstudyare:
Todescribethescopeoftheproposedprojectandassociatedworks;
Toestablishthebaselineenvironmentalstatusoftheprojectsite;
Toidentifyandquantifypollutionsourcesanddeterminethesignificanceofimpactsonsensitivereceptors;
To identify, predict and evaluate environmental and social impactsexpectedduringtheconstructionandfunctionalphasesinrelationtotheexistingcivicinfrastructureandsensitivereceptorspresentifany;
To develop mitigation measures so as to minimize pollution,environmental disturbance and nuisance during construction andfunctionalphases;and
To design and specify themonitoring schedule necessary to ensure theimplementationandtheaffectivityofthemitigationmeasuresadopted
IV. METHODOLOGYOFTHESTUDY
Reconnaissance surveywas carried out to understand nature of the proposeddevelopment, conduct visual site inspection,decide the sampling locations andprogramme.Samplinglocationswereidentifiedonthebasisoffollowingcriteria:
Predominantwinddirectioninthestudyarea;
Existingtopography;
Locationofexistingactivities;
Locationofsensitiveareas;
Accessibility,availabilityofpowerandsecurityofmonitoringinstruments;and
Areathatrepresentsbaselineconditions.
Sampleswerecollectedforaperiodofthreemonthsi.eforSummerSeason.
2. PROJECTDISCRIPTION
The proposed development is located in the Lower Parel Division, Worli,Mumbai. It will provide private residential space with relevant amenities andservices.Themainpurposeandbenefitoftheprojectare:
Toprovidequalityresidentialaccommodation
ToRforAmendment/ExpansionofResidential&CommercialProjectatWorli,Mumbai
OMKARREALTORS&DEVELOPERSPVT.LTD. Page6
Tocreateanenvironmentthatcouldsupportthegoodstandardoflivingenvironment;
Tomeetthegrowingdemandsofresidentialspaceinanenvironmentallysustainablemannerinthearea;
To enhance the surroundings with greenery, landscaping and pleasingaesthetics
Toimplementthepolicyofwaterconservationandrainwaterharvesting.
Theproposeddevelopmentwillinvolvesiteformationworksandconstructionofbuilding/structures, access roads,drains and sewer connections.Thebuildingsare proposed to locate on a flat terrain. The proposed residential project willhave4SaleTowersand8RehabBuildings.TheLayoutPlanisgivenbelow.
ToRforAmendment/ExpansionofResidential&CommercialProjectatWorli,Mumbai
OMKARREALTORS&DEVELOPERSPVT.LTD. Page7
Figure2:LayoutPlan
6.0
0
3.1
0
10.13 10.13
3.1
0
6. 00
2 3. 54
LAYOUT SHEET NO. 01/02
LOCATION PLAN
C.N
ASPHALTPLANT
PA
ND
UR
AN
G B
HO
DK
AR
MA
RG
R.G
H.D
12.20 M. D.P ROAD
S.AMRITWAR MARG
S.NARM PATHR.G
R.G
P.GP
G
R.GRELOCATED
SITE U/R
PROFORMA - II
STAMP OF DATE OF APPROVAL OF PLANS
DESCRIPTION OF PROPOSAL & PROPERTY
N
PROPOSED PUBLIC PARKING LOT (PPL2) ON PLOT BEARINGC.S. No.- 286 (pt), 793 (pt), 913, 1/913, 1A/913, 914, 1/914, 2/914, 3/914,4/914, 915, 7D/1629, 6A/1629, 6B/1629 & 7E/1629 OF LOWER PAREL
DIVISION FOR WORLI, MUMBAI 400025.
STAMP OF DATE OF RECEIPT OF PLANS
JOB No.
NAME & ADDRESS OF ARCHITECT
SCALE DATE DRAWN BY CHECKED BY
NAME AND SIGNATURE OF OWNER
M/s OMKAR REALTORS & DEVELOPERS Pvt. Ltd. SIGNATURE
NORTH
F / 63, "PALM ACRES", CHS, MAHATMA PHULE ROAD, MULUND EAST, MUMBAI - 400081.
FILE PATH :- Y:\RAMESH NETHA\MAHALAXMI\ACAD\MUNP.DRG\mivan-rehab-dwg
M-110 AS SHOWN
STP
TEMPLE
FLOUR MILL
C.S.-6A/1629pt
LAYOUTSCALE 1:500
C.S.-6B/1629pt
C.S.-7D/1629pt
C.S.-7D/1629pt
PROPOSEDRELOCATED
D.P. R.G.2248.00 SQ. MT
PODIUM FLOOR LINE
BASEMENT LINE
ENTRY
PROPOSED 12.2 0 WIDE D.P. ROAD
SUB PLOT - B
SUB PLOT - C
SUB PLOT - E
C.S. NO.-1629
C.S. NO.-6/1629
C.S. NO.-794C.S. NO.-794
EXISTING ROAD PROPOSEDTO BE DELETED
SUB-01SUB-02
FIRE CO NTROL ROOM
METER ROOM
L ETTE R BOX RM.
DISH ANTINA RM.
SOC. OFFICE
Uti li ty IntakeRoom
MIL K BOOTH
S OCIETYO FFICE
D IS H ANTINAROOM ME TE R ROOM
EPBX ROOM
SUB-STATION
PR
ESS
UR
IZED
FA
N &
BLO
WE
R C
ON
TR
OL R
OO
M
F IREESCAPE
V IS ITOR'SL OBBY
VIS
ITO
R'S
DR
OP
OFF
RESIDENTIALL OBBY
FIREESCAPE
S ECURITY
S ECURITY
SE
CU
RIT
Y
SE
CU
RIT
Y
SE
CU
RIT
Y
SE
CU
RIT
Y
T3 RE SIDE NTIALDROP OFF
RE
SID
EN
TIA
LL
OB
BY
RE
SID
EN
TIA
LL
OB
BY
RE
SID
EN
TIA
LL
OB
BY
ME
PS
TO
RE
PUBL IC
PAR
KING
LIFT
LOBBY
FIR
E E
SC
AP
E
DRIV
ER'S
LIFT
LOBBY
T2
RE
SID
EN
TIA
LD
RO
P O
FF
T1
RE
SID
EN
TIA
LD
RO
P O
FF
FIR
EE
SC
AP
E
GU
ES
TT
OIL
ETS
FIR
EE
SC
AP
E
STO
RE
FIR
EE
SC
AP
E
TO
ILE
TS
WATERFEATURE
WATERFEATURE
IN
OU
T
OU
T
P UBLIC PA RKING ACCESS
UP
UP
UP
UP
UP
UP
UP
SE
RV
ICE
RO
AD
SE
RV
ICE
RO
AD
SE
RV
ICE
RO
AD
IN
OU
T
FO
R B
AS
EM
EN
TS
FOR BASEMENTS
VENT. SHAFTS
FOR BASEMENTS
VENT. SHAFTS
FOR BASEMENTS
WA
LKW
AY
DR
AIN
AS
/C
ON
SU
LTA
NT
FO
R B
AS
EM
EN
TS
FO
R B
AS
EM
EN
TS
PLA
NTE
R
PLA
NT
ER
PLA
NT
ER
PL
AN
TER
PLA
NT
ER
P LANTER
P LANTER
PLA
NTE
R
PLA
NTE
R
VENT. SHAFTS
FOR BASEMENTS
VENT. SHAFTS
FOR BASEMENTS
VENT. SHAFTS
FOR BASEMENTS
VENT. SHAFTS
FOR BASEMENTS
ME
P E
QU
IPM
EN
T
BE
NC
HS
EA
TIN
G(W
ITH
VE
NT
ILA
TIO
NS
HA
FT
S B
ELO
W)
WA
LKW
AY
RE
SID
EN
TIA
L P
AR
KI N
G A
CC
ES
S
PU
BL
IC P
AR
KIN
GA
CC
ES
S (T
O B
01)
GOODSLIFTLOBBY
PU
BL
IC P
AR
KIN
GA
CC
ES
S (T
O P
03)
TOP OFWATERLEVEL
LIM
ITE
D H
EA
DR
OO
MU
ND
ER
NE
AT
H R
AM
P
UP
FR
OM
B-0
1
TO
B-0
1
T2
RE
SID
EN
TIA
LD
RO
P O
FF
DR
AIN
AS
/
< < < 1 2 . 2 0 M . W I D E D . P . R O A D > > >
< <
<
24 .
40 M
. WID
E P
AN
DU
RA
NG
BU
DH
KA
R M
AR
G
>>
>
DV
< < < 1 2 . 2 0 M
. W I D E
D . P . R O A D > > >
ENTRY
ENTRY
ENTRY
ENTR
Y
SUB PLOT - A
C.S. NO.-1546
DV
DV
LV LV
DV
DVDV
DV
DV
DV
LV LV
LV
LV
LV
LV
LV
LV
LVLV LV
TO MUNICIPAL SEWER
POSITION 'P'.
UG &CFO
TANKUG &CFO
TANK(FL USHEDWIT H GR.L EVEL)
UG &CFO
TANK(FLU SHEDWIT H GR.L EVEL)
UG &CFO
TANK(FLU SHEDWITH GR.LEVEL)
UG &CFO
TANK(FL USHEDWIT H GR.LEVEL)
UG &CFO
TANK(FLUSHED
WITHGR.
LEVEL)
UG &CFO
TANK(FLUSHED
WITHGR.
LEVEL)
Wing-D1
Wing-I1
Wing-C1
Temple
STP
P LANTER
PLA
NTER
TOP OFWATERLEVEL
GR
D L
VL
. TO
PO
DI U
M 3
LV
L.P
UB
LIC
PA
RK
I NG
AC
CE
SS
BA
SE
ME
NT
1 L
VL
. TO
PO
DI U
M 1
LV
L.
RESIDENTIA L PAR KING A CCESS
G RD LVL . TO P ODIUM 3 LV L.
PP
L E
NT
RY
LOCATION FOR OWC
SUB-STATION
SUB STATION
SUB STATION
SU
B S
TATI
ON
UP DN
E NTRY
E XIT
05
06
07
08
09
10
ToRforAmendment/ExpansionofResidential&CommercialProjectatWorli,Mumbai
OMKARREALTORS&DEVELOPERSPVT.LTD. Page8
I. LANDUSE
The proposed project plot is of irregular shape. As per the DP, the land is situated inResidentialZone.
II. BUILTUPAREA
Theprojectwillbedevelopedonthelandcomprisingabout37,674.29m2area.Thetotalbuilt up area (FSI Proposed) of the Project is 144417.2m2. Total construction area isaround5,74,120.87m2.
TheFSIandNonFSIareadetailsaregiveninTable1
Table2:FSIandNonFSIAreaStatement
III. SITESETTING
The topographyof the land is irregular shape. Theproposedproject is accessible fromPandurangBudhkarMarg and SudamKaluAhireMarg. The proposed site is located atabout 1.3 km away from Elphinstone Road Railway Station. The Google image of theprojectsiteanditssurroundingsaregiveninFigure3.
Sr.No. Description Aream2
1. FSIArea 1,44,417.2 2. NonFSIArea 4,29,703.67 3. TotalConstructionArea 5,74,120.87
ToRforAmendment/ExpansionofResidential&CommercialProjectatWorli,Mumbai
OMKARREALTORS&DEVELOPERSPVT.LTD. Page9
Figure3:GoogleImage
ToRforAmendment/ExpansionofResidential&CommercialProjectatWorli,Mumbai
OMKARREALTORS&DEVELOPERSPVT.LTD. Page10
TENEMENTSTATEMENT
Thetotalpopulationduringoperationphaseoftheprojectwillbearound10220.
Sr.No.
BuildingName Tenement
1 SaleTower1:3B+G+10P(ParkingFloor)+1MechFlr+1MechMezzFlr+2AmenityFlr+1FireCheckFloor+16thto75thhabitablefloors(including2firechkfloors+6MechFloors)Ht:266.73m
237
2 SaleTower2:3B+G+10P(ParkingFloor)+1MechFlr+1MechMezzFlr+2AmenityFlr+1FireCheckFloor+16thto70thhabitablefloors(including3FireCheckFloors+3MechFloors+1MechMezzanineFloors)Ht:265.37m
147
3 SaleTower3:3B+G+10P(ParkingFloor)+1MechFloor+1MechMezzFlr+2AmenityFlr.+1FireCheckFloor+16thto68thhabitablefloors(including2FireCheckFloors+5MechFloors)Ht:267.44m
66
4 SalebuildingNo.2:‐2B+G+8MechanicalCarparkfloor+1ServiceFloor+1stto15thHabitablefloorHt:69.95m
71
RehabBldg: WingB:G+23Floors,
Ht:69.95mRehab:1380Nos.;BWSUnits:48Nos.R/C:25Nos.Amenities:9Nos.,Temple:4Nos.Shops:130Nos.
BuildingNo.CtoI:G+23Floors,Ht:69.95m
IV. PROJECTINFRASTRUCTURE&ITSUTILITIESPLANNED
The utilities and recreational facilities planned in proposed project includeslandscaped garden. The other infrastructure facilities planned for proposedprojectarehighlightedbelow:
Table:ProjectDetails
Sr.No. Description Details
ToRforAmendment/ExpansionofResidential&CommercialProjectatWorli,Mumbai
OMKARREALTORS&DEVELOPERSPVT.LTD. Page11
1 No.ofTenement
SaleFlats:521;Rehab:1380Nos.;BWSUnits:48Nos.R/C:25Nos.Amenities:9Nos.,Temple:4Nos.,Shops:120
2 Population 10220Nos.
3 WaterRequirement 1327KLD
4 SewageGeneration 1150KLD
5 STPCapacity 1250KLD
6 STPTechnology MBBRTechnology
7 SolidWaste 4993kg/d
8 PowerRequirement 20.5MW
9 DGSetCapacity Rehab:630kVAandSale:2x2500kVA
10 LandscapeArea 1842m2
11 ParkingProvided(4W)
4WParking:1278No’s(insituSaleResidentialParking)4WPPLParking:600No’s(HandovertoMCGM)
3. ENVIRONMENTALBASELINESTATUSThedata forEIAstudywerecollectedduringMarch2016toMay2016throughfieldstudies,literaturereview,andinteractionwithconcerneddepartments.Thestudy area for the EIA study shall be the areawithin the 10 km radius of theperipheryoftheproject.Mapofthestudyareaclearlydelineatingthelocationofvarious monitoring stations (air/ water / soil and noise) superimposed withlocationofhabitats shall be shown.Primarydatawas collected forone seasonexceptrainyseason.MonitoringwascarriedoutasperCPCBguidelines.The data/information on Environmental Baseline Statuswere collected as perthefollowingparagraphs.Meteorology: As a part of the REIA study, a micro‐meteorological data wascollected from nearest IMD station. The parameters includewind speed,winddirection,temperature,andrelativehumidity.Thecollecteddatawillbeusedforpreparationofwindrosediagramsandairqualitymodelling.
ToRforAmendment/ExpansionofResidential&CommercialProjectatWorli,Mumbai
OMKARREALTORS&DEVELOPERSPVT.LTD. Page12
AmbientAirQuality:Anambientairqualitymonitoringnetworkwasdesignedforassessmentofthebaselinestatusofambientairquality.Theparameterstobemonitoredaregivenasbelow:
PM10 PM2.5 SulphurDioxide(SO2) NitrogenOxide(NOx) CarbonMonoxide
Thefrequencyofsamplingwastwiceaweekfor13consecutiveweeks.Ambientair quality monitoring were conducted for one season. The sampling stationswereselectedbasedonthepredominantwinddirectionofthearea.Thestationslocatedatupwind,downwindandcrosswinddirections.Noise:Equivalent continuous noise level (Leq) in and around theproject areawasmonitored.Constructionequipmentandroadtrafficarethemajorsourcesofnoise.Baselinedataofnoiseattheprojectareaandtheneighbourhoodhabitatareasistobeascertained.Daytimeandnighttimedatawerecollected. Landuse:TheinformationonLandusepatternwascollectedfromtheavailabledata. The project is located within the Municipal limit of MCGM. The land issituated in Residential Zone as per Development Plan of MCGM. The detailsregard to Soil type and Characteristics, Physical and chemical characteristic ofsoilwasanalysedtoascertaincontaminationifany.WaterQuality:Baselinewater quality from all sources such as groundwater,MCGM water, and surface water were analysed and compared to the water qualitynormsprescribedfordrinkingwaterBiologicalEnvironment:Asapartofthestudytheinformationonthefollowingwere collected through Gazetteer of district, forest department and revenueoffices:Preparationofaninventoryofmajorspeciesoftrees,herbs,shrubsandtimbertreesinthearea; Listofeconomicallyimportantplants,ifany; Presenceofrareandendangeredspecies,ifany;
Thedataontheavailabilityofvariousfloralandfaunalspeciesinthestudyareaalready available with the Department of Forests will also be collected andutilized.Socio‐EconomicEnvironment:The data on demographic profile in the studyarea were collected using secondary data sources. The data collected is asfollows: Demography Casteprofile Literacyprofile
ToRforAmendment/ExpansionofResidential&CommercialProjectatWorli,Mumbai
OMKARREALTORS&DEVELOPERSPVT.LTD. Page13
Occupationalprofile
4. IMPACTASSESSMENTWith the knowledge of the baseline conditions, Project characteristics, theintensity of construction activities, detailed projections shall be made of theinfluence of planned project on all the areas of social, physical and biologicalenvironment in the area. Based on the predictions, the critically affectedenvironmentalparameterswillbeidentifiedfortheproposedproject.The impacts to be considered during project construction phase are listed asbelow:
Table4:ImpactsinConstructionPhase
S.No.
Aspect Impact
1. LandEnvironment Disturbanceatsiteduetovarioussitepreparatoryactivities
Impact on natural drainage pattern and soilerosion
2. WaterEnvironment Degradation of water quality due to disposal ofuntreatedeffluentsfromlabourcamp
Impacts on water quality due to runoff carryinghighsuspendedsolidsfromconstructionsite
3. NoiseEnvironment Noise generation by operation of variousconstructionequipments
Increase innoise leveldueto increasedvehicularmovement
4. AirEnvironment Impacts on ambient air quality due to emissionsgeneratedasaresultoffuelcombustionoperationofvariousconstructionequipment
Fugitive emissions from storage sites ofconstructionmaterial
5. Ecology Impacts on ecology due to increased humaninterferences
6. Socio‐economicEnvironment
Increasedstressonexisting infrastructuredue toimmigrationoflabourpopulation
Improvementinemploymentpotentialasaresultof project construction activities andmushroomingofalliedactivities
7. Aesthetics ConstructionactivitiesandExcavationTheimpactstobeconsideredduringprojectoperationphasearelistedasbelow:
Table5:ImpactsinOperationPhase
S.No.
Aspect Impact
ToRforAmendment/ExpansionofResidential&CommercialProjectatWorli,Mumbai
OMKARREALTORS&DEVELOPERSPVT.LTD. Page14
1. LandEnvironment
Storageanddisposalofsolidwastes. Fuelandmaterialspills. Dischargeofsewageonland. Generationofdomesticsolidwaste
2. WaterEnvironment
Impacts on surfacewater quality due to disposaltreated/untreatedsewageinnearbysurfacewaterbody
3. NoiseEnvironment
Noisegenerationduetothetraffic Noise from vehicle movement and operation of
dieselgeneratorsetsduringpowerfailure.4. AirEnvironment Particulate and gaseous emissions from DG sets
andvehiclemovement5. Ecology Habitat disturbance, Landscaping will help in
reducing any adverse impacts on air and noisequality.
6 Socioeconomic Increased job opportunity in householdmaintenanceandancillaryservices.
7 TrafficPattern The proposed project is likely to addmoderatelytothetrafficflowconsideredduringpeakhour.
5. SPECIFICSTUDIES
1. Presenttrafficstudyonapproachroadandnearestmajorroads2. Impactidentificationontrafficduetoproposeddevelopment.3. Energyconservationmeasures
6. ENVIRONMENTALMONITORINGPROGRAMEAn environmental monitoring programme is required to provide scientificallydefensibleinformationfordeterminingthestatusoftheenvironmentalqualityofthesurroundingareaoftheprojectsiteandtocheckwhetherthelevelsofcriticalpollutants are within the environmentally acceptable limits. This will help toobtain an early warning of unacceptable environmental conditions so thatcontrolmeasurescanbetakenimmediately.Italsohelpstodetermineinatimelyfashion,changesinthelocalenvironmentalquality.
I. MONITORINGPLANDURINGCONSTRUCTIONPHASE
Environmentalmonitoringduringconstructionphaseshallcomprisechecking:
Appropriatepermits,certificates,authorizationsand
CompliancewithEMPandgovernmentalregulations
Thiscanbeensuredthroughuseofchecklistsfor:
Siteestablishment
ToRforAmendment/ExpansionofResidential&CommercialProjectatWorli,Mumbai
OMKARREALTORS&DEVELOPERSPVT.LTD. Page15
MonthlyAudit
Siteclosure
EnvironmentalManagementPlanimplementationmonitoringduringconstructionphase
Table6:EnvironnementalMonitoringProgramme
Sr.No. Environmentalattribute
Locations Parameters PeriodandFrequency
1. AmbientAirQuality
Locationsat•Oneatcentre•OneUpwind&•OnedownwindLocation
CriteriaPollutants:SO2,NOx,PM10,PM2.5andCO
24‐hraveragesamplingexceptforCO,whichwillbe8‐hrsampling.(Twiceaweek)
2.Drinkingwater(potablitytesting)
MunicipalTapDrinkingwaterparametersasperIS10500
TwiceinayearduringFunctionalphase
3. AmbientNoise
ProjectSiteandPandurangBudhkarMarg,nearbysensitiveandCommercialPlaces
dB(A)levels Leq(Night+Day)
Leq(day)andLeq(Night)shouldbemonitoredonceinaseason.
4. Soilquality Greenbeltarea
Organicmatter,C,H,N,Alkalinity,Acidity
Pre‐monsoonandpost‐monsoonduringfunctionalphase.
5.Groundwater&surfacequality
At1location
DrinkingwaterparametersasperIS10500SurfacewaterasPerIS2296
OnceeveryyearinApril
6Occupationalexposuremonitoring
Workersworkingonsite
Lungtest,Audiometertest.
Onceinasixmonth
7. RISKANALYSISANDDISASTERMANAGEMENTPLAN
RiskassessmentformsanintegralpartofEIAstudy.Riskassessmentstudydealswith identifyingandevaluating themagnitudeof impendingrisks towhich theneighbouringpopulation isexposeddue tooccurrenceofaccidents involved inthe project construction and implementation. This assists in illustrating theguidelinesforpreparationofdisastermanagementplanwhichwillbeexecutedtohandlethesituation,ifanyemergencyoccurs.
ToRforAmendment/ExpansionofResidential&CommercialProjectatWorli,Mumbai
OMKARREALTORS&DEVELOPERSPVT.LTD. Page16
Ariskanalysisstudycomprisingofthefollowingistobeconducted: Identificationofpotentialaccidents Typeofemergency Emergencyevacuationplan
As a part of the study, a detailed onsite Disaster Management Plan shall beformulated.
8. PROJECTBENEFITS
Theimprovementinphysicalinfrastructure,socialinfrastructureifanyshallbedetailedout.Employmentpotentialduringconstructionandoperationphaseoftheprojectshallbemonitored.
9. ENVIRONMENTALMANAGEMENTPLAN(EMP)EnvironmentalManagement Planwill be developed to selectivelymitigate theadverse impacts due to the construction and operation of various activitiesplanned for the proposed project. The key issues to cover as a part ofEnvironmentalmanagementplanarelistedinthefollowingparagraphs.Environmental Management Plan for Implementation in ConstructionPhase Airpollutioncontrol WaterQuality Managementofsolidwaste,Debriswastemanagement NoiseControlMeasures Biologicalenvironment Healthandsafetyofconstructionworkers
EnvironmentalManagementPlanduringOperationPhase Water Environment – waste water treatment and its recycling for
flushing,gardening,Waterconservation,Rainwaterharvesting Solidwastemanagement NoiseControlMeasures AirPollutionControlmeasuresforDGsets. Firefightingmeasures Solarlighting GreenbeltDevelopment Environmentmanagementcell BudgetaryallocationforEnvironmentalManagement
ToRforAmendment/ExpansionofResidential&CommercialProjectatWorli,Mumbai
OMKARREALTORS&DEVELOPERSPVT.LTD. Page17
10. EXECUTIVESUMMARYOFEIA
This sectionprovidesgeneraldetailsofactivities inbrief, summaryofbaselinedata,impactandmitigationmeasures.
11. CREDENTIALSOFCONSULTANTS
This chapter shall include the names of the consultants, NABET accreditationstatusandnatureofconsultancyrendered.
ANNEXURES
ToRforAmendment/ExpansionofResidential&CommercialProjectatWorli,Mumbai
OMKARREALTORS&DEVELOPERSPVT.LTD. Page18
ANNEXUREI
STUDYAREAMAP
SITEU/R