proposition 84 allocation balance...

345
Proposition 84 Allocation Balance Report as of January 29, 2020 Public Resources Code 75000 et seq. Chapter Net Available for Appropriation Enacted Appropriation Proposed Balance SubSection Department Program Public Resources Code Ch. 2 9,650,000 1,111 75021(a) State Water Resources Control Board: Emergency water grants 9,591,889 57,000 Ch. 2 173,700,000 501 75022 State Water Resources Control Board: Small community water grants 172,943,499 756,000 Ch. 2 48,250,000 46,424 75023 State Water Resources Control Board: Safe Drinking Water State Revolving Fund 48,103,576 100,000 Ch. 2 77,200,000 3,143,485 75024 State Water Resources Control Board: State Water Pollution Control Revolving Fund 74,056,515 0 Ch. 2 57,900,000 138,132 75025 State Water Resources Control Board: Groundwater Contamination grants/loans 57,626,868 135,000 Ch. 2 35,705,000 225,803 75026, 75027(a)(1) Department of Water Resources: Integrated Regional Water Management 35,479,197 0 Ch. 2 133,170,000 188,606 75026, 75027(a)(2) Department of Water Resources: Integrated Regional Water Management 132,981,394 0 Ch. 2 50,180,000 71,051 75026, 75027(a)(3) Department of Water Resources: Integrated Regional Water Management 50,108,949 0 Ch. 2 207,475,000 293,768 75026, 75027(a)(4) Department of Water Resources: Integrated Regional Water Management 207,181,232 0 Ch. 2 110,010,000 155,763 75026, 75027(a)(5) Department of Water Resources: Integrated Regional Water Management 109,854,237 0 Ch. 2 87,815,000 124,339 75026, 75027(a)(6) Department of Water Resources: Integrated Regional Water Management 87,690,661 0 Ch. 2 70,445,000 99,743 75026, 75027(a)(7) Department of Water Resources: Integrated Regional Water Management 70,345,257 0 Ch. 2 55,005,000 77,883 75026, 75027(a)(8) Department of Water Resources: Integrated Regional Water Management 54,927,117 0 Ch. 2 57,900,000 2,736 75026, 75027(a)(9) Department of Water Resources: Integrated Regional Water Management 57,897,264 0 Ch. 2 26,055,000 36,892 75026, 75027(a)(10) Department of Water Resources: Integrated Regional Water Management 26,018,108 0 Ch. 2 34,740,000 49,188 75026, 75027(a)(11) Department of Water Resources: Integrated Regional Water Management 34,690,812 0 Ch. 2 96,500,000 321,916 75026, 75027(a)(12) and (b) Department of Water Resources: Integrated Regional Water Management 96,178,084 0 Ch. 2 0 0 75026, unspecified Department of Water Resources: Integrated Regional Water Management 0 0 Ch. 2 86,850,000 919,033 75029 Department of Water Resources: Delta Water Quality Grants 85,930,967 0 Ch. 2 38,460,000 -103,738 75029(a) Department of Water Resources: Delta Water Quality Grants 38,198,738 (b) 365,000 Ch. 2 14,475,000 338,820 75029.5 State Water Resources Control Board: Agricultural Discharge 14,136,180 0 Ch. 3 28,950,000 -1,050,000 75031 Department of Water Resources: Flood Prevention Planning 30,000,000 (a) 0 Ch. 3 265,375,000 -9,625,000 75032 Department of Water Resources: Flood Control Projects 275,000,000 (a) 0 Ch. 3 38,060,000 20,462 75032.5 Department of Water Resources: Flood Protection Corridor projects 37,499,538 540,000 Ch. 3 257,387,000 -1,087,843 75033 Department of Water Resources: Flood Control Projects: Delta 256,477,843 (b) 1,997,000 Ch. 3 172,875,000 3,254,911 75034 Department of Water Resources: Flood Control Projects 138,945,089 30,675,000 Ch. 4 62,373,000 -155,718 75041 Department of Water Resources: Water supply, conveyance and flood control systems 61,349,718 (b) 1,179,000 Page 1 of 3

Upload: others

Post on 13-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

Proposition 84 Allocation Balance Report

as of January 29, 2020

Public Resources Code 75000 et seq.

ChapterNet Available for Appropriation

Enacted Appropriation Proposed BalanceSubSection Department Program

Public Resources Code

Ch. 2 9,650,000 1,11175021(a) State Water Resources Control Board: Emergency water grants 9,591,889 57,000

Ch. 2 173,700,000 50175022 State Water Resources Control Board: Small community water grants 172,943,499 756,000

Ch. 2 48,250,000 46,42475023 State Water Resources Control Board: Safe Drinking Water State Revolving Fund 48,103,576 100,000

Ch. 2 77,200,000 3,143,48575024 State Water Resources Control Board: State Water Pollution Control Revolving Fund 74,056,515 0

Ch. 2 57,900,000 138,13275025 State Water Resources Control Board: Groundwater Contamination grants/loans 57,626,868 135,000

Ch. 2 35,705,000 225,80375026, 75027(a)(1) Department of Water Resources: Integrated Regional Water Management 35,479,197 0

Ch. 2 133,170,000 188,60675026, 75027(a)(2) Department of Water Resources: Integrated Regional Water Management 132,981,394 0

Ch. 2 50,180,000 71,05175026, 75027(a)(3) Department of Water Resources: Integrated Regional Water Management 50,108,949 0

Ch. 2 207,475,000 293,76875026, 75027(a)(4) Department of Water Resources: Integrated Regional Water Management 207,181,232 0

Ch. 2 110,010,000 155,76375026, 75027(a)(5) Department of Water Resources: Integrated Regional Water Management 109,854,237 0

Ch. 2 87,815,000 124,33975026, 75027(a)(6) Department of Water Resources: Integrated Regional Water Management 87,690,661 0

Ch. 2 70,445,000 99,74375026, 75027(a)(7) Department of Water Resources: Integrated Regional Water Management 70,345,257 0

Ch. 2 55,005,000 77,88375026, 75027(a)(8) Department of Water Resources: Integrated Regional Water Management 54,927,117 0

Ch. 2 57,900,000 2,73675026, 75027(a)(9) Department of Water Resources: Integrated Regional Water Management 57,897,264 0

Ch. 2 26,055,000 36,89275026, 75027(a)(10) Department of Water Resources: Integrated Regional Water Management 26,018,108 0

Ch. 2 34,740,000 49,18875026, 75027(a)(11) Department of Water Resources: Integrated Regional Water Management 34,690,812 0

Ch. 2 96,500,000 321,91675026, 75027(a)(12) and (b) Department of Water Resources: Integrated Regional Water Management 96,178,084 0

Ch. 2 0 075026, unspecified Department of Water Resources: Integrated Regional Water Management 0 0

Ch. 2 86,850,000 919,03375029 Department of Water Resources: Delta Water Quality Grants 85,930,967 0

Ch. 2 38,460,000 -103,73875029(a) Department of Water Resources: Delta Water Quality Grants 38,198,738 (b)365,000

Ch. 2 14,475,000 338,82075029.5 State Water Resources Control Board: Agricultural Discharge 14,136,180 0

Ch. 3 28,950,000 -1,050,00075031 Department of Water Resources: Flood Prevention Planning 30,000,000 (a)0

Ch. 3 265,375,000 -9,625,00075032 Department of Water Resources: Flood Control Projects 275,000,000 (a)0

Ch. 3 38,060,000 20,46275032.5 Department of Water Resources: Flood Protection Corridor projects 37,499,538 540,000

Ch. 3 257,387,000 -1,087,84375033 Department of Water Resources: Flood Control Projects: Delta 256,477,843 (b)1,997,000

Ch. 3 172,875,000 3,254,91175034 Department of Water Resources: Flood Control Projects 138,945,089 30,675,000

Ch. 4 62,373,000 -155,71875041 Department of Water Resources: Water supply, conveyance and flood control systems 61,349,718 (b)1,179,000

Page 1 of 3

Page 2: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

Proposition 84 Allocation Balance Report

as of January 29, 2020

Public Resources Code 75000 et seq.

ChapterNet Available for Appropriation

Enacted Appropriation Proposed BalanceSubSection Department Program

Public Resources Code

Ch. 5 172,256,000 -9,083,54475050(a) California Department of Fish and Wildlife: Bay-Delta and coastal fishery restoration 180,978,544 (b)361,000

Ch. 5 41,495,000 1575050(b) Various: Water Conservation Projects (including Salton Sea) 41,494,985 0

Ch. 5 44,171,000 5,137,19275050(b)(3) Various: Water Conservation Projects (including Salton Sea) 38,737,808 296,000

Ch. 5 52,110,000 4,386,00075050(c) Department of Water Resources: Public access with State Water Project 42,724,000 5,000,000

Ch. 5 69,168,000 1,12675050(d) Various: River Parkway Program 69,010,874 156,000

Ch. 5 17,313,000 99,92675050(e) Department of Water Resources: Urban Streams Restoration Program 17,165,074 48,000

Ch. 5 33,744,000 3,737,34575050(f) San Joaquin River Conservancy: Conservancy Projects 29,757,655 249,000

Ch. 5 34,430,000 -17,35675050(g)(1) Rivers and Mountains Conservancy: Los Angeles and San Gabriel River Watersheds 34,340,356 (b)107,000

Ch. 5 34,664,000 -20,12275050(g)(2) Santa Monica Mountains Conservancy: Upper Los Angeles Watershed 34,597,122 (b)87,000

Ch. 5 34,500,000 48,73575050(h) Coachella Valley Mountains Conservancy: Conservancy projects 34,391,265 60,000

Ch. 5 14,235,000 30875050(i) State Coastal Conservancy: Santa Ana River Parkway projects 10,255,692 3,979,000

Ch. 5 9,510,000 62775050(i), ref 1 State Coastal Conservancy: Santa Ana River Parkway projects 5,077,373 4,432,000

Ch. 5 9,510,000 81975050(i), ref 2 State Coastal Conservancy: Santa Ana River Parkway projects 6,776,181 2,733,000

Ch. 5 9,580,000 -1,990,74575050(i), ref 3 State Coastal Conservancy: Santa Ana River Parkway projects 11,535,745 (b)35,000

Ch. 5 51,910,000 33,79775050(j) Sierra Nevada Conservancy: Conservancy projects 51,826,203 50,000

Ch. 5 34,458,000 1,446,38875050(k) California Tahoe Conservancy: Conservancy projects 32,761,612 250,000

Ch. 5 12,062,500 38,00075050(l)(1), ref 1 California Conservation Corps: Conservation Corps projects 12,024,500 0

Ch. 5 12,062,500 69,57375050(l)(1), ref 2 California Conservation Corps: Conservation Corps projects 11,992,927 0

Ch. 5 19,300,000 1,293,46975050(l)(2) California Conservation Corps: Conservation Corps projects 18,006,531 0

Ch. 5 86,850,000 117,97775050(m) State Water Resources Control Board: Stormwater contamination prevention and reduction 86,732,023 0

Ch. 5 96,500,000 3,360,81275050(n) Secretary for Natural Resources: San Joaquin River settlement 93,139,188 0

Ch. 6 173,700,000 -9,724,65575055(a) Wildlife Conservation Board: Forest conservation and protection projects 183,139,109 (a)285,546

Ch. 6 129,340,437 -8,325,41375055(b)(1) Wildlife Conservation Board: Habitat protection and rehabilitation 137,354,328 (a)311,522

Ch. 6 84,062,471 2,626,91675055(c) Wildlife Conservation Board: Natural Community Conservation Plans 81,102,100 333,455

Ch. 6 14,475,000 29,55875055(d)(1) Various: Agricultural/oaklands/rangelands land preservation 14,445,442 0

Ch. 6 14,475,000 7,21175055(d)(2) Various: Agricultural/oaklands/rangelands land preservation 14,467,789 0

Ch. 6 9,650,000 -37,20375055(d)(3) Various: Agricultural/oaklands/rangelands land preservation 9,687,203 (b)0

Page 2 of 3

Page 3: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

Proposition 84 Allocation Balance Report

as of January 29, 2020

Public Resources Code 75000 et seq.

ChapterNet Available for Appropriation

Enacted Appropriation Proposed BalanceSubSection Department Program

Public Resources Code

Ch. 6 4,787,092 679,70275055(d)(4) Various: Agricultural/oaklands/rangelands land preservation 4,097,913 9,477

Ch. 7 33,775,000 6,81875060(a), ref 1 State Water Resources Control Board: Beaches and coastal waters 33,768,182 0

Ch. 7 17,370,000 15,93875060(a), ref 2 State Water Resources Control Board: Beaches and coastal waters 17,354,062 0

Ch. 7 35,705,000 18,58675060(a), unspecified State Water Resources Control Board: Beaches and coastal waters 35,686,414 0

Ch. 7 127,415,000 38275060(b) State Coastal Conservancy: Conservancy projects 123,627,618 3,787,000

Ch. 7 82,176,000 29275060(c), ref 1 State Coastal Conservancy: San Francisco Bay Area Conservancy projects 80,296,708 1,879,000

Ch. 7 20,044,000 -806,02475060(c), ref 2 State Coastal Conservancy: San Francisco Bay Area Conservancy projects 20,650,024 (b)200,000

Ch. 7 19,300,000 6,55475060(d)(1) Santa Monica Mountains Conservancy: Projects in Santa Monica Bay and its watersheds 19,284,446 9,000

Ch. 7 9,494,000 2,169,33475060(d)(2) Baldwin Hills Conservancy: Conservancy projects 7,279,936 44,730

Ch. 7 14,475,000 9,58975060(d)(3) Rivers and Mountains Conservancy: Projects in Santa Monica Bay and its watersheds 14,465,411 0

Ch. 7 42,825,000 10275060(e) State Coastal Conservancy: Projects in Monterey Bay and its watersheds 41,584,898 1,240,000

Ch. 7 25,655,000 98275060(f) State Coastal Conservancy: Projects in San Diego Bay and adjacent watersheds 25,222,018 432,000

Ch. 7 86,850,000 075060(g) Secretary for Natural Resources: California Ocean Protection Trust Fund 86,850,000 0

Ch. 8 328,800,000 -7,122,66975063(a) California State Parks: State Park System projects 319,138,669 (b)16,784,000

Ch. 8 95,739,000 1,407,62675063(b) California State Parks: Nature Education Facilities grants 94,207,374 124,000

Ch. 9 20,265,000 91875065(a), ref 1 Various: Urban forestry grants 18,516,082 1,748,000

Ch. 9 66,265,000 2,41775065(a), ref 2 Various: Urban forestry grants 66,182,583 80,000

Ch. 9 379,638,000 28,05475065(b) California State Parks: Competitive grants for Statewide Park Development 379,034,946 575,000

Ch. 9 86,682,000 1,616,52675065(c) Various: Planning grants and planning incentives 85,023,474 42,000

5,109,297,000 5,039,005,118 81,531,730 -11,239,848Total Appropriations*

This allocation over-commitment will be resolved, as appropriate, as part of the budget process.

This allocation was continuously appropriated by the bond act and shows a negative balance due to how the State Controller’s Office tracks and reports continuous appropriations. The allocation will continue to be managed for typical year-to-year changes that impact the allocation balance and ensure the funds are not over-committed.

Statewide Costs Requiring Appropriations

Total Appropriations

25,639,204 4,359,000

5,064,644,322 85,890,730

Enacted appropriations shown net of reversions.**(a)

(b)

Pursuant to PRC Section 75078 et seq., the Net Available for Appropriation amounts for the $5.388 billion bond have been reduced by $278,703,000 for bond issuance costs, other statewide bond costs, a Prop 1 reduction, a Prop 68 reduction and outyear amounts already committed by or proposed to the Legislature.

Numbers may not add or match to other statements due to rounding of budget details.

Page 3 of 3

Page 4: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

Prop. 84: Detailed Allocations, Appropriations, Proposals, Set Asides and Balances

Safe Drinking Water and Water Quality ProjectsChapter 2

Allocation: Emergency water grants

Allocation $: $10,000,000$52,055

$103,068Statewide Set Asides: $155,122 {

Outyear Obligations: $0

$0

$0

{

PRC §75021(a)Ch. 2

Appropriations, Proposals and Reversions

Statewide, requiring appropriation:

Statewide, not requiring appropriation:

Outyear Program Delivery commitments:

Outyear Cap. Outlay (to complete started projects):Reversions are shown below$0

Outyear Local Asst. commitments:

Grants and direct expenditures to fund emergency and urgent actions to ensure that safe drinking water supplies are available. Grants and expenditures shall not

exceed $250,000 per project. Direct expenditures exempt from contracting and procurement requirements as necessary.

Dept.: State Water Resources Control

Board

Other Outyear Support commitments:$0

Committed

$0

$0

$0

$0

Proposed

$0

Prop 1 Reduction $194,878

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3940-001-6051 Portion of support

budget

2014-15 Budget Act $14,400 B0011Emergency Water GrantsEnacted 2014-15

3940-001-6051 Portion of support

budget: Natural

Reversion

2014-15 Natural

Reversion

($11,525) B0011Emergency Water GrantsEnacted 2016-17

3940-001-6051 Portion of support

budget

2015-16 Budget Act $9,010 B0011Drinking WaterEnacted 2015-16

3940-001-6051 Portion of support

budget: Reversion

2015-16 Budget Act ($54) B0011Drinking WaterEnacted 2017-18

3940-001-6051 Portion of support

budget

2016-17 Budget Act $34,747 B0011Emergency Water GrantsEnacted 2016-17

3940-001-6051 Portion of support

budget: Natural

Reversion

2016-17 Natural

Reversion

($5,261) B0011Emergency Water GrantsEnacted 2018-19

3940-001-6051 Portion of support

budget

2017-18 Budget Act $11,000 B0011Emergency Water GrantsEnacted 2017-18

3940-101-6051 Portion of local

assistance budget

2017-18 Budget Act $469,391 B0012Emergency Water GrantsEnacted 2017-18

Wednesday, January 29, Page 1 of 3421:20:02 PM Public Resources Code (PRC) Section PRC §75021(a)Ch. 2Prop 84 Report

Page 5: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3940-111-6051 Transfer of local

assistance balance per

3940-401/14

2013-14 Budget Act $1,198,019 B0012Emergency Water GrantsEnacted 2014-15

3940-111-6051 Transfer of local

assistance balance per

3940-401/14: Reversion

2013-14 Budget Act ($430,613) B0012Emergency Water GrantsEnacted 2017-18

3940-111-6051 Portion of local

assistance budget

2014-15 Budget Act $1,953,161 B0012Emergency Water GrantsEnacted 2014-15

3940-601-6051 Transfer of local

assistance balance per

3940-401/14

2008-09 Budget Act $1,340,637 B0012Emergency Water GrantsEnacted 2014-15

3940-601-6051 Transfer of local

assistance balance per

3940-401/14: Reversion

2008-09 Budget Act ($89,088) B0012Emergency Water GrantsEnacted 2017-18

4265-001-6051 Portion of support

budget

2007-08 Budget Act $18,948 B0011Emergency Drinking WaterEnacted 2007-08

4265-001-6051 Portion of support

budget

2008-09 Budget Act $12,785 B0011Emergency Drinking WaterEnacted 2008-09

4265-001-6051 Portion of support

budget

2009-10 Budget Act $19,177 B0011Emergency Drinking WaterEnacted 2009-10

4265-001-6051 Portion of support

budget

2010-11 Budget Act $31,962 B0011Emergency Drinking WaterEnacted 2010-11

4265-001-6051 Portion of support

budget

2011-12 Budget Act $31,962 B0011Emergency Drinking WaterEnacted 2011-12

4265-001-6051 Portion of support

budget

2012-13 Budget Act $89,495 B0011Emergency Drinking WaterEnacted 2012-13

4265-001-6051 Portion of support

budget

2013-14 Budget Act $236,522 B0011Emergency Drinking WaterEnacted 2013-14

4265-111-6051 Portion of local

assistance budget

2007-08 Budget Act $9,050,000 B0012Emergency Drinking Water GrantsEnacted 2007-08

4265-111-6051 Portion of local

assistance budget:

Natural Reversion

2007-08 Natural

Reversion

($490,049) B0012Emergency Drinking Water GrantsEnacted 2009-10

4265-111-6051 Portion of local

assistance budget:

Reversion

2007-08 Budget Act ($8,005,423) B0012Emergency Drinking Water GrantsEnacted 2009-10

4265-111-6051 Portion of local

assistance budget

2008-09 Budget Act $778,769 B0012Emergency Drinking WaterEnacted 2008-09

4265-111-6051 (1) Portion of local

assistance budget

2011-12 Budget Act $115,213 B0012Emergency Drinking WaterEnacted 2011-12

4265-111-6051 Portion of local

assistance budget

2013-14 Budget Act $113,420 B0012Emergency Drinking WaterEnacted 2013-14

4265-601-6051 Portion of local

assistance budget

2008-09 Special

Legislation

$3,096,252 B0012Emergency Drinking WaterEnacted 2008-09

Sum: $9,592,858Enacted

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

Wednesday, January 29, Page 2 of 3421:20:02 PM Public Resources Code (PRC) Section PRC §75021(a)Ch. 2Prop 84 Report

Page 6: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3940-101-6051 Portion of local

assistance budget:

Reversion

2017-18 Budget Act ($969) B0012Emergency Water GrantsEnacted/Not 2019-20

3940-111-6051 Transfer of local

assistance balance per

3940-401/14:

Reappropriation

(decrease)

2013-14 Budget Act ($1,198,019) B0012Emergency Water GrantsEnacted/Not 2014-15

3940-111-6051 Transfer of local

assistance balance per

3940-401/14:

Reappropriation

(increase)

2013-14 Budget Act $1,198,019 B0012Emergency Water GrantsEnacted/Not 2018-19

Sum: ($969)Enacted/Not Posted

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3940-101-6051 Portion of local

assistance budget

2017-18 Budget Act ($468,422) B0012Emergency Water GrantsProposed 2017-18

3940-101-6051 (4) Portion of local

assistance budget

2017-18 Budget Act $468,422 B0012Emergency Water GrantsProposed 2020-21

3940-101-6051 (1) Portion of local

assistance budget

2020-21 Budget Act $57,000 B0012Emergency Water GrantsProposed 2020-21

3940-111-6051 Transfer of local

assistance balance per

3940-401/14:

Reappropriation

(decrease)

2013-14 Budget Act ($767,406) B0012Emergency Water GrantsProposed 2018-19

3940-111-6051 (2) Transfer of local

assistance balance per

3940-401/14:

Reappropriation

(increase)

2013-14 Budget Act $767,406 B0012Emergency Water GrantsProposed 2020-21

3940-111-6051 Portion of local

assistance budget:

Reappropriation

(decrease)

2014-15 Budget Act ($1,953,161) B0012Emergency Water GrantsProposed 2016-17

3940-111-6051 (3) Portion of local

assistance budget:

Reappropriation

(increase)

2014-15 Budget Act $1,953,161 B0012Emergency Water GrantsProposed 2020-21

3940-601-6051 Local assistance:

Reappropriation

(decrease)

2008-09 Budget Act ($1,251,549) B0012Emergency Water GrantsProposed 2015-16

3940-601-6051 (1) Local assistance:

Reappropriation

(increase)

2008-09 Budget Act $1,251,549 B0012Emergency Water GrantsProposed 2020-21

Sum: $57,000Proposed

Wednesday, January 29, Page 3 of 3421:20:02 PM Public Resources Code (PRC) Section PRC §75021(a)Ch. 2Prop 84 Report

Page 7: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

Sum: $9,648,889

$1,111

Balance for Emergency water grants:

Wednesday, January 29, Page 4 of 3421:20:02 PM Public Resources Code (PRC) Section PRC §75021(a)Ch. 2Prop 84 Report

Page 8: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

Safe Drinking Water and Water Quality ProjectsChapter 2

Allocation: Small community water grants

Allocation $: $180,000,000$936,982

$1,855,223Statewide Set Asides: $2,792,205 {

Outyear Obligations: $0

$0

$0

{

PRC §75022Ch. 2

Appropriations, Proposals and Reversions

Statewide, requiring appropriation:

Statewide, not requiring appropriation:

Outyear Program Delivery commitments:

Outyear Cap. Outlay (to complete started projects):Reversions are shown below$0

Outyear Local Asst. commitments:

Grants for small community drinking water system infrastructure improvements and related actions. Construction grants limited to $5,000,000 per project. DHS

may expend up to $5,000,000 for technical assistance to eligible communities.

Dept.: State Water Resources Control

Board

Other Outyear Support commitments:$0

Committed

$0

$0

$0

$0

Proposed

$0

Prop 1 Reduction $3,507,795

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3940-001-6051 Transfer of support

balance per 3940-

401/14

2012-13 Budget Act $270 B0021Small Community InfrastructureEnacted 2014-15

3940-001-6051 Transfer of support

balance per 3940-

401/14

2012-13 Budget Act ($270) B0021Small Community Infrastructure -

Safe Drinking Water

Enacted 2014-15

3940-001-6051 Transfer of support

balance per 3940-

401/14

2013-14 Budget Act $18,721 B0021Small Community Infrastructure -

Safe Drinking Water

Enacted 2014-15

3940-001-6051 Transfer of support

balance per 3940-

401/14: Natural

Reversion

2013-14 Natural

Reversion

($18,721) B0021Small Community Infrastructure -

Safe Drinking Water

Enacted 2015-16

3940-001-6051 Portion of support

budget

2015-16 Budget Act $50,700 B0021Drinking WaterEnacted 2015-16

3940-001-6051 Portion of support

budget: Reversion

2015-16 Budget Act ($283) B0021Drinking WaterEnacted 2017-18

3940-001-6051 Portion of support

budget

2016-17 Budget Act $386,135 B0021Small Community Infrastructure -

Safe Drinking Water

Enacted 2016-17

3940-001-6051 Portion of support

budget: Natural

Reversion

2016-17 Natural

Reversion

($32,219) B0021Small Community Infrastructure -

Safe Drinking Water

Enacted 2018-19

3940-001-6051 Portion of support

budget

2017-18 Budget Act $450,000 B0021Small Community Infrastructure -

Safe Drinking Water

Enacted 2017-18

3940-001-6051 Portion of support

budget

2018-19 Budget Act $315,000 B0021Small Community Infrastructure -

Safe Drinking Water

Enacted 2018-19

Wednesday, January 29, Page 5 of 3421:20:02 PM Public Resources Code (PRC) Section PRC §75022Ch. 2Prop 84 Report

Page 9: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3940-001-6051 Portion of support

budget

2019-20 Budget Act $315,000 B0021Small Community Infrastructure -

Safe Drinking Water

Enacted 2019-20

3940-101-6051 Portion of local

assistance budget

2015-16 Budget Act $8,800,000 B0022Drinking WaterEnacted 2015-16

3940-101-6051 Portion of local

assistance budget:

Reappropriation

(decrease)

2015-16 Budget Act ($8,800,000) B0022Drinking WaterEnacted 2015-16

3940-101-6051 Portion of local

assistance budget:

Reappropriation

(increase)

2015-16 Budget Act $8,800,000 B0022Drinking WaterEnacted 2018-19

3940-101-6051 Portion of local

assistance budget

2017-18 Budget Act $6,216,031 B0022Small Community Infrastructure -

Safe Drinking Water

Enacted 2017-18

3940-101-6051 Portion of local

assistance budget

2019-20 Budget Act $12,812,000 B0022Small Community Infrastructure -

Safe Drinking Water

Enacted 2019-20

3940-111-6051 Transfer of local

assistance balance per

3940-401/14

2013-14 Budget Act $35,104,826 B0022Small Community Infrastructure -

Safe Drinking Water

Enacted 2014-15

3940-111-6051 Transfer of local

assistance balance per

3940-401/14: Reversion

2013-14 Budget Act ($1,403,470) B0022Small Community Infrastructure -

Safe Drinking Water

Enacted 2017-18

3940-111-6051 Portion of local

assistance budget

2014-15 Budget Act $60,657,839 B0022Small Community Drinking Water

Grants

Enacted 2014-15

3940-501-6051 Portion of support

budget: Reversion

2008-09 Budget Act ($46,951) B0021Small Community InfrastructureEnacted 2014-15

3940-501-6051 Transfer of support

balance per 3940-

401/14

2008-09 Budget Act $46,951 B0021Small Community InfrastructureEnacted 2014-15

3940-601-6051 Reversion of transfer of

local assistance balance

per 3940-401/14

2008-09 Budget Act ($3,037,139) B0022Small Community InfrastructureEnacted 2014-15

3940-601-6051 Transfer of local

assistance balance per

3940-401/14

2008-09 Budget Act $30,700,981 B0022Small Community InfrastructureEnacted 2014-15

3940-601-6051 Transfer of local

assistance balance per

3940-401/14: Reversion

2008-09 Budget Act ($5,346,130) B0022Small Community InfrastructureEnacted 2017-18

4265-001-6051 Portion of support

budget

2007-08 Budget Act $1,011,526 B0021Small Community InfrastructureEnacted 2007-08

4265-001-6051 Portion of support

budget: Control Section

Adjustment

2007-08 Control

Section

Adjustment

$50,000 B0021Small Community InfrastructureEnacted 2007-08

4265-001-6051 Portion of support

budget: Natural

Reversion

2007-08 Natural

Reversion

($786,787) B0021Small Community InfrastructureEnacted 2009-10

4265-001-6051 Portion of support

budget

2008-09 Budget Act $636,097 B0021Small Community InfrastructureEnacted 2008-09

Wednesday, January 29, Page 6 of 3421:20:02 PM Public Resources Code (PRC) Section PRC §75022Ch. 2Prop 84 Report

Page 10: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

4265-001-6051 Portion of support

budget: Control Section

Adjustment

2008-09 Control

Section

Adjustment

($2,370) B0021Small Community InfrastructureEnacted 2008-09

4265-001-6051 Portion of support

budget: Natural

Reversion

2008-09 Natural

Reversion

($323,720) B0021Small Community InfrastructureEnacted 2010-11

4265-001-6051 Portion of support

budget

2009-10 Budget Act $2,132,823 B0021Small Community InfrastructureEnacted 2009-10

4265-001-6051 Portion of support

budget: Control Section

Adjustment

2009-10 Control

Section

Adjustment

($444,351) B0021Small Community InfrastructureEnacted 2009-10

4265-001-6051 Portion of support

budget: Natural

Reversion

2009-10 Natural

Reversion

($159,221) B0021Small Community InfrastructureEnacted 2011-12

4265-001-6051 Portion of support

budget

2010-11 Budget Act $1,650,914 B0021Small Community InfrastructureEnacted 2010-11

4265-001-6051 Portion of support

budget: Control Section

Adjustment

2010-11 Control

Section

Adjustment

($117,207) B0021Small Community InfrastructureEnacted 2010-11

4265-001-6051 Portion of support

budget: Natural

Reversion

2010-11 Natural

Reversion

($156,574) B0021Small Community InfrastructureEnacted 2012-13

4265-001-6051 Portion of support

budget

2011-12 Budget Act $2,248,038 B0021Small Community InfrastructureEnacted 2011-12

4265-001-6051 Portion of support

budget: Control Section

Adjustment

2011-12 Control

Section

Adjustment

($48,671) B0021Small Community InfrastructureEnacted 2011-12

4265-001-6051 Portion of support

budget: Natural

Reversion

2011-12 Natural

Reversion

($341,141) B0021Small Community InfrastructureEnacted 2013-14

4265-001-6051 Portion of support

budget

2012-13 Budget Act $1,844,872 B0021Small Community InfrastructureEnacted 2012-13

4265-001-6051 Portion of support

budget: Control Section

Adjustment

2012-13 Control

Section

Adjustment

($35,516) B0021Small Community InfrastructureEnacted 2012-13

4265-001-6051 Transfer of support

balance per 3940-

401/14

2012-13 Budget Act ($557,118) B0021Small Community InfrastructureEnacted 2014-15

4265-001-6051 Portion of support

budget

2013-14 Budget Act $525,620 B0021Small Community InfrastructureEnacted 2013-14

4265-001-6051 Portion of support

budget: Control Section

Adjustment

2013-14 Control

Section

Adjustment

$12,912 B0021Small Community InfrastructureEnacted 2013-14

4265-001-6051 Transfer of support

balance per 3940-

401/14

2013-14 Budget Act ($18,721) B0021Small Community InfrastructureEnacted 2014-15

4265-111-6051 Portion of local

assistance budget

2007-08 Budget Act $27,150,000 B0022Small Community InfrastructureEnacted 2007-08

Wednesday, January 29, Page 7 of 3421:20:02 PM Public Resources Code (PRC) Section PRC §75022Ch. 2Prop 84 Report

Page 11: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

4265-111-6051 Portion of local

assistance budget:

Natural Reversion

2007-08 Natural

Reversion

($10,177,505) B0022Small Community InfrastructureEnacted 2009-10

4265-111-6051 Portion of local

assistance budget:

Reversion

2007-08 Budget Act ($16,972,495) B0022Small Community InfrastructureEnacted 2009-10

4265-111-6051 Portion of local

assistance budget

2008-09 Budget Act $32,914,191 B0022Small Community InfrastructureEnacted 2008-09

4265-111-6051 Portion of local

assistance budget:

Natural Reversion

2008-09 Natural

Reversion

($27,854,578) B0022Small Community InfrastructureEnacted 2012-13

4265-111-6051 Portion of local

assistance budget

2009-10 Budget Act $0 B0022Small Community InfrastructureEnacted 2009-10

4265-111-6051 (1) Portion of local

assistance budget

2011-12 Budget Act $4,454,975 B0022Small Community InfrastructureEnacted 2011-12

4265-111-6051 (1) Portion of local

assistance budget:

Natural Reversion

2011-12 Natural

Reversion

($2,331,103) B0022Small Community InfrastructureEnacted 2013-14

4265-111-6051 Portion of local

assistance budget

2013-14 Budget Act $47,886,580 B0022Small Community InfrastructureEnacted 2013-14

4265-111-6051 Transfer of local

assistance balance per

3940-401/14

2013-14 Budget Act ($44,853,298) B0022Small Community InfrastructureEnacted 2014-15

4265-501-6051 Portion of support

budget

2008-09 Special

Legislation

$50,939 B0021Small Community InfrastructureEnacted 2008-09

4265-501-6051 Transfer of support

balance per 3940-

401/14

2008-09 Budget Act ($50,939) B0021Small Community InfrastructureEnacted 2014-15

4265-601-6051 Portion of local

assistance budget

2008-09 Special

Legislation

$48,978,000 B0022Small Community InfrastructureEnacted 2008-09

4265-601-6051 Transfer of local

assistance balance per

3940-401/14

2008-09 Budget Act ($27,622,477) B0022Small Community InfrastructureEnacted 2014-15

Sum: $184,682,964Enacted

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3940-101-6051 Portion of local

assistance budget:

Reversion

2017-18 Budget Act ($6,216,031) B0022Small Community Infrastructure -

Safe Drinking Water

Enacted/Not 2019-20

3940-111-6051 Transfer of local

assistance balance per

3940-401/14:

Reappropriation

(decrease)

2013-14 Budget Act ($35,104,826) B0022Small Community Infrastructure -

Safe Drinking Water

Enacted/Not 2014-15

3940-111-6051 Transfer of local

assistance balance per

3940-401/14:

Reappropriation

(increase)

2013-14 Budget Act $35,104,826 B0022Small Community Infrastructure -

Safe Drinking Water

Enacted/Not 2018-19

Wednesday, January 29, Page 8 of 3421:20:02 PM Public Resources Code (PRC) Section PRC §75022Ch. 2Prop 84 Report

Page 12: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3940-111-6051 Portion of local

assistance budget:

Reversion

2014-15 Budget Act ($5,523,434) B0022Small Community Drinking Water

Grants

Enacted/Not 2019-20

Sum: ($11,739,465)Enacted/Not Posted

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3940-001-6051 (1) Portion of support

budget

2020-21 Budget Act $315,000 B0021Small Community Infrastructure -

Safe Drinking Water

Proposed 2020-21

3940-101-6051 (1) Portion of local

assistance budget

2020-21 Budget Act $441,000 B0022Small Community Infrastructure -

Safe Drinking Water

Proposed 2020-21

3940-111-6051 Transfer of local

assistance balance per

3940-401/14:

Reappropriation

(decrease)

2013-14 Budget Act ($33,701,357) B0022Small Community Infrastructure -

Safe Drinking Water

Proposed 2018-19

3940-111-6051 (2) Transfer of local

assistance balance per

3940-401/14:

Reappropriation

(increase)

2013-14 Budget Act $33,701,357 B0022Small Community Infrastructure -

Safe Drinking Water

Proposed 2020-21

3940-111-6051 Portion of local

assistance budget:

Reappropriation

(decrease)

2014-15 Budget Act ($60,657,839) B0022Small Community Drinking Water

Grants

Proposed 2016-17

3940-111-6051 (3) Portion of local

assistance budget:

Reappropriation

(increase)

2014-15 Budget Act $60,657,839 B0022Small Community Drinking Water

Grants

Proposed 2020-21

3940-601-6051 Local assistance:

Reappropriation

(decrease)

2008-09 Budget Act ($22,317,711) B0022Small Community InfrastructureProposed 2015-16

3940-601-6051 (1) Local assistance:

Reappropriation

(increase)

2008-09 Budget Act $22,317,711 B0022Small Community InfrastructureProposed 2020-21

Sum: $756,000Proposed

Sum: $173,699,499

$501

Balance for Small community water grants:

Wednesday, January 29, Page 9 of 3421:20:02 PM Public Resources Code (PRC) Section PRC §75022Ch. 2Prop 84 Report

Page 13: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

Safe Drinking Water and Water Quality ProjectsChapter 2

Allocation: Safe Drinking Water State Revolving

Fund

Allocation $: $50,000,000$260,273

$515,340Statewide Set Asides: $775,612 {

Outyear Obligations: $0

$0

$0

{

PRC §75023Ch. 2

Appropriations, Proposals and Reversions

Statewide, requiring appropriation:

Statewide, not requiring appropriation:

Outyear Program Delivery commitments:

Outyear Cap. Outlay (to complete started projects):Reversions are shown below$0

Outyear Local Asst. commitments:

For purpose of providing state share needed to leverage federal funds to assist communities in providing safe drinking water. Funds to Safe Drinking Water State

Revolving Fund (H&S Code, §116760.30).

Dept.: State Water Resources Control

Board

Other Outyear Support commitments:$0

Committed

$0

$0

$0

$0

Proposed

$0

Prop 1 Reduction $974,388

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3940-001-6051 Portion of support

budget

2014-15 Budget Act $2,308,600 B0031State Water Pollution ControlEnacted 2014-15

3940-001-6051 Portion of support

budget: Natural

Reversion

2014-15 Natural

Reversion

($273,353) B0031State Water Pollution ControlEnacted 2016-17

3940-001-6051 Portion of support

budget: Reversion

2014-15 Budget Act ($1,291,000) B0031State Water Pollution ControlEnacted 2015-16

3940-001-6051 Portion of support

budget

2015-16 Budget Act $111,790 B0031Drinking WaterEnacted 2015-16

3940-001-6051 Portion of support

budget: Reversion

2015-16 Budget Act ($708) B0031Drinking WaterEnacted 2017-18

3940-001-6051 Portion of support

budget

2016-17 Budget Act $166,118 B0031State Water Pollution ControlEnacted 2016-17

3940-001-6051 Portion of support

budget: Natural

Reversion

2016-17 Natural

Reversion

($50,237) B0031State Water Pollution ControlEnacted 2018-19

3940-001-6051 Portion of support

budget

2017-18 Budget Act $190,000 B0031State Water Pollution ControlEnacted 2017-18

3940-001-6051 Portion of support

budget

2018-19 Budget Act $100,000 B0031State Water Pollution ControlEnacted 2018-19

3940-001-6051 Portion of support

budget

2019-20 Budget Act $100,000 B0031State Water Pollution ControlEnacted 2019-20

3940-115-6051 Portion of local

assistance budget

2014-15 Budget Act $45,750,000 B0032Safe Drinking Water State

Revolving Fund

Enacted 2014-15

Wednesday, January 29, Page 10 of 3421:20:02 PM Public Resources Code (PRC) Section PRC §75023Ch. 2Prop 84 Report

Page 14: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

4265-001-6051 Portion of support

budget

2013-14 Budget Act $992,366 B0031Small Community InfrastructureEnacted 2013-14

Sum: $48,103,576Enacted

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3940-001-6051 (1) Portion of support

budget

2020-21 Budget Act $100,000 B0031State Water Pollution ControlProposed 2020-21

Sum: $100,000Proposed

Sum: $48,203,576

$46,424

Balance for Safe Drinking Water State Revolving Fund:

Wednesday, January 29, Page 11 of 3421:20:02 PM Public Resources Code (PRC) Section PRC §75023Ch. 2Prop 84 Report

Page 15: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

Safe Drinking Water and Water Quality ProjectsChapter 2

Allocation: State Water Pollution Control Revolving

Fund

Allocation $: $80,000,000$416,437

$824,543Statewide Set Asides: $1,240,980 {

Outyear Obligations: $0

$0

$0

{

PRC §75024Ch. 2

Appropriations, Proposals and Reversions

Statewide, requiring appropriation:

Statewide, not requiring appropriation:

Outyear Program Delivery commitments:

Outyear Cap. Outlay (to complete started projects):Reversions are shown below$0

Outyear Local Asst. commitments:

For purpose of providing state share needed to leverage federal funds to assist communities in making those infrastructure investments necessary to prevent

pollution of drinking water sources. Funds to State Water Pollution Control Revolving Fund (Water Code, §13477).

Dept.: State Water Resources Control

Board

Other Outyear Support commitments:$0

Committed

$0

$0

$0

$0

Proposed

$0

Prop 1 Reduction $1,559,020

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3940-001-6051 Portion of support

budget

2007-08 Budget Act $1,661,102 B0041State Water Pollution ControlEnacted 2007-08

3940-001-6051 Portion of support

budget: Natural

Reversion

2007-08 Natural

Reversion

($1,594,879) B0041State Water Pollution ControlEnacted 2009-10

3940-001-6051 Portion of support

budget

2008-09 Budget Act $1,354,110 B0041State Water Pollution ControlEnacted 2008-09

3940-001-6051 Portion of support

budget: Reversion

2008-09 Budget Act ($1,291,955) B0041State Water Pollution ControlEnacted 2010-11

3940-001-6051 Portion of support

budget

2009-10 Budget Act $984,788 B0041State Water Pollution ControlEnacted 2009-10

3940-001-6051 Portion of support

budget: Control Section

Adjustment

2009-10 Control

Section

Adjustment

($492,394) B0041State Water Pollution ControlEnacted 2009-10

3940-001-6051 Portion of support

budget: Reversion

2009-10 Budget Act ($492,394) B0041State Water Pollution ControlEnacted 2010-11

3940-001-6051 Portion of support

budget

2010-11 Budget Act $395,394 B0041State Water Pollution ControlEnacted 2010-11

3940-001-6051 Portion of support

budget: Control Section

Adjustment

2010-11 Control

Section

Adjustment

($5,483) B0041State Water Pollution ControlEnacted 2010-11

3940-001-6051 Portion of support

budget: Reversion

2010-11 Budget Act ($389,911) B0041State Water Pollution ControlEnacted 2012-13

3940-001-6051 Portion of support

budget

2011-12 Budget Act $387,921 B0041State Water Pollution ControlEnacted 2011-12

Wednesday, January 29, Page 12 of 3421:20:02 PM Public Resources Code (PRC) Section PRC §75024Ch. 2Prop 84 Report

Page 16: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3940-001-6051 Portion of support

budget: Control Section

Adjustment

2011-12 Control

Section

Adjustment

($1,400) B0041State Water Pollution ControlEnacted 2011-12

3940-001-6051 Portion of support

budget: Reversion

2011-12 Budget Act ($386,521) B0041State Water Pollution ControlEnacted 2013-14

3940-001-6051 Portion of support

budget

2012-13 Budget Act $394,000 B0041State Water Pollution ControlEnacted 2012-13

3940-001-6051 Portion of support

budget: Control Section

Adjustment

2012-13 Control

Section

Adjustment

($1,179) B0041State Water Pollution ControlEnacted 2012-13

3940-001-6051 Portion of support

budget: Reversion

2012-13 Budget Act ($216,197) B0041State Water Pollution ControlEnacted 2014-15

3940-001-6051 Portion of support

budget

2013-14 Budget Act $427,000 B0041State Water Pollution ControlEnacted 2013-14

3940-001-6051 Portion of support

budget: Natural

Reversion

2013-14 Natural

Reversion

($3,476) B0041State Water Pollution ControlEnacted 2015-16

3940-001-6051 Portion of support

budget: Reversion

2013-14 Budget Act ($114,210) B0041State Water Pollution ControlEnacted 2014-15

3940-001-6051 Portion of support

budget

2014-15 Budget Act $470,000 B0041State Water Pollution ControlEnacted 2014-15

3940-001-6051 Portion of support

budget: Natural

Reversion

2014-15 Natural

Reversion

($32,022) B0041State Water Pollution ControlEnacted 2016-17

3940-001-6051 Portion of support

budget: Reversion

2014-15 Budget Act ($150,000) B0041State Water Pollution ControlEnacted 2015-16

3940-001-6051 Portion of support

budget

2015-16 Budget Act $1,954,840 B0041State Water Pollution ControlEnacted 2015-16

3940-001-6051 Portion of support

budget: Natural

Reversion

2015-16 Natural

Reversion

($3,851) B0041State Water Pollution ControlEnacted 2017-18

3940-001-6051 Portion of support

budget: Reversion

2015-16 Budget Act ($1,873,910) B0041State Water Pollution ControlEnacted 2016-17

3940-001-6051 Portion of support

budget

2016-17 Budget Act $2,231,534 B0041State Water Pollution ControlEnacted 2016-17

3940-001-6051 Portion of support

budget: Natural

Reversion

2016-17 Natural

Reversion

($212,392) B0041State Water Pollution ControlEnacted 2018-19

3940-001-6051 Portion of support

budget: Reversion

2016-17 Budget Act ($2,000,000) B0041State Water Pollution ControlEnacted 2018-19

3940-001-6051 Portion of support

budget

2017-18 Budget Act $11,000 B0041State Water Pollution ControlEnacted 2017-18

3940-101-6051 Portion of local

assistance budget

2007-08 Budget Act $73,200,001 B0042State Water Pollution ControlEnacted 2007-08

3940-101-6051 Portion of local

assistance budget:

Reversion

2007-08 Budget Act ($153,477) B0042State Water Pollution ControlEnacted 2011-12

3940-101-6051 Portion of local

assistance budget

2012-13 Budget Act $153,000 B0042State Water Pollution ControlEnacted 2012-13

Wednesday, January 29, Page 13 of 3421:20:02 PM Public Resources Code (PRC) Section PRC §75024Ch. 2Prop 84 Report

Page 17: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3940-101-6051 Portion of local

assistance budget:

Natural Reversion

2012-13 Natural

Reversion

($153,000) B0042State Water Pollution ControlEnacted 2016-17

3940-101-6051 Portion of local

assistance budget

2014-15 Budget Act $476 B0042State Water Pollution ControlEnacted 2014-15

Sum: $74,056,515Enacted

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3940-101-6051 Portion of local

assistance budget:

Reappropriation

(decrease)

2007-08 Budget Act ($73,046,524) B0042State Water Pollution ControlEnacted/Not 2016-17

3940-101-6051 Portion of local

assistance budget:

Reappropriation

(increase)

2007-08 Budget Act $73,046,524 B0042State Water Pollution ControlEnacted/Not 2019-20

3940-101-6051 Portion of local

assistance budget:

Reappropriation

(decrease)

2014-15 Budget Act ($476) B0042State Water Pollution ControlEnacted/Not 2016-17

3940-101-6051 Portion of local

assistance budget:

Reappropriation

(increase)

2014-15 Budget Act $476 B0042State Water Pollution ControlEnacted/Not 2019-20

Sum: $0Enacted/Not Posted

Sum: $74,056,515

$3,143,485

Balance for State Water Pollution Control Revolving Fund:

Wednesday, January 29, Page 14 of 3421:20:02 PM Public Resources Code (PRC) Section PRC §75024Ch. 2Prop 84 Report

Page 18: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

Safe Drinking Water and Water Quality ProjectsChapter 2

Allocation: Groundwater Contamination grants/loans

Allocation $: $60,000,000$312,327

$618,408Statewide Set Asides: $930,735 {

Outyear Obligations: $0

$0

$0

{

PRC §75025Ch. 2

Appropriations, Proposals and Reversions

Statewide, requiring appropriation:

Statewide, not requiring appropriation:

Outyear Program Delivery commitments:

Outyear Cap. Outlay (to complete started projects):Reversions are shown below$0

Outyear Local Asst. commitments:

Loans and grants for projects to prevent or reduce contamination of groundwater that serves as a source of drinking water.

Dept.: State Water Resources Control

Board

Other Outyear Support commitments:$0

Committed

$0

$0

$0

$0

Proposed

$0

Prop 1 Reduction $1,169,265

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3940-001-6051 Transfer of support

balance per 3940-

401/14

2012-13 Budget Act $0 B0051Prevent or Reduce Groundwater

Contamination - Safe Drinking

Water

Enacted 2014-15

3940-001-6051 Transfer of support

balance per 3940-

401/14

2013-14 Budget Act $551,906 B0051Prevent or Reduce Groundwater

Contamination - Safe Drinking

Water

Enacted 2014-15

3940-001-6051 Transfer of support

balance per 3940-

401/14: Natural

Reversion

2013-14 Natural

Reversion

($491,395) B0051Prevent or Reduce Groundwater

Contamination - Safe Drinking

Water

Enacted 2015-16

3940-001-6051 Portion of support

budget

2015-16 Budget Act $232,500 B0051Drinking WaterEnacted 2015-16

3940-001-6051 Portion of support

budget: Reversion

2015-16 Budget Act ($1,192) B0051Drinking WaterEnacted 2017-18

3940-001-6051 Portion of support

budget

2017-18 Budget Act $170,000 B0051Drinking WaterEnacted 2017-18

3940-001-6051 Portion of support

budget

2018-19 Budget Act $135,000 B0051Drinking WaterEnacted 2018-19

3940-001-6051 Portion of support

budget

2019-20 Budget Act $135,000 B0051Drinking WaterEnacted 2019-20

3940-101-6051 Portion of local

assistance budget

2017-18 Budget Act $653,578 B0052Drinking WaterEnacted 2017-18

3940-101-6051 Portion of local

assistance budget

2019-20 Budget Act $32,000 B0052Prevent or Reduce Groundwater

Contamination - Safe Drinking

Water

Enacted 2019-20

Wednesday, January 29, Page 15 of 3421:20:02 PM Public Resources Code (PRC) Section PRC §75025Ch. 2Prop 84 Report

Page 19: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3940-111-6051 Transfer of local

assistance balance per

3940-401/14

2013-14 Budget Act $8,550,453 B0052Prevent or Reduce Groundwater

Contamination - Safe Drinking

Water

Enacted 2014-15

3940-111-6051 Transfer of local

assistance balance per

3940-401/14: Reversion

2013-14 Budget Act ($27,389) B0052Prevent or Reduce Groundwater

Contamination - Safe Drinking

Water

Enacted 2018-19

3940-501-6051 Portion of support

budget: Reversion

2008-09 Budget Act ($54,926) B0051Prevent or Reduce Groundwater

Contamination

Enacted 2014-15

3940-501-6051 Transfer of support

balance per 3940-

401/14

2008-09 Budget Act $54,926 B0051Prevent or Reduce Groundwater

Contamination

Enacted 2014-15

3940-601-6051 Reversion of transfer of

local assistance balance

per 3940-401/14

2008-09 Budget Act ($3,037,139) B0052Prevent or Reduce Groundwater

Contamination

Enacted 2014-15

3940-601-6051 Transfer of local

assistance balance per

3940-401/14

2008-09 Budget Act $16,058,222 B0052Prevent or Reduce Groundwater

Contamination

Enacted 2014-15

3940-601-6051 Transfer of local

assistance balance per

3940-401/14: Reversion

2008-09 Budget Act ($565,782) B0052Prevent or Reduce Groundwater

Contamination

Enacted 2017-18

4265-001-6051 Portion of support

budget

2007-08 Budget Act $1,011,526 B0051Prevent or Reduce Groundwater

Contamination

Enacted 2007-08

4265-001-6051 Portion of support

budget: Control Section

Adjustment

2007-08 Control

Section

Adjustment

$50,000 B0051Prevent or Reduce Groundwater

Contamination

Enacted 2007-08

4265-001-6051 Portion of support

budget: Natural

Reversion

2007-08 Natural

Reversion

($786,787) B0051Prevent or Reduce Groundwater

Contamination

Enacted 2009-10

4265-001-6051 Portion of support

budget

2008-09 Budget Act $1,055,108 B0051Prevent or Reduce Groundwater

Contamination

Enacted 2008-09

4265-001-6051 Portion of support

budget

2008-09 Budget Act $419,011 B0052Prevent or Reduce Groundwater

Contamination

Enacted 2008-09

4265-001-6051 Portion of support

budget: Control Section

Adjustment

2008-09 Control

Section

Adjustment

($2,370) B0051Prevent or Reduce Groundwater

Contamination

Enacted 2008-09

4265-001-6051 Portion of support

budget: Natural

Reversion

2008-09 Natural

Reversion

($323,720) B0051Prevent or Reduce Groundwater

Contamination

Enacted 2010-11

4265-001-6051 Portion of support

budget

2010-11 Budget Act $471,124 B0051Prevent or Reduce Groundwater

Contamination

Enacted 2010-11

4265-001-6051 Portion of support

budget

2012-13 Budget Act $337,633 B0051Prevent or Reduce Groundwater

Contamination

Enacted 2012-13

4265-001-6051 Transfer of support

balance per 3940-

401/14

2012-13 Budget Act ($207,192) B0051Prevent or Reduce Groundwater

Contamination

Enacted 2014-15

4265-001-6051 Portion of support

budget

2013-14 Budget Act $557,492 B0051Prevent or Reduce Groundwater

Contamination

Enacted 2013-14

Wednesday, January 29, Page 16 of 3421:20:02 PM Public Resources Code (PRC) Section PRC §75025Ch. 2Prop 84 Report

Page 20: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

4265-001-6051 Portion of support

budget: Control Section

Adjustment

2013-14 Control

Section

Adjustment

$17,830 B0051Prevent or Reduce Groundwater

Contamination

Enacted 2013-14

4265-001-6051 Transfer of support

balance per 3940-

401/14

2013-14 Budget Act ($551,906) B0051Prevent or Reduce Groundwater

Contamination

Enacted 2014-15

4265-111-6051 Portion of local

assistance budget

2007-08 Budget Act $9,050,000 B0052Prevent or Reduce Groundwater

Contamination

Enacted 2007-08

4265-111-6051 Portion of local

assistance budget:

Reversion

2007-08 Budget Act ($9,050,000) B0052Prevent or Reduce Groundwater

Contamination

Enacted 2009-10

4265-111-6051 Portion of local

assistance budget

2008-09 Budget Act $2,507,040 B0052Prevent or Reduce Groundwater

Contamination

Enacted 2008-09

4265-111-6051 (1) Portion of local

assistance budget

2011-12 Budget Act $2,929,812 B0052Prevent or Reduce Groundwater

Contamination

Enacted 2011-12

4265-501-6051 Portion of support

budget

2008-09 Special

Legislation

$412,741 B0051Prevent or Reduce Groundwater

Contamination

Enacted 2008-09

4265-501-6051 Portion of support

budget

2008-09 Special

Legislation

$1,580,320 B0052Prevent or Reduce Groundwater

Contamination

Enacted 2008-09

4265-501-6051 Transfer of support

balance per 3940-

401/14

2008-09 Budget Act ($50,939) B0051Prevent or Reduce Groundwater

Contamination

Enacted 2014-15

4265-601-6051 Portion of local

assistance budget

2008-09 Special

Legislation

$46,281,748 B0052Prevent or Reduce Groundwater

Contamination

Enacted 2008-09

4265-601-6051 Transfer of local

assistance balance per

3940-401/14

2008-09 Budget Act ($20,477,363) B0052Prevent or Reduce Groundwater

Contamination

Enacted 2014-15

Sum: $57,626,868Enacted

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3940-111-6051 Transfer of local

assistance balance per

3940-401/14:

Reappropriation

(decrease)

2013-14 Budget Act ($8,550,453) B0052Prevent or Reduce Groundwater

Contamination - Safe Drinking

Water

Enacted/Not 2014-15

3940-111-6051 Transfer of local

assistance balance per

3940-401/14:

Reappropriation

(increase)

2013-14 Budget Act $8,550,453 B0052Prevent or Reduce Groundwater

Contamination - Safe Drinking

Water

Enacted/Not 2018-19

Sum: $0Enacted/Not Posted

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3940-001-6051 (1) Portion of support

budget

2020-21 Budget Act $135,000 B0051Drinking WaterProposed 2020-21

3940-601-6051 Local assistance:

Reappropriation

(decrease)

2008-09 Budget Act ($12,455,301) B0052Prevent or Reduce Groundwater

Contamination

Proposed 2015-16

Wednesday, January 29, Page 17 of 3421:20:02 PM Public Resources Code (PRC) Section PRC §75025Ch. 2Prop 84 Report

Page 21: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3940-601-6051 (1) Local assistance:

Reappropriation

(increase)

2008-09 Budget Act $12,455,301 B0052Prevent or Reduce Groundwater

Contamination

Proposed 2020-21

Sum: $135,000Proposed

Sum: $57,761,868

$138,132

Balance for Groundwater Contamination grants/loans:

Wednesday, January 29, Page 18 of 3421:20:02 PM Public Resources Code (PRC) Section PRC §75025Ch. 2Prop 84 Report

Page 22: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

Safe Drinking Water and Water Quality ProjectsChapter 2

Allocation: Integrated Regional Water Management

Allocation $: $37,000,000$192,602

$381,351Statewide Set Asides: $573,953 {

Outyear Obligations: $0

$0

$0

{

PRC §75026, 75027(a)(1)Ch. 2

Appropriations, Proposals and Reversions

Statewide, requiring appropriation:

Statewide, not requiring appropriation:

Outyear Program Delivery commitments:

Outyear Cap. Outlay (to complete started projects):Reversions are shown below$0

Outyear Local Asst. commitments:

North Coast portion: Grants for projects that assist local public agencies to meet the State`s long term water needs, including delivery of safe drinking water and

the protection of water quality and the environment. Must implement integrated regional water management plans and meet various other requirements in §75026,

§75027 and §75028. Local assistance appropriation amounts to be posted against this specific allocation upon project approval. In interim, appropriation charged

against PRC Section 75026, unspecified.

Dept.: Department of Water

Resources

Other Outyear Support commitments:$0

Committed

$0

$0

$0

$0

Proposed

$0

Prop 1 Reduction $721,047

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3860-001-6051 Portion of support

budget

2010-11 Budget Act $65,231 B0151IRWMEnacted 2010-11

3860-001-6051 Portion of support

budget: Natural

Reversion

2010-11 Natural

Reversion

($5,495) B0151IRWMEnacted 2012-13

3860-001-6051 Portion of support

budget

2011-12 Budget Act $65,231 B0151IRWMEnacted 2011-12

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2011-12 Control

Section

Adjustment

($1,287) B0151IRWMEnacted 2011-12

3860-001-6051 Portion of support

budget: Natural

Reversion

2011-12 Natural

Reversion

($3,148) B0151IRWMEnacted 2013-14

3860-001-6051 Portion of support

budget

2012-13 Budget Act $65,231 B0151IRWMEnacted 2012-13

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2012-13 Control

Section

Adjustment

($2,960) B0151IRWMEnacted 2012-13

3860-001-6051 Portion of support

budget: Reversion

2012-13 Budget Act ($8,183) B0151IRWMEnacted 2015-16

3860-001-6051 Portion of support

budget

2013-14 Budget Act $176,231 B0151IRWMEnacted 2013-14

Wednesday, January 29, Page 19 of 3421:20:02 PM Public Resources Code (PRC) Section PRC §75026, 75027(a)(1)Ch. 2Prop 84 Report

Page 23: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-001-6051 Portion of support

budget: Reversion

2013-14 Budget Act ($12,809) B0151IRWMEnacted 2015-16

3860-001-6051 Portion of support

budget

2014-15 Budget Act $92,500 B0151IRWMEnacted 2014-15

3860-001-6051 Portion of support

budget: Natural

Reversion

2014-15 Natural

Reversion

($56,673) B0151IRWMEnacted 2016-17

3860-001-6051 Portion of support

budget: Reversion

Reverse

2014-15 Natural

Reversion

$56,673 B0151IRWMEnacted 2017-18

3860-001-6051 Portion of support

budget

2015-16 Budget Act $104,007 B0151IRWMEnacted 2015-16

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2015-16 Budget Act ($104,007) B0151IRWMEnacted 2016-17

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2015-16 Budget Act $104,007 B0151IRWMEnacted 2018-19

3860-001-6051 Portion of support

budget

2016-17 Budget Act $45,236 B0151IRWMEnacted 2016-17

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2016-17 Control

Section

Adjustment

$2,304 B0151IRWMEnacted 2016-17

3860-001-6051 Portion of support

budget: Control Section

Adjustment:

Reappropriation

(decrease)

2016-17 Budget Act ($2,304) B0151IRWMEnacted 2016-17

3860-001-6051 Portion of support

budget: Control Section

Adjustment:

Reappropriation

(increase)

2016-17 Budget Act $2,304 B0151IRWMEnacted 2019-20

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2016-17 Budget Act ($45,236) B0151IRWMEnacted 2016-17

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2016-17 Budget Act $45,236 B0151IRWMEnacted 2019-20

3860-001-6051 Portion of support

budget

2017-18 Budget Act $46,620 B0153IRWMEnacted 2017-18

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2017-18 Control

Section

Adjustment

$3,041 B0153IRWMEnacted 2017-18

3860-001-6051 Portion of support

budget

2018-19 Budget Act $49,703 B0153IRWMEnacted 2018-19

Wednesday, January 29, Page 20 of 3421:20:02 PM Public Resources Code (PRC) Section PRC §75026, 75027(a)(1)Ch. 2Prop 84 Report

Page 24: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2018-19 Control

Section

Adjustment

$1,894 B0153IRWMEnacted 2018-19

3860-001-6051 Portion of support

budget: Control Section

Adjustment:

Reappropriation

(decrease)

2018-19 Budget Act ($1,894) B0153IRWMEnacted 2018-19

3860-001-6051 Portion of support

budget: Control Section

Adjustment:

Reappropriation

(increase)

2018-19 Budget Act $1,894 B0153IRWMEnacted 2019-20

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2018-19 Budget Act ($49,703) B0153IRWMEnacted 2018-19

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2018-19 Budget Act $49,703 B0153IRWMEnacted 2019-20

3860-001-6051 Portion of support

budget

2019-20 Budget Act $55,148 B0153IRWMEnacted 2019-20

3860-503-6051 Portion of support

budget

2008-09 Special

Legislation

$765,900 B0151IRWM: North CoastEnacted 2008-09

3860-503-6051 Portion of support

budget: Control Section

Adjustment

2008-09 Control

Section

Adjustment

($40,006) B0151IRWM: North CoastEnacted 2012-13

3860-503-6051 Portion of support

budget: Natural

Reversion

2008-09 Natural

Reversion

($11,181) B0151IRWM: North CoastEnacted 2015-16

3860-503-6051 Portion of support

budget: Reversion

2008-09 Budget Act ($157,406) B0151IRWM: North CoastEnacted 2015-16

3860-503-6051 Portion of support

budget: Reversion

Reverse

2008-09 Natural

Reversion

$5,590 B0151IRWM: North CoastEnacted 2016-17

3860-503-6051 Section

83002(b)(3)(a)(iv):

Control Section

Adjustment

2008-09 Control

Section

Adjustment

($22,108) B0151IRWM: North CoastEnacted 2009-10

3860-505-6051 Section 8(a); PG 10, EL

29 per JE 0036307

dated 2-10-10

2009-10 Special

Legislation

$518,000 B0151IRWMEnacted 2009-10

3860-505-6051 Section 8(a); PG 10, EL

29 per JE 0036307

dated 2-10-10:

Reversion

2009-10 Special

Legislation

($518,000) B0151IRWMEnacted 2010-11

Wednesday, January 29, Page 21 of 3421:20:02 PM Public Resources Code (PRC) Section PRC §75026, 75027(a)(1)Ch. 2Prop 84 Report

Page 25: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-505-6051 Portion of support

budget: Ch. 718 (SB

855), Statutes of 2010,

Sec. 31(c):

Reappropriation

(decrease)

2010-11 Budget Act ($518,000) B0151IRWMEnacted 2017-18

3860-505-6051 Portion of support

budget: Ch. 718 (SB

855), Statutes of 2010,

Sec. 31(c):

Reappropriation

(increase)

2010-11 Budget Act $518,000 B0151IRWMEnacted 2019-20

3860-505-6051 Portion of support

budget: SB 855, Sec.

31(c )

2010-11 Special

Legislation

$518,000 B0151IRWMEnacted 2010-11

3860-601-6051 Local Assistance:

Reappropriation

(decrease)

2013-14 Budget Act ($9,778,000) B0152IRWM Drought Preparedness

Projects

Enacted 2013-14

3860-601-6051 Local Assistance:

Reappropriation

(increase)

2013-14 Budget Act $9,778,000 B0152IRWM Drought Preparedness

Projects

Enacted 2018-19

3860-601-6051 Projects: SB 104:

increase and transfer

approp from 75026,

unspecified

2013-14 Budget

Revision

$9,794,694 B0152IRWM 2015 Implementation GrantsEnacted 2013-14

3860-601-6051 Projects: SB 104:

increase and transfer

approp from 75026,

unspecified

2013-14 Budget

Revision

$9,778,000 B0152IRWM Drought Preparedness

Projects

Enacted 2013-14

3860-603-6051 Local Assistance:

increase and transfer

approp from 75026,

unspecified

2008-09 Budget

Revision

$8,221,061 B0152IRWM: Implementation Grants -

Round 1

Enacted 2011-12

3860-603-6051 Local Assistance:

increase and transfer

approp from 75026,

unspecified

2008-09 Budget

Revision

$500,000 B0152IRWM: Planning Grants - Round 1Enacted 2010-11

3860-603-6051 Local Assistance:

increase and transfer

approp from 75026,

unspecified:

Reappropriation

(decrease)

2008-09 Budget Act ($8,221,061) B0152IRWM: Implementation Grants -

Round 1

Enacted 2011-12

3860-603-6051 Local Assistance:

increase and transfer

approp from 75026,

unspecified:

Reappropriation

(decrease)

2008-09 Budget Act ($500,000) B0152IRWM: Planning Grants - Round 1Enacted 2010-11

Wednesday, January 29, Page 22 of 3421:20:02 PM Public Resources Code (PRC) Section PRC §75026, 75027(a)(1)Ch. 2Prop 84 Report

Page 26: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-603-6051 Local Assistance:

increase and transfer

approp from 75026,

unspecified:

Reappropriation

(increase)

2008-09 Budget Act $8,221,061 B0152IRWM: Implementation Grants -

Round 1

Enacted 2019-20

3860-603-6051 Local Assistance:

increase and transfer

approp from 75026,

unspecified:

Reappropriation

(increase)

2008-09 Budget Act $500,000 B0152IRWM: Planning Grants - Round 1Enacted 2019-20

3860-605-6051 Projects: SB 855, Sec.

31(c): increase and

transfer approp from

75026, unspecified

2010-11 Special

Legislation

$5,386,000 B0152IRWM: Implementation Grants Rnd

2 - SB855

Enacted 2013-14

3860-605-6051 Projects: SB 855, Sec.

31(c): Natural Reversion

2010-11 Natural

Reversion

($2,104,772) B0152IRWM: Implementation Grants Rnd

2 - SB855

Enacted 2016-17

3860-605-6051 Projects: SB 855, Sec.

31(c): Reversion

Reverse

2010-11 Natural

Reversion

$2,104,772 B0152IRWM: Implementation Grants Rnd

2 - SB855

Enacted 2017-18

Sum: $35,477,039Enacted

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2013-14 Budget Act ($163,422) B0151IRWMEnacted/Not 2017-18

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2013-14 Budget Act $163,422 B0151IRWMEnacted/Not 2019-20

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2019-20 Control

Section

Adjustment

$2,158 B0153IRWMEnacted/Not 2019-20

Sum: $2,158Enacted/Not Posted

Sum: $35,479,197

$225,803

Balance for Integrated Regional Water Management:

Wednesday, January 29, Page 23 of 3421:20:02 PM Public Resources Code (PRC) Section PRC §75026, 75027(a)(1)Ch. 2Prop 84 Report

Page 27: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

Safe Drinking Water and Water Quality ProjectsChapter 2

Allocation: Integrated Regional Water Management

Allocation $: $138,000,000$718,353

$1,422,337Statewide Set Asides: $2,140,690 {

Outyear Obligations: $0

$0

$0

{

PRC §75026, 75027(a)(2)Ch. 2

Appropriations, Proposals and Reversions

Statewide, requiring appropriation:

Statewide, not requiring appropriation:

Outyear Program Delivery commitments:

Outyear Cap. Outlay (to complete started projects):Reversions are shown below$0

Outyear Local Asst. commitments:

San Francisco Bay portion: Grants for projects that assist local public agencies to meet the State`s long term water needs, including delivery of safe drinking water

and the protection of water quality and the environment. Must implement integrated regional water management plans and meet various other requirements in

§75026, §75027 and §75028. Local assistance appropriation amounts to be posted against this specific allocation upon project approval. In interim, appropriation

charged against PRC Section 75026, unspecified.

Dept.: Department of Water

Resources

Other Outyear Support commitments:$0

Committed

$0

$0

$0

$0

Proposed

$0

Prop 1 Reduction $2,689,310

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3860-001-6051 Portion of support

budget

2010-11 Budget Act $243,294 B0191IRWMEnacted 2010-11

3860-001-6051 Portion of support

budget: Natural

Reversion

2010-11 Natural

Reversion

($20,495) B0191IRWMEnacted 2012-13

3860-001-6051 Portion of support

budget

2011-12 Budget Act $243,294 B0191IRWMEnacted 2011-12

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2011-12 Control

Section

Adjustment

($4,800) B0191IRWMEnacted 2011-12

3860-001-6051 Portion of support

budget: Natural

Reversion

2011-12 Natural

Reversion

($11,742) B0191IRWMEnacted 2013-14

3860-001-6051 Portion of support

budget

2012-13 Budget Act $243,294 B0191IRWMEnacted 2012-13

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2012-13 Control

Section

Adjustment

($11,090) B0191IRWMEnacted 2012-13

3860-001-6051 Portion of support

budget: Natural

Reversion

2012-13 Natural

Reversion

$0 B0191IRWMEnacted 2017-18

3860-001-6051 Portion of support

budget: Reversion

2012-13 Budget Act ($30,520) B0191IRWMEnacted 2015-16

Wednesday, January 29, Page 24 of 3421:20:02 PM Public Resources Code (PRC) Section PRC §75026, 75027(a)(2)Ch. 2Prop 84 Report

Page 28: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-001-6051 Portion of support

budget

2013-14 Budget Act $657,294 B0191IRWMEnacted 2013-14

3860-001-6051 Portion of support

budget: Reversion

2013-14 Budget Act ($47,774) B0191IRWMEnacted 2015-16

3860-001-6051 Portion of support

budget

2014-15 Budget Act $345,000 B0191IRWMEnacted 2014-15

3860-001-6051 Portion of support

budget: Natural

Reversion

2014-15 Natural

Reversion

($211,375) B0191IRWMEnacted 2016-17

3860-001-6051 Portion of support

budget: Reversion

Reverse

2014-15 Natural

Reversion

$211,375 B0191IRWMEnacted 2017-18

3860-001-6051 Portion of support

budget

2015-16 Budget Act $387,918 B0191IRWMEnacted 2015-16

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2015-16 Budget Act ($387,918) B0191IRWMEnacted 2016-17

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2015-16 Budget Act $387,918 B0191IRWMEnacted 2018-19

3860-001-6051 Portion of support

budget

2016-17 Budget Act $168,716 B0191IRWMEnacted 2016-17

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2016-17 Control

Section

Adjustment

$8,594 B0191IRWMEnacted 2016-17

3860-001-6051 Portion of support

budget: Control Section

Adjustment:

Reappropriation

(decrease)

2016-17 Budget Act ($8,594) B0191IRWMEnacted 2016-17

3860-001-6051 Portion of support

budget: Control Section

Adjustment:

Reappropriation

(increase)

2016-17 Budget Act $8,594 B0191IRWMEnacted 2019-20

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2016-17 Budget Act ($168,716) B0191IRWMEnacted 2016-17

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2016-17 Budget Act $168,716 B0191IRWMEnacted 2019-20

3860-001-6051 Portion of support

budget

2017-18 Budget Act $173,880 B0193IRWMEnacted 2017-18

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2017-18 Control

Section

Adjustment

$11,347 B0193IRWMEnacted 2017-18

Wednesday, January 29, Page 25 of 3421:20:02 PM Public Resources Code (PRC) Section PRC §75026, 75027(a)(2)Ch. 2Prop 84 Report

Page 29: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-001-6051 Portion of support

budget

2018-19 Budget Act $185,380 B0193IRWMEnacted 2018-19

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2018-19 Control

Section

Adjustment

$7,064 B0193IRWMEnacted 2018-19

3860-001-6051 Portion of support

budget: Control Section

Adjustment:

Reappropriation

(decrease)

2018-19 Budget Act ($7,064) B0193IRWMEnacted 2018-19

3860-001-6051 Portion of support

budget: Control Section

Adjustment:

Reappropriation

(increase)

2018-19 Budget Act $7,064 B0193IRWMEnacted 2019-20

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2018-19 Budget Act ($185,380) B0193IRWMEnacted 2018-19

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2018-19 Budget Act $185,380 B0193IRWMEnacted 2019-20

3860-001-6051 Portion of support

budget

2019-20 Budget Act $205,686 B0193IRWMEnacted 2019-20

3860-503-6051 Portion of support

budget

2008-09 Special

Legislation

$2,856,600 B0191IRWM: San Francisco BayEnacted 2008-09

3860-503-6051 Portion of support

budget: Control Section

Adjustment

2008-09 Control

Section

Adjustment

($149,210) B0191IRWM: San Francisco BayEnacted 2012-13

3860-503-6051 Portion of support

budget: Natural

Reversion

2008-09 Natural

Reversion

($41,693) B0191IRWM: San Francisco BayEnacted 2015-16

3860-503-6051 Portion of support

budget: Reversion

2008-09 Budget Act ($587,087) B0191IRWM: San Francisco BayEnacted 2015-16

3860-503-6051 Portion of support

budget: Reversion

Reverse

2008-09 Natural

Reversion

$20,847 B0191IRWM: San Francisco BayEnacted 2016-17

3860-503-6051 Section

83002(b)(3)(a)(iv):

Control Section

Adjustment

2008-09 Control

Section

Adjustment

($82,453) B0191IRWM: San Francisco BayEnacted 2009-10

3860-505-6051 Section 8(a); PG 10, EL

29 per JE 0036307

dated 2-10-10

2009-10 Special

Legislation

$1,932,000 B0191IRWMEnacted 2009-10

3860-505-6051 Section 8(a); PG 10, EL

29 per JE 0036307

dated 2-10-10:

Reversion

2009-10 Special

Legislation

($1,932,000) B0191IRWMEnacted 2010-11

Wednesday, January 29, Page 26 of 3421:20:02 PM Public Resources Code (PRC) Section PRC §75026, 75027(a)(2)Ch. 2Prop 84 Report

Page 30: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-505-6051 Portion of support

budget: Ch. 718 (SB

855), Statutes of 2010,

Sec. 31(c):

Reappropriation

(decrease)

2010-11 Budget Act ($1,932,000) B0191IRWMEnacted 2017-18

3860-505-6051 Portion of support

budget: Ch. 718 (SB

855), Statutes of 2010,

Sec. 31(c):

Reappropriation

(increase)

2010-11 Budget Act $1,932,000 B0191IRWMEnacted 2019-20

3860-505-6051 Portion of support

budget: SB 855, Sec.

31(c)

2010-11 Special

Legislation

$1,932,000 B0191IRWMEnacted 2010-11

3860-601-6051 Local Assistance:

Reappropriation

(decrease)

2013-14 Budget Act ($24,178,423) B0192IRWM Drought Preparedness

Projects

Enacted 2013-14

3860-601-6051 Local Assistance:

Reappropriation

(increase)

2013-14 Budget Act $24,178,423 B0192IRWM Drought Preparedness

Projects

Enacted 2018-19

3860-601-6051 Projects: SB 104:

increase and transfer

approp from 75026,

unspecified

2013-14 Budget

Revision

$8,000,000 B0192IRWM 2014 Drought GrantsEnacted 2013-14

3860-601-6051 Projects: SB 104:

increase and transfer

approp from 75026,

unspecified

2013-14 Budget

Revision

$41,305,435 B0192IRWM 2015 Implementation GrantsEnacted 2013-14

3860-601-6051 Projects: SB 104:

increase and transfer

approp from 75026,

unspecified

2013-14 Budget

Revision

$24,178,423 B0192IRWM Drought Preparedness

Projects

Enacted 2013-14

3860-603-6051 Local Assistance:

increase and transfer

approp from 75026,

unspecified

2008-09 Budget

Revision

$9,415,104 B0192IRWM: Implementation Grants -

Round 1

Enacted 2011-12

3860-603-6051 Local Assistance:

increase and transfer

approp from 75026,

unspecified

2008-09 Budget

Revision

$454,342 B0192IRWM: Planning Grants - Round 1Enacted 2010-11

3860-603-6051 Local Assistance:

increase and transfer

approp from 75026,

unspecified

2008-09 Budget

Revision

$33,209 B0192IRWM: Planning Grants - Round 2Enacted 2012-13

3860-603-6051 Local Assistance:

increase and transfer

approp from 75026,

unspecified:

Reappropriation

(decrease)

2008-09 Budget Act ($9,415,104) B0192IRWM: Implementation Grants -

Round 1

Enacted 2011-12

Wednesday, January 29, Page 27 of 3421:20:02 PM Public Resources Code (PRC) Section PRC §75026, 75027(a)(2)Ch. 2Prop 84 Report

Page 31: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-603-6051 Local Assistance:

increase and transfer

approp from 75026,

unspecified:

Reappropriation

(decrease)

2008-09 Budget Act ($454,342) B0192IRWM: Planning Grants - Round 1Enacted 2010-11

3860-603-6051 Local Assistance:

increase and transfer

approp from 75026,

unspecified:

Reappropriation

(decrease)

2008-09 Budget Act ($33,209) B0192IRWM: Planning Grants - Round 2Enacted 2012-13

3860-603-6051 Local Assistance:

increase and transfer

approp from 75026,

unspecified:

Reappropriation

(increase)

2008-09 Budget Act $9,415,104 B0192IRWM: Implementation Grants -

Round 1

Enacted 2019-20

3860-603-6051 Local Assistance:

increase and transfer

approp from 75026,

unspecified:

Reappropriation

(increase)

2008-09 Budget Act $454,342 B0192IRWM: Planning Grants - Round 1Enacted 2019-20

3860-603-6051 Local Assistance:

increase and transfer

approp from 75026,

unspecified:

Reappropriation

(increase)

2008-09 Budget Act $33,209 B0192IRWM: Planning Grants - Round 2Enacted 2019-20

3860-605-6051 Projects: SB 855, Sec.

31(c): increase and

transfer approp from

75026, unspecified

2010-11 Special

Legislation

$22,453,489 B0192IRWM: Implementation Grants -

SB855

Enacted 2013-14

3860-605-6051 Projects: SB 855, Sec.

31(c): increase and

transfer approp from

75026, unspecified

2010-11 Special

Legislation

$20,430,000 B0192IRWM: Implementation Grants Rnd

2 - SB855

Enacted 2013-14

3860-605-6051 Projects: SB 855, Sec.

31(c): Natural Reversion

2010-11 Natural

Reversion

($16,758,258) B0192IRWM: Implementation Grants Rnd

2 - SB855

Enacted 2016-17

3860-605-6051 Projects: SB 855, Sec.

31(c): Reversion

Reverse

2010-11 Natural

Reversion

$16,758,258 B0192IRWM: Implementation Grants Rnd

2 - SB855

Enacted 2017-18

Sum: $132,973,344Enacted

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2013-14 Budget Act ($609,520) B0191IRWMEnacted/Not 2017-18

Wednesday, January 29, Page 28 of 3421:20:02 PM Public Resources Code (PRC) Section PRC §75026, 75027(a)(2)Ch. 2Prop 84 Report

Page 32: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2013-14 Budget Act $609,520 B0191IRWMEnacted/Not 2019-20

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2019-20 Control

Section

Adjustment

$8,050 B0193IRWMEnacted/Not 2019-20

Sum: $8,050Enacted/Not Posted

Sum: $132,981,394

$188,606

Balance for Integrated Regional Water Management:

Wednesday, January 29, Page 29 of 3421:20:02 PM Public Resources Code (PRC) Section PRC §75026, 75027(a)(2)Ch. 2Prop 84 Report

Page 33: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

Safe Drinking Water and Water Quality ProjectsChapter 2

Allocation: Integrated Regional Water Management

Allocation $: $52,000,000$270,684

$535,953Statewide Set Asides: $806,637 {

Outyear Obligations: $0

$0

$0

{

PRC §75026, 75027(a)(3)Ch. 2

Appropriations, Proposals and Reversions

Statewide, requiring appropriation:

Statewide, not requiring appropriation:

Outyear Program Delivery commitments:

Outyear Cap. Outlay (to complete started projects):Reversions are shown below$0

Outyear Local Asst. commitments:

Central Coast portion: Grants for projects that assist local public agencies to meet the State`s long term water needs, including delivery of safe drinking water and

the protection of water quality and the environment. Must implement integrated regional water management plans and meet various other requirements in §75026,

§75027 and §75028. Local assistance appropriation amounts to be posted against this specific allocation upon project approval. In interim, appropriation charged

against PRC Section 75026, unspecified.

Dept.: Department of Water

Resources

Other Outyear Support commitments:$0

Committed

$0

$0

$0

$0

Proposed

$0

Prop 1 Reduction $1,013,363

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3860-001-6051 Portion of support

budget

2010-11 Budget Act $91,676 B0201IRWMEnacted 2010-11

3860-001-6051 Portion of support

budget: Natural

Reversion

2010-11 Natural

Reversion

($7,723) B0201IRWMEnacted 2012-13

3860-001-6051 Portion of support

budget

2011-12 Budget Act $91,676 B0201IRWMEnacted 2011-12

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2011-12 Control

Section

Adjustment

($1,808) B0201IRWMEnacted 2011-12

3860-001-6051 Portion of support

budget: Natural

Reversion

2011-12 Natural

Reversion

($4,425) B0201IRWMEnacted 2013-14

3860-001-6051 Portion of support

budget

2012-13 Budget Act $91,676 B0201IRWMEnacted 2012-13

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2012-13 Control

Section

Adjustment

($4,161) B0201IRWMEnacted 2012-13

3860-001-6051 Portion of support

budget: Natural

Reversion

2012-13 Natural

Reversion

$0 B0201IRWMEnacted 2017-18

3860-001-6051 Portion of support

budget: Reversion

2012-13 Budget Act ($11,500) B0201IRWMEnacted 2015-16

Wednesday, January 29, Page 30 of 3421:20:03 PM Public Resources Code (PRC) Section PRC §75026, 75027(a)(3)Ch. 2Prop 84 Report

Page 34: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-001-6051 Portion of support

budget

2013-14 Budget Act $247,676 B0201IRWMEnacted 2013-14

3860-001-6051 Portion of support

budget: Reversion

2013-14 Budget Act ($18,002) B0201IRWMEnacted 2015-16

3860-001-6051 Portion of support

budget

2014-15 Budget Act $130,000 B0201IRWMEnacted 2014-15

3860-001-6051 Portion of support

budget: Natural

Reversion

2014-15 Natural

Reversion

($79,648) B0201IRWMEnacted 2016-17

3860-001-6051 Portion of support

budget: Reversion

Reverse

2014-15 Natural

Reversion

$79,648 B0201IRWMEnacted 2017-18

3860-001-6051 Portion of support

budget

2015-16 Budget Act $146,172 B0201IRWMEnacted 2015-16

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2015-16 Budget Act ($146,172) B0201IRWMEnacted 2016-17

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2015-16 Budget Act $146,172 B0201IRWMEnacted 2018-19

3860-001-6051 Portion of support

budget

2016-17 Budget Act $63,574 B0201IRWMEnacted 2016-17

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2016-17 Control

Section

Adjustment

$3,239 B0201IRWMEnacted 2016-17

3860-001-6051 Portion of support

budget: Control Section

Adjustment:

Reappropriation

(decrease)

2016-17 Budget Act ($3,239) B0201IRWMEnacted 2016-17

3860-001-6051 Portion of support

budget: Control Section

Adjustment:

Reappropriation

(increase)

2016-17 Budget Act $3,239 B0201IRWMEnacted 2019-20

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2016-17 Budget Act ($63,574) B0201IRWMEnacted 2016-17

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2016-17 Budget Act $63,574 B0201IRWMEnacted 2019-20

3860-001-6051 Portion of support

budget

2017-18 Budget Act $65,520 B0203IRWMEnacted 2017-18

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2017-18 Control

Section

Adjustment

$4,276 B0203IRWMEnacted 2017-18

Wednesday, January 29, Page 31 of 3421:20:03 PM Public Resources Code (PRC) Section PRC §75026, 75027(a)(3)Ch. 2Prop 84 Report

Page 35: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-001-6051 Portion of support

budget

2018-19 Budget Act $69,853 B0203IRWMEnacted 2018-19

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2018-19 Control

Section

Adjustment

$2,662 B0203IRWMEnacted 2018-19

3860-001-6051 Portion of support

budget: Control Section

Adjustment:

Reappropriation

(decrease)

2018-19 Budget Act ($2,662) B0203IRWMEnacted 2018-19

3860-001-6051 Portion of support

budget: Control Section

Adjustment:

Reappropriation

(increase)

2018-19 Budget Act $2,662 B0203IRWMEnacted 2019-20

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2018-19 Budget Act ($69,853) B0203IRWMEnacted 2018-19

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2018-19 Budget Act $69,853 B0203IRWMEnacted 2019-20

3860-001-6051 Portion of support

budget

2019-20 Budget Act $77,505 B0203IRWMEnacted 2019-20

3860-503-6051 Portion of support

budget

2008-09 Special

Legislation

$1,076,400 B0201IRWM: Central CoastEnacted 2008-09

3860-503-6051 Portion of support

budget: Control Section

Adjustment

2008-09 Control

Section

Adjustment

($56,224) B0201IRWM: Central CoastEnacted 2012-13

3860-503-6051 Portion of support

budget: Natural

Reversion

2008-09 Natural

Reversion

($15,711) B0201IRWM: Central CoastEnacted 2015-16

3860-503-6051 Portion of support

budget: Reversion

2008-09 Budget Act ($221,221) B0201IRWM: Central CoastEnacted 2015-16

3860-503-6051 Portion of support

budget: Reversion

Reverse

2008-09 Natural

Reversion

$7,855 B0201IRWM: Central CoastEnacted 2016-17

3860-503-6051 Section

83002(b)(3)(a)(iv):

Control Section

Adjustment

2008-09 Control

Section

Adjustment

($31,069) B0201IRWM: Central CoastEnacted 2009-10

3860-505-6051 Section 8(a); PG 10, EL

29 per JE 0036307

dated 2-10-10

2009-10 Special

Legislation

$728,000 B0201IRWMEnacted 2009-10

3860-505-6051 Section 8(a); PG 10, EL

29 per JE 0036307

dated 2-10-10:

Reversion

2009-10 Special

Legislation

($728,000) B0201IRWMEnacted 2010-11

Wednesday, January 29, Page 32 of 3421:20:03 PM Public Resources Code (PRC) Section PRC §75026, 75027(a)(3)Ch. 2Prop 84 Report

Page 36: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-505-6051 Portion of support

budget: Ch. 718 (SB

855), Statutes of 2010,

Sec. 31(c):

Reappropriation

(decrease)

2010-11 Budget Act ($728,000) B0201IRWMEnacted 2017-18

3860-505-6051 Portion of support

budget: Ch. 718 (SB

855), Statutes of 2010,

Sec. 31(c):

Reappropriation

(increase)

2010-11 Budget Act $728,000 B0201IRWMEnacted 2019-20

3860-505-6051 Portion of support

budget: SB 855, Sec.

31(c)

2010-11 Special

Legislation

$728,000 B0201IRWMEnacted 2010-11

3860-601-6051 Local Assistance:

Reappropriation

(decrease)

2013-14 Budget Act ($14,811,049) B0202IRWM Drought Preparedness

Projects

Enacted 2013-14

3860-601-6051 Local Assistance:

Reappropriation

(increase)

2013-14 Budget Act $14,811,049 B0202IRWM Drought Preparedness

Projects

Enacted 2018-19

3860-601-6051 Projects: SB 104:

increase and transfer

approp from 75026,

unspecified

2013-14 Budget

Revision

$4,937,016 B0202IRWM 2015 Implementation GrantsEnacted 2013-14

3860-601-6051 Projects: SB 104:

increase and transfer

approp from 75026,

unspecified

2013-14 Budget

Revision

$14,811,049 B0202IRWM Drought Preparedness

Projects

Enacted 2013-14

3860-603-6051 Local Assistance:

increase and transfer

approp from 75026,

unspecified

2008-09 Budget

Revision

$11,025,264 B0202IRWM: Implementation Grants -

Round 1

Enacted 2011-12

3860-603-6051 Local Assistance:

increase and transfer

approp from 75026,

unspecified

2008-09 Budget

Revision

$2,185,445 B0202IRWM: Planning Grants - Round 1Enacted 2010-11

3860-603-6051 Local Assistance:

increase and transfer

approp from 75026,

unspecified

2008-09 Budget

Revision

$536,494 B0202IRWM: Planning Grants - Round 2Enacted 2012-13

3860-603-6051 Local Assistance:

increase and transfer

approp from 75026,

unspecified:

Reappropriation

(decrease)

2008-09 Budget Act ($11,025,264) B0202IRWM: Implementation Grants -

Round 1

Enacted 2011-12

Wednesday, January 29, Page 33 of 3421:20:03 PM Public Resources Code (PRC) Section PRC §75026, 75027(a)(3)Ch. 2Prop 84 Report

Page 37: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-603-6051 Local Assistance:

increase and transfer

approp from 75026,

unspecified:

Reappropriation

(decrease)

2008-09 Budget Act ($2,185,445) B0202IRWM: Planning Grants - Round 1Enacted 2010-11

3860-603-6051 Local Assistance:

increase and transfer

approp from 75026,

unspecified:

Reappropriation

(decrease)

2008-09 Budget Act ($536,494) B0202IRWM: Planning Grants - Round 2Enacted 2012-13

3860-603-6051 Local Assistance:

increase and transfer

approp from 75026,

unspecified:

Reappropriation

(increase)

2008-09 Budget Act $11,025,264 B0202IRWM: Implementation Grants -

Round 1

Enacted 2019-20

3860-603-6051 Local Assistance:

increase and transfer

approp from 75026,

unspecified:

Reappropriation

(increase)

2008-09 Budget Act $2,185,445 B0202IRWM: Planning Grants - Round 1Enacted 2019-20

3860-603-6051 Local Assistance:

increase and transfer

approp from 75026,

unspecified:

Reappropriation

(increase)

2008-09 Budget Act $536,494 B0202IRWM: Planning Grants - Round 2Enacted 2019-20

3860-605-6051 Projects: SB 855, Sec.

31(c): increase and

transfer approp from

75026, unspecified

2010-11 Special

Legislation

$6,515,732 B0202IRWM: Implementation Grants -

SB855

Enacted 2013-14

3860-605-6051 Projects: SB 855, Sec.

31(c): increase and

transfer approp from

75026, unspecified

2010-11 Special

Legislation

$7,569,000 B0202IRWM: Implementation Grants Rnd

2 - SB855

Enacted 2013-14

3860-605-6051 Projects: SB 855, Sec.

31(c): Natural Reversion

2010-11 Natural

Reversion

($5,504,113) B0202IRWM: Implementation Grants Rnd

2 - SB855

Enacted 2016-17

3860-605-6051 Projects: SB 855, Sec.

31(c): Reversion

Reverse

2010-11 Natural

Reversion

$5,504,113 B0202IRWM: Implementation Grants Rnd

2 - SB855

Enacted 2017-18

Sum: $50,105,916Enacted

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2013-14 Budget Act ($229,674) B0201IRWMEnacted/Not 2017-18

Wednesday, January 29, Page 34 of 3421:20:03 PM Public Resources Code (PRC) Section PRC §75026, 75027(a)(3)Ch. 2Prop 84 Report

Page 38: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2013-14 Budget Act $229,674 B0201IRWMEnacted/Not 2019-20

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2019-20 Control

Section

Adjustment

$3,033 B0203IRWMEnacted/Not 2019-20

Sum: $3,033Enacted/Not Posted

Sum: $50,108,949

$71,051

Balance for Integrated Regional Water Management:

Wednesday, January 29, Page 35 of 3421:20:03 PM Public Resources Code (PRC) Section PRC §75026, 75027(a)(3)Ch. 2Prop 84 Report

Page 39: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

Safe Drinking Water and Water Quality ProjectsChapter 2

Allocation: Integrated Regional Water Management

Allocation $: $215,000,000$1,119,173

$2,215,960Statewide Set Asides: $3,335,134 {

Outyear Obligations: $0

$0

$0

{

PRC §75026, 75027(a)(4)Ch. 2

Appropriations, Proposals and Reversions

Statewide, requiring appropriation:

Statewide, not requiring appropriation:

Outyear Program Delivery commitments:

Outyear Cap. Outlay (to complete started projects):Reversions are shown below$0

Outyear Local Asst. commitments:

South Coast region/Los Angeles sub-region portion: Grants for projects that assist local public agencies to meet the State`s long term water needs, including

delivery of safe drinking water and the protection of water quality and the environment. Must implement integrated regional water management plans and meet

various other requirements in §75026, §75027 and §75028. Local assistance appropriation amounts to be posted against this specific allocation upon project

approval. In interim, appropriation charged against PRC Section 75026, unspecified.

Dept.: Department of Water

Resources

Other Outyear Support commitments:$0

Committed

$0

$0

$0

$0

Proposed

$0

Prop 1 Reduction $4,189,866

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3860-001-6051 Portion of support

budget

2010-11 Budget Act $379,045 B0211IRWMEnacted 2010-11

3860-001-6051 Portion of support

budget: Natural

Reversion

2010-11 Natural

Reversion

($31,930) B0211IRWMEnacted 2012-13

3860-001-6051 Portion of support

budget

2011-12 Budget Act $379,045 B0211IRWMEnacted 2011-12

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2011-12 Control

Section

Adjustment

($7,491) B0211IRWMEnacted 2011-12

3860-001-6051 Portion of support

budget: Natural

Reversion

2011-12 Natural

Reversion

($18,281) B0211IRWMEnacted 2013-14

3860-001-6051 Portion of support

budget

2012-13 Budget Act $379,045 B0211IRWMEnacted 2012-13

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2012-13 Control

Section

Adjustment

($17,202) B0211IRWMEnacted 2012-13

3860-001-6051 Portion of support

budget: Natural

Reversion

2012-13 Natural

Reversion

$0 B0211IRWMEnacted 2017-18

3860-001-6051 Portion of support

budget: Reversion

2012-13 Budget Act ($47,550) B0211IRWMEnacted 2015-16

Wednesday, January 29, Page 36 of 3421:20:03 PM Public Resources Code (PRC) Section PRC §75026, 75027(a)(4)Ch. 2Prop 84 Report

Page 40: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-001-6051 Portion of support

budget

2013-14 Budget Act $1,024,045 B0211IRWMEnacted 2013-14

3860-001-6051 Portion of support

budget: Reversion

2013-14 Budget Act ($74,431) B0211IRWMEnacted 2015-16

3860-001-6051 Portion of support

budget

2014-15 Budget Act $537,500 B0211IRWMEnacted 2014-15

3860-001-6051 Portion of support

budget: Natural

Reversion

2014-15 Natural

Reversion

($329,316) B0211IRWMEnacted 2016-17

3860-001-6051 Portion of support

budget: Reversion

Reverse

2014-15 Natural

Reversion

$329,316 B0211IRWMEnacted 2017-18

3860-001-6051 Portion of support

budget

2015-16 Budget Act $604,365 B0211IRWMEnacted 2015-16

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2015-16 Budget Act ($604,365) B0211IRWMEnacted 2016-17

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2015-16 Budget Act $604,365 B0211IRWMEnacted 2018-19

3860-001-6051 Portion of support

budget

2016-17 Budget Act $262,855 B0211IRWMEnacted 2016-17

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2016-17 Control

Section

Adjustment

$13,390 B0211IRWMEnacted 2016-17

3860-001-6051 Portion of support

budget: Control Section

Adjustment:

Reappropriation

(decrease)

2016-17 Budget Act ($13,390) B0211IRWMEnacted 2016-17

3860-001-6051 Portion of support

budget: Control Section

Adjustment:

Reappropriation

(increase)

2016-17 Budget Act $13,390 B0211IRWMEnacted 2019-20

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2016-17 Budget Act ($262,855) B0211IRWMEnacted 2016-17

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2016-17 Budget Act $262,855 B0211IRWMEnacted 2019-20

3860-001-6051 Portion of support

budget

2017-18 Budget Act $270,900 B0213IRWMEnacted 2017-18

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2017-18 Control

Section

Adjustment

$17,677 B0213IRWMEnacted 2017-18

Wednesday, January 29, Page 37 of 3421:20:03 PM Public Resources Code (PRC) Section PRC §75026, 75027(a)(4)Ch. 2Prop 84 Report

Page 41: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-001-6051 Portion of support

budget

2018-19 Budget Act $288,817 B0213IRWMEnacted 2018-19

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2018-19 Control

Section

Adjustment

$11,006 B0213IRWMEnacted 2018-19

3860-001-6051 Portion of support

budget: Control Section

Adjustment:

Reappropriation

(decrease)

2018-19 Budget Act ($11,006) B0213IRWMEnacted 2018-19

3860-001-6051 Portion of support

budget: Control Section

Adjustment:

Reappropriation

(increase)

2018-19 Budget Act $11,006 B0213IRWMEnacted 2019-20

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2018-19 Budget Act ($288,817) B0213IRWMEnacted 2018-19

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2018-19 Budget Act $288,817 B0213IRWMEnacted 2019-20

3860-001-6051 Portion of support

budget

2019-20 Budget Act $320,452 B0213IRWMEnacted 2019-20

3860-503-6051 Portion of support

budget

2008-09 Special

Legislation

$4,450,500 B0211IRWM: Los Angeles sub-regionEnacted 2008-09

3860-503-6051 Portion of support

budget: Control Section

Adjustment

2008-09 Control

Section

Adjustment

($232,464) B0211IRWM: Los Angeles sub-regionEnacted 2012-13

3860-503-6051 Portion of support

budget: Natural

Reversion

2008-09 Natural

Reversion

($64,957) B0211IRWM: Los Angeles sub-regionEnacted 2015-16

3860-503-6051 Portion of support

budget: Reversion

2008-09 Budget Act ($914,665) B0211IRWM: Los Angeles sub-regionEnacted 2015-16

3860-503-6051 Portion of support

budget: Reversion

Reverse

2008-09 Natural

Reversion

$32,478 B0211IRWM: Los Angeles sub-regionEnacted 2016-17

3860-503-6051 Section

83002(b)(3)(a)(iv):

Control Section

Adjustment

2008-09 Control

Section

Adjustment

($128,459) B0211IRWM: Los Angeles sub-regionEnacted 2009-10

3860-505-6051 Section 8(a); PG 10, EL

29 per JE 0036307

dated 2-10-10

2009-10 Special

Legislation

$3,010,000 B0211IRWMEnacted 2009-10

3860-505-6051 Section 8(a); PG 10, EL

29 per JE 0036307

dated 2-10-10:

Reversion

2009-10 Special

Legislation

($3,010,000) B0211IRWMEnacted 2010-11

Wednesday, January 29, Page 38 of 3421:20:03 PM Public Resources Code (PRC) Section PRC §75026, 75027(a)(4)Ch. 2Prop 84 Report

Page 42: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-505-6051 Portion of support

budget: Ch. 718 (SB

855), Statutes of 2010,

Sec. 31(c):

Reappropriation

(decrease)

2010-11 Budget Act ($3,010,000) B0211IRWMEnacted 2017-18

3860-505-6051 Portion of support

budget: Ch. 718 (SB

855), Statutes of 2010,

Sec. 31(c):

Reappropriation

(increase)

2010-11 Budget Act $3,010,000 B0211IRWMEnacted 2019-20

3860-505-6051 Portion of support

budget: SB 855, Sec.

31(c)

2010-11 Special

Legislation

$3,010,000 B0211IRWMEnacted 2010-11

3860-601-6051 Local Assistance:

Reappropriation

(decrease)

2013-14 Budget Act ($56,301,434) B0212IRWM Drought Preparedness

Projects

Enacted 2013-14

3860-601-6051 Local Assistance:

Reappropriation

(decrease)

2013-14 Budget Act ($4,535,834) B0212IRWM Implementation Grants -

Round 2

Enacted 2013-14

3860-601-6051 Local Assistance:

Reappropriation

(increase)

2013-14 Budget Act $56,301,434 B0212IRWM Drought Preparedness

Projects

Enacted 2018-19

3860-601-6051 Local Assistance:

Reappropriation

(increase)

2013-14 Budget Act $4,535,834 B0212IRWM Implementation Grants -

Round 2

Enacted 2018-19

3860-601-6051 Projects: SB 104:

increase and transfer

approp from 75026,

unspecified

2013-14 Budget

Revision

$40,039,355 B0212IRWM 2015 Implementation GrantsEnacted 2013-14

3860-601-6051 Projects: SB 104:

increase and transfer

approp from 75026,

unspecified

2013-14 Budget

Revision

$56,301,434 B0212IRWM Drought Preparedness

Projects

Enacted 2013-14

3860-601-6051 Projects: SB 104:

increase and transfer

approp from 75026,

unspecified

2013-14 Budget

Revision

$4,535,834 B0212IRWM Implementation Grants -

Round 2

Enacted 2013-14

3860-603-6051 Local Assistance:

increase and transfer

approp from 75026,

unspecified

2008-09 Budget

Revision

$29,855,006 B0212IRWM: Implementation Grants -

Round 1

Enacted 2011-12

3860-603-6051 Local Assistance:

increase and transfer

approp from 75026,

unspecified

2008-09 Budget

Revision

$1,316,488 B0212IRWM: Planning Grants - Round 1Enacted 2010-11

3860-603-6051 Local Assistance:

increase and transfer

approp from 75026,

unspecified

2008-09 Budget

Revision

$587,381 B0212IRWM: Planning Grants - Round 2Enacted 2012-13

Wednesday, January 29, Page 39 of 3421:20:03 PM Public Resources Code (PRC) Section PRC §75026, 75027(a)(4)Ch. 2Prop 84 Report

Page 43: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-603-6051 Local Assistance:

increase and transfer

approp from 75026,

unspecified:

Reappropriation

(decrease)

2008-09 Budget Act ($29,855,006) B0212IRWM: Implementation Grants -

Round 1

Enacted 2011-12

3860-603-6051 Local Assistance:

increase and transfer

approp from 75026,

unspecified:

Reappropriation

(decrease)

2008-09 Budget Act ($1,316,488) B0212IRWM: Planning Grants - Round 1Enacted 2010-11

3860-603-6051 Local Assistance:

increase and transfer

approp from 75026,

unspecified:

Reappropriation

(decrease)

2008-09 Budget Act ($587,381) B0212IRWM: Planning Grants - Round 2Enacted 2012-13

3860-603-6051 Local Assistance:

increase and transfer

approp from 75026,

unspecified:

Reappropriation

(increase)

2008-09 Budget Act $29,855,006 B0212IRWM: Implementation Grants -

Round 1

Enacted 2019-20

3860-603-6051 Local Assistance:

increase and transfer

approp from 75026,

unspecified:

Reappropriation

(increase)

2008-09 Budget Act $1,316,488 B0212IRWM: Planning Grants - Round 1Enacted 2019-20

3860-603-6051 Local Assistance:

increase and transfer

approp from 75026,

unspecified:

Reappropriation

(increase)

2008-09 Budget Act $587,381 B0212IRWM: Planning Grants - Round 2Enacted 2019-20

3860-605-6051 Projects: SB 855, Sec.

31(c): increase and

transfer approp from

75026, unspecified

2010-11 Special

Legislation

$20,186,593 B0212IRWM: Implementation Grants -

SB855

Enacted 2013-14

3860-605-6051 Projects: SB 855, Sec.

31(c): increase and

transfer approp from

75026, unspecified

2010-11 Special

Legislation

$43,902,909 B0212IRWM: Implementation Grants Rnd

2 - SB855

Enacted 2013-14

3860-605-6051 Projects: SB 855, Sec.

31(c): Natural Reversion

2010-11 Natural

Reversion

($33,116,943) B0212IRWM: Implementation Grants Rnd

2 - SB855

Enacted 2016-17

3860-605-6051 Projects: SB 855, Sec.

31(c): Reversion

Reverse

2010-11 Natural

Reversion

$33,116,943 B0212IRWM: Implementation Grants Rnd

2 - SB855

Enacted 2017-18

Sum: $207,168,690Enacted

Wednesday, January 29, Page 40 of 3421:20:03 PM Public Resources Code (PRC) Section PRC §75026, 75027(a)(4)Ch. 2Prop 84 Report

Page 44: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2013-14 Budget Act ($949,614) B0211IRWMEnacted/Not 2017-18

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2013-14 Budget Act $949,614 B0211IRWMEnacted/Not 2019-20

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2019-20 Control

Section

Adjustment

$12,542 B0213IRWMEnacted/Not 2019-20

Sum: $12,542Enacted/Not Posted

Sum: $207,181,232

$293,768

Balance for Integrated Regional Water Management:

Wednesday, January 29, Page 41 of 3421:20:03 PM Public Resources Code (PRC) Section PRC §75026, 75027(a)(4)Ch. 2Prop 84 Report

Page 45: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

Safe Drinking Water and Water Quality ProjectsChapter 2

Allocation: Integrated Regional Water Management

Allocation $: $114,000,000$593,422

$1,174,974Statewide Set Asides: $1,768,396 {

Outyear Obligations: $0

$0

$0

{

PRC §75026, 75027(a)(5)Ch. 2

Appropriations, Proposals and Reversions

Statewide, requiring appropriation:

Statewide, not requiring appropriation:

Outyear Program Delivery commitments:

Outyear Cap. Outlay (to complete started projects):Reversions are shown below$0

Outyear Local Asst. commitments:

South Coast region/Santa Ana sub-region portion: Grants for projects that assist local public agencies to meet the State`s long term water needs, including delivery

of safe drinking water and the protection of water quality and the environment. Must implement integrated regional water management plans and meet various

other requirements in §75026, §75027 and §75028. Local assistance appropriation amounts to be posted against this specific allocation upon project approval. In

interim, appropriation charged against PRC Section 75026, unspecified.

Dept.: Department of Water

Resources

Other Outyear Support commitments:$0

Committed

$0

$0

$0

$0

Proposed

$0

Prop 1 Reduction $2,221,604

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3860-001-6051 Portion of support

budget

2010-11 Budget Act $200,982 B0221IRWMEnacted 2010-11

3860-001-6051 Portion of support

budget: Natural

Reversion

2010-11 Natural

Reversion

($16,931) B0221IRWMEnacted 2012-13

3860-001-6051 Portion of support

budget

2011-12 Budget Act $200,982 B0221IRWMEnacted 2011-12

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2011-12 Control

Section

Adjustment

($3,964) B0221IRWMEnacted 2011-12

3860-001-6051 Portion of support

budget: Natural

Reversion

2011-12 Natural

Reversion

($9,701) B0221IRWMEnacted 2013-14

3860-001-6051 Portion of support

budget

2012-13 Budget Act $200,982 B0221IRWMEnacted 2012-13

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2012-13 Control

Section

Adjustment

($9,121) B0221IRWMEnacted 2012-13

3860-001-6051 Portion of support

budget: Natural

Reversion

2012-13 Natural

Reversion

$0 B0221IRWMEnacted 2017-18

3860-001-6051 Portion of support

budget: Reversion

2012-13 Budget Act ($25,212) B0221IRWMEnacted 2015-16

Wednesday, January 29, Page 42 of 3421:20:03 PM Public Resources Code (PRC) Section PRC §75026, 75027(a)(5)Ch. 2Prop 84 Report

Page 46: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-001-6051 Portion of support

budget

2013-14 Budget Act $542,982 B0221IRWMEnacted 2013-14

3860-001-6051 Portion of support

budget: Reversion

2013-14 Budget Act ($39,465) B0221IRWMEnacted 2015-16

3860-001-6051 Portion of support

budget

2014-15 Budget Act $285,000 B0221IRWMEnacted 2014-15

3860-001-6051 Portion of support

budget: Natural

Reversion

2014-15 Natural

Reversion

($174,614) B0221IRWMEnacted 2016-17

3860-001-6051 Portion of support

budget: Reversion

Reverse

2014-15 Natural

Reversion

$174,614 B0221IRWMEnacted 2017-18

3860-001-6051 Portion of support

budget

2015-16 Budget Act $320,454 B0221IRWMEnacted 2015-16

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2015-16 Budget Act ($320,454) B0221IRWMEnacted 2016-17

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2015-16 Budget Act $320,454 B0221IRWMEnacted 2018-19

3860-001-6051 Portion of support

budget

2016-17 Budget Act $139,374 B0221IRWMEnacted 2016-17

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2016-17 Control

Section

Adjustment

$7,101 B0221IRWMEnacted 2016-17

3860-001-6051 Portion of support

budget: Control Section

Adjustment:

Reappropriation

(decrease)

2016-17 Budget Act ($7,101) B0221IRWMEnacted 2016-17

3860-001-6051 Portion of support

budget: Control Section

Adjustment:

Reappropriation

(increase)

2016-17 Budget Act $7,101 B0221IRWMEnacted 2019-20

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2016-17 Budget Act ($139,374) B0221IRWMEnacted 2016-17

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2016-17 Budget Act $139,374 B0221IRWMEnacted 2019-20

3860-001-6051 Portion of support

budget

2017-18 Budget Act $143,640 B0223IRWMEnacted 2017-18

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2017-18 Control

Section

Adjustment

$9,373 B0223IRWMEnacted 2017-18

Wednesday, January 29, Page 43 of 3421:20:03 PM Public Resources Code (PRC) Section PRC §75026, 75027(a)(5)Ch. 2Prop 84 Report

Page 47: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-001-6051 Portion of support

budget

2018-19 Budget Act $153,140 B0223IRWMEnacted 2018-19

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2018-19 Control

Section

Adjustment

$5,836 B0223IRWMEnacted 2018-19

3860-001-6051 Portion of support

budget: Control Section

Adjustment:

Reappropriation

(decrease)

2018-19 Budget Act ($5,836) B0223IRWMEnacted 2018-19

3860-001-6051 Portion of support

budget: Control Section

Adjustment:

Reappropriation

(increase)

2018-19 Budget Act $5,836 B0223IRWMEnacted 2019-20

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2018-19 Budget Act ($153,140) B0223IRWMEnacted 2018-19

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2018-19 Budget Act $153,140 B0223IRWMEnacted 2019-20

3860-001-6051 Portion of support

budget

2019-20 Budget Act $169,914 B0223IRWMEnacted 2019-20

3860-503-6051 Portion of support

budget

2008-09 Special

Legislation

$2,359,800 B0221IRWM: Santa Ana sub-regionEnacted 2008-09

3860-503-6051 Portion of support

budget: Control Section

Adjustment

2008-09 Control

Section

Adjustment

($123,260) B0221IRWM: Santa Ana sub-regionEnacted 2012-13

3860-503-6051 Portion of support

budget: Natural

Reversion

2008-09 Natural

Reversion

($34,442) B0221IRWM: Santa Ana sub-regionEnacted 2015-16

3860-503-6051 Portion of support

budget: Reversion

2008-09 Budget Act ($484,985) B0221IRWM: Santa Ana sub-regionEnacted 2015-16

3860-503-6051 Portion of support

budget: Reversion

Reverse

2008-09 Natural

Reversion

$17,221 B0221IRWM: Santa Ana sub-regionEnacted 2016-17

3860-503-6051 Section

83002(b)(3)(a)(iv):

Control Section

Adjustment

2008-09 Control

Section

Adjustment

($68,113) B0221IRWM: Santa Ana sub-regionEnacted 2009-10

3860-505-6051 Section 8(a); PG 10, EL

29 per JE 0036307

dated 2-10-10

2009-10 Special

Legislation

$1,596,000 B0221IRWMEnacted 2009-10

3860-505-6051 Section 8(a); PG 10, EL

29 per JE 0036307

dated 2-10-10:

Reversion

2009-10 Special

Legislation

($1,596,000) B0221IRWMEnacted 2010-11

Wednesday, January 29, Page 44 of 3421:20:03 PM Public Resources Code (PRC) Section PRC §75026, 75027(a)(5)Ch. 2Prop 84 Report

Page 48: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-505-6051 Portion of support

budget: Ch. 718 (SB

855), Statutes of 2010,

Sec. 31(c):

Reappropriation

(decrease)

2010-11 Budget Act ($1,596,000) B0221IRWMEnacted 2017-18

3860-505-6051 Portion of support

budget: Ch. 718 (SB

855), Statutes of 2010,

Sec. 31(c):

Reappropriation

(increase)

2010-11 Budget Act $1,596,000 B0221IRWMEnacted 2019-20

3860-505-6051 Portion of support

budget: SB 855, Sec.

31(c)

2010-11 Special

Legislation

$1,596,000 B0221IRWMEnacted 2010-11

3860-601-6051 Local Assistance:

Reappropriation

(decrease)

2013-14 Budget Act ($11,757,000) B0222IRWM Drought Preparedness

Projects

Enacted 2013-14

3860-601-6051 Local Assistance:

Reappropriation

(decrease)

2013-14 Budget Act ($6,791,809) B0222IRWM Implementation Grants -

Round 2

Enacted 2013-14

3860-601-6051 Local Assistance:

Reappropriation

(increase)

2013-14 Budget Act $11,757,000 B0222IRWM Drought Preparedness

Projects

Enacted 2018-19

3860-601-6051 Local Assistance:

Reappropriation

(increase)

2013-14 Budget Act $6,791,809 B0222IRWM Implementation Grants -

Round 2

Enacted 2018-19

3860-601-6051 Projects: SB 104:

increase and transfer

approp from 75026,

unspecified

2013-14 Budget

Revision

$64,267,687 B0222IRWM 2015 Implementation GrantsEnacted 2013-14

3860-601-6051 Projects: SB 104:

increase and transfer

approp from 75026,

unspecified

2013-14 Budget

Revision

$11,757,000 B0222IRWM Drought Preparedness

Projects

Enacted 2013-14

3860-601-6051 Projects: SB 104:

increase and transfer

approp from 75026,

unspecified

2013-14 Budget

Revision

$6,791,809 B0222IRWM Implementation Grants -

Round 2

Enacted 2013-14

3860-603-6051 Local Assistance:

increase and transfer

approp from 75026,

unspecified

2008-09 Budget

Revision

$422,222 B0222IRWM: Implementation Grants -

Round 1

Enacted 2011-12

3860-603-6051 Local Assistance:

increase and transfer

approp from 75026,

unspecified

2008-09 Budget

Revision

$500,000 B0222IRWM: Planning Grants - Round 1Enacted 2010-11

Wednesday, January 29, Page 45 of 3421:20:03 PM Public Resources Code (PRC) Section PRC §75026, 75027(a)(5)Ch. 2Prop 84 Report

Page 49: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-603-6051 Local Assistance:

increase and transfer

approp from 75026,

unspecified:

Reappropriation

(decrease)

2008-09 Budget Act ($422,222) B0222IRWM: Implementation Grants -

Round 1

Enacted 2011-12

3860-603-6051 Local Assistance:

increase and transfer

approp from 75026,

unspecified:

Reappropriation

(decrease)

2008-09 Budget Act ($500,000) B0222IRWM: Planning Grants - Round 1Enacted 2010-11

3860-603-6051 Local Assistance:

increase and transfer

approp from 75026,

unspecified:

Reappropriation

(increase)

2008-09 Budget Act $422,222 B0222IRWM: Implementation Grants -

Round 1

Enacted 2019-20

3860-603-6051 Local Assistance:

increase and transfer

approp from 75026,

unspecified:

Reappropriation

(increase)

2008-09 Budget Act $500,000 B0222IRWM: Planning Grants - Round 1Enacted 2019-20

3860-605-6051 Projects: SB 855, Sec.

31(c): Natural Reversion

2010-11 Natural

Reversion

($8,038,965) B0222IRWM: Implementation Grants Rnd

2 - SB855

Enacted 2016-17

3860-605-6051 Projects: SB 855, Sec.

31(c): Reversion

Reverse

2010-11 Natural

Reversion

$8,038,965 B0222IRWM: Implementation Grants Rnd

2 - SB855

Enacted 2017-18

3860-605-6051 Projects: SB 855, Sec.

31(c):: increase and

transfer approp from

75026, unspecified

2010-11 Special

Legislation

$12,237,782 B0222IRWM: Implementation Grants -

SB855

Enacted 2013-14

3860-605-6051 Projects: SB 855, Sec.

31(c):: increase and

transfer approp from

75026, unspecified

2010-11 Special

Legislation

$8,333,500 B0222IRWM: Implementation Grants Rnd

2 - SB855

Enacted 2013-14

Sum: $109,847,587Enacted

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2013-14 Budget Act ($503,517) B0221IRWMEnacted/Not 2017-18

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2013-14 Budget Act $503,517 B0221IRWMEnacted/Not 2019-20

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2019-20 Control

Section

Adjustment

$6,650 B0223IRWMEnacted/Not 2019-20

Wednesday, January 29, Page 46 of 3421:20:03 PM Public Resources Code (PRC) Section PRC §75026, 75027(a)(5)Ch. 2Prop 84 Report

Page 50: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

Sum: $6,650Enacted/Not Posted

Sum: $109,854,237

$155,763

Balance for Integrated Regional Water Management:

Wednesday, January 29, Page 47 of 3421:20:03 PM Public Resources Code (PRC) Section PRC §75026, 75027(a)(5)Ch. 2Prop 84 Report

Page 51: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

Safe Drinking Water and Water Quality ProjectsChapter 2

Allocation: Integrated Regional Water Management

Allocation $: $91,000,000$473,697

$937,918Statewide Set Asides: $1,411,615 {

Outyear Obligations: $0

$0

$0

{

PRC §75026, 75027(a)(6)Ch. 2

Appropriations, Proposals and Reversions

Statewide, requiring appropriation:

Statewide, not requiring appropriation:

Outyear Program Delivery commitments:

Outyear Cap. Outlay (to complete started projects):Reversions are shown below$0

Outyear Local Asst. commitments:

South Coast region/San Diego sub-region portion: Grants for projects that assist local public agencies to meet the State`s long term water needs, including delivery

of safe drinking water and the protection of water quality and the environment. Must implement integrated regional water management plans and meet various

other requirements in §75026, §75027 and §75028. Local assistance appropriation amounts to be posted against this specific allocation upon project approval. In

interim, appropriation charged against PRC Section 75026, unspecified.

Dept.: Department of Water

Resources

Other Outyear Support commitments:$0

Committed

$0

$0

$0

$0

Proposed

$0

Prop 1 Reduction $1,773,385

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3860-001-6051 Portion of support

budget

2010-11 Budget Act $160,433 B0231IRWMEnacted 2010-11

3860-001-6051 Portion of support

budget: Natural

Reversion

2010-11 Natural

Reversion

($13,515) B0231IRWMEnacted 2012-13

3860-001-6051 Portion of support

budget

2011-12 Budget Act $160,433 B0231IRWMEnacted 2011-12

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2011-12 Control

Section

Adjustment

($3,165) B0231IRWMEnacted 2011-12

3860-001-6051 Portion of support

budget: Natural

Reversion

2011-12 Natural

Reversion

($7,743) B0231IRWMEnacted 2013-14

3860-001-6051 Portion of support

budget

2012-13 Budget Act $160,433 B0231IRWMEnacted 2012-13

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2012-13 Control

Section

Adjustment

($7,281) B0231IRWMEnacted 2012-13

3860-001-6051 Portion of support

budget: Natural

Reversion

2012-13 Natural

Reversion

$0 B0231IRWMEnacted 2017-18

3860-001-6051 Portion of support

budget: Reversion

2012-13 Budget Act ($20,126) B0231IRWMEnacted 2015-16

Wednesday, January 29, Page 48 of 3421:20:03 PM Public Resources Code (PRC) Section PRC §75026, 75027(a)(6)Ch. 2Prop 84 Report

Page 52: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-001-6051 Portion of support

budget

2013-14 Budget Act $433,433 B0231IRWMEnacted 2013-14

3860-001-6051 Portion of support

budget: Reversion

2013-14 Budget Act ($31,503) B0231IRWMEnacted 2015-16

3860-001-6051 Portion of support

budget

2014-15 Budget Act $227,500 B0231IRWMEnacted 2014-15

3860-001-6051 Portion of support

budget: Natural

Reversion

2014-15 Natural

Reversion

($139,385) B0231IRWMEnacted 2016-17

3860-001-6051 Portion of support

budget: Reversion

Reverse

2014-15 Natural

Reversion

$139,385 B0231IRWMEnacted 2017-18

3860-001-6051 Portion of support

budget

2015-16 Budget Act $255,801 B0231IRWMEnacted 2015-16

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2015-16 Budget Act ($255,801) B0231IRWMEnacted 2016-17

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2015-16 Budget Act $255,801 B0231IRWMEnacted 2018-19

3860-001-6051 Portion of support

budget

2016-17 Budget Act $111,255 B0231IRWMEnacted 2016-17

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2016-17 Control

Section

Adjustment

$5,667 B0231IRWMEnacted 2016-17

3860-001-6051 Portion of support

budget: Control Section

Adjustment:

Reappropriation

(decrease)

2016-17 Budget Act ($5,667) B0231IRWMEnacted 2016-17

3860-001-6051 Portion of support

budget: Control Section

Adjustment:

Reappropriation

(increase)

2016-17 Budget Act $5,667 B0231IRWMEnacted 2019-20

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2016-17 Budget Act ($111,255) B0231IRWMEnacted 2016-17

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2016-17 Budget Act $111,255 B0231IRWMEnacted 2019-20

3860-001-6051 Portion of support

budget

2017-18 Budget Act $114,660 B0233IRWMEnacted 2017-18

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2017-18 Control

Section

Adjustment

$7,483 B0233IRWMEnacted 2017-18

Wednesday, January 29, Page 49 of 3421:20:03 PM Public Resources Code (PRC) Section PRC §75026, 75027(a)(6)Ch. 2Prop 84 Report

Page 53: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-001-6051 Portion of support

budget

2018-19 Budget Act $122,244 B0233IRWMEnacted 2018-19

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2018-19 Control

Section

Adjustment

$4,658 B0233IRWMEnacted 2018-19

3860-001-6051 Portion of support

budget: Control Section

Adjustment:

Reappropriation

(decrease)

2018-19 Budget Act ($4,658) B0233IRWMEnacted 2018-19

3860-001-6051 Portion of support

budget: Control Section

Adjustment:

Reappropriation

(increase)

2018-19 Budget Act $4,658 B0233IRWMEnacted 2019-20

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2018-19 Budget Act ($122,244) B0233IRWMEnacted 2018-19

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2018-19 Budget Act $122,244 B0233IRWMEnacted 2019-20

3860-001-6051 Portion of support

budget

2019-20 Budget Act $135,633 B0233IRWMEnacted 2019-20

3860-503-6051 Portion of support

budget

2008-09 Special

Legislation

$1,883,700 B0231IRWM: San Diego sub-regionEnacted 2008-09

3860-503-6051 Portion of support

budget: Control Section

Adjustment

2008-09 Control

Section

Adjustment

($98,392) B0231IRWM: San Diego sub-regionEnacted 2012-13

3860-503-6051 Portion of support

budget: Natural

Reversion

2008-09 Natural

Reversion

($27,493) B0231IRWM: San Diego sub-regionEnacted 2015-16

3860-503-6051 Portion of support

budget: Reversion

2008-09 Budget Act ($387,137) B0231IRWM: San Diego sub-regionEnacted 2015-16

3860-503-6051 Portion of support

budget: Reversion

Reverse

2008-09 Natural

Reversion

$13,747 B0231IRWM: San Diego sub-regionEnacted 2016-17

3860-503-6051 Section

83002(b)(3)(a)(iv):

Control Section

Adjustment

2008-09 Control

Section

Adjustment

($54,371) B0231IRWM: San Diego sub-regionEnacted 2009-10

3860-505-6051 Section 8(a); PG 10, EL

29 per JE 0036307

dated 2-10-10

2009-10 Special

Legislation

$1,274,000 B0231IRWMEnacted 2009-10

3860-505-6051 Section 8(a); PG 10, EL

29 per JE 0036307

dated 2-10-10:

Reversion

2009-10 Special

Legislation

($1,274,000) B0231IRWMEnacted 2010-11

Wednesday, January 29, Page 50 of 3421:20:03 PM Public Resources Code (PRC) Section PRC §75026, 75027(a)(6)Ch. 2Prop 84 Report

Page 54: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-505-6051 Portion of support

budget: Ch. 718 (SB

855), Statutes of 2010,

Sec. 31(c):

Reappropriation

(decrease)

2010-11 Budget Act ($1,274,000) B0231IRWMEnacted 2017-18

3860-505-6051 Portion of support

budget: Ch. 718 (SB

855), Statutes of 2010,

Sec. 31(c):

Reappropriation

(increase)

2010-11 Budget Act $1,274,000 B0231IRWMEnacted 2019-20

3860-505-6051 Portion of support

budget: SB 855, Sec.

31(c)

2010-11 Special

Legislation

$1,274,000 B0231IRWMEnacted 2010-11

3860-601-6051 Local Assistance:

Reappropriation

(decrease)

2013-14 Budget Act ($17,678,048) B0232IRWM Drought Preparedness

Projects

Enacted 2013-14

3860-601-6051 Local Assistance:

Reappropriation

(decrease)

2013-14 Budget Act ($5,255,612) B0232IRWM Implementation Grants -

Round 2

Enacted 2013-14

3860-601-6051 Local Assistance:

Reappropriation

(increase)

2013-14 Budget Act $17,678,048 B0232IRWM Drought Preparedness

Projects

Enacted 2018-19

3860-601-6051 Local Assistance:

Reappropriation

(increase)

2013-14 Budget Act $5,255,612 B0232IRWM Implementation Grants -

Round 2

Enacted 2018-19

3860-601-6051 Projects: SB 104:

increase and transfer

approp from 75026,

unspecified

2013-14 Budget

Revision

$38,834,904 B0232IRWM 2015 Implementation GrantsEnacted 2013-14

3860-601-6051 Projects: SB 104:

increase and transfer

approp from 75026,

unspecified

2013-14 Budget

Revision

$17,678,048 B0232IRWM Drought Preparedness

Projects

Enacted 2013-14

3860-601-6051 Projects: SB 104:

increase and transfer

approp from 75026,

unspecified

2013-14 Budget

Revision

$5,255,612 B0232IRWM Implementation Grants -

Round 2

Enacted 2013-14

3860-603-6051 Local Assistance:

increase and transfer

approp from 75026,

unspecified

2008-09 Budget

Revision

$3,001,000 B0232IRWM: Implementation Grants -

Round 1

Enacted 2011-12

3860-603-6051 Local Assistance:

increase and transfer

approp from 75026,

unspecified

2008-09 Budget

Revision

$728,708 B0232IRWM: Planning Grants - Round 1Enacted 2010-11

3860-603-6051 Local Assistance:

increase and transfer

approp from 75026,

unspecified

2008-09 Budget

Revision

$388,525 B0232IRWM: Planning Grants - Round 2Enacted 2012-13

Wednesday, January 29, Page 51 of 3421:20:03 PM Public Resources Code (PRC) Section PRC §75026, 75027(a)(6)Ch. 2Prop 84 Report

Page 55: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-603-6051 Local Assistance:

increase and transfer

approp from 75026,

unspecified:

Reappropriation

(decrease)

2008-09 Budget Act ($3,001,000) B0232IRWM: Implementation Grants -

Round 1

Enacted 2011-12

3860-603-6051 Local Assistance:

increase and transfer

approp from 75026,

unspecified:

Reappropriation

(decrease)

2008-09 Budget Act ($728,708) B0232IRWM: Planning Grants - Round 1Enacted 2010-11

3860-603-6051 Local Assistance:

increase and transfer

approp from 75026,

unspecified:

Reappropriation

(decrease)

2008-09 Budget Act ($388,525) B0232IRWM: Planning Grants - Round 2Enacted 2012-13

3860-603-6051 Local Assistance:

increase and transfer

approp from 75026,

unspecified:

Reappropriation

(increase)

2008-09 Budget Act $3,001,000 B0232IRWM: Implementation Grants -

Round 1

Enacted 2019-20

3860-603-6051 Local Assistance:

increase and transfer

approp from 75026,

unspecified:

Reappropriation

(increase)

2008-09 Budget Act $728,708 B0232IRWM: Planning Grants - Round 1Enacted 2019-20

3860-603-6051 Local Assistance:

increase and transfer

approp from 75026,

unspecified:

Reappropriation

(increase)

2008-09 Budget Act $388,525 B0232IRWM: Planning Grants - Round 2Enacted 2019-20

3860-605-6051 Projects: SB 855, Sec.

31(c): increase and

transfer approp from

75026, unspecified

2010-11 Special

Legislation

$9,382,780 B0232IRWM: Implementation Grants -

SB855

Enacted 2013-14

3860-605-6051 Projects: SB 855, Sec.

31(c): increase and

transfer approp from

75026, unspecified

2010-11 Special

Legislation

$7,995,423 B0232IRWM: Implementation Grants Rnd

2 - SB855

Enacted 2013-14

3860-605-6051 Projects: SB 855, Sec.

31(c): Natural Reversion

2010-11 Natural

Reversion

($6,791,155) B0232IRWM: Implementation Grants Rnd

2 - SB855

Enacted 2016-17

3860-605-6051 Projects: SB 855, Sec.

31(c): Reversion

Reverse

2010-11 Natural

Reversion

$6,791,155 B0232IRWM: Implementation Grants Rnd

2 - SB855

Enacted 2017-18

Sum: $87,685,353Enacted

Wednesday, January 29, Page 52 of 3421:20:03 PM Public Resources Code (PRC) Section PRC §75026, 75027(a)(6)Ch. 2Prop 84 Report

Page 56: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2013-14 Budget Act ($401,930) B0231IRWMEnacted/Not 2017-18

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2013-14 Budget Act $401,930 B0231IRWMEnacted/Not 2019-20

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2019-20 Control

Section

Adjustment

$5,308 B0233IRWMEnacted/Not 2019-20

Sum: $5,308Enacted/Not Posted

Sum: $87,690,661

$124,339

Balance for Integrated Regional Water Management:

Wednesday, January 29, Page 53 of 3421:20:03 PM Public Resources Code (PRC) Section PRC §75026, 75027(a)(6)Ch. 2Prop 84 Report

Page 57: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

Safe Drinking Water and Water Quality ProjectsChapter 2

Allocation: Integrated Regional Water Management

Allocation $: $73,000,000$379,998

$752,396Statewide Set Asides: $1,132,394 {

Outyear Obligations: $0

$0

$0

{

PRC §75026, 75027(a)(7)Ch. 2

Appropriations, Proposals and Reversions

Statewide, requiring appropriation:

Statewide, not requiring appropriation:

Outyear Program Delivery commitments:

Outyear Cap. Outlay (to complete started projects):Reversions are shown below$0

Outyear Local Asst. commitments:

Sacramento River: Grants for projects that assist local public agencies to meet the State`s long term water needs, including delivery of safe drinking water and the

protection of water quality and the environment. Must implement integrated regional water management plans and meet various other requirements in §75026,

§75027 and §75028. Local assistance appropriation amounts to be posted against this specific allocation upon project approval. In interim, appropriation charged

against PRC Section 75026, unspecified.

Dept.: Department of Water

Resources

Other Outyear Support commitments:$0

Committed

$0

$0

$0

$0

Proposed

$0

Prop 1 Reduction $1,422,606

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3860-001-6051 Portion of support

budget

2010-11 Budget Act $128,699 B0241IRWMEnacted 2010-11

3860-001-6051 Portion of support

budget: Natural

Reversion

2010-11 Natural

Reversion

($10,841) B0241IRWMEnacted 2012-13

3860-001-6051 Portion of support

budget

2011-12 Budget Act $128,699 B0241IRWMEnacted 2011-12

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2011-12 Control

Section

Adjustment

($2,538) B0241IRWMEnacted 2011-12

3860-001-6051 Portion of support

budget: Natural

Reversion

2011-12 Natural

Reversion

($6,213) B0241IRWMEnacted 2013-14

3860-001-6051 Portion of support

budget

2012-13 Budget Act $128,699 B0241IRWMEnacted 2012-13

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2012-13 Control

Section

Adjustment

($5,841) B0241IRWMEnacted 2012-13

3860-001-6051 Portion of support

budget: Natural

Reversion

2012-13 Natural

Reversion

$0 B0241IRWMEnacted 2017-18

3860-001-6051 Portion of support

budget: Reversion

2012-13 Budget Act ($16,145) B0241IRWMEnacted 2015-16

Wednesday, January 29, Page 54 of 3421:20:03 PM Public Resources Code (PRC) Section PRC §75026, 75027(a)(7)Ch. 2Prop 84 Report

Page 58: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-001-6051 Portion of support

budget

2013-14 Budget Act $347,699 B0241IRWMEnacted 2013-14

3860-001-6051 Portion of support

budget: Reversion

2013-14 Budget Act ($25,272) B0241IRWMEnacted 2015-16

3860-001-6051 Portion of support

budget

2014-15 Budget Act $182,500 B0241IRWMEnacted 2014-15

3860-001-6051 Portion of support

budget: Natural

Reversion

2014-15 Natural

Reversion

($111,814) B0241IRWMEnacted 2016-17

3860-001-6051 Portion of support

budget: Reversion

Reverse

2014-15 Natural

Reversion

$111,814 B0241IRWMEnacted 2017-18

3860-001-6051 Portion of support

budget

2015-16 Budget Act $205,203 B0241IRWMEnacted 2015-16

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2015-16 Budget Act ($205,203) B0241IRWMEnacted 2016-17

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2015-16 Budget Act $205,203 B0241IRWMEnacted 2018-19

3860-001-6051 Portion of support

budget

2016-17 Budget Act $89,248 B0241IRWMEnacted 2016-17

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2016-17 Control

Section

Adjustment

$4,547 B0241IRWMEnacted 2016-17

3860-001-6051 Portion of support

budget: Control Section

Adjustment:

Reappropriation

(decrease)

2016-17 Budget Act ($4,547) B0241IRWMEnacted 2016-17

3860-001-6051 Portion of support

budget: Control Section

Adjustment:

Reappropriation

(increase)

2016-17 Budget Act $4,547 B0241IRWMEnacted 2019-20

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2016-17 Budget Act ($89,248) B0241IRWMEnacted 2016-17

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2016-17 Budget Act $89,248 B0241IRWMEnacted 2019-20

3860-001-6051 Portion of support

budget

2017-18 Budget Act $91,980 B0243IRWMEnacted 2017-18

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2017-18 Control

Section

Adjustment

$6,003 B0243IRWMEnacted 2017-18

Wednesday, January 29, Page 55 of 3421:20:03 PM Public Resources Code (PRC) Section PRC §75026, 75027(a)(7)Ch. 2Prop 84 Report

Page 59: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-001-6051 Portion of support

budget

2018-19 Budget Act $98,063 B0243IRWMEnacted 2018-19

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2018-19 Control

Section

Adjustment

$3,737 B0243IRWMEnacted 2018-19

3860-001-6051 Portion of support

budget: Control Section

Adjustment:

Reappropriation

(decrease)

2018-19 Budget Act ($3,737) B0243IRWMEnacted 2018-19

3860-001-6051 Portion of support

budget: Control Section

Adjustment:

Reappropriation

(increase)

2018-19 Budget Act $3,737 B0243IRWMEnacted 2019-20

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2018-19 Budget Act ($98,063) B0243IRWMEnacted 2018-19

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2018-19 Budget Act $98,063 B0243IRWMEnacted 2019-20

3860-001-6051 Portion of support

budget

2019-20 Budget Act $108,805 B0243IRWMEnacted 2019-20

3860-503-6051 Portion of support

budget

2008-09 Special

Legislation

$1,511,100 B0241IRWM: Sacramento RiverEnacted 2008-09

3860-503-6051 Portion of support

budget: Control Section

Adjustment

2008-09 Control

Section

Adjustment

($78,929) B0241IRWM: Sacramento RiverEnacted 2012-13

3860-503-6051 Portion of support

budget: Natural

Reversion

2008-09 Natural

Reversion

($22,055) B0241IRWM: Sacramento RiverEnacted 2015-16

3860-503-6051 Portion of support

budget: Reversion

2008-09 Budget Act ($310,561) B0241IRWM: Sacramento RiverEnacted 2015-16

3860-503-6051 Portion of support

budget: Reversion

Reverse

2008-09 Natural

Reversion

$11,028 B0241IRWM: Sacramento RiverEnacted 2016-17

3860-503-6051 Section

83002(b)(3)(a)(iv):

Control Section

Adjustment

2008-09 Control

Section

Adjustment

($43,616) B0241IRWM: Sacramento RiverEnacted 2009-10

3860-505-6051 Section 8(a); PG 10, EL

29 per JE 0036307

dated 2-10-10

2009-10 Special

Legislation

$1,022,000 B0241IRWMEnacted 2009-10

3860-505-6051 Section 8(a); PG 10, EL

29 per JE 0036307

dated 2-10-10:

Reversion

2009-10 Special

Legislation

($1,022,000) B0241IRWMEnacted 2010-11

Wednesday, January 29, Page 56 of 3421:20:03 PM Public Resources Code (PRC) Section PRC §75026, 75027(a)(7)Ch. 2Prop 84 Report

Page 60: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-505-6051 Portion of support

budget: Ch. 718 (SB

855), Statutes of 2010,

Sec. 31(c):

Reappropriation

(decrease)

2010-11 Budget Act ($1,022,000) B0241IRWMEnacted 2017-18

3860-505-6051 Portion of support

budget: Ch. 718 (SB

855), Statutes of 2010,

Sec. 31(c):

Reappropriation

(increase)

2010-11 Budget Act $1,022,000 B0241IRWMEnacted 2019-20

3860-505-6051 Portion of support

budget: SB 855, Sec.

31(c)

2010-11 Special

Legislation

$1,022,000 B0241IRWMEnacted 2010-11

3860-601-6051 Local Assistance:

Reappropriation

(decrease)

2013-14 Budget Act ($30,388,808) B0242IRWM Drought Preparedness

Projects

Enacted 2013-14

3860-601-6051 Local Assistance:

Reappropriation

(increase)

2013-14 Budget Act $30,388,808 B0242IRWM Drought Preparedness

Projects

Enacted 2018-19

3860-601-6051 Projects: SB 104:

increase and transfer

approp from 75026,

unspecified

2013-14 Budget

Revision

$10,129,278 B0242IRWM 2015 Implementation GrantsEnacted 2013-14

3860-601-6051 Projects: SB 104:

increase and transfer

approp from 75026,

unspecified

2013-14 Budget

Revision

$30,388,808 B0242IRWM Drought Preparedness

Projects

Enacted 2013-14

3860-603-6051 Local Assistance:

increase and transfer

approp from 75026,

unspecified

2008-09 Budget

Revision

$17,332,463 B0242IRWM: Implementation Grants -

Round 1

Enacted 2011-12

3860-603-6051 Local Assistance:

increase and transfer

approp from 75026,

unspecified

2008-09 Budget

Revision

$1,991,627 B0242IRWM: Planning Grants - Round 1Enacted 2010-11

3860-603-6051 Local Assistance:

increase and transfer

approp from 75026,

unspecified

2008-09 Budget

Revision

$641,382 B0242IRWM: Planning Grants - Round 2Enacted 2012-13

3860-603-6051 Local Assistance:

increase and transfer

approp from 75026,

unspecified:

Reappropriation

(decrease)

2008-09 Budget Act ($17,332,463) B0242IRWM: Implementation Grants -

Round 1

Enacted 2011-12

Wednesday, January 29, Page 57 of 3421:20:03 PM Public Resources Code (PRC) Section PRC §75026, 75027(a)(7)Ch. 2Prop 84 Report

Page 61: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-603-6051 Local Assistance:

increase and transfer

approp from 75026,

unspecified:

Reappropriation

(decrease)

2008-09 Budget Act ($1,991,627) B0242IRWM: Planning Grants - Round 1Enacted 2010-11

3860-603-6051 Local Assistance:

increase and transfer

approp from 75026,

unspecified:

Reappropriation

(decrease)

2008-09 Budget Act ($641,382) B0242IRWM: Planning Grants - Round 2Enacted 2012-13

3860-603-6051 Local Assistance:

increase and transfer

approp from 75026,

unspecified:

Reappropriation

(increase)

2008-09 Budget Act $17,332,463 B0242IRWM: Implementation Grants -

Round 1

Enacted 2019-20

3860-603-6051 Local Assistance:

increase and transfer

approp from 75026,

unspecified:

Reappropriation

(increase)

2008-09 Budget Act $1,991,627 B0242IRWM: Planning Grants - Round 1Enacted 2019-20

3860-603-6051 Local Assistance:

increase and transfer

approp from 75026,

unspecified:

Reappropriation

(increase)

2008-09 Budget Act $641,382 B0242IRWM: Planning Grants - Round 2Enacted 2019-20

3860-605-6051 Projects: SB 855, Sec.

31(c): increase and

transfer approp from

75026, unspecified

2010-11 Special

Legislation

$6,311,442 B0242IRWM: Implementation Grants Rnd

2 - SB855

Enacted 2013-14

3860-605-6051 Projects: SB 855, Sec.

31(c): Natural Reversion

2010-11 Natural

Reversion

($2,466,422) B0242IRWM: Implementation Grants Rnd

2 - SB855

Enacted 2016-17

3860-605-6051 Projects: SB 855, Sec.

31(c): Reversion

Reverse

2010-11 Natural

Reversion

$2,466,422 B0242IRWM: Implementation Grants Rnd

2 - SB855

Enacted 2017-18

Sum: $70,340,998Enacted

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2013-14 Budget Act ($322,427) B0241IRWMEnacted/Not 2017-18

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2013-14 Budget Act $322,427 B0241IRWMEnacted/Not 2019-20

Wednesday, January 29, Page 58 of 3421:20:03 PM Public Resources Code (PRC) Section PRC §75026, 75027(a)(7)Ch. 2Prop 84 Report

Page 62: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2019-20 Control

Section

Adjustment

$4,259 B0243IRWMEnacted/Not 2019-20

Sum: $4,259Enacted/Not Posted

Sum: $70,345,257

$99,743

Balance for Integrated Regional Water Management:

Wednesday, January 29, Page 59 of 3421:20:03 PM Public Resources Code (PRC) Section PRC §75026, 75027(a)(7)Ch. 2Prop 84 Report

Page 63: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

Safe Drinking Water and Water Quality ProjectsChapter 2

Allocation: Integrated Regional Water Management

Allocation $: $57,000,000$296,711

$587,487Statewide Set Asides: $884,198 {

Outyear Obligations: $0

$0

$0

{

PRC §75026, 75027(a)(8)Ch. 2

Appropriations, Proposals and Reversions

Statewide, requiring appropriation:

Statewide, not requiring appropriation:

Outyear Program Delivery commitments:

Outyear Cap. Outlay (to complete started projects):Reversions are shown below$0

Outyear Local Asst. commitments:

San Joaquin River portion: Grants for projects that assist local public agencies to meet the State`s long term water needs, including delivery of safe drinking water

and the protection of water quality and the environment. Must implement integrated regional water management plans and meet various other requirements in

§75026, §75027 and §75028. Local assistance appropriation amounts to be posted against this specific allocation upon project approval. In interim, appropriation

charged against PRC Section 75026, unspecified.

Dept.: Department of Water

Resources

Other Outyear Support commitments:$0

Committed

$0

$0

$0

$0

Proposed

$0

Prop 1 Reduction $1,110,802

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3860-001-6051 Portion of support

budget

2010-11 Budget Act $100,491 B0251IRWMEnacted 2010-11

3860-001-6051 Portion of support

budget: Natural

Reversion

2010-11 Natural

Reversion

($8,465) B0251IRWMEnacted 2012-13

3860-001-6051 Portion of support

budget

2011-12 Budget Act $100,491 B0251IRWMEnacted 2011-12

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2011-12 Control

Section

Adjustment

($1,982) B0251IRWMEnacted 2011-12

3860-001-6051 Portion of support

budget: Natural

Reversion

2011-12 Natural

Reversion

($4,851) B0251IRWMEnacted 2013-14

3860-001-6051 Portion of support

budget

2012-13 Budget Act $100,491 B0251IRWMEnacted 2012-13

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2012-13 Control

Section

Adjustment

($4,561) B0251IRWMEnacted 2012-13

3860-001-6051 Portion of support

budget: Natural

Reversion

2012-13 Natural

Reversion

$0 B0251IRWMEnacted 2017-18

3860-001-6051 Portion of support

budget: Reversion

2012-13 Budget Act ($12,606) B0251IRWMEnacted 2015-16

Wednesday, January 29, Page 60 of 3421:20:03 PM Public Resources Code (PRC) Section PRC §75026, 75027(a)(8)Ch. 2Prop 84 Report

Page 64: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-001-6051 Portion of support

budget

2013-14 Budget Act $271,491 B0251IRWMEnacted 2013-14

3860-001-6051 Portion of support

budget: Reversion

2013-14 Budget Act ($19,733) B0251IRWMEnacted 2015-16

3860-001-6051 Portion of support

budget

2014-15 Budget Act $142,500 B0251IRWMEnacted 2014-15

3860-001-6051 Portion of support

budget: Natural

Reversion

2014-15 Natural

Reversion

($87,307) B0251IRWMEnacted 2016-17

3860-001-6051 Portion of support

budget: Reversion

Reverse

2014-15 Natural

Reversion

$87,307 B0251IRWMEnacted 2017-18

3860-001-6051 Portion of support

budget

2015-16 Budget Act $160,227 B0251IRWMEnacted 2015-16

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2015-16 Budget Act ($160,227) B0251IRWMEnacted 2016-17

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2015-16 Budget Act $160,227 B0251IRWMEnacted 2018-19

3860-001-6051 Portion of support

budget

2016-17 Budget Act $69,687 B0251IRWMEnacted 2016-17

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2016-17 Control

Section

Adjustment

$3,550 B0251IRWMEnacted 2016-17

3860-001-6051 Portion of support

budget: Control Section

Adjustment:

Reappropriation

(decrease)

2016-17 Budget Act ($3,550) B0251IRWMEnacted 2016-17

3860-001-6051 Portion of support

budget: Control Section

Adjustment:

Reappropriation

(increase)

2016-17 Budget Act $3,550 B0251IRWMEnacted 2019-20

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2016-17 Budget Act ($69,687) B0251IRWMEnacted 2016-17

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2016-17 Budget Act $69,687 B0251IRWMEnacted 2019-20

3860-001-6051 Portion of support

budget

2017-18 Budget Act $71,820 B0253IRWMEnacted 2017-18

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2017-18 Control

Section

Adjustment

$4,687 B0253IRWMEnacted 2017-18

Wednesday, January 29, Page 61 of 3421:20:03 PM Public Resources Code (PRC) Section PRC §75026, 75027(a)(8)Ch. 2Prop 84 Report

Page 65: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-001-6051 Portion of support

budget

2018-19 Budget Act $76,570 B0253IRWMEnacted 2018-19

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2018-19 Control

Section

Adjustment

$2,918 B0253IRWMEnacted 2018-19

3860-001-6051 Portion of support

budget: Control Section

Adjustment:

Reappropriation

(decrease)

2018-19 Budget Act ($2,918) B0253IRWMEnacted 2018-19

3860-001-6051 Portion of support

budget: Control Section

Adjustment:

Reappropriation

(increase)

2018-19 Budget Act $2,918 B0253IRWMEnacted 2019-20

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2018-19 Budget Act ($76,570) B0253IRWMEnacted 2018-19

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2018-19 Budget Act $76,570 B0253IRWMEnacted 2019-20

3860-001-6051 Portion of support

budget

2019-20 Budget Act $84,957 B0253IRWMEnacted 2019-20

3860-503-6051 Portion of support

budget

2008-09 Special

Legislation

$1,179,900 B0251IRWM: San Joaquin RiverEnacted 2008-09

3860-503-6051 Portion of support

budget: Control Section

Adjustment

2008-09 Control

Section

Adjustment

($61,630) B0251IRWM: San Joaquin RiverEnacted 2012-13

3860-503-6051 Portion of support

budget: Natural

Reversion

2008-09 Natural

Reversion

($17,221) B0251IRWM: San Joaquin RiverEnacted 2015-16

3860-503-6051 Portion of support

budget: Reversion

2008-09 Budget Act ($242,493) B0251IRWM: San Joaquin RiverEnacted 2015-16

3860-503-6051 Portion of support

budget: Reversion

Reverse

2008-09 Natural

Reversion

$8,611 B0251IRWM: San Joaquin RiverEnacted 2016-17

3860-503-6051 Section

83002(b)(3)(a)(iv):

Control Section

Adjustment

2008-09 Control

Section

Adjustment

($34,057) B0251IRWM: San Joaquin RiverEnacted 2009-10

3860-505-6051 Section 8(a); PG 10, EL

29 per JE 0036307

dated 2-10-10

2009-10 Special

Legislation

$798,000 B0251IRWMEnacted 2009-10

3860-505-6051 Section 8(a); PG 10, EL

29 per JE 0036307

dated 2-10-10:

Reversion

2009-10 Special

Legislation

($798,000) B0251IRWMEnacted 2010-11

Wednesday, January 29, Page 62 of 3421:20:03 PM Public Resources Code (PRC) Section PRC §75026, 75027(a)(8)Ch. 2Prop 84 Report

Page 66: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-505-6051 Portion of support

budget: Ch. 718 (SB

855), Statutes of 2010,

Sec. 31(c):

Reappropriation

(decrease)

2010-11 Budget Act ($798,000) B0251IRWMEnacted 2017-18

3860-505-6051 Portion of support

budget: Ch. 718 (SB

855), Statutes of 2010,

Sec. 31(c):

Reappropriation

(increase)

2010-11 Budget Act $798,000 B0251IRWMEnacted 2019-20

3860-505-6051 Portion of support

budget: SB 855, Sec.

31(c)

2010-11 Special

Legislation

$798,000 B0251IRWMEnacted 2010-11

3860-601-6051 Local Assistance:

Reappropriation

(decrease)

2013-14 Budget Act ($20,022,341) B0252IRWM Drought Preparedness

Projects

Enacted 2013-14

3860-601-6051 Local Assistance:

Reappropriation

(decrease)

2013-14 Budget Act ($1,721,343) B0252IRWM Implementation Grants -

Round 2

Enacted 2013-14

3860-601-6051 Local Assistance:

Reappropriation

(increase)

2013-14 Budget Act $20,022,341 B0252IRWM Drought Preparedness

Projects

Enacted 2018-19

3860-601-6051 Local Assistance:

Reappropriation

(increase)

2013-14 Budget Act $1,721,343 B0252IRWM Implementation Grants -

Round 2

Enacted 2018-19

3860-601-6051 Projects: SB 104:

increase and transfer

approp from 75026,

unspecified

2013-14 Budget

Revision

$6,674,438 B0252IRWM 2015 Implementation GrantsEnacted 2013-14

3860-601-6051 Projects: SB 104:

increase and transfer

approp from 75026,

unspecified

2013-14 Budget

Revision

$20,022,341 B0252IRWM Drought Preparedness

Projects

Enacted 2013-14

3860-601-6051 Projects: SB 104:

increase and transfer

approp from 75026,

unspecified

2013-14 Budget

Revision

$1,721,343 B0252IRWM Implementation Grants -

Round 2

Enacted 2013-14

3860-603-6051 Local Assistance:

increase and transfer

approp from 75026,

unspecified

2008-09 Budget

Revision

$9,673,270 B0252IRWM: Implementation Grants -

Round 1

Enacted 2011-12

3860-603-6051 Local Assistance:

increase and transfer

approp from 75026,

unspecified

2008-09 Budget

Revision

$1,373,155 B0252IRWM: Planning Grants - Round 1Enacted 2010-11

3860-603-6051 Local Assistance:

increase and transfer

approp from 75026,

unspecified

2008-09 Budget

Revision

$1,092,392 B0252IRWM: Planning Grants - Round 2Enacted 2012-13

Wednesday, January 29, Page 63 of 3421:20:03 PM Public Resources Code (PRC) Section PRC §75026, 75027(a)(8)Ch. 2Prop 84 Report

Page 67: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-603-6051 Local Assistance:

increase and transfer

approp from 75026,

unspecified:

Reappropriation

(decrease)

2008-09 Budget Act ($9,673,270) B0252IRWM: Implementation Grants -

Round 1

Enacted 2011-12

3860-603-6051 Local Assistance:

increase and transfer

approp from 75026,

unspecified:

Reappropriation

(decrease)

2008-09 Budget Act ($1,373,155) B0252IRWM: Planning Grants - Round 1Enacted 2010-11

3860-603-6051 Local Assistance:

increase and transfer

approp from 75026,

unspecified:

Reappropriation

(decrease)

2008-09 Budget Act ($1,092,392) B0252IRWM: Planning Grants - Round 2Enacted 2012-13

3860-603-6051 Local Assistance:

increase and transfer

approp from 75026,

unspecified:

Reappropriation

(increase)

2008-09 Budget Act $9,673,270 B0252IRWM: Implementation Grants -

Round 1

Enacted 2019-20

3860-603-6051 Local Assistance:

increase and transfer

approp from 75026,

unspecified:

Reappropriation

(increase)

2008-09 Budget Act $1,373,155 B0252IRWM: Planning Grants - Round 1Enacted 2019-20

3860-603-6051 Local Assistance:

increase and transfer

approp from 75026,

unspecified:

Reappropriation

(increase)

2008-09 Budget Act $1,092,392 B0252IRWM: Planning Grants - Round 2Enacted 2019-20

3860-605-6051 Projects: SB 855, Sec.

31(c): increase and

transfer approp from

75026, unspecified

2010-11 Special

Legislation

$3,934,483 B0252IRWM: Implementation Grants -

SB855

Enacted 2013-14

3860-605-6051 Projects: SB 855, Sec.

31(c): increase and

transfer approp from

75026, unspecified

2010-11 Special

Legislation

$7,663,579 B0252IRWM: Implementation Grants Rnd

2 - SB855

Enacted 2013-14

3860-605-6051 Projects: SB 855, Sec.

31(c): Natural Reversion

2010-11 Natural

Reversion

($4,532,358) B0252IRWM: Implementation Grants Rnd

2 - SB855

Enacted 2016-17

3860-605-6051 Projects: SB 855, Sec.

31(c): Reversion

Reverse

2010-11 Natural

Reversion

$4,532,358 B0252IRWM: Implementation Grants Rnd

2 - SB855

Enacted 2017-18

Sum: $54,923,792Enacted

Wednesday, January 29, Page 64 of 3421:20:03 PM Public Resources Code (PRC) Section PRC §75026, 75027(a)(8)Ch. 2Prop 84 Report

Page 68: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2013-14 Budget Act ($251,758) B0251IRWMEnacted/Not 2017-18

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2013-14 Budget Act $251,758 B0251IRWMEnacted/Not 2019-20

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2019-20 Control

Section

Adjustment

$3,325 B0253IRWMEnacted/Not 2019-20

Sum: $3,325Enacted/Not Posted

Sum: $54,927,117

$77,883

Balance for Integrated Regional Water Management:

Wednesday, January 29, Page 65 of 3421:20:03 PM Public Resources Code (PRC) Section PRC §75026, 75027(a)(8)Ch. 2Prop 84 Report

Page 69: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

Safe Drinking Water and Water Quality ProjectsChapter 2

Allocation: Integrated Regional Water Management

Allocation $: $60,000,000$312,327

$618,408Statewide Set Asides: $930,735 {

Outyear Obligations: $0

$0

$0

{

PRC §75026, 75027(a)(9)Ch. 2

Appropriations, Proposals and Reversions

Statewide, requiring appropriation:

Statewide, not requiring appropriation:

Outyear Program Delivery commitments:

Outyear Cap. Outlay (to complete started projects):Reversions are shown below$0

Outyear Local Asst. commitments:

Tulare/Kern (Tulare Lake) portion: Grants for projects that assist local public agencies to meet the State`s long term water needs, including delivery of safe

drinking water and the protection of water quality and the environment. Must implement integrated regional water management plans and meet various other

requirements in §75026, §75027 and §75028. Local assistance appropriation amounts to be posted against this specific allocation upon project approval. In

interim, appropriation charged against PRC Section 75026, unspecified.

Dept.: Department of Water

Resources

Other Outyear Support commitments:$0

Committed

$0

$0

$0

$0

Proposed

$0

Prop 1 Reduction $1,169,265

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3860-001-6051 Portion of support

budget

2010-11 Budget Act $105,780 B0261IRWMEnacted 2010-11

3860-001-6051 Portion of support

budget: Natural

Reversion

2010-11 Natural

Reversion

($8,911) B0261IRWMEnacted 2012-13

3860-001-6051 Portion of support

budget

2011-12 Budget Act $105,780 B0261IRWMEnacted 2011-12

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2011-12 Control

Section

Adjustment

($2,087) B0261IRWMEnacted 2011-12

3860-001-6051 Portion of support

budget: Natural

Reversion

2011-12 Natural

Reversion

($5,105) B0261IRWMEnacted 2013-14

3860-001-6051 Portion of support

budget

2012-13 Budget Act $105,780 B0261IRWMEnacted 2012-13

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2012-13 Control

Section

Adjustment

($4,801) B0261IRWMEnacted 2012-13

3860-001-6051 Portion of support

budget: Natural

Reversion

2012-13 Natural

Reversion

$0 B0261IRWMEnacted 2017-18

3860-001-6051 Portion of support

budget: Reversion

2012-13 Budget Act ($13,270) B0261IRWMEnacted 2015-16

Wednesday, January 29, Page 66 of 3421:20:04 PM Public Resources Code (PRC) Section PRC §75026, 75027(a)(9)Ch. 2Prop 84 Report

Page 70: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-001-6051 Portion of support

budget

2013-14 Budget Act $285,780 B0261IRWMEnacted 2013-14

3860-001-6051 Portion of support

budget: Reversion

2013-14 Budget Act ($20,771) B0261IRWMEnacted 2015-16

3860-001-6051 Portion of support

budget

2014-15 Budget Act $150,000 B0261IRWMEnacted 2014-15

3860-001-6051 Portion of support

budget: Natural

Reversion

2014-15 Natural

Reversion

($91,902) B0261IRWMEnacted 2016-17

3860-001-6051 Portion of support

budget: Reversion

Reverse

2014-15 Natural

Reversion

$91,902 B0261IRWMEnacted 2017-18

3860-001-6051 Portion of support

budget

2015-16 Budget Act $168,660 B0261IRWMEnacted 2015-16

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2015-16 Budget Act ($168,660) B0261IRWMEnacted 2016-17

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2015-16 Budget Act $168,660 B0261IRWMEnacted 2018-19

3860-001-6051 Portion of support

budget

2016-17 Budget Act $73,355 B0261IRWMEnacted 2016-17

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2016-17 Control

Section

Adjustment

$3,738 B0261IRWMEnacted 2016-17

3860-001-6051 Portion of support

budget: Control Section

Adjustment:

Reappropriation

(decrease)

2016-17 Budget Act ($3,738) B0261IRWMEnacted 2016-17

3860-001-6051 Portion of support

budget: Control Section

Adjustment:

Reappropriation

(increase)

2016-17 Budget Act $3,738 B0261IRWMEnacted 2019-20

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2016-17 Budget Act ($73,355) B0261IRWMEnacted 2016-17

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2016-17 Budget Act $73,355 B0261IRWMEnacted 2019-20

3860-001-6051 Portion of support

budget

2017-18 Budget Act $75,600 B0263IRWMEnacted 2017-18

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2017-18 Control

Section

Adjustment

$4,933 B0263IRWMEnacted 2017-18

Wednesday, January 29, Page 67 of 3421:20:04 PM Public Resources Code (PRC) Section PRC §75026, 75027(a)(9)Ch. 2Prop 84 Report

Page 71: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-001-6051 Portion of support

budget

2018-19 Budget Act $80,600 B0263IRWMEnacted 2018-19

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2018-19 Budget Act ($80,600) B0263IRWMEnacted 2018-19

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2018-19 Budget Act $80,600 B0263IRWMEnacted 2019-20

3860-503-6051 Portion of support

budget

2008-09 Special

Legislation

$1,242,000 B0261IRWM: Tulare/Kern (Tulare Lake)Enacted 2008-09

3860-503-6051 Portion of support

budget: Control Section

Adjustment

2008-09 Control

Section

Adjustment

($64,873) B0261IRWM: Tulare/Kern (Tulare Lake)Enacted 2012-13

3860-503-6051 Portion of support

budget: Natural

Reversion

2008-09 Natural

Reversion

($18,128) B0261IRWM: Tulare/Kern (Tulare Lake)Enacted 2015-16

3860-503-6051 Portion of support

budget: Reversion

2008-09 Budget Act ($255,256) B0261IRWM: Tulare/Kern (Tulare Lake)Enacted 2015-16

3860-503-6051 Portion of support

budget: Reversion

Reverse

2008-09 Natural

Reversion

$9,064 B0261IRWM: Tulare/Kern (Tulare Lake)Enacted 2016-17

3860-503-6051 Section

83002(b)(3)(a)(iv):

Control Section

Adjustment

2008-09 Control

Section

Adjustment

($35,849) B0261IRWM: Tulare/Kern (Tulare Lake)Enacted 2009-10

3860-505-6051 Section 8(a); PG 10, EL

29 per JE 0036307

dated 2-10-10

2009-10 Special

Legislation

$840,000 B0261IRWMEnacted 2009-10

3860-505-6051 Section 8(a); PG 10, EL

29 per JE 0036307

dated 2-10-10:

Reversion

2009-10 Special

Legislation

($840,000) B0261IRWMEnacted 2010-11

3860-505-6051 Portion of support

budget: Ch. 718 (SB

855), Statutes of 2010,

Sec. 31(c):

Reappropriation

(decrease)

2010-11 Budget Act ($840,000) B0261IRWMEnacted 2017-18

3860-505-6051 Portion of support

budget: Ch. 718 (SB

855), Statutes of 2010,

Sec. 31(c):

Reappropriation

(increase)

2010-11 Budget Act $840,000 B0261IRWMEnacted 2019-20

3860-505-6051 Portion of support

budget: SB 855, Sec.

31(c)

2010-11 Special

Legislation

$840,000 B0261IRWMEnacted 2010-11

Wednesday, January 29, Page 68 of 3421:20:04 PM Public Resources Code (PRC) Section PRC §75026, 75027(a)(9)Ch. 2Prop 84 Report

Page 72: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-601-6051 Local Assistance:

Reappropriation

(decrease)

2013-14 Budget Act ($4,054,299) B0262IRWM 2015 Implementation GrantsEnacted 2013-14

3860-601-6051 Local Assistance:

Reappropriation

(decrease)

2013-14 Budget Act ($12,162,897) B0262IRWM Drought Preparedness

Projects

Enacted 2013-14

3860-601-6051 Local Assistance:

Reappropriation

(increase)

2013-14 Budget Act $4,054,299 B0262IRWM 2015 Implementation GrantsEnacted 2013-14

3860-601-6051 Local Assistance:

Reappropriation

(increase)

2013-14 Budget Act $12,162,897 B0262IRWM Drought Preparedness

Projects

Enacted 2018-19

3860-601-6051 Projects: SB 104:

increase and transfer

approp from 75026,

unspecified

2013-14 Budget

Revision

$4,054,299 B0262IRWM 2015 Implementation GrantsEnacted 2013-14

3860-601-6051 Projects: SB 104:

increase and transfer

approp from 75026,

unspecified

2013-14 Budget

Revision

$12,162,897 B0262IRWM Drought Preparedness

Projects

Enacted 2013-14

3860-603-6051 Local Assistance:

increase and transfer

approp from 75026,

unspecified

2008-09 Budget

Revision

$4,952,866 B0262IRWM: Implementation Grants -

Round 1

Enacted 2011-12

3860-603-6051 Local Assistance:

increase and transfer

approp from 75026,

unspecified

2008-09 Budget

Revision

$118,445 B0262IRWM: Planning Grants - Round 1Enacted 2010-11

3860-603-6051 Local Assistance:

increase and transfer

approp from 75026,

unspecified

2008-09 Budget

Revision

$464,461 B0262IRWM: Planning Grants - Round 2Enacted 2012-13

3860-603-6051 Local Assistance:

increase and transfer

approp from 75026,

unspecified:

Reappropriation

(decrease)

2008-09 Budget Act ($4,952,866) B0262IRWM: Implementation Grants -

Round 1

Enacted 2011-12

3860-603-6051 Local Assistance:

increase and transfer

approp from 75026,

unspecified:

Reappropriation

(decrease)

2008-09 Budget Act ($118,445) B0262IRWM: Planning Grants - Round 1Enacted 2010-11

3860-603-6051 Local Assistance:

increase and transfer

approp from 75026,

unspecified:

Reappropriation

(decrease)

2008-09 Budget Act ($464,461) B0262IRWM: Planning Grants - Round 2Enacted 2012-13

Wednesday, January 29, Page 69 of 3421:20:04 PM Public Resources Code (PRC) Section PRC §75026, 75027(a)(9)Ch. 2Prop 84 Report

Page 73: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-603-6051 Local Assistance:

increase and transfer

approp from 75026,

unspecified:

Reappropriation

(increase)

2008-09 Budget Act $4,952,866 B0262IRWM: Implementation Grants -

Round 1

Enacted 2019-20

3860-603-6051 Local Assistance:

increase and transfer

approp from 75026,

unspecified:

Reappropriation

(increase)

2008-09 Budget Act $118,445 B0262IRWM: Planning Grants - Round 1Enacted 2019-20

3860-603-6051 Local Assistance:

increase and transfer

approp from 75026,

unspecified:

Reappropriation

(increase)

2008-09 Budget Act $464,461 B0262IRWM: Planning Grants - Round 2Enacted 2019-20

3860-605-6051 Projects: SB 855, Sec.

31(c): increase and

transfer approp from

75026, unspecified

2010-11 Special

Legislation

$16,401,134 B0262IRWM: Implementation Grants -

SB855

Enacted 2013-14

3860-605-6051 Projects: SB 855, Sec.

31(c): increase and

transfer approp from

75026, unspecified

2010-11 Special

Legislation

$16,921,143 B0262IRWM: Implementation Grants Rnd

2 - SB855

Enacted 2013-14

3860-605-6051 Projects: SB 855, Sec.

31(c): Natural Reversion

2010-11 Natural

Reversion

($13,021,872) B0262IRWM: Implementation Grants Rnd

2 - SB855

Enacted 2016-17

3860-605-6051 Projects: SB 855, Sec.

31(c): Reversion

Reverse

2010-11 Natural

Reversion

$13,021,872 B0262IRWM: Implementation Grants Rnd

2 - SB855

Enacted 2017-18

Sum: $57,897,264Enacted

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2013-14 Budget Act ($265,009) B0261IRWMEnacted/Not 2017-18

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2013-14 Budget Act $265,009 B0261IRWMEnacted/Not 2019-20

Sum: $0Enacted/Not Posted

Sum: $57,897,264

$2,736

Balance for Integrated Regional Water Management:

Wednesday, January 29, Page 70 of 3421:20:04 PM Public Resources Code (PRC) Section PRC §75026, 75027(a)(9)Ch. 2Prop 84 Report

Page 74: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

Safe Drinking Water and Water Quality ProjectsChapter 2

Allocation: Integrated Regional Water Management

Allocation $: $27,000,000$140,547

$278,283Statewide Set Asides: $418,831 {

Outyear Obligations: $0

$0

$0

{

PRC §75026, 75027(a)(10)Ch. 2

Appropriations, Proposals and Reversions

Statewide, requiring appropriation:

Statewide, not requiring appropriation:

Outyear Program Delivery commitments:

Outyear Cap. Outlay (to complete started projects):Reversions are shown below$0

Outyear Local Asst. commitments:

North/South Lahontan portion: Grants for projects that assist local public agencies to meet the State`s long term water needs, including delivery of safe drinking

water and the protection of water quality and the environment. Must implement integrated regional water management plans and meet various other requirements

in §75026, §75027 and §75028. Local assistance appropriation amounts to be posted against this specific allocation upon project approval. In interim,

appropriation charged against PRC Section 75026, unspecified.

Dept.: Department of Water

Resources

Other Outyear Support commitments:$0

Committed

$0

$0

$0

$0

Proposed

$0

Prop 1 Reduction $526,169

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3860-001-6051 Portion of support

budget

2010-11 Budget Act $47,601 B0161IRWMEnacted 2010-11

3860-001-6051 Portion of support

budget: Natural

Reversion

2010-11 Natural

Reversion

($4,010) B0161IRWMEnacted 2012-13

3860-001-6051 Portion of support

budget

2011-12 Budget Act $47,601 B0161IRWMEnacted 2011-12

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2011-12 Control

Section

Adjustment

($939) B0161IRWMEnacted 2011-12

3860-001-6051 Portion of support

budget: Natural

Reversion

2011-12 Natural

Reversion

($2,297) B0161IRWMEnacted 2013-14

3860-001-6051 Portion of support

budget

2012-13 Budget Act $47,601 B0161IRWMEnacted 2012-13

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2012-13 Control

Section

Adjustment

($2,160) B0161IRWMEnacted 2012-13

3860-001-6051 Portion of support

budget: Reversion

2012-13 Budget Act ($5,971) B0161IRWMEnacted 2015-16

3860-001-6051 Portion of support

budget

2013-14 Budget Act $128,601 B0161IRWMEnacted 2013-14

Wednesday, January 29, Page 71 of 3421:20:04 PM Public Resources Code (PRC) Section PRC §75026, 75027(a)(10)Ch. 2Prop 84 Report

Page 75: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-001-6051 Portion of support

budget: Reversion

2013-14 Budget Act ($9,347) B0161IRWMEnacted 2015-16

3860-001-6051 Portion of support

budget

2014-15 Budget Act $67,500 B0161IRWMEnacted 2014-15

3860-001-6051 Portion of support

budget: Natural

Reversion

2014-15 Natural

Reversion

($41,356) B0161IRWMEnacted 2016-17

3860-001-6051 Portion of support

budget: Reversion

Reverse

2014-15 Natural

Reversion

$41,356 B0161IRWMEnacted 2017-18

3860-001-6051 Portion of support

budget

2015-16 Budget Act $75,897 B0161IRWMEnacted 2015-16

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2015-16 Budget Act ($75,897) B0161IRWMEnacted 2016-17

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2015-16 Budget Act $75,897 B0161IRWMEnacted 2018-19

3860-001-6051 Portion of support

budget

2016-17 Budget Act $33,010 B0161IRWMEnacted 2016-17

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2016-17 Control

Section

Adjustment

$1,681 B0161IRWMEnacted 2016-17

3860-001-6051 Portion of support

budget: Control Section

Adjustment:

Reappropriation

(decrease)

2016-17 Budget Act ($1,681) B0161IRWMEnacted 2016-17

3860-001-6051 Portion of support

budget: Control Section

Adjustment:

Reappropriation

(increase)

2016-17 Budget Act $1,681 B0161IRWMEnacted 2019-20

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2016-17 Budget Act ($33,010) B0161IRWMEnacted 2016-17

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2016-17 Budget Act $33,010 B0161IRWMEnacted 2019-20

3860-001-6051 Portion of support

budget

2017-18 Budget Act $34,020 B0163IRWMEnacted 2017-18

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2017-18 Control

Section

Adjustment

$2,220 B0163IRWMEnacted 2017-18

3860-001-6051 Portion of support

budget

2018-19 Budget Act $36,270 B0163IRWMEnacted 2018-19

Wednesday, January 29, Page 72 of 3421:20:04 PM Public Resources Code (PRC) Section PRC §75026, 75027(a)(10)Ch. 2Prop 84 Report

Page 76: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2018-19 Control

Section

Adjustment

$1,382 B0163IRWMEnacted 2018-19

3860-001-6051 Portion of support

budget: Control Section

Adjustment:

Reappropriation

(decrease)

2018-19 Budget Act ($1,382) B0163IRWMEnacted 2018-19

3860-001-6051 Portion of support

budget: Control Section

Adjustment:

Reappropriation

(increase)

2018-19 Budget Act $1,382 B0163IRWMEnacted 2019-20

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2018-19 Budget Act ($36,270) B0163IRWMEnacted 2018-19

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2018-19 Budget Act $36,270 B0163IRWMEnacted 2019-20

3860-001-6051 Portion of support

budget

2019-20 Budget Act $40,243 B0163IRWMEnacted 2019-20

3860-503-6051 Portion of support

budget

2008-09 Special

Legislation

$558,900 B0161IRWM: North/South LahontanEnacted 2008-09

3860-503-6051 Portion of support

budget: Control Section

Adjustment

2008-09 Control

Section

Adjustment

($29,194) B0161IRWM: North/South LahontanEnacted 2012-13

3860-503-6051 Portion of support

budget: Natural

Reversion

2008-09 Natural

Reversion

($8,157) B0161IRWM: North/South LahontanEnacted 2015-16

3860-503-6051 Portion of support

budget: Reversion

2008-09 Budget Act ($114,865) B0161IRWM: North/South LahontanEnacted 2015-16

3860-503-6051 Portion of support

budget: Reversion

Reverse

2008-09 Natural

Reversion

$4,079 B0161IRWM: North/South LahontanEnacted 2016-17

3860-503-6051 Section

83002(b)(3)(a)(iv):

Control Section

Adjustment

2008-09 Control

Section

Adjustment

($16,132) B0161IRWM: North/South LahontanEnacted 2009-10

3860-505-6051 Section 8(a); PG 10, EL

29 per JE 0036307

dated 2-10-10

2009-10 Special

Legislation

$378,000 B0161IRWMEnacted 2009-10

3860-505-6051 Section 8(a); PG 10, EL

29 per JE 0036307

dated 2-10-10:

Reversion

2009-10 Special

Legislation

($378,000) B0161IRWMEnacted 2010-11

Wednesday, January 29, Page 73 of 3421:20:04 PM Public Resources Code (PRC) Section PRC §75026, 75027(a)(10)Ch. 2Prop 84 Report

Page 77: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-505-6051 Portion of support

budget: Ch. 718 (SB

855), Statutes of 2010,

Sec. 31(c):

Reappropriation

(decrease)

2010-11 Budget Act ($378,000) B0161IRWMEnacted 2017-18

3860-505-6051 Portion of support

budget: Ch. 718 (SB

855), Statutes of 2010,

Sec. 31(c):

Reappropriation

(increase)

2010-11 Budget Act $378,000 B0161IRWMEnacted 2019-20

3860-505-6051 Portion of support

budget: SB 855, Sec.

31(c)

2010-11 Special

Legislation

$378,000 B0161IRWMEnacted 2010-11

3860-601-6051 Local Assistance:

Reappropriation

(decrease)

2013-14 Budget Act ($2,922,000) B0162IRWM Drought Preparedness

Projects

Enacted 2013-14

3860-601-6051 Local Assistance:

Reappropriation

(decrease)

2013-14 Budget Act ($1,675,245) B0162IRWM Implementation Grants -

Round 2

Enacted 2013-14

3860-601-6051 Local Assistance:

Reappropriation

(increase)

2013-14 Budget Act $2,922,000 B0162IRWM Drought Preparedness

Projects

Enacted 2018-19

3860-601-6051 Local Assistance:

Reappropriation

(increase)

2013-14 Budget Act $1,675,245 B0162IRWM Implementation Grants -

Round 2

Enacted 2018-19

3860-601-6051 Projects: SB 104:

increase and transfer

approp from 75026,

unspecified

2013-14 Budget

Revision

$1,666,244 B0162IRWM 2014 Drought GrantsEnacted 2013-14

3860-601-6051 Projects: SB 104:

increase and transfer

approp from 75026,

unspecified

2013-14 Budget

Revision

$6,116,807 B0162IRWM 2015 Implementation GrantsEnacted 2013-14

3860-601-6051 Projects: SB 104:

increase and transfer

approp from 75026,

unspecified

2013-14 Budget

Revision

$2,922,000 B0162IRWM Drought Preparedness

Projects

Enacted 2013-14

3860-601-6051 Projects: SB 104:

increase and transfer

approp from 75026,

unspecified

2013-14 Budget

Revision

$1,675,245 B0162IRWM Implementation Grants -

Round 2

Enacted 2013-14

3860-603-6051 Local Assistance:

increase and transfer

approp from 75026,

unspecified

2008-09 Budget

Revision

$4,512,000 B0162IRWM: Implementation Grants -

Round 1

Enacted 2011-12

3860-603-6051 Local Assistance:

increase and transfer

approp from 75026,

unspecified

2008-09 Budget

Revision

$355,267 B0162IRWM: Planning Grants - Round 1Enacted 2010-11

Wednesday, January 29, Page 74 of 3421:20:04 PM Public Resources Code (PRC) Section PRC §75026, 75027(a)(10)Ch. 2Prop 84 Report

Page 78: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-603-6051 Local Assistance:

increase and transfer

approp from 75026,

unspecified

2008-09 Budget

Revision

$732,682 B0162IRWM: Planning Grants - Round 2Enacted 2012-13

3860-603-6051 Local Assistance:

increase and transfer

approp from 75026,

unspecified:

Reappropriation

(decrease)

2008-09 Budget Act ($4,512,000) B0162IRWM: Implementation Grants -

Round 1

Enacted 2011-12

3860-603-6051 Local Assistance:

increase and transfer

approp from 75026,

unspecified:

Reappropriation

(decrease)

2008-09 Budget Act ($355,267) B0162IRWM: Planning Grants - Round 1Enacted 2010-11

3860-603-6051 Local Assistance:

increase and transfer

approp from 75026,

unspecified:

Reappropriation

(decrease)

2008-09 Budget Act ($732,682) B0162IRWM: Planning Grants - Round 2Enacted 2012-13

3860-603-6051 Local Assistance:

increase and transfer

approp from 75026,

unspecified:

Reappropriation

(increase)

2008-09 Budget Act $4,512,000 B0162IRWM: Implementation Grants -

Round 1

Enacted 2019-20

3860-603-6051 Local Assistance:

increase and transfer

approp from 75026,

unspecified:

Reappropriation

(increase)

2008-09 Budget Act $355,267 B0162IRWM: Planning Grants - Round 1Enacted 2019-20

3860-603-6051 Local Assistance:

increase and transfer

approp from 75026,

unspecified:

Reappropriation

(increase)

2008-09 Budget Act $732,682 B0162IRWM: Planning Grants - Round 2Enacted 2019-20

3860-605-6051 Projects: SB 855, Sec.

31(c): increase and

transfer approp from

75026, unspecified

2010-11 Special

Legislation

$5,400,000 B0162IRWM: Implementation Grants -

SB855

Enacted 2013-14

3860-605-6051 Projects: SB 855, Sec.

31(c): increase and

transfer approp from

75026, unspecified

2010-11 Special

Legislation

$1,324,755 B0162IRWM: Implementation Grants Rnd

2 - SB855

Enacted 2013-14

3860-605-6051 Projects: SB 855, Sec.

31(c): Natural Reversion

2010-11 Natural

Reversion

($2,627,939) B0162IRWM: Implementation Grants Rnd

2 - SB855

Enacted 2016-17

Wednesday, January 29, Page 75 of 3421:20:04 PM Public Resources Code (PRC) Section PRC §75026, 75027(a)(10)Ch. 2Prop 84 Report

Page 79: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-605-6051 Projects: SB 855, Sec.

31(c): Reversion

Reverse

2010-11 Natural

Reversion

$2,627,939 B0162IRWM: Implementation Grants Rnd

2 - SB855

Enacted 2017-18

Sum: $26,016,533Enacted

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2013-14 Budget Act ($119,254) B0161IRWMEnacted/Not 2017-18

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2013-14 Budget Act $119,254 B0161IRWMEnacted/Not 2019-20

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2019-20 Control

Section

Adjustment

$1,575 B0163IRWMEnacted/Not 2019-20

Sum: $1,575Enacted/Not Posted

Sum: $26,018,108

$36,892

Balance for Integrated Regional Water Management:

Wednesday, January 29, Page 76 of 3421:20:04 PM Public Resources Code (PRC) Section PRC §75026, 75027(a)(10)Ch. 2Prop 84 Report

Page 80: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

Safe Drinking Water and Water Quality ProjectsChapter 2

Allocation: Integrated Regional Water Management

Allocation $: $36,000,000$187,396

$371,045Statewide Set Asides: $558,441 {

Outyear Obligations: $0

$0

$0

{

PRC §75026, 75027(a)(11)Ch. 2

Appropriations, Proposals and Reversions

Statewide, requiring appropriation:

Statewide, not requiring appropriation:

Outyear Program Delivery commitments:

Outyear Cap. Outlay (to complete started projects):Reversions are shown below$0

Outyear Local Asst. commitments:

Colorado River Basin portion: Grants for projects that assist local public agencies to meet the State`s long term water needs, including delivery of safe drinking

water and the protection of water quality and the environment. Must implement integrated regional water management plans and meet various other requirements

in §75026, §75027 and §75028. Local assistance appropriation amounts to be posted against this specific allocation upon project approval. In interim,

appropriation charged against PRC Section 75026, unspecified.

Dept.: Department of Water

Resources

Other Outyear Support commitments:$0

Committed

$0

$0

$0

$0

Proposed

$0

Prop 1 Reduction $701,559

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3860-001-6051 Portion of support

budget

2010-11 Budget Act $63,468 B0171IRWMEnacted 2010-11

3860-001-6051 Portion of support

budget: Natural

Reversion

2010-11 Natural

Reversion

($5,346) B0171IRWMEnacted 2012-13

3860-001-6051 Portion of support

budget

2011-12 Budget Act $63,468 B0171IRWMEnacted 2011-12

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2011-12 Control

Section

Adjustment

($1,253) B0171IRWMEnacted 2011-12

3860-001-6051 Portion of support

budget: Natural

Reversion

2011-12 Natural

Reversion

($3,062) B0171IRWMEnacted 2013-14

3860-001-6051 Portion of support

budget

2012-13 Budget Act $63,468 B0171IRWMEnacted 2012-13

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2012-13 Control

Section

Adjustment

($2,880) B0171IRWMEnacted 2012-13

3860-001-6051 Portion of support

budget: Reversion

2012-13 Budget Act ($7,962) B0171IRWMEnacted 2015-16

3860-001-6051 Portion of support

budget

2013-14 Budget Act $171,468 B0171IRWMEnacted 2013-14

Wednesday, January 29, Page 77 of 3421:20:04 PM Public Resources Code (PRC) Section PRC §75026, 75027(a)(11)Ch. 2Prop 84 Report

Page 81: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-001-6051 Portion of support

budget: Reversion

2013-14 Budget Act ($12,463) B0171IRWMEnacted 2015-16

3860-001-6051 Portion of support

budget

2014-15 Budget Act $90,000 B0171IRWMEnacted 2014-15

3860-001-6051 Portion of support

budget: Natural

Reversion

2014-15 Natural

Reversion

($55,141) B0171IRWMEnacted 2016-17

3860-001-6051 Portion of support

budget: Reversion

Reverse

2014-15 Natural

Reversion

$55,141 B0171IRWMEnacted 2017-18

3860-001-6051 Portion of support

budget

2015-16 Budget Act $101,196 B0171IRWMEnacted 2015-16

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2015-16 Budget Act ($101,196) B0171IRWMEnacted 2016-17

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2015-16 Budget Act $101,196 B0171IRWMEnacted 2018-19

3860-001-6051 Portion of support

budget

2016-17 Budget Act $44,013 B0171IRWMEnacted 2016-17

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2016-17 Control

Section

Adjustment

$2,242 B0171IRWMEnacted 2016-17

3860-001-6051 Portion of support

budget: Control Section

Adjustment:

Reappropriation

(decrease)

2016-17 Budget Act ($2,242) B0171IRWMEnacted 2016-17

3860-001-6051 Portion of support

budget: Control Section

Adjustment:

Reappropriation

(increase)

2016-17 Budget Act $2,242 B0171IRWMEnacted 2019-20

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2016-17 Budget Act ($44,013) B0171IRWMEnacted 2016-17

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2016-17 Budget Act $44,013 B0171IRWMEnacted 2019-20

3860-001-6051 Portion of support

budget

2017-18 Budget Act $45,360 B0173IRWMEnacted 2017-18

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2017-18 Control

Section

Adjustment

$2,960 B0173IRWMEnacted 2017-18

3860-001-6051 Portion of support

budget

2018-19 Budget Act $48,360 B0173IRWMEnacted 2018-19

Wednesday, January 29, Page 78 of 3421:20:04 PM Public Resources Code (PRC) Section PRC §75026, 75027(a)(11)Ch. 2Prop 84 Report

Page 82: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2018-19 Control

Section

Adjustment

$1,843 B0173IRWMEnacted 2018-19

3860-001-6051 Portion of support

budget: Control Section

Adjustment:

Reappropriation

(decrease)

2018-19 Budget Act ($1,843) B0173IRWMEnacted 2018-19

3860-001-6051 Portion of support

budget: Control Section

Adjustment:

Reappropriation

(increase)

2018-19 Budget Act $1,843 B0173IRWMEnacted 2019-20

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2018-19 Budget Act ($48,360) B0173IRWMEnacted 2018-19

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2018-19 Budget Act $48,360 B0173IRWMEnacted 2019-20

3860-001-6051 Portion of support

budget

2019-20 Budget Act $53,657 B0173IRWMEnacted 2019-20

3860-503-6051 Portion of support

budget

2008-09 Special

Legislation

$745,200 B0171IRWM: Colorado River BasinEnacted 2008-09

3860-503-6051 Portion of support

budget: Control Section

Adjustment

2008-09 Control

Section

Adjustment

($38,924) B0171IRWM: Colorado River BasinEnacted 2012-13

3860-503-6051 Portion of support

budget: Natural

Reversion

2008-09 Natural

Reversion

($10,877) B0171IRWM: Colorado River BasinEnacted 2015-16

3860-503-6051 Portion of support

budget: Reversion

2008-09 Budget Act ($153,153) B0171IRWM: Colorado River BasinEnacted 2015-16

3860-503-6051 Portion of support

budget: Reversion

Reverse

2008-09 Natural

Reversion

$5,438 B0171IRWM: Colorado River BasinEnacted 2016-17

3860-503-6051 Section

83002(b)(3)(a)(iv):

Control Section

Adjustment

2008-09 Control

Section

Adjustment

($21,509) B0171IRWM: Colorado River BasinEnacted 2009-10

3860-505-6051 Section 8(a); PG 10, EL

29 per JE 0036307

dated 2-10-10

2009-10 Special

Legislation

$504,000 B0171IRWMEnacted 2009-10

3860-505-6051 Section 8(a); PG 10, EL

29 per JE 0036307

dated 2-10-10:

Reversion

2009-10 Special

Legislation

($504,000) B0171IRWMEnacted 2010-11

Wednesday, January 29, Page 79 of 3421:20:04 PM Public Resources Code (PRC) Section PRC §75026, 75027(a)(11)Ch. 2Prop 84 Report

Page 83: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-505-6051 Portion of support

budget: Ch. 718 (SB

855), Statutes of 2010,

Sec. 31(c):

Reappropriation

(decrease)

2010-11 Budget Act ($504,000) B0171IRWMEnacted 2017-18

3860-505-6051 Portion of support

budget: Ch. 718 (SB

855), Statutes of 2010,

Sec. 31(c):

Reappropriation

(increase)

2010-11 Budget Act $504,000 B0171IRWMEnacted 2019-20

3860-505-6051 Portion of support

budget: SB 855, Sec.

31(c)

2010-11 Special

Legislation

$504,000 B0171IRWMEnacted 2010-11

3860-601-6051 Projects: SB 104:

increase and transfer

approp from 75026,

unspecified

2013-14 Budget

Revision

$12,525,000 B0172IRWM 2014 Drought GrantsEnacted 2013-14

3860-601-6051 Projects: SB 104:

increase and transfer

approp from 75026,

unspecified

2013-14 Budget

Revision

$4,175,000 B0172IRWM 2015 Implementation GrantsEnacted 2013-14

3860-603-6051 Local Assistance:

increase and transfer

approp from 75026,

unspecified

2008-09 Budget

Revision

$1,589,744 B0172IRWM: Implementation Grants -

Round 1

Enacted 2011-12

3860-603-6051 Local Assistance:

increase and transfer

approp from 75026,

unspecified

2008-09 Budget

Revision

$1,000,000 B0172IRWM: Planning Grants - Round 1Enacted 2010-11

3860-603-6051 Local Assistance:

increase and transfer

approp from 75026,

unspecified:

Reappropriation

(decrease)

2008-09 Budget Act ($1,589,744) B0172IRWM: Implementation Grants -

Round 1

Enacted 2011-12

3860-603-6051 Local Assistance:

increase and transfer

approp from 75026,

unspecified:

Reappropriation

(decrease)

2008-09 Budget Act ($1,000,000) B0172IRWM: Planning Grants - Round 1Enacted 2010-11

3860-603-6051 Local Assistance:

increase and transfer

approp from 75026,

unspecified:

Reappropriation

(increase)

2008-09 Budget Act $1,589,744 B0172IRWM: Implementation Grants -

Round 1

Enacted 2019-20

Wednesday, January 29, Page 80 of 3421:20:04 PM Public Resources Code (PRC) Section PRC §75026, 75027(a)(11)Ch. 2Prop 84 Report

Page 84: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-603-6051 Local Assistance:

increase and transfer

approp from 75026,

unspecified:

Reappropriation

(increase)

2008-09 Budget Act $1,000,000 B0172IRWM: Planning Grants - Round 1Enacted 2019-20

3860-605-6051 Projects: SB 855, Sec.

31(c): increase and

transfer approp from

75026, unspecified

2010-11 Special

Legislation

$8,410,256 B0172IRWM: Implementation Grants -

SB855

Enacted 2013-14

3860-605-6051 Projects: SB 855, Sec.

31(c): increase and

transfer approp from

75026, unspecified

2010-11 Special

Legislation

$5,240,000 B0172IRWM: Implementation Grants Rnd

2 - SB855

Enacted 2013-14

3860-605-6051 Projects: SB 855, Sec.

31(c): Natural Reversion

2010-11 Natural

Reversion

($5,334,326) B0172IRWM: Implementation Grants Rnd

2 - SB855

Enacted 2016-17

3860-605-6051 Projects: SB 855, Sec.

31(c): Reversion

Reverse

2010-11 Natural

Reversion

$5,334,326 B0172IRWM: Implementation Grants Rnd

2 - SB855

Enacted 2017-18

Sum: $34,688,712Enacted

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2013-14 Budget Act ($159,005) B0171IRWMEnacted/Not 2017-18

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2013-14 Budget Act $159,005 B0171IRWMEnacted/Not 2019-20

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2019-20 Control

Section

Adjustment

$2,100 B0173IRWMEnacted/Not 2019-20

Sum: $2,100Enacted/Not Posted

Sum: $34,690,812

$49,188

Balance for Integrated Regional Water Management:

Wednesday, January 29, Page 81 of 3421:20:04 PM Public Resources Code (PRC) Section PRC §75026, 75027(a)(11)Ch. 2Prop 84 Report

Page 85: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

Safe Drinking Water and Water Quality ProjectsChapter 2

Allocation: Integrated Regional Water Management

Allocation $: $100,000,000$520,546

$1,030,679Statewide Set Asides: $1,551,225 {

Outyear Obligations: $0

$0

$0

{

PRC §75026, 75027(a)(12) and (b)Ch. 2

Appropriations, Proposals and Reversions

Statewide, requiring appropriation:

Statewide, not requiring appropriation:

Outyear Program Delivery commitments:

Outyear Cap. Outlay (to complete started projects):Reversions are shown below$0

Outyear Local Asst. commitments:

Inter-regional/Unallocated: May be expended directly or granted by Department to address multi-regional needs or issues of statewide significance. Projects to

meet the State`s long term water needs, including delivery of safe drinking water and the protection of water quality and the environment. Must implement

integrated regional water management plans and meet various other requirements in §75026, §75027 and §75028. Amounts associated with projects (undertaken

either through grants or direct expenditure) to be posted against this specific allocation upon project approval. In interim, appropriation charged against PRC

Section 75026, unspecified.

Dept.: Department of Water

Resources

Other Outyear Support commitments:$0

Committed

$0

$0

$0

$0

Proposed

$0

Prop 1 Reduction $1,948,775

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3860-001-6051 Portion of support

budget

2008-09 Budget Act $8,000,000 B0182IRWM: CALFEDEnacted 2008-09

3860-001-6051 Portion of support

budget: Natural

Reversion

2008-09 Natural

Reversion

($17,108,395) B0182IRWM: CALFEDEnacted 2009-10

3860-001-6051 Portion of support

budget: Reversion

Reverse

2008-09 Natural

Reversion

$16,773,552 B0182IRWM: CALFEDEnacted 2011-12

3860-001-6051 Portion of support

budget

2010-11 Budget Act $14,000,000 B0182Delta PlanEnacted 2010-11

3860-001-6051 Portion of support

budget

2010-11 Budget Act $176,300 B0181IRWMEnacted 2010-11

3860-001-6051 Portion of support

budget

2010-11 Budget Act $3,836,000 B1272Water Conservation Act

Implementation

Enacted 2010-11

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2010-11 Control

Section

Adjustment

($176,991) B1272Water Conservation Act

Implementation

Enacted 2010-11

3860-001-6051 Portion of support

budget: Natural

Reversion

2010-11 Natural

Reversion

($14,851) B0181IRWMEnacted 2012-13

Wednesday, January 29, Page 82 of 3421:20:04 PM Public Resources Code (PRC) Section PRC §75026, 75027(a)(12) and (b)Ch. 2Prop 84 Report

Page 86: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-001-6051 Portion of support

budget: Natural

Reversion

2010-11 Natural

Reversion

($3,358,470) B1272Water Conservation Act

Implementation

Enacted 2012-13

3860-001-6051 Portion of support

budget

2011-12 Budget Act $176,300 B0181IRWMEnacted 2011-12

3860-001-6051 Portion of support

budget

2011-12 Budget Act $2,940,000 B1272Water Conservation Act

Implementation

Enacted 2011-12

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2011-12 Control

Section

Adjustment

($3,463) B0181IRWMEnacted 2011-12

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2011-12 Control

Section

Adjustment

($33,956) B1272Water Conservation Act

Implementation

Enacted 2011-12

3860-001-6051 Portion of support

budget: Natural

Reversion

2011-12 Natural

Reversion

($8,524) B0181IRWMEnacted 2013-14

3860-001-6051 Portion of support

budget: Natural

Reversion

2011-12 Natural

Reversion

($2,001,366) B1272Water Conservation Act

Implementation

Enacted 2013-14

3860-001-6051 Portion of support

budget

2012-13 Budget Act $176,300 B0181IRWMEnacted 2012-13

3860-001-6051 Portion of support

budget

2012-13 Budget Act $2,940,000 B1272Water Conservation Act

Implementation

Enacted 2012-13

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2012-13 Control

Section

Adjustment

($8,001) B0181IRWMEnacted 2012-13

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2012-13 Control

Section

Adjustment

($66,879) B1272Water Conservation Act

Implementation

Enacted 2012-13

3860-001-6051 Portion of support

budget: Natural

Reversion

2012-13 Natural

Reversion

$0 B0181IRWMEnacted 2017-18

3860-001-6051 Portion of support

budget: Natural

Reversion

2012-13 Natural

Reversion

$0 B1272Water Conservation Act

Implementation

Enacted 2017-18

3860-001-6051 Portion of support

budget: Reversion

2012-13 Budget Act ($22,116) B0181IRWMEnacted 2015-16

3860-001-6051 Portion of support

budget: Reversion

2012-13 Budget Act ($1,799,045) B1272Water Conservation Act

Implementation

Enacted 2016-17

3860-001-6051 Portion of support

budget

2013-14 Budget Act $476,300 B1271IRWMEnacted 2013-14

3860-001-6051 Portion of support

budget

2013-14 Budget Act $2,149,800 B1272IRWMEnacted 2013-14

3860-001-6051 Portion of support

budget: Reversion

2013-14 Budget Act ($34,619) B1271IRWMEnacted 2015-16

3860-001-6051 Portion of support

budget

2014-15 Budget Act $250,000 B1271IRWMEnacted 2014-15

3860-001-6051 Portion of support

budget

2014-15 Budget Act $1,824,000 B1272IRWMEnacted 2014-15

Wednesday, January 29, Page 83 of 3421:20:04 PM Public Resources Code (PRC) Section PRC §75026, 75027(a)(12) and (b)Ch. 2Prop 84 Report

Page 87: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-001-6051 Portion of support

budget: Natural

Reversion

2014-15 Natural

Reversion

($153,170) B1271IRWMEnacted 2016-17

3860-001-6051 Portion of support

budget: Reversion

Reverse

2014-15 Natural

Reversion

$153,170 B1271IRWMEnacted 2017-18

3860-001-6051 Portion of support

budget

2015-16 Budget Act $281,100 B1271IRWMEnacted 2015-16

3860-001-6051 Portion of support

budget

2015-16 Budget Act $1,900,000 B1272IRWMEnacted 2015-16

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2015-16 Budget Act ($281,100) B1271IRWMEnacted 2016-17

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2015-16 Budget Act ($1,900,000) B1272IRWMEnacted 2016-17

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2015-16 Budget Act $281,100 B1271IRWMEnacted 2018-19

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2015-16 Budget Act $1,900,000 B1272IRWMEnacted 2018-19

3860-001-6051 Portion of support

budget

2016-17 Budget Act $858,677 B1273IRWMEnacted 2016-17

3860-001-6051 Portion of support

budget

2016-17 Budget Act $1,180,000 B1272IRWMEnacted 2016-17

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2016-17 Control

Section

Adjustment

$34,947 B1273IRWMEnacted 2016-17

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2016-17 Control

Section

Adjustment

$46,000 B1272IRWMEnacted 2016-17

3860-001-6051 Portion of support

budget: Control Section

Adjustment:

Reappropriation

(decrease)

2016-17 Budget Act ($34,947) B1273IRWMEnacted 2016-17

3860-001-6051 Portion of support

budget: Control Section

Adjustment:

Reappropriation

(decrease)

2016-17 Budget Act ($46,000) B1272IRWMEnacted 2016-17

Wednesday, January 29, Page 84 of 3421:20:04 PM Public Resources Code (PRC) Section PRC §75026, 75027(a)(12) and (b)Ch. 2Prop 84 Report

Page 88: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-001-6051 Portion of support

budget: Control Section

Adjustment:

Reappropriation

(increase)

2016-17 Budget Act $34,947 B1273IRWMEnacted 2019-20

3860-001-6051 Portion of support

budget: Control Section

Adjustment:

Reappropriation

(increase)

2016-17 Budget Act $46,000 B1272IRWMEnacted 2019-20

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2016-17 Budget Act ($858,677) B1273IRWMEnacted 2016-17

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2016-17 Budget Act ($1,180,000) B1272IRWMEnacted 2016-17

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2016-17 Budget Act $858,677 B1273IRWMEnacted 2019-20

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2016-17 Budget Act $1,180,000 B1272IRWMEnacted 2019-20

3860-001-6051 Portion of support

budget

2018-19 Budget Act $684,000 B1272IRWMEnacted 2018-19

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2018-19 Budget Act $0 B1273IRWM 2018-19

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2018-19 Budget Act ($684,000) B1272IRWMEnacted 2018-19

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2018-19 Budget Act $0 B1273IRWM 2019-20

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2018-19 Budget Act $684,000 B1272IRWMEnacted 2019-20

3860-101-6051 Portion of local

assistance budget

2008-09 Budget Act $13,484,000 B0182Colorado River water management

projects

Enacted 2008-09

3860-101-6051 Portion of local

assistance budget

2012-13 Budget Act $249,000 B0182IRWM: Inter-regional Statewide

Projects

Enacted 2012-13

3860-101-6051 Portion of local

assistance budget:

Natural Reversion

2012-13 Natural

Reversion

($25) B0182IRWM: Inter-regional Statewide

Projects

Enacted 2014-15

Wednesday, January 29, Page 85 of 3421:20:04 PM Public Resources Code (PRC) Section PRC §75026, 75027(a)(12) and (b)Ch. 2Prop 84 Report

Page 89: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-101-6051 Portion of local

assistance budget:

Reversion Reverse

2012-13 Natural

Reversion

$13 B0182IRWM: Inter-regional Statewide

Projects

Enacted 2015-16

3860-503-6051 Portion of support

budget

2008-09 Special

Legislation

$10,000,000 B0182IRWM: Inter-regional Delta

Aqueducts Projects

Enacted 2008-09

3860-503-6051 Portion of support

budget

2008-09 Special

Legislation

$10,091,000 B0182IRWM: Inter-regional Statewide

Projects

Enacted 2008-09

3860-503-6051 Portion of support

budget

2008-09 Special

Legislation

$2,070,000 B0181IRWM: Inter-regional/UnallocatedEnacted 2008-09

3860-503-6051 Portion of support

budget

2008-09 Special

Legislation

$2,000,000 B0182IRWM: Tulare County PlanningEnacted 2008-09

3860-503-6051 Portion of support

budget: Control Section

Adjustment

2008-09 Control

Section

Adjustment

($108,124) B0181IRWM: Inter-regional/UnallocatedEnacted 2012-13

3860-503-6051 Portion of support

budget: Natural

Reversion

2008-09 Natural

Reversion

($885,179) B0182IRWM: Inter-regional Statewide

Projects

Enacted 2015-16

3860-503-6051 Portion of support

budget: Natural

Reversion

2008-09 Natural

Reversion

($30,211) B0181IRWM: Inter-regional/UnallocatedEnacted 2015-16

3860-503-6051 Portion of support

budget: Natural

Reversion

2008-09 Natural

Reversion

($57,803) B0182IRWM: Tulare County PlanningEnacted 2015-16

3860-503-6051 Portion of support

budget: Reversion

2008-09 Budget Act ($425,426) B0181IRWM: Inter-regional/UnallocatedEnacted 2015-16

3860-503-6051 Portion of support

budget: Reversion

Reverse

2008-09 Natural

Reversion

$541,123 B0182IRWM: Inter-regional Statewide

Projects

Enacted 2016-17

3860-503-6051 Portion of support

budget: Reversion

Reverse

2008-09 Natural

Reversion

$15,105 B0181IRWM: Inter-regional/UnallocatedEnacted 2016-17

3860-503-6051 Portion of support

budget: Reversion

Reverse

2008-09 Natural

Reversion

$51,760 B0182IRWM: Tulare County PlanningEnacted 2016-17

3860-503-6051 Section

83002(b)(3)(a)(iv):

Control Section

Adjustment

2008-09 Control

Section

Adjustment

($59,749) B0181IRWM: Inter-regional/UnallocatedEnacted 2009-10

3860-505-6051 Section 8(a); PG 10, EL

29 per JE 0036307

dated 2-10-10

2009-10 Special

Legislation

$1,400,000 B0181IRWMEnacted 2009-10

3860-505-6051 Section 8(a); PG 10, EL

29 per JE 0036307

dated 2-10-10:

Reversion

2009-10 Special

Legislation

($1,400,000) B0181IRWMEnacted 2010-11

Wednesday, January 29, Page 86 of 3421:20:04 PM Public Resources Code (PRC) Section PRC §75026, 75027(a)(12) and (b)Ch. 2Prop 84 Report

Page 90: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-505-6051 Portion of support

budget: Ch. 718 (SB

855), Statutes of 2010,

Sec. 31(c):

Reappropriation

(decrease)

2010-11 Budget Act ($1,400,000) B0181IRWMEnacted 2017-18

3860-505-6051 Portion of support

budget: Ch. 718 (SB

855), Statutes of 2010,

Sec. 31(c):

Reappropriation

(increase)

2010-11 Budget Act $1,400,000 B0181IRWMEnacted 2019-20

3860-505-6051 Portion of support

budget: SB 855, Sec.

31(c)

2010-11 Special

Legislation

$1,400,000 B0181IRWMEnacted 2010-11

3860-506-6051 Two-Gates Fish

Protection

Demonstration Program

2009-10 Special

Legislation

$28,000,000 B1252Two-Gates Fish Protection

Demonstration Program

Enacted 2009-10

3860-506-6051 Two-Gates Fish

Protection

Demonstration

Program: Reversion

2009-10 Budget Act ($28,000,000) B1252Two-Gates Fish Protection

Demonstration Program

Enacted 2010-11

3860-603-6051 Portion of local

assistance budget

2008-09 Special

Legislation

$9,000,000 B0182IRWM: LGA GrantsEnacted 2008-09

3860-603-6051 Portion of local

assistance budget

2008-09 Special

Legislation

$15,000,000 B0182IRWM: Planning GrantsEnacted 2008-09

3860-603-6051 Portion of local

assistance budget:

Reappropriation

(decrease)

2008-09 Budget Act ($9,000,000) B0182IRWM: LGA GrantsEnacted 2008-09

3860-603-6051 Portion of local

assistance budget:

Reappropriation

(decrease)

2008-09 Budget Act ($15,000,000) B0182IRWM: Planning GrantsEnacted 2008-09

3860-603-6051 Portion of local

assistance budget:

Reappropriation

(increase)

2008-09 Budget Act $9,000,000 B0182IRWM: LGA GrantsEnacted 2019-20

3860-603-6051 Portion of local

assistance budget:

Reappropriation

(increase)

2008-09 Budget Act $15,000,000 B0182IRWM: Planning GrantsEnacted 2019-20

3860-603-6051 Portion of local

assistance budget:

Reversion

2008-09 Budget Act ($224,000) B0182IRWM: LGA GrantsEnacted 2012-13

Sum: $96,178,084Enacted

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

Wednesday, January 29, Page 87 of 3421:20:04 PM Public Resources Code (PRC) Section PRC §75026, 75027(a)(12) and (b)Ch. 2Prop 84 Report

Page 91: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2013-14 Budget Act ($441,681) B1271IRWMEnacted/Not 2017-18

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2013-14 Budget Act ($2,149,800) B1272IRWMEnacted/Not 2017-18

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2013-14 Budget Act $441,681 B1271IRWMEnacted/Not 2019-20

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2013-14 Budget Act $2,149,800 B1272IRWMEnacted/Not 2019-20

Sum: $0Enacted/Not Posted

Sum: $96,178,084

$321,916

Balance for Integrated Regional Water Management:

Wednesday, January 29, Page 88 of 3421:20:04 PM Public Resources Code (PRC) Section PRC §75026, 75027(a)(12) and (b)Ch. 2Prop 84 Report

Page 92: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

Safe Drinking Water and Water Quality ProjectsChapter 2

Allocation: Integrated Regional Water Management

Allocation $: $0$0

$0Statewide Set Asides: $0 {

Outyear Obligations: $0

$0

$0

{

PRC §75026, unspecifiedCh. 2

Appropriations, Proposals and Reversions

Statewide, requiring appropriation:

Statewide, not requiring appropriation:

Outyear Program Delivery commitments:

Outyear Cap. Outlay (to complete started projects):Reversions are shown below$0

Outyear Local Asst. commitments:

Integrated Regional Water Management: Locations to be determined. Grants for projects that assist local public agencies to meet the State`s long term water

needs, including delivery of safe drinking water and the protection of water quality and the environment. Local assistance appropriation amounts posted against

this allocation until projects are approved; at that time, appropriations will be shifted to the associated allocation.

Dept.: Department of Water

Resources

Other Outyear Support commitments:$0

Committed

$0

$0

$0

$0

Proposed

$0

Prop 1 Reduction $0

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3860-601-6051 Local Assistance2013-14 Special

Legislation

$200,000,000 B0992IRWM Drought Preparedness

Projects

Enacted 2013-14

3860-601-6051 Local Assistance2013-14 Special

Legislation

$252,520,157 B0992IRWM Implementation GrantsEnacted 2013-14

3860-601-6051 Local Assistance2013-14 Special

Legislation

$19,979,843 B0992IRWM Implementation Grants -

Round 2

Enacted 2013-14

3860-601-6051 Projects: SB 104:

decrease and transfer

approp to 75026,

75027(a)(1)

2013-14 Budget

Revision

($9,778,000) B0992IRWM Drought Preparedness

Projects

Enacted 2013-14

3860-601-6051 Projects: SB 104:

decrease and transfer

approp to 75026,

75027(a)(10)

2013-14 Budget

Revision

($2,922,000) B0992IRWM Drought Preparedness

Projects

Enacted 2013-14

3860-601-6051 Projects: SB 104:

decrease and transfer

approp to 75026,

75027(a)(10)

2013-14 Budget

Revision

($1,675,245) B0992IRWM Implementation Grants -

Round 2

Enacted 2013-14

3860-601-6051 Projects: SB 104:

decrease and transfer

approp to 75026,

75027(a)(2)

2013-14 Budget

Revision

($24,178,423) B0992IRWM Drought Preparedness

Projects

Enacted 2013-14

Wednesday, January 29, Page 89 of 3421:20:04 PM Public Resources Code (PRC) Section PRC §75026, unspecifiedCh. 2Prop 84 Report

Page 93: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-601-6051 Projects: SB 104:

decrease and transfer

approp to 75026,

75027(a)(3)

2013-14 Budget

Revision

($14,811,049) B0992IRWM Drought Preparedness

Projects

Enacted 2013-14

3860-601-6051 Projects: SB 104:

decrease and transfer

approp to 75026,

75027(a)(4)

2013-14 Budget

Revision

($230,328,913) B0992IRWM 2015 Implementation GrantsEnacted 2013-14

3860-601-6051 Projects: SB 104:

decrease and transfer

approp to 75026,

75027(a)(4)

2013-14 Budget

Revision

($56,301,434) B0992IRWM Drought Preparedness

Projects

Enacted 2013-14

3860-601-6051 Projects: SB 104:

decrease and transfer

approp to 75026,

75027(a)(4)

2013-14 Budget

Revision

($4,535,834) B0992IRWM Implementation Grants -

Round 2

Enacted 2013-14

3860-601-6051 Projects: SB 104:

decrease and transfer

approp to 75026,

75027(a)(5)

2013-14 Budget

Revision

($11,757,000) B0992IRWM Drought Preparedness

Projects

Enacted 2013-14

3860-601-6051 Projects: SB 104:

decrease and transfer

approp to 75026,

75027(a)(5)

2013-14 Budget

Revision

($6,791,809) B0992IRWM Implementation Grants -

Round 2

Enacted 2013-14

3860-601-6051 Projects: SB 104:

decrease and transfer

approp to 75026,

75027(a)(6)

2013-14 Budget

Revision

($22,191,244) B0992IRWM 2014 Drought GrantsEnacted 2013-14

3860-601-6051 Projects: SB 104:

decrease and transfer

approp to 75026,

75027(a)(6)

2013-14 Budget

Revision

($17,678,048) B0992IRWM Drought Preparedness

Projects

Enacted 2013-14

3860-601-6051 Projects: SB 104:

decrease and transfer

approp to 75026,

75027(a)(6)

2013-14 Budget

Revision

($5,255,612) B0992IRWM Implementation Grants -

Round 2

Enacted 2013-14

3860-601-6051 Projects: SB 104:

decrease and transfer

approp to 75026,

75027(a)(7)

2013-14 Budget

Revision

($30,388,808) B0992IRWM Drought Preparedness

Projects

Enacted 2013-14

3860-601-6051 Projects: SB 104:

decrease and transfer

approp to 75026,

75027(a)(8)

2013-14 Budget

Revision

($20,022,341) B0992IRWM Drought Preparedness

Projects

Enacted 2013-14

3860-601-6051 Projects: SB 104:

decrease and transfer

approp to 75026,

75027(a)(8)

2013-14 Budget

Revision

($1,721,343) B0992IRWM Implementation Grants -

Round 2

Enacted 2013-14

Wednesday, January 29, Page 90 of 3421:20:04 PM Public Resources Code (PRC) Section PRC §75026, unspecifiedCh. 2Prop 84 Report

Page 94: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-601-6051 Projects: SB 104:

decrease and transfer

approp to 75026,

75027(a)(9)

2013-14 Budget

Revision

($12,162,897) B0992IRWM Drought Preparedness

Projects

Enacted 2013-14

3860-603-6051 Local Assistance2008-09 Special

Legislation

$100,000,000 B0992IRWM: Implementation Grants -

Round 1

Enacted 2008-09

3860-603-6051 Local Assistance2008-09 Special

Legislation

$15,000,000 B0992IRWM: Planning GrantsEnacted 2008-09

3860-603-6051 Local Assistance:

decrease and transfer

approp to 75026,

75027(a)(1)

2008-09 Budget

Revision

($8,221,061) B0992IRWM: Implementation Grants -

Round 1

Enacted 2011-12

3860-603-6051 Local Assistance:

decrease and transfer

approp to 75026,

75027(a)(1)

2008-09 Budget

Revision

($500,000) B0992IRWM: Planning Grants - Round 1Enacted 2010-11

3860-603-6051 Local Assistance:

decrease and transfer

approp to 75026,

75027(a)(10)

2008-09 Budget

Revision

($4,512,000) B0992IRWM: Implementation Grants -

Round 1

Enacted 2011-12

3860-603-6051 Local Assistance:

decrease and transfer

approp to 75026,

75027(a)(10)

2008-09 Budget

Revision

($355,267) B0992IRWM: Planning Grants - Round 1Enacted 2010-11

3860-603-6051 Local Assistance:

decrease and transfer

approp to 75026,

75027(a)(10)

2008-09 Budget

Revision

($732,682) B0992IRWM: Planning Grants - Round 2Enacted 2012-13

3860-603-6051 Local Assistance:

decrease and transfer

approp to 75026,

75027(a)(11)

2008-09 Budget

Revision

($1,589,744) B0992IRWM: Implementation Grants -

Round 1

Enacted 2011-12

3860-603-6051 Local Assistance:

decrease and transfer

approp to 75026,

75027(a)(11)

2008-09 Budget

Revision

($1,000,000) B0992IRWM: Planning Grants - Round 1Enacted 2010-11

3860-603-6051 Local Assistance:

decrease and transfer

approp to 75026,

75027(a)(2)

2008-09 Budget

Revision

($9,415,104) B0992IRWM: Implementation Grants -

Round 1

Enacted 2011-12

3860-603-6051 Local Assistance:

decrease and transfer

approp to 75026,

75027(a)(2)

2008-09 Budget

Revision

($454,342) B0992IRWM: Planning Grants - Round 1Enacted 2010-11

3860-603-6051 Local Assistance:

decrease and transfer

approp to 75026,

75027(a)(2)

2008-09 Budget

Revision

($33,209) B0992IRWM: Planning Grants - Round 2Enacted 2012-13

Wednesday, January 29, Page 91 of 3421:20:04 PM Public Resources Code (PRC) Section PRC §75026, unspecifiedCh. 2Prop 84 Report

Page 95: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-603-6051 Local Assistance:

decrease and transfer

approp to 75026,

75027(a)(3)

2008-09 Budget

Revision

($11,025,264) B0992IRWM: Implementation Grants -

Round 1

Enacted 2011-12

3860-603-6051 Local Assistance:

decrease and transfer

approp to 75026,

75027(a)(3)

2008-09 Budget

Revision

($2,185,445) B0992IRWM: Planning Grants - Round 1Enacted 2010-11

3860-603-6051 Local Assistance:

decrease and transfer

approp to 75026,

75027(a)(3)

2008-09 Budget

Revision

($536,494) B0992IRWM: Planning Grants - Round 2Enacted 2012-13

3860-603-6051 Local Assistance:

decrease and transfer

approp to 75026,

75027(a)(4)

2008-09 Budget

Revision

($29,855,006) B0992IRWM: Implementation Grants -

Round 1

Enacted 2011-12

3860-603-6051 Local Assistance:

decrease and transfer

approp to 75026,

75027(a)(4)

2008-09 Budget

Revision

($1,316,488) B0992IRWM: Planning Grants - Round 1Enacted 2010-11

3860-603-6051 Local Assistance:

decrease and transfer

approp to 75026,

75027(a)(4)

2008-09 Budget

Revision

($587,381) B0992IRWM: Planning Grants - Round 2Enacted 2012-13

3860-603-6051 Local Assistance:

decrease and transfer

approp to 75026,

75027(a)(5)

2008-09 Budget

Revision

($422,222) B0992IRWM: Implementation Grants -

Round 1

Enacted 2011-12

3860-603-6051 Local Assistance:

decrease and transfer

approp to 75026,

75027(a)(5)

2008-09 Budget

Revision

($500,000) B0992IRWM: Planning Grants - Round 1Enacted 2010-11

3860-603-6051 Local Assistance:

decrease and transfer

approp to 75026,

75027(a)(6)

2008-09 Budget

Revision

($3,001,000) B0992IRWM: Implementation Grants -

Round 1

Enacted 2011-12

3860-603-6051 Local Assistance:

decrease and transfer

approp to 75026,

75027(a)(6)

2008-09 Budget

Revision

($728,708) B0992IRWM: Planning Grants - Round 1Enacted 2010-11

3860-603-6051 Local Assistance:

decrease and transfer

approp to 75026,

75027(a)(6)

2008-09 Budget

Revision

($388,525) B0992IRWM: Planning Grants - Round 2Enacted 2012-13

3860-603-6051 Local Assistance:

decrease and transfer

approp to 75026,

75027(a)(7)

2008-09 Budget

Revision

($17,332,463) B0992IRWM: Implementation Grants -

Round 1

Enacted 2011-12

Wednesday, January 29, Page 92 of 3421:20:04 PM Public Resources Code (PRC) Section PRC §75026, unspecifiedCh. 2Prop 84 Report

Page 96: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-603-6051 Local Assistance:

decrease and transfer

approp to 75026,

75027(a)(7)

2008-09 Budget

Revision

($1,991,627) B0992IRWM: Planning Grants - Round 1Enacted 2010-11

3860-603-6051 Local Assistance:

decrease and transfer

approp to 75026,

75027(a)(7)

2008-09 Budget

Revision

($641,382) B0992IRWM: Planning Grants - Round 2Enacted 2012-13

3860-603-6051 Local Assistance:

decrease and transfer

approp to 75026,

75027(a)(8)

2008-09 Budget

Revision

($9,673,270) B0992IRWM: Implementation Grants -

Round 1

Enacted 2011-12

3860-603-6051 Local Assistance:

decrease and transfer

approp to 75026,

75027(a)(8)

2008-09 Budget

Revision

($1,373,155) B0992IRWM: Planning Grants - Round 1Enacted 2010-11

3860-603-6051 Local Assistance:

decrease and transfer

approp to 75026,

75027(a)(8)

2008-09 Budget

Revision

($1,092,392) B0992IRWM: Planning Grants - Round 2Enacted 2012-13

3860-603-6051 Local Assistance:

decrease and transfer

approp to 75026,

75027(a)(9)

2008-09 Budget

Revision

($4,952,866) B0992IRWM: Implementation Grants -

Round 1

Enacted 2011-12

3860-603-6051 Local Assistance:

decrease and transfer

approp to 75026,

75027(a)(9)

2008-09 Budget

Revision

($118,445) B0992IRWM: Planning Grants - Round 1Enacted 2010-11

3860-603-6051 Local Assistance:

decrease and transfer

approp to 75026,

75027(a)(9)

2008-09 Budget

Revision

($464,461) B0992IRWM: Planning Grants - Round 2Enacted 2012-13

3860-603-6051 Portion of local

assistance budget:

Reappropriation

(decrease)

2008-09 Budget Act ($100,000,000) B0992IRWM: Implementation Grants -

Round 1

Enacted 2008-09

3860-603-6051 Portion of local

assistance budget:

Reappropriation

(increase)

2008-09 Budget Act $100,000,000 B0992IRWM: Implementation Grants -

Round 1

Enacted 2019-20

3860-605-6051 Section 8(a); PG 10, EL

29 per JE 0036307

dated 2-10-10

2009-10 Special

Legislation

$236,000,000 B0992IRWM: Implementation Grants -

SB855

Enacted 2009-10

3860-605-6051 Section 8(a); PG 10, EL

29 per JE 0036307

dated 2-10-10:

Reversion

2009-10 Special

Legislation

($236,000,000) B0992IRWM: Implementation Grants -

SB855

Enacted 2010-11

3860-605-6051 Projects: SB 855, Sec.

31(c)

2010-11 Special

Legislation

$236,000,000 B0992IRWM: Implementation Grants -

SB855

Enacted 2010-11

Wednesday, January 29, Page 93 of 3421:20:04 PM Public Resources Code (PRC) Section PRC §75026, unspecifiedCh. 2Prop 84 Report

Page 97: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-605-6051 Projects: SB 855, Sec.

31(c): decrease and

transfer approp to

75026, 75027(a)(1)

2010-11 Special

Legislation

($5,386,000) B0992IRWM: Implementation Grants Rnd

2 - SB855

Enacted 2013-14

3860-605-6051 Projects: SB 855, Sec.

31(c): decrease and

transfer approp to

75026, 75027(a)(10)

2010-11 Special

Legislation

($5,400,000) B0992IRWM: Implementation Grants -

SB855

Enacted 2013-14

3860-605-6051 Projects: SB 855, Sec.

31(c): decrease and

transfer approp to

75026, 75027(a)(10)

2010-11 Special

Legislation

($1,324,755) B0992IRWM: Implementation Grants Rnd

2 - SB855

Enacted 2013-14

3860-605-6051 Projects: SB 855, Sec.

31(c): decrease and

transfer approp to

75026, 75027(a)(11)

2010-11 Special

Legislation

($8,410,256) B0992IRWM: Implementation Grants -

SB855

Enacted 2013-14

3860-605-6051 Projects: SB 855, Sec.

31(c): decrease and

transfer approp to

75026, 75027(a)(11)

2010-11 Special

Legislation

($5,240,000) B0992IRWM: Implementation Grants Rnd

2 - SB855

Enacted 2013-14

3860-605-6051 Projects: SB 855, Sec.

31(c): decrease and

transfer approp to

75026, 75027(a)(2)

2010-11 Special

Legislation

($22,453,489) B0992IRWM: Implementation Grants -

SB855

Enacted 2013-14

3860-605-6051 Projects: SB 855, Sec.

31(c): decrease and

transfer approp to

75026, 75027(a)(2)

2010-11 Special

Legislation

($20,430,000) B0992IRWM: Implementation Grants Rnd

2 - SB855

Enacted 2013-14

3860-605-6051 Projects: SB 855, Sec.

31(c): decrease and

transfer approp to

75026, 75027(a)(3)

2010-11 Special

Legislation

($6,515,732) B0992IRWM: Implementation Grants -

SB855

Enacted 2013-14

3860-605-6051 Projects: SB 855, Sec.

31(c): decrease and

transfer approp to

75026, 75027(a)(3)

2010-11 Special

Legislation

($7,569,000) B0992IRWM: Implementation Grants Rnd

2 - SB855

Enacted 2013-14

3860-605-6051 Projects: SB 855, Sec.

31(c): decrease and

transfer approp to

75026, 75027(a)(4)

2010-11 Special

Legislation

($20,186,593) B0992IRWM: Implementation Grants -

SB855

Enacted 2013-14

3860-605-6051 Projects: SB 855, Sec.

31(c): decrease and

transfer approp to

75026, 75027(a)(4)

2010-11 Special

Legislation

($43,902,909) B0992IRWM: Implementation Grants Rnd

2 - SB855

Enacted 2013-14

3860-605-6051 Projects: SB 855, Sec.

31(c): decrease and

transfer approp to

75026, 75027(a)(5)

2010-11 Special

Legislation

($12,237,782) B0992IRWM: Implementation Grants -

SB855

Enacted 2013-14

Wednesday, January 29, Page 94 of 3421:20:04 PM Public Resources Code (PRC) Section PRC §75026, unspecifiedCh. 2Prop 84 Report

Page 98: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-605-6051 Projects: SB 855, Sec.

31(c): decrease and

transfer approp to

75026, 75027(a)(5)

2010-11 Special

Legislation

($8,333,500) B0992IRWM: Implementation Grants Rnd

2 - SB855

Enacted 2013-14

3860-605-6051 Projects: SB 855, Sec.

31(c): decrease and

transfer approp to

75026, 75027(a)(6)

2010-11 Special

Legislation

($9,382,780) B0992IRWM: Implementation Grants -

SB855

Enacted 2013-14

3860-605-6051 Projects: SB 855, Sec.

31(c): decrease and

transfer approp to

75026, 75027(a)(6)

2010-11 Special

Legislation

($7,995,423) B0992IRWM: Implementation Grants Rnd

2 - SB855

Enacted 2013-14

3860-605-6051 Projects: SB 855, Sec.

31(c): decrease and

transfer approp to

75026, 75027(a)(7)

2010-11 Special

Legislation

($6,311,442) B0992IRWM: Implementation Grants Rnd

2 - SB855

Enacted 2013-14

3860-605-6051 Projects: SB 855, Sec.

31(c): decrease and

transfer approp to

75026, 75027(a)(8)

2010-11 Special

Legislation

($3,934,483) B0992IRWM: Implementation Grants -

SB855

Enacted 2013-14

3860-605-6051 Projects: SB 855, Sec.

31(c): decrease and

transfer approp to

75026, 75027(a)(8)

2010-11 Special

Legislation

($7,663,579) B0992IRWM: Implementation Grants Rnd

2 - SB855

Enacted 2013-14

3860-605-6051 Projects: SB 855, Sec.

31(c): decrease and

transfer approp to

75026, 75027(a)(9)

2010-11 Special

Legislation

($16,401,134) B0992IRWM: Implementation Grants -

SB855

Enacted 2013-14

3860-605-6051 Projects: SB 855, Sec.

31(c): decrease and

transfer approp to

75026, 75027(a)(9)

2010-11 Special

Legislation

($16,921,143) B0992IRWM: Implementation Grants Rnd

2 - SB855

Enacted 2013-14

3860-605-6051 Projects: SB 855, Sec.

31(c): Reappropriation

(decrease)

2010-11 Budget Act ($236,000,000) B0992IRWM: Implementation Grants -

SB855

Enacted 2017-18

3860-605-6051 Projects: SB 855, Sec.

31(c): Reappropriation

(increase)

2010-11 Budget Act $236,000,000 B0992IRWM: Implementation Grants -

SB855

Enacted 2019-20

Sum: $0Enacted

Sum: $0

$0

Balance for Integrated Regional Water Management:

Wednesday, January 29, Page 95 of 3421:20:04 PM Public Resources Code (PRC) Section PRC §75026, unspecifiedCh. 2Prop 84 Report

Page 99: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

Safe Drinking Water and Water Quality ProjectsChapter 2

Allocation: Delta Water Quality

Allocation $: $90,000,000$468,491

$927,611Statewide Set Asides: $1,396,102 {

Outyear Obligations: $0

$0

$0

{

PRC §75029Ch. 2

Appropriations, Proposals and Reversions

Statewide, requiring appropriation:

Statewide, not requiring appropriation:

Outyear Program Delivery commitments:

Outyear Cap. Outlay (to complete started projects):Reversions are shown below$0

Outyear Local Asst. commitments:

Grants to implement Delta water quality improvement projects that protect drinking water supplies. Unspecified portion.

Dept.: Department of Water

Resources

Other Outyear Support commitments:$0

Committed

$0

$0

$0

$0

Proposed

$0

Prop 1 Reduction $1,753,898

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3860-001-6051 Portion of support

budget

2010-11 Budget Act $250,000 B0061Drinking Water Intake FacilitiesEnacted 2010-11

3860-001-6051 Portion of support

budget

2010-11 Budget Act $200,000 B0061Reduce Salinity, Pollutants at Ag &

Drinking Water Intakes

Enacted 2010-11

3860-001-6051 Portion of support

budget: Natural

Reversion

2010-11 Natural

Reversion

($76,525) B0061Drinking Water Intake Facilities

Projects

Enacted 2012-13

3860-001-6051 Portion of support

budget: Natural

Reversion

2010-11 Natural

Reversion

($200,000) B0061Reduce Salinity, Pollutants at Ag &

Drinking Water Intakes

Enacted 2012-13

3860-001-6051 Portion of support

budget

2011-12 Budget Act $250,000 B0061Drinking Water Intake FacilitiesEnacted 2011-12

3860-001-6051 Portion of support

budget

2011-12 Budget Act $200,000 B0061Reduce Salinity, Pollutants at Ag &

Drinking Water Intakes

Enacted 2011-12

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2011-12 Control

Section

Adjustment

($3,713) B0061Drinking Water Intake FacilitiesEnacted 2011-12

3860-001-6051 Portion of support

budget: Natural

Reversion

2011-12 Natural

Reversion

($246,287) B0061Drinking Water Intake FacilitiesEnacted 2013-14

3860-001-6051 Portion of support

budget: Natural

Reversion

2011-12 Natural

Reversion

($29,528) B0061Reduce Salinity, Pollutants at Ag &

Drinking Water Intakes

Enacted 2013-14

3860-001-6051 Portion of support

budget

2012-13 Budget Act $450,000 B0061State Op Delta Water QualityEnacted 2012-13

Wednesday, January 29, Page 96 of 3421:20:04 PM Public Resources Code (PRC) Section PRC §75029Ch. 2Prop 84 Report

Page 100: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2012-13 Control

Section

Adjustment

($12,128) B0061State Op Delta Water QualityEnacted 2012-13

3860-001-6051 Portion of support

budget: Natural

Reversion

2012-13 Natural

Reversion

($222,254) B0061State Op Delta Water QualityEnacted 2017-18

3860-001-6051 Portion of support

budget

2013-14 Budget Act $450,000 B0061State Op Delta Water QualityEnacted 2013-14

3860-001-6051 Portion of support

budget

2014-15 Budget Act $700,000 B0061State Op Delta Water QualityEnacted 2014-15

3860-001-6051 Portion of support

budget: Natural

Reversion

2014-15 Natural

Reversion

($404,865) B0061State Op Delta Water QualityEnacted 2016-17

3860-001-6051 Portion of support

budget: Reversion

Reverse

2014-15 Natural

Reversion

$404,865 B0061State Op Delta Water QualityEnacted 2017-18

3860-001-6051 Portion of support

budget

2015-16 Budget Act $250,000 B0061State Op Delta Water QualityEnacted 2015-16

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2015-16 Budget Act ($250,000) B0061State Op Delta Water QualityEnacted 2018-19

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2015-16 Budget Act $250,000 B0061State Op Delta Water QualityEnacted 2016-17

3860-001-6051 Portion of support

budget

2016-17 Budget Act $250,000 B0061State Op Delta Water QualityEnacted 2016-17

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2016-17 Control

Section

Adjustment

$12,000 B0061State Op Delta Water QualityEnacted 2016-17

3860-001-6051 Portion of support

budget: Control Section

Adjustment:

Reappropriation

(decrease)

2016-17 Budget Act ($12,000) B0061State Op Delta Water QualityEnacted 2016-17

3860-001-6051 Portion of support

budget: Control Section

Adjustment:

Reappropriation

(increase)

2016-17 Budget Act $12,000 B0061State Op Delta Water QualityEnacted 2019-20

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2016-17 Budget Act ($250,000) B0061State Op Delta Water QualityEnacted 2016-17

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2016-17 Budget Act $250,000 B0061State Op Delta Water QualityEnacted 2019-20

Wednesday, January 29, Page 97 of 3421:20:04 PM Public Resources Code (PRC) Section PRC §75029Ch. 2Prop 84 Report

Page 101: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-001-6051 Portion of support

budget

2017-18 Budget Act $280,000 B0061State Op Delta Water QualityEnacted 2017-18

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2017-18 Control

Section

Adjustment

$19,000 B0061State Op Delta Water QualityEnacted 2017-18

3860-001-6051 Portion of support

budget

2018-19 Budget Act $299,000 B0061State Op Delta Water QualityEnacted 2018-19

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2018-19 Control

Section

Adjustment

$14,000 B0061State Op Delta Water QualityEnacted 2018-19

3860-001-6051 Portion of support

budget: Control Section

Adjustment:

Reappropriation

(decrease)

2018-19 Budget Act ($14,000) B0061State Op Delta Water QualityEnacted 2018-19

3860-001-6051 Portion of support

budget: Control Section

Adjustment:

Reappropriation

(increase)

2018-19 Budget Act $14,000 B0061State Op Delta Water QualityEnacted 2019-20

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2018-19 Budget Act ($299,000) B0061State Op Delta Water QualityEnacted 2018-19

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2018-19 Budget Act $299,000 B0061State Op Delta Water QualityEnacted 2019-20

3860-001-6051 Portion of support

budget

2019-20 Budget Act $313,000 B0061State Op Delta Water QualityEnacted 2019-20

3860-503-6051 Portion of support

budget

2008-09 Special

Legislation

$1,250,000 B0061Drinking Water Intake Facilities

Projects - Support

Enacted 2008-09

3860-503-6051 Portion of support

budget

2008-09 Special

Legislation

$1,250,000 B006NExcess authority, do not spend --

Drinking Water Intake Facilities

Projects - Support

Enacted 2008-09

3860-503-6051 Portion of support

budget

2008-09 Special

Legislation

$1,000,000 B006NExcess authority, do not spend --

Reduce Salinity, Pollutants at Ag &

Drinking Water Intakes - Support

Enacted 2008-09

3860-503-6051 Portion of support

budget

2008-09 Special

Legislation

$1,000,000 B0061Reduce Salinity, Pollutants at Ag &

Drinking Water Intakes - Support

Enacted 2008-09

3860-503-6051 Portion of support

budget: Control Section

Adjustment

2008-09 Control

Section

Adjustment

($18,125) B0061Drinking Water Intake Facilities

Projects - Support

Enacted 2010-11

3860-503-6051 Portion of support

budget: Control Section

Adjustment

2008-09 Control

Section

Adjustment

($14,640) B0061Reduce Salinity, Pollutants at Ag &

Drinking Water Intakes - Support

Enacted 2010-11

3860-503-6051 Portion of support

budget: Reversion

2008-09 Budget Act ($812,473) B0061Drinking Water Intake Facilities

Projects - Support

Enacted 2014-15

Wednesday, January 29, Page 98 of 3421:20:04 PM Public Resources Code (PRC) Section PRC §75029Ch. 2Prop 84 Report

Page 102: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-503-6051 Portion of support

budget: Reversion

2008-09 Budget Act ($1,250,000) B006NExcess authority, do not spend --

Drinking Water Intake Facilities

Projects - Support

Enacted 2010-11

3860-503-6051 Portion of support

budget: Reversion

2008-09 Budget Act ($1,000,000) B006NExcess authority, do not spend --

Reduce Salinity, Pollutants at Ag &

Drinking Water Intakes - Support

Enacted 2010-11

3860-503-6051 Portion of support

budget: Reversion

2008-09 Budget Act ($985,360) B0061Reduce Salinity, Pollutants at Ag &

Drinking Water Intakes - Support

Enacted 2014-15

3860-603-6051 Portion of local

assistance budget

2008-09 Special

Legislation

$45,750,000 B0062Drinking Water Intake Facilities

Projects

Enacted 2008-09

3860-603-6051 Portion of local

assistance budget

2008-09 Special

Legislation

$1,750,000 B006NDrinking Water Intake Facilities

Projects: Excess authority

Enacted 2008-09

3860-603-6051 Portion of local

assistance budget

2008-09 Special

Legislation

$36,600,000 B0062Reduce Salinity, Pollutants at Ag &

Drinking Water Intakes

Enacted 2008-09

3860-603-6051 Portion of local

assistance budget

2008-09 Special

Legislation

$1,400,000 B006NReduce Salinity, Pollutants at Ag &

Drinking Water Intakes: Excess

authority

Enacted 2008-09

3860-603-6051 Portion of local

assistance budget:

Natural Reversion

2008-09 Natural

Reversion

($32,665,387) B0062Drinking Water Intake Facilities

Projects

Enacted 2017-18

3860-603-6051 Portion of local

assistance budget:

Natural Reversion

Reverse

2008-09 Natural

Reversion

$32,665,387 B0062Drinking Water Intake Facilities

Projects

Enacted 2018-19

3860-603-6051 Portion of local

assistance budget:

Reappropriation

(decrease)

2008-09 Budget Act ($91,500,000) B0062Drinking Water Intake Facilities

Projects

Enacted 2014-15

3860-603-6051 Portion of local

assistance budget:

Reappropriation

(decrease)

2008-09 Budget Act ($73,200,000) B0062Reduce Salinity, Pollutants at Ag &

Drinking Water Intakes

Enacted 2014-15

3860-603-6051 Portion of local

assistance budget:

Reappropriation

(increase)

2008-09 Budget Act $91,500,000 B0062Drinking Water Intake Facilities

Projects

Enacted 2018-19

3860-603-6051 Portion of local

assistance budget:

Reappropriation

(increase)

2008-09 Budget Act $73,200,000 B0062Reduce Salinity, Pollutants at Ag &

Drinking Water Intakes

Enacted 2018-19

3860-603-6051 Portion of local

assistance budget:

Reversion

2008-09 Budget Act ($1,750,000) B006NDrinking Water Intake Facilities

Projects: Excess authority

Enacted 2010-11

3860-603-6051 Portion of local

assistance budget:

Reversion

2008-09 Budget Act ($1,400,000) B006NReduce Salinity, Pollutants at Ag &

Drinking Water Intakes: Excess

authority

Enacted 2010-11

Sum: $85,915,967Enacted

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

Wednesday, January 29, Page 99 of 3421:20:04 PM Public Resources Code (PRC) Section PRC §75029Ch. 2Prop 84 Report

Page 103: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2013-14 Budget Act ($450,000) B0061State Op Delta Water QualityEnacted/Not 2017-18

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2013-14 Budget Act $450,000 B0061State Op Delta Water QualityEnacted/Not 2019-20

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2019-20 Control

Section

Adjustment

$15,000 B0061State Op Delta Water QualityEnacted/Not 2019-20

Sum: $15,000Enacted/Not Posted

Sum: $85,930,967

$919,033

Balance for Delta Water Quality:

Wednesday, January 29, Page 100 of 3421:20:05 PM Public Resources Code (PRC) Section PRC §75029Ch. 2Prop 84 Report

Page 104: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

Safe Drinking Water and Water Quality ProjectsChapter 2

Allocation: Delta Water Quality: San Joaquin

Allocation $: $40,000,000$208,218

$412,272Statewide Set Asides: $620,490 {

Outyear Obligations: $140,000

$140,000

$0

{

PRC §75029(a)Ch. 2

Appropriations, Proposals and Reversions

Statewide, requiring appropriation:

Statewide, not requiring appropriation:

Outyear Program Delivery commitments:

Outyear Cap. Outlay (to complete started projects):Reversions are shown below$0

Outyear Local Asst. commitments:

Grants to implement Delta water quality improvement projects that protect drinking water supplies and reduce or eliminate discharges of subsurface agricultural

drain water from the west side of the San Joaquin Valley.

Dept.: Department of Water

Resources

Other Outyear Support commitments:$0

Committed

$0

$0

$0

$0

Proposed

$0

Prop 1 Reduction $779,510

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3860-001-6051 Portion of support

budget

2010-11 Budget Act $394,000 B0271Agricultural Drainage/Delta Water

Quality Improvement

Enacted 2010-11

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2010-11 Control

Section

Adjustment

($48,218) B0271Agricultural Drainage/Delta Water

Quality Improvement

Enacted 2010-11

3860-001-6051 Portion of support

budget: Natural

Reversion

2010-11 Natural

Reversion

($345,782) B0271Agricultural Drainage/Delta Water

Quality Improvement

Enacted 2012-13

3860-001-6051 Portion of support

budget

2011-12 Budget Act $369,000 B0271Agricultural Drainage/Delta Water

Quality Improvement

Enacted 2011-12

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2011-12 Control

Section

Adjustment

($4,076) B0271Agricultural Drainage/Delta Water

Quality Improvement

Enacted 2011-12

3860-001-6051 Portion of support

budget: Natural

Reversion

2011-12 Natural

Reversion

($337,108) B0271Agricultural Drainage/Delta Water

Quality Improvement

Enacted 2013-14

3860-001-6051 Portion of support

budget

2012-13 Budget Act $369,000 B0271Agricultural Drainage/Delta Water

Quality Improvement

Enacted 2012-13

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2012-13 Control

Section

Adjustment

($9,414) B0271Agricultural Drainage/Delta Water

Quality Improvement

Enacted 2012-13

3860-001-6051 Portion of support

budget: Natural

Reversion

2012-13 Natural

Reversion

$0 B0271Agricultural Drainage/Delta Water

Quality Improvement

Enacted 2017-18

3860-001-6051 Portion of support

budget: Reversion

2012-13 Budget Act ($341,056) B0271Agricultural Drainage/Delta Water

Quality Improvement

Enacted 2016-17

Wednesday, January 29, Page 101 of 3421:20:05 PM Public Resources Code (PRC) Section PRC §75029(a)Ch. 2Prop 84 Report

Page 105: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-001-6051 Portion of support

budget

2013-14 Budget Act $369,000 B0271Agricultural Drainage/Delta Water

Quality Improvement

Enacted 2013-14

3860-001-6051 Portion of support

budget: Reversion

2013-14 Budget Act ($208,197) B0271Agricultural Drainage/Delta Water

Quality Improvement

Enacted 2017-18

3860-001-6051 Portion of support

budget

2014-15 Budget Act $510,000 B0271Agricultural Drainage/Delta Water

Quality Improvement

Enacted 2014-15

3860-001-6051 Portion of support

budget: Natural

Reversion

2014-15 Natural

Reversion

($360,947) B0271Agricultural Drainage/Delta Water

Quality Improvement

Enacted 2016-17

3860-001-6051 Portion of support

budget: Reversion

2014-15 Budget Act ($360,947) B0271Agricultural Drainage/Delta Water

Quality Improvement

Enacted 2017-18

3860-001-6051 Portion of support

budget: Reversion

Reverse

2014-15 Natural

Reversion

$360,947 B0271Agricultural Drainage/Delta Water

Quality Improvement

Enacted 2017-18

3860-001-6051 Portion of support

budget

2015-16 Budget Act $394,000 B0271Agricultural Drainage/Delta Water

Quality Improvement

Enacted 2015-16

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2015-16 Budget Act ($394,000) B0271Agricultural Drainage/Delta Water

Quality Improvement

Enacted 2018-19

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2015-16 Budget Act $394,000 B0271Agricultural Drainage/Delta Water

Quality Improvement

Enacted 2016-17

3860-001-6051 Portion of support

budget: Reversion

2015-16 Budget Act ($271,282) B0271Agricultural Drainage/Delta Water

Quality Improvement

Enacted 2017-18

3860-001-6051 Portion of support

budget

2016-17 Budget Act $395,000 B0271Agricultural Drainage/Delta Water

Quality Improvement

Enacted 2016-17

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2016-17 Control

Section

Adjustment

$13,000 B0271Agricultural Drainage/Delta Water

Quality Improvement

Enacted 2016-17

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2016-17 Budget Act ($126,818) B0271Agricultural Drainage/Delta Water

Quality Improvement

Enacted 2016-17

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2016-17 Budget Act $126,818 B0271Agricultural Drainage/Delta Water

Quality Improvement

Enacted 2019-20

3860-001-6051 Portion of support

budget: Reversion

2016-17 Budget Act ($281,182) B0271Agricultural Drainage/Delta Water

Quality Improvement

Enacted 2017-18

3860-001-6051 Portion of support

budget

2017-18 Budget Act $40,000 B0271Agricultural Drainage/Delta Water

Quality Improvement

Enacted 2017-18

3860-001-6051 Portion of support

budget

2017-18 Budget Act $95,000 B0272Agricultural Drainage/Delta Water

Quality Improvement

Enacted 2017-18

3860-001-6051 Portion of support

budget - Planning

2017-18 Budget Act $180,000 B0273Agricultural Drainage/Delta Water

Quality Improvement

Enacted 2017-18

3860-001-6051 Portion of support

budget

2018-19 Budget Act $80,000 B0273Agricultural Drainage/Delta Water

Quality Improvement

Enacted 2018-19

Wednesday, January 29, Page 102 of 3421:20:05 PM Public Resources Code (PRC) Section PRC §75029(a)Ch. 2Prop 84 Report

Page 106: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-001-6051 Portion of support

budget

2018-19 Budget Act $30,000 B0271Agricultural Drainage/Delta Water

Quality Improvement

Enacted 2018-19

3860-001-6051 Portion of support

budget

2018-19 Budget Act $205,000 B0272Agricultural Drainage/Delta Water

Quality Improvement

Enacted 2018-19

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2018-19 Control

Section

Adjustment

$15,000 B0271Agricultural Drainage/Delta Water

Quality Improvement

Enacted 2018-19

3860-001-6051 Portion of support

budget: Control Section

Adjustment:

Reappropriation

(decrease)

2018-19 Budget Act ($15,000) B0271Agricultural Drainage/Delta Water

Quality Improvement

Enacted 2018-19

3860-001-6051 Portion of support

budget: Control Section

Adjustment:

Reappropriation

(increase)

2018-19 Budget Act $15,000 B0271Agricultural Drainage/Delta Water

Quality Improvement

Enacted 2019-20

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2018-19 Budget Act ($80,000) B0273Agricultural Drainage/Delta Water

Quality Improvement

Enacted 2018-19

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2018-19 Budget Act ($30,000) B0271Agricultural Drainage/Delta Water

Quality Improvement

Enacted 2018-19

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2018-19 Budget Act ($205,000) B0272Agricultural Drainage/Delta Water

Quality Improvement

Enacted 2018-19

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2018-19 Budget Act $80,000 B0273Agricultural Drainage/Delta Water

Quality Improvement

Enacted 2019-20

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2018-19 Budget Act $30,000 B0271Agricultural Drainage/Delta Water

Quality Improvement

Enacted 2019-20

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2018-19 Budget Act $205,000 B0272Agricultural Drainage/Delta Water

Quality Improvement

Enacted 2019-20

3860-001-6051 Portion of support

budget

2019-20 Budget Act $330,000 B0271Agricultural Drainage/Delta Water

Quality Improvement

Enacted 2019-20

3860-101-6051 Portion of local

assistance budget

2010-11 Budget Act $606,000 B0272Agricultural Drainage/Delta Water

Quality Improvement Program

Enacted 2010-11

3860-101-6051 Portion of local

assistance budget:

Natural Reversion

2010-11 Natural

Reversion

($606,000) B0272Agricultural Drainage/Delta Water

Quality Improvement Program

Enacted 2014-15

3860-101-6051 Portion of local

assistance budget

2014-15 Budget Act $36,600,000 B0272Agricultural Drainage/Delta Water

Quality Improvement

Enacted 2014-15

Wednesday, January 29, Page 103 of 3421:20:05 PM Public Resources Code (PRC) Section PRC §75029(a)Ch. 2Prop 84 Report

Page 107: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-101-6051 Portion of local

assistance budget:

Reappropriation

(decrease)

2014-15 Budget Act ($36,600,000) B0272Agricultural Drainage/Delta Water

Quality Improvement

Enacted 2017-18

3860-101-6051 Portion of local

assistance budget:

Reappropriation

(increase)

2014-15 Budget Act $36,600,000 B0272Agricultural Drainage/Delta Water

Quality Improvement

Enacted 2019-20

Sum: $38,180,738Enacted

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2013-14 Budget Act ($160,803) B0271Agricultural Drainage/Delta Water

Quality Improvement

Enacted/Not 2017-18

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2013-14 Budget Act $160,803 B0271Agricultural Drainage/Delta Water

Quality Improvement

Enacted/Not 2019-20

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2019-20 Control

Section

Adjustment

$18,000 B0271Agricultural Drainage/Delta Water

Quality Improvement

Enacted/Not 2019-20

Sum: $18,000Enacted/Not Posted

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3860-001-6051 (1) Portion of support

budget

2020-21 Budget Act $365,000 B0271Agricultural Drainage/Delta Water

Quality Improvement

Proposed 2020-21

Sum: $365,000Proposed

Sum: $38,563,738

($103,738)

Balance for Delta Water Quality: San Joaquin:

Wednesday, January 29, Page 104 of 3421:20:05 PM Public Resources Code (PRC) Section PRC §75029(a)Ch. 2Prop 84 Report

Page 108: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

Safe Drinking Water and Water Quality ProjectsChapter 2

Allocation: Agricultural Discharge

Allocation $: $15,000,000$78,082

$154,602Statewide Set Asides: $232,684 {

Outyear Obligations: $0

$0

$0

{

PRC §75029.5Ch. 2

Appropriations, Proposals and Reversions

Statewide, requiring appropriation:

Statewide, not requiring appropriation:

Outyear Program Delivery commitments:

Outyear Cap. Outlay (to complete started projects):Reversions are shown below$0

Outyear Local Asst. commitments:

Grants to public agencies and non profits for projects that reduce the discharge of pollutants from agricultural operations into surface waters.

Dept.: State Water Resources Control

Board

Other Outyear Support commitments:$0

Committed

$0

$0

$0

$0

Proposed

$0

Prop 1 Reduction $292,316

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3940-001-6051 Portion of support

budget

2007-08 Budget Act $260,071 B0071Agricultural Water Quality Grant

Program

Enacted 2007-08

3940-001-6051 Portion of support

budget: Natural

Reversion

2007-08 Natural

Reversion

($52,798) B0071Agricultural Water Quality Grant

Program

Enacted 2009-10

3940-001-6051 Portion of support

budget

2008-09 Budget Act $260,071 B0071Agricultural Water Quality Grant

Program

Enacted 2008-09

3940-001-6051 Portion of support

budget: Reversion

2008-09 Budget Act ($56,164) B0071Agricultural Water Quality Grant

Program

Enacted 2010-11

3940-001-6051 Portion of support

budget

2009-10 Budget Act $229,858 B0071Agricultural Water Quality Grant

Program

Enacted 2009-10

3940-001-6051 Portion of support

budget: Control Section

Adjustment

2009-10 Control

Section

Adjustment

($114,929) B0071Agricultural Water Quality Grant

Program

Enacted 2009-10

3940-001-6051 Portion of support

budget: Reversion

2009-10 Budget Act ($114,929) B0071Agricultural Water Quality Grant

Program

Enacted 2010-11

3940-001-6051 Portion of support

budget

2010-11 Budget Act $114,929 B0071Agricultural Water Quality Grant

Program

Enacted 2010-11

3940-001-6051 Portion of support

budget: Control Section

Adjustment

2010-11 Control

Section

Adjustment

($1,592) B0071Agricultural Water Quality Grant

Program

Enacted 2010-11

3940-001-6051 Portion of support

budget: Reversion

2010-11 Budget Act ($113,337) B0071Agricultural Water Quality Grant

Program

Enacted 2012-13

3940-001-6051 Portion of support

budget

2011-12 Budget Act $113,929 B0071Agricultural Water Quality Grant

Program

Enacted 2011-12

Wednesday, January 29, Page 105 of 3421:20:05 PM Public Resources Code (PRC) Section PRC §75029.5Ch. 2Prop 84 Report

Page 109: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3940-001-6051 Portion of support

budget: Control Section

Adjustment

2011-12 Control

Section

Adjustment

($350) B0071Agricultural Water Quality Grant

Program

Enacted 2011-12

3940-001-6051 Portion of support

budget: Reversion

2011-12 Budget Act ($113,579) B0071Agricultural Water Quality Grant

Program

Enacted 2013-14

3940-001-6051 Portion of support

budget

2012-13 Budget Act $113,900 B0071Agricultural Water Quality Grant

Program

Enacted 2012-13

3940-001-6051 Portion of support

budget: Control Section

Adjustment

2012-13 Control

Section

Adjustment

($365) B0071Agricultural Water Quality Grant

Program

Enacted 2012-13

3940-001-6051 Portion of support

budget: Reversion

2012-13 Budget Act ($113,535) B0071Agricultural Water Quality Grant

Program

Enacted 2014-15

3940-001-6051 Portion of support

budget

2013-14 Budget Act $113,900 B0071Agricultural Water Quality Grant

Program

Enacted 2013-14

3940-001-6051 Portion of support

budget: Reversion

2013-14 Budget Act ($113,900) B0071Agricultural Water Quality Grant

Program

Enacted 2014-15

3940-101-6051 Portion of local

assistance budget

2007-08 Budget Act $6,000,000 B0072Agricultural Water Quality Grant

Program

Enacted 2007-08

3940-101-6051 Portion of local

assistance budget:

Reversion

2007-08 Budget Act ($6,000,000) B0072Agricultural Water Quality Grant

Program

Enacted 2011-12

3940-101-6051 Portion of local

assistance budget

2008-09 Budget Act $9,065,000 B0072Agricultural Water Quality Grant

Program

Enacted 2008-09

3940-101-6051 Portion of local

assistance budget

2011-12 Budget Act $4,660,000 B0072Agricultural Water Quality Grant

Program

Enacted 2011-12

Sum: $14,136,180Enacted

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3940-101-6051 Portion of local

assistance budget:

Reappropriation

(decrease)

2008-09 Budget Act ($9,065,000) B0072Agricultural Water Quality Grant

Program

Enacted/Not 2016-17

3940-101-6051 Portion of local

assistance budget:

Reappropriation

(increase)

2008-09 Budget Act $9,065,000 B0072Agricultural Water Quality Grant

Program

Enacted/Not 2019-20

3940-101-6051 Portion of local

assistance budget:

Reappropriation

(decrease)

2011-12 Budget Act ($4,660,000) B0072Agricultural Water Quality Grant

Program

Enacted/Not 2016-17

3940-101-6051 Portion of local

assistance budget:

Reappropriation

(increase)

2011-12 Budget Act $4,660,000 B0072Agricultural Water Quality Grant

Program

Enacted/Not 2019-20

Sum: $0Enacted/Not Posted

Wednesday, January 29, Page 106 of 3421:20:05 PM Public Resources Code (PRC) Section PRC §75029.5Ch. 2Prop 84 Report

Page 110: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

Sum: $14,136,180

$338,820

Balance for Agricultural Discharge:

Wednesday, January 29, Page 107 of 3421:20:05 PM Public Resources Code (PRC) Section PRC §75029.5Ch. 2Prop 84 Report

Page 111: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

Summary for Chapter 2

Enacted/Proposed: $1,465,353,543

Allocation: $15,000,000

Set Asides: $232,684

Outyears: $0

Balance: $338,820

Safe Drinking Water and Water Quality Projects

Prop 1 Reduction: $292,316

Wednesday, January 29, Page 108 of 3421:20:05 PM Public Resources Code (PRC) Section PRC §75029.5Ch. 2Prop 84 Report

Page 112: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

Flood ControlChapter 3

Allocation: Flood Prevention Planning

Allocation $: $30,000,000$156,164

$309,204Statewide Set Asides: $465,367 {

Outyear Obligations: $0

$0

$0

{

PRC §75031Ch. 3

Appropriations, Proposals and Reversions

Statewide, requiring appropriation:

Statewide, not requiring appropriation:

Outyear Program Delivery commitments:

Outyear Cap. Outlay (to complete started projects):Reversions are shown below$0

Outyear Local Asst. commitments:

For purposes of floodplain mapping, assisting local land-use planning and to avoid or reduce future flood risks and damages. Per §75032.4, funds continuously

appropriated to the Department.

Dept.: Department of Water

Resources

Other Outyear Support commitments:$0

Committed

$0

$0

$0

$0

Proposed

$0

Prop 1 Reduction $584,633

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3860-501-6051 Continuous

appropriation

2006-07 Statutory

from Bond

$2,950,000 B1362Alluvial Fan Task Force

Implementation

Enacted 2006-07

3860-501-6051 Continuous

appropriation

2006-07 Statutory

from Bond

$1,050,000 B008NExcess continuous appropriation

authority (do not spend)

Enacted 2006-07

3860-501-6051 Continuous

appropriation

2006-07 Statutory

from Bond

$26,000,000 B0082Flood Plain Evaluation and

Delineation

Enacted 2006-07

Sum: $30,000,000Enacted

Sum: $30,000,000

($1,050,000)

Balance for Flood Prevention Planning:

Wednesday, January 29, Page 109 of 3421:20:05 PM Public Resources Code (PRC) Section PRC §75031Ch. 3Prop 84 Report

Page 113: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

Flood ControlChapter 3

Allocation: Flood Control Projects

Allocation $: $275,000,000$1,431,501

$2,834,368Statewide Set Asides: $4,265,869 {

Outyear Obligations: $0

$0

$0

{

PRC §75032Ch. 3

Appropriations, Proposals and Reversions

Statewide, requiring appropriation:

Statewide, not requiring appropriation:

Outyear Program Delivery commitments:

Outyear Cap. Outlay (to complete started projects):Reversions are shown below$0

Outyear Local Asst. commitments:

Available to the Dept. of Water Resources for the following types of flood control projects: (a) Inspect and evaluate the integrity and capability of existing flood

control project facilities, develop an economically viable flood control rehabilitation plan; (b) Improve, construct, modify, and relocate flood control levees, weirs

or bypasses; (c) Improve the Department`s emergency response capability; and (d) Environmental mitigation and infrastructure relocation costs related to these

projects. Per §75032.4, funds continuously appropriated to the Department.

Dept.: Department of Water

Resources

Other Outyear Support commitments:$0

Committed

$0

$0

$0

$0

Proposed

$0

Prop 1 Reduction $5,359,131

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3860-502-6051 Continuous

appropriation

2006-07 Statutory

from Bond

$29,000,000 B0102California Flood PlanEnacted 2006-07

3860-502-6051 Continuous

appropriation

2006-07 Statutory

from Bond

$14,460,118 B0092Critical Repairs for Nonproject

Levees

Enacted 2006-07

3860-502-6051 Continuous

appropriation

2006-07 Statutory

from Bond

$2,000,000 B1322Delta levee emergency responseEnacted 2006-07

3860-502-6051 Continuous

appropriation

2006-07 Statutory

from Bond

$41,529,185 B1322Enhanced Flood Response and

Emergency Preparedness

Enacted 2006-07

3860-502-6051 Continuous

appropriation

2006-07 Statutory

from Bond

$9,625,000 B135NExcess continuous appropriation

authority (do not spend)

Enacted 2006-07

3860-502-6051 Continuous

appropriation

2006-07 Statutory

from Bond

$100,000 B1352Frazier Creek/Strathmore Creek

Feasibility Study

Enacted 2006-07

3860-502-6051 Continuous

appropriation

2006-07 Statutory

from Bond

$2,000,000 B1331New Feasibility Studies and Levee

Evaluations

Enacted 2006-07

3860-502-6051 Continuous

appropriation

2006-07 Statutory

from Bond

$66,695,882 B1332New Feasibility Studies and Levee

Evaluations

Enacted 2006-07

3860-502-6051 Continuous

appropriation

2006-07 Statutory

from Bond

$59,490,000 B0092Reserve for Critical ProjectsEnacted 2006-07

3860-502-6051 Continuous

appropriation

2006-07 Statutory

from Bond

$100,000 B1352Rock Creek/Keefer Slough

Feasibility Study

Enacted 2006-07

3860-502-6051 Continuous

appropriation

2006-07 Statutory

from Bond

$1,340,000 B1472Sediment Removal ProgramEnacted 2006-07

Wednesday, January 29, Page 110 of 3421:20:05 PM Public Resources Code (PRC) Section PRC §75032Ch. 3Prop 84 Report

Page 114: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-502-6051 Continuous

appropriation

2006-07 Statutory

from Bond

$3,050,815 B0091State-Federal Flood Control

Modifications

Enacted 2006-07

3860-502-6051 Continuous

appropriation

2006-07 Statutory

from Bond

$44,550,000 B0092State-Federal Flood Control

Modifications

Enacted 2006-07

3860-502-6051 Continuous

appropriation

2006-07 Statutory

from Bond

$959,000 B1352West Stanislaus County Feasibility

Study - Orestimba Creek Project

Enacted 2006-07

3860-502-6051 Continuous

appropriation

2006-07 Statutory

from Bond

$100,000 B1352White River/Deer Creek Feasibility

Study

Enacted 2006-07

Sum: $275,000,000Enacted

Sum: $275,000,000

($9,625,000)

Balance for Flood Control Projects:

Wednesday, January 29, Page 111 of 3421:20:05 PM Public Resources Code (PRC) Section PRC §75032Ch. 3Prop 84 Report

Page 115: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

Flood ControlChapter 3

Allocation: Flood Protection Corridor

Allocation $: $40,000,000$208,218

$412,272Statewide Set Asides: $620,490 {

Outyear Obligations: $540,000

$0

$0

{

PRC §75032.5Ch. 3

Appropriations, Proposals and Reversions

Statewide, requiring appropriation:

Statewide, not requiring appropriation:

Outyear Program Delivery commitments:

Outyear Cap. Outlay (to complete started projects):Reversions are shown below$0

Outyear Local Asst. commitments:

Available to the Dept. of Water Resources for Flood Protection Corridor projects consistent with Water Code §79037.

Dept.: Department of Water

Resources

Other Outyear Support commitments:$540,000

Committed

$0

$0

$0

$0

Proposed

$0

Prop 1 Reduction $779,510

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3860-001-6051 Portion of support

budget

2007-08 Budget Act $631,000 B0111Flood Protection Corridor

Program/Floodway Corridor

Program

Enacted 2007-08

3860-001-6051 Portion of support

budget

2007-08 Budget Act $369,000 B0112Flood Protection Corridor

Program/Floodway Corridor

Program

Enacted 2007-08

3860-001-6051 Portion of support

budget: Natural

Reversion

2007-08 Natural

Reversion

($62,547) B0111Flood Protection Corridor

Program/Floodway Corridor

Program

Enacted 2009-10

3860-001-6051 Portion of support

budget: Natural

Reversion

2007-08 Natural

Reversion

($325,454) B0112Flood Protection Corridor

Program/Floodway Corridor

Program

Enacted 2009-10

3860-001-6051 Portion of support

budget

2008-09 Budget Act $500,000 B0111Flood Protection Corridor ProgramEnacted 2008-09

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2008-09 Control

Section

Adjustment

($17,861) B0111Flood Protection Corridor ProgramEnacted 2008-09

3860-001-6051 Portion of support

budget: Natural

Reversion

2008-09 Natural

Reversion

($1) B0111Flood Protection Corridor ProgramEnacted 2012-13

3860-001-6051 Portion of support

budget: Reversion

2008-09 Budget Act ($157,866) B0111Flood Protection Corridor ProgramEnacted 2012-13

3860-001-6051 Portion of support

budget: Reversion

Reverse

2008-09 Budget Act $78,933 B0111Flood Protection Corridor ProgramEnacted 2012-13

Wednesday, January 29, Page 112 of 3421:20:05 PM Public Resources Code (PRC) Section PRC §75032.5Ch. 3Prop 84 Report

Page 116: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-001-6051 Portion of support

budget

2009-10 Budget Act $198,819 B0111Flood Protection Corridor ProgramEnacted 2009-10

3860-001-6051 Portion of support

budget

2009-10 Budget Act $301,181 B0112Flood Protection Corridor ProgramEnacted 2009-10

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2009-10 Control

Section

Adjustment

($49,118) B0111Flood Protection Corridor ProgramEnacted 2009-10

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2009-10 Control

Section

Adjustment

($74,406) B0112Flood Protection Corridor ProgramEnacted 2009-10

3860-001-6051 Portion of support

budget: Natural

Reversion

2009-10 Natural

Reversion

$0 B0111Flood Protection Corridor ProgramEnacted 2011-12

3860-001-6051 Portion of support

budget: Natural

Reversion

2009-10 Natural

Reversion

$0 B0112Flood Protection Corridor ProgramEnacted 2011-12

3860-001-6051 Portion of support

budget

2010-11 Budget Act $289,051 B0111Flood Protection Corridor ProgramEnacted 2010-11

3860-001-6051 Portion of support

budget

2010-11 Budget Act $204,949 B0112Flood Protection Corridor ProgramEnacted 2010-11

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2010-11 Control

Section

Adjustment

($2,102) B0111Flood Protection Corridor ProgramEnacted 2010-11

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2010-11 Control

Section

Adjustment

($1,491) B0112Flood Protection Corridor ProgramEnacted 2010-11

3860-001-6051 Portion of support

budget: Natural

Reversion

2010-11 Natural

Reversion

($137,048) B0111Flood Protection Corridor ProgramEnacted 2012-13

3860-001-6051 Portion of support

budget: Natural

Reversion

2010-11 Natural

Reversion

($97,172) B0112Flood Protection Corridor ProgramEnacted 2012-13

3860-001-6051 Portion of support

budget

2011-12 Budget Act $403,190 B0111Flood Protection Corridor ProgramEnacted 2011-12

3860-001-6051 Portion of support

budget

2011-12 Budget Act $89,147 B0112Flood Protection Corridor ProgramEnacted 2011-12

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2011-12 Control

Section

Adjustment

($4,206) B0111Flood Protection Corridor ProgramEnacted 2011-12

3860-001-6051 Portion of support

budget: Natural

Reversion

2011-12 Natural

Reversion

($376,697) B0111Flood Protection Corridor ProgramEnacted 2013-14

3860-001-6051 Portion of support

budget

2012-13 Budget Act $28,633 B0111Flood Protection Corridor ProgramEnacted 2012-13

3860-001-6051 Portion of support

budget

2012-13 Budget Act $97,704 B0112Flood Protection Corridor ProgramEnacted 2012-13

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2012-13 Control

Section

Adjustment

($4,207) B0111Flood Protection Corridor ProgramEnacted 2012-13

Wednesday, January 29, Page 113 of 3421:20:05 PM Public Resources Code (PRC) Section PRC §75032.5Ch. 3Prop 84 Report

Page 117: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-001-6051 Portion of support

budget: Natural

Reversion

2012-13 Natural

Reversion

($148) B0111Flood Protection Corridor ProgramEnacted 2014-15

3860-001-6051 Portion of support

budget

2013-14 Budget Act $25,267 B0111Flood Protection Corridor ProgramEnacted 2013-14

3860-001-6051 Portion of support

budget

2013-14 Budget Act $101,070 B0112Flood Protection Corridor ProgramEnacted 2013-14

3860-001-6051 Portion of support

budget: Natural

Reversion

2013-14 Natural

Reversion

($6) B0111Flood Protection Corridor ProgramEnacted 2015-16

3860-001-6051 Portion of support

budget: Natural

Reversion

2013-14 Natural

Reversion

($24) B0112Flood Protection Corridor ProgramEnacted 2015-16

3860-001-6051 Portion of support

budget

2014-15 Budget Act $25,267 B0111Flood Protection Corridor ProgramEnacted 2014-15

3860-001-6051 Portion of support

budget

2014-15 Budget Act $101,070 B0112Flood Protection Corridor ProgramEnacted 2014-15

3860-001-6051 Portion of support

budget: Natural

Reversion

2014-15 Natural

Reversion

($848) B0111Flood Protection Corridor ProgramEnacted 2016-17

3860-001-6051 Portion of support

budget: Natural

Reversion

2014-15 Natural

Reversion

($3,393) B0112Flood Protection Corridor ProgramEnacted 2016-17

3860-001-6051 Portion of support

budget

2015-16 Budget Act $0 B0111Flood Protection Corridor ProgramEnacted 2015-16

3860-001-6051 Portion of support

budget

2016-17 Budget Act $334,000 B0111Flood Protection Corridor ProgramEnacted 2016-17

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2016-17 Budget Act ($668,000) B0111Flood Protection Corridor ProgramEnacted 2016-17

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2016-17 Budget Act $668,000 B0111Flood Protection Corridor ProgramEnacted 2018-19

3860-001-6051 Portion of support

budget: Reversion

2016-17 Budget Act ($91,000) B0111Flood Protection Corridor ProgramEnacted 2019-20

3860-001-6051 Portion of support

budget

2017-18 Budget Act $22,000 B0113Flood Protection Corridor Program -

Planning

Enacted 2017-18

3860-001-6051 Portion of support

budget

2017-18 Budget Act $17,000 B0111Flood Protection Corridor Program -

Program Delivery

Enacted 2017-18

3860-001-6051 Portion of support

budget

2017-18 Budget Act $313,000 B0112Flood Protection Corridor Program -

Projects

Enacted 2017-18

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2017-18 Control

Section

Adjustment

$999 B0113Flood Protection Corridor Program -

Planning

Enacted 2017-18

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2017-18 Control

Section

Adjustment

$773 B0111Flood Protection Corridor Program -

Program Delivery

Enacted 2017-18

Wednesday, January 29, Page 114 of 3421:20:05 PM Public Resources Code (PRC) Section PRC §75032.5Ch. 3Prop 84 Report

Page 118: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2017-18 Control

Section

Adjustment

$14,228 B0112Flood Protection Corridor Program -

Projects

Enacted 2017-18

3860-001-6051 Portion of support

budget: Control Section

Adjustment:

Reappropriation

(decrease)

2017-18 Budget Act ($999) B0113Flood Protection Corridor Program -

Planning

Enacted 2017-18

3860-001-6051 Portion of support

budget: Control Section

Adjustment:

Reappropriation

(decrease)

2017-18 Budget Act ($773) B0111Flood Protection Corridor Program -

Program Delivery

Enacted 2017-18

3860-001-6051 Portion of support

budget: Control Section

Adjustment:

Reappropriation

(decrease)

2017-18 Budget Act ($14,228) B0112Flood Protection Corridor Program -

Projects

Enacted 2017-18

3860-001-6051 Portion of support

budget: Control Section

Adjustment:

Reappropriation

(increase)

2017-18 Budget Act $999 B0113Flood Protection Corridor Program -

Planning

Enacted 2018-19

3860-001-6051 Portion of support

budget: Control Section

Adjustment:

Reappropriation

(increase)

2017-18 Budget Act $773 B0111Flood Protection Corridor Program -

Program Delivery

Enacted 2018-19

3860-001-6051 Portion of support

budget: Control Section

Adjustment:

Reappropriation

(increase)

2017-18 Budget Act $14,228 B0112Flood Protection Corridor Program -

Projects

Enacted 2018-19

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2017-18 Budget Act ($17,000) B0111Enacted 2017-18

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2017-18 Budget Act ($22,000) B0113Flood Protection Corridor Program -

Planning

Enacted 2017-18

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2017-18 Budget Act ($313,000) B0112Flood Protection Corridor Program -

Projects

Enacted 2017-18

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2017-18 Budget Act $17,000 B0111Enacted 2018-19

Wednesday, January 29, Page 115 of 3421:20:05 PM Public Resources Code (PRC) Section PRC §75032.5Ch. 3Prop 84 Report

Page 119: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2017-18 Budget Act $22,000 B0113Flood Protection Corridor Program -

Planning

Enacted 2018-19

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2017-18 Budget Act $313,000 B0112Flood Protection Corridor Program -

Projects

Enacted 2018-19

3860-001-6051 Portion of support

budget

2018-19 Budget Act $23,000 B0113Flood Protection Corridor Program -

Planning

Enacted 2018-19

3860-001-6051 Portion of support

budget

2018-19 Budget Act $17,773 B0111Flood Protection Corridor Program -

Program Delivery

Enacted 2018-19

3860-001-6051 Portion of support

budget

2018-19 Budget Act $327,227 B0112Flood Protection Corridor Program -

Projects

Enacted 2018-19

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2018-19 Control

Section

Adjustment

$4,000 B0112Flood Protection Corridor Program -

Projects

Enacted 2018-19

3860-001-6051 Portion of support

budget: Control Section

Adjustment:

Reappropriation

(decrease)

2018-19 Budget Act ($4,000) B0112Flood Protection Corridor Program -

Projects

Enacted 2018-19

3860-001-6051 Portion of support

budget: Control Section

Adjustment:

Reappropriation

(increase)

2018-19 Budget Act $4,000 B0112Flood Protection Corridor Program -

Projects

Enacted 2019-20

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2018-19 Budget Act ($23,000) B0113Flood Protection Corridor Program -

Planning

Enacted 2018-19

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2018-19 Budget Act ($17,773) B0111Flood Protection Corridor Program -

Program Delivery

Enacted 2018-19

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2018-19 Budget Act ($327,227) B0112Flood Protection Corridor Program -

Projects

Enacted 2018-19

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2018-19 Budget Act $23,000 B0113Flood Protection Corridor Program -

Planning

Enacted 2019-20

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2018-19 Budget Act $17,773 B0111Flood Protection Corridor Program -

Program Delivery

Enacted 2019-20

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2018-19 Budget Act $327,227 B0112Flood Protection Corridor Program -

Projects

Enacted 2019-20

Wednesday, January 29, Page 116 of 3421:20:05 PM Public Resources Code (PRC) Section PRC §75032.5Ch. 3Prop 84 Report

Page 120: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-001-6051 Portion of support

budget

2019-20 Budget Act $540,000 B0113Flood Protection Corridor Program -

Planning

Enacted 2019-20

3860-001-6051 Portion of support

budget

2019-20 Budget Act $4,000 B0112Flood Protection Corridor Program -

Projects

Enacted 2019-20

3860-001-6051 Portion of support

budget: Reduction

2019-20 Budget

Revision

($4,000) B0112Flood Protection Corridor Program -

Projects

Enacted 2019-20

3860-101-6051 Portion of local

assistance budget

2007-08 Budget Act $24,000,000 B0112Flood Protection Corridor

Program/Floodway Corridor

Program

Enacted 2007-08

3860-101-6051 Portion of local

assistance budget:

Natural Reversion

2007-08 Natural

Reversion

($39,109,171) B0112Flood Protection Corridor

Program/Floodway Corridor

Program

Enacted 2009-10

3860-101-6051 Portion of local

assistance budget:

Reappropriation

(decrease)

2007-08 Budget Act ($4,303,264) B0112Flood Protection Corridor

Program/Floodway Corridor

Program

Enacted 2016-17

3860-101-6051 Portion of local

assistance budget:

Reappropriation

(increase)

2007-08 Budget Act $4,303,264 B0112Flood Protection Corridor

Program/Floodway Corridor

Program

Enacted 2018-19

3860-101-6051 Portion of local

assistance budget:

Reversion

2007-08 Budget Act ($6,553,943) B0112Flood Protection Corridor

Program/Floodway Corridor

Program

Enacted 2015-16

3860-101-6051 Portion of local

assistance budget:

Reversion Reverse

2007-08 Natural

Reversion

$39,109,171 B0112Flood Protection Corridor

Program/Floodway Corridor

Program

Enacted 2010-11

3860-101-6051 Portion of local

assistance budget

2008-09 Budget Act $12,100,000 B0112Flood Protection Corridor ProgramEnacted 2008-09

3860-101-6051 Portion of local

assistance budget:

Natural Reversion

2008-09 Natural

Reversion

($9,487,590) B0112Flood Protection Corridor ProgramEnacted 2014-15

3860-101-6051 Portion of local

assistance budget:

Reappropriation

(decrease)

2008-09 Budget Act ($3,300,795) B0112Flood Protection Corridor ProgramEnacted 2017-18

3860-101-6051 Portion of local

assistance budget:

Reappropriation

(increase)

2008-09 Budget Act $3,300,795 B0112Flood Protection Corridor ProgramEnacted 2019-20

3860-101-6051 Portion of local

assistance budget:

Reversion

2008-09 Budget Act ($8,799,205) B0112Flood Protection Corridor ProgramEnacted 2014-15

3860-101-6051 Portion of local

assistance budget:

Reversion Reverse

2008-09 Natural

Reversion

$9,487,590 B0112Flood Protection Corridor ProgramEnacted 2015-16

3860-101-6051 Portion of local

assistance budget

2015-16 Budget Act $9,600,000 B0112Flood Protection Corridor ProgramEnacted 2015-16

Wednesday, January 29, Page 117 of 3421:20:05 PM Public Resources Code (PRC) Section PRC §75032.5Ch. 3Prop 84 Report

Page 121: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-101-6051 Portion of local

assistance budget:

Reappropriation

(decrease)

2015-16 Budget Act ($9,600,000) B0112Flood Protection Corridor ProgramEnacted 2016-17

3860-101-6051 Portion of local

assistance budget:

Reappropriation

(increase)

2015-16 Budget Act $9,600,000 B0112Flood Protection Corridor ProgramEnacted 2018-19

3860-101-6051 Portion of local

assistance budget

2018-19 Budget Act $2,000,000 B0112Flood Protection Corridor Program -

Projects

Enacted 2018-19

3860-101-6051 Portion of local

assistance

2019-20 Budget Act $1,500,000 B0112Flood Protection Corridor Program -

Projects

Enacted 2019-20

Sum: $37,499,538Enacted

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3860-001-6051 (2) Portion of support

budget

2020-21 Budget Act $540,000 B0113Flood Protection Corridor Program -

Planning

Proposed 2020-21

Sum: $540,000Proposed

Sum: $38,039,538

$20,462

Balance for Flood Protection Corridor:

Wednesday, January 29, Page 118 of 3421:20:05 PM Public Resources Code (PRC) Section PRC §75032.5Ch. 3Prop 84 Report

Page 122: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

Flood ControlChapter 3

Allocation: Flood Control Projects: Delta

Allocation $: $275,000,000$1,431,501

$2,834,368Statewide Set Asides: $4,265,869 {

Outyear Obligations: $7,988,000

$394,000

$0

{

PRC §75033Ch. 3

Appropriations, Proposals and Reversions

Statewide, requiring appropriation:

Statewide, not requiring appropriation:

Outyear Program Delivery commitments:

Outyear Cap. Outlay (to complete started projects):Reversions are shown below$0

Outyear Local Asst. commitments:

Available to the Dept. of Water Resources for flood control projects in the Delta designed to increase Department`s ability to respond to levee breaches and reduce

the potential for levee failures. Funds available for: (a) Projects to improve emergency response preparedness; (b) Local assistance under the delta levee

maintenance subventions program; (c) Special flood protection projects under Chapter 2 of Part 4.8 of Division 6 of the Water Code; and (d) All projects subject

to provisions of Water Code §79050.

Dept.: Department of Water

Resources

Other Outyear Support commitments:$7,594,000

Committed

$0

$0

$0

$0

Proposed

$0

Prop 1 Reduction $5,359,131

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3860-001-6051 Portion of support

budget

2007-08 Budget Act $122,021 B0121Delta Levees System IntegrityEnacted 2007-08

3860-001-6051 Portion of support

budget

2007-08 Budget Act $4,202,979 B0122Delta Levees System IntegrityEnacted 2007-08

3860-001-6051 Portion of support

budget

2007-08 Budget Act $2,045,000 B0122DRMS Concepts AugmentationEnacted 2007-08

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2007-08 Control

Section

Adjustment

$196,479 B0121Delta Levees System IntegrityEnacted 2007-08

3860-001-6051 Portion of support

budget: Natural

Reversion

2007-08 Natural

Reversion

($79,691) B0121Delta Levees System IntegrityEnacted 2009-10

3860-001-6051 Portion of support

budget: Natural

Reversion

2007-08 Natural

Reversion

($1,484,316) B0122Delta Levees System IntegrityEnacted 2009-10

3860-001-6051 Portion of support

budget: Natural

Reversion

2007-08 Natural

Reversion

($1,813,285) B0122DRMS Concepts AugmentationEnacted 2009-10

3860-001-6051 Portion of support

budget

2008-09 Budget Act $2,518,474 B0121Delta Levees System IntegrityEnacted 2008-09

3860-001-6051 Portion of support

budget

2008-09 Budget Act $3,976,000 B0122Delta Levees System IntegrityEnacted 2008-09

Wednesday, January 29, Page 119 of 3421:20:05 PM Public Resources Code (PRC) Section PRC §75033Ch. 3Prop 84 Report

Page 123: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-001-6051 Portion of support

budget

2008-09 Budget Act $2,005,526 B0122DRMS Concepts AugmentationEnacted 2008-09

3860-001-6051 Portion of support

budget

2008-09 Budget Act $1,451,000 B0121Flood Control Projects - DeltaEnacted 2008-09

3860-001-6051 Portion of support

budget

2008-09 Budget Act $1,000,000 B0122Programmatic Habitat RestorationEnacted 2008-09

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2008-09 Control

Section

Adjustment

($106,710) B0121Delta Levees System IntegrityEnacted 2008-09

3860-001-6051 Portion of support

budget: Natural

Reversion

2008-09 Natural

Reversion

($423,476) B0121Delta Levees System IntegrityEnacted 2012-13

3860-001-6051 Portion of support

budget: Natural

Reversion

2008-09 Natural

Reversion

($3,976,000) B0122Delta Levees System IntegrityEnacted 2012-13

3860-001-6051 Portion of support

budget: Natural

Reversion

2008-09 Natural

Reversion

($545,327) B0122DRMS Concepts AugmentationEnacted 2012-13

3860-001-6051 Portion of support

budget: Reversion

2008-09 Budget Act ($1,453,000) B0122DRMS Concepts AugmentationEnacted 2010-11

3860-001-6051 Portion of support

budget: Reversion

2008-09 Budget Act ($1,451,000) B0121Flood Control Projects - DeltaEnacted 2010-11

3860-001-6051 Portion of support

budget: Reversion

2008-09 Budget Act ($1,000,000) B0122Programmatic Habitat RestorationEnacted 2010-11

3860-001-6051 Portion of support

budget

2009-10 Budget Act $1,986,000 B0121Delta Levees System IntegrityEnacted 2009-10

3860-001-6051 Portion of support

budget

2009-10 Budget Act $1,029,000 B0121Dutch Slough Tidal Marsh Habitat

Restoration

Enacted 2009-10

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2009-10 Control

Section

Adjustment

($356,182) B0121Delta Levees System IntegrityEnacted 2009-10

3860-001-6051 Portion of support

budget: Natural

Reversion

2009-10 Natural

Reversion

($1,629,818) B0121Delta Levees System IntegrityEnacted 2011-12

3860-001-6051 Portion of support

budget: Natural

Reversion

2009-10 Natural

Reversion

($1,029,000) B0121Dutch Slough Tidal Marsh Habitat

Restoration

Enacted 2011-12

3860-001-6051 Portion of support

budget

2010-11 Budget Act $104,000 B0121Dutch Slough Tidal Marsh Habitat

Restoration

Enacted 2010-11

3860-001-6051 Portion of support

budget

2010-11 Budget Act $1,436,000 B0121Flood Control Projects - DeltaEnacted 2010-11

3860-001-6051 Portion of support

budget

2010-11 Budget Act $535,000 B0122Programmatic Habitat RestorationEnacted 2010-11

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2010-11 Control

Section

Adjustment

($18,295) B0121Dutch Slough Tidal Marsh Habitat

Restoration

Enacted 2010-11

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2010-11 Control

Section

Adjustment

($240,246) B0121Flood Control Projects - DeltaEnacted 2010-11

Wednesday, January 29, Page 120 of 3421:20:05 PM Public Resources Code (PRC) Section PRC §75033Ch. 3Prop 84 Report

Page 124: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2010-11 Control

Section

Adjustment

($94,112) B0122Programmatic Habitat RestorationEnacted 2010-11

3860-001-6051 Portion of support

budget: Natural

Reversion

2010-11 Natural

Reversion

($8,047) B0122Programmatic Habitat RestorationEnacted 2012-13

3860-001-6051 Portion of support

budget

2011-12 Budget Act $94,031 B0121Dutch Slough Tidal Marsh Habitat

Restoration

Enacted 2011-12

3860-001-6051 Portion of support

budget

2011-12 Budget Act $1,311,914 B0121Flood Control Projects - DeltaEnacted 2011-12

3860-001-6051 Portion of support

budget

2011-12 Budget Act $483,718 B0122Programmatic Habitat RestorationEnacted 2011-12

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2011-12 Control

Section

Adjustment

($1,006) B0121Dutch Slough Tidal Marsh Habitat

Restoration

Enacted 2011-12

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2011-12 Control

Section

Adjustment

($19,661) B0121Flood Control Projects - DeltaEnacted 2011-12

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2011-12 Control

Section

Adjustment

($4,942) B0122Programmatic Habitat RestorationEnacted 2011-12

3860-001-6051 Portion of support

budget: Natural

Reversion

2011-12 Natural

Reversion

($42,384) B0121Dutch Slough Tidal Marsh Habitat

Restoration

Enacted 2013-14

3860-001-6051 Portion of support

budget: Natural

Reversion

2011-12 Natural

Reversion

($182,484) B0121Flood Control Projects - DeltaEnacted 2013-14

3860-001-6051 Portion of support

budget: Natural

Reversion

2011-12 Natural

Reversion

($89,124) B0122Programmatic Habitat RestorationEnacted 2013-14

3860-001-6051 Portion of support

budget

2012-13 Budget Act $94,031 B0121Dutch Slough Tidal Marsh Habitat

Restoration

Enacted 2012-13

3860-001-6051 Portion of support

budget

2012-13 Budget Act $1,311,914 B0121Flood Control Projects - DeltaEnacted 2012-13

3860-001-6051 Portion of support

budget

2012-13 Budget Act $483,718 B0122Programmatic Habitat RestorationEnacted 2012-13

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2012-13 Control

Section

Adjustment

($3,850) B0121Dutch Slough Tidal Marsh Habitat

Restoration

Enacted 2012-13

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2012-13 Control

Section

Adjustment

($38,611) B0121Flood Control Projects - DeltaEnacted 2012-13

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2012-13 Control

Section

Adjustment

($15,400) B0122Programmatic Habitat RestorationEnacted 2012-13

3860-001-6051 Portion of support

budget: Natural

Reversion

2012-13 Natural

Reversion

($1,038) B0121Flood Control Projects - DeltaEnacted 2014-15

Wednesday, January 29, Page 121 of 3421:20:05 PM Public Resources Code (PRC) Section PRC §75033Ch. 3Prop 84 Report

Page 125: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-001-6051 Portion of support

budget: Reversion

2012-13 Budget Act ($411,877) B0121Flood Control Projects - DeltaEnacted 2014-15

3860-001-6051 Portion of support

budget

2013-14 Budget Act $94,031 B0121Dutch Slough Tidal Marsh Habitat

Restoration

Enacted 2013-14

3860-001-6051 Portion of support

budget

2013-14 Budget Act $1,311,914 B0121Flood Control Projects - DeltaEnacted 2013-14

3860-001-6051 Portion of support

budget

2013-14 Budget Act $483,718 B0121Programmatic Habitat RestorationEnacted 2013-14

3860-001-6051 Portion of support

budget: Natural

Reversion

2013-14 Natural

Reversion

($288) B0121Dutch Slough Tidal Marsh Habitat

Restoration

Enacted 2015-16

3860-001-6051 Portion of support

budget: Natural

Reversion

2013-14 Natural

Reversion

($635,847) B0121Flood Control Projects - DeltaEnacted 2015-16

3860-001-6051 Portion of support

budget: Natural

Reversion

2013-14 Natural

Reversion

($143,997) B0121Programmatic Habitat RestorationEnacted 2015-16

3860-001-6051 Portion of support

budget

2014-15 Budget Act $94,031 B0121Dutch Slough Tidal Marsh Habitat

Restoration

Enacted 2014-15

3860-001-6051 Portion of support

budget

2014-15 Budget Act $1,311,914 B0121Flood Control Projects - DeltaEnacted 2014-15

3860-001-6051 Portion of support

budget

2014-15 Budget Act $483,718 B0121Programmatic Habitat RestorationEnacted 2014-15

3860-001-6051 Portion of support

budget: Natural

Reversion

2014-15 Natural

Reversion

($1) B0121Dutch Slough Tidal Marsh Habitat

Restoration

Enacted 2016-17

3860-001-6051 Portion of support

budget: Natural

Reversion

2014-15 Natural

Reversion

$0 B0121Flood Control Projects - DeltaEnacted 2016-17

3860-001-6051 Portion of support

budget: Natural

Reversion

2014-15 Natural

Reversion

$0 B0121Programmatic Habitat RestorationEnacted 2016-17

3860-001-6051 Portion of support

budget: Reversion

2014-15 Budget Act ($1,721) B0121Dutch Slough Tidal Marsh Habitat

Restoration

Enacted 2016-17

3860-001-6051 Portion of support

budget: Reversion

2014-15 Budget Act ($201,519) B0121Flood Control Projects - DeltaEnacted 2016-17

3860-001-6051 Portion of support

budget: Reversion

2014-15 Budget Act ($5,770) B0121Programmatic Habitat RestorationEnacted 2016-17

3860-001-6051 Portion of support

budget

2015-16 Budget Act $94,000 B0121Dutch Slough Tidal Marsh Habitat

Restoration

Enacted 2015-16

3860-001-6051 Portion of support

budget

2015-16 Budget Act $1,312,000 B0121Flood Control Projects - DeltaEnacted 2015-16

3860-001-6051 Portion of support

budget

2015-16 Budget Act $484,000 B0121Programmatic Habitat RestorationEnacted 2015-16

3860-001-6051 Portion of support

budget: Natural

Reversion

2015-16 Natural

Reversion

($17,168) B0121Dutch Slough Tidal Marsh Habitat

Restoration

Enacted 2017-18

Wednesday, January 29, Page 122 of 3421:20:05 PM Public Resources Code (PRC) Section PRC §75033Ch. 3Prop 84 Report

Page 126: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-001-6051 Portion of support

budget: Natural

Reversion

2015-16 Natural

Reversion

($41,792) B0121Flood Control Projects - DeltaEnacted 2017-18

3860-001-6051 Portion of support

budget: Natural

Reversion

2015-16 Natural

Reversion

($21,490) B0121Programmatic Habitat RestorationEnacted 2017-18

3860-001-6051 Portion of support

budget

2016-17 Budget Act $1,740,491 B0123Dutch Slough Tidal Marsh Habitat

Restoration

Enacted 2016-17

3860-001-6051 Portion of support

budget

2016-17 Budget Act $149,509 B0121Dutch Slough Tidal Marsh Habitat

Restoration

Enacted 2016-17

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2016-17 Control

Section

Adjustment

$60,000 B0123Dutch Slough Tidal Marsh Habitat

Restoration

Enacted 2016-17

3860-001-6051 Portion of support

budget: Control Section

Adjustment:

Reappropriation

(decrease)

2016-17 Budget Act ($120,000) B0123Dutch Slough Tidal Marsh Habitat

Restoration

Enacted 2016-17

3860-001-6051 Portion of support

budget: Control Section

Adjustment:

Reappropriation

(increase)

2016-17 Budget Act $120,000 B0123Dutch Slough Tidal Marsh Habitat

Restoration

Enacted 2018-19

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2016-17 Budget Act ($3,480,981) B0123Dutch Slough Tidal Marsh Habitat

Restoration

Enacted 2016-17

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2016-17 Budget Act ($299,019) B0121Dutch Slough Tidal Marsh Habitat

Restoration

Enacted 2016-17

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2016-17 Budget Act $3,480,981 B0123Dutch Slough Tidal Marsh Habitat

Restoration

Enacted 2018-19

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2016-17 Budget Act $299,019 B0121Dutch Slough Tidal Marsh Habitat

Restoration

Enacted 2018-19

3860-001-6051 Portion of support

budget

2017-18 Budget Act $1,112,000 B0123Dutch Slough Tidal Marsh Habitat

Restoration - Planning

Enacted 2017-18

3860-001-6051 Portion of support

budget

2017-18 Budget Act $229,500 B0121Dutch Slough Tidal Marsh Habitat

Restoration - Program Delivery

Enacted 2017-18

3860-001-6051 Portion of support

budget

2017-18 Budget Act $554,500 B0122Dutch Slough Tidal Marsh Habitat

Restoration - Projects

Enacted 2017-18

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2017-18 Control

Section

Adjustment

$3,965 B0123Dutch Slough Tidal Marsh Habitat

Restoration - Planning

Enacted 2017-18

Wednesday, January 29, Page 123 of 3421:20:05 PM Public Resources Code (PRC) Section PRC §75033Ch. 3Prop 84 Report

Page 127: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2017-18 Control

Section

Adjustment

$283 B0121Dutch Slough Tidal Marsh Habitat

Restoration - Program Delivery

Enacted 2017-18

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2017-18 Control

Section

Adjustment

$1,752 B0122Dutch Slough Tidal Marsh Habitat

Restoration - Projects

Enacted 2017-18

3860-001-6051 Portion of support

budget: Control Section

Adjustment:

Reappropriation

(decrease)

2017-18 Budget Act ($3,965) B0123Dutch Slough Tidal Marsh Habitat

Restoration - Planning

Enacted 2017-18

3860-001-6051 Portion of support

budget: Control Section

Adjustment:

Reappropriation

(decrease)

2017-18 Budget Act ($283) B0121Dutch Slough Tidal Marsh Habitat

Restoration - Program Delivery

Enacted 2017-18

3860-001-6051 Portion of support

budget: Control Section

Adjustment:

Reappropriation

(decrease)

2017-18 Budget Act ($1,752) B0122Dutch Slough Tidal Marsh Habitat

Restoration - Projects

Enacted 2017-18

3860-001-6051 Portion of support

budget: Control Section

Adjustment:

Reappropriation

(increase)

2017-18 Budget Act $3,965 B0123Dutch Slough Tidal Marsh Habitat

Restoration - Planning

Enacted 2018-19

3860-001-6051 Portion of support

budget: Control Section

Adjustment:

Reappropriation

(increase)

2017-18 Budget Act $283 B0121Dutch Slough Tidal Marsh Habitat

Restoration - Program Delivery

Enacted 2018-19

3860-001-6051 Portion of support

budget: Control Section

Adjustment:

Reappropriation

(increase)

2017-18 Budget Act $1,752 B0122Dutch Slough Tidal Marsh Habitat

Restoration - Projects

Enacted 2018-19

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2017-18 Budget Act ($1,112,000) B0123Dutch Slough Tidal Marsh Habitat

Restoration - Planning

Enacted 2017-18

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2017-18 Budget Act ($229,500) B0121Dutch Slough Tidal Marsh Habitat

Restoration - Program Delivery

Enacted 2017-18

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2017-18 Budget Act ($554,500) B0122Dutch Slough Tidal Marsh Habitat

Restoration - Projects

Enacted 2017-18

Wednesday, January 29, Page 124 of 3421:20:05 PM Public Resources Code (PRC) Section PRC §75033Ch. 3Prop 84 Report

Page 128: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2017-18 Budget Act $1,112,000 B0123Dutch Slough Tidal Marsh Habitat

Restoration - Planning

Enacted 2018-19

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2017-18 Budget Act $229,500 B0121Dutch Slough Tidal Marsh Habitat

Restoration - Program Delivery

Enacted 2018-19

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2017-18 Budget Act $554,500 B0122Dutch Slough Tidal Marsh Habitat

Restoration - Projects

Enacted 2018-19

3860-001-6051 Portion of support

budget

2018-19 Budget Act $1,212,000 B0123Dutch Slough Tidal Marsh Habitat

Restoration - Planning

Enacted 2018-19

3860-001-6051 Portion of support

budget

2018-19 Budget Act $130,500 B0121Dutch Slough Tidal Marsh Habitat

Restoration - Program Delivery

Enacted 2018-19

3860-001-6051 Portion of support

budget

2018-19 Budget Act $559,500 B0122Dutch Slough Tidal Marsh Habitat

Restoration - Projects

Enacted 2018-19

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2018-19 Control

Section

Adjustment

$32,000 B0122Dutch Slough Tidal Marsh Habitat

Restoration - Projects

Enacted 2018-19

3860-001-6051 Portion of support

budget: Control Section

Adjustment:

Reappropriation

(decrease)

2018-19 Budget Act ($32,000) B0122Dutch Slough Tidal Marsh Habitat

Restoration - Projects

Enacted 2018-19

3860-001-6051 Portion of support

budget: Control Section

Adjustment:

Reappropriation

(increase)

2018-19 Budget Act $32,000 B0122Dutch Slough Tidal Marsh Habitat

Restoration - Projects

Enacted 2019-20

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2018-19 Budget Act ($1,212,000) B0123Dutch Slough Tidal Marsh Habitat

Restoration - Planning

Enacted 2018-19

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2018-19 Budget Act ($130,500) B0121Dutch Slough Tidal Marsh Habitat

Restoration - Program Delivery

Enacted 2018-19

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2018-19 Budget Act ($559,500) B0122Dutch Slough Tidal Marsh Habitat

Restoration - Projects

Enacted 2018-19

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2018-19 Budget Act $1,212,000 B0123Dutch Slough Tidal Marsh Habitat

Restoration - Planning

Enacted 2019-20

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2018-19 Budget Act $130,500 B0121Dutch Slough Tidal Marsh Habitat

Restoration - Program Delivery

Enacted 2019-20

Wednesday, January 29, Page 125 of 3421:20:05 PM Public Resources Code (PRC) Section PRC §75033Ch. 3Prop 84 Report

Page 129: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2018-19 Budget Act $559,500 B0122Dutch Slough Tidal Marsh Habitat

Restoration - Projects

Enacted 2019-20

3860-001-6051 Portion of support

budget

2019-20 Budget Act $1,253,000 B0123Dutch Slough Tidal Marsh Habitat

Restoration - Planning

Enacted 2019-20

3860-001-6051 Portion of support

budget

2019-20 Budget Act $90,500 B0121Dutch Slough Tidal Marsh Habitat

Restoration - Program Delivery

Enacted 2019-20

3860-001-6051 Portion of support

budget

2019-20 Budget Act $590,500 B0122Dutch Slough Tidal Marsh Habitat

Restoration - Projects

Enacted 2019-20

3860-101-6051 Portion of local

assistance budget

2007-08 Budget Act $50,291,494 B0122Delta Levees System IntegrityEnacted 2007-08

3860-101-6051 Portion of local

assistance budget

2007-08 Budget Act $1,208,506 B012NExcess Authority, do not spend --

Delta Levees System Integrity

Enacted 2007-08

3860-101-6051 Portion of local

assistance budget:

Natural Reversion

2007-08 Natural

Reversion

($28,891,831) B0122Delta Levees System IntegrityEnacted 2009-10

3860-101-6051 Portion of local

assistance budget:

Natural Reversion

2007-08 Natural

Reversion

($1,208,506) B012NExcess Authority, do not spend --

Delta Levees System Integrity

Enacted 2009-10

3860-101-6051 Portion of local

assistance budget:

Reappropriation

(increase)

2007-08 Budget Act $0 B0122Delta Levees System IntegrityEnacted 2016-17

3860-101-6051 Portion of local

assistance budget:

Reversion

2007-08 Budget Act ($10,616,663) B0122Delta Levees System IntegrityEnacted 2010-11

3860-101-6051 Portion of local

assistance budget:

Reversion

2007-08 Budget Act ($1,208,506) B012NExcess Authority, do not spend --

Delta Levees System Integrity

Enacted 2010-11

3860-101-6051 Portion of local

assistance budget:

Reversion Reverse

2007-08 Natural

Reversion

$28,891,831 B0122Delta Levees System IntegrityEnacted 2010-11

3860-101-6051 Portion of local

assistance budget:

Reversion Reverse

2007-08 Natural

Reversion

$1,208,506 B012NExcess Authority, do not spend --

Delta Levees System Integrity

Enacted 2010-11

3860-101-6051 Portion of local

assistance budget

2008-09 Budget Act $48,940,053 B0122Delta Levees System IntegrityEnacted 2008-09

3860-101-6051 Portion of local

assistance budget

2008-09 Budget Act $2,559,947 B012NExcess Authority, do not spend --

Delta Levees System Integrity

Enacted 2008-09

3860-101-6051 Portion of local

assistance budget

2008-09 Budget Act $2,000,000 B0122Meins Landing ImplementationEnacted 2008-09

3860-101-6051 Portion of local

assistance budget

2008-09 Budget Act $4,500,000 B0122Programmatic Habitat RestorationEnacted 2008-09

3860-101-6051 Portion of local

assistance budget:

Natural Reversion

2008-09 Natural

Reversion

($3,880,279) B0122Delta Levees System IntegrityEnacted 2014-15

Wednesday, January 29, Page 126 of 3421:20:05 PM Public Resources Code (PRC) Section PRC §75033Ch. 3Prop 84 Report

Page 130: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-101-6051 Portion of local

assistance budget:

Reappropriation

(decrease)

2008-09 Budget Act ($38,092,558) B0122Delta Levees System IntegrityEnacted 2017-18

3860-101-6051 Portion of local

assistance budget:

Reappropriation

(increase)

2008-09 Budget Act $38,092,558 B0122Delta Levees System IntegrityEnacted 2019-20

3860-101-6051 Portion of local

assistance budget:

Reversion

2008-09 Budget Act ($16,967,766) B0122Delta Levees System IntegrityEnacted 2014-15

3860-101-6051 Portion of local

assistance budget:

Reversion

2008-09 Budget Act ($2,559,947) B012NExcess Authority, do not spend --

Delta Levees System Integrity

Enacted 2014-15

3860-101-6051 Portion of local

assistance budget:

Reversion

2008-09 Budget Act ($379,729) B0122Programmatic Habitat RestorationEnacted 2014-15

3860-101-6051 Portion of local

assistance budget:

Reversion Reverse

2008-09 Natural

Reversion

$3,880,279 B0122Delta Levees System IntegrityEnacted 2015-16

3860-101-6051 Portion of local

assistance budget

2009-10 Budget Act $4,400,000 B0122Dutch Slough, Delta Levees System

Integrity

Enacted 2009-10

3860-101-6051 Portion of local

assistance budget:

Natural Reversion

2009-10 Natural

Reversion

($4,800,307) B0122Dutch Slough, Delta Levees System

Integrity

Enacted 2015-16

3860-101-6051 Portion of local

assistance budget:

Natural Reversion

Reverse

2009-10 Natural

Reversion

$900,001 B0122Dutch Slough, Delta Levees System

Integrity

Enacted 2017-18

3860-101-6051 Portion of local

assistance budget:

Reappropriation

(decrease)

2009-10 Budget Act ($4,399,694) B0122Dutch Slough, Delta Levees System

Integrity

Enacted 2016-17

3860-101-6051 Portion of local

assistance budget:

Reappropriation

(increase)

2009-10 Budget Act $4,399,694 B0122Dutch Slough, Delta Levees System

Integrity

Enacted 2018-19

3860-101-6051 Portion of local

assistance budget:

Reversion

2009-10 Budget Act ($306) B0122Dutch Slough, Delta Levees System

Integrity

Enacted 2016-17

3860-101-6051 Portion of local

assistance budget:

Reversion Reverse

2009-10 Natural

Reversion

$3,900,307 B0122Dutch Slough, Delta Levees System

Integrity

Enacted 2016-17

3860-101-6051 Portion of local

assistance budget

2016-17 Budget Act $60,000,000 B0122Delta Levees System IntegrityEnacted 2016-17

3860-101-6051 Portion of local

assistance budget:

Reappropriation

(decrease)

2016-17 Budget Act ($60,000,000) B0122Delta Levees System IntegrityEnacted 2016-17

Wednesday, January 29, Page 127 of 3421:20:05 PM Public Resources Code (PRC) Section PRC §75033Ch. 3Prop 84 Report

Page 131: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-101-6051 Portion of local

assistance budget:

Reappropriation

(increase)

2016-17 Budget Act $60,000,000 B0122Delta Levees System IntegrityEnacted 2018-19

3860-301-6051 Portion of capital outlay

budget:

Reappropriation

(decrease)

2010-11 Budget Act ($1,094,000) B0122Land Acquisition for Delta

Mitigation

Enacted 2016-17

3860-301-6051 Portion of capital outlay

budget:

Reappropriation

(increase)

2010-11 Budget Act $1,094,000 B0122Land Acquisition for Delta

Mitigation

Enacted 2018-19

3860-301-6051 (2) Portion of capital outlay

budget

2010-11 Budget Act $1,094,000 B0122Land Acquisition for Delta

Mitigation

Enacted 2010-11

3860-503-6051 Portion of support

budget

2008-09 Special

Legislation

$5,000,000 B0772Flood Emergency Response

Program - Support

Enacted 2008-09

3860-503-6051 Portion of support

budget

2008-09 Special

Legislation

$10,000,000 B0122Sacramento-San Joaquin Delta

Protection and Restoration - Support

Enacted 2008-09

3860-503-6051 Portion of support

budget: Natural

Reversion

2008-09 Natural

Reversion

($382,008) B0772Flood Emergency Response

Program - Support

Enacted 2015-16

3860-503-6051 Portion of support

budget: Reversion

2008-09 Budget Act ($3,125) B0772Flood Emergency Response

Program - Support

Enacted 2016-17

3860-503-6051 Portion of support

budget: Reversion

2008-09 Budget Act ($10,000,000) B0122Sacramento-San Joaquin Delta

Protection and Restoration - Support

Enacted 2014-15

3860-503-6051 Portion of support

budget: Reversion

Reverse

2008-09 Natural

Reversion

$192,566 B0772Flood Emergency Response

Program - Support

Enacted 2016-17

3860-505-6051 Delta Levees2009-10 Special

Legislation

$0 B0121Delta Levees System Integrity

Program

Enacted 2009-10

3860-505-6051 Delta Levees2009-10 Special

Legislation

$0 B0122Delta Levees System Integrity

Program

Enacted 2009-10

3860-505-6051 Delta Levees2010-11 Special

Legislation

$1,700,000 B0121Delta Levees System Integrity

Program

Enacted 2010-11

3860-505-6051 Delta Levees2010-11 Special

Legislation

$2,470,000 B0122Delta Levees System Integrity

Program

Enacted 2010-11

3860-505-6051 Delta Levees:

Reappropriation

(decrease)

2010-11 Budget Act ($1,700,000) B0121Delta Levees System Integrity

Program

Enacted 2017-18

3860-505-6051 Delta Levees:

Reappropriation

(decrease)

2010-11 Budget Act ($2,470,000) B0122Delta Levees System Integrity

Program

Enacted 2017-18

3860-505-6051 Delta Levees:

Reappropriation

(increase)

2010-11 Budget Act $1,700,000 B0121Delta Levees System Integrity

Program

Enacted 2019-20

3860-505-6051 Delta Levees:

Reappropriation

(increase)

2010-11 Budget Act $2,470,000 B0122Delta Levees System Integrity

Program

Enacted 2019-20

Wednesday, January 29, Page 128 of 3421:20:05 PM Public Resources Code (PRC) Section PRC §75033Ch. 3Prop 84 Report

Page 132: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-603-6051 Portion of local

assistance budget

2008-09 Special

Legislation

$85,000,000 B0122Sacramento-San Joaquin Delta

Protection and Restoration - Local

Assistance

Enacted 2008-09

3860-603-6051 Portion of local

assistance budget:

Reversion

2008-09 Budget Act ($30,838,330) B0122Sacramento-San Joaquin Delta

Protection and Restoration - Local

Assistance

Enacted 2016-17

3860-603-6051 Portion of local

assistance budget:

Natural Reversion

2008-09 Natural

Reversion

($92,532,891) B0122Sacramento-San Joaquin Delta

Protection and Restoration - Local

Assistance

Enacted 2013-14

3860-603-6051 Portion of local

assistance budget:

Natural Reversion

Reverse

2008-09 Natural

Reversion

$16,249,711 B0122Sacramento-San Joaquin Delta

Protection and Restoration - Local

Assistance

Enacted 2018-19

3860-603-6051 Portion of local

assistance budget:

Reappropriation

(decrease)

2008-09 Budget Act ($170,000,000) B0122Sacramento-San Joaquin Delta

Protection and Restoration - Local

Assistance

Enacted 2016-17

3860-603-6051 Portion of local

assistance budget:

Reappropriation

(increase)

2008-09 Budget Act $170,000,000 B0122Sacramento-San Joaquin Delta

Protection and Restoration - Local

Assistance

Enacted 2018-19

3860-603-6051 Portion of local

assistance budget:

Reversion Reverse

2008-09 Natural

Reversion

$76,283,180 B0122Sacramento-San Joaquin Delta

Protection and Restoration - Local

Assistance

Enacted 2014-15

3860-605-6051 Section 8(b); PG 30, EL

20 per JE 0036307

dated 2-10-10

2009-10 Special

Legislation

$0 B0122Delta Levees System Integrity

Program

Enacted 2009-10

3860-605-6051 Local assistance

projects: Ch. 718 (SB

855), Statutes of 2010,

Sec. 31(d):

Reappropriation

(decrease)

2010-11 Budget Act ($27,830,000) B0122Delta Levees System Integrity

Program

Enacted 2017-18

3860-605-6051 Local assistance

projects: Ch. 718 (SB

855), Statutes of 2010,

Sec. 31(d):

Reappropriation

(increase)

2010-11 Budget Act $27,830,000 B0122Delta Levees System Integrity

Program

Enacted 2019-20

3860-605-6051 Local Assistance

projects: SB 855, Sec.

31(d)

2010-11 Special

Legislation

$27,830,000 B0122Delta Levees System Integrity

Program

Enacted 2010-11

Sum: $256,417,843Enacted

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2019-20 Control

Section

Adjustment

$28,000 B0123Dutch Slough Tidal Marsh Habitat

Restoration - Planning

Enacted/Not 2019-20

Wednesday, January 29, Page 129 of 3421:20:05 PM Public Resources Code (PRC) Section PRC §75033Ch. 3Prop 84 Report

Page 133: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2019-20 Control

Section

Adjustment

$7,000 B0121Dutch Slough Tidal Marsh Habitat

Restoration - Program Delivery

Enacted/Not 2019-20

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2019-20 Control

Section

Adjustment

$25,000 B0122Dutch Slough Tidal Marsh Habitat

Restoration - Projects

Enacted/Not 2019-20

Sum: $60,000Enacted/Not Posted

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3860-001-6051 (2) Portion of support

budget

2020-21 Budget Act $1,282,000 B0123Dutch Slough Tidal Marsh Habitat

Restoration - Planning

Proposed 2020-21

3860-001-6051 (2) Portion of support

budget

2020-21 Budget Act $98,500 B0121Dutch Slough Tidal Marsh Habitat

Restoration - Program Delivery

Proposed 2020-21

3860-001-6051 (2) Portion of support

budget

2020-21 Budget Act $616,500 B0122Dutch Slough Tidal Marsh Habitat

Restoration - Projects

Proposed 2020-21

Sum: $1,997,000Proposed

Sum: $258,474,843

($1,087,843)

Balance for Flood Control Projects: Delta:

Wednesday, January 29, Page 130 of 3421:20:05 PM Public Resources Code (PRC) Section PRC §75033Ch. 3Prop 84 Report

Page 134: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

Flood ControlChapter 3

Allocation: Flood Control Projects

Allocation $: $180,000,000$936,982

$1,855,223Statewide Set Asides: $2,792,205 {

Outyear Obligations: $825,000

$75,000

$0

{

PRC §75034Ch. 3

Appropriations, Proposals and Reversions

Statewide, requiring appropriation:

Statewide, not requiring appropriation:

Outyear Program Delivery commitments:

Outyear Cap. Outlay (to complete started projects):Reversions are shown below$0

Outyear Local Asst. commitments:

Available to the Dept. of Water Resources to fund the State`s share of the nonfederal costs of flood control and flood prevention projects. Projects eligible for

funding shall comply with several requirements including AB 1147 (Statutes of 2000, Chapter 1071).

Dept.: Department of Water

Resources

Other Outyear Support commitments:$750,000

Committed

$0

$0

$0

$0

Proposed

$0

Prop 1 Reduction $3,507,795

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3860-001-6051 Portion of support

budget

2008-09 Budget Act $1,541,000 B0131Flood Control Subventions - Delta

Flood Protection Projects

Enacted 2008-09

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2008-09 Control

Section

Adjustment

($47,550) B0131Flood Control Subventions - Delta

Flood Protection Projects

Enacted 2008-09

3860-001-6051 Portion of support

budget: Natural

Reversion

2008-09 Natural

Reversion

($338,877) B0131Flood Control Subventions - Delta

Flood Protection Projects

Enacted 2012-13

3860-001-6051 Portion of support

budget

2016-17 Budget Act $500,000 B0131Flood Control Subventions - Delta

Flood Protection Projects - Program

Delivery

Enacted 2016-17

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2016-17 Budget Act ($1,000,000) B0131Flood Control Subventions - Delta

Flood Protection Projects - Program

Delivery

Enacted 2016-17

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2016-17 Budget Act $1,000,000 B0131Flood Control Subventions - Delta

Flood Protection Projects - Program

Delivery

Enacted 2018-19

3860-001-6051 Portion of support

budget

2017-18 Budget Act $35,000 B0133Flood Control Subventions - Delta

Flood Protection Projects - Planning

Enacted 2017-18

3860-001-6051 Portion of support

budget

2017-18 Budget Act $26,000 B0131Flood Control Subventions - Delta

Flood Protection Projects - Program

Delivery

Enacted 2017-18

3860-001-6051 Portion of support

budget

2017-18 Budget Act $474,000 B0132Flood Control Subventions - Delta

Flood Protection Projects - Projects

Enacted 2017-18

Wednesday, January 29, Page 131 of 3421:20:06 PM Public Resources Code (PRC) Section PRC §75034Ch. 3Prop 84 Report

Page 135: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2017-18 Control

Section

Adjustment

$2,224 B0133Flood Control Subventions - Delta

Flood Protection Projects - Planning

Enacted 2017-18

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2017-18 Control

Section

Adjustment

$1,652 B0131Flood Control Subventions - Delta

Flood Protection Projects - Program

Delivery

Enacted 2017-18

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2017-18 Control

Section

Adjustment

$30,124 B0132Flood Control Subventions - Delta

Flood Protection Projects - Projects

Enacted 2017-18

3860-001-6051 Portion of support

budget: Control Section

Adjustment:

Reappropriation

(decrease)

2017-18 Budget Act ($2,224) B0133Flood Control Subventions - Delta

Flood Protection Projects - Planning

Enacted 2017-18

3860-001-6051 Portion of support

budget: Control Section

Adjustment:

Reappropriation

(decrease)

2017-18 Budget Act ($1,652) B0131Flood Control Subventions - Delta

Flood Protection Projects - Program

Delivery

Enacted 2017-18

3860-001-6051 Portion of support

budget: Control Section

Adjustment:

Reappropriation

(decrease)

2017-18 Budget Act ($30,124) B0132Flood Control Subventions - Delta

Flood Protection Projects - Projects

Enacted 2017-18

3860-001-6051 Portion of support

budget: Control Section

Adjustment:

Reappropriation

(increase)

2017-18 Budget Act $2,224 B0133Flood Control Subventions - Delta

Flood Protection Projects - Planning

Enacted 2018-19

3860-001-6051 Portion of support

budget: Control Section

Adjustment:

Reappropriation

(increase)

2017-18 Budget Act $1,652 B0131Flood Control Subventions - Delta

Flood Protection Projects - Program

Delivery

Enacted 2018-19

3860-001-6051 Portion of support

budget: Control Section

Adjustment:

Reappropriation

(increase)

2017-18 Budget Act $30,124 B0132Flood Control Subventions - Delta

Flood Protection Projects - Projects

Enacted 2018-19

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2017-18 Budget Act ($35,000) B0133Flood Control Subventions - Delta

Flood Protection Projects - Planning

Enacted 2017-18

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2017-18 Budget Act ($26,000) B0131Flood Control Subventions - Delta

Flood Protection Projects - Program

Delivery

Enacted 2017-18

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2017-18 Budget Act ($474,000) B0132Flood Control Subventions - Delta

Flood Protection Projects - Projects

Enacted 2017-18

Wednesday, January 29, Page 132 of 3421:20:06 PM Public Resources Code (PRC) Section PRC §75034Ch. 3Prop 84 Report

Page 136: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2017-18 Budget Act $35,000 B0133Flood Control Subventions - Delta

Flood Protection Projects - Planning

Enacted 2018-19

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2017-18 Budget Act $26,000 B0131Flood Control Subventions - Delta

Flood Protection Projects - Program

Delivery

Enacted 2018-19

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2017-18 Budget Act $474,000 B0132Flood Control Subventions - Delta

Flood Protection Projects - Projects

Enacted 2018-19

3860-001-6051 Portion of support

budget

2018-19 Budget Act $57,000 B0133Flood Control Subventions - Delta

Flood Protection Projects - Planning

Enacted 2018-19

3860-001-6051 Portion of support

budget

2018-19 Budget Act $28,500 B0131Flood Control Subventions - Delta

Flood Protection Projects - Program

Delivery

Enacted 2018-19

3860-001-6051 Portion of support

budget

2018-19 Budget Act $484,500 B0132Flood Control Subventions - Delta

Flood Protection Projects - Projects

Enacted 2018-19

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2018-19 Control

Section

Adjustment

$22,000 B0132Flood Control Subventions - Delta

Flood Protection Projects - Projects

Enacted 2018-19

3860-001-6051 Portion of support

budget: Control Section

Adjustment:

Reappropriation

(decrease)

2018-19 Budget Act ($22,000) B0132Flood Control Subventions - Delta

Flood Protection Projects - Projects

Enacted 2018-19

3860-001-6051 Portion of support

budget: Control Section

Adjustment:

Reappropriation

(increase)

2018-19 Budget Act $22,000 B0132Flood Control Subventions - Delta

Flood Protection Projects - Projects

Enacted 2019-20

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2018-19 Budget Act ($57,000) B0133Flood Control Subventions - Delta

Flood Protection Projects - Planning

Enacted 2018-19

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2018-19 Budget Act ($28,500) B0131Flood Control Subventions - Delta

Flood Protection Projects - Program

Delivery

Enacted 2018-19

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2018-19 Budget Act ($484,500) B0132Flood Control Subventions - Delta

Flood Protection Projects - Projects

Enacted 2018-19

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2018-19 Budget Act $57,000 B0133Flood Control Subventions - Delta

Flood Protection Projects - Planning

Enacted 2019-20

Wednesday, January 29, Page 133 of 3421:20:06 PM Public Resources Code (PRC) Section PRC §75034Ch. 3Prop 84 Report

Page 137: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2018-19 Budget Act $28,500 B0131Flood Control Subventions - Delta

Flood Protection Projects - Program

Delivery

Enacted 2019-20

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2018-19 Budget Act $484,500 B0132Flood Control Subventions - Delta

Flood Protection Projects - Projects

Enacted 2019-20

3860-001-6051 Portion of support

budget

2019-20 Budget Act $22,000 B0132Flood Control Subventions - Delta

Flood Protection Projects - Projects

Enacted 2019-20

3860-001-6051 Portion of support

budget

2019-20 Budget Act $750,000 B0132Flood Control Subventions - ProjectsEnacted 2019-20

3860-001-6051 Portion of support

budget: Reduction

2019-20 Budget

Revision

($22,000) B0132Flood Control Subventions - Delta

Flood Protection Projects - Projects

Enacted 2019-20

3860-101-6051 Portion of local

assistance budget

2007-08 Budget Act $100,000,000 B0132Flood Control Project SubventionsEnacted 2007-08

3860-101-6051 Portion of local

assistance budget:

Natural Reversion

2007-08 Natural

Reversion

($31,841,783) B0132Flood Control Project SubventionsEnacted 2009-10

3860-101-6051 Portion of local

assistance budget:

Reappropriation

(decrease)

2007-08 Budget Act ($6,099,456) B0132Flood Control Project SubventionsEnacted 2016-17

3860-101-6051 Portion of local

assistance budget:

Reappropriation

(increase)

2007-08 Budget Act $6,099,456 B0132Flood Control Project SubventionsEnacted 2018-19

3860-101-6051 Portion of local

assistance budget:

Reversion Reverse

2007-08 Natural

Reversion

$31,841,783 B0132Flood Control Project SubventionsEnacted 2010-11

3860-101-6051 Portion of local

assistance budget

2008-09 Budget Act $72,159,000 B0132Flood Control Subventions - Delta

Flood Protection Projects

Enacted 2008-09

3860-101-6051 Portion of local

assistance budget:

Natural Reversion

2008-09 Natural

Reversion

($8,640,108) B0132Flood Control Subventions - Delta

Flood Protection Projects

Enacted 2014-15

3860-101-6051 Portion of local

assistance budget:

Reappropriation

(decrease)

2008-09 Budget Act ($4,320,054) B0132Flood Control Subventions - Delta

Flood Protection Projects

Enacted 2017-18

3860-101-6051 Portion of local

assistance budget:

Reappropriation

(increase)

2008-09 Budget Act $4,320,054 B0132Flood Control Subventions - Delta

Flood Protection Projects

Enacted 2019-20

3860-101-6051 Portion of local

assistance budget:

Reversion

2008-09 Budget Act ($36,779,484) B0132Flood Control Subventions - Delta

Flood Protection Projects

Enacted 2014-15

3860-101-6051 Portion of local

assistance budget:

Reversion Reverse

2008-09 Natural

Reversion

$8,640,108 B0132Flood Control Subventions - Delta

Flood Protection Projects

Enacted 2015-16

Wednesday, January 29, Page 134 of 3421:20:06 PM Public Resources Code (PRC) Section PRC §75034Ch. 3Prop 84 Report

Page 138: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

Sum: $138,945,089Enacted

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3860-001-6051 (2) Portion of support

budget

2020-21 Budget Act $75,000 B0131Flood Control Subventions -

Program Delivery

Proposed 2020-21

3860-001-6051 (2) Portion of support

budget

2020-21 Budget Act $750,000 B0132Flood Control Subventions - ProjectsProposed 2020-21

3860-101-6051 (1) Portion of local

assistance

2020-21 Budget Act $29,850,000 B0132Flood Control Subventions - ProjectsProposed 2020-21

Sum: $30,675,000Proposed

Sum: $169,620,089

$3,254,911

Balance for Flood Control Projects:

Wednesday, January 29, Page 135 of 3421:20:06 PM Public Resources Code (PRC) Section PRC §75034Ch. 3Prop 84 Report

Page 139: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

Summary for Chapter 3

Enacted/Proposed: $771,134,469

Allocation: $180,000,000

Set Asides: $2,792,205

Outyears: $825,000

Balance: $3,254,911

Flood Control

Prop 1 Reduction: $3,507,795

Wednesday, January 29, Page 136 of 3421:20:06 PM Public Resources Code (PRC) Section PRC §75034Ch. 3Prop 84 Report

Page 140: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

Statewide Water Planning and DesignChapter 4

Allocation: Water supply, conveyance and flood

control systems

Allocation $: $65,000,000$338,355

$669,942Statewide Set Asides: $1,008,296 {

Outyear Obligations: $352,000

$0

$0

{

PRC §75041Ch. 4

Appropriations, Proposals and Reversions

Statewide, requiring appropriation:

Statewide, not requiring appropriation:

Outyear Program Delivery commitments:

Outyear Cap. Outlay (to complete started projects):Reversions are shown below$0

Outyear Local Asst. commitments:

Available to the Dept. of Water Resources for planning and feasibility studies related to the existing and potential future needs of California`s water supply,

conveyance and flood control systems. Projects to be funded include: (a) Evaluation of climate change impacts on the State`s water supply and flood control

systems and development of system redesign alternatives; (b) Surface water storage planning and feasibility studies pursuant to CALFED; (c) Modeling and

feasibility studies to evaluate the potential for improving flood protection and water supply through coordinating groundwater storage and reservoir operations;

and (d) Other planning and feasibility studies necessary to improve the integration of flood control and water supply systems.

Dept.: Department of Water

Resources

Other Outyear Support commitments:$352,000

Committed

$0

$0

$0

$0

Proposed

$0

Prop 1 Reduction $1,266,704

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3860-001-6051 Portion of support

budget

2007-08 Budget Act $400,000 B0142Water Conservation in Landscaping

Act (AB 1881)

Enacted 2007-08

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2007-08 Control

Section

Adjustment

$14,032 B0142Water Conservation in Landscaping

Act (AB 1881)

Enacted 2007-08

3860-001-6051 Portion of support

budget: Natural

Reversion

2007-08 Natural

Reversion

($257,018) B0142Water Conservation in Landscaping

Act (AB 1881)

Enacted 2009-10

3860-001-6051 Portion of support

budget

2008-09 Budget Act $338,000 B0142Multi Benefit Planning and

Feasilibity Study

Enacted 2008-09

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2008-09 Control

Section

Adjustment

($7,420) B0142Multi Benefit Planning and

Feasilibity Study

Enacted 2008-09

3860-001-6051 Portion of support

budget: Natural

Reversion

2008-09 Natural

Reversion

($1) B0142Multi Benefit Planning and

Feasilibity Study

Enacted 2010-11

3860-001-6051 Portion of support

budget: Reversion

Reverse

2008-09 Natural

Reversion

$1 B0142Multi Benefit Planning and

Feasilibity Study

Enacted 2011-12

3860-001-6051 Portion of support

budget

2009-10 Budget Act $338,000 B0142Multi Benefit Planning and

Feasilibity Study

Enacted 2009-10

Wednesday, January 29, Page 137 of 3421:20:06 PM Public Resources Code (PRC) Section PRC §75041Ch. 4Prop 84 Report

Page 141: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2009-10 Control

Section

Adjustment

($28,266) B0142Multi Benefit Planning and

Feasilibity Study

Enacted 2009-10

3860-001-6051 Portion of support

budget: Natural

Reversion

2009-10 Natural

Reversion

($37,406) B0142Multi Benefit Planning and

Feasilibity Study

Enacted 2011-12

3860-001-6051 Portion of support

budget

2010-11 Budget Act $1,250,000 B1262Achieving 20x2020 Water

Conservation Targets

Enacted 2010-11

3860-001-6051 Portion of support

budget

2010-11 Budget Act $300,000 B0142California Water Plan UpdateEnacted 2010-11

3860-001-6051 Portion of support

budget

2010-11 Budget Act $3,800,000 B0832Climate Change Evaluation &

Adaptation

Enacted 2010-11

3860-001-6051 Portion of support

budget

2010-11 Budget Act $200,000 B0142Integrated Flood Management,

Water Systems Studies

Enacted 2010-11

3860-001-6051 Portion of support

budget

2010-11 Budget Act $1,449,000 B0142Water Use EfficiencyEnacted 2010-11

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2010-11 Control

Section

Adjustment

($104,376) B1262Achieving 20x2020 Water

Conservation Targets

Enacted 2010-11

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2010-11 Control

Section

Adjustment

($192,117) B0832Climate Change Evaluation &

Adaptation

Enacted 2010-11

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2010-11 Control

Section

Adjustment

($129,151) B0142Water Use EfficiencyEnacted 2010-11

3860-001-6051 Portion of support

budget: Natural

Reversion

2010-11 Natural

Reversion

($1,125,369) B1262Achieving 20x2020 Water

Conservation Targets

Enacted 2012-13

3860-001-6051 Portion of support

budget: Natural

Reversion

2010-11 Natural

Reversion

$0 B0142California Water Plan UpdateEnacted 2012-13

3860-001-6051 Portion of support

budget: Natural

Reversion

2010-11 Natural

Reversion

($3,178,847) B0832Climate Change Evaluation &

Adaptation

Enacted 2012-13

3860-001-6051 Portion of support

budget: Natural

Reversion

2010-11 Natural

Reversion

($407,902) B0142Water Use EfficiencyEnacted 2012-13

3860-001-6051 Portion of support

budget

2011-12 Budget Act $620,000 B1262Achieving 20x2020 Water

Conservation Targets

Enacted 2011-12

3860-001-6051 Portion of support

budget

2011-12 Budget Act $300,000 B0141CA Water PlanEnacted 2011-12

3860-001-6051 Portion of support

budget

2011-12 Budget Act $3,200,000 B0142CA Water Plan UpdateEnacted 2011-12

3860-001-6051 Portion of support

budget

2011-12 Budget Act $960,230 B0832Climate ChangeEnacted 2011-12

3860-001-6051 Portion of support

budget

2011-12 Budget Act $2,540,000 B0832Climate Change Multiple BenefitEnacted 2011-12

3860-001-6051 Portion of support

budget

2011-12 Budget Act $200,000 B0142Integrated Flood Management,

Water Systems Studies

Enacted 2011-12

Wednesday, January 29, Page 138 of 3421:20:06 PM Public Resources Code (PRC) Section PRC §75041Ch. 4Prop 84 Report

Page 142: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-001-6051 Portion of support

budget

2011-12 Budget Act $482,000 B0142Water Use EfficiencyEnacted 2011-12

3860-001-6051 Portion of support

budget

2011-12 Budget Act $900,000 B0142Water Use Multiple Benefit - Urban

Ag

Enacted 2011-12

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2011-12 Control

Section

Adjustment

($9,866) B1262Achieving 20x2020 Water

Conservation Targets

Enacted 2011-12

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2011-12 Control

Section

Adjustment

($4,070) B0141CA Water PlanEnacted 2011-12

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2011-12 Control

Section

Adjustment

($47,251) B0142CA Water Plan UpdateEnacted 2011-12

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2011-12 Control

Section

Adjustment

($9,477) B0832Climate ChangeEnacted 2011-12

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2011-12 Control

Section

Adjustment

($1,080,272) B0832Climate Change Multiple BenefitEnacted 2011-12

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2011-12 Control

Section

Adjustment

($3,454) B0142Integrated Flood Management,

Water Systems Studies

Enacted 2011-12

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2011-12 Control

Section

Adjustment

($6,307) B0142Water Use EfficiencyEnacted 2011-12

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2011-12 Control

Section

Adjustment

($14,925) B0142Water Use Multiple Benefit - Urban

Ag

Enacted 2011-12

3860-001-6051 Portion of support

budget: Natural

Reversion

2011-12 Natural

Reversion

($165,320) B1262Achieving 20x2020 Water

Conservation Targets

Enacted 2013-14

3860-001-6051 Portion of support

budget: Natural

Reversion

2011-12 Natural

Reversion

($123,774) B0141CA Water PlanEnacted 2013-14

3860-001-6051 Portion of support

budget: Natural

Reversion

2011-12 Natural

Reversion

($21,870) B0142CA Water Plan UpdateEnacted 2013-14

3860-001-6051 Portion of support

budget: Natural

Reversion

2011-12 Natural

Reversion

($128,972) B0832Climate ChangeEnacted 2013-14

3860-001-6051 Portion of support

budget: Natural

Reversion

2011-12 Natural

Reversion

($1,051,779) B0832Climate Change Multiple BenefitEnacted 2013-14

3860-001-6051 Portion of support

budget: Natural

Reversion

2011-12 Natural

Reversion

($21) B0142Integrated Flood Management,

Water Systems Studies

Enacted 2013-14

3860-001-6051 Portion of support

budget: Natural

Reversion

2011-12 Natural

Reversion

($7,496) B0142Water Use EfficiencyEnacted 2013-14

Wednesday, January 29, Page 139 of 3421:20:06 PM Public Resources Code (PRC) Section PRC §75041Ch. 4Prop 84 Report

Page 143: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-001-6051 Portion of support

budget: Natural

Reversion

2011-12 Natural

Reversion

($97,296) B0142Water Use Multiple Benefit - Urban

Ag

Enacted 2013-14

3860-001-6051 Portion of support

budget: Reversion

Reverse

2011-12 Natural

Reversion

$19,507 B0142CA Water Plan UpdateEnacted 2013-14

3860-001-6051 Portion of support

budget

2012-13 Budget Act $755,000 B1262Achieving 20x2020 Water

Conservation Targets

Enacted 2012-13

3860-001-6051 Portion of support

budget

2012-13 Budget Act $450,000 B0141CA Water PlanEnacted 2012-13

3860-001-6051 Portion of support

budget

2012-13 Budget Act $2,700,000 B0142CA Water Plan UpdateEnacted 2012-13

3860-001-6051 Portion of support

budget

2012-13 Budget Act $960,000 B0832Climate ChangeEnacted 2012-13

3860-001-6051 Portion of support

budget

2012-13 Budget Act $1,202,000 B0832Climate Change Multiple BenefitEnacted 2012-13

3860-001-6051 Portion of support

budget

2012-13 Budget Act $1,003,000 B0142Integrated Flood Management,

Water Systems Studies

Enacted 2012-13

3860-001-6051 Portion of support

budget

2012-13 Budget Act $482,000 B0142Water Use EfficiencyEnacted 2012-13

3860-001-6051 Portion of support

budget

2012-13 Budget Act $665,000 B0142Water Use Multiple Benefit - Urban

Ag

Enacted 2012-13

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2012-13 Control

Section

Adjustment

($6,690) B1262Achieving 20x2020 Water

Conservation Targets

Enacted 2012-13

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2012-13 Control

Section

Adjustment

($9,577) B0141CA Water PlanEnacted 2012-13

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2012-13 Control

Section

Adjustment

($97,511) B0142CA Water Plan UpdateEnacted 2012-13

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2012-13 Control

Section

Adjustment

($31,607) B0832Climate ChangeEnacted 2012-13

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2012-13 Control

Section

Adjustment

($16,100) B0832Climate Change Multiple BenefitEnacted 2012-13

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2012-13 Control

Section

Adjustment

($4,802) B0142Integrated Flood Management,

Water Systems Studies

Enacted 2012-13

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2012-13 Control

Section

Adjustment

($18,959) B0142Water Use EfficiencyEnacted 2012-13

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2012-13 Control

Section

Adjustment

($18,559) B0142Water Use Multiple Benefit - Urban

Ag

Enacted 2012-13

3860-001-6051 Portion of support

budget: Natural

Reversion

2012-13 Natural

Reversion

$0 B1262Achieving 20x2020 Water

Conservation Targets

Enacted 2017-18

Wednesday, January 29, Page 140 of 3421:20:06 PM Public Resources Code (PRC) Section PRC §75041Ch. 4Prop 84 Report

Page 144: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-001-6051 Portion of support

budget: Natural

Reversion

2012-13 Natural

Reversion

($666) B0141CA Water PlanEnacted 2017-18

3860-001-6051 Portion of support

budget: Natural

Reversion

2012-13 Natural

Reversion

($3,403) B0142CA Water Plan UpdateEnacted 2017-18

3860-001-6051 Portion of support

budget: Natural

Reversion

2012-13 Natural

Reversion

($1) B0832Climate ChangeEnacted 2017-18

3860-001-6051 Portion of support

budget: Natural

Reversion

2012-13 Natural

Reversion

($3,460) B0832Climate Change Multiple BenefitEnacted 2017-18

3860-001-6051 Portion of support

budget: Natural

Reversion

2012-13 Natural

Reversion

$0 B0142Integrated Flood Management,

Water Systems Studies

Enacted 2017-18

3860-001-6051 Portion of support

budget: Natural

Reversion

2012-13 Natural

Reversion

($1) B0142Water Use EfficiencyEnacted 2017-18

3860-001-6051 Portion of support

budget: Natural

Reversion

2012-13 Natural

Reversion

$0 B0142Water Use Multiple Benefit - Urban

Ag

Enacted 2017-18

3860-001-6051 Portion of support

budget: Reversion

2012-13 Budget Act ($471,184) B1262Achieving 20x2020 Water

Conservation Targets

Enacted 2016-17

3860-001-6051 Portion of support

budget: Reversion

2012-13 Budget Act ($189,335) B0832Climate ChangeEnacted 2014-15

3860-001-6051 Portion of support

budget: Reversion

2012-13 Budget Act ($625,954) B0832Climate Change Multiple BenefitEnacted 2014-15

3860-001-6051 Portion of support

budget: Reversion

2012-13 Budget Act ($361,560) B0142Integrated Flood Management,

Water Systems Studies

Enacted 2014-15

3860-001-6051 Portion of support

budget: Reversion

2012-13 Budget Act ($11,209) B0142Water Use EfficiencyEnacted 2016-17

3860-001-6051 Portion of support

budget: Reversion

2012-13 Budget Act ($80,056) B0142Water Use Multiple Benefit - Urban

Ag

Enacted 2016-17

3860-001-6051 Portion of support

budget

2013-14 Budget Act $308,000 B0142CA Water PlanEnacted 2013-14

3860-001-6051 Portion of support

budget

2013-14 Budget Act $639,136 B0142CA Water Plan UpdateEnacted 2013-14

3860-001-6051 Portion of support

budget

2013-14 Budget Act $67,000 B0833Climate ChangeEnacted 2013-14

3860-001-6051 Portion of support

budget

2013-14 Budget Act $65,000 B0831Climate ChangeEnacted 2013-14

3860-001-6051 Portion of support

budget

2013-14 Budget Act $2,139,000 B0832Climate ChangeEnacted 2013-14

3860-001-6051 Portion of support

budget

2013-14 Budget Act $385,864 B0142Integrated Flood Management,

Water Systems Studies

Enacted 2013-14

3860-001-6051 Portion of support

budget

2013-14 Budget Act $80,000 B0142Water Use EfficiencyEnacted 2013-14

3860-001-6051 Portion of support

budget

2013-14 Budget Act $878,200 B0142Water Use Multiple Benefit - Urban

Ag

Enacted 2013-14

Wednesday, January 29, Page 141 of 3421:20:06 PM Public Resources Code (PRC) Section PRC §75041Ch. 4Prop 84 Report

Page 145: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-001-6051 Portion of support

budget: Reversion

2013-14 Budget Act ($19,073) B0142Water Use EfficiencyEnacted 2016-17

3860-001-6051 Portion of support

budget: Reversion

2013-14 Budget Act ($52,025) B0142Water Use Multiple Benefit - Urban

Ag

Enacted 2016-17

3860-001-6051 Portion of support

budget

2014-15 Budget Act $361,000 B0142CA Water Plan UpdateEnacted 2014-15

3860-001-6051 Portion of support

budget

2014-15 Budget Act $69,000 B0833Climate ChangeEnacted 2014-15

3860-001-6051 Portion of support

budget

2014-15 Budget Act $67,000 B0831Climate ChangeEnacted 2014-15

3860-001-6051 Portion of support

budget

2014-15 Budget Act $2,543,000 B0832Climate ChangeEnacted 2014-15

3860-001-6051 Portion of support

budget

2014-15 Budget Act $1,970,000 B0142Integrated Flood Management,

Water Systems Studies - System

Reoperation Program

Enacted 2014-15

3860-001-6051 Portion of support

budget

2014-15 Budget Act $130,000 B0842Surface Storage, California Bay-

Delta Program

Enacted 2014-15

3860-001-6051 Portion of support

budget

2014-15 Budget Act $13,000 B0141Water Use EfficiencyEnacted 2014-15

3860-001-6051 Portion of support

budget

2014-15 Budget Act $257,000 B0142Water Use EfficiencyEnacted 2014-15

3860-001-6051 Portion of support

budget

2014-15 Budget Act $722,000 B0142Water Use Multiple Benefit - Urban

Ag

Enacted 2014-15

3860-001-6051 Portion of support

budget: Natural

Reversion

2014-15 Natural

Reversion

($149,400) B0142CA Water Plan UpdateEnacted 2016-17

3860-001-6051 Portion of support

budget: Natural

Reversion

2014-15 Natural

Reversion

($1) B0833Climate ChangeEnacted 2016-17

3860-001-6051 Portion of support

budget: Natural

Reversion

2014-15 Natural

Reversion

($1) B0831Climate ChangeEnacted 2016-17

3860-001-6051 Portion of support

budget: Natural

Reversion

2014-15 Natural

Reversion

($53) B0832Climate ChangeEnacted 2016-17

3860-001-6051 Portion of support

budget: Natural

Reversion

2014-15 Natural

Reversion

($317,250) B0142Integrated Flood Management,

Water Systems Studies - System

Reoperation Program

Enacted 2016-17

3860-001-6051 Portion of support

budget: Natural

Reversion

2014-15 Natural

Reversion

($1) B0842Surface Storage, California Bay-

Delta Program

Enacted 2016-17

3860-001-6051 Portion of support

budget: Natural

Reversion

2014-15 Natural

Reversion

($163) B0141Water Use EfficiencyEnacted 2016-17

3860-001-6051 Portion of support

budget: Natural

Reversion

2014-15 Natural

Reversion

($3,213) B0142Water Use EfficiencyEnacted 2016-17

Wednesday, January 29, Page 142 of 3421:20:06 PM Public Resources Code (PRC) Section PRC §75041Ch. 4Prop 84 Report

Page 146: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-001-6051 Portion of support

budget: Natural

Reversion

2014-15 Natural

Reversion

$0 B0142Water Use Multiple Benefit - Urban

Ag

Enacted 2016-17

3860-001-6051 Portion of support

budget: Reversion

2014-15 Budget Act ($11,769) B0833Climate ChangeEnacted 2016-17

3860-001-6051 Portion of support

budget: Reversion

2014-15 Budget Act ($11,511) B0831Climate ChangeEnacted 2016-17

3860-001-6051 Portion of support

budget: Reversion

2014-15 Budget Act ($433,757) B0832Climate ChangeEnacted 2016-17

3860-001-6051 Portion of support

budget: Reversion

2014-15 Budget Act ($1,300,001) B0142Integrated Flood Management,

Water Systems Studies - System

Reoperation Program

Enacted 2016-17

3860-001-6051 Portion of support

budget: Reversion

2014-15 Budget Act ($122,509) B0842Surface Storage, California Bay-

Delta Program

Enacted 2016-17

3860-001-6051 Portion of support

budget: Reversion

2014-15 Budget Act ($56,876) B0142Water Use Multiple Benefit - Urban

Ag

Enacted 2016-17

3860-001-6051 Portion of support

budget: Reversion

Reverse

2014-15 Natural

Reversion

$149,400 B0142CA Water Plan UpdateEnacted 2017-18

3860-001-6051 Portion of support

budget: Reversion

Reverse

2014-15 Natural

Reversion

$1 B0833Climate ChangeEnacted 2017-18

3860-001-6051 Portion of support

budget: Reversion

Reverse

2014-15 Natural

Reversion

$1 B0831Climate ChangeEnacted 2017-18

3860-001-6051 Portion of support

budget: Reversion

Reverse

2014-15 Natural

Reversion

$53 B0832Climate ChangeEnacted 2017-18

3860-001-6051 Portion of support

budget: Reversion

Reverse

2014-15 Natural

Reversion

$317,250 B0142Integrated Flood Management,

Water Systems Studies - System

Reoperation Program

Enacted 2017-18

3860-001-6051 Portion of support

budget: Reversion

Reverse

2014-15 Natural

Reversion

$1 B0842Surface Storage, California Bay-

Delta Program

Enacted 2017-18

3860-001-6051 Portion of support

budget: Reversion

Reverse

2014-15 Natural

Reversion

$163 B0141Water Use EfficiencyEnacted 2017-18

3860-001-6051 Portion of support

budget: Reversion

Reverse

2014-15 Natural

Reversion

$3,213 B0142Water Use EfficiencyEnacted 2017-18

3860-001-6051 Portion of support

budget: Reversion

Reverse

2014-15 Natural

Reversion

$0 B0142Water Use Multiple Benefit - Urban

Ag

Enacted 2017-18

3860-001-6051 Portion of support

budget

2015-16 Budget Act $96,000 B0833Climate ChangeEnacted 2015-16

3860-001-6051 Portion of support

budget

2015-16 Budget Act $93,000 B0831Climate ChangeEnacted 2015-16

3860-001-6051 Portion of support

budget

2015-16 Budget Act $2,488,000 B0832Climate ChangeEnacted 2015-16

Wednesday, January 29, Page 143 of 3421:20:06 PM Public Resources Code (PRC) Section PRC §75041Ch. 4Prop 84 Report

Page 147: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-001-6051 Portion of support

budget

2015-16 Budget Act $1,970,000 B0142Integrated Flood Management,

Water Systems Studies - System

Reoperation Program

Enacted 2015-16

3860-001-6051 Portion of support

budget

2015-16 Budget Act $130,000 B0842Surface Storage, California Bay-

Delta Program

Enacted 2015-16

3860-001-6051 Portion of support

budget

2015-16 Budget Act $18,500 B0141Water Use EfficiencyEnacted 2015-16

3860-001-6051 Portion of support

budget

2015-16 Budget Act $351,500 B0142Water Use EfficiencyEnacted 2015-16

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2015-16 Budget Act ($96,000) B0833Climate ChangeEnacted 2016-17

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2015-16 Budget Act ($93,000) B0831Climate ChangeEnacted 2016-17

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2015-16 Budget Act ($2,488,000) B0832Climate ChangeEnacted 2016-17

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2015-16 Budget Act ($1,970,000) B0142Integrated Flood Management,

Water Systems Studies - System

Reoperation Program

Enacted 2016-17

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2015-16 Budget Act ($130,000) B0842Surface Storage, California Bay-

Delta Program

Enacted 2016-17

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2015-16 Budget Act ($18,500) B0141Water Use EfficiencyEnacted 2016-17

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2015-16 Budget Act ($351,500) B0142Water Use EfficiencyEnacted 2016-17

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2015-16 Budget Act $96,000 B0833Climate ChangeEnacted 2018-19

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2015-16 Budget Act $93,000 B0831Climate ChangeEnacted 2018-19

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2015-16 Budget Act $2,488,000 B0832Climate ChangeEnacted 2018-19

Wednesday, January 29, Page 144 of 3421:20:06 PM Public Resources Code (PRC) Section PRC §75041Ch. 4Prop 84 Report

Page 148: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2015-16 Budget Act $1,970,000 B0142Integrated Flood Management,

Water Systems Studies - System

Reoperation Program

Enacted 2018-19

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2015-16 Budget Act $130,000 B0842Surface Storage, California Bay-

Delta Program

Enacted 2018-19

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2015-16 Budget Act $18,500 B0141Water Use EfficiencyEnacted 2018-19

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2015-16 Budget Act $351,500 B0142Water Use EfficiencyEnacted 2018-19

3860-001-6051 Portion of support

budget: Reversion

2015-16 Budget Act ($1,465,000) B0142Integrated Flood Management,

Water Systems Studies - System

Reoperation Program

Enacted 2016-17

3860-001-6051 Portion of support

budget: Reversion

2015-16 Budget Act ($102,491) B0842Surface Storage, California Bay-

Delta Program

Enacted 2016-17

3860-001-6051 Portion of support

budget

2016-17 Budget Act $2,235,000 B0833Planning and MonitoringEnacted 2016-17

3860-001-6051 Portion of support

budget

2016-17 Budget Act $75,000 B0831Surface Storage ProgramEnacted 2016-17

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2016-17 Control

Section

Adjustment

$78,000 B0833Planning and MonitoringEnacted 2016-17

3860-001-6051 Portion of support

budget: Control Section

Adjustment:

Reappropriation

(decrease)

2016-17 Budget Act ($79,000) B0833Planning and MonitoringEnacted 2016-17

3860-001-6051 Portion of support

budget: Control Section

Adjustment:

Reappropriation

(increase)

2016-17 Budget Act $79,000 B0833Planning and MonitoringEnacted 2019-20

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2016-17 Budget Act ($999,000) B0833Planning and MonitoringEnacted 2016-17

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2016-17 Budget Act ($75,000) B0831Surface Storage ProgramEnacted 2016-17

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2016-17 Budget Act $999,000 B0833Planning and MonitoringEnacted 2019-20

Wednesday, January 29, Page 145 of 3421:20:06 PM Public Resources Code (PRC) Section PRC §75041Ch. 4Prop 84 Report

Page 149: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2016-17 Budget Act $75,000 B0831Surface Storage ProgramEnacted 2019-20

3860-001-6051 Portion of support

budget: Reduction

2016-17 Budget Act ($1,235,000) B0833Planning and MonitoringEnacted 2016-17

3860-001-6051 Portion of support

budget

2017-18 Budget Act $1,108,000 B0833Planning and MonitoringEnacted 2017-18

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2017-18 Control

Section

Adjustment

$20,000 B0833Planning and MonitoringEnacted 2017-18

3860-001-6051 Portion of support

budget

2018-19 Budget Act $1,128,000 B0833Planning and MonitoringEnacted 2018-19

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2018-19 Control

Section

Adjustment

$47,000 B0833Planning and MonitoringEnacted 2018-19

3860-001-6051 Portion of support

budget: Control Section

Adjustment:

Reappropriation

(decrease)

2018-19 Budget Act ($47,000) B0833Planning and MonitoringEnacted 2018-19

3860-001-6051 Portion of support

budget: Control Section

Adjustment:

Reappropriation

(increase)

2018-19 Budget Act $47,000 B0833Planning and MonitoringEnacted 2019-20

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2018-19 Budget Act ($1,128,000) B0833Planning and MonitoringEnacted 2018-19

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2018-19 Budget Act $1,128,000 B0833Planning and MonitoringEnacted 2019-20

3860-001-6051 Portion of support

budget

2019-20 Budget Act $1,091,000 B0833Planning and MonitoringEnacted 2019-20

3860-503-6051 Portion of local

assistance budget:

Natural Reversion

2008-09 Natural

Reversion

($31,035) B0142California Water Plan UpdateEnacted 2015-16

3860-503-6051 Portion of local

assistance budget:

Natural Reversion

2008-09 Natural

Reversion

($191,535) B1382Integrated Flood Management,

Water Systems Studies

Enacted 2015-16

3860-503-6051 Portion of local

assistance budget:

Natural Reversion

2008-09 Natural

Reversion

($250) B0842Surface Storage, California Bay-

Delta Program

Enacted 2015-16

3860-503-6051 Portion of support

budget

2008-09 Special

Legislation

$10,000,000 B0142California Water Plan UpdateEnacted 2008-09

3860-503-6051 Portion of support

budget

2008-09 Special

Legislation

$15,000,000 B1382Integrated Flood Management,

Water Systems Studies

Enacted 2008-09

Wednesday, January 29, Page 146 of 3421:20:06 PM Public Resources Code (PRC) Section PRC §75041Ch. 4Prop 84 Report

Page 150: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-503-6051 Portion of support

budget

2008-09 Special

Legislation

$12,000,000 B0842Surface Storage, California Bay-

Delta Program

Enacted 2008-09

3860-503-6051 Portion of support

budget: Control Section

Adjustment

2008-09 Control

Section

Adjustment

($311,620) B0142California Water Plan UpdateEnacted 2012-13

3860-503-6051 Portion of support

budget: Control Section

Adjustment

2008-09 Control

Section

Adjustment

($1,047,913) B1382Integrated Flood Management,

Water Systems Studies

Enacted 2012-13

3860-503-6051 Portion of support

budget: Control Section

Adjustment

2008-09 Control

Section

Adjustment

($29,054) B0842Surface Storage, California Bay-

Delta Program

Enacted 2012-13

3860-503-6051 Portion of support

budget: Reversion

2008-09 Budget Act ($5,689,640) B1382Integrated Flood Management,

Water Systems Studies

Enacted 2014-15

3860-503-6051 Portion of support

budget: Reversion

2008-09 Budget Act ($383,800) B0842Surface Storage, California Bay-

Delta Program

Enacted 2014-15

3860-503-6051 Section

83002(b)(6)(A):

Control Section

Adjustment

2008-09 Control

Section

Adjustment

($3,600) B0842Surface Storage, California Bay-

Delta Program

Enacted 2012-13

3860-503-6051 Section

83002(b)(6)(B):

Control Section

2008-09 Control

Section

Adjustment

($82,137) B1382Integrated Flood Management,

Water Systems Studies

Enacted 2012-13

3860-503-6051 Section

83002(b)(6)(C):

Control Section

2008-09 Control

Section

Adjustment

($83,000) B0142California Water Plan UpdateEnacted 2012-13

Sum: $61,296,718Enacted

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2013-14 Budget Act ($308,000) B0142CA Water PlanEnacted/Not 2017-18

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2013-14 Budget Act ($639,136) B0142CA Water Plan UpdateEnacted/Not 2017-18

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2013-14 Budget Act ($67,000) B0833Climate ChangeEnacted/Not 2017-18

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2013-14 Budget Act ($65,000) B0831Climate ChangeEnacted/Not 2017-18

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2013-14 Budget Act ($2,139,000) B0832Climate ChangeEnacted/Not 2017-18

Wednesday, January 29, Page 147 of 3421:20:06 PM Public Resources Code (PRC) Section PRC §75041Ch. 4Prop 84 Report

Page 151: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2013-14 Budget Act ($385,864) B0142Integrated Flood Management,

Water Systems Studies

Enacted/Not 2017-18

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2013-14 Budget Act ($60,927) B0142Water Use EfficiencyEnacted/Not 2017-18

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2013-14 Budget Act ($826,175) B0142Water Use Multiple Benefit - Urban

Ag

Enacted/Not 2017-18

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2013-14 Budget Act $308,000 B0142CA Water PlanEnacted/Not 2019-20

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2013-14 Budget Act $639,136 B0142CA Water Plan UpdateEnacted/Not 2019-20

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2013-14 Budget Act $67,000 B0833Climate ChangeEnacted/Not 2019-20

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2013-14 Budget Act $65,000 B0831Climate ChangeEnacted/Not 2019-20

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2013-14 Budget Act $2,139,000 B0832Climate ChangeEnacted/Not 2019-20

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2013-14 Budget Act $385,864 B0142Integrated Flood Management,

Water Systems Studies

Enacted/Not 2019-20

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2013-14 Budget Act $60,927 B0142Water Use EfficiencyEnacted/Not 2019-20

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2013-14 Budget Act $826,175 B0142Water Use Multiple Benefit - Urban

Ag

Enacted/Not 2019-20

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2019-20 Control

Section

Adjustment

$53,000 B0833Planning and MonitoringEnacted/Not 2019-20

Sum: $53,000Enacted/Not Posted

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

Wednesday, January 29, Page 148 of 3421:20:06 PM Public Resources Code (PRC) Section PRC §75041Ch. 4Prop 84 Report

Page 152: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-001-6051 (1) Portion of support

budget

2020-21 Budget Act $1,179,000 B0833Planning and MonitoringProposed 2020-21

Sum: $1,179,000Proposed

Sum: $62,528,718

($155,718)

Balance for Water supply, conveyance and flood control systems:

Wednesday, January 29, Page 149 of 3421:20:06 PM Public Resources Code (PRC) Section PRC §75041Ch. 4Prop 84 Report

Page 153: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

Summary for Chapter 4

Enacted/Proposed: $62,528,718

Allocation: $65,000,000

Set Asides: $1,008,296

Outyears: $352,000

Balance: ($155,718)

Statewide Water Planning and Design

Prop 1 Reduction: $1,266,704

Wednesday, January 29, Page 150 of 3421:20:06 PM Public Resources Code (PRC) Section PRC §75041Ch. 4Prop 84 Report

Page 154: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

Protection of Rivers, Lakes and StreamsChapter 5

Allocation: Bay-Delta and coastal fishery restoration

Allocation $: $180,000,000$936,982

$1,855,223Statewide Set Asides: $2,792,205 {

Outyear Obligations: $1,444,000

$361,000

$0

{

PRC §75050(a)Ch. 5

Appropriations, Proposals and Reversions

Statewide, requiring appropriation:

Statewide, not requiring appropriation:

Outyear Program Delivery commitments:

Outyear Cap. Outlay (to complete started projects):Reversions are shown below$0

Outyear Local Asst. commitments:

For Bay-Delta and coastal fishery restoration projects. Up to $20,000,000 for development of a natural community conservation plan for the CALFED Bay-Delta

Program. Up to $45,000,000 for coastal salmon and steelhead fishery restoration projects that support development and implementation of species recovery plans

and strategies.

Dept.: California Department of Fish

and Wildlife

Other Outyear Support commitments:$1,083,000

Committed

$0

$0

$0

$0

Proposed

$0

Prop 1 Reduction $3,507,795

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3600-001-6051 Portion of support

budget

2007-08 Budget Act $3,659,000 B0281CALFED Ecosytem Restoration

Program Implementation

Enacted 2007-08

3600-001-6051 Portion of support

budget

2007-08 Budget Act $43,581,000 B0282CALFED Ecosytem Restoration

Program Implementation

Enacted 2007-08

3600-001-6051 Portion of support

budget

2007-08 Budget Act $140,000 B0291CALFED Ecosytem Restoration

Program: Central Valley

HCP/NCCP Development

Enacted 2007-08

3600-001-6051 Portion of support

budget

2007-08 Budget Act $1,591,000 B0292CALFED Ecosytem Restoration

Program: Central Valley

HCP/NCCP Development

Enacted 2007-08

3600-001-6051 Portion of support

budget: Natural

Reversion

2007-08 Natural

Reversion

($3,895) B0281CALFED Ecosytem Restoration

Program Implementation

Enacted 2014-15

3600-001-6051 Portion of support

budget: Natural

Reversion

2007-08 Natural

Reversion

($8,431,307) B0282CALFED Ecosytem Restoration

Program Implementation

Enacted 2014-15

3600-001-6051 Portion of support

budget: Natural

Reversion

2007-08 Natural

Reversion

($29) B0291CALFED Ecosytem Restoration

Program: Central Valley

HCP/NCCP Development

Enacted 2014-15

3600-001-6051 Portion of support

budget: Natural

Reversion

2007-08 Natural

Reversion

($6,706) B0292CALFED Ecosytem Restoration

Program: Central Valley

HCP/NCCP Development

Enacted 2014-15

3600-001-6051 Portion of support

budget: Reversion

2007-08 Budget Act ($1,574,321) B0281CALFED Ecosytem Restoration

Program Implementation

Enacted 2013-14

Wednesday, January 29, Page 151 of 3421:20:06 PM Public Resources Code (PRC) Section PRC §75050(a)Ch. 5Prop 84 Report

Page 155: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3600-001-6051 Portion of support

budget: Reversion

2007-08 Budget Act ($4,670,477) B0282CALFED Ecosytem Restoration

Program Implementation

Enacted 2013-14

3600-001-6051 Portion of support

budget: Reversion

2007-08 Budget Act ($27,223) B0291CALFED Ecosytem Restoration

Program: Central Valley

HCP/NCCP Development

Enacted 2013-14

3600-001-6051 Portion of support

budget: Reversion

2007-08 Budget Act ($610,598) B0292CALFED Ecosytem Restoration

Program: Central Valley

HCP/NCCP Development

Enacted 2013-14

3600-001-6051 Portion of support

budget

2008-09 Budget Act $2,122,000 B0292Bay Delta - NCCPEnacted 2008-09

3600-001-6051 Portion of support

budget

2008-09 Budget Act $9,049,349 B0302Coastal Salmonid Monitoring PlanEnacted 2008-09

3600-001-6051 Portion of support

budget

2008-09 Budget Act $706,651 B0301Coastal Salmonid Monitoring Plan -

Support

Enacted 2008-09

3600-001-6051 Portion of support

budget

2008-09 Budget Act $4,296,000 B0282Ecosystem Restoration ProgramEnacted 2008-09

3600-001-6051 Portion of support

budget

2008-09 Budget Act $300,000 B0281Ecosystem Restoration Program -

Support

Enacted 2008-09

3600-001-6051 Portion of support

budget - Control

Section Adjustment

2008-09 Control

Section

Adjustment

($206,651) B0301Coastal Salmonid Monitoring Plan -

Support

Enacted 2008-09

3600-001-6051 Portion of support

budget - Planning

2008-09 Budget Act $1,100,000 B0303Coastal Salmonid Monitoring Plan -

Planning

Enacted 2008-09

3600-001-6051 Portion of support

budget - Planning

2008-09 Budget Act $2,124,000 B0283Ecosystem Restoration Program -

Planning

Enacted 2008-09

3600-001-6051 Portion of support

budget - Planning:

Reversion

2008-09 Budget Act ($227,218) B0303Coastal Salmonid Monitoring Plan -

Planning

Enacted 2013-14

3600-001-6051 Portion of support

budget - Planning:

Reversion

2008-09 Budget Act ($952,744) B0283Ecosystem Restoration Program -

Planning

Enacted 2013-14

3600-001-6051 Portion of support

budget: Natural

Reversion

2008-09 Natural

Reversion

($1,670) B0292Bay Delta - NCCPEnacted 2014-15

3600-001-6051 Portion of support

budget: Natural

Reversion

2008-09 Natural

Reversion

($767,755) B0302Coastal Salmonid Monitoring PlanEnacted 2014-15

3600-001-6051 Portion of support

budget: Natural

Reversion

2008-09 Natural

Reversion

($225,148) B0303Coastal Salmonid Monitoring Plan -

Planning

Enacted 2014-15

3600-001-6051 Portion of support

budget: Natural

Reversion

2008-09 Natural

Reversion

($701) B0301Coastal Salmonid Monitoring Plan -

Support

Enacted 2014-15

3600-001-6051 Portion of support

budget: Natural

Reversion

2008-09 Natural

Reversion

($38,312) B0282Ecosystem Restoration ProgramEnacted 2014-15

3600-001-6051 Portion of support

budget: Natural

Reversion

2008-09 Natural

Reversion

($39,482) B0283Ecosystem Restoration Program -

Planning

Enacted 2014-15

Wednesday, January 29, Page 152 of 3421:20:06 PM Public Resources Code (PRC) Section PRC §75050(a)Ch. 5Prop 84 Report

Page 156: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3600-001-6051 Portion of support

budget: Reversion

2008-09 Budget Act ($900,061) B0292Bay Delta - NCCPEnacted 2013-14

3600-001-6051 Portion of support

budget: Reversion

2008-09 Budget Act ($50,117) B0302Coastal Salmonid Monitoring PlanEnacted 2013-14

3600-001-6051 Portion of support

budget: Reversion

2008-09 Budget Act ($142,921) B0301Coastal Salmonid Monitoring Plan -

Support

Enacted 2013-14

3600-001-6051 Portion of support

budget: Reversion

2008-09 Budget Act ($171,225) B0282Ecosystem Restoration ProgramEnacted 2013-14

3600-001-6051 Portion of support

budget: Reversion

2008-09 Budget Act ($104,790) B0281Ecosystem Restoration Program -

Support

Enacted 2013-14

3600-001-6051 Appropriation available

via provision in Budget

Act, upon passage of

specific law

2009-10 Budget Act $22,022,000 B0282Ecosystem Restoration ProgramEnacted 2009-10

3600-001-6051 Appropriation available

via provision in Budget

Act, upon passage of

specific law: Control

Section Adjustment

2009-10 Control

Section

Adjustment

($159,920) B0282Ecosystem Restoration ProgramEnacted 2010-11

3600-001-6051 Appropriation available

via provision in Budget

Act, upon passage of

specific law: Reversion

2009-10 Budget Act ($241,773) B0282Ecosystem Restoration ProgramEnacted 2013-14

3600-001-6051 Portion of support

budget

2009-10 Budget Act $9,529,615 B0302Anadromous Fish ManagementEnacted 2009-10

3600-001-6051 Portion of support

budget

2009-10 Budget Act $463,697 B0301Anadromous Fish Management -

Support

Enacted 2009-10

3600-001-6051 Portion of support

budget

2009-10 Budget Act $10,584,464 B0292Bay Delta - NCCPEnacted 2009-10

3600-001-6051 Portion of support

budget

2009-10 Budget Act $241,536 B0291Bay Delta - NCCP - SupportEnacted 2009-10

3600-001-6051 Portion of support

budget

2009-10 Budget Act $4,458,000 B0282Ecosystem Restoration Program -

CALFED

Enacted 2009-10

3600-001-6051 Portion of support

budget

2009-10 Budget Act $330,000 B0281Ecosystem Restoration Program -

CALFED - Support

Enacted 2009-10

3600-001-6051 Portion of support

budget - Planning

2009-10 Budget Act $1,047,688 B0303Anadromous Fish Management -

Planning

Enacted 2009-10

3600-001-6051 Portion of support

budget - Planning

2009-10 Budget Act $1,798,000 B0283Ecosystem Restoration Program -

CALFED - Planning

Enacted 2009-10

3600-001-6051 Portion of support

budget - Planning:

Reversion

2009-10 Budget Act ($228,245) B0303Anadromous Fish Management -

Planning

Enacted 2013-14

3600-001-6051 Portion of support

budget - Planning:

Reversion

2009-10 Budget Act ($1,041,483) B0283Ecosystem Restoration Program -

CALFED - Planning

Enacted 2013-14

3600-001-6051 Portion of support

budget: Control Section

Adjustment

2009-10 Control

Section

Adjustment

($417,337) B0302Anadromous Fish ManagementEnacted 2009-10

Wednesday, January 29, Page 153 of 3421:20:06 PM Public Resources Code (PRC) Section PRC §75050(a)Ch. 5Prop 84 Report

Page 157: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3600-001-6051 Portion of support

budget: Control Section

Adjustment

2009-10 Control

Section

Adjustment

($125,697) B0301Anadromous Fish Management -

Support

Enacted 2009-10

3600-001-6051 Portion of support

budget: Control Section

Adjustment

2009-10 Control

Section

Adjustment

($519,645) B0292Bay Delta - NCCPEnacted 2009-10

3600-001-6051 Portion of support

budget: Control Section

Adjustment

2009-10 Control

Section

Adjustment

($21,536) B0291Bay Delta - NCCP - SupportEnacted 2009-10

3600-001-6051 Portion of support

budget: Control Section

Adjustment

2009-10 Control

Section

Adjustment

($271,601) B0282Ecosystem Restoration Program -

CALFED

Enacted 2009-10

3600-001-6051 Portion of support

budget: Control Section

Adjustment

2009-10 Control

Section

Adjustment

($13,129) B0281Ecosystem Restoration Program -

CALFED - Support

Enacted 2009-10

3600-001-6051 Portion of support

budget: Natural

Reversion

2009-10 Natural

Reversion

($3,376,182) B0302Anadromous Fish ManagementEnacted 2014-15

3600-001-6051 Portion of support

budget: Natural

Reversion

2009-10 Natural

Reversion

($29,437) B0303Anadromous Fish Management -

Planning

Enacted 2014-15

3600-001-6051 Portion of support

budget: Natural

Reversion

2009-10 Natural

Reversion

($3,295) B0301Anadromous Fish Management -

Support

Enacted 2014-15

3600-001-6051 Portion of support

budget: Natural

Reversion

2009-10 Natural

Reversion

($18,890) B0292Bay Delta - NCCPEnacted 2014-15

3600-001-6051 Portion of support

budget: Natural

Reversion

2009-10 Natural

Reversion

$0 B0291Bay Delta - NCCP - SupportEnacted 2014-15

3600-001-6051 Portion of support

budget: Natural

Reversion

2009-10 Natural

Reversion

($4,425,065) B0282Ecosystem Restoration ProgramEnacted 2014-15

3600-001-6051 Portion of support

budget: Natural

Reversion

2009-10 Natural

Reversion

($304,260) B0282Ecosystem Restoration Program -

CALFED

Enacted 2014-15

3600-001-6051 Portion of support

budget: Natural

Reversion

2009-10 Natural

Reversion

($259,057) B0283Ecosystem Restoration Program -

CALFED - Planning

Enacted 2014-15

3600-001-6051 Portion of support

budget: Reversion

2009-10 Budget Act ($73,188) B0301Anadromous Fish Management -

Support

Enacted 2013-14

3600-001-6051 Portion of support

budget: Reversion

2009-10 Budget Act ($3,656,863) B0292Bay Delta - NCCPEnacted 2013-14

3600-001-6051 Portion of support

budget: Reversion

2009-10 Budget Act ($36,628) B0291Bay Delta - NCCP - SupportEnacted 2013-14

3600-001-6051 Portion of support

budget: Reversion

2009-10 Budget Act ($1,236,455) B0282Ecosystem Restoration Program -

CALFED

Enacted 2013-14

3600-001-6051 Portion of support

budget: Reversion

2009-10 Budget Act ($250,395) B0281Ecosystem Restoration Program -

CALFED - Support

Enacted 2013-14

Wednesday, January 29, Page 154 of 3421:20:06 PM Public Resources Code (PRC) Section PRC §75050(a)Ch. 5Prop 84 Report

Page 158: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3600-001-6051 Portion of support

budget

2010-11 Budget Act $1,307,000 B0302Anadromous Fish ManagementEnacted 2010-11

3600-001-6051 Portion of support

budget

2010-11 Budget Act $1,817,000 B0292Bay Delta - NCCPEnacted 2010-11

3600-001-6051 Portion of support

budget

2010-11 Budget Act $95,000 B0291Bay Delta - NCCP - SupportEnacted 2010-11

3600-001-6051 Portion of support

budget

2010-11 Budget Act $325,000 B0282Delta Environmental ReviewEnacted 2010-11

3600-001-6051 Portion of support

budget

2010-11 Budget Act $1,039,000 B0282Delta Water Instream Flow ProgramEnacted 2010-11

3600-001-6051 Portion of support

budget

2010-11 Budget Act $4,474,000 B0282Ecosystem Restoration ProgramEnacted 2010-11

3600-001-6051 Portion of support

budget

2010-11 Budget Act $330,000 B0281Ecosystem Restoration Program -

Support

Enacted 2010-11

3600-001-6051 Portion of support

budget - Fisheries

Restoration Grants

2010-11 Budget Act $13,490,000 B0302Anadromous Fish ManagementEnacted 2010-11

3600-001-6051 Portion of support

budget - Fisheries

Restoration Grants

2010-11 Budget Act $338,000 B0301Anadromous Fish Management -

Support

Enacted 2010-11

3600-001-6051 Portion of support

budget - Fisheries

Restoration Grants -

Planning

2010-11 Budget Act $1,100,000 B0303Anadromous Fish Management -

Planning

Enacted 2010-11

3600-001-6051 Portion of support

budget - Fisheries

Restoration Grants -

Planning: Reversion

2010-11 Budget Act ($1,100,000) B0303Anadromous Fish Management -

Planning

Enacted 2013-14

3600-001-6051 Portion of support

budget - Fisheries

Restoration Grants:

Control Section

Adjustment

2010-11 Control

Section

Adjustment

($12,148) B0302Anadromous Fish ManagementEnacted 2010-11

3600-001-6051 Portion of support

budget - Fisheries

Restoration Grants:

Reversion

2010-11 Budget Act ($8,266,898) B0302Anadromous Fish ManagementEnacted 2013-14

3600-001-6051 Portion of support

budget - Fisheries

Restoration Grants:

Reversion

2010-11 Budget Act ($311,530) B0301Anadromous Fish Management -

Support

Enacted 2013-14

3600-001-6051 Portion of support

budget - Planning

2010-11 Budget Act $1,798,000 B0283Ecosystem Restoration Program -

Planning

Enacted 2010-11

3600-001-6051 Portion of support

budget - Planning:

Reversion

2010-11 Budget Act ($1,401,036) B0283Ecosystem Restoration Program -

Planning

Enacted 2013-14

3600-001-6051 Portion of support

budget: Control Section

Adjustment

2010-11 Control

Section

Adjustment

($23,667) B0302Anadromous Fish ManagementEnacted 2010-11

Wednesday, January 29, Page 155 of 3421:20:06 PM Public Resources Code (PRC) Section PRC §75050(a)Ch. 5Prop 84 Report

Page 159: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3600-001-6051 Portion of support

budget: Control Section

Adjustment

2010-11 Control

Section

Adjustment

($56,562) B0292Bay Delta - NCCPEnacted 2010-11

3600-001-6051 Portion of support

budget: Control Section

Adjustment

2010-11 Control

Section

Adjustment

($1,929,920) B0282Ecosystem Restoration ProgramEnacted 2010-11

3600-001-6051 Portion of support

budget: Natural

Reversion

2010-11 Natural

Reversion

($1,777,253) B0302Anadromous Fish ManagementEnacted 2014-15

3600-001-6051 Portion of support

budget: Natural

Reversion

2010-11 Natural

Reversion

($1) B0291Bay Delta - NCCP - SupportEnacted 2014-15

3600-001-6051 Portion of support

budget: Natural

Reversion

2010-11 Natural

Reversion

($44,483) B0282Delta Water Instream Flow ProgramEnacted 2014-15

3600-001-6051 Portion of support

budget: Natural

Reversion

2010-11 Natural

Reversion

($142,937) B0282Ecosystem Restoration ProgramEnacted 2014-15

3600-001-6051 Portion of support

budget: Natural

Reversion

2010-11 Natural

Reversion

($4) B0283Ecosystem Restoration Program -

Planning

Enacted 2014-15

3600-001-6051 Portion of support

budget: Reversion

2010-11 Budget Act ($939,725) B0292Bay Delta - NCCPEnacted 2013-14

3600-001-6051 Portion of support

budget: Reversion

2010-11 Budget Act ($3,064) B0291Bay Delta - NCCP - SupportEnacted 2013-14

3600-001-6051 Portion of support

budget: Reversion

2010-11 Budget Act ($307,275) B0282Delta Environmental ReviewEnacted 2013-14

3600-001-6051 Portion of support

budget: Reversion

2010-11 Budget Act ($277,416) B0282Delta Water Instream Flow ProgramEnacted 2013-14

3600-001-6051 Portion of support

budget: Reversion

2010-11 Budget Act ($6,768) B0282Ecosystem Restoration ProgramEnacted 2013-14

3600-001-6051 Portion of support

budget: Reversion

2010-11 Budget Act ($168,642) B0281Ecosystem Restoration Program -

Support

Enacted 2013-14

3600-001-6051 Portion of support

budget

2011-12 Budget Act $1,078,000 B0292Bay Delta - NCCPEnacted 2011-12

3600-001-6051 Portion of support

budget

2011-12 Budget Act $20,000 B0291Bay Delta - NCCP - SupportEnacted 2011-12

3600-001-6051 Portion of support

budget

2011-12 Budget Act $300,000 B0282Delta Environmental ReviewEnacted 2011-12

3600-001-6051 Portion of support

budget

2011-12 Budget Act $988,000 B0282Delta Water Instream Flow ProgramEnacted 2011-12

3600-001-6051 Portion of support

budget

2011-12 Budget Act $2,593,000 B0282Ecosystem Restoration ProgramEnacted 2011-12

3600-001-6051 Portion of support

budget

2011-12 Budget Act $85,000 B0281Ecosystem Restoration Program -

Support

Enacted 2011-12

3600-001-6051 Portion of support

budget - Fisheries

Restoration Grants

2011-12 Budget Act $347,000 B0301Anadromous Fish Management -

Support

Enacted 2011-12

Wednesday, January 29, Page 156 of 3421:20:06 PM Public Resources Code (PRC) Section PRC §75050(a)Ch. 5Prop 84 Report

Page 160: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3600-001-6051 Portion of support

budget - Fisheries

Restoration Grants -

Planning

2011-12 Budget Act $308,000 B0303Anadromous Fish Management -

Planning

Enacted 2011-12

3600-001-6051 Portion of support

budget - Fisheries

Restoration Grants -

Planning: Reversion

2011-12 Budget Act ($308,000) B0303Anadromous Fish Management -

Planning

Enacted 2013-14

3600-001-6051 Portion of support

budget - Fisheries

Restoration Grants:

Control Section

Adjustment

2011-12 Control

Section

Adjustment

($24,723) B0301Anadromous Fish Management -

Support

Enacted 2011-12

3600-001-6051 Portion of support

budget - Fisheries

Restoration Grants:

Reversion

2011-12 Budget Act ($296,111) B0301Anadromous Fish Management -

Support

Enacted 2013-14

3600-001-6051 Portion of support

budget - Planning

2011-12 Budget Act $1,798,000 B0283Ecosystem Restoration Program -

Planning

Enacted 2011-12

3600-001-6051 Portion of support

budget - Planning:

Reversion

2011-12 Budget Act ($1,526,800) B0283Ecosystem Restoration Program -

Planning

Enacted 2013-14

3600-001-6051 Portion of support

budget: Control Section

Adjustment

2011-12 Control

Section

Adjustment

($203,311) B0292Bay Delta - NCCPEnacted 2011-12

3600-001-6051 Portion of support

budget: Control Section

Adjustment

2011-12 Control

Section

Adjustment

($480,980) B0282Ecosystem Restoration ProgramEnacted 2011-12

3600-001-6051 Portion of support

budget: Natural

Reversion

2011-12 Natural

Reversion

($116) B0301Anadromous Fish Management -

Support

Enacted 2014-15

3600-001-6051 Portion of support

budget: Natural

Reversion

2011-12 Natural

Reversion

($200) B0291Bay Delta - NCCP - SupportEnacted 2014-15

3600-001-6051 Portion of support

budget: Natural

Reversion

2011-12 Natural

Reversion

($1,015) B0282Delta Environmental ReviewEnacted 2014-15

3600-001-6051 Portion of support

budget: Natural

Reversion

2011-12 Natural

Reversion

($158,776) B0282Delta Water Instream Flow ProgramEnacted 2014-15

3600-001-6051 Portion of support

budget: Natural

Reversion

2011-12 Natural

Reversion

($9,704) B0282Ecosystem Restoration ProgramEnacted 2014-15

3600-001-6051 Portion of support

budget: Reversion

2011-12 Budget Act ($496,645) B0292Bay Delta - NCCPEnacted 2013-14

3600-001-6051 Portion of support

budget: Reversion

2011-12 Budget Act ($2,862) B0291Bay Delta - NCCP - SupportEnacted 2013-14

3600-001-6051 Portion of support

budget: Reversion

2011-12 Budget Act ($224,828) B0282Delta Environmental ReviewEnacted 2013-14

Wednesday, January 29, Page 157 of 3421:20:06 PM Public Resources Code (PRC) Section PRC §75050(a)Ch. 5Prop 84 Report

Page 161: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3600-001-6051 Portion of support

budget: Reversion

2011-12 Budget Act ($172,855) B0282Delta Water Instream Flow ProgramEnacted 2013-14

3600-001-6051 Portion of support

budget: Reversion

2011-12 Budget Act ($1,758,614) B0282Ecosystem Restoration ProgramEnacted 2013-14

3600-001-6051 Portion of support

budget: Reversion

2011-12 Budget Act ($16,387) B0281Ecosystem Restoration Program -

Support

Enacted 2013-14

3600-001-6051 Portion of support

budget

2012-13 Budget Act $2,087,236 B0292Bay Delta - NCCPEnacted 2012-13

3600-001-6051 Portion of support

budget

2012-13 Budget Act $51,764 B0291Bay Delta - NCCP - SupportEnacted 2012-13

3600-001-6051 Portion of support

budget

2012-13 Budget Act $300,000 B0282Delta Environmental ReviewEnacted 2012-13

3600-001-6051 Portion of support

budget

2012-13 Budget Act $988,000 B0282Delta Water Instream Flow ProgramEnacted 2012-13

3600-001-6051 Portion of support

budget

2012-13 Budget Act $3,168,000 B0282Ecosystem Restoration ProgramEnacted 2012-13

3600-001-6051 Portion of support

budget

2012-13 Budget Act $580,000 B0281Ecosystem Restoration Program -

Support

Enacted 2012-13

3600-001-6051 Portion of support

budget - Fisheries

Restoration Grants

2012-13 Budget Act $128,000 B0301Anadromous Fish Management -

Support

Enacted 2012-13

3600-001-6051 Portion of support

budget - Fisheries

Restoration Grants:

Control Section

Adjustment

2012-13 Control

Section

Adjustment

$2,957 B0301Anadromous Fish Management -

Support

Enacted 2012-13

3600-001-6051 Portion of support

budget - Fisheries

Restoration Grants:

Natural Reversion

2012-13 Natural

Reversion

($121) B0301Anadromous Fish Management -

Support

Enacted 2016-17

3600-001-6051 Portion of support

budget - Fisheries

Restoration Grants:

Reversion

2012-13 Budget Act ($19,555) B0301Anadromous Fish Management -

Support

Enacted 2016-17

3600-001-6051 Portion of support

budget - Planning

2012-13 Budget Act $1,798,000 B0283Ecosystem Restoration Program -

Planning

Enacted 2012-13

3600-001-6051 Portion of support

budget - Planning:

Natural Reversion

2012-13 Natural

Reversion

($27,522) B0283Ecosystem Restoration Program -

Planning

Enacted 2016-17

3600-001-6051 Portion of support

budget - Planning:

Reversion

2012-13 Budget Act ($543,313) B0283Ecosystem Restoration Program -

Planning

Enacted 2016-17

3600-001-6051 Portion of support

budget: Control Section

Adjustment

2012-13 Control

Section

Adjustment

($91,539) B0292Bay Delta - NCCPEnacted 2012-13

3600-001-6051 Portion of support

budget: Natural

Reversion

2012-13 Natural

Reversion

($2,410) B0292Bay Delta - NCCPEnacted 2016-17

Wednesday, January 29, Page 158 of 3421:20:06 PM Public Resources Code (PRC) Section PRC §75050(a)Ch. 5Prop 84 Report

Page 162: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3600-001-6051 Portion of support

budget: Natural

Reversion

2012-13 Natural

Reversion

($91) B0291Bay Delta - NCCP - SupportEnacted 2016-17

3600-001-6051 Portion of support

budget: Natural

Reversion

2012-13 Natural

Reversion

($99,352) B0282Delta Water Instream Flow ProgramEnacted 2016-17

3600-001-6051 Portion of support

budget: Natural

Reversion

2012-13 Natural

Reversion

($546,941) B0282Ecosystem Restoration ProgramEnacted 2016-17

3600-001-6051 Portion of support

budget: Natural

Reversion

2012-13 Natural

Reversion

($104) B0281Ecosystem Restoration Program -

Support

Enacted 2016-17

3600-001-6051 Portion of support

budget: Reversion

2012-13 Budget Act ($1,531,634) B0292Bay Delta - NCCPEnacted 2016-17

3600-001-6051 Portion of support

budget: Reversion

2012-13 Budget Act ($13,800) B0291Bay Delta - NCCP - SupportEnacted 2016-17

3600-001-6051 Portion of support

budget: Reversion

2012-13 Budget Act ($256,621) B0282Delta Environmental ReviewEnacted 2016-17

3600-001-6051 Portion of support

budget: Reversion

2012-13 Budget Act ($72,363) B0282Delta Water Instream Flow ProgramEnacted 2016-17

3600-001-6051 Portion of support

budget: Reversion

2012-13 Budget Act ($138,116) B0282Ecosystem Restoration ProgramEnacted 2016-17

3600-001-6051 Portion of support

budget: Reversion

2012-13 Budget Act ($427,598) B0281Ecosystem Restoration Program -

Support

Enacted 2016-17

3600-001-6051 Portion of support

budget

2013-14 Budget Act $4,364,000 B0292Bay Delta - NCCPEnacted 2013-14

3600-001-6051 Portion of support

budget

2013-14 Budget Act $300,000 B0282Delta Environmental ReviewEnacted 2013-14

3600-001-6051 Portion of support

budget

2013-14 Budget Act $988,000 B0282Delta Water Instream Flow ProgramEnacted 2013-14

3600-001-6051 Portion of support

budget

2013-14 Budget Act $12,105,000 B0282Ecosystem Restoration ProgramEnacted 2013-14

3600-001-6051 Portion of support

budget

2013-14 Budget Act $3,000,000 B0281Ecosystem Restoration Program -

Support

Enacted 2013-14

3600-001-6051 Portion of support

budget - Fisheries

Restoration Grants

2013-14 Budget Act $4,134,417 B0302Anadromous Fish ManagementEnacted 2013-14

3600-001-6051 Portion of support

budget - Fisheries

Restoration Grants

2013-14 Budget Act $237,166 B0301Anadromous Fish Management -

Support

Enacted 2013-14

3600-001-6051 Portion of support

budget - Fisheries

Restoration Grants -

Planning

2013-14 Budget Act $485,417 B0303Anadromous Fish Management -

Planning

Enacted 2013-14

3600-001-6051 Portion of support

budget - Fisheries

Restoration Grants -

Planning: Reversion

2013-14 Budget Act ($10,846) B0303Anadromous Fish Management -

Planning

Enacted 2017-18

Wednesday, January 29, Page 159 of 3421:20:06 PM Public Resources Code (PRC) Section PRC §75050(a)Ch. 5Prop 84 Report

Page 163: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3600-001-6051 Portion of support

budget - Fisheries

Restoration Grants:

Control Section

Adjustment

2013-14 Control

Section

Adjustment

$5,000 B0301Anadromous Fish Management -

Support

Enacted 2013-14

3600-001-6051 Portion of support

budget - Fisheries

Restoration Grants:

Reversion

2013-14 Budget Act ($144,202) B0302Anadromous Fish ManagementEnacted 2017-18

3600-001-6051 Portion of support

budget - Fisheries

Restoration Grants:

Reversion

2013-14 Budget Act ($4,952) B0301Anadromous Fish Management -

Support

Enacted 2017-18

3600-001-6051 Portion of support

budget - Planning

2013-14 Budget Act $1,798,000 B0283Ecosystem Restoration Program -

Planning

Enacted 2013-14

3600-001-6051 Portion of support

budget - Planning:

Reversion

2013-14 Budget Act ($148,098) B0283Ecosystem Restoration Program -

Planning

Enacted 2017-18

3600-001-6051 Portion of support

budget: Control Section

Adjustment

2013-14 Control

Section

Adjustment

$7,000 B0292Bay Delta - NCCPEnacted 2013-14

3600-001-6051 Portion of support

budget: Control Section

Adjustment

2013-14 Control

Section

Adjustment

$6,000 B0282Delta Environmental ReviewEnacted 2013-14

3600-001-6051 Portion of support

budget: Control Section

Adjustment

2013-14 Control

Section

Adjustment

$6,000 B0282Delta Water Instream Flow ProgramEnacted 2013-14

3600-001-6051 Portion of support

budget: Control Section

Adjustment

2013-14 Control

Section

Adjustment

$54,446 B0282Ecosystem Restoration ProgramEnacted 2013-14

3600-001-6051 Portion of support

budget: Reversion

2013-14 Budget Act ($807,020) B0292Bay Delta - NCCPEnacted 2017-18

3600-001-6051 Portion of support

budget: Reversion

2013-14 Budget Act ($171,312) B0282Delta Environmental ReviewEnacted 2017-18

3600-001-6051 Portion of support

budget: Reversion

2013-14 Budget Act ($425,323) B0282Delta Water Instream Flow ProgramEnacted 2017-18

3600-001-6051 Portion of support

budget: Reversion

2013-14 Budget Act ($1,481,377) B0282Ecosystem Restoration ProgramEnacted 2017-18

3600-001-6051 Portion of support

budget: Reversion

2013-14 Budget Act ($851,870) B0281Ecosystem Restoration Program -

Support

Enacted 2017-18

3600-001-6051 Portion of support

budget

2014-15 Budget Act $1,191,000 B0292Bay Delta - NCCPEnacted 2014-15

3600-001-6051 Portion of support

budget

2014-15 Budget Act $300,000 B0282Delta Environmental ReviewEnacted 2014-15

3600-001-6051 Portion of support

budget

2014-15 Budget Act $988,000 B0282Delta Water Instream Flow ProgramEnacted 2014-15

3600-001-6051 Portion of support

budget

2014-15 Budget Act $6,157,419 B0282Ecosystem Restoration Program -

Projects

Enacted 2014-15

Wednesday, January 29, Page 160 of 3421:20:06 PM Public Resources Code (PRC) Section PRC §75050(a)Ch. 5Prop 84 Report

Page 164: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3600-001-6051 Portion of support

budget

2014-15 Budget Act $277,581 B0281Ecosystem Restoration Program -

Support

Enacted 2014-15

3600-001-6051 Portion of support

budget - Fisheries

Restoration Grants

2014-15 Budget Act $4,231,307 B0302Anadromous Fish ManagementEnacted 2014-15

3600-001-6051 Portion of support

budget - Fisheries

Restoration Grants

2014-15 Budget Act $108,190 B0301Anadromous Fish Management -

Support

Enacted 2014-15

3600-001-6051 Portion of support

budget - Fisheries

Restoration Grants -

Planning

2014-15 Budget Act $509,503 B0303Anadromous Fish Management -

Planning

Enacted 2014-15

3600-001-6051 Portion of support

budget - Fisheries

Restoration Grants:

Control Section

Adjustment

2014-15 Control

Section

Adjustment

$40,096 B0301Anadromous Fish Management -

Support

Enacted 2014-15

3600-001-6051 Portion of support

budget - Planning

2014-15 Budget Act $1,798,000 B0283Ecosystem Restoration Program -

Planning

Enacted 2014-15

3600-001-6051 Portion of support

budget - Planning:

Reversion

2014-15 Budget Act ($576,142) B0283Ecosystem Restoration Program -

Planning

Enacted 2017-18

3600-001-6051 Portion of support

budget: Control Section

Adjustment

2014-15 Control

Section

Adjustment

$123,085 B0292Bay Delta - NCCPEnacted 2014-15

3600-001-6051 Portion of support

budget: Control Section

Adjustment

2014-15 Control

Section

Adjustment

$12,956 B0282Delta Environmental ReviewEnacted 2014-15

3600-001-6051 Portion of support

budget: Control Section

Adjustment

2014-15 Control

Section

Adjustment

$58,304 B0282Delta Water Instream Flow ProgramEnacted 2014-15

3600-001-6051 Portion of support

budget: Control Section

Adjustment

2014-15 Control

Section

Adjustment

$453,472 B0281Ecosystem Restoration Program -

Support

Enacted 2014-15

3600-001-6051 Portion of support

budget: Reversion

2014-15 Budget Act ($1,180,128) B0292Bay Delta - NCCPEnacted 2017-18

3600-001-6051 Portion of support

budget: Reversion

2014-15 Budget Act ($290,449) B0282Delta Environmental ReviewEnacted 2017-18

3600-001-6051 Portion of support

budget: Reversion

2014-15 Budget Act ($989,567) B0282Delta Water Instream Flow ProgramEnacted 2017-18

3600-001-6051 Portion of support

budget: Reversion

2014-15 Budget Act ($2,305,393) B0282Ecosystem Restoration ProgramEnacted 2017-18

3600-001-6051 Portion of support

budget: Reversion

2014-15 Budget Act ($593,321) B0281Ecosystem Restoration Program -

Support

Enacted 2017-18

3600-001-6051 Portion of support

budget

2015-16 Budget Act $1,064,000 B0292Bay Delta - NCCPEnacted 2015-16

3600-001-6051 Portion of support

budget

2015-16 Budget Act $5,010,419 B0282Ecosystem Restoration ProgramEnacted 2015-16

Wednesday, January 29, Page 161 of 3421:20:07 PM Public Resources Code (PRC) Section PRC §75050(a)Ch. 5Prop 84 Report

Page 165: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3600-001-6051 Portion of support

budget

2015-16 Budget Act $277,581 B0281Ecosystem Restoration Program -

Support

Enacted 2015-16

3600-001-6051 Portion of support

budget - Fisheries

Restoration Grants

2015-16 Budget Act $4,288,194 B0302Anadromous Fish ManagementEnacted 2015-16

3600-001-6051 Portion of support

budget - Fisheries

Restoration Grants

2015-16 Budget Act $313,276 B0301Anadromous Fish Management -

Support

Enacted 2015-16

3600-001-6051 Portion of support

budget - Fisheries

Restoration Grants -

Planning

2015-16 Budget Act $270,530 B0303Anadromous Fish Management -

Planning

Enacted 2015-16

3600-001-6051 Portion of support

budget - Fisheries

Restoration Grants:

Control Section

Adjustment

2015-16 Control

Section

Adjustment

$29,000 B0301Anadromous Fish Management -

Support

Enacted 2015-16

3600-001-6051 Portion of support

budget - Planning

2015-16 Budget Act $1,235,000 B0283Ecosystem Restoration Program -

Planning

Enacted 2015-16

3600-001-6051 Portion of support

budget: Control Section

Adjustment

2015-16 Control

Section

Adjustment

$179,000 B0281Ecosystem Restoration Program -

Support

Enacted 2015-16

3600-001-6051 Portion of support

budget

2016-17 Budget Act $1,500,000 B0282Bay Delta - NCCPEnacted 2016-17

3600-001-6051 Portion of support

budget

2016-17 Budget Act $366,350 B0283Ecosystem Restoration Program -

Planning

Enacted 2016-17

3600-001-6051 Portion of support

budget

2016-17 Budget Act $5,460,650 B0282Ecosystem Restoration Program -

Projects

Enacted 2016-17

3600-001-6051 Portion of support

budget - Fisheries

Restoration Grants

2016-17 Budget Act $685,034 B0303Anadromous Fish Management -

Planning

Enacted 2016-17

3600-001-6051 Portion of support

budget - Fisheries

Restoration Grants

2016-17 Budget Act $3,735,000 B0302Anadromous Fish Management -

Projects

Enacted 2016-17

3600-001-6051 Portion of support

budget - Fisheries

Restoration Grants:

Reversion

2016-17 Budget Act ($228,000) B0303Anadromous Fish Management -

Planning

Enacted 2019-20

3600-001-6051 Portion of support

budget - Fisheries

Restoration Grants:

Reversion

2016-17 Budget Act ($3,735,000) B0302Anadromous Fish Management -

Projects

Enacted 2019-20

3600-001-6051 Portion of support

budget: Control Section

Adjustment

2016-17 Control

Section

Adjustment

$27,000 B0303Anadromous Fish Management -

Planning

Enacted 2016-17

3600-001-6051 Portion of support

budget: Control Section

Adjustment

2016-17 Control

Section

Adjustment

$143,000 B0283Ecosystem Restoration Program -

Planning

Enacted 2016-17

3600-001-6051 Portion of support

budget: Reversion

2016-17 Budget Act ($5,248,000) B0282Ecosystem Restoration Program -

Projects

Enacted 2019-20

Wednesday, January 29, Page 162 of 3421:20:07 PM Public Resources Code (PRC) Section PRC §75050(a)Ch. 5Prop 84 Report

Page 166: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3600-001-6051 Portion of support

budget

2017-18 Budget Act $6,295,000 B0292Bay Delta - NCCPEnacted 2017-18

3600-001-6051 Portion of support

budget - Fisheries

Restoration Grants

2017-18 Budget Act $3,691,000 B0302Anadromous Fish Management -

Projects

Enacted 2017-18

3600-001-6051 Portion of support

budget - Fisheries

Restoration Grants:

Control Section

Adjustment

2017-18 Control

Section

Adjustment

$31,000 B0302Anadromous Fish Management -

Projects

Enacted 2017-18

3600-001-6051 Portion of support

budget: Control Section

Adjustment

2017-18 Control

Section

Adjustment

$133,000 B0292Bay Delta - NCCPEnacted 2017-18

3600-001-6051 Portion of support

budget

2018-19 Budget Act $6,036,000 B0292Bay Delta - NCCPEnacted 2018-19

3600-001-6051 Portion of support

budget

2018-19 Budget Act $138,000 B0291Bay Delta - NCCP - SupportEnacted 2018-19

3600-001-6051 Portion of support

budget - Fisheries

Restoration Grants

2018-19 Budget Act $4,062,000 B0302Anadromous Fish Management -

Projects

Enacted 2018-19

3600-001-6051 Portion of support

budget - Fisheries

Restoration Grants

2018-19 Budget Act $33,000 B0301Anadromous Fish Management -

Support

Enacted 2018-19

3600-001-6051 Portion of support

budget: Control Section

Adjustment

2018-19 Control

Section

Adjustment

$73,000 B0301Anadromous Fish Management -

Support

Enacted 2018-19

3600-001-6051 Portion of support

budget: Control Section

Adjustment

2018-19 Control

Section

Adjustment

$107,000 B0291Bay Delta - NCCP - SupportEnacted 2018-19

3600-001-6051 Portion of support

budget

2019-20 Budget Act $1,069,000 B0282Bay Delta - NCCPEnacted 2019-20

3600-001-6051 Portion of support

budget

2019-20 Budget Act $245,000 B0291Bay Delta - NCCP - SupportEnacted 2019-20

3600-001-6051 Portion of support

budget

2019-20 Budget Act $67,000 B0282Delta Water Instream Flow

Program - SBX71 Projects

Enacted 2019-20

3600-001-6051 Portion of support

budget

2019-20 Budget Act $38,000 B0283Ecosystem Restoration Program -

Planning

Enacted 2019-20

3600-001-6051 Portion of support

budget

2019-20 Budget Act $4,074,000 B0282Ecosystem Restoration Program -

Projects

Enacted 2019-20

3600-001-6051 Portion of support

budget - Fisheries

Restoration Grants

2019-20 Budget Act $106,000 B0301Anadromous Fish Management -

Support

Enacted 2019-20

3600-001-6051 Portion of support

budget - Fisheries

Restoration Grants

2019-20 Budget Act $364,000 B0303Coastal salmon and steelhead

fishery restoration - Planning

Enacted 2019-20

3600-001-6051 Portion of support

budget - Fisheries

Restoration Grants

2019-20 Budget Act $3,599,000 B0302Coastal salmon and steelhead

fishery restoration - Projects

Enacted 2019-20

Wednesday, January 29, Page 163 of 3421:20:07 PM Public Resources Code (PRC) Section PRC §75050(a)Ch. 5Prop 84 Report

Page 167: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3600-501-6051 Coastal salmon and

steelhead fishery

restoration projects

2007-08 Special

Legislation

$5,293,000 B0302Coastal SalmonEnacted 2008-09

3600-501-6051 Coastal salmon and

steelhead fishery

restoration projects:

Natural Reversion

2007-08 Natural

Reversion

($215,124) B0302Coastal SalmonEnacted 2012-13

Sum: $184,163,459Enacted

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3600-001-6051 Portion of support

budget: Reversion

2015-16 Budget Act ($328,559) B0292Bay Delta - NCCPEnacted/Not 2018-19

3600-001-6051 Portion of support

budget: Reversion

2015-16 Budget Act ($2,694,411) B0282Ecosystem Restoration ProgramEnacted/Not 2018-19

3600-001-6051 Portion of support

budget: Reversion

2015-16 Budget Act ($171,945) B0281Ecosystem Restoration Program -

Support

Enacted/Not 2018-19

3600-001-6051 Portion of support

budget: Control Section

Adjustment

2019-20 Control

Section

Adjustment

$6,000 B0301Anadromous Fish Management -

Support

Enacted/Not 2019-20

3600-001-6051 Portion of support

budget: Control Section

Adjustment

2019-20 Control

Section

Adjustment

$4,000 B0291Bay Delta - NCCP - SupportEnacted/Not 2019-20

Sum: ($3,184,915)Enacted/Not Posted

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3600-001-6051 Portion of support

budget - Fisheries

Restoration Grants:

Control Section

Adjustment:

Reappropriation

(decrease)

2017-18 Budget Act ($31,000) B0302Anadromous Fish Management -

Projects

Proposed 2017-18

3600-001-6051 Portion of support

budget - Fisheries

Restoration Grants:

Reappropriation

(decrease)

2017-18 Budget Act ($3,691,000) B0302Anadromous Fish Management -

Projects

Proposed 2017-18

3600-001-6051 Portion of support

budget: Control Section

Adjustment:

Reappropriation

(decrease)

2017-18 Budget Act ($133,000) B0292Bay Delta - NCCPProposed 2017-18

3600-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2017-18 Budget Act ($6,295,000) B0292Bay Delta - NCCPProposed 2017-18

Wednesday, January 29, Page 164 of 3421:20:07 PM Public Resources Code (PRC) Section PRC §75050(a)Ch. 5Prop 84 Report

Page 168: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3600-001-6051 (1) Portion of support

budget - Fisheries

Restoration Grants:

Control Section

Adjustment:

Reappropriation

(increase)

2017-18 Budget Act $31,000 B0302Anadromous Fish Management -

Projects

Proposed 2020-21

3600-001-6051 (1) Portion of support

budget - Fisheries

Restoration Grants:

Reappropriation

(increase)

2017-18 Budget Act $3,691,000 B0302Anadromous Fish Management -

Projects

Proposed 2020-21

3600-001-6051 (1) Portion of support

budget: Control Section

Adjustment:

Reappropriation

(increase)

2017-18 Budget Act $133,000 B0292Bay Delta - NCCPProposed 2020-21

3600-001-6051 (1) Portion of support

budget:

Reappropriation

(increase)

2017-18 Budget Act $6,295,000 B0292Bay Delta - NCCPProposed 2020-21

3600-001-6051 (1) Portion of support

budget

2020-21 Budget Act $249,000 B0301Bay Delta - NCCP - SupportProposed 2020-21

3600-001-6051 (2) Portion of support

budget

2020-21 Budget Act $112,000 B0301Anadromous Fish Management -

Support

Proposed 2020-21

Sum: $361,000Proposed

Sum: $181,339,544

($9,083,544)

Balance for Bay-Delta and coastal fishery restoration:

Wednesday, January 29, Page 165 of 3421:20:07 PM Public Resources Code (PRC) Section PRC §75050(a)Ch. 5Prop 84 Report

Page 169: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

Protection of Rivers, Lakes and StreamsChapter 5

Allocation: Water Conservation Projects

Allocation $: $43,000,000$223,835

$443,192Statewide Set Asides: $667,027 {

Outyear Obligations: $0

$0

$0

{

PRC §75050(b)Ch. 5

Appropriations, Proposals and Reversions

Statewide, requiring appropriation:

Statewide, not requiring appropriation:

Outyear Program Delivery commitments:

Outyear Cap. Outlay (to complete started projects):Reversions are shown below$0

Outyear Local Asst. commitments:

Unspecified. Includes up to $36 million that could be available for water conservation projects that implement the Allocation Agreement as defined in the

Quantification Settlement Agreement and up to $7 million that could be available for projects to implement the Lower Colorado River Multi-Species Habitat

Conservation Plan.

Dept.: Unspecified

Other Outyear Support commitments:$0

Committed

$0

$0

$0

$0

Proposed

$0

Prop 1 Reduction $837,973

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3600-001-6051 Portion of support

budget

2007-08 Budget Act $6,755,000 B0332Lower Colorado River Multi-

Species HCP

Enacted 2007-08

3600-001-6051 Portion of support

budget: Reversion

2007-08 Budget Act ($15) B0332Lower Colorado River Multi-

Species HCP

Enacted 2013-14

3860-101-6051 Portion of local

assistance budget

2007-08 Budget Act $34,740,000 B0322All-American Canal projectEnacted 2007-08

Sum: $41,494,985Enacted

Sum: $41,494,985

$15

Balance for Water Conservation Projects:

Wednesday, January 29, Page 166 of 3421:20:07 PM Public Resources Code (PRC) Section PRC §75050(b)Ch. 5Prop 84 Report

Page 170: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

Protection of Rivers, Lakes and StreamsChapter 5

Allocation: Salton Sea Restoration

Allocation $: $47,000,000$244,656

$484,419Statewide Set Asides: $729,076 {

Outyear Obligations: $1,184,000

$0

$0

{

PRC §75050(b)(3)Ch. 5

Appropriations, Proposals and Reversions

Statewide, requiring appropriation:

Statewide, not requiring appropriation:

Outyear Program Delivery commitments:

Outyear Cap. Outlay (to complete started projects):Reversions are shown below$0

Outyear Local Asst. commitments:

Available for deposit into the Salton Sea Restoration Fund. (Fund 8018)

Dept.: Unspecified

Other Outyear Support commitments:$1,184,000

Committed

$0

$0

$0

$0

Proposed

$0

Prop 1 Reduction $915,924

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3600-001-6051 Transfer to Salton Sea

Restoration Fund (Fund

8018)

2016-17 Budget Act $176,966 B0342Salton Sea "No-Action" AlternativeEnacted 2016-17

3600-002-6051 Transfer to Salton Sea

Restoration Fund (Fund

8018)

2007-08 Budget Act $13,300,000 B0342Salton SeaEnacted 2007-08

3600-002-6051 Transfer to Salton Sea

Restoration Fund (Fund

8018): Natural

Reversion

2007-08 Natural

Reversion

($3,114,603) B0342Salton SeaEnacted 2017-18

3600-002-6051 Transfer to Salton Sea

Restoration Fund (Fund

8018)

2008-09 Budget Act $300,000 B0341Salton SeaEnacted 2008-09

3600-002-6051 Transfer to Salton Sea

Restoration Fund (Fund

8018)

2008-09 Budget Act $10,450,000 B0342Salton SeaEnacted 2008-09

3600-002-6051 Transfer to Salton Sea

Restoration Fund (Fund

8018): Natural

Reversion

2008-09 Natural

Reversion

($300,000) B0341Salton SeaEnacted 2017-18

3600-002-6051 Transfer to Salton Sea

Restoration Fund (Fund

8018): Natural

Reversion

2008-09 Natural

Reversion

($5,553,949) B0342Salton SeaEnacted 2017-18

Wednesday, January 29, Page 167 of 3421:20:07 PM Public Resources Code (PRC) Section PRC §75050(b)(3)Ch. 5Prop 84 Report

Page 171: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3600-002-6051 Transfer to Salton Sea

Restoration Fund (Fund

8018)

2009-10 Budget Act $5,296,000 B0342Salton Sea "No-Action" AlternativeEnacted 2009-10

3600-002-6051 Transfer to Salton Sea

Restoration Fund (Fund

8018): Natural

Reversion

2009-10 Natural

Reversion

($4,106,765) B0342Salton Sea "No-Action" AlternativeEnacted 2017-18

3600-002-6051 Transfer to Salton Sea

Restoration Fund (Fund

8018)

2010-11 Budget Act $296,000 B0342Salton Sea "No-Action" AlternativeEnacted 2010-11

3600-002-6051 Transfer to Salton Sea

Restoration Fund (Fund

8018)

2011-12 Budget Act $282,000 B0342Salton Sea "No-Action" AlternativeEnacted 2011-12

3600-002-6051 Transfer to Salton Sea

Restoration Fund (Fund

8018)

2011-12 Budget Act $14,000 B0341Salton Sea "No-Action"

Alternative - Support

Enacted 2011-12

3600-002-6051 Transfer to Salton Sea

Restoration Fund (Fund

8018): Natural

Reversion

2011-12 Natural

Reversion

($79,057) B0342Salton Sea "No-Action" AlternativeEnacted 2015-16

3600-002-6051 Transfer to Salton Sea

Restoration Fund (Fund

8018): Natural

Reversion

2011-12 Natural

Reversion

($14,000) B0341Salton Sea "No-Action"

Alternative - Support

Enacted 2015-16

3600-002-6051 Transfer to Salton Sea

Restoration Fund (Fund

8018)

2012-13 Budget Act $296,000 B0342Salton Sea "No-Action" AlternativeEnacted 2012-13

3600-002-6051 Transfer to Salton Sea

Restoration Fund (Fund

8018): Natural

Reversion

2012-13 Natural

Reversion

($296,000) B0342Salton Sea "No-Action" AlternativeEnacted 2016-17

3600-002-6051 Transfer to Salton Sea

Restoration Fund (Fund

8018)

2013-14 Budget Act $12,396,000 B0342Salton Sea "No-Action" AlternativeEnacted 2013-14

3600-002-6051 Transfer to Salton Sea

Restoration Fund (Fund

8018): Natural

Reversion

2013-14 Natural

Reversion

($12,396,000) B0342Salton Sea "No-Action" AlternativeEnacted 2017-18

3600-002-6051 Transfer to Salton Sea

Restoration Fund (Fund

8018)

2014-15 Budget Act $296,000 B0342Salton Sea "No-Action" AlternativeEnacted 2014-15

3600-002-6051 Transfer to Salton Sea

Restoration Fund (Fund

8018): Natural

Reversion

2014-15 Natural

Reversion

($295,784) B0342Salton Sea "No-Action" AlternativeEnacted 2017-18

3600-002-6051 Transfer to Salton Sea

Restoration Fund (Fund

8018)

2015-16 Budget Act $296,000 B0342Salton Sea "No-Action" AlternativeEnacted 2015-16

Wednesday, January 29, Page 168 of 3421:20:07 PM Public Resources Code (PRC) Section PRC §75050(b)(3)Ch. 5Prop 84 Report

Page 172: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3600-002-6051 Transfer to Salton Sea

Restoration Fund (Fund

8018): Natural

Reversion

2015-16 Natural

Reversion

($296,000) B0342Salton Sea "No-Action" AlternativeEnacted 2018-19

3600-002-6051 Transfer to Salton Sea

Restoration Fund (Fund

8018)

2016-17 Budget Act $296,000 B0342Salton Sea "No-Action" AlternativeEnacted 2016-17

3600-002-6051 Transfer to Salton Sea

Restoration Fund (Fund

8018)

2017-18 Budget Act $296,000 B0342Salton Sea "No-Action" AlternativeEnacted 2017-18

3600-002-6051 Transfer to Salton Sea

Restoration Fund (Fund

8018)

2018-19 Budget Act $21,296,000 B0342Salton Sea "No-Action" AlternativeEnacted 2018-19

3600-002-6051 Transfer to Salton Sea

Restoration Fund (Fund

8018): Reversion

2018-19 Budget Act ($21,296,000) B0342Salton Sea "No-Action" AlternativeEnacted 2019-20

3600-002-6051 Transfer to Salton Sea

Restoration Fund (Fund

8018)

2019-20 Budget Act $296,000 B0342Salton Sea "No-Action" AlternativeEnacted 2019-20

3600-311-6051 Transfer to Salton Sea

Restoration Fund (Fund

8018)

2019-20 Budget Act $20,903,000 B0342Salton Sea "No-Action" AlternativeEnacted 2019-20

Sum: $38,737,808Enacted

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3600-002-6051 (1) Transfer to Salton Sea

Restoration Fund (Fund

8018)

2020-21 Budget Act $296,000 B0342Salton Sea "No-Action" AlternativeProposed 2020-21

Sum: $296,000Proposed

Sum: $39,033,808

$5,137,192

Balance for Salton Sea Restoration:

Wednesday, January 29, Page 169 of 3421:20:07 PM Public Resources Code (PRC) Section PRC §75050(b)(3)Ch. 5Prop 84 Report

Page 173: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

Protection of Rivers, Lakes and StreamsChapter 5

Allocation: Public access with State Water Project

Allocation $: $54,000,000$281,095

$556,567Statewide Set Asides: $837,661 {

Outyear Obligations: $0

$0

$0

{

PRC §75050(c)Ch. 5

Appropriations, Proposals and Reversions

Statewide, requiring appropriation:

Statewide, not requiring appropriation:

Outyear Program Delivery commitments:

Outyear Cap. Outlay (to complete started projects):Reversions are shown below$0

Outyear Local Asst. commitments:

Development, rehabilitation, acquisition and restoration costs related to providing public access to recreation and fish and wildlife resources in connection with

State Water Project obligations pursuant to Water Code §11912.

Dept.: Department of Water

Resources

Other Outyear Support commitments:$0

Committed

$0

$0

$0

$0

Proposed

$0

Prop 1 Reduction $1,052,339

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3860-301-6051 (1) Portion of capital outlay

budget

2013-14 Budget Act $11,324,000 B0352SWP Facilities Fish & Wildlife

Enhancement and Recreation -

Perris Dam Remediation

Enacted 2013-14

3860-301-6051 (1) Portion of capital outlay

budget

2014-15 Budget Act $26,400,000 B0352Perris Dam Remediation -SWP

Facilities Fish & Wildlife

Enacted 2014-15

3860-301-6051 (1)(a) Portion of capital outlay

budget

2019-20 Budget Act $5,000,000 B0352Perris Dam RemediationEnacted 2019-20

Sum: $42,724,000Enacted

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3860-301-6051 (1) Portion of capital outlay

budget

2020-21 Budget Act $5,000,000 B0352Perris Dam RemediationProposed 2020-21

Sum: $5,000,000Proposed

Sum: $47,724,000

$4,386,000

Balance for Public access with State Water Project:

Wednesday, January 29, Page 170 of 3421:20:07 PM Public Resources Code (PRC) Section PRC §75050(c)Ch. 5Prop 84 Report

Page 174: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

Protection of Rivers, Lakes and StreamsChapter 5

Allocation: River Parkway Program

Allocation $: $72,000,000$374,793

$742,089Statewide Set Asides: $1,116,882 {

Outyear Obligations: $312,000

$312,000

$0

{

PRC §75050(d)Ch. 5

Appropriations, Proposals and Reversions

Statewide, requiring appropriation:

Statewide, not requiring appropriation:

Outyear Program Delivery commitments:

Outyear Cap. Outlay (to complete started projects):Reversions are shown below$0

Outyear Local Asst. commitments:

Available for projects in accordance with the California River Parkways Act of 2004. Up to $10,000,000 may be transferred to the Department of Conservation for

the Watershed Coordinator Grant Program.

Dept.: Various

Other Outyear Support commitments:$0

Committed

$0

$0

$0

$0

Proposed

$0

Prop 1 Reduction $1,403,118

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

0540-001-6051 Portion of support

budget

2008-09 Budget Act $241,000 B0361California River Parkway Grant

Program

Enacted 2008-09

0540-001-6051 Portion of support

budget: Natural

Reversion

2008-09 Natural

Reversion

($230,024) B0361California River Parkway Grant

Program

Enacted 2012-13

0540-001-6051 Portion of support

budget

2009-10 Budget Act $422,000 B0361California River Parkway Grant

Program

Enacted 2009-10

0540-001-6051 Portion of support

budget: Control Section

Adjustment

2009-10 Control

Section

Adjustment

($32,286) B0361California River Parkway Grant

Program

Enacted 2009-10

0540-001-6051 Portion of support

budget: Natural

Reversion

2009-10 Natural

Reversion

($329,092) B0361California River Parkway Grant

Program

Enacted 2016-17

0540-001-6051 Portion of support

budget

2010-11 Budget Act $381,000 B0361California River Parkway Grant

Program

Enacted 2010-11

0540-001-6051 Portion of support

budget: Control Section

Adjustment

2010-11 Control

Section

Adjustment

($12,500) B0361California River Parkway Grant

Program

Enacted 2010-11

0540-001-6051 Portion of support

budget: Natural

Reversion

2010-11 Natural

Reversion

($243,480) B0361California River Parkway Grant

Program

Enacted 2013-14

0540-001-6051 Portion of support

budget

2011-12 Budget Act $536,000 B0361California River Parkway Grant

Program

Enacted 2011-12

0540-001-6051 Portion of support

budget: Control Section

Adjustment

2011-12 Control

Section

Adjustment

($55,500) B0361California River Parkway Grant

Program

Enacted 2011-12

Wednesday, January 29, Page 171 of 3421:20:07 PM Public Resources Code (PRC) Section PRC §75050(d)Ch. 5Prop 84 Report

Page 175: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

0540-001-6051 Portion of support

budget: Natural

Reversion

2011-12 Natural

Reversion

($200,702) B0361California River Parkway Grant

Program

Enacted 2015-16

0540-001-6051 Portion of support

budget

2012-13 Budget Act $536,000 B0361California River Parkway Grant

Program

Enacted 2012-13

0540-001-6051 Portion of support

budget: Control Section

Adjustment

2012-13 Control

Section

Adjustment

($14,503) B0361California River Parkway Grant

Program

Enacted 2012-13

0540-001-6051 Portion of support

budget: Natural

Reversion

2012-13 Natural

Reversion

($225,085) B0361California River Parkway Grant

Program

Enacted 2016-17

0540-001-6051 Portion of support

budget

2013-14 Budget Act $513,000 B0361California River Parkway Grant

Program

Enacted 2013-14

0540-001-6051 Portion of support

budget: Natural

Reversion

2013-14 Natural

Reversion

($306,339) B0361California River Parkway Grant

Program

Enacted 2017-18

0540-001-6051 Portion of support

budget

2014-15 Budget Act $382,000 B0361California River Parkway Grant

Program

Enacted 2014-15

0540-001-6051 Portion of support

budget: Control Section

Adjustment

2014-15 Control

Section

Adjustment

$9,210 B0361California River Parkway Grant

Program

Enacted 2014-15

0540-001-6051 Portion of support

budget: Natural

Reversion

2014-15 Natural

Reversion

($232,322) B0361California River Parkway Grant

Program

Enacted 2016-17

0540-001-6051 Portion of support

budget

2015-16 Budget Act $220,000 B0361California River Parkway Grant

Program

Enacted 2015-16

0540-001-6051 Portion of support

budget: Natural

Reversion

2015-16 Natural

Reversion

($38,580) B0361California River Parkway Grant

Program

Enacted 2017-18

0540-001-6051 Portion of support

budget

2016-17 Budget Act $300,000 B0361California River Parkway Grant

Program

Enacted 2016-17

0540-001-6051 Portion of support

budget

2017-18 Budget Act $260,000 B0361California River Parkway Grant

Program

Enacted 2017-18

0540-001-6051 Portion of support

budget

2018-19 Budget Act $310,000 B0361California River Parkway Grant

Program

Enacted 2018-19

0540-001-6051 Portion of support

budget

2019-20 Budget Act $310,000 B0361California River Parkway Grant

Program

Enacted 2019-20

0540-101-6051 Portion of local

assistance budget

2008-09 Budget Act $28,365,000 B0362California River Parkway Grant

Program

Enacted 2008-09

0540-101-6051 Portion of local

assistance budget

2009-10 Budget Act $27,565,000 B0362California River Parkway Grant

Program

Enacted 2009-10

0540-101-6051 Portion of local

assistance budget

2009-10 Budget Act $800,000 B0362Grant to City of Calexico for New

River project

Enacted 2009-10

0540-101-6051 Portion of local

assistance budget:

Reappropriation

(decrease)

2009-10 Budget Act ($27,565,000) B0362California River Parkway Grant

Program

Enacted 2016-17

Wednesday, January 29, Page 172 of 3421:20:07 PM Public Resources Code (PRC) Section PRC §75050(d)Ch. 5Prop 84 Report

Page 176: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

0540-101-6051 Portion of local

assistance budget:

Reappropriation

(decrease)

2009-10 Budget Act ($800,000) B0362Grant to City of Calexico for New

River project

Enacted 2016-17

0540-101-6051 Portion of local

assistance budget:

Reappropriation

(increase)

2009-10 Budget Act $27,565,000 B0362California River Parkway Grant

Program

Enacted 2019-20

0540-101-6051 Portion of local

assistance budget:

Reappropriation

(increase)

2009-10 Budget Act $800,000 B0362Grant to City of Calexico for New

River project

Enacted 2019-20

0540-101-6051 Portion of local

assistance budget

2016-17 Budget Act $729,000 B0362California River Parkway Grant

Program

Enacted 2016-17

0540-101-6051 Portion of local

assistance budget:

Reappropriation

(decrease)

2016-17 Budget Act ($729,000) B0362California River Parkway Grant

Program

Enacted 2016-17

0540-101-6051 Portion of local

assistance budget:

Reappropriation

(increase)

2016-17 Budget Act $729,000 B0362California River Parkway Grant

Program

Enacted 2019-20

3480-001-6051 Portion of support

budget

2008-09 Budget Act $100,000 B0361Watershed - Program DeliveryEnacted 2008-09

3480-001-6051 Portion of support

budget: Natural

Reversion

2008-09 Natural

Reversion

($47,200) B0361Watershed - Program DeliveryEnacted 2010-11

3480-001-6051 Portion of support

budget

2009-10 Budget Act $100,000 B0361Watershed - Program DeliveryEnacted 2009-10

3480-001-6051 Portion of support

budget: Natural

Reversion

2009-10 Natural

Reversion

($47,025) B0361Watershed - Program DeliveryEnacted 2013-14

3480-001-6051 Portion of support

budget

2010-11 Budget Act $100,000 B0361Watershed - Program DeliveryEnacted 2010-11

3480-001-6051 Portion of support

budget: Natural

Reversion

2010-11 Natural

Reversion

($15,184) B0361Watershed - Program DeliveryEnacted 2014-15

3480-001-6051 Portion of support

budget

2011-12 Budget Act $100,000 B0361Watershed - Program DeliveryEnacted 2011-12

3480-001-6051 Portion of support

budget: Natural

Reversion

2011-12 Natural

Reversion

($55,046) B0361Watershed - Program DeliveryEnacted 2013-14

3480-001-6051 Portion of support

budget

2012-13 Budget Act $126,000 B0361Watershed - Program DeliveryEnacted 2012-13

3480-001-6051 Portion of support

budget: Natural

Reversion

2012-13 Natural

Reversion

($55,064) B0361Watershed - Program DeliveryEnacted 2014-15

3480-001-6051 Portion of support

budget

2013-14 Budget Act $26,000 B0361Watershed - Program DeliveryEnacted 2013-14

Wednesday, January 29, Page 173 of 3421:20:07 PM Public Resources Code (PRC) Section PRC §75050(d)Ch. 5Prop 84 Report

Page 177: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3480-001-6051 Portion of support

budget: Natural

Reversion

2013-14 Natural

Reversion

($26,000) B0361Watershed - Program DeliveryEnacted 2015-16

3480-001-6051 Portion of support

budget

2019-20 Budget Act $9,000 B0361Watershed - Program DeliveryEnacted 2019-20

3480-101-6051 Portion of local

assistance budget

2008-09 Budget Act $2,000,000 B0362Watershed - ProjectsEnacted 2008-09

3480-101-6051 Portion of local

assistance budget:

Natural Reversion

2008-09 Natural

Reversion

($103,266) B0362Watershed - ProjectsEnacted 2015-16

3480-101-6051 Portion of local

assistance budget

2009-10 Budget Act $3,500,000 B0362Watershed - ProjectsEnacted 2009-10

3480-101-6051 Portion of local

assistance budget:

Natural Reversion

2009-10 Natural

Reversion

($160,917) B0362Watershed - ProjectsEnacted 2013-14

3480-101-6051 Portion of local

assistance budget

2011-12 Budget Act $3,650,000 B1112Watershed Coordinator Grant

Program

Enacted 2011-12

3480-101-6051 Portion of local

assistance budget:

Natural Reversion

2011-12 Natural

Reversion

($149,221) B1112Watershed Coordinator Grant

Program

Enacted 2016-17

Sum: $69,010,874Enacted

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

0540-001-6051 (1) Portion of support

budget

2020-21 Budget Act $156,000 B0361California River Parkway Grant

Program

Proposed 2020-21

Sum: $156,000Proposed

Sum: $69,166,874

$1,126

Balance for River Parkway Program:

Wednesday, January 29, Page 174 of 3421:20:07 PM Public Resources Code (PRC) Section PRC §75050(d)Ch. 5Prop 84 Report

Page 178: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

Protection of Rivers, Lakes and StreamsChapter 5

Allocation: Urban Streams Restoration Program

Allocation $: $18,000,000$93,698

$185,522Statewide Set Asides: $279,220 {

Outyear Obligations: $57,000

$0

$0

{

PRC §75050(e)Ch. 5

Appropriations, Proposals and Reversions

Statewide, requiring appropriation:

Statewide, not requiring appropriation:

Outyear Program Delivery commitments:

Outyear Cap. Outlay (to complete started projects):Reversions are shown below$0

Outyear Local Asst. commitments:

Urban Streams Restoration Program pursuant to Water Code §7048.

Dept.: Department of Water

Resources

Other Outyear Support commitments:$57,000

Committed

$0

$0

$0

$0

Proposed

$0

Prop 1 Reduction $350,780

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3860-001-6051 Portion of support

budget

2007-08 Budget Act $150,000 B0371Urban Streams Restoration Grant

Program

Enacted 2007-08

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2007-08 Control

Section

Adjustment

$8,021 B0371Urban Streams Restoration Grant

Program

Enacted 2007-08

3860-001-6051 Portion of support

budget: Natural

Reversion

2007-08 Natural

Reversion

($149,513) B0371Urban Streams Restoration Grant

Program

Enacted 2009-10

3860-001-6051 Portion of support

budget

2008-09 Budget Act $320,000 B0371Urban Streams Restoration Grant

Program

Enacted 2008-09

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2008-09 Control

Section

Adjustment

($9,169) B0371Urban Streams Restoration Grant

Program

Enacted 2008-09

3860-001-6051 Portion of support

budget: Natural

Reversion

2008-09 Natural

Reversion

($50) B0371Urban Streams Restoration Grant

Program

Enacted 2011-12

3860-001-6051 Portion of support

budget: Reversion

Reverse

2008-09 Natural

Reversion

$37 B0371Urban Streams Restoration Grant

Program

Enacted 2012-13

3860-001-6051 Portion of support

budget

2009-10 Budget Act $290,000 B0371Urban Streams RestorationEnacted 2009-10

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2009-10 Control

Section

Adjustment

($36,722) B0371Urban Streams RestorationEnacted 2009-10

Wednesday, January 29, Page 175 of 3421:20:07 PM Public Resources Code (PRC) Section PRC §75050(e)Ch. 5Prop 84 Report

Page 179: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-001-6051 Portion of support

budget: Natural

Reversion

2009-10 Natural

Reversion

($246,253) B0371Urban Streams RestorationEnacted 2011-12

3860-001-6051 Portion of support

budget

2010-11 Budget Act $158,000 B0371Urban Streams RestorationEnacted 2010-11

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2010-11 Control

Section

Adjustment

($14,749) B0371Urban Streams RestorationEnacted 2010-11

3860-001-6051 Portion of support

budget: Natural

Reversion

2010-11 Natural

Reversion

$0 B0371Urban Streams RestorationEnacted 2012-13

3860-001-6051 Portion of support

budget: Reversion

2010-11 Budget Act ($21,883) B0371Urban Streams RestorationEnacted 2012-13

3860-001-6051 Portion of support

budget

2011-12 Budget Act $45,400 B0372Urban Streams RestorationEnacted 2011-12

3860-001-6051 Portion of support

budget

2011-12 Budget Act $44,370 B0372Urban Streams Restoration Grant

Program

Enacted 2011-12

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2011-12 Control

Section

Adjustment

($863) B0372Urban Streams RestorationEnacted 2011-12

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2011-12 Control

Section

Adjustment

($177) B0372Urban Streams Restoration Grant

Program

Enacted 2011-12

3860-001-6051 Portion of support

budget: Natural

Reversion

2011-12 Natural

Reversion

($5,218) B0372Urban Streams RestorationEnacted 2013-14

3860-001-6051 Portion of support

budget: Natural

Reversion

2011-12 Natural

Reversion

($21) B0372Urban Streams Restoration Grant

Program

Enacted 2013-14

3860-001-6051 Portion of support

budget

2012-13 Budget Act $400 B0372Urban Streams RestorationEnacted 2012-13

3860-001-6051 Portion of support

budget

2012-13 Budget Act $693,600 B0372Urban Streams Restoration Grant

Program

Enacted 2012-13

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2012-13 Control

Section

Adjustment

($9) B0372Urban Streams RestorationEnacted 2012-13

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2012-13 Control

Section

Adjustment

($15,743) B0372Urban Streams Restoration Grant

Program

Enacted 2012-13

3860-001-6051 Portion of support

budget: Natural

Reversion

2012-13 Natural

Reversion

($391) B0372Urban Streams RestorationEnacted 2017-18

3860-001-6051 Portion of support

budget: Natural

Reversion

2012-13 Natural

Reversion

($47,839) B0372Urban Streams Restoration Grant

Program

Enacted 2017-18

3860-001-6051 Portion of support

budget: Reversion

2012-13 Budget Act ($292,457) B0372Urban Streams Restoration Grant

Program

Enacted 2016-17

3860-001-6051 Portion of support

budget

2013-14 Budget Act $645,000 B0372Urban Streams Restoration Grant

Program

Enacted 2013-14

Wednesday, January 29, Page 176 of 3421:20:07 PM Public Resources Code (PRC) Section PRC §75050(e)Ch. 5Prop 84 Report

Page 180: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-001-6051 Portion of support

budget: Reversion

2013-14 Budget Act ($286,327) B0372Urban Streams Restoration Grant

Program

Enacted 2016-17

3860-001-6051 Portion of support

budget

2014-15 Budget Act $645,000 B0372Urban Streams Restoration Grant

Program

Enacted 2014-15

3860-001-6051 Portion of support

budget: Natural

Reversion

2014-15 Natural

Reversion

($1) B0372Urban Streams Restoration Grant

Program

Enacted 2016-17

3860-001-6051 Portion of support

budget: Reversion

2014-15 Budget Act ($203,976) B0372Urban Streams Restoration Grant

Program

Enacted 2016-17

3860-001-6051 Portion of support

budget: Reversion

Reverse

2014-15 Natural

Reversion

$1 B0372Urban Streams Restoration Grant

Program

Enacted 2017-18

3860-001-6051 Portion of support

budget

2015-16 Budget Act $645,000 B0372Urban Streams Restoration Grant

Program

Enacted 2015-16

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2015-16 Budget Act ($645,000) B0372Urban Streams Restoration Grant

Program

Enacted 2016-17

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2015-16 Budget Act $645,000 B0372Urban Streams Restoration Grant

Program

Enacted 2018-19

3860-001-6051 Portion of support

budget: Reversion

2015-16 Budget Act ($200,000) B0372Urban Streams Restoration Grant

Program

Enacted 2016-17

3860-001-6051 Portion of support

budget

2016-17 Budget Act $205,000 B0371Urban Streams Restoration Grant

Program

Enacted 2016-17

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2016-17 Budget Act ($205,000) B0371Urban Streams Restoration Grant

Program

Enacted 2016-17

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2016-17 Budget Act $205,000 B0371Urban Streams Restoration Grant

Program

Enacted 2019-20

3860-001-6051 Portion of support

budget: Reversion

2016-17 Budget Act ($336) B0371Urban Streams Restoration Grant

Program

Enacted 2019-20

3860-001-6051 Portion of support

budget

2017-18 Budget Act $357,000 B0373Urban Streams Restoration Grant

Program

Enacted 2017-18

3860-001-6051 Portion of support

budget

2017-18 Budget Act $100,000 B0371Urban Streams Restoration Grant

Program

Enacted 2017-18

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2017-18 Control

Section

Adjustment

$22,654 B0373Urban Streams Restoration Grant

Program

Enacted 2017-18

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2017-18 Control

Section

Adjustment

$6,346 B0371Urban Streams Restoration Grant

Program

Enacted 2017-18

3860-001-6051 Portion of support

budget: Executive Order

2017-18 Executive

Order

(excluding

CS)

($781) B0373Urban Streams Restoration Grant

Program

Enacted 2017-18

Wednesday, January 29, Page 177 of 3421:20:07 PM Public Resources Code (PRC) Section PRC §75050(e)Ch. 5Prop 84 Report

Page 181: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-001-6051 Portion of support

budget: Executive Order

2017-18 Executive

Order

(excluding

CS)

($219) B0371Urban Streams Restoration Grant

Program

Enacted 2017-18

3860-001-6051 Portion of support

budget: Reversion

2017-18 Budget Act ($100,576) B0373Urban Streams Restoration Grant

Program

Enacted 2019-20

3860-001-6051 Portion of support

budget: Reversion

2017-18 Budget Act ($28,000) B0371Urban Streams Restoration Grant

Program

Enacted 2019-20

3860-001-6051 Portion of support

budget

2018-19 Budget Act $212,000 B0373Urban Streams Restoration Grant

Program

Enacted 2018-19

3860-001-6051 Portion of support

budget

2018-19 Budget Act $118,000 B0371Urban Streams Restoration Grant

Program

Enacted 2018-19

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2018-19 Control

Section

Adjustment

$14,000 B0373Urban Streams Restoration Grant

Program

Enacted 2018-19

3860-001-6051 Portion of support

budget: Control Section

Adjustment:

Reappropriation

(decrease)

2018-19 Budget Act ($14,000) B0373Urban Streams Restoration Grant

Program

Enacted 2018-19

3860-001-6051 Portion of support

budget: Control Section

Adjustment:

Reappropriation

(increase)

2018-19 Budget Act $14,000 B0373Urban Streams Restoration Grant

Program

Enacted 2019-20

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2018-19 Budget Act ($212,000) B0373Urban Streams Restoration Grant

Program

Enacted 2018-19

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2018-19 Budget Act ($118,000) B0371Urban Streams Restoration Grant

Program

Enacted 2018-19

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2018-19 Budget Act $212,000 B0373Urban Streams Restoration Grant

Program

Enacted 2019-20

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2018-19 Budget Act $118,000 B0371Urban Streams Restoration Grant

Program

Enacted 2019-20

3860-001-6051 Portion of support

budget

2019-20 Budget Act $45,000 B0373Riverine Stewardship Technical

Assistance

Enacted 2019-20

3860-001-6051 Portion of support

budget

2019-20 Budget Act $14,000 B0373Urban Streams Restoration Grant

Program - Planning

Enacted 2019-20

3860-001-6051 Portion of support

budget: Reduction

2019-20 Budget

Revision

($14,000) B0373Urban Streams Restoration Grant

Program - Planning

Enacted 2019-20

3860-10110-60 Portion of local

assistance budget

2010-11 Budget Act $6,848,000 B0372Urban Streams Restoration Grant

Program

Enacted 2010-11

Wednesday, January 29, Page 178 of 3421:20:07 PM Public Resources Code (PRC) Section PRC §75050(e)Ch. 5Prop 84 Report

Page 182: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-101-6051 Portion of local

assistance budget

2007-08 Budget Act $9,100,000 B0372Urban Streams Restoration Grant

Program

Enacted 2007-08

3860-101-6051 Portion of local

assistance budget:

Reversion

2007-08 Budget Act ($9,100,000) B0372Urban Streams Restoration Grant

Program

Enacted 2010-11

3860-101-6051 Portion of local

assistance budget

2010-11 Budget Act $2,252,000 B0372Urban Streams Restoration Grant

Program

Enacted 2010-11

3860-101-6051 Portion of local

assistance budget:

Natural Reversion

2010-11 Natural

Reversion

($5,278,046) B0372Urban Streams Restoration Grant

Program

Enacted 2016-17

3860-101-6051 Portion of local

assistance budget:

Reappropriation

(decrease)

2010-11 Budget Act ($4,160,717) B0372Urban Streams Restoration Grant

Program

Enacted 2017-18

3860-101-6051 Portion of local

assistance budget:

Reappropriation

(increase)

2010-11 Budget Act $4,160,717 B0372Urban Streams Restoration Grant

Program

Enacted 2019-20

3860-101-6051 Portion of local

assistance budget:

Reversion

2010-11 Budget Act ($3,252,000) B0372Urban Streams Restoration Grant

Program

Enacted 2012-13

3860-101-6051 Portion of local

assistance budget:

Reversion Reverse

2010-11 Natural

Reversion

$5,278,046 B0372Urban Streams Restoration Grant

Program

Enacted 2017-18

3860-101-6051 Portion of local

assistance budget

2016-17 Budget Act $800,000 B0372Urban Streams Restoration Grant

Program

Enacted 2016-17

3860-101-6051 Portion of local

assistance

2019-20 Budget Act $1,840,000 B0372Urban Streams Restoration Grant

Program - Projects

Enacted 2019-20

3860-101-6051 Portion of local

assistance budget:

Reduction

2019-20 Budget

Revision

($840,000) B0372Urban Streams Restoration Grant

Program - Projects

Enacted 2019-20

3860-603-6051 Portion of local

assistance budget

2008-09 Special

Legislation

$7,300,000 B0372Urban Streams Restoration ProgramEnacted 2008-09

3860-603-6051 Portion of local

assistance budget:

Natural Reversion

2008-09 Natural

Reversion

($5,836,700) B0372Urban Streams Restoration ProgramEnacted 2015-16

3860-603-6051 Portion of local

assistance budget:

Natural Reversion

Reverse

2008-09 Natural

Reversion

$1,439,982 B0372Urban Streams Restoration ProgramEnacted 2018-19

3860-603-6051 Portion of local

assistance budget:

Reappropriation

(decrease)

2008-09 Budget Act ($14,600,000) B0372Urban Streams Restoration ProgramEnacted 2016-17

3860-603-6051 Portion of local

assistance budget:

Reappropriation

(increase)

2008-09 Budget Act $14,600,000 B0372Urban Streams Restoration ProgramEnacted 2018-19

Wednesday, January 29, Page 179 of 3421:20:07 PM Public Resources Code (PRC) Section PRC §75050(e)Ch. 5Prop 84 Report

Page 183: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-603-6051 Portion of local

assistance budget:

Reversion

2008-09 Budget Act ($849,481) B0372Urban Streams Restoration ProgramEnacted 2016-17

3860-603-6051 Portion of local

assistance budget:

Reversion Reverse

2008-09 Natural

Reversion

$4,396,718 B0372Urban Streams Restoration ProgramEnacted 2016-17

Sum: $17,162,074Enacted

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2013-14 Budget Act ($358,673) B0371Urban Streams Restoration Grant

Program

Enacted/Not 2017-18

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2013-14 Budget Act $358,673 B0371Urban Streams Restoration Grant

Program

Enacted/Not 2019-20

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2019-20 Control

Section

Adjustment

$3,000 B0373Riverine Stewardship Technical

Assistance

Enacted/Not 2019-20

Sum: $3,000Enacted/Not Posted

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3860-001-6051 (1) Portion of support

budget

2020-21 Budget Act $48,000 B0373Riverine Stewardship Technical

Assistance

Proposed 2020-21

Sum: $48,000Proposed

Sum: $17,213,074

$99,926

Balance for Urban Streams Restoration Program:

Wednesday, January 29, Page 180 of 3421:20:07 PM Public Resources Code (PRC) Section PRC §75050(e)Ch. 5Prop 84 Report

Page 184: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

Protection of Rivers, Lakes and StreamsChapter 5

Allocation: San Joaquin River Conservancy Projects

Allocation $: $36,000,000$187,396

$371,045Statewide Set Asides: $558,441 {

Outyear Obligations: $996,000

$232,000

$0

{

PRC §75050(f)Ch. 5

Appropriations, Proposals and Reversions

Statewide, requiring appropriation:

Statewide, not requiring appropriation:

Outyear Program Delivery commitments:

Outyear Cap. Outlay (to complete started projects):Reversions are shown below$0

Outyear Local Asst. commitments:

Available for San Joaquin River Conservancy river parkway projects.

Dept.: San Joaquin River

Conservancy

Other Outyear Support commitments:$764,000

Committed

$0

$0

$0

$0

Proposed

$0

Prop 1 Reduction $701,559

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3640-302-6051 (1) San Joaquin River

Conservancy projects

2007-08 Budget Act $10,000,000 B0382San Joaquin River Conservancy

Projects

Enacted 2007-08

3640-302-6051 San Joaquin River

Conservancy projects

2008-09 Budget Act $10,000,000 B0382San Joaquin River Conservancy

Projects

Enacted 2008-09

3640-302-6051 San Joaquin River

Conservancy projects:

Natural Reversion

2008-09 Natural

Reversion

($10,000,000) B0382San Joaquin River Conservancy

Projects

Enacted 2012-13

3640-302-6051 San Joaquin River

Conservancy projects

2009-10 Budget Act $8,000,000 B0382San Joaquin River Conservancy

Projects

Enacted 2009-10

3640-302-6051 San Joaquin River

Conservancy projects

2009-10 Budget Act $2,000,000 B0382San Joaquin River Conservancy

Public Access, Recreation and

Environmental Restoration

Enacted 2009-10

3640-302-6051 San Joaquin River

Conservancy projects:

Natural Heritage

Preservation Tax Credit

2009-10 $55,000 B0382Natural Heritage Preservation Tax

Credit

Enacted 2015-16

3640-302-6051 San Joaquin River

Conservancy projects:

Natural Reversion

2009-10 Natural

Reversion

($3,200,000) B0382San Joaquin River Conservancy

Projects

Enacted 2013-14

3640-302-6051 San Joaquin River

Conservancy projects:

Natural Reversion

2009-10 Natural

Reversion

($2,000,000) B0382San Joaquin River Conservancy

Public Access, Recreation and

Environmental Restoration

Enacted 2013-14

Wednesday, January 29, Page 181 of 3421:20:07 PM Public Resources Code (PRC) Section PRC §75050(f)Ch. 5Prop 84 Report

Page 185: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3640-302-6051 San Joaquin River

Conservancy projects:

Transfer for Natural

Heritage Preservation

Tax Credit

2009-10 ($55,000) B0382San Joaquin River Conservancy

Projects

Enacted 2009-10

3640-302-6051 San Joaquin River

Conservancy projects:

Transfer to

reimbursement projects

2009-10 ($1,000,000) B0382San Joaquin River Conservancy

Projects

Enacted 2009-10

3640-302-6051 San Joaquin River

Conservancy projects

2010-11 Budget Act $3,380,000 B0382San Joaquin River Conservancy

Projects

Enacted 2010-11

3640-302-6051 San Joaquin River

Conservancy projects

2015-16 Budget Act $11,000,000 B0382San Joaquin River Conservancy

Projects

Enacted 2015-16

3640-302-6051 San Joaquin River

Conservancy projects:

Reversion

2015-16 Budget Act ($8,000,000) B0382San Joaquin River Conservancy

Projects

Enacted 2018-19

3640-302-6051 (1) San Joaquin River

Conservancy projects

2018-19 Budget Act $8,000,000 B0382San Joaquin River Conservancy

Projects

Enacted 2018-19

3830-001-6051 Portion of support

budget

2008-09 Budget Act $126,000 B0381Program DeliveryEnacted 2008-09

3830-001-6051 Portion of support

budget: Control Section

Adjustment

2008-09 Control

Section

Adjustment

($1,902) B0381Program DeliveryEnacted 2008-09

3830-001-6051 Portion of support

budget: Natural

Reversion

2008-09 Natural

Reversion

($70,575) B0381Program DeliveryEnacted 2010-11

3830-001-6051 Portion of support

budget

2009-10 Budget Act $128,000 B0381Program DeliveryEnacted 2009-10

3830-001-6051 Portion of support

budget

2009-10 Budget Act $109,000 B0381Program Delivery for WCB positionEnacted 2009-10

3830-001-6051 Portion of support

budget: Control Section

Adjustment

2009-10 Control

Section

Adjustment

($10,000) B0381Program DeliveryEnacted 2009-10

3830-001-6051 Portion of support

budget: Natural

Reversion

2009-10 Natural

Reversion

($58,410) B0381Program DeliveryEnacted 2011-12

3830-001-6051 Portion of support

budget: Natural

Reversion

2009-10 Natural

Reversion

($109,000) B0381Program Delivery for WCB positionEnacted 2011-12

3830-001-6051 Portion of support

budget

2010-11 Budget Act $237,000 B0381Program DeliveryEnacted 2010-11

3830-001-6051 Portion of support

budget: Control Section

Adjustment

2010-11 Control

Section

Adjustment

($3,000) B0381Program DeliveryEnacted 2010-11

3830-001-6051 Portion of support

budget: Natural

Reversion

2010-11 Natural

Reversion

($66,668) B0381Program DeliveryEnacted 2012-13

3830-001-6051 Portion of support

budget

2011-12 Budget Act $237,000 B0381Program DeliveryEnacted 2011-12

Wednesday, January 29, Page 182 of 3421:20:07 PM Public Resources Code (PRC) Section PRC §75050(f)Ch. 5Prop 84 Report

Page 186: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3830-001-6051 Portion of support

budget: Natural

Reversion

2011-12 Natural

Reversion

($41,440) B0381Program DeliveryEnacted 2013-14

3830-001-6051 Portion of support

budget

2012-13 Budget Act $237,000 B0381Program DeliveryEnacted 2012-13

3830-001-6051 Portion of support

budget: Natural

Reversion

2012-13 Natural

Reversion

($56,750) B0381Program DeliveryEnacted 2014-15

3830-001-6051 Portion of support

budget

2013-14 Budget Act $237,000 B0381Program DeliveryEnacted 2013-14

3830-001-6051 Portion of support

budget: Natural

Reversion

2013-14 Natural

Reversion

($88,890) B0381Program DeliveryEnacted 2015-16

3830-001-6051 Portion of support

budget

2014-15 Budget Act $237,000 B0381Program DeliveryEnacted 2014-15

3830-001-6051 Portion of support

budget: Control Section

Adjustment

2014-15 Control

Section

Adjustment

$3,505 B0381Program DeliveryEnacted 2014-15

3830-001-6051 Portion of support

budget: Natural

Reversion

2014-15 Natural

Reversion

($38,459) B0381Program DeliveryEnacted 2016-17

3830-001-6051 Portion of support

budget

2015-16 Budget Act $240,000 B0381Program DeliveryEnacted 2015-16

3830-001-6051 Portion of support

budget: Control Section

Adjustment

2015-16 Control

Section

Adjustment

$4,000 B0381Program DeliveryEnacted 2015-16

3830-001-6051 Portion of support

budget: Natural

Reversion

2015-16 Natural

Reversion

($74,573) B0381Program DeliveryEnacted 2017-18

3830-001-6051 Portion of support

budget

2016-17 Budget Act $50,000 B0381Program DeliveryEnacted 2016-17

3830-001-6051 Portion of support

budget: Control Section

Adjustment

2016-17 Control

Section

Adjustment

$5,000 B0381Program DeliveryEnacted 2016-17

3830-001-6051 Portion of support

budget: Natural

Reversion

2016-17 Natural

Reversion

($6,183) B0381Program DeliveryEnacted 2018-19

3830-001-6051 Portion of support

budget

2017-18 Budget Act $52,000 B0381Program DeliveryEnacted 2017-18

3830-001-6051 Portion of support

budget

2018-19 Budget Act $52,000 B0381Program DeliveryEnacted 2018-19

3830-001-6051 Portion of support

budget

2019-20 Budget Act $191,000 B0383Planning and MonitoringEnacted 2019-20

3830-001-6051 Portion of support

budget

2019-20 Budget Act $52,000 B0381Program DeliveryEnacted 2019-20

Sum: $29,751,655Enacted

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

Wednesday, January 29, Page 183 of 3421:20:07 PM Public Resources Code (PRC) Section PRC §75050(f)Ch. 5Prop 84 Report

Page 187: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3830-001-6051 Portion of support

budget: Control Section

Adjustment

2019-20 Control

Section

Adjustment

$6,000 B0381Program DeliveryEnacted/Not 2019-20

Sum: $6,000Enacted/Not Posted

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3640-302-6051 San Joaquin River

Conservancy projects:

Reappropriation

(decrease)

2015-16 Budget Act ($3,000,000) B0382San Joaquin River Conservancy

Projects

Proposed 2015-16

3640-302-6051 (1) San Joaquin River

Conservancy projects:

Reappropriation

(increase)

2015-16 Budget Act $3,000,000 B0382San Joaquin River Conservancy

Projects

Proposed 2020-21

3830-001-6051 (1) Portion of support

budget

2020-21 Budget Act $191,000 B0383Planning and MonitoringProposed 2020-21

3830-001-6051 (1) Portion of support

budget

2020-21 Budget Act $58,000 B0381Program DeliveryProposed 2020-21

Sum: $249,000Proposed

Sum: $30,006,655

$3,737,345

Balance for San Joaquin River Conservancy Projects:

Wednesday, January 29, Page 184 of 3421:20:07 PM Public Resources Code (PRC) Section PRC §75050(f)Ch. 5Prop 84 Report

Page 188: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

Protection of Rivers, Lakes and StreamsChapter 5

Allocation: Los Angeles and San Gabriel River

Watersheds

Allocation $: $36,000,000$187,396

$371,045Statewide Set Asides: $558,441 {

Outyear Obligations: $310,000

$0

$0

{

PRC §75050(g)(1)Ch. 5

Appropriations, Proposals and Reversions

Statewide, requiring appropriation:

Statewide, not requiring appropriation:

Outyear Program Delivery commitments:

Outyear Cap. Outlay (to complete started projects):Reversions are shown below$0

Outyear Local Asst. commitments:

Projects within the watersheds of the Los Angeles and San Gabriel Rivers (pursuant to Division 22.8, commencing with §32600).

Dept.: San Gabriel and Lower Los

Angeles Rivers and Mountains

Conservancy

Other Outyear Support commitments:$310,000

Committed

$0

$0

$0

$0

Proposed

$0

Prop 1 Reduction $701,559

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3825-001-6051 Portion of support

budget

2007-08 Budget Act $371,000 B0391Proposition Program Delivery StaffEnacted 2007-08

3825-001-6051 Portion of support

budget: Control Section

Adjustment

2007-08 Control

Section

Adjustment

$11,257 B0391Proposition Program Delivery StaffEnacted 2007-08

3825-001-6051 Portion of support

budget: Natural

Reversion

2007-08 Natural

Reversion

($36,296) B0391Proposition Program Delivery StaffEnacted 2009-10

3825-001-6051 Portion of support

budget

2008-09 Budget Act $383,070 B0391Program DeliveryEnacted 2008-09

3825-001-6051 Portion of support

budget: Control Section

Adjustment

2008-09 Control

Section

Adjustment

($5,214) B0391Proposition Program Delivery StaffEnacted 2008-09

3825-001-6051 Portion of support

budget: Natural

Reversion

2008-09 Natural

Reversion

($144,574) B0391Program DeliveryEnacted 2010-11

3825-001-6051 Portion of support

budget

2009-10 Budget Act $318,000 B0391Program DeliveryEnacted 2009-10

3825-001-6051 Portion of support

budget: Control Section

Adjustment

2009-10 Control

Section

Adjustment

($30,920) B0391Program DeliveryEnacted 2009-10

3825-001-6051 Portion of support

budget

2010-11 Budget Act $318,000 B0391Program DeliveryEnacted 2010-11

3825-001-6051 Portion of support

budget: Control Section

Adjustment

2010-11 Control

Section

Adjustment

($16,987) B0391Program DeliveryEnacted 2010-11

Wednesday, January 29, Page 185 of 3421:20:07 PM Public Resources Code (PRC) Section PRC §75050(g)(1)Ch. 5Prop 84 Report

Page 189: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3825-001-6051 Portion of support

budget: Natural

Reversion

2010-11 Natural

Reversion

($59,493) B0391Program DeliveryEnacted 2012-13

3825-001-6051 Portion of support

budget

2011-12 Budget Act $310,190 B0391Program DeliveryEnacted 2011-12

3825-001-6051 Portion of support

budget: Control Section

Adjustment

2011-12 Control

Section

Adjustment

($3,070) B0391Program DeliveryEnacted 2011-12

3825-001-6051 Portion of support

budget: Natural

Reversion

2011-12 Natural

Reversion

($121,800) B0391Program DeliveryEnacted 2013-14

3825-001-6051 Portion of support

budget

2012-13 Budget Act $181,388 B0391Program DeliveryEnacted 2012-13

3825-001-6051 Portion of support

budget: Control Section

Adjustment

2012-13 Control

Section

Adjustment

($2,564) B0391Program DeliveryEnacted 2012-13

3825-001-6051 Portion of support

budget

2013-14 Budget Act $46,300 B0391Program DeliveryEnacted 2013-14

3825-001-6051 Portion of support

budget: Control Section

Adjustment

2013-14 Control

Section

Adjustment

$501 B0391Program DeliveryEnacted 2013-14

3825-001-6051 Portion of support

budget

2014-15 Budget Act $46,872 B0391Program DeliveryEnacted 2014-15

3825-001-6051 Portion of support

budget: Control Section

Adjustment

2014-15 Control

Section

Adjustment

$1,403 B0391Program DeliveryEnacted 2014-15

3825-001-6051 Portion of support

budget

2015-16 Budget Act $66,500 B0391Program DeliveryEnacted 2015-16

3825-001-6051 Portion of support

budget: Control Section

Adjustments

2015-16 Control

Section

Adjustment

$2,800 B0391Program DeliveryEnacted 2015-16

3825-001-6051 Portion of support

budget: Natural

Reversion

2015-16 Natural

Reversion

($1,686) B0391Program DeliveryEnacted 2017-18

3825-001-6051 Portion of support

budget

2018-19 Budget Act $60,000 B0393Planning and MonitoringEnacted 2018-19

3825-001-6051 Portion of support

budget: Control Section

Adjustments

2018-19 Control

Section

Adjustment

$2,000 B0393Planning and MonitoringEnacted 2018-19

3825-001-6051 Portion of support

budget

2019-20 Budget Act $62,000 B0393Planning and MonitoringEnacted 2019-20

3825-101-6051 Capital Outlay and

Local Assistance

2019-20 Budget Act $618,000 B0392Proposition 84, Capital Outlay and

Grants

Enacted 2019-20

3825-301-6051 Portion of capital outlay

budget

2007-08 Budget Act $17,750,000 B0392Proposition 84, Capital Outlay and

Grants

Enacted 2007-08

3825-301-6051 Portion of capital outlay

budget: Natural

Reversion

2007-08 Natural

Reversion

($7,217) B0392Proposition 84, Capital Outlay and

Grants

Enacted 2016-17

Wednesday, January 29, Page 186 of 3421:20:07 PM Public Resources Code (PRC) Section PRC §75050(g)(1)Ch. 5Prop 84 Report

Page 190: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3825-301-6051 Portion of capital outlay

budget: Reversion

2007-08 Budget Act ($28,000) B0392Proposition 84, Capital Outlay and

Grants

Enacted 2012-13

3825-301-6051 Portion of capital outlay

budget

2008-09 Budget Act $5,680,000 B0392Capital Outlay and GrantsEnacted 2008-09

3825-301-6051 Portion of capital outlay

budget: Natural

Reversion

2008-09 Natural

Reversion

($410,242) B0392Capital Outlay and GrantsEnacted 2016-17

3825-301-6051 Portion of capital outlay

budget

2009-10 Budget Act $4,970,000 B0392Capital Outlay and GrantsEnacted 2009-10

3825-301-6051 Portion of capital outlay

budget: Natural

Reversion

2009-10 Natural

Reversion

($1,164,434) B0392Capital Outlay and GrantsEnacted 2013-14

3825-301-6051 Portion of capital outlay

budget

2011-12 Budget Act $4,708,953 B0392Capital Outlay and GrantsEnacted 2011-12

3825-301-6051 Portion of capital outlay

budget:

Reappropriation

(decrease)

2011-12 Budget Act ($4,708,953) B0392Capital Outlay and GrantsEnacted 2014-15

3825-301-6051 Portion of capital outlay

budget:

Reappropriation

(increase)

2011-12 Budget Act $4,708,953 B0392Capital Outlay and GrantsEnacted 2019-20

3825-301-6051 Portion of capital outlay

budget

2015-16 Budget Act $1,187,000 B0392Capital Outlay and GrantsEnacted 2015-16

Sum: $35,062,736Enacted

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3825-001-6051 Portion of support

budget: Control Section

Adjustments

2019-20 Control

Section

Adjustment

$3,000 B0393Planning and MonitoringEnacted/Not 2019-20

3825-301-6051 Portion of capital outlay

budget: Reversion

2011-12 Budget Act ($696,585) B0392Capital Outlay and GrantsEnacted/Not 2019-20

3825-301-6051 Portion of capital outlay

budget: Reversion

2015-16 Budget Act ($28,795) B0392Capital Outlay and GrantsEnacted/Not 2019-20

Sum: ($722,380)Enacted/Not Posted

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3825-001-6051 (1) Portion of support

budget

2020-21 Budget Act $107,000 B0393Planning and MonitoringProposed 2020-21

Sum: $107,000Proposed

Sum: $34,447,356

($17,356)

Balance for Los Angeles and San Gabriel River Watersheds:

Wednesday, January 29, Page 187 of 3421:20:07 PM Public Resources Code (PRC) Section PRC §75050(g)(1)Ch. 5Prop 84 Report

Page 191: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

Protection of Rivers, Lakes and StreamsChapter 5

Allocation: Upper Los Angeles Watershed

Allocation $: $36,000,000$187,396

$371,045Statewide Set Asides: $558,441 {

Outyear Obligations: $76,000

$0

$0

{

PRC §75050(g)(2)Ch. 5

Appropriations, Proposals and Reversions

Statewide, requiring appropriation:

Statewide, not requiring appropriation:

Outyear Program Delivery commitments:

Outyear Cap. Outlay (to complete started projects):Reversions are shown below$0

Outyear Local Asst. commitments:

Implement watershed protection activities throughout the watershed of the Upper Los Angeles River pursuant to Water Code §79508.

Dept.: Santa Monica Mountains

Conservancy

Other Outyear Support commitments:$76,000

Committed

$0

$0

$0

$0

Proposed

$0

Prop 1 Reduction $701,559

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3810-001-6051 Portion of support

budget

2007-08 Budget Act $300,000 B0401Program DeliveryEnacted 2007-08

3810-001-6051 Portion of support

budget: Natural

Reversion

2007-08 Natural

Reversion

($62,979) B0401Program DeliveryEnacted 2010-11

3810-001-6051 Portion of support

budget

2008-09 Budget Act $300,000 B0401Program DeliveryEnacted 2008-09

3810-001-6051 Portion of support

budget: Natural

Reversion

2008-09 Natural

Reversion

($141,646) B0401Program DeliveryEnacted 2010-11

3810-001-6051 Portion of support

budget

2009-10 Budget Act $305,760 B0401Program DeliveryEnacted 2009-10

3810-001-6051 Portion of support

budget: Control Section

Adjustment

2009-10 Control

Section

Adjustment

($19,493) B0401Program DeliveryEnacted 2009-10

3810-001-6051 Portion of support

budget: Natural

Reversion

2009-10 Natural

Reversion

($85,232) B0401Program DeliveryEnacted 2011-12

3810-001-6051 Portion of support

budget

2010-11 Budget Act $26,202 B0403Planning and MonitoringEnacted 2010-11

3810-001-6051 Portion of support

budget

2010-11 Budget Act $279,558 B0401Program DeliveryEnacted 2010-11

3810-001-6051 Portion of support

budget: Control Section

Adjustment

2010-11 Control

Section

Adjustment

($15,917) B0401Program DeliveryEnacted 2010-11

Wednesday, January 29, Page 188 of 3421:20:07 PM Public Resources Code (PRC) Section PRC §75050(g)(2)Ch. 5Prop 84 Report

Page 192: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3810-001-6051 Portion of support

budget: Natural

Reversion

2010-11 Natural

Reversion

($40,507) B0401Program DeliveryEnacted 2012-13

3810-001-6051 Portion of support

budget

2011-12 Budget Act $27,300 B0403Planning and MonitoringEnacted 2011-12

3810-001-6051 Portion of support

budget

2011-12 Budget Act $273,080 B0401Program DeliveryEnacted 2011-12

3810-001-6051 Portion of support

budget: Control Section

Adjustment

2011-12 Control

Section

Adjustment

($2,490) B0401Program DeliveryEnacted 2011-12

3810-001-6051 Portion of support

budget: Natural

Reversion

2011-12 Natural

Reversion

($30,265) B0401Program DeliveryEnacted 2013-14

3810-001-6051 (1) Portion of support

budget: Reversion

2011-12 Budget Act ($10,000) B0401Program DeliveryEnacted 2013-14

3810-001-6051 Portion of support

budget

2012-13 Budget Act $341,600 B0401Program DeliveryEnacted 2012-13

3810-001-6051 Portion of support

budget: Control Section

Adjustment

2012-13 Control

Section

Adjustment

($5,040) B0401Program DeliveryEnacted 2012-13

3810-001-6051 Portion of support

budget

2013-14 Budget Act $226,500 B0401Program DeliveryEnacted 2013-14

3810-001-6051 Portion of support

budget: Control Section

Adjustment

2013-14 Control

Section

Adjustment

$1,500 B0401Program DeliveryEnacted 2013-14

3810-001-6051 Portion of support

budget

2014-15 Budget Act $109,580 B0401Program DeliveryEnacted 2014-15

3810-001-6051 Portion of support

budget: Control Section

Adjustment

2014-15 Control

Section

Adjustment

$7,111 B0401Program DeliveryEnacted 2014-15

3810-001-6051 Portion of support

budget: Natural

Reversion

2014-15 Natural

Reversion

($171) B0401Program DeliveryEnacted 2016-17

3810-001-6051 Portion of support

budget

2015-16 Budget Act $56,320 B0401Program DeliveryEnacted 2015-16

3810-001-6051 Portion of support

budget: Natural

Reversion

2015-16 Natural

Reversion

($23,941) B0401Program DeliveryEnacted 2017-18

3810-001-6051 Portion of support

budget

2017-18 Budget Act $24,000 B0403Planning and Monitoring for

watershed protection activities

throughout the watershed of the

Upper Los Angeles River.

Enacted 2017-18

3810-001-6051 Portion of support

budget

2018-19 Budget Act $74,000 B0403Planning and Monitoring for

watershed protection activities

throughout the watershed of the

Upper Los Angeles River.

Enacted 2018-19

3810-001-6051 Portion of support

budget: Control Section

Adjustment

2018-19 Control

Section

Adjustment

$8,000 B0403Planning and Monitoring for

watershed protection activities

throughout the watershed of the

Upper Los Angeles River.

Enacted 2018-19

Wednesday, January 29, Page 189 of 3421:20:07 PM Public Resources Code (PRC) Section PRC §75050(g)(2)Ch. 5Prop 84 Report

Page 193: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3810-001-6051 Portion of support

budget

2019-20 Budget Act $87,000 B0403Planning and Monitoring for

watershed protection activities

throughout the watershed of the

Upper Los Angeles River.

Enacted 2019-20

3810-101-6051 Portion of local

assistance budget

2016-17 Budget Act $342,000 B0402Capital Outlay or Local Assistance

Grants for watershed protection

activities throughout the watershed

of the Upper Los Angeles River.

Enacted 2016-17

3810-101-6051 Portion of local

assistance budget

2016-17 Budget Act $40,000 B0403Planning and Monitoring for

watershed protection activities

throughout the watershed of the

Upper Los Angeles River.

Enacted 2016-17

3810-101-6051 Portion of local

assistance budget

2017-18 Budget Act $963,000 B0402Capital Outlay or Local Assistance

Grants for watershed protection

activities throughout the watershed

of the Upper Los Angeles River.

Enacted 2017-18

3810-301-6051 (1) Capital Outlay and

Local Assistance

2007-08 Budget Act $10,000,000 B0402Acquisition and Local Assistance

Grants: Watershed protection

activities throughout the watershed

of the Upper Los Angeles River

Enacted 2007-08

3810-301-6051 (2) Capital Outlay and

Local Assistance:

Reversion

2007-08 Budget Act ($1,222,802) B0402Acquisition and Local Assistance

Grants: Watershed protection

activities throughout the watershed

of the Upper Los Angeles River

Enacted 2013-14

3810-301-6051 Capital Outlay and

Local Assistance

2008-09 Budget Act $10,000,000 B0402Acquisition and Local Assistance

Grants: Watershed protection

activities throughout the watershed

of the Upper Los Angeles River

Enacted 2008-09

3810-301-6051 Capital Outlay and

Local Assistance:

Natural Reversion

2008-09 Natural

Reversion

($2,382,145) B0402Acquisition and Local Assistance

Grants: Watershed protection

activities throughout the watershed

of the Upper Los Angeles River

Enacted 2013-14

3810-301-6051 (3) Capital Outlay and

Local Assistance:

Reversion

2008-09 Budget Act ($51,251) B0402Acquisition and Local Assistance

Grants: Watershed protection

activities throughout the watershed

of the Upper Los Angeles River

Enacted 2013-14

3810-301-6051 Capital Outlay and

Local Assistance

2009-10 Budget Act $8,300,000 B0402Acquisition and Local Assistance

Grants: Watershed protection

activities throughout the watershed

of the Upper Los Angeles River

Enacted 2009-10

3810-301-6051 Capital Outlay and

Local Assistance:

Natural Reversion

2009-10 Natural

Reversion

($727,689) B0402Acquisition and Local Assistance

Grants: Watershed protection

activities throughout the watershed

of the Upper Los Angeles River

Enacted 2013-14

3810-301-6051 (4) Capital Outlay and

Local Assistance:

Reversion

2009-10 Budget Act ($5,186,000) B0402Acquisition and Local Assistance

Grants: Watershed protection

activities throughout the watershed

of the Upper Los Angeles River

Enacted 2013-14

Wednesday, January 29, Page 190 of 3421:20:07 PM Public Resources Code (PRC) Section PRC §75050(g)(2)Ch. 5Prop 84 Report

Page 194: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3810-301-6051 Capital Outlay and

Local Assistance

2010-11 Budget Act $4,000,000 B0402Acquisition and Local Assistance

Grants: Watershed protection

activities throughout the watershed

of the Upper Los Angeles River

Enacted 2010-11

3810-301-6051 Capital Outlay and

Local Assistance:

Natural reversion

2010-11 Natural

Reversion

($366,400) B0402Acquisition and Local Assistance

Grants: Watershed protection

activities throughout the watershed

of the Upper Los Angeles River

Enacted 2014-15

3810-301-6051 Capital Outlay and

Local Assistance:

Refund to Reverted

2010-11 ($1,258,946) B0402Acquisition and Local Assistance

Grants: Watershed protection

activities throughout the watershed

of the Upper Los Angeles River

Enacted 2016-17

3810-301-6051 Capital Outlay and

Local Assistance

2011-12 Budget Act $47,900 B0402Acquisition and Local Assistance

Grants: Watershed protection

activities throughout the watershed

of the Upper Los Angeles River

Enacted 2011-12

3810-301-6051 Capital Outlay and

Local Assistance:

Natural Reversion

2011-12 Natural

Reversion

($24,427) B0402Acquisition and Local Assistance

Grants: Watershed protection

activities throughout the watershed

of the Upper Los Angeles River

Enacted 2015-16

3810-301-6051 Capital Outlay and

Local Assistance

2013-14 Budget Act $6,460,053 B0402Acquisition and Local Assistance

Grants: Watershed protection

activities throughout the watershed

of the Upper Los Angeles River

Enacted 2013-14

3810-301-6051 Capital Outlay and

Local Assistance:

Reappropriation

(decrease)

2013-14 Budget Act ($6,460,053) B0402Acquisition and Local Assistance

Grants: Watershed protection

activities throughout the watershed

of the Upper Los Angeles River

Enacted 2013-14

3810-301-6051 Capital Outlay and

Local Assistance:

Reappropriation

(increase)

2013-14 Budget Act $6,460,053 B0402Acquisition and Local Assistance

Grants: Watershed protection

activities throughout the watershed

of the Upper Los Angeles River

Enacted 2018-19

3810-301-6051 Capital Outlay and

Local Assistance

2014-15 Budget Act $3,122,082 B0402Acquisition and Local Assistance

Grants: Watershed protection

activities throughout the watershed

of the Upper Los Angeles River

Enacted 2014-15

3810-301-6051 Capital Outlay and

Local Assistance

2014-15 Budget Act $17,918 B0403Planning and MonitoringEnacted 2014-15

3810-301-6051 Capital Outlay and

Local Assistance:

Reappropriation

(decrease)

2014-15 Budget Act ($3,122,082) B0402Acquisition and Local Assistance

Grants: Watershed protection

activities throughout the watershed

of the Upper Los Angeles River

Enacted 2014-15

3810-301-6051 Capital Outlay and

Local Assistance:

Reappropriation

(decrease)

2014-15 Budget Act ($17,918) B0403Planning and MonitoringEnacted 2014-15

3810-301-6051 Capital Outlay and

Local Assistance:

Reappropriation

(increase)

2014-15 Budget Act $3,122,082 B0402Acquisition and Local Assistance

Grants: Watershed protection

activities throughout the watershed

of the Upper Los Angeles River

Enacted 2018-19

Wednesday, January 29, Page 191 of 3421:20:07 PM Public Resources Code (PRC) Section PRC §75050(g)(2)Ch. 5Prop 84 Report

Page 195: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3810-301-6051 Capital Outlay and

Local Assistance:

Reappropriation

(increase)

2014-15 Budget Act $17,918 B0403Planning and MonitoringEnacted 2018-19

3810-301-6051 Capital Outlay and

Local Assistance

2015-16 Budget Act $505,000 B0402Acquisition and Local Assistance

Grants: Watershed protection

activities throughout the watershed

of the Upper Los Angeles River

Enacted 2015-16

3810-301-6051 Capital Outlay and

Local Assistance:

Reappropriation

(decrease)

2015-16 Budget Act ($505,000) B0402Acquisition and Local Assistance

Grants: Watershed protection

activities throughout the watershed

of the Upper Los Angeles River

Enacted 2015-16

3810-301-6051 Capital Outlay and

Local Assistance:

Reappropriation

(increase)

2015-16 Budget Act $505,000 B0402Acquisition and Local Assistance

Grants: Watershed protection

activities throughout the watershed

of the Upper Los Angeles River

Enacted 2018-19

Sum: $34,588,122Enacted

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3810-001-6051 Portion of support

budget: Control Section

Adjustment

2019-20 Control

Section

Adjustment

$9,000 B0403Planning and Monitoring for

watershed protection activities

throughout the watershed of the

Upper Los Angeles River.

Enacted/Not 2019-20

Sum: $9,000Enacted/Not Posted

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3810-001-6051 (1) Portion of support

budget

2020-21 Budget Act $87,000 B0403Planning and Monitoring for

watershed protection activities

throughout the watershed of the

Upper Los Angeles River.

Proposed 2020-21

Sum: $87,000Proposed

Sum: $34,684,122

($20,122)

Balance for Upper Los Angeles Watershed:

Wednesday, January 29, Page 192 of 3421:20:07 PM Public Resources Code (PRC) Section PRC §75050(g)(2)Ch. 5Prop 84 Report

Page 196: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

Protection of Rivers, Lakes and StreamsChapter 5

Allocation: Coachella Valley Mountains

Conservancy projects

Allocation $: $36,000,000$187,396

$371,045Statewide Set Asides: $558,441 {

Outyear Obligations: $240,000

$240,000

$0

{

PRC §75050(h)Ch. 5

Appropriations, Proposals and Reversions

Statewide, requiring appropriation:

Statewide, not requiring appropriation:

Outyear Program Delivery commitments:

Outyear Cap. Outlay (to complete started projects):Reversions are shown below$0

Outyear Local Asst. commitments:

Available for Coachella Valley Mountains Conservancy projects.

Dept.: Coachella Valley Mountains

Conservancy

Other Outyear Support commitments:$0

Committed

$0

$0

$0

$0

Proposed

$0

Prop 1 Reduction $701,559

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3850-001-6051 Portion of support

budget

2007-08 Budget Act $66,000 B0411Land acquisition and improvementsEnacted 2007-08

3850-001-6051 Portion of support

budget: Control Section

Adjustment

2007-08 Control

Section

Adjustment

$2,000 B0411Land acquisition and improvementsEnacted 2007-08

3850-001-6051 Portion of support

budget: Natural

Reversion

2007-08 Natural

Reversion

($5,363) B0411Land acquisition and improvementsEnacted 2009-10

3850-001-6051 Portion of support

budget

2008-09 Budget Act $30,000 B0411Land acquisition and improvementsEnacted 2008-09

3850-001-6051 Portion of support

budget: Control Section

Adjustment

2008-09 Control

Section

Adjustment

($502) B0411Land acquisition and improvementsEnacted 2008-09

3850-001-6051 Portion of support

budget: Natural

Reversion

2008-09 Natural

Reversion

($11,719) B0411Land acquisition and improvementsEnacted 2010-11

3850-001-6051 Portion of support

budget

2009-10 Budget Act $60,000 B0411Land acquisition and improvementsEnacted 2009-10

3850-001-6051 Portion of support

budget: Control Section

Adjustment

2009-10 Control

Section

Adjustment

($5,225) B0411Land acquisition and improvementsEnacted 2009-10

3850-001-6051 Portion of support

budget: Reversion

2009-10 Budget Act ($16,236) B0411Land acquisition and improvementsEnacted 2011-12

3850-001-6051 Portion of support

budget

2010-11 Budget Act $60,000 B0411Land acquisition and improvementsEnacted 2010-11

Wednesday, January 29, Page 193 of 3421:20:08 PM Public Resources Code (PRC) Section PRC §75050(h)Ch. 5Prop 84 Report

Page 197: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3850-001-6051 Portion of support

budget: Reversion

2010-11 Budget Act ($42,881) B0411Land acquisition and improvementsEnacted 2012-13

3850-001-6051 Portion of support

budget

2011-12 Budget Act $60,000 B0411Land acquisition and improvementsEnacted 2011-12

3850-001-6051 Portion of support

budget: Natural

Reversion

2011-12 Natural

Reversion

($54,125) B0411Land acquisition and improvementsEnacted 2013-14

3850-001-6051 Portion of support

budget

2012-13 Budget Act $60,000 B0411Land acquisition and improvementsEnacted 2012-13

3850-001-6051 Portion of support

budget: Natural

Reversion

2012-13 Natural

Reversion

($59,150) B0411Land acquisition and improvementsEnacted 2014-15

3850-001-6051 Portion of support

budget

2013-14 Budget Act $60,000 B0411Land acquisition and improvementsEnacted 2013-14

3850-001-6051 Portion of support

budget: Natural

Reversion

2013-14 Natural

Reversion

($12,548) B0411Land acquisition and improvementsEnacted 2015-16

3850-001-6051 Portion of support

budget

2014-15 Budget Act $60,000 B0411Land acquisition and improvementsEnacted 2014-15

3850-001-6051 Portion of support

budget: Natural

Reversion

2014-15 Natural

Reversion

($10,350) B0411Land acquisition and improvementsEnacted 2016-17

3850-001-6051 Portion of support

budget

2015-16 Budget Act $60,000 B0411Land acquisition and improvementsEnacted 2015-16

3850-001-6051 Portion of support

budget: Natural

Reversion

2015-16 Natural

Reversion

($6,737) B0411Land acquisition and improvementsEnacted 2017-18

3850-001-6051 Portion of support

budget

2016-17 Budget Act $60,000 B0411Land acquisition and improvementsEnacted 2016-17

3850-001-6051 Portion of support

budget: Natural

Reversion

2016-17 Natural

Reversion

($27,792) B0411Land acquisition and improvementsEnacted 2018-19

3850-001-6051 Portion of support

budget

2017-18 Budget Act $60,000 B0411Land acquisition and improvementsEnacted 2017-18

3850-001-6051 Portion of support

budget

2018-19 Budget Act $60,000 B0411Land acquisition and improvementsEnacted 2018-19

3850-001-6051 Portion of support

budget

2019-20 Budget Act $60,000 B0411Land acquisition and improvementsEnacted 2019-20

3850-301-6051 (1) Coachella Valley

Mountains Acquisition

and Enhancement

Projects and Costs

2007-08 Budget Act $11,514,000 B0412Land acquisition and improvementsEnacted 2007-08

3850-301-6051 Coachella Valley

Mountains Acquisition

and Enhancement

Projects and Costs

2008-09 Budget Act $11,554,000 B0412Land acquisition and improvementsEnacted 2008-09

Wednesday, January 29, Page 194 of 3421:20:08 PM Public Resources Code (PRC) Section PRC §75050(h)Ch. 5Prop 84 Report

Page 198: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3850-301-6051 Coachella Valley

Mountains Acquisition

and Enhancement

Projects and Costs

2009-10 Budget Act $6,000,000 B0412Land acquisition and improvementsEnacted 2009-10

3850-301-6051 Coachella Valley

Mountains Acquisition

and Enhancement

Projects and Costs:

Natural Reversion

2009-10 Natural

Reversion

($3,258,412) B0412Land acquisition and improvementsEnacted 2013-14

3850-301-6051 Coachella Valley

Mountains Acquisition

and Enhancement

Projects and Costs:

Refund to Reverted

2009-10 ($55,000) B0412Land acquisition and improvementsEnacted 2016-17

3850-301-6051 Coachella Valley

Mountains Acquisition

and Enhancement

Projects and Costs:

Reversion

2009-10 Budget Act ($218,074) B0412Land acquisition and improvementsEnacted 2011-12

3850-301-6051 Coachella Valley

Mountains Acquisition

and Enhancement

Projects and Costs

2010-11 Budget Act $5,453,379 B0412Land acquisition and improvementsEnacted 2010-11

3850-301-6051 Coachella Valley

Mountains Acquisition

and Enhancement

Projects and Costs:

Refund to Reverted

2010-11 ($362,000) B0412Land acquisition and improvementsEnacted 2016-17

3850-301-6051 Coachella Valley

Mountains Acquisition

and Enhancement

Projects and Costs

2013-14 Budget Act $3,258,000 B0412Land acquisition and improvementsEnacted 2017-18

Sum: $34,391,265Enacted

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3850-001-6051 (1) Portion of support

budget

2020-21 Budget Act $60,000 B0411Land acquisition and improvementsProposed 2020-21

3850-301-6051 Coachella Valley

Mountains Acquisition

and Enhancement:

Reappropriation

(decrease)

2007-08 Budget Act ($11,514,000) B0412Land acquisition and improvementsProposed 2017-18

3850-301-6051 (1) Coachella Valley

Mountains Acquisition

and Enhancement:

Reappropriation

(increase)

2007-08 Budget Act $11,514,000 B0412Land acquisition and improvementsProposed 2020-21

Wednesday, January 29, Page 195 of 3421:20:08 PM Public Resources Code (PRC) Section PRC §75050(h)Ch. 5Prop 84 Report

Page 199: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3850-301-6051 Coachella Valley

Mountains Acquisition

and Enhancement:

Reappropriation

(decrease)

2008-09 Budget Act ($11,554,000) B0412Land acquisition and improvementsProposed 2017-18

3850-301-6051 (2) Coachella Valley

Mountains Acquisition

and Enhancement:

Reappropriation

(increase)

2008-09 Budget Act $11,554,000 B0412Land acquisition and improvementsProposed 2020-21

3850-301-6051 Coachella Valley

Mountains Acquisition

and Enhancement:

Reappropriation

(decrease)

2013-14 Budget Act ($3,258,000) B0412Land acquisition and improvementsProposed 2017-18

3850-301-6051 (3) Coachella Valley

Mountains Acquisition

and Enhancement:

Reappropriation

(increase)

2013-14 Budget Act $3,258,000 B0412Land acquisition and improvementsProposed 2020-21

Sum: $60,000Proposed

Sum: $34,451,265

$48,735

Balance for Coachella Valley Mountains Conservancy projects:

Wednesday, January 29, Page 196 of 3421:20:08 PM Public Resources Code (PRC) Section PRC §75050(h)Ch. 5Prop 84 Report

Page 200: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

Protection of Rivers, Lakes and StreamsChapter 5

Allocation: Santa Ana River Parkway: Unspecified

Allocation $: $15,000,000$78,082

$154,602Statewide Set Asides: $232,684 {

Outyear Obligations: $240,000

$0

$0

{

PRC §75050(i)Ch. 5

Appropriations, Proposals and Reversions

Statewide, requiring appropriation:

Statewide, not requiring appropriation:

Outyear Program Delivery commitments:

Outyear Cap. Outlay (to complete started projects):Reversions are shown below$0

Outyear Local Asst. commitments:

Unspecified: Projects to expand and improve the Santa Ana River Parkway. Projects developed in consultation with local government agencies. Estimated portion

for this area posted against this specific allocation; upon project selection, appropriation will be charged against the appropriate PRC Section.

Dept.: State Coastal Conservancy

Other Outyear Support commitments:$240,000

Committed

$0

$0

$0

$0

Proposed

$0

Prop 1 Reduction $292,316

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3760-001-6051 Portion of support

budget

2010-11 Budget Act $35,524 B0421Santa Ana River Parkway Program -

unspecified

Enacted 2010-11

3760-001-6051 Portion of support

budget

2010-11 Budget Act $13,476 B0422Santa Ana River Parkway Program -

unspecified

Enacted 2010-11

3760-001-6051 Portion of support

budget: Control Section

Adjustment

2010-11 Control

Section

Adjustment

($30,300) B0421Santa Ana River Parkway Program -

unspecified

Enacted 2010-11

3760-001-6051 Portion of support

budget

2011-12 Budget Act $103,582 B0421Santa Ana River Parkway Program -

unspecified

Enacted 2011-12

3760-001-6051 Portion of support

budget

2011-12 Budget Act $3,481 B0422Santa Ana River Parkway Program -

unspecified

Enacted 2011-12

3760-001-6051 Portion of support

budget: Control Section

Adjustment

2011-12 Control

Section

Adjustment

($3,101) B0421Santa Ana River Parkway Program -

unspecified

Enacted 2011-12

3760-001-6051 Portion of support

budget

2012-13 Budget Act $200,000 B0421Santa Ana River Parkway Program -

unspecified

Enacted 2012-13

3760-001-6051 Portion of support

budget

2013-14 Budget Act $199,667 B0421Santa Ana River Parkway Program -

unspecified

Enacted 2013-14

3760-001-6051 Portion of support

budget

2013-14 Budget Act $333 B0422Santa Ana River Parkway Program -

unspecified

Enacted 2013-14

3760-001-6051 Portion of support

budget

2014-15 Budget Act $99,417 B0421Santa Ana River Parkway Program -

unspecified

Enacted 2014-15

3760-001-6051 Portion of support

budget

2014-15 Budget Act $583 B0422Santa Ana River Parkway Program -

unspecified

Enacted 2014-15

Wednesday, January 29, Page 197 of 3421:20:08 PM Public Resources Code (PRC) Section PRC §75050(i)Ch. 5Prop 84 Report

Page 201: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3760-001-6051 Portion of support

budget

2015-16 Budget Act $47,907 B0421Santa Ana River Parkway Program -

unspecified

Enacted 2015-16

3760-001-6051 Portion of support

budget

2015-16 Budget Act $2,093 B0422Santa Ana River Parkway Program -

unspecified

Enacted 2015-16

3760-001-6051 Portion of support

budget

2016-17 Budget Act $5,000 B0423Santa Ana River Parkway Program -

unspecified

Enacted 2016-17

3760-001-6051 Portion of support

budget

2016-17 Budget Act $25,000 B0421Santa Ana River Parkway Program -

unspecified

Enacted 2016-17

3760-001-6051 Portion of support

budget

2016-17 Budget Act $10,000 B0422Santa Ana River Parkway Program -

unspecified

Enacted 2016-17

3760-001-6051 Portion of support

budget

2017-18 Budget Act $60,000 B0421Santa Ana River Parkway Program -

unspecified

Enacted 2017-18

3760-001-6051 Portion of support

budget

2018-19 Budget Act $60,000 B0423Santa Ana River Parkway Program -

unspecified

Enacted 2018-19

3760-001-6051 Portion of support

budget

2019-20 Budget Act $60,000 B0423Santa Ana River Parkway Program -

unspecified

Enacted 2019-20

3760-101-6051 (1) Portion of local

assistance budget

2016-17 Budget Act $4,500,000 B0422Santa Ana River Parkway Program -

unspecified

Enacted 2016-17

3760-101-6051 (1) Portion of local

assistance budget

2018-19 Budget Act $2,270,000 B0422Santa Ana River Parkway Program -

unspecified

Enacted 2018-19

3760-101-6051 (1) Portion of local

assistance budget

2019-20 Budget Act $2,000,000 B0422Santa Ana River Parkway Program -

unspecified

Enacted 2019-20

3760-301-6051 (2) Conservancy Programs2007-08 Budget Act $3,281,000 B0422Santa Ana River Parkway Program -

unspecified

Enacted 2007-08

3760-301-6051 (2) Conservancy Programs:

Natural Reversion

2007-08 Natural

Reversion

($3,131,000) B0422Santa Ana River Parkway Program -

unspecified

Enacted 2011-12

3760-301-6051 Conservancy Programs2008-09 Budget Act $4,556,000 B0422Santa Ana River Parkway Program -

unspecified

Enacted 2008-09

3760-301-6051 Conservancy Programs:

Natural Reversion

2008-09 Natural

Reversion

($4,377,800) B0422Santa Ana River Parkway Program -

unspecified

Enacted 2015-16

3760-301-6051 Conservancy Programs:

Reversion Reverse

2008-09 Natural

Reversion

$264,830 B0422Santa Ana River Parkway Program -

unspecified

Enacted 2016-17

3760-301-6051 Conservancy Programs2012-13 Budget Act $2,300,000 B0422Santa Ana River Parkway Program -

unspecified

Enacted 2012-13

3760-301-6051 Conservancy Programs:

Natural Reversion

2012-13 Natural

Reversion

($2,300,000) B0422Santa Ana River Parkway Program -

unspecified

Enacted 2016-17

3760-810-6051 Conservancy Programs2009-10 Special

Legislation

$3,400,000 B0422Santa Ana River Parkway Program -

unspecified

Enacted 2009-10

3760-810-6051 Conservancy Programs:

Natural Reversion

2009-10 Natural

Reversion

($3,400,000) B0422Santa Ana River Parkway Program -

unspecified

Enacted 2011-12

Sum: $10,255,692Enacted

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3760-001-6051 (1) Portion of support

budget

2020-21 Budget Act $60,000 B0423Santa Ana River Parkway Program -

unspecified

Proposed 2020-21

3760-101-6051 (1) Portion of local

assistance budget

2020-21 Budget Act $3,919,000 B0422Santa Ana River Parkway Program -

unspecified

Proposed 2020-21

Wednesday, January 29, Page 198 of 3421:20:08 PM Public Resources Code (PRC) Section PRC §75050(i)Ch. 5Prop 84 Report

Page 202: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

Sum: $3,979,000Proposed

Sum: $14,234,692

$308

Balance for Santa Ana River Parkway: Unspecified:

Wednesday, January 29, Page 199 of 3421:20:08 PM Public Resources Code (PRC) Section PRC §75050(i)Ch. 5Prop 84 Report

Page 203: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

Protection of Rivers, Lakes and StreamsChapter 5

Allocation: Santa Ana River Parkway: Orange

County

Allocation $: $10,000,000$52,055

$103,068Statewide Set Asides: $155,122 {

Outyear Obligations: $140,000

$0

$0

{

PRC §75050(i), ref 1Ch. 5

Appropriations, Proposals and Reversions

Statewide, requiring appropriation:

Statewide, not requiring appropriation:

Outyear Program Delivery commitments:

Outyear Cap. Outlay (to complete started projects):Reversions are shown below$0

Outyear Local Asst. commitments:

Orange County: Projects to expand and improve the Santa Ana River Parkway. Projects developed in consultation with local government agencies. ($30,000,000

shall be equally divided between projects in Orange, San Bernardino and Riverside Counties. Estimated portion for this area posted against this specific

allocation; upon project selection, appropriation will be charged against the appropriate PRC Section.)

Dept.: State Coastal Conservancy

Other Outyear Support commitments:$140,000

Committed

$0

$0

$0

$0

Proposed

$0

Prop 1 Reduction $194,878

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3760-001-6051 Portion of support

budget

2011-12 Budget Act $5,325 B0432Santa Ana River Parkway Program -

Orange Co.

Enacted 2011-12

3760-001-6051 Portion of support

budget

2012-13 Budget Act $198,637 B0431Santa Ana River Parkway Program -

Orange Co.

Enacted 2012-13

3760-001-6051 Portion of support

budget

2012-13 Budget Act $1,363 B0432Santa Ana River Parkway Program -

Orange Co.

Enacted 2012-13

3760-001-6051 Portion of support

budget

2013-14 Budget Act $199,388 B0431Santa Ana River Parkway Program -

Orange Co.

Enacted 2013-14

3760-001-6051 Portion of support

budget

2013-14 Budget Act $612 B0432Santa Ana River Parkway Program -

Orange Co.

Enacted 2013-14

3760-001-6051 Portion of support

budget

2014-15 Budget Act $48,861 B0431Santa Ana River Parkway Program -

Orange Co.

Enacted 2014-15

3760-001-6051 Portion of support

budget

2014-15 Budget Act $1,139 B0432Santa Ana River Parkway Program -

Orange Co.

Enacted 2014-15

3760-001-6051 Portion of support

budget

2015-16 Budget Act $2,000 B0432Santa Ana River Parkway Program -

Orange Co.

Enacted 2015-16

3760-001-6051 Portion of support

budget

2016-17 Budget Act $15,000 B0431Santa Ana River Parkway Program -

Orange Co.

Enacted 2016-17

3760-001-6051 Portion of support

budget

2016-17 Budget Act $5,000 B0432Santa Ana River Parkway Program -

Orange Co.

Enacted 2016-17

3760-001-6051 Portion of support

budget

2017-18 Budget Act $35,000 B0431Santa Ana River Parkway Program -

Orange Co.

Enacted 2017-18

3760-001-6051 Portion of support

budget

2018-19 Budget Act $35,000 B0433Santa Ana River Parkway Program -

Orange Co.

Enacted 2018-19

Wednesday, January 29, Page 200 of 3421:20:08 PM Public Resources Code (PRC) Section PRC §75050(i), ref 1Ch. 5Prop 84 Report

Page 204: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3760-001-6051 Portion of support

budget

2019-20 Budget Act $35,000 B0433Santa Ana River Parkway Program -

Orange Co.

Enacted 2019-20

3760-101-6051 Conservancy Programs2015-16 Budget Act $4,057,000 B0432Santa Ana River Parkway Program -

Orange Co.

Enacted 2015-16

3760-101-6051 Conservancy Programs:

Reversion

2015-16 Budget Act ($4,057,000) B0432Santa Ana River Parkway Program -

Orange Co.

Enacted 2018-19

3760-101-6051 (1) Portion of local

assistance budget

2018-19 Budget Act $2,000,000 B0432Santa Ana River Parkway Program -

Orange Co.

Enacted 2018-19

3760-301-6051 (2) Conservancy Programs2007-08 Budget Act $2,123,000 B0432Santa Ana River Parkway Program -

Orange Co.

Enacted 2007-08

3760-301-6051 (2) Conservancy Programs:

Natural Reversion

2007-08 Natural

Reversion

($1,627,952) B0432Santa Ana River Parkway Program -

Orange Co.

Enacted 2011-12

3760-301-6051 Conservancy Programs2008-09 Budget Act $2,948,000 B0432Santa Ana River Parkway Program -

Orange Co.

Enacted 2008-09

3760-301-6051 Conservancy Programs:

Natural Reversion

2008-09 Natural

Reversion

($2,651,187) B0432Santa Ana River Parkway Program -

Orange Co.

Enacted 2015-16

3760-301-6051 Conservancy Programs:

Reversion Reverse

2008-09 Natural

Reversion

$1,703,187 B0432Santa Ana River Parkway Program -

Orange Co.

Enacted 2016-17

3760-301-6051 Conservancy Programs2012-13 Budget Act $1,600,000 B0432Santa Ana River Parkway Program -

Orange Co.

Enacted 2012-13

3760-301-6051 Conservancy Programs:

Natural Reversion

2012-13 Natural

Reversion

($1,600,000) B0432Santa Ana River Parkway Program -

Orange Co.

Enacted 2016-17

3760-810-6051 Conservancy Programs2009-10 Special

Legislation

$2,200,000 B0432Santa Ana River Parkway Program -

Orange Co.

Enacted 2009-10

3760-810-6051 Conservancy Programs:

Natural Reversion

2009-10 Natural

Reversion

($2,200,000) B0432Santa Ana River Parkway Program -

Orange Co.

Enacted 2011-12

Sum: $5,077,373Enacted

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3760-001-6051 (1) Portion of support

budget

2020-21 Budget Act $35,000 B0433Santa Ana River Parkway Program -

Orange Co.

Proposed 2020-21

3760-101-6051 (1) Portion of local

assistance budget

2020-21 Budget Act $4,397,000 B0432Santa Ana River Parkway Program -

Orange Co.

Proposed 2020-21

Sum: $4,432,000Proposed

Sum: $9,509,373

$627

Balance for Santa Ana River Parkway: Orange County:

Wednesday, January 29, Page 201 of 3421:20:08 PM Public Resources Code (PRC) Section PRC §75050(i), ref 1Ch. 5Prop 84 Report

Page 205: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

Protection of Rivers, Lakes and StreamsChapter 5

Allocation: Santa Ana River Parkway: San

Bernardino County

Allocation $: $10,000,000$52,055

$103,068Statewide Set Asides: $155,122 {

Outyear Obligations: $140,000

$0

$0

{

PRC §75050(i), ref 2Ch. 5

Appropriations, Proposals and Reversions

Statewide, requiring appropriation:

Statewide, not requiring appropriation:

Outyear Program Delivery commitments:

Outyear Cap. Outlay (to complete started projects):Reversions are shown below$0

Outyear Local Asst. commitments:

San Bernardino County: Projects to expand and improve the Santa Ana River Parkway. Projects developed in consultation with local government agencies.

($30,000,000 shall be equally divided between projects in Orange, San Bernardino and Riverside Counties. Estimated portion for this area posted against this

specific allocation; upon project selection, appropriation will be charged against the appropriate PRC Section.)

Dept.: State Coastal Conservancy

Other Outyear Support commitments:$140,000

Committed

$0

$0

$0

$0

Proposed

$0

Prop 1 Reduction $194,878

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3760-001-6051 Portion of support

budget

2011-12 Budget Act $3,173 B0442Santa Ana River Parkway Program -

San Bernardino Co.

Enacted 2011-12

3760-001-6051 Portion of support

budget

2012-13 Budget Act $196,410 B0441Santa Ana River Parkway Program -

San Bernardino Co.

Enacted 2012-13

3760-001-6051 Portion of support

budget

2012-13 Budget Act $3,590 B0442Santa Ana River Parkway Program -

San Bernardino Co.

Enacted 2012-13

3760-001-6051 Portion of support

budget

2013-14 Budget Act $198,984 B0441Santa Ana River Parkway Program -

San Bernardino Co.

Enacted 2013-14

3760-001-6051 Portion of support

budget

2013-14 Budget Act $1,016 B0442Santa Ana River Parkway Program -

San Bernardino Co.

Enacted 2013-14

3760-001-6051 Portion of support

budget

2014-15 Budget Act $42,366 B0441Santa Ana River Parkway Program -

San Bernardino Co.

Enacted 2014-15

3760-001-6051 Portion of support

budget

2014-15 Budget Act $7,634 B0442Santa Ana River Parkway Program -

San Bernardino Co.

Enacted 2014-15

3760-001-6051 Portion of support

budget

2015-16 Budget Act $2,000 B0442Santa Ana River Parkway Program -

San Bernardino Co.

Enacted 2015-16

3760-001-6051 Portion of support

budget

2016-17 Budget Act $15,000 B0441Santa Ana River Parkway Program -

San Bernardino Co.

Enacted 2016-17

3760-001-6051 Portion of support

budget

2016-17 Budget Act $5,000 B0442Santa Ana River Parkway Program -

San Bernardino Co.

Enacted 2016-17

3760-001-6051 Portion of support

budget

2017-18 Budget Act $35,000 B0441Santa Ana River Parkway Program -

San Bernardino Co.

Enacted 2017-18

3760-001-6051 Portion of support

budget

2018-19 Budget Act $35,000 B0443Santa Ana River Parkway Program -

San Bernardino Co.

Enacted 2018-19

Wednesday, January 29, Page 202 of 3421:20:08 PM Public Resources Code (PRC) Section PRC §75050(i), ref 2Ch. 5Prop 84 Report

Page 206: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3760-001-6051 Portion of support

budget

2019-20 Budget Act $35,000 B0443Santa Ana River Parkway Program -

San Bernardino Co.

Enacted 2019-20

3760-101-6051 Conservancy Programs2015-16 Budget Act $2,082,000 B0442Santa Ana River Parkway Program -

San Bernardino Co.

Enacted 2015-16

3760-101-6051 Conservancy Programs:

Reversion

2015-16 Budget Act ($1,285,992) B0442Santa Ana River Parkway Program -

San Bernardino Co.

Enacted 2018-19

3760-101-6051 (1) Portion of local

assistance budget

2019-20 Budget Act $2,000,000 B0442Santa Ana River Parkway Program -

San Bernardino Co.

Enacted 2019-20

3760-301-6051 (2) Conservancy Programs2007-08 Budget Act $2,123,000 B0442Santa Ana River Parkway Program -

San Bernardino Co.

Enacted 2007-08

3760-301-6051 (2) Conservancy Programs:

Natural Reversion

2007-08 Natural

Reversion

($1,853,000) B0442Santa Ana River Parkway Program -

San Bernardino Co.

Enacted 2011-12

3760-301-6051 Conservancy Programs2008-09 Budget Act $2,948,000 B0442Santa Ana River Parkway Program -

San Bernardino Co.

Enacted 2008-09

3760-301-6051 Conservancy Programs:

Natural Reversion

2008-09 Natural

Reversion

($2,818,000) B0442Santa Ana River Parkway Program -

San Bernardino Co.

Enacted 2015-16

3760-301-6051 Conservancy Programs2012-13 Budget Act $800,000 B0442Santa Ana River Parkway Program -

San Bernardino Co.

Enacted 2012-13

3760-301-6051 Conservancy Programs:

Natural Reversion

2012-13 Natural

Reversion

($800,000) B0442Santa Ana River Parkway Program -

San Bernardino Co.

Enacted 2016-17

3760-301-6051 Conservancy Programs2013-14 Budget Act $3,000,000 B0442Santa Ana River Parkway Program -

San Bernardino Co.

Enacted 2013-14

3760-810-6051 Conservancy Programs2009-10 Special

Legislation

$2,200,000 B0442Santa Ana River Parkway Program -

San Bernardino Co.

Enacted 2009-10

3760-810-6051 Conservancy Programs:

Natural Reversion

2009-10 Natural

Reversion

($2,200,000) B0442Santa Ana River Parkway Program -

San Bernardino Co.

Enacted 2011-12

Sum: $6,776,181Enacted

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3760-001-6051 (1) Portion of support

budget

2020-21 Budget Act $35,000 B0443Santa Ana River Parkway Program -

San Bernardino Co.

Proposed 2020-21

3760-101-6051 (1) Portion of local

assistance budget

2020-21 Budget Act $2,698,000 B0442Santa Ana River Parkway Program -

San Bernardino Co.

Proposed 2020-21

Sum: $2,733,000Proposed

Sum: $9,509,181

$819

Balance for Santa Ana River Parkway: San Bernardino County:

Wednesday, January 29, Page 203 of 3421:20:08 PM Public Resources Code (PRC) Section PRC §75050(i), ref 2Ch. 5Prop 84 Report

Page 207: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

Protection of Rivers, Lakes and StreamsChapter 5

Allocation: Santa Ana River Parkway: Riverside

County

Allocation $: $10,000,000$52,055

$103,068Statewide Set Asides: $155,122 {

Outyear Obligations: $70,000

$0

$0

{

PRC §75050(i), ref 3Ch. 5

Appropriations, Proposals and Reversions

Statewide, requiring appropriation:

Statewide, not requiring appropriation:

Outyear Program Delivery commitments:

Outyear Cap. Outlay (to complete started projects):Reversions are shown below$0

Outyear Local Asst. commitments:

Riverside County: Projects to expand and improve the Santa Ana River Parkway. Projects developed in consultation with local government agencies.

($30,000,000 shall be equally divided between projects in Orange, San Bernardino and Riverside Counties. Estimated portion for this area posted against this

specific allocation; upon project selection, appropriation will be charged against the appropriate PRC Section.)

Dept.: State Coastal Conservancy

Other Outyear Support commitments:$70,000

Committed

$0

$0

$0

$0

Proposed

$0

Prop 1 Reduction $194,878

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3760-001-6051 Portion of support

budget

2011-12 Budget Act $1,939 B0452Santa Ana River Parkway Program -

Riverside Co.

Enacted 2011-12

3760-001-6051 Portion of support

budget

2012-13 Budget Act $197,004 B0451Santa Ana River Parkway Program -

Riverside Co.

Enacted 2012-13

3760-001-6051 Portion of support

budget

2012-13 Budget Act $2,996 B0452Santa Ana River Parkway Program -

Riverside Co.

Enacted 2012-13

3760-001-6051 Portion of support

budget

2013-14 Budget Act $189,318 B0451Santa Ana River Parkway Program -

Riverside Co.

Enacted 2013-14

3760-001-6051 Portion of support

budget

2013-14 Budget Act $10,682 B0452Santa Ana River Parkway Program -

Riverside Co.

Enacted 2013-14

3760-001-6051 Portion of support

budget

2014-15 Budget Act $46,531 B0451Santa Ana River Parkway Program -

Riverside Co.

Enacted 2014-15

3760-001-6051 Portion of support

budget

2014-15 Budget Act $3,469 B0452Santa Ana River Parkway Program -

Riverside Co.

Enacted 2014-15

3760-001-6051 Portion of support

budget

2015-16 Budget Act $2,000 B0452Santa Ana River Parkway Program -

Riverside Co.

Enacted 2015-16

3760-001-6051 Portion of support

budget

2016-17 Budget Act $15,000 B0451Santa Ana River Parkway Program -

Riverside Co.

Enacted 2016-17

3760-001-6051 Portion of support

budget

2016-17 Budget Act $5,000 B0452Santa Ana River Parkway Program -

Riverside Co.

Enacted 2016-17

3760-001-6051 Portion of support

budget

2017-18 Budget Act $35,000 B0451Santa Ana River Parkway Program -

Riverside Co.

Enacted 2017-18

3760-001-6051 Portion of support

budget

2018-19 Budget Act $35,000 B0453Santa Ana River Parkway Program -

Riverside Co.

Enacted 2018-19

Wednesday, January 29, Page 204 of 3421:20:08 PM Public Resources Code (PRC) Section PRC §75050(i), ref 3Ch. 5Prop 84 Report

Page 208: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3760-001-6051 Portion of support

budget

2019-20 Budget Act $35,000 B0453Santa Ana River Parkway Program -

Riverside Co.

Enacted 2019-20

3760-101-6051 (1) Portion of local

assistance budget

2016-17 Budget Act $2,500,000 B0452Santa Ana River Parkway Program -

Riverside Co.

Enacted 2016-17

3760-101-6051 (1) Portion of local

assistance budget

2017-18 Budget Act $1,500,000 B0452Santa Ana River Parkway Program -

Riverside Co.

Enacted 2017-18

3760-101-6051 (1) Portion of local

assistance budget

2018-19 Budget Act $1,169,000 B0452Santa Ana River Parkway Program -

Riverside Co.

Enacted 2018-19

3760-301-6051 (2) Conservancy Programs2007-08 Budget Act $2,123,000 B0452Santa Ana River Parkway Program -

Riverside Co.

Enacted 2007-08

3760-301-6051 (2) Conservancy Programs:

Natural Reversion

2007-08 Natural

Reversion

($1,287,186) B0452Santa Ana River Parkway Program -

Riverside Co.

Enacted 2011-12

3760-301-6051 Conservancy Programs2008-09 Budget Act $2,948,000 B0452Santa Ana River Parkway Program -

Riverside Co.

Enacted 2008-09

3760-301-6051 Conservancy Programs:

Natural Reversion

2008-09 Natural

Reversion

($1,803,590) B0452Santa Ana River Parkway Program -

Riverside Co.

Enacted 2015-16

3760-301-6051 Conservancy Programs:

Reversion Reverse

2008-09 Natural

Reversion

$1,803,590 B0452Santa Ana River Parkway Program -

Riverside Co.

Enacted 2016-17

3760-301-6051 Conservancy Programs2012-13 Budget Act $800,000 B0452Santa Ana River Parkway Program -

Riverside Co.

Enacted 2012-13

3760-301-6051 Conservancy Programs:

Natural Reversion

2012-13 Natural

Reversion

($796,008) B0452Santa Ana River Parkway Program -

Riverside Co.

Enacted 2016-17

3760-301-6051 Conservancy Programs2013-14 Budget Act $2,000,000 B0452Santa Ana River Parkway Program -

Riverside Co.

Enacted 2013-14

3760-810-6051 Conservancy Programs2009-10 Special

Legislation

$2,200,000 B0452Santa Ana River Parkway Program -

Riverside Co.

Enacted 2009-10

3760-810-6051 Conservancy Programs:

Natural Reversion

2009-10 Natural

Reversion

($2,200,000) B0452Santa Ana River Parkway Program -

Riverside Co.

Enacted 2011-12

Sum: $11,535,745Enacted

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3760-001-6051 (1) Portion of support

budget

2020-21 Budget Act $35,000 B0453Santa Ana River Parkway Program -

Riverside Co.

Proposed 2020-21

Sum: $35,000Proposed

Sum: $11,570,745

($1,990,745)

Balance for Santa Ana River Parkway: Riverside County:

Wednesday, January 29, Page 205 of 3421:20:08 PM Public Resources Code (PRC) Section PRC §75050(i), ref 3Ch. 5Prop 84 Report

Page 209: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

Protection of Rivers, Lakes and StreamsChapter 5

Allocation: Sierra Nevada Conservancy projects

Allocation $: $54,000,000$281,095

$556,567Statewide Set Asides: $837,661 {

Outyear Obligations: $200,000

$0

$0

{

PRC §75050(j)Ch. 5

Appropriations, Proposals and Reversions

Statewide, requiring appropriation:

Statewide, not requiring appropriation:

Outyear Program Delivery commitments:

Outyear Cap. Outlay (to complete started projects):Reversions are shown below$0

Outyear Local Asst. commitments:

Available for Sierra Nevada Conservancy projects.

Dept.: Sierra Nevada Conservancy

Other Outyear Support commitments:$200,000

Committed

$0

$0

$0

$0

Proposed

$0

Prop 1 Reduction $1,052,339

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3855-001-6051 Portion of support

budget

2007-08 Budget Act $500,000 B0461Sierra Nevada Conservancy GrantsEnacted 2007-08

3855-001-6051 Portion of support

budget: Control Section

Adjustment

2007-08 Control

Section

Adjustment

$6,361 B0461Sierra Nevada Conservancy GrantsEnacted 2007-08

3855-001-6051 Portion of support

budget: Natural

Reversion

2007-08 Natural

Reversion

($351,749) B0461Sierra Nevada Conservancy GrantsEnacted 2009-10

3855-001-6051 Portion of support

budget

2008-09 Budget Act $513,000 B0461Sierra Nevada Conservancy GrantsEnacted 2008-09

3855-001-6051 Portion of support

budget: Control Section

Adjustment

2008-09 Control

Section

Adjustment

($4,236) B0461Sierra Nevada Conservancy GrantsEnacted 2008-09

3855-001-6051 Portion of support

budget: Natural

Reversion

2008-09 Natural

Reversion

($282,468) B0461Sierra Nevada Conservancy GrantsEnacted 2010-11

3855-001-6051 Portion of support

budget

2009-10 Budget Act $522,000 B0461Sierra Nevada Conservancy GrantsEnacted 2009-10

3855-001-6051 Portion of support

budget: Control Section

Adjustment

2009-10 Control

Section

Adjustment

($44,572) B0461Sierra Nevada Conservancy GrantsEnacted 2009-10

3855-001-6051 Portion of support

budget: Natural

Reversion

2009-10 Natural

Reversion

($231,678) B0461Sierra Nevada Conservancy GrantsEnacted 2011-12

3855-001-6051 Portion of support

budget

2010-11 Budget Act $522,000 B0461Sierra Nevada Conservancy GrantsEnacted 2010-11

Wednesday, January 29, Page 206 of 3421:20:08 PM Public Resources Code (PRC) Section PRC §75050(j)Ch. 5Prop 84 Report

Page 210: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3855-001-6051 Portion of support

budget: Control Section

Adjustment

2010-11 Control

Section

Adjustment

($19,224) B0461Sierra Nevada Conservancy GrantsEnacted 2010-11

3855-001-6051 Portion of support

budget: Natural

Reversion

2010-11 Natural

Reversion

($145,288) B0461Sierra Nevada Conservancy GrantsEnacted 2012-13

3855-001-6051 Portion of support

budget

2011-12 Budget Act $515,000 B0461Sierra Nevada Conservancy GrantsEnacted 2011-12

3855-001-6051 Portion of support

budget: Control Section

Adjustment

2011-12 Control

Section

Adjustment

($19,779) B0461Sierra Nevada Conservancy GrantsEnacted 2011-12

3855-001-6051 Portion of support

budget: Natural

Reversion

2011-12 Natural

Reversion

($97,209) B0461Sierra Nevada Conservancy GrantsEnacted 2013-14

3855-001-6051 Portion of support

budget

2012-13 Budget Act $523,000 B0461Sierra Nevada Conservancy GrantsEnacted 2012-13

3855-001-6051 Portion of support

budget: Control Section

Adjustment

2012-13 Control

Section

Adjustment

($7,249) B0461Sierra Nevada Conservancy GrantsEnacted 2012-13

3855-001-6051 Portion of support

budget: Natural

Reversion

2012-13 Natural

Reversion

($181,060) B0461Sierra Nevada Conservancy GrantsEnacted 2014-15

3855-001-6051 Portion of support

budget

2013-14 Budget Act $532,000 B0461Sierra Nevada Conservancy GrantsEnacted 2013-14

3855-001-6051 Portion of support

budget: Control Section

Adjustment

2013-14 Control

Section

Adjustment

$6,688 B0461Sierra Nevada Conservancy GrantsEnacted 2013-14

3855-001-6051 Portion of support

budget: Natural

Reversion

2013-14 Natural

Reversion

($10,211) B0461Sierra Nevada Conservancy GrantsEnacted 2015-16

3855-001-6051 Portion of support

budget: Reversion

2013-14 Budget Act ($110,446) B0461Enacted 2015-16

3855-001-6051 Portion of support

budget

2014-15 Budget Act $256,000 B0461Sierra Nevada Conservancy GrantsEnacted 2014-15

3855-001-6051 Portion of support

budget: Control Section

Adjustment

2014-15 Control

Section

Adjustment

$10,123 B0461Sierra Nevada Conservancy GrantsEnacted 2014-15

3855-001-6051 Portion of support

budget: Natural

Reversion

2014-15 Natural

Reversion

($77,039) B0461Sierra Nevada Conservancy GrantsEnacted 2016-17

3855-001-6051 Portion of support

budget

2015-16 Budget Act $145,000 B0461Sierra Nevada Conservancy GrantsEnacted 2015-16

3855-001-6051 Portion of support

budget: Control Section

Adjustment

2015-16 Control

Section

Adjustment

$5,000 B0461Sierra Nevada Conservancy GrantsEnacted 2015-16

3855-001-6051 Portion of support

budget: Natural

Reversion

2015-16 Natural

Reversion

($90) B0461Sierra Nevada Conservancy GrantsEnacted 2017-18

Wednesday, January 29, Page 207 of 3421:20:08 PM Public Resources Code (PRC) Section PRC §75050(j)Ch. 5Prop 84 Report

Page 211: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3855-001-6051 Portion of support

budget

2016-17 Budget Act $124,000 B0461Sierra Nevada Conservancy Grants -

Program Delivery

Enacted 2016-17

3855-001-6051 Portion of support

budget: Control Section

Adjustment

2016-17 Control

Section

Adjustment

$5,000 B0461Sierra Nevada Conservancy GrantsEnacted 2016-17

3855-001-6051 Portion of support

budget: Reversion

2016-17 Budget Act ($5,095) B0461Sierra Nevada Conservancy Grants -

Program Delivery

Enacted 2018-19

3855-001-6051 Portion of support

budget

2017-18 Budget Act $32,600 B0463Sierra Nevada Conservancy Grants -

Planning and Monitoring

Enacted 2017-18

3855-001-6051 Portion of support

budget

2017-18 Budget Act $50,400 B0461Sierra Nevada Conservancy Grants -

Program Delivery

Enacted 2017-18

3855-001-6051 Portion of support

budget: Control Section

Adjustment

2017-18 Control

Section

Adjustment

$5,000 B0463Sierra Nevada Conservancy Grants -

Planning and Monitoring

Enacted 2017-18

3855-001-6051 Portion of support

budget: Reversion

2017-18 Budget Act ($7,604) B0463Sierra Nevada Conservancy Grants -

Planning and Monitoring

Enacted 2018-19

3855-001-6051 Portion of support

budget: Reversion

2017-18 Budget Act ($18) B0461Sierra Nevada Conservancy Grants -

Program Delivery

Enacted 2018-19

3855-001-6051 Portion of support

budget

2018-19 Budget Act $79,000 B0463Sierra Nevada Conservancy Grants -

Planning and Monitoring

Enacted 2018-19

3855-001-6051 Portion of support

budget

2018-19 Budget Act $52,000 B0461Sierra Nevada Conservancy Grants -

Program Delivery

Enacted 2018-19

3855-001-6051 Portion of support

budget: Control Section

Adjustment

2018-19 Control

Section

Adjustment

$6,000 B0463Sierra Nevada Conservancy Grants -

Planning and Monitoring

Enacted 2018-19

3855-001-6051 Portion of support

budget

2019-20 Budget Act $85,000 B0463Sierra Nevada Conservancy Grants -

Planning and Monitoring

Enacted 2019-20

3855-101-6051 Portion of local

assistance budget

2007-08 Budget Act $17,000,000 B0462Sierra Nevada Conservancy GrantsEnacted 2007-08

3855-101-6051 Portion of local

assistance budget:

Natural Reversion

2007-08 Natural

Reversion

($196,592) B0462Sierra Nevada Conservancy GrantsEnacted 2015-16

3855-101-6051 Portion of local

assistance budget:

Reversion

2007-08 Budget Act ($139,155) B0462Sierra Nevada Conservancy GrantsEnacted 2014-15

3855-101-6051 Portion of local

assistance budget

2008-09 Budget Act $17,000,000 B0462Sierra Nevada Conservancy GrantsEnacted 2008-09

3855-101-6051 Portion of local

assistance budget:

Natural Reversion

2008-09 Natural

Reversion

($407,855) B0462Sierra Nevada Conservancy GrantsEnacted 2015-16

3855-101-6051 Portion of local

assistance budget:

Reversion

2008-09 Budget Act ($1,307,786) B0462Sierra Nevada Conservancy GrantsEnacted 2014-15

3855-101-6051 Portion of local

assistance budget

2009-10 Budget Act $15,448,000 B0462Sierra Nevada Conservancy GrantsEnacted 2009-10

3855-101-6051 Portion of local

assistance budget:

Natural Reversion

2009-10 Natural

Reversion

($902,978) B0462Sierra Nevada Conservancy GrantsEnacted 2016-17

Wednesday, January 29, Page 208 of 3421:20:08 PM Public Resources Code (PRC) Section PRC §75050(j)Ch. 5Prop 84 Report

Page 212: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3855-101-6051 Portion of local

assistance budget

2014-15 Budget Act $1,550,000 B0462Sierra Nevada Conservancy GrantsEnacted 2014-15

3855-101-6051 Portion of local

assistance budget:

Natural Reversion

2014-15 Natural

Reversion

($110,587) B0462Sierra Nevada Conservancy GrantsEnacted 2014-15

3855-101-6051 Portion of local

assistance budget

2016-17 Budget Act $403,000 B0462Sierra Nevada Conservancy GrantsEnacted 2016-17

3855-101-6051 Portion of local

assistance budget

2018-19 Budget Act $300,000 B0462Sierra Nevada Conservancy GrantsEnacted 2018-19

3855-601-6051 Portion of local

assistance budget

2017-18 Special

Legislation

$285,000 B0462Sierra Nevada Conservancy GrantsEnacted 2017-18

Sum: $51,821,203Enacted

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3855-001-6051 Portion of support

budget: Control Section

Adjustment

2019-20 Control

Section

Adjustment

$5,000 B0463Sierra Nevada Conservancy Grants -

Planning and Monitoring

Enacted/Not 2019-20

Sum: $5,000Enacted/Not Posted

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3855-001-6051 (1) Portion of support

budget

2020-21 Budget Act $50,000 B0463Sierra Nevada Conservancy Grants -

Planning and Monitoring

Proposed 2020-21

Sum: $50,000Proposed

Sum: $51,876,203

$33,797

Balance for Sierra Nevada Conservancy projects:

Wednesday, January 29, Page 209 of 3421:20:08 PM Public Resources Code (PRC) Section PRC §75050(j)Ch. 5Prop 84 Report

Page 213: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

Protection of Rivers, Lakes and StreamsChapter 5

Allocation: Tahoe Conservancy projects

Allocation $: $36,000,000$187,396

$371,045Statewide Set Asides: $558,441 {

Outyear Obligations: $282,000

$0

$282,000

{

PRC §75050(k)Ch. 5

Appropriations, Proposals and Reversions

Statewide, requiring appropriation:

Statewide, not requiring appropriation:

Outyear Program Delivery commitments:

Outyear Cap. Outlay (to complete started projects):Reversions are shown below$0

Outyear Local Asst. commitments:

Available for Tahoe Conservancy projects.

Dept.: California Tahoe Conservancy

Other Outyear Support commitments:$0

Committed

$0

$0

$0

$0

Proposed

$0

Prop 1 Reduction $701,559

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3125-001-6051 Portion of support

budget

2007-08 Budget Act $219,000 B0471Implementation of the EIP for Lake

Tahoe

Enacted 2007-08

3125-001-6051 Portion of support

budget: Control Section

Adjustment

2007-08 Control

Section

Adjustment

$13,000 B0471Implementation of the EIP for Lake

Tahoe

Enacted 2007-08

3125-001-6051 (1) Portion of support

budget

2007-08 Budget Act $716,000 B0472Implementation of the EIP for Lake

Tahoe

Enacted 2007-08

3125-001-6051 (1) Portion of support

budget: Natural

Reversion

2007-08 Natural

Reversion

($2,113) B0472Implementation of the EIP for Lake

Tahoe

Enacted 2010-11

3125-001-6051 Portion of support

budget

2008-09 Budget Act $243,000 B0471Implementation of the EIP for Lake

Tahoe

Enacted 2008-09

3125-001-6051 Portion of support

budget

2008-09 Budget Act $256,000 B0471Lake Tahoe Basin Interagency Fuels

Reduction

Enacted 2008-09

3125-001-6051 Portion of support

budget: Control Section

Adjustment

2008-09 Control

Section

Adjustment

($4,601) B0471Implementation of the EIP for Lake

Tahoe

Enacted 2008-09

3125-001-6051 Portion of support

budget

2009-10 Budget Act $248,000 B0471Implementation of the EIP for Lake

Tahoe

Enacted 2009-10

3125-001-6051 Portion of support

budget

2009-10 Budget Act $261,000 B0471Lake Tahoe Basin Interagency Fuels

Reduction

Enacted 2009-10

3125-001-6051 Portion of support

budget: Control Section

Adjustment

2009-10 Control

Section

Adjustment

($42,285) B0471Implementation of the EIP for Lake

Tahoe

Enacted 2009-10

Wednesday, January 29, Page 210 of 3421:20:08 PM Public Resources Code (PRC) Section PRC §75050(k)Ch. 5Prop 84 Report

Page 214: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3125-001-6051 Portion of support

budget: Natural

Reversion

2009-10 Natural

Reversion

($14,142) B0471Lake Tahoe Basin Interagency Fuels

Reduction

Enacted 2011-12

3125-001-6051 Portion of support

budget

2010-11 Budget Act $248,000 B0471Implementation of the EIP for Lake

Tahoe

Enacted 2010-11

3125-001-6051 Portion of support

budget

2010-11 Budget Act $262,000 B0471Lake Tahoe Basin Interagency Fuels

Reduction

Enacted 2010-11

3125-001-6051 Portion of support

budget: Control Section

Adjustment

2010-11 Control

Section

Adjustment

($31,532) B0471Implementation of the EIP for Lake

Tahoe

Enacted 2010-11

3125-001-6051 Portion of support

budget: Natural

Reversion

2010-11 Natural

Reversion

($2,134) B0471Lake Tahoe Basin Interagency Fuels

Reduction

Enacted 2012-13

3125-001-6051 Portion of support

budget

2011-12 Budget Act $95,000 B0471Implementation of the EIP for Lake

Tahoe

Enacted 2011-12

3125-001-6051 Portion of support

budget: Control Section

Adjustment

2011-12 Control

Section

Adjustment

($1,298) B0471Implementation of the EIP for Lake

Tahoe

Enacted 2011-12

3125-001-6051 Portion of support

budget

2012-13 Budget Act $33,000 B0471Implementation of the EIP for Lake

Tahoe

Enacted 2012-13

3125-001-6051 Portion of support

budget: Control Section

Adjustment

2012-13 Control

Section

Adjustment

($492) B0471Implementation of the EIP for Lake

Tahoe

Enacted 2012-13

3125-001-6051 Portion of support

budget: Natural

Reversion

2012-13 Natural

Reversion

($1,405) B0471Implementation of the EIP for Lake

Tahoe

Enacted 2014-15

3125-001-6051 Portion of support

budget

2013-14 Budget Act $15,000 B0471Implementation of the EIP for Lake

Tahoe

Enacted 2013-14

3125-001-6051 Portion of support

budget: Control Section

Adjustment

2013-14 Control

Section

Adjustment

$210 B0471Implementation of the EIP for Lake

Tahoe

Enacted 2013-14

3125-001-6051 Portion of support

budget: Reversion

2013-14 Budget Act ($1,022) B0471Implementation of the EIP for Lake

Tahoe

Enacted 2015-16

3125-001-6051 Portion of support

budget

2014-15 Budget Act $6,000 B0471Implementation of the EIP for Lake

Tahoe

Enacted 2014-15

3125-001-6051 Portion of support

budget: Natural

Reversion

2014-15 Natural

Reversion

($890) B0471Implementation of the EIP for Lake

Tahoe

Enacted 2016-17

3125-001-6051 Portion of support

budget: Reversion

2014-15 Budget Act ($1,581) B0471Implementation of the EIP for Lake

Tahoe

Enacted 2015-16

3125-101-6051 (1) Tahoe Conservancy

projects

2007-08 Budget Act $12,382,000 B0472Implementation of the EIP for Lake

Tahoe

Enacted 2007-08

3125-101-6051 (1) Tahoe Conservancy

projects: Natural

reversion

2007-08 Natural

Reversion

($1,735,077) B0472Implementation of the EIP for Lake

Tahoe

Enacted 2014-15

3125-101-6051 Tahoe Conservancy

projects: Reversion

2017-18 Budget Act ($1,078,000) B0472Implementation of the EIP for Lake

Tahoe

Enacted 2018-19

3125-101-6051 (1) Tahoe Conservancy

projects

2017-18 Budget Act $1,180,000 B0472Implementation of the EIP for Lake

Tahoe

Enacted 2017-18

Wednesday, January 29, Page 211 of 3421:20:08 PM Public Resources Code (PRC) Section PRC §75050(k)Ch. 5Prop 84 Report

Page 215: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3125-301-6051 (1) Land acquisition for

implementation of the

Environmental

Improvement Program

for Lake Tahoe Basin,

pursuant to Title 7.42

2007-08 Budget Act $14,991,000 B0472Implementation of the EIP for Lake

Tahoe

Enacted 2007-08

3125-301-6051 (1) Land acquisition for

implementation of the

Environmental

Improvement Program

for Lake Tahoe Basin,

pursuant to Title 7.42:

Reversion

2007-08 Budget Act ($6,028,555) B0472Implementation of the EIP for Lake

Tahoe

Enacted 2013-14

3125-301-6051 Land acquisition for

implementation of the

EIP: Natural reversion

2008-09 Natural

Reversion

($658,723) B0472Implementation of the EIP for Lake

Tahoe

Enacted 2014-15

3125-301-6051 Land acquisition for

implementation of the

Environmental

Improvement Program

for Lake Tahoe Basin,

pursuant to Title 7.42

2008-09 Budget Act $4,851,000 B0472Implementation of the EIP for Lake

Tahoe

Enacted 2008-09

3125-301-6051 Land acquisition for

implementation of the

Environmental

Improvement Program

for Lake Tahoe Basin,

pursuant to Title 7.42

2013-14 Budget Act $4,000,000 B0472Implementation of the EIP for Lake

Tahoe

Enacted 2013-14

3125-301-6051 Land acquisition for

implementation of the

Environmental

Improvement Program

for Lake Tahoe Basin,

pursuant to Title 7.42:

Natural Reversion

2013-14 Natural

Reversion

($1,345,672) B0472Implementation of the EIP for Lake

Tahoe

Enacted 2017-18

3125-301-6051 Land acquisition for

implementation of the

Environmental

Improvement Program

for Lake Tahoe Basin,

pursuant to Title 7.42

2015-16 Budget Act $2,024,000 B0472Implementation of the EIP for Lake

Tahoe

Enacted 2015-16

3125-301-6051 Land acquisition for

implementation of the

Environmental

Improvement Program

for Lake Tahoe Basin,

pursuant to Title 7.42:

Reversion

2015-16 Budget Act ($1,184,403) B0472Implementation of the EIP for Lake

Tahoe

Enacted 2018-19

Wednesday, January 29, Page 212 of 3421:20:08 PM Public Resources Code (PRC) Section PRC §75050(k)Ch. 5Prop 84 Report

Page 216: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3125-301-6051 Land acquisition for

implementation of the

Environmental

Improvement Program

for Lake Tahoe Basin,

pursuant to Title 7.42

2016-17 Budget Act $25,000 B0472Implementation of the EIP for Lake

Tahoe

Enacted 2016-17

3125-301-6051 Land acquisition for

implementation of the

Environmental

Improvement Program

for Lake Tahoe Basin,

pursuant to Title 7.42:

Reversion

2016-17 Budget Act ($25,000) B0472Implementation of the EIP for Lake

Tahoe

Enacted 2018-19

3125-301-6051 Conceptual Feasibility

Planning - Study:

Reversion

2017-18 Budget Act ($493,047) B0473Implementation of the EIP for Lake

Tahoe

Enacted 2018-19

3125-301-6051 Minor Capital Outlay

Projects: Reversion

2017-18 Budget Act ($129) B0472Implementation of the EIP for Lake

Tahoe

Enacted 2018-19

3125-301-6051 Opportunity

Acquisitions -

Acquisition: Reversion

2017-18 Budget Act ($108,066) B0472Implementation of the EIP for Lake

Tahoe

Enacted 2018-19

3125-301-6051 Upper Truckee River

and Marsh

Restoration - WD:

2017-18 Budget Act ($432) B0472Implementation of the EIP for Lake

Tahoe

Enacted 2018-19

3125-301-6051 (1) Upper Truckee River

and Marsh

Restoration - WD

2017-18 Budget Act $51,000 B0472Implementation of the EIP for Lake

Tahoe

Enacted 2017-18

3125-301-6051 (2) Opportunity

Acquisitions -

Acquisition

2017-18 Budget Act $200,000 B0472Implementation of the EIP for Lake

Tahoe

Enacted 2017-18

3125-301-6051 (3) Conceptual Feasibility

Planning - Study

2017-18 Budget Act $674,000 B0473Implementation of the EIP for Lake

Tahoe

Enacted 2017-18

3125-301-6051 (4) Minor Capital Outlay

Projects

2017-18 Budget Act $271,000 B0472Implementation of the EIP for Lake

Tahoe

Enacted 2017-18

3125-301-6051 Tahoe Pines

Restoration Project - C

2018-19 Budget Act $362,000 B0472Implementation of the EIP for Lake

Tahoe

Enacted 2018-19

3125-301-6051 Upper Truckee River

and Marsh

Restoration - C

2018-19 Budget Act $1,416,000 B0472Implementation of the EIP for Lake

Tahoe

Enacted 2018-19

3125-301-6051 Upper Truckee River

and Marsh

Restoration - C

2019-20 Budget Act $1,410,000 B0472Implementation of the EIP for Lake

Tahoe

Enacted 2019-20

3125-301-6051 (1) Minor Capital Outlay

Projects

2019-20 Budget Act $480,000 B0472Implementation of the EIP for Lake

Tahoe

Enacted 2019-20

Sum: $34,171,612Enacted

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

Wednesday, January 29, Page 213 of 3421:20:08 PM Public Resources Code (PRC) Section PRC §75050(k)Ch. 5Prop 84 Report

Page 217: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3125-301-6051 Upper Truckee River

and Marsh

Restoration - C:

2018-19 Budget Act ($1,410,000) B0472Implementation of the EIP for Lake

Tahoe

Enacted/Not 2019-20

Sum: ($1,410,000)Enacted/Not Posted

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3125-301-6051 (1) Minor Capital Outlay

Projects

2020-21 Budget Act $250,000 B0472Implementation of the EIP for Lake

Tahoe

Proposed 2020-21

Sum: $250,000Proposed

Sum: $33,011,612

$1,446,388

Balance for Tahoe Conservancy projects:

Wednesday, January 29, Page 214 of 3421:20:08 PM Public Resources Code (PRC) Section PRC §75050(k)Ch. 5Prop 84 Report

Page 218: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

Protection of Rivers, Lakes and StreamsChapter 5

Allocation: Local Conservation Corps projects

Allocation $: $12,500,000$65,068

$128,835Statewide Set Asides: $193,903 {

Outyear Obligations: $0

$0

$0

{

PRC §75050(l)(1), ref 1Ch. 5

Appropriations, Proposals and Reversions

Statewide, requiring appropriation:

Statewide, not requiring appropriation:

Outyear Program Delivery commitments:

Outyear Cap. Outlay (to complete started projects):Reversions are shown below$0

Outyear Local Asst. commitments:

Projects to improve public safety and improve and restore watersheds. Portion required for grants to local conservation corps.

Dept.: California Conservation Corps

Other Outyear Support commitments:$0

Committed

$0

$0

$0

$0

Proposed

$0

Prop 1 Reduction $243,597

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3340-001-6051 Portion of support

budget

2007-08 Budget Act $73,000 B0481Park Bond Act of 2006 (Proposition

84)

Enacted 2007-08

3340-001-6051 Portion of support

budget: Control Section

Adjustment

2007-08 Control

Section

Adjustment

$2,000 B0481Park Bond Act of 2006 (Proposition

84)

Enacted 2007-08

3340-001-6051 Portion of support

budget

2008-09 Budget Act $81,000 B0481Park Bond Act of 2006 (Proposition

84)

Enacted 2008-09

3340-001-6051 Portion of support

budget: Control Section

Adjustment

2008-09 Control

Section

Adjustment

$482 B0481Park Bond Act of 2006 (Proposition

84)

Enacted 2008-09

3340-001-6051 Portion of support

budget

2009-10 Budget Act $130,278 B0481Grants to Local Corps and

Watershed Restoration Projects

Enacted 2009-10

3340-001-6051 Portion of support

budget: Control Section

Adjustment

2009-10 Control

Section

Adjustment

($19,326) B0481Grants to Local Corps and

Watershed Restoration Projects

Enacted 2009-10

3340-001-6051 Portion of support

budget

2010-11 Budget Act $132,000 B0481Grants to Local Corps and

Watershed Restoration Projects

Enacted 2010-11

3340-001-6051 Portion of support

budget: Control Section

Adjustment

2010-11 Control

Section

Adjustment

($7,050) B0481Grants to Local Corps and

Watershed Restoration Projects

Enacted 2010-11

3340-001-6051 Portion of support

budget

2011-12 Budget Act $132,000 B0481Grants to Local Corps and

Watershed Restoration Projects

Enacted 2011-12

3340-001-6051 Portion of support

budget: Control Section

Adjustment

2011-12 Control

Section

Adjustment

$0 B0481Grants to Local Corps and

Watershed Restoration Projects

Enacted 2011-12

Wednesday, January 29, Page 215 of 3421:20:08 PM Public Resources Code (PRC) Section PRC §75050(l)(1), ref 1Ch. 5Prop 84 Report

Page 219: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3340-001-6051 Portion of support

budget

2012-13 Budget Act $100,116 B0481Grants to Local Corps and

Watershed Restoration Projects

Enacted 2012-13

3340-101-6051 Portion of local

assistance budget

2008-09 Budget Act $7,000,000 B0482Grants to Local Corps and

Watershed Restoration Projects

Enacted 2008-09

3340-101-6051 Portion of local

assistance budget

2009-10 Budget Act $4,400,000 B0482Grants to Local Corps and

Watershed Restoration Projects

Enacted 2009-10

3340-101-6051 Portion of local

assistance budget

2012-13 Budget Act $38,000 B0482Grants to Local Corps and

Watershed Restoration Projects

Enacted 2012-13

3340-101-6051 Portion of local

assistance budget:

Natural Reversion

2012-13 Natural

Reversion

($38,000) B0482Grants to Local Corps and

Watershed Restoration Projects

Enacted 2014-15

Sum: $12,024,500Enacted

Sum: $12,024,500

$38,000

Balance for Local Conservation Corps projects:

Wednesday, January 29, Page 216 of 3421:20:08 PM Public Resources Code (PRC) Section PRC §75050(l)(1), ref 1Ch. 5Prop 84 Report

Page 220: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

Protection of Rivers, Lakes and StreamsChapter 5

Allocation: Conservation Corps Projects

Allocation $: $12,500,000$65,068

$128,835Statewide Set Asides: $193,903 {

Outyear Obligations: $0

$0

$0

{

PRC §75050(l)(1), ref 2Ch. 5

Appropriations, Proposals and Reversions

Statewide, requiring appropriation:

Statewide, not requiring appropriation:

Outyear Program Delivery commitments:

Outyear Cap. Outlay (to complete started projects):Reversions are shown below$0

Outyear Local Asst. commitments:

Projects to improve public safety and improve and restore watersheds. May or may not be in the form of grants to local conservation corps.

Dept.: California Conservation Corps

Other Outyear Support commitments:$0

Committed

$0

$0

$0

$0

Proposed

$0

Prop 1 Reduction $243,597

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3340-001-6051 Portion of support

budget

2007-08 Budget Act $73,000 B0491Park Bond Act of 2006 (Proposition

84)

Enacted 2007-08

3340-001-6051 Portion of support

budget: Control Section

Adjustment

2007-08 Control

Section

Adjustment

$1,000 B0491Park Bond Act of 2006 (Proposition

84)

Enacted 2007-08

3340-001-6051 Portion of support

budget

2008-09 Budget Act $3,000,000 B0492CCC Watershed Restoration ProjectsEnacted 2008-09

3340-001-6051 Portion of support

budget

2008-09 Budget Act $81,000 B0491Park Bond Act of 2006 (Proposition

84)

Enacted 2008-09

3340-001-6051 Portion of support

budget: Control Section

Adjustment

2008-09 Control

Section

Adjustment

$482 B0491Park Bond Act of 2006 (Proposition

84)

Enacted 2008-09

3340-001-6051 Portion of support

budget

2009-10 Budget Act $11,000,000 B0492CCC Watershed Restoration ProjectsEnacted 2009-10

3340-001-6051 Portion of support

budget

2009-10 Budget Act $130,278 B0491Grants to Local Corps and

Watershed Restoration Projects

Enacted 2009-10

3340-001-6051 Portion of support

budget: Control Section

Adjustment

2009-10 Control

Section

Adjustment

($19,326) B0491Grants to Local Corps and

Watershed Restoration Projects

Enacted 2009-10

3340-001-6051 Portion of support

budget: Reversion

2009-10 Budget Act ($3,068,423) B0492CCC Watershed Restoration ProjectsEnacted 2010-11

3340-001-6051 Portion of support

budget

2010-11 Budget Act $128,000 B0491Grants to Local Corps and

Watershed Restoration Projects

Enacted 2010-11

Wednesday, January 29, Page 217 of 3421:20:08 PM Public Resources Code (PRC) Section PRC §75050(l)(1), ref 2Ch. 5Prop 84 Report

Page 221: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3340-001-6051 Portion of support

budget: Control Section

Adjustment

2010-11 Control

Section

Adjustment

($7,050) B0491Grants to Local Corps and

Watershed Restoration Projects

Enacted 2010-11

3340-001-6051 Portion of support

budget

2011-12 Budget Act $128,000 B0491Grants to Local Corps and

Watershed Restoration Projects

Enacted 2011-12

3340-001-6051 Portion of support

budget: Control Section

Adjustment

2011-12 Control

Section

Adjustment

($1,000) B0491Grants to Local Corps and

Watershed Restoration Projects

Enacted 2011-12

3340-001-6051 Portion of support

budget

2012-13 Budget Act $111,000 B0491CCC Watershed Restoration

Projects - Program Delivery

Enacted 2012-13

3340-001-6051 Portion of support

budget - Projects

2012-13 Budget Act $437,000 B0492CCC Watershed Restoration ProjectsEnacted 2012-13

3340-001-6051 Portion of support

budget: Control Section

Adjustment

2012-13 Control

Section

Adjustment

($1,028) B0491CCC Watershed Restoration

Projects - Program Delivery

Enacted 2012-13

3340-001-6051 Portion of support

budget: Reversion

2012-13 Budget Act ($6) B0492CCC Watershed Restoration ProjectsEnacted 2014-15

Sum: $11,992,927Enacted

Sum: $11,992,927

$69,573

Balance for Conservation Corps Projects:

Wednesday, January 29, Page 218 of 3421:20:08 PM Public Resources Code (PRC) Section PRC §75050(l)(1), ref 2Ch. 5Prop 84 Report

Page 222: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

Protection of Rivers, Lakes and StreamsChapter 5

Allocation: Local Conservation Corps Acquisition

and Development of Facilities

Allocation $: $20,000,000$104,109

$206,136Statewide Set Asides: $310,245 {

Outyear Obligations: $0

$0

$0

{

PRC §75050(l)(2)Ch. 5

Appropriations, Proposals and Reversions

Statewide, requiring appropriation:

Statewide, not requiring appropriation:

Outyear Program Delivery commitments:

Outyear Cap. Outlay (to complete started projects):Reversions are shown below$0

Outyear Local Asst. commitments:

Grants to local conservation corps for acquisition and development of facilities to support local conservation corps programs and for local resource conservation

activities.

Dept.: California Conservation Corps

Other Outyear Support commitments:$0

Committed

$0

$0

$0

$0

Proposed

$0

Prop 1 Reduction $389,755

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3340-001-6051 Portion of support

budget

2007-08 Budget Act $117,000 B0501Park Bond Act of 2006 (Proposition

84)

Enacted 2007-08

3340-001-6051 Portion of support

budget: Control Section

Adjustment

2007-08 Control

Section

Adjustment

$605 B0501Park Bond Act of 2006 (Proposition

84)

Enacted 2007-08

3340-001-6051 Portion of support

budget: Natural

Reversion

2007-08 Natural

Reversion

($2,107) B0501Park Bond Act of 2006 (Proposition

84)

Enacted 2010-11

3340-001-6051 Portion of support

budget

2008-09 Budget Act $130,000 B0501Park Bond Act of 2006 (Proposition

84)

Enacted 2008-09

3340-001-6051 Portion of support

budget: Control Section

Adjustment

2008-09 Control

Section

Adjustment

($3,286) B0501Park Bond Act of 2006 (Proposition

84)

Enacted 2008-09

3340-001-6051 Portion of support

budget: Reversion

2008-09 Budget Act ($16,058) B0501Park Bond Act of 2006 (Proposition

84)

Enacted 2014-15

3340-001-6051 Portion of support

budget

2009-10 Budget Act $208,444 B0501Grants to Local Corps and

Watershed Restoration Projects

Enacted 2009-10

3340-001-6051 Portion of support

budget: Control Section

Adjustment

2009-10 Control

Section

Adjustment

($30,921) B0501Grants to Local Corps and

Watershed Restoration Projects

Enacted 2009-10

3340-001-6051 Portion of support

budget

2010-11 Budget Act $209,000 B0501Grants to Local Corps and

Watershed Restoration Projects

Enacted 2010-11

3340-001-6051 Portion of support

budget: Control Section

Adjustment

2010-11 Control

Section

Adjustment

($10,100) B0501Grants to Local Corps and

Watershed Restoration Projects

Enacted 2010-11

Wednesday, January 29, Page 219 of 3421:20:08 PM Public Resources Code (PRC) Section PRC §75050(l)(2)Ch. 5Prop 84 Report

Page 223: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3340-001-6051 Portion of support

budget: Reversion

2010-11 Budget Act ($3,605) B0501Grants to Local Corps and

Watershed Restoration Projects

Enacted 2014-15

3340-001-6051 Portion of support

budget

2011-12 Budget Act $200,000 B0501Grants to Local Corps and

Watershed Restoration Projects

Enacted 2011-12

3340-001-6051 Portion of support

budget: Control Section

Adjustment

2011-12 Control

Section

Adjustment

($4,293) B0501Grants to Local Corps and

Watershed Restoration Projects

Enacted 2011-12

3340-001-6051 Portion of support

budget: Reversion

2011-12 Budget Act ($90,612) B0501Grants to Local Corps and

Watershed Restoration Projects

Enacted 2014-15

3340-001-6051 Portion of support

budget

2012-13 Budget Act $179,884 B0501Grants to Local Corps and

Watershed Restoration Projects

Enacted 2012-13

3340-001-6051 Portion of support

budget: Control Section

Adjustment

2012-13 Control

Section

Adjustment

($2,167) B0501Grants to Local Corps and

Watershed Restoration Projects

Enacted 2012-13

3340-001-6051 Portion of support

budget: Reversion

2012-13 Budget Act ($94,345) B0501Grants to Local Corps and

Watershed Restoration Projects

Enacted 2014-15

3340-001-6051 Portion of support

budget

2013-14 Budget Act $5,000 B0501Grants to Local Corps and

Watershed Restoration Projects

Enacted 2013-14

3340-001-6051 Portion of support

budget: Control Section

Adjustment

2013-14 Control

Section

Adjustment

$2,000 B0501Grants to Local Corps and

Watershed Restoration Projects

Enacted 2013-14

3340-001-6051 Portion of support

budget: Reversion

2013-14 Budget Act ($6,243) B0501Grants to Local Corps and

Watershed Restoration Projects

Enacted 2014-15

3340-001-6051 Portion of support

budget

2014-15 Budget Act $208,000 B0501Grants to Local Corps and

Watershed Restoration Projects

Enacted 2014-15

3340-001-6051 Portion of support

budget: Natural

Reversion

2014-15 Natural

Reversion

($139,696) B0501Grants to Local Corps and

Watershed Restoration Projects

Enacted 2016-17

3340-101-6051 Portion of local

assistance budget

2008-09 Budget Act $16,000,000 B0502Grants to Local Corps and

Watershed Restoration Projects

Enacted 2008-09

3340-101-6051 Portion of local

assistance budget:

Natural Reversion

2008-09 Natural

Reversion

($1,128,660) B0502Grants to Local Corps and

Watershed Restoration Projects

Enacted 2014-15

3340-101-6051 Portion of local

assistance budget

2009-10 Budget Act $2,300,000 B0502Grants to Local Corps and

Watershed Restoration Projects

Enacted 2009-10

3340-101-6051 Portion of local

assistance budget:

Natural Reversion

2009-10 Natural

Reversion

($103,706) B0502Grants to Local Corps and

Watershed Restoration Projects

Enacted 2014-15

3340-101-6051 Portion of local

assistance budget

2014-15 Budget Act $114,000 B0502Grants to Local Corps and

Watershed Restoration Projects

Enacted 2014-15

3340-101-6051 Portion of local

assistance budget:

Natural Reversion

2014-15 Natural

Reversion

($31,604) B0502Grants to Local Corps and

Watershed Restoration Projects

Enacted 2016-17

Sum: $18,006,531Enacted

Wednesday, January 29, Page 220 of 3421:20:08 PM Public Resources Code (PRC) Section PRC §75050(l)(2)Ch. 5Prop 84 Report

Page 224: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

Sum: $18,006,531

$1,293,469

Balance for Local Conservation Corps Acquisition and

Development of Facilities:

Wednesday, January 29, Page 221 of 3421:20:08 PM Public Resources Code (PRC) Section PRC §75050(l)(2)Ch. 5Prop 84 Report

Page 225: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

Protection of Rivers, Lakes and StreamsChapter 5

Allocation: Stormwater contamination prevention

grants

Allocation $: $90,000,000$468,491

$927,611Statewide Set Asides: $1,396,102 {

Outyear Obligations: $0

$0

$0

{

PRC §75050(m)Ch. 5

Appropriations, Proposals and Reversions

Statewide, requiring appropriation:

Statewide, not requiring appropriation:

Outyear Program Delivery commitments:

Outyear Cap. Outlay (to complete started projects):Reversions are shown below$0

Outyear Local Asst. commitments:

Matching grants to local public agencies to reduce and prevent stormwater contamination of rivers, lakes and streams. Legislature may enact legislation to

implement this subdivision.

Dept.: State Water Resources Control

Board

Other Outyear Support commitments:$0

Committed

$0

$0

$0

$0

Proposed

$0

Prop 1 Reduction $1,753,898

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3940-001-6051 Portion of support

budget

2007-08 Budget Act $874,691 B0511Urban Stormwater Grant ProgramEnacted 2007-08

3940-001-6051 Portion of support

budget: Natural

Reversion

2007-08 Natural

Reversion

($154,277) B0511Urban Stormwater Grant ProgramEnacted 2009-10

3940-001-6051 Portion of support

budget

2008-09 Budget Act $874,691 B0511Urban Stormwater Grant ProgramEnacted 2008-09

3940-001-6051 Portion of support

budget: Reversion

2008-09 Budget Act ($277,060) B0511Urban Stormwater Grant ProgramEnacted 2010-11

3940-001-6051 Portion of support

budget

2009-10 Budget Act $1,590,011 B0511Urban Stormwater Grant ProgramEnacted 2009-10

3940-001-6051 Portion of support

budget: Control Section

Adjustment

2009-10 Control

Section

Adjustment

($758,506) B0511Urban Stormwater Grant ProgramEnacted 2009-10

3940-001-6051 Portion of support

budget: Reversion

2009-10 Budget Act ($831,505) B0511Urban Stormwater Grant ProgramEnacted 2010-11

3940-001-6051 Portion of support

budget

2010-11 Budget Act $758,506 B0511Urban Stormwater Grant ProgramEnacted 2010-11

3940-001-6051 Portion of support

budget: Control Section

Adjustment

2010-11 Control

Section

Adjustment

($10,619) B0511Urban Stormwater Grant ProgramEnacted 2010-11

3940-001-6051 Portion of support

budget: Reversion

2010-11 Budget Act ($535,053) B0511Urban Stormwater Grant ProgramEnacted 2012-13

3940-001-6051 Portion of support

budget

2011-12 Budget Act $708,228 B0511Urban Stormwater Grant ProgramEnacted 2011-12

Wednesday, January 29, Page 222 of 3421:20:08 PM Public Resources Code (PRC) Section PRC §75050(m)Ch. 5Prop 84 Report

Page 226: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3940-001-6051 Portion of support

budget: Control Section

Adjustment

2011-12 Control

Section

Adjustment

($2,935) B0511Urban Stormwater Grant ProgramEnacted 2011-12

3940-001-6051 Portion of support

budget: Reversion

2011-12 Budget Act ($705,293) B0511Urban Stormwater Grant ProgramEnacted 2013-14

3940-001-6051 Portion of support

budget

2012-13 Budget Act $757,100 B0511Urban Stormwater Grant ProgramEnacted 2012-13

3940-001-6051 Portion of support

budget: Control Section

Adjustment

2012-13 Control

Section

Adjustment

($2,236) B0511Urban Stormwater Grant ProgramEnacted 2012-13

3940-001-6051 Portion of support

budget: Reversion

2012-13 Budget Act ($372,375) B0511Urban Stormwater Grant ProgramEnacted 2014-15

3940-001-6051 Portion of support

budget

2013-14 Budget Act $654,051 B0511Urban Stormwater Grant ProgramEnacted 2013-14

3940-001-6051 Portion of support

budget: Natural

Reversion

2013-14 Natural

Reversion

($13,110) B0511Urban Stormwater Grant ProgramEnacted 2015-16

3940-001-6051 Portion of support

budget

2014-15 Budget Act $1,382,000 B0511Urban Stormwater Grant ProgramEnacted 2014-15

3940-001-6051 Portion of support

budget: Natural

Reversion

2014-15 Natural

Reversion

($80,060) B0511Urban Stormwater Grant ProgramEnacted 2016-17

3940-001-6051 Portion of support

budget: Reversion

2014-15 Budget Act ($450,000) B0511Urban Stormwater Grant ProgramEnacted 2015-16

3940-001-6051 Portion of support

budget

2015-16 Budget Act $1,000,000 B0511Urban Stormwater Grant ProgramEnacted 2015-16

3940-001-6051 Portion of support

budget: Reversion

2015-16 Budget Act ($534,995) B0511Urban Stormwater Grant ProgramEnacted 2016-17

3940-001-6051 Portion of support

budget

2016-17 Budget Act $520,000 B0511Urban Stormwater Grant ProgramEnacted 2016-17

3940-001-6051 Portion of support

budget: Natural

Reversion

2016-17 Natural

Reversion

($115,231) B0511Urban Stormwater Grant ProgramEnacted 2018-19

3940-001-6051 Portion of support

budget

2017-18 Budget Act $106,000 B0511Urban Stormwater Grant ProgramEnacted 2017-18

3940-101-6051 Portion of local

assistance budget

2007-08 Budget Act $14,000,000 B0512Urban Stormwater Grant ProgramEnacted 2007-08

3940-101-6051 Portion of local

assistance budget:

Reversion

2007-08 Budget Act ($14,000,000) B0512Urban Stormwater Grant ProgramEnacted 2011-12

3940-101-6051 Portion of local

assistance budget

2008-09 Budget Act $38,000,000 B0512Urban Stormwater Grant ProgramEnacted 2008-09

3940-101-6051 Portion of local

assistance budget:

Reversion

2008-09 Budget Act ($38,000,000) B0512Urban Stormwater Grant ProgramEnacted 2011-12

3940-101-6051 Portion of local

assistance budget

2011-12 Budget Act $58,000,000 B0512Urban Stormwater Grant ProgramEnacted 2011-12

3940-101-6051 Portion of local

assistance budget

2014-15 Budget Act $24,350,000 B0512Urban Stormwater Grant ProgramEnacted 2014-15

Wednesday, January 29, Page 223 of 3421:20:08 PM Public Resources Code (PRC) Section PRC §75050(m)Ch. 5Prop 84 Report

Page 227: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

Sum: $86,732,023Enacted

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3940-101-6051 Portion of local

assistance budget:

Reappropriation

(decrease)

2011-12 Budget Act ($58,000,000) B0512Urban Stormwater Grant ProgramEnacted/Not 2016-17

3940-101-6051 Portion of local

assistance budget:

Reappropriation

(increase)

2011-12 Budget Act $58,000,000 B0512Urban Stormwater Grant ProgramEnacted/Not 2019-20

3940-101-6051 Portion of local

assistance budget:

Reappropriation

(decrease)

2014-15 Budget Act ($24,350,000) B0512Urban Stormwater Grant ProgramEnacted/Not 2016-17

3940-101-6051 Portion of local

assistance budget:

Reappropriation

(increase)

2014-15 Budget Act $24,350,000 B0512Urban Stormwater Grant ProgramEnacted/Not 2019-20

Sum: $0Enacted/Not Posted

Sum: $86,732,023

$117,977

Balance for Stormwater contamination prevention grants:

Wednesday, January 29, Page 224 of 3421:20:08 PM Public Resources Code (PRC) Section PRC §75050(m)Ch. 5Prop 84 Report

Page 228: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

Protection of Rivers, Lakes and StreamsChapter 5

Allocation: San Joaquin River settlement

Allocation $: $100,000,000$520,546

$1,030,679Statewide Set Asides: $1,551,225 {

Outyear Obligations: $0

$0

$0

{

PRC §75050(n)Ch. 5

Appropriations, Proposals and Reversions

Statewide, requiring appropriation:

Statewide, not requiring appropriation:

Outyear Program Delivery commitments:

Outyear Cap. Outlay (to complete started projects):Reversions are shown below$0

Outyear Local Asst. commitments:

Implement a court settlement to restore flows and naturally-reproducing and self-sustaining populations of salmon to the San Joaquin River. Funds available for

channel and structural improvements and related research pursuant to the court settlement.

Dept.: Secretary for Natural

Resources

Other Outyear Support commitments:$0

Committed

$0

$0

$0

$0

Proposed

$0

Prop 1 Reduction $1,948,775

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

0540-001-6051 Portion of support

budget

2007-08 Budget Act $477,000 B0521San Joaquin River RestorationEnacted 2007-08

0540-001-6051 Portion of support

budget

2007-08 Budget Act $13,392,000 B0522San Joaquin River RestorationEnacted 2007-08

0540-001-6051 Portion of support

budget: Control Section

Adjustment

2007-08 Control

Section

Adjustment

$6,147 B0521San Joaquin River RestorationEnacted 2007-08

0540-001-6051 Portion of support

budget: Natural

Reversion

2007-08 Natural

Reversion

$0 B0522San Joaquin River RestorationEnacted 2011-12

0540-001-6051 Portion of support

budget: Reversion

2007-08 Budget Act ($341,612) B0521San Joaquin River RestorationEnacted 2011-12

0540-001-6051 Portion of support

budget: Reversion

2007-08 Budget Act ($7,096,780) B0522San Joaquin River RestorationEnacted 2011-12

0540-001-6051 Portion of support

budget

2008-09 Budget Act $15,917,000 B0522San Joaquin River RestorationEnacted 2008-09

0540-001-6051 Portion of support

budget: Control Section

Adjustment

2008-09 Control

Section

Adjustment

($5,409) B0522San Joaquin River RestorationEnacted 2008-09

0540-001-6051 Portion of support

budget: Natural

Reversion

2008-09 Natural

Reversion

($13,291,766) B0522San Joaquin River RestorationEnacted 2012-13

0540-001-6051 Portion of support

budget

2009-10 Budget Act $24,000 B0521San Joaquin River RestorationEnacted 2009-10

Wednesday, January 29, Page 225 of 3421:20:08 PM Public Resources Code (PRC) Section PRC §75050(n)Ch. 5Prop 84 Report

Page 229: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

0540-001-6051 Portion of support

budget

2009-10 Budget Act $24,786,000 B0522San Joaquin River RestorationEnacted 2009-10

0540-001-6051 Portion of support

budget: Natural

Reversion

2009-10 Natural

Reversion

($24,000) B0521San Joaquin River RestorationEnacted 2016-17

0540-001-6051 Portion of support

budget: Natural

Reversion

2009-10 Natural

Reversion

($4,427,876) B0522San Joaquin River RestorationEnacted 2016-17

0540-001-6051 Portion of support

budget

2010-11 Budget Act $706,000 B0521San Joaquin River RestorationEnacted 2010-11

0540-001-6051 Portion of support

budget

2010-11 Budget Act $18,000,000 B0522San Joaquin River RestorationEnacted 2010-11

0540-001-6051 Portion of support

budget: Natural

Reversion

2010-11 Natural

Reversion

($96,764) B0521San Joaquin River RestorationEnacted 2013-14

0540-001-6051 Portion of support

budget: Natural

Reversion

2010-11 Natural

Reversion

($8,731,202) B0522San Joaquin River RestorationEnacted 2013-14

0540-001-6051 Portion of support

budget

2011-12 Budget Act $895,200 B0521San Joaquin River Restoration -

DFG Program Delivery

Enacted 2011-12

0540-001-6051 Portion of support

budget

2011-12 Budget Act $11,733,200 B0522San Joaquin River Restoration -

DFG Projects

Enacted 2011-12

0540-001-6051 Portion of support

budget

2011-12 Budget Act $1,342,800 B0521San Joaquin River Restoration -

DWR Program Delivery

Enacted 2011-12

0540-001-6051 Portion of support

budget

2011-12 Budget Act $11,080,800 B0522San Joaquin River Restoration -

DWR Projects

Enacted 2011-12

0540-001-6051 Portion of support

budget: Natural

Reversion

2011-12 Natural

Reversion

($69,714) B0521San Joaquin River Restoration -

DFG Program Delivery

Enacted 2015-16

0540-001-6051 Portion of support

budget: Natural

Reversion

2011-12 Natural

Reversion

($7,653,035) B0522San Joaquin River Restoration -

DFG Projects

Enacted 2015-16

0540-001-6051 Portion of support

budget: Natural

Reversion

2011-12 Natural

Reversion

($494,801) B0521San Joaquin River Restoration -

DWR Program Delivery

Enacted 2015-16

0540-001-6051 Portion of support

budget

2016-17 Budget Act $16,548,000 B0522San Joaquin River RestorationEnacted 2016-17

0540-101-6051 Portion of local

assistance budget

2017-18 Budget Act $20,464,000 B0522San Joaquin River RestorationEnacted 2017-18

0540-301-6051 Portion of capital outlay

budget

2016-17 Budget Act $15,983,000 B0522San Joaquin River RestorationEnacted 2016-17

0540-301-6051 Portion of capital outlay

budget: Reversion

2016-17 Executive

Order

(excluding

CS)

($15,983,000) B0522San Joaquin River RestorationEnacted 2016-17

Sum: $93,139,188Enacted

Wednesday, January 29, Page 226 of 3421:20:08 PM Public Resources Code (PRC) Section PRC §75050(n)Ch. 5Prop 84 Report

Page 230: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

Sum: $93,139,188

$3,360,812

Balance for San Joaquin River settlement:

Wednesday, January 29, Page 227 of 3421:20:08 PM Public Resources Code (PRC) Section PRC §75050(n)Ch. 5Prop 84 Report

Page 231: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

Summary for Chapter 5

Enacted/Proposed: $881,168,660

Allocation: $100,000,000

Set Asides: $1,551,225

Outyears: $0

Balance: $3,360,812

Protection of Rivers, Lakes and Streams

Prop 1 Reduction: $1,948,775

Wednesday, January 29, Page 228 of 3421:20:08 PM Public Resources Code (PRC) Section PRC §75050(n)Ch. 5Prop 84 Report

Page 232: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

Forest and Wildlife ConservationChapter 6

Allocation: Forest conservation and protection

Allocation $: $180,000,000$936,982

$1,855,223Statewide Set Asides: $2,792,205 {

Outyear Obligations: $0

$0

$0

{

PRC §75055(a)Ch. 6

Appropriations, Proposals and Reversions

Statewide, requiring appropriation:

Statewide, not requiring appropriation:

Outyear Program Delivery commitments:

Outyear Cap. Outlay (to complete started projects):Reversions are shown below$0

Outyear Local Asst. commitments:

Forest conservation and protection projects. Goal to promote the ecological integrity and economic stability of California`s diverse native forests through forest

conservation, preservation and restoration. Funds are continuously appropriated.

Dept.: Wildlife Conservation Board

Other Outyear Support commitments:$0

Committed

$0

$0

$0

$0

Proposed

$0

Prop 1 Reduction $3,507,795

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3640-001-6051 Portion of support

budget

2007-08 Budget Act $317,455 B0531Program DeliveryEnacted 2007-08

3640-001-6051 Portion of support

budget: Control Section

Adjustment

2007-08 Control

Section

Adjustment

$4,415 B0531Program DeliveryEnacted 2007-08

3640-001-6051 Portion of support

budget: Natural

Reversion

2007-08 Natural

Reversion

($218,107) B0531Program DeliveryEnacted 2010-11

3640-001-6051 Portion of support

budget

2008-09 Budget Act $323,181 B0531Program DeliveryEnacted 2008-09

3640-001-6051 Portion of support

budget: Control Section

Adjustment

2008-09 Control

Section

Adjustment

($2,954) B0531Program DeliveryEnacted 2008-09

3640-001-6051 Portion of support

budget: Natural

Reversion

2008-09 Natural

Reversion

($192,821) B0531Program DeliveryEnacted 2010-11

3640-001-6051 Portion of support

budget

2009-10 Budget Act $334,227 B0531Program DeliveryEnacted 2009-10

3640-001-6051 Portion of support

budget: Control Section

Adjustment

2009-10 Control

Section

Adjustment

($20,872) B0531Program DeliveryEnacted 2009-10

3640-001-6051 Portion of support

budget: Natural

Reversion

2009-10 Natural

Reversion

($186,712) B0531Program DeliveryEnacted 2011-12

3640-001-6051 Portion of support

budget

2010-11 Budget Act $334,227 B0531Program DeliveryEnacted 2010-11

Wednesday, January 29, Page 229 of 3421:20:09 PM Public Resources Code (PRC) Section PRC §75055(a)Ch. 6Prop 84 Report

Page 233: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3640-001-6051 Portion of support

budget: Control Section

Adjustment

2010-11 Control

Section

Adjustment

($38,337) B0531Program DeliveryEnacted 2010-11

3640-001-6051 Portion of support

budget: Natural

Reversion

2010-11 Natural

Reversion

($140,352) B0531Program DeliveryEnacted 2012-13

3640-001-6051 Portion of support

budget

2011-12 Budget Act $304,772 B0531Program DeliveryEnacted 2011-12

3640-001-6051 Portion of support

budget: Control Section

Adjustment

2011-12 Control

Section

Adjustment

($251) B0531Program DeliveryEnacted 2011-12

3640-001-6051 Portion of support

budget: Natural

Reversion

2011-12 Natural

Reversion

($137,544) B0531Program DeliveryEnacted 2013-14

3640-001-6051 Portion of support

budget

2012-13 Budget Act $306,000 B0531Program DeliveryEnacted 2012-13

3640-001-6051 Portion of support

budget: Control Section

Adjustment

2012-13 Control

Section

Adjustment

($3,567) B0531Program DeliveryEnacted 2012-13

3640-001-6051 Portion of support

budget: Natural

Reversion

2012-13 Natural

Reversion

($78,810) B0531Program DeliveryEnacted 2014-15

3640-001-6051 Portion of support

budget

2013-14 Budget Act $311,318 B0531Program DeliveryEnacted 2013-14

3640-001-6051 Portion of support

budget: Control Section

Adjustment

2013-14 Control

Section

Adjustment

$4,185 B0531Program DeliveryEnacted 2013-14

3640-001-6051 Portion of support

budget: Natural

Reversion

2013-14 Natural

Reversion

($78,714) B0531Program DeliveryEnacted 2015-16

3640-001-6051 Portion of support

budget

2014-15 Budget Act $315,409 B0531Program DeliveryEnacted 2014-15

3640-001-6051 Portion of support

budget: Control Section

Adjustment

2014-15 Control

Section

Adjustment

$8,175 B0531Program DeliveryEnacted 2014-15

3640-001-6051 Portion of support

budget: Natural

Reversion

2014-15 Natural

Reversion

($8,787) B0531Program DeliveryEnacted 2016-17

3640-001-6051 Portion of support

budget

2015-16 Budget Act $323,591 B0531Program DeliveryEnacted 2015-16

3640-001-6051 Portion of support

budget: Control Section

Adjustment

2015-16 Control

Section

Adjustment

$10,227 B0531Program DeliveryEnacted 2015-16

3640-001-6051 Portion of support

budget: Natural

Reversion

2015-16 Natural

Reversion

($22,970) B0531Program DeliveryEnacted 2017-18

3640-001-6051 Portion of support

budget

2016-17 Budget Act $335,045 B0531Program DeliveryEnacted 2016-17

Wednesday, January 29, Page 230 of 3421:20:09 PM Public Resources Code (PRC) Section PRC §75055(a)Ch. 6Prop 84 Report

Page 234: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3640-001-6051 Portion of support

budget: Control Section

Adjustment

2016-17 Control

Section

Adjustment

$9,409 B0531Program DeliveryEnacted 2016-17

3640-001-6051 Portion of support

budget: Natural

Reversion

2016-17 Natural

Reversion

($9,498) B0531Program DeliveryEnacted 2018-19

3640-001-6051 Portion of support

budget

2017-18 Budget Act $341,182 B0531Program DeliveryEnacted 2017-18

3640-001-6051 Portion of support

budget: Control Section

Adjustment

2017-18 Control

Section

Adjustment

$12,638 B0531Program DeliveryEnacted 2017-18

3640-001-6051 Portion of support

budget

2018-19 Budget Act $341,182 B0531Program DeliveryEnacted 2018-19

3640-001-6051 Portion of support

budget

2019-20 Budget Act $341,182 B0531Program DeliveryEnacted 2019-20

3640-501-6051 Continuous

appropriation

2006-07 Statutory

from Bond

$217,714 B0531Forest Conservation & ProtectionEnacted 2006-07

3640-501-6051 Continuous

appropriation: Natural

Reversion

2006-07 Natural

Reversion

($216,129) B0531Forest Conservation & ProtectionEnacted 2008-09

3640-801-6051 Continuous

appropriation

2006-07 Statutory

from Bond

$9,724,655 B053NExcess continuous appropriation

authority (do not spend)

Enacted 2006-07

3640-801-6051 Continuous

appropriation

2006-07 Statutory

from Bond

$170,275,345 B0532Forest Conservation & ProtectionEnacted 2006-07

Sum: $183,139,109Enacted

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3640-001-6051 (1) Portion of support

budget

2020-21 Budget Act $285,546 B0531Program DeliveryProposed 2020-21

Sum: $285,546Proposed

Sum: $183,424,655

($9,724,655)

Balance for Forest conservation and protection:

Wednesday, January 29, Page 231 of 3421:20:09 PM Public Resources Code (PRC) Section PRC §75055(a)Ch. 6Prop 84 Report

Page 235: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

Forest and Wildlife ConservationChapter 6

Allocation: Habitat protection

Allocation $: $135,000,000$702,737

$1,391,417Statewide Set Asides: $2,094,154 {

Outyear Obligations: $934,563

$934,563

$0

{

PRC §75055(b)(1)Ch. 6

Appropriations, Proposals and Reversions

Statewide, requiring appropriation:

Statewide, not requiring appropriation:

Outyear Program Delivery commitments:

Outyear Cap. Outlay (to complete started projects):Reversions are shown below$0

Outyear Local Asst. commitments:

Develop, rehabilitate, restore, acquire and protect habitat that accomplishes one of the following: (a) Promotes recovery of threatened and endangered species; (b)

Provides corridors linking separate habitat areas to prevent fragmentation; (c) Protects significant natural landscapes and ecosystems; and (d) Implements

recommendations of California Comprehensive Wildlife Strategy. Funds are continuously appropriated. Pursuant to §75055(b)(2), funds may be used for direct

expenditures or for grants and related state administrative costs. Up to $25,000,000 may be granted to the University of California for the Natural Reserve System

per §75055(b)(3).

Dept.: Wildlife Conservation Board

Other Outyear Support commitments:$0

Committed

$0

$0

$0

$0

Proposed

$0

Prop 1 Reduction $2,630,846

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3640-001-6051 Portion of support

budget

2007-08 Budget Act $238,090 B0541Program DeliveryEnacted 2007-08

3640-001-6051 Portion of support

budget: Control Section

Adjustment

2007-08 Control

Section

Adjustment

$4,296 B0541Program DeliveryEnacted 2007-08

3640-001-6051 Portion of support

budget: Natural

Reversion

2007-08 Natural

Reversion

($164,564) B0541Program DeliveryEnacted 2010-11

3640-001-6051 Portion of support

budget

2008-09 Budget Act $242,386 B0541Program DeliveryEnacted 2008-09

3640-001-6051 Portion of support

budget: Control Section

Adjustment

2008-09 Control

Section

Adjustment

($2,216) B0541Program DeliveryEnacted 2008-09

3640-001-6051 Portion of support

budget: Natural

Reversion

2008-09 Natural

Reversion

($144,615) B0541Program DeliveryEnacted 2010-11

3640-001-6051 Portion of support

budget

2009-10 Budget Act $250,671 B0541Program DeliveryEnacted 2009-10

3640-001-6051 Portion of support

budget: Control Section

Adjustment

2009-10 Control

Section

Adjustment

($15,655) B0541Program DeliveryEnacted 2009-10

Wednesday, January 29, Page 232 of 3421:20:09 PM Public Resources Code (PRC) Section PRC §75055(b)(1)Ch. 6Prop 84 Report

Page 236: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3640-001-6051 Portion of support

budget: Natural

Reversion

2009-10 Natural

Reversion

($140,034) B0541Program DeliveryEnacted 2011-12

3640-001-6051 Portion of support

budget

2010-11 Budget Act $250,671 B0541Program DeliveryEnacted 2010-11

3640-001-6051 Portion of support

budget: Control Section

Adjustment

2010-11 Control

Section

Adjustment

($28,725) B0541Program DeliveryEnacted 2010-11

3640-001-6051 Portion of support

budget: Natural

Reversion

2010-11 Natural

Reversion

($105,292) B0541Program DeliveryEnacted 2012-13

3640-001-6051 Portion of support

budget

2011-12 Budget Act $228,580 B0541Program DeliveryEnacted 2011-12

3640-001-6051 Portion of support

budget: Control Section

Adjustment

2011-12 Control

Section

Adjustment

($349) B0541Program DeliveryEnacted 2011-12

3640-001-6051 Portion of support

budget: Natural

Reversion

2011-12 Natural

Reversion

($102,998) B0541Program DeliveryEnacted 2013-14

3640-001-6051 Portion of support

budget

2012-13 Budget Act $231,000 B0541Program DeliveryEnacted 2012-13

3640-001-6051 Portion of support

budget: Control Section

Adjustment

2012-13 Control

Section

Adjustment

($2,756) B0541Program DeliveryEnacted 2012-13

3640-001-6051 Portion of support

budget: Natural

Reversion

2012-13 Natural

Reversion

($60,527) B0541Program DeliveryEnacted 2014-15

3640-001-6051 Portion of support

budget

2013-14 Budget Act $233,489 B0541Program DeliveryEnacted 2013-14

3640-001-6051 Portion of support

budget: Control Section

Adjustment

2013-14 Control

Section

Adjustment

$3,148 B0541Program DeliveryEnacted 2013-14

3640-001-6051 Portion of support

budget: Natural

Reversion

2013-14 Natural

Reversion

($59,045) B0541Program DeliveryEnacted 2015-16

3640-001-6051 Portion of support

budget

2014-15 Budget Act $236,557 B0541Program DeliveryEnacted 2014-15

3640-001-6051 Portion of support

budget: Control Section

Adjustment

2014-15 Control

Section

Adjustment

$6,131 B0541Program DeliveryEnacted 2014-15

3640-001-6051 Portion of support

budget: Natural

Reversion

2014-15 Natural

Reversion

($6,590) B0541Program DeliveryEnacted 2016-17

3640-001-6051 Portion of support

budget

2015-16 Budget Act $242,693 B0541Program DeliveryEnacted 2015-16

3640-001-6051 Portion of support

budget: Control Section

Adjustment

2015-16 Control

Section

Adjustment

$7,670 B0541Program DeliveryEnacted 2015-16

Wednesday, January 29, Page 233 of 3421:20:09 PM Public Resources Code (PRC) Section PRC §75055(b)(1)Ch. 6Prop 84 Report

Page 237: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3640-001-6051 Portion of support

budget: Natural

Reversion

2015-16 Natural

Reversion

($17,228) B0541Program DeliveryEnacted 2017-18

3640-001-6051 Portion of support

budget

2016-17 Budget Act $251,284 B0541Program DeliveryEnacted 2016-17

3640-001-6051 Portion of support

budget: Control Section

Adjustment

2016-17 Control

Section

Adjustment

$7,058 B0541Program DeliveryEnacted 2016-17

3640-001-6051 Portion of support

budget: Natural

Reversion

2016-17 Natural

Reversion

($7,126) B0541Program DeliveryEnacted 2018-19

3640-001-6051 Portion of support

budget

2017-18 Budget Act $255,886 B0541Program DeliveryEnacted 2017-18

3640-001-6051 Portion of support

budget: Control Section

Adjustment

2017-18 Control

Section

Adjustment

$9,477 B0541Program DeliveryEnacted 2017-18

3640-001-6051 Portion of support

budget

2018-19 Budget Act $255,886 B0541Program DeliveryEnacted 2018-19

3640-001-6051 Portion of support

budget

2019-20 Budget Act $255,886 B0541Program DeliveryEnacted 2019-20

3640-501-6051 Continuous

appropriation

2006-07 Statutory

from Bond

$163,286 B0541Habitat Acq., Protection, RestorationEnacted 2006-07

3640-501-6051 Continuous

appropriation: Natural

Reversion

2006-07 Natural

Reversion

($162,097) B0541Habitat Acq., Protection, RestorationEnacted 2008-09

3640-802-6051 Continuous

appropriation

2006-07 Statutory

from Bond

$8,325,413 B054NExcess continuous appropriation

authority (do not spend)

Enacted 2006-07

3640-802-6051 Continuous

appropriation

2006-07 Statutory

from Bond

$126,674,587 B0542Habitat Acq., Protection, RestorationEnacted 2006-07

Sum: $137,354,328Enacted

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3640-001-6051 (1) Portion of support

budget

2020-21 Budget Act $311,522 B0541Program DeliveryProposed 2020-21

Sum: $311,522Proposed

Sum: $137,665,850

($8,325,413)

Balance for Habitat protection:

Wednesday, January 29, Page 234 of 3421:20:09 PM Public Resources Code (PRC) Section PRC §75055(b)(1)Ch. 6Prop 84 Report

Page 238: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

Forest and Wildlife ConservationChapter 6

Allocation: Natural Community Conservation Plans

Allocation $: $90,000,000$468,491

$927,611Statewide Set Asides: $1,396,102 {

Outyear Obligations: $2,787,529

$2,244,008

$0

{

PRC §75055(c)Ch. 6

Appropriations, Proposals and Reversions

Statewide, requiring appropriation:

Statewide, not requiring appropriation:

Outyear Program Delivery commitments:

Outyear Cap. Outlay (to complete started projects):Reversions are shown below$0

Outyear Local Asst. commitments:

Grants to implement or assist in the establishment of Natural Community Conservation Plans.

Dept.: Wildlife Conservation Board

Other Outyear Support commitments:$543,521

Committed

$0

$0

$0

$0

Proposed

$0

Prop 1 Reduction $1,753,898

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3640-001-6051 Portion of support

budget

2007-08 Budget Act $158,727 B0551Program DeliveryEnacted 2007-08

3640-001-6051 Portion of support

budget: Control Section

Adjustment

2007-08 Control

Section

Adjustment

$2,864 B0551Program DeliveryEnacted 2007-08

3640-001-6051 Portion of support

budget: Natural

Reversion

2007-08 Natural

Reversion

($109,709) B0551Program DeliveryEnacted 2010-11

3640-001-6051 Portion of support

budget

2008-09 Budget Act $161,590 B0551Program DeliveryEnacted 2008-09

3640-001-6051 Portion of support

budget: Control Section

Adjustment

2008-09 Control

Section

Adjustment

($1,158) B0551Program DeliveryEnacted 2008-09

3640-001-6051 Portion of support

budget: Natural

Reversion

2008-09 Natural

Reversion

($96,729) B0551Program DeliveryEnacted 2010-11

3640-001-6051 Portion of support

budget

2009-10 Budget Act $167,114 B0551Program DeliveryEnacted 2009-10

3640-001-6051 Portion of support

budget: Control Section

Adjustment

2009-10 Control

Section

Adjustment

($10,435) B0551Program DeliveryEnacted 2009-10

3640-001-6051 Portion of support

budget: Natural

Reversion

2009-10 Natural

Reversion

($93,358) B0551Program DeliveryEnacted 2011-12

3640-001-6051 Portion of support

budget

2010-11 Budget Act $167,114 B0551Program DeliveryEnacted 2010-11

Wednesday, January 29, Page 235 of 3421:20:09 PM Public Resources Code (PRC) Section PRC §75055(c)Ch. 6Prop 84 Report

Page 239: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3640-001-6051 Portion of support

budget: Control Section

Adjustment

2010-11 Control

Section

Adjustment

($19,222) B0551Program DeliveryEnacted 2010-11

3640-001-6051 Portion of support

budget: Natural

Reversion

2010-11 Natural

Reversion

($70,123) B0551Program DeliveryEnacted 2012-13

3640-001-6051 Portion of support

budget

2011-12 Budget Act $152,386 B0551Program DeliveryEnacted 2011-12

3640-001-6051 Portion of support

budget: Control Section

Adjustment

2011-12 Control

Section

Adjustment

($500) B0551Program DeliveryEnacted 2011-12

3640-001-6051 Portion of support

budget: Natural

Reversion

2011-12 Natural

Reversion

($68,397) B0551Program DeliveryEnacted 2013-14

3640-001-6051 Portion of support

budget

2012-13 Budget Act $153,000 B0551Program DeliveryEnacted 2012-13

3640-001-6051 Portion of support

budget: Control Section

Adjustment

2012-13 Control

Section

Adjustment

($1,850) B0551Program DeliveryEnacted 2012-13

3640-001-6051 Portion of support

budget: Natural

Reversion

2012-13 Natural

Reversion

($39,338) B0551Program DeliveryEnacted 2014-15

3640-001-6051 Portion of support

budget

2013-14 Budget Act $155,659 B0551Program DeliveryEnacted 2013-14

3640-001-6051 Portion of support

budget: Control Section

Adjustment

2013-14 Control

Section

Adjustment

$2,095 B0551Program DeliveryEnacted 2013-14

3640-001-6051 Portion of support

budget: Natural

Reversion

2013-14 Natural

Reversion

($39,360) B0551Program DeliveryEnacted 2015-16

3640-001-6051 Portion of support

budget

2014-15 Budget Act $157,705 B0551Program DeliveryEnacted 2014-15

3640-001-6051 Portion of support

budget: Control Section

Adjustment

2014-15 Control

Section

Adjustment

$4,087 B0551Program DeliveryEnacted 2014-15

3640-001-6051 Portion of support

budget: Natural

Reversion

2014-15 Natural

Reversion

($4,394) B0551Program DeliveryEnacted 2016-17

3640-001-6051 Portion of support

budget

2015-16 Budget Act $161,795 B0551Program DeliveryEnacted 2015-16

3640-001-6051 Portion of support

budget: Control Section

Adjustment

2015-16 Control

Section

Adjustment

$5,114 B0551Program DeliveryEnacted 2015-16

3640-001-6051 Portion of support

budget: Natural

Reversion

2015-16 Natural

Reversion

($11,485) B0551Program DeliveryEnacted 2017-18

3640-001-6051 Portion of support

budget

2016-17 Budget Act $167,523 B0551Program DeliveryEnacted 2016-17

Wednesday, January 29, Page 236 of 3421:20:09 PM Public Resources Code (PRC) Section PRC §75055(c)Ch. 6Prop 84 Report

Page 240: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3640-001-6051 Portion of support

budget: Control Section

Adjustment

2016-17 Control

Section

Adjustment

$4,705 B0551Program DeliveryEnacted 2016-17

3640-001-6051 Portion of support

budget: Natural

Reversion

2016-17 Natural

Reversion

($4,751) B0551Program DeliveryEnacted 2018-19

3640-001-6051 Portion of support

budget

2017-18 Budget Act $230,455 B0551Program DeliveryEnacted 2017-18

3640-001-6051 Portion of support

budget: Control Section

Adjustment

2017-18 Control

Section

Adjustment

$8,535 B0551Program DeliveryEnacted 2017-18

3640-001-6051 Portion of support

budget

2018-19 Budget Act $261,455 B0551Program DeliveryEnacted 2018-19

3640-001-6051 Portion of support

budget: Control Section

Adjustment

2018-19 Control

Section

Adjustment

$33,000 B0551Program DeliveryEnacted 2018-19

3640-001-6051 Portion of support

budget

2019-20 Budget Act $294,455 B0551Program DeliveryEnacted 2019-20

3640-301-6051 Wildlife Conservation

Board projects: Natural

Reversion

2007-08 Natural

Reversion

($172,693) B0552NCCP ImplementationEnacted 2018-19

3640-301-6051 (1) Wildlife Conservation

Board projects

2007-08 Budget Act $25,000,000 B0552NCCP ImplementationEnacted 2007-08

3640-301-6051 Wildlife Conservation

Board projects

2008-09 Budget Act $25,000,000 B0552NCCP ImplementationEnacted 2008-09

3640-301-6051 Wildlife Conservation

Board projects: Natural

Heritage Preservation

Tax Credit

2008-09 $2,700,000 B0552Natural Heritage Preservation Tax

Credit

Enacted 2015-16

3640-301-6051 Wildlife Conservation

Board projects:

Transfer for Natural

Heritage Preservation

Tax Credit

2008-09 ($2,700,000) B0552NCCP ImplementationEnacted 2008-09

3640-301-6051 Wildlife Conservation

Board projects:

Reversion

2008-09 Budget Act ($12,181,788) B0552NCCP ImplementationEnacted 2017-18

3640-301-6051 Wildlife Conservation

Board projects

2009-10 Budget Act $10,000,000 B0552NCCP ImplementationEnacted 2009-10

3640-301-6051 Wildlife Conservation

Board projects: Natural

Reversion

2009-10 Natural

Reversion

($73,395) B0552NCCP ImplementationEnacted 2013-14

3640-301-6051 Wildlife Conservation

Board projects:

Reversion

2009-10 Budget Act ($3,000,000) B0552NCCP ImplementationEnacted 2010-11

3640-301-6051 Wildlife Conservation

Board projects

2017-18 Budget Act $11,000,000 B0552NCCP ImplementationEnacted 2017-18

3640-308-6051 Wildlife Conservation

Board projects

2017-18 Budget Act $5,700,000 B0552NCCP Implementation -

Sacramento-San Joaquin Delta

Enacted 2017-18

Wednesday, January 29, Page 237 of 3421:20:09 PM Public Resources Code (PRC) Section PRC §75055(c)Ch. 6Prop 84 Report

Page 241: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3640-801-6051 Wildlife Conservation

Board projects

2009-10 Special

Legislation

$24,000,000 B0552NCCP ImplementationEnacted 2009-10

3640-801-6051 Wildlife Conservation

Board projects: Natural

Reversion

2009-10 Natural

Reversion

($113) B0552NCCP ImplementationEnacted 2018-19

3640-801-6051 Wildlife Conservation

Board projects:

Reversion

2009-10 Budget Act ($6,087,479) B0552NCCP ImplementationEnacted 2017-18

Sum: $81,063,100Enacted

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3640-001-6051 Portion of support

budget: Control Section

Adjustment

2019-20 Control

Section

Adjustment

$39,000 B0551Program DeliveryEnacted/Not 2019-20

Sum: $39,000Enacted/Not Posted

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3640-001-6051 (1) Portion of support

budget

2020-21 Budget Act $333,455 B0551Program DeliveryProposed 2020-21

3640-301-6051 Wildlife Conservation

Board projects:

Reappropriation

(decrease)

2017-18 Budget Act ($11,000,000) B0552NCCP ImplementationProposed 2017-18

3640-301-6051 (1) Wildlife Conservation

Board projects:

Reappropriation

(increase)

2017-18 Budget Act $11,000,000 B0552NCCP ImplementationProposed 2020-21

Sum: $333,455Proposed

Sum: $81,435,555

$2,626,916

Balance for Natural Community Conservation Plans:

Wednesday, January 29, Page 238 of 3421:20:09 PM Public Resources Code (PRC) Section PRC §75055(c)Ch. 6Prop 84 Report

Page 242: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

Forest and Wildlife ConservationChapter 6

Allocation: Rangeland, Grazing Land and Protection

Allocation $: $15,000,000$78,082

$154,602Statewide Set Asides: $232,684 {

Outyear Obligations: $0

$0

$0

{

PRC §75055(d)(1)Ch. 6

Appropriations, Proposals and Reversions

Statewide, requiring appropriation:

Statewide, not requiring appropriation:

Outyear Program Delivery commitments:

Outyear Cap. Outlay (to complete started projects):Reversions are shown below$0

Outyear Local Asst. commitments:

Grazing land protection pursuant to the California Rangeland, Grazing Land and Protection Act.

Dept.: Wildlife Conservation Board

Other Outyear Support commitments:$0

Committed

$0

$0

$0

$0

Proposed

$0

Prop 1 Reduction $292,316

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3640-001-6051 Portion of support

budget

2007-08 Budget Act $26,455 B0561Program DeliveryEnacted 2007-08

3640-001-6051 Portion of support

budget: Control Section

Adjustment

2007-08 Control

Section

Adjustment

$477 B0561Program DeliveryEnacted 2007-08

3640-001-6051 Portion of support

budget: Natural

Reversion

2007-08 Natural

Reversion

($18,285) B0561Program DeliveryEnacted 2010-11

3640-001-6051 Portion of support

budget

2008-09 Budget Act $26,933 B0561Program DeliveryEnacted 2008-09

3640-001-6051 Portion of support

budget: Control Section

Adjustment

2008-09 Control

Section

Adjustment

($246) B0561Program DeliveryEnacted 2008-09

3640-001-6051 Portion of support

budget: Natural

Reversion

2008-09 Natural

Reversion

($16,070) B0561Program DeliveryEnacted 2010-11

3640-001-6051 Portion of support

budget

2009-10 Budget Act $27,852 B0561Program DeliveryEnacted 2009-10

3640-001-6051 Portion of support

budget: Control Section

Adjustment

2009-10 Control

Section

Adjustment

($1,739) B0561Program DeliveryEnacted 2009-10

3640-001-6051 Portion of support

budget: Natural

Reversion

2009-10 Natural

Reversion

($15,559) B0561Program DeliveryEnacted 2011-12

3640-001-6051 Portion of support

budget

2010-11 Budget Act $27,852 B0561Program DeliveryEnacted 2010-11

Wednesday, January 29, Page 239 of 3421:20:09 PM Public Resources Code (PRC) Section PRC §75055(d)(1)Ch. 6Prop 84 Report

Page 243: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3640-001-6051 Portion of support

budget: Control Section

Adjustment

2010-11 Control

Section

Adjustment

($3,239) B0561Program DeliveryEnacted 2010-11

3640-001-6051 Portion of support

budget: Natural

Reversion

2010-11 Natural

Reversion

($11,651) B0561Program DeliveryEnacted 2012-13

3640-001-6051 Portion of support

budget

2011-12 Budget Act $25,398 B0561Program DeliveryEnacted 2011-12

3640-001-6051 Portion of support

budget: Control Section

Adjustment

2011-12 Control

Section

Adjustment

($600) B0561Program DeliveryEnacted 2011-12

3640-001-6051 Portion of support

budget: Natural

Reversion

2011-12 Natural

Reversion

($10,883) B0561Program DeliveryEnacted 2013-14

3640-001-6051 Portion of support

budget

2012-13 Budget Act $25,500 B0561Program DeliveryEnacted 2012-13

3640-001-6051 Portion of support

budget: Control Section

Adjustment

2012-13 Control

Section

Adjustment

($314) B0561Program DeliveryEnacted 2012-13

3640-001-6051 Portion of support

budget: Natural

Reversion

2012-13 Natural

Reversion

($6,551) B0561Program DeliveryEnacted 2014-15

3640-001-6051 Portion of support

budget

2013-14 Budget Act $25,943 B0561Program DeliveryEnacted 2013-14

3640-001-6051 Portion of support

budget: Control Section

Adjustment

2013-14 Control

Section

Adjustment

$350 B0561Program DeliveryEnacted 2013-14

3640-001-6051 Portion of support

budget: Natural

Reversion

2013-14 Natural

Reversion

($6,561) B0561Program DeliveryEnacted 2015-16

3640-001-6051 Portion of support

budget

2014-15 Budget Act $26,284 B0561Program DeliveryEnacted 2014-15

3640-001-6051 Portion of support

budget: Control Section

Adjustment

2014-15 Control

Section

Adjustment

$681 B0561Program DeliveryEnacted 2014-15

3640-001-6051 Portion of support

budget: Natural

Reversion

2014-15 Natural

Reversion

($732) B0561Program DeliveryEnacted 2016-17

3640-001-6051 Portion of support

budget

2015-16 Budget Act $26,966 B0561Program DeliveryEnacted 2015-16

3640-001-6051 Portion of support

budget: Control Section

Adjustment

2015-16 Control

Section

Adjustment

$852 B0561Program DeliveryEnacted 2015-16

3640-001-6051 Portion of support

budget: Natural

Reversion

2015-16 Natural

Reversion

($1,914) B0561Program DeliveryEnacted 2017-18

3640-001-6051 Portion of support

budget

2016-17 Budget Act $27,920 B0561Program DeliveryEnacted 2016-17

Wednesday, January 29, Page 240 of 3421:20:09 PM Public Resources Code (PRC) Section PRC §75055(d)(1)Ch. 6Prop 84 Report

Page 244: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3640-001-6051 Portion of support

budget: Control Section

Adjustment

2016-17 Control

Section

Adjustment

$783 B0561Program DeliveryEnacted 2016-17

3640-001-6051 Portion of support

budget: Natural

Reversion

2016-17 Natural

Reversion

($790) B0561Program DeliveryEnacted 2018-19

3640-301-6051 (2) Rangeland, Grazing

Land, and Grasslands

Protection Program

2013-14 Budget Act $1,279,000 B0562Funding for the Rangeland, Grazing

Land and Grassland Protection

Program

Enacted 2013-14

3640-301-6051 (2) Rangeland, Grazing

Land, and Grasslands

Protection Program:

Natural Reversion

2013-14 Natural

Reversion

($23,060) B0562Funding for the Rangeland, Grazing

Land and Grassland Protection

Program

Enacted 2017-18

3640-301-6051 (2) Rangeland, Grazing

Land, and Grasslands

Protection Program:

Reversion

2013-14 Budget Act ($1,047,000) B0562Funding for the Rangeland, Grazing

Land and Grassland Protection

Program

Enacted 2014-15

3640-305-6051 (1) Rangeland, Grazing

Land, and Grasslands

Protection Program

2007-08 Budget Act $14,293,000 B0562Funding for the Rangeland, Grazing

Land and Grassland Protection

Program

Enacted 2007-08

3640-305-6051 (1) Rangeland, Grazing

Land, and Grasslands

Protection Program:

Reversion

2007-08 Budget Act ($231,610) B0562Funding for the Rangeland, Grazing

Land and Grassland Protection

Program

Enacted 2014-15

Sum: $14,445,442Enacted

Sum: $14,445,442

$29,558

Balance for Rangeland, Grazing Land and Protection:

Wednesday, January 29, Page 241 of 3421:20:09 PM Public Resources Code (PRC) Section PRC §75055(d)(1)Ch. 6Prop 84 Report

Page 245: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

Forest and Wildlife ConservationChapter 6

Allocation: Oak Woodland Preservation

Allocation $: $15,000,000$78,082

$154,602Statewide Set Asides: $232,684 {

Outyear Obligations: $0

$0

$0

{

PRC §75055(d)(2)Ch. 6

Appropriations, Proposals and Reversions

Statewide, requiring appropriation:

Statewide, not requiring appropriation:

Outyear Program Delivery commitments:

Outyear Cap. Outlay (to complete started projects):Reversions are shown below$0

Outyear Local Asst. commitments:

Oak Woodland Preservation.

Dept.: Wildlife Conservation Board

Other Outyear Support commitments:$0

Committed

$0

$0

$0

$0

Proposed

$0

Prop 1 Reduction $292,316

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3640-001-6051 Portion of support

budget

2007-08 Budget Act $26,455 B0571Program DeliveryEnacted 2007-08

3640-001-6051 Portion of support

budget: Control Section

Adjustment

2007-08 Control

Section

Adjustment

$477 B0571Program DeliveryEnacted 2007-08

3640-001-6051 Portion of support

budget: Natural

Reversion

2007-08 Natural

Reversion

($18,285) B0571Program DeliveryEnacted 2010-11

3640-001-6051 Portion of support

budget

2008-09 Budget Act $26,933 B0571Program DeliveryEnacted 2008-09

3640-001-6051 Portion of support

budget: Control Section

Adjustment

2008-09 Control

Section

Adjustment

($246) B0571Program DeliveryEnacted 2008-09

3640-001-6051 Portion of support

budget: Natural

Reversion

2008-09 Natural

Reversion

($16,070) B0571Program DeliveryEnacted 2010-11

3640-001-6051 Portion of support

budget

2009-10 Budget Act $27,852 B0571Program DeliveryEnacted 2009-10

3640-001-6051 Portion of support

budget: Control Section

Adjustment

2009-10 Control

Section

Adjustment

($1,739) B0571Program DeliveryEnacted 2009-10

3640-001-6051 Portion of support

budget: Natural

Reversion

2009-10 Natural

Reversion

($15,559) B0571Program DeliveryEnacted 2011-12

3640-001-6051 Portion of support

budget

2010-11 Budget Act $27,852 B0571Program DeliveryEnacted 2010-11

Wednesday, January 29, Page 242 of 3421:20:09 PM Public Resources Code (PRC) Section PRC §75055(d)(2)Ch. 6Prop 84 Report

Page 246: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3640-001-6051 Portion of support

budget: Control Section

Adjustment

2010-11 Control

Section

Adjustment

($3,239) B0571Program DeliveryEnacted 2010-11

3640-001-6051 Portion of support

budget: Natural

Reversion

2010-11 Natural

Reversion

($11,651) B0571Program DeliveryEnacted 2012-13

3640-001-6051 Portion of support

budget

2011-12 Budget Act $25,398 B0571Program DeliveryEnacted 2011-12

3640-001-6051 Portion of support

budget: Control Section

Adjustment

2011-12 Control

Section

Adjustment

($391) B0571Program DeliveryEnacted 2011-12

3640-001-6051 Portion of support

budget: Natural

Reversion

2011-12 Natural

Reversion

($11,092) B0571Program DeliveryEnacted 2013-14

3640-001-6051 Portion of support

budget

2012-13 Budget Act $25,500 B0571Program DeliveryEnacted 2012-13

3640-001-6051 Portion of support

budget: Control Section

Adjustment

2012-13 Control

Section

Adjustment

($315) B0571Program DeliveryEnacted 2012-13

3640-001-6051 Portion of support

budget: Natural

Reversion

2012-13 Natural

Reversion

($6,550) B0571Program DeliveryEnacted 2014-15

3640-001-6051 Portion of support

budget

2013-14 Budget Act $25,943 B0571Program DeliveryEnacted 2013-14

3640-001-6051 Portion of support

budget: Control Section

Adjustment

2013-14 Control

Section

Adjustment

$350 B0571Program DeliveryEnacted 2013-14

3640-001-6051 Portion of support

budget: Natural

Reversion

2013-14 Natural

Reversion

($6,561) B0571Program DeliveryEnacted 2015-16

3640-001-6051 Portion of support

budget

2014-15 Budget Act $26,284 B0571Program DeliveryEnacted 2014-15

3640-001-6051 Portion of support

budget: Control Section

Adjustment

2014-15 Control

Section

Adjustment

$681 B0571Program DeliveryEnacted 2014-15

3640-001-6051 Portion of support

budget: Natural

Reversion

2014-15 Natural

Reversion

($732) B0571Program DeliveryEnacted 2016-17

3640-001-6051 Portion of support

budget

2015-16 Budget Act $26,966 B0571Program DeliveryEnacted 2015-16

3640-001-6051 Portion of support

budget: Control Section

Adjustment

2015-16 Control

Section

Adjustment

$852 B0571Program DeliveryEnacted 2015-16

3640-001-6051 Portion of support

budget: Natural

Reversion

2015-16 Natural

Reversion

($1,914) B0571Program DeliveryEnacted 2017-18

3640-001-6051 Portion of support

budget

2016-17 Budget Act $27,920 B0571Program DeliveryEnacted 2016-17

Wednesday, January 29, Page 243 of 3421:20:09 PM Public Resources Code (PRC) Section PRC §75055(d)(2)Ch. 6Prop 84 Report

Page 247: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3640-001-6051 Portion of support

budget: Control Section

Adjustment

2016-17 Control

Section

Adjustment

$783 B0571Program DeliveryEnacted 2016-17

3640-001-6051 Portion of support

budget: Natural

Reversion

2016-17 Natural

Reversion

($790) B0571Program DeliveryEnacted 2018-19

3640-301-6051 Oak Woodlands

Conservation Program:

Natural Reversion

2013-14 Natural

Reversion

($126) B0572Funding for Oak Woodland

Preservation

Enacted 2017-18

3640-301-6051 (1) Oak Woodlands

Conservation Program

2013-14 Budget Act $1,500,000 B0572Funding for Oak Woodland

Preservation

Enacted 2013-14

3640-301-6051 (1) Oak Woodlands

Conservation Program:

Reversion

2013-14 Budget Act ($841,000) B0572Funding for Oak Woodland

Preservation

Enacted 2014-15

3640-303-6051 (1) Oak Woodlands

Conservation Program

2007-08 Budget Act $14,293,000 B0572Funding for Oak Woodland

Preservation

Enacted 2007-08

3640-303-6051 (1) Oak Woodlands

Conservation Program:

Reversion

2007-08 Budget Act ($659,197) B0572Funding for Oak Woodland

Preservation

Enacted 2014-15

Sum: $14,467,789Enacted

Sum: $14,467,789

$7,211

Balance for Oak Woodland Preservation:

Wednesday, January 29, Page 244 of 3421:20:09 PM Public Resources Code (PRC) Section PRC §75055(d)(2)Ch. 6Prop 84 Report

Page 248: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

Forest and Wildlife ConservationChapter 6

Allocation: Agricultural land preservation

Allocation $: $10,000,000$52,055

$103,068Statewide Set Asides: $155,122 {

Outyear Obligations: $0

$0

$0

{

PRC §75055(d)(3)Ch. 6

Appropriations, Proposals and Reversions

Statewide, requiring appropriation:

Statewide, not requiring appropriation:

Outyear Program Delivery commitments:

Outyear Cap. Outlay (to complete started projects):Reversions are shown below$0

Outyear Local Asst. commitments:

Agricultural land preservation pursuant to the California Farmland Conservancy Program Act of 1995.

Dept.: Department of Conservation

Other Outyear Support commitments:$0

Committed

$0

$0

$0

$0

Proposed

$0

Prop 1 Reduction $194,878

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3480-001-6051 Portion of support

budget

2008-09 Budget Act $165,000 B0581Farmland Conservancy Program -

Program Delivery

Enacted 2008-09

3480-001-6051 Portion of support

budget: Natural

Reversion

2008-09 Natural

Reversion

($26,635) B0581Farmland Conservancy Program -

Program Delivery

Enacted 2010-11

3480-001-6051 Portion of support

budget

2009-10 Budget Act $165,000 B0581Farmland Conservancy Program -

Program Delivery

Enacted 2009-10

3480-001-6051 Portion of support

budget: Natural

Reversion

2009-10 Natural

Reversion

($22,407) B0581Farmland Conservancy Program -

Program Delivery

Enacted 2013-14

3480-001-6051 Portion of support

budget

2010-11 Budget Act $165,000 B0581Farmland Conservancy Program -

Program Delivery

Enacted 2010-11

3480-001-6051 Portion of support

budget: Natural

Reversion

2010-11 Natural

Reversion

($77,228) B0581Farmland Conservancy Program -

Program Delivery

Enacted 2014-15

3480-001-6051 Portion of support

budget: Reversion

2010-11 Budget Act ($42,830) B0581Farmland Conservancy Program -

Program Delivery

Enacted 2013-14

3480-001-6051 Portion of support

budget

2011-12 Budget Act $0 B0581Farmland Conservancy Program -

Program Delivery

Enacted 2011-12

3480-001-6051 Portion of support

budget

2019-20 Budget Act $20,000 B0581Farmland Conservancy Program -

Program Delivery

Enacted 2019-20

3480-101-6051 Portion of local

assistance budget

2008-09 Budget Act $5,000,000 B0582Farmland Conservancy Program -

Projects

Enacted 2008-09

Wednesday, January 29, Page 245 of 3421:20:09 PM Public Resources Code (PRC) Section PRC §75055(d)(3)Ch. 6Prop 84 Report

Page 249: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3480-101-6051 Portion of local

assistance budget:

Natural Reversion

2008-09 Natural

Reversion

($161,685) B0582Farmland Conservancy Program -

Projects

Enacted 2015-16

3480-101-6051 Portion of local

assistance budget

2009-10 Budget Act $4,155,000 B0582Farmland Conservancy Program -

Projects

Enacted 2009-10

3480-101-6051 Portion of local

assistance budget:

Natural Reversion

2009-10 Natural

Reversion

($467,067) B0582Farmland Conservancy Program -

Projects

Enacted 2013-14

3480-101-6051 Portion of local

assistance budget

2014-15 Budget Act $621,000 B0582Farmland Conservancy Program -

Projects

Enacted 2014-15

3480-101-6051 Portion of local

assistance budget:

Natural Reversion

2014-15 Natural

Reversion

($57,344) B0582Farmland Conservancy Program -

Projects

Enacted 2017-18

3480-101-6051 Portion of local

assistance budget:

Reversion

2014-15 Budget Act ($23,603) B0582Farmland Conservancy Program -

Projects

Enacted 2016-17

3480-101-6051 Portion of local

assistance budget

2016-17 Budget Act $180,000 B0582Farmland Conservancy Program -

Projects

Enacted 2016-17

3480-101-6051 Portion of local

assistance budget:

Reversion

2016-17 Budget Act ($180,000) B0582Farmland Conservancy Program -

Projects

Enacted 2019-20

3480-101-6051 Portion of local

assistance budget

2019-20 Budget Act $275,000 B0582Farmland Conservancy Program -

Projects

Enacted 2019-20

Sum: $9,687,203Enacted

Sum: $9,687,203

($37,203)

Balance for Agricultural land preservation:

Wednesday, January 29, Page 246 of 3421:20:09 PM Public Resources Code (PRC) Section PRC §75055(d)(3)Ch. 6Prop 84 Report

Page 250: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

Forest and Wildlife ConservationChapter 6

Allocation: Agriculture with ecosystem restoration

Allocation $: $5,000,000$26,027

$51,534Statewide Set Asides: $77,561 {

Outyear Obligations: $37,908

$37,908

$0

{

PRC §75055(d)(4)Ch. 6

Appropriations, Proposals and Reversions

Statewide, requiring appropriation:

Statewide, not requiring appropriation:

Outyear Program Delivery commitments:

Outyear Cap. Outlay (to complete started projects):Reversions are shown below$0

Outyear Local Asst. commitments:

Grants to assist farmers in integrating agricultural activities with ecosystem restoration and wildlife protection.

Dept.: Wildlife Conservation Board

Other Outyear Support commitments:$0

Committed

$0

$0

$0

$0

Proposed

$0

Prop 1 Reduction $97,439

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3640-001-6051 Portion of support

budget

2007-08 Budget Act $8,818 B0591Program DeliveryEnacted 2007-08

3640-001-6051 Portion of support

budget: Control Section

Adjustment

2007-08 Control

Section

Adjustment

$196 B0591Program DeliveryEnacted 2007-08

3640-001-6051 Portion of support

budget: Natural

Reversion

2007-08 Natural

Reversion

($6,132) B0591Program DeliveryEnacted 2010-11

3640-001-6051 Portion of support

budget

2008-09 Budget Act $8,977 B0591Program DeliveryEnacted 2008-09

3640-001-6051 Portion of support

budget: Control Section

Adjustment

2008-09 Control

Section

Adjustment

($82) B0591Program DeliveryEnacted 2008-09

3640-001-6051 Portion of support

budget: Natural

Reversion

2008-09 Natural

Reversion

($5,356) B0591Program DeliveryEnacted 2010-11

3640-001-6051 Portion of support

budget

2009-10 Budget Act $9,284 B0591Program DeliveryEnacted 2009-10

3640-001-6051 Portion of support

budget: Control Section

Adjustment

2009-10 Control

Section

Adjustment

($580) B0591Program DeliveryEnacted 2009-10

3640-001-6051 Portion of support

budget: Natural

Reversion

2009-10 Natural

Reversion

($5,186) B0591Program DeliveryEnacted 2011-12

3640-001-6051 Portion of support

budget

2010-11 Budget Act $9,284 B0591Program DeliveryEnacted 2010-11

Wednesday, January 29, Page 247 of 3421:20:09 PM Public Resources Code (PRC) Section PRC §75055(d)(4)Ch. 6Prop 84 Report

Page 251: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3640-001-6051 Portion of support

budget: Control Section

Adjustment

2010-11 Control

Section

Adjustment

($972) B0591Program DeliveryEnacted 2010-11

3640-001-6051 Portion of support

budget: Natural

Reversion

2010-11 Natural

Reversion

($3,992) B0591Program DeliveryEnacted 2012-13

3640-001-6051 Portion of support

budget

2011-12 Budget Act $8,466 B0591Program DeliveryEnacted 2011-12

3640-001-6051 Portion of support

budget: Control Section

Adjustment

2011-12 Control

Section

Adjustment

($391) B0591Program DeliveryEnacted 2011-12

3640-001-6051 Portion of support

budget: Natural

Reversion

2011-12 Natural

Reversion

($3,437) B0591Program DeliveryEnacted 2013-14

3640-001-6051 Portion of support

budget

2012-13 Budget Act $9,000 B0591Program DeliveryEnacted 2012-13

3640-001-6051 Portion of support

budget: Control Section

Adjustment

2012-13 Control

Section

Adjustment

($84) B0591Program DeliveryEnacted 2012-13

3640-001-6051 Portion of support

budget: Natural

Reversion

2012-13 Natural

Reversion

($2,704) B0591Program DeliveryEnacted 2014-15

3640-001-6051 Portion of support

budget

2013-14 Budget Act $8,648 B0591Program DeliveryEnacted 2013-14

3640-001-6051 Portion of support

budget: Control Section

Adjustment

2013-14 Control

Section

Adjustment

$118 B0591Program DeliveryEnacted 2013-14

3640-001-6051 Portion of support

budget: Natural

Reversion

2013-14 Natural

Reversion

($2,188) B0591Program DeliveryEnacted 2015-16

3640-001-6051 Portion of support

budget

2014-15 Budget Act $8,761 B0591Program DeliveryEnacted 2014-15

3640-001-6051 Portion of support

budget: Control Section

Adjustment

2014-15 Control

Section

Adjustment

$227 B0591Program DeliveryEnacted 2014-15

3640-001-6051 Portion of support

budget: Natural

Reversion

2014-15 Natural

Reversion

($244) B0591Program DeliveryEnacted 2016-17

3640-001-6051 Portion of support

budget

2015-16 Budget Act $8,989 B0591Program DeliveryEnacted 2015-16

3640-001-6051 Portion of support

budget: Control Section

Adjustment

2015-16 Control

Section

Adjustment

$284 B0591Program DeliveryEnacted 2015-16

3640-001-6051 Portion of support

budget: Natural

Reversion

2015-16 Natural

Reversion

($638) B0591Program DeliveryEnacted 2017-18

3640-001-6051 Portion of support

budget

2016-17 Budget Act $9,308 B0591Program DeliveryEnacted 2016-17

Wednesday, January 29, Page 248 of 3421:20:09 PM Public Resources Code (PRC) Section PRC §75055(d)(4)Ch. 6Prop 84 Report

Page 252: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3640-001-6051 Portion of support

budget: Control Section

Adjustment

2016-17 Control

Section

Adjustment

$263 B0591Program DeliveryEnacted 2016-17

3640-001-6051 Portion of support

budget: Natural

Reversion

2016-17 Natural

Reversion

($265) B0591Program DeliveryEnacted 2018-19

3640-001-6051 Portion of support

budget

2017-18 Budget Act $9,477 B0591Program DeliveryEnacted 2017-18

3640-001-6051 Portion of support

budget: Control Section

Adjustment

2017-18 Control

Section

Adjustment

$350 B0591Program DeliveryEnacted 2017-18

3640-001-6051 Portion of support

budget

2018-19 Budget Act $9,477 B0591Program DeliveryEnacted 2018-19

3640-001-6051 Portion of support

budget

2019-20 Budget Act $9,477 B0591Program DeliveryEnacted 2019-20

3640-301-6051 (3) Projects for ecosystem

restoration and wildlife

protection

2013-14 Budget Act $2,368,000 B0592Integrating Agricultural Activities

with Ecosystem Restoration and

Wildlife Protection

Enacted 2013-14

3640-301-6051 (3) Projects for ecosystem

restoration and wildlife

protection: Natural

Reversion

2013-14 Natural

Reversion

($202,177) B0592Integrating Agricultural Activities

with Ecosystem Restoration and

Wildlife Protection

Enacted 2017-18

3640-301-6051 (3) Projects for ecosystem

restoration and wildlife

protection: Reversion

2013-14 Budget Act ($233,000) B0592Integrating Agricultural Activities

with Ecosystem Restoration and

Wildlife Protection

Enacted 2014-15

3640-304-6051 (1) Projects for ecosystem

restoration and wildlife

protection

2007-08 Budget Act $4,762,000 B0592Integrating Agricultural Activities

with Ecosystem Restoration and

Wildlife Protection

Enacted 2007-08

3640-304-6051 (1) Projects for ecosystem

restoration and wildlife

protection: Natural

reversion

2007-08 Natural

Reversion

($549,299) B0592Integrating Agricultural Activities

with Ecosystem Restoration and

Wildlife Protection

Enacted 2014-15

3640-304-6051 (1) Projects for ecosystem

restoration and wildlife

protection: Reversion

2007-08 Budget Act ($2,134,764) B0592Integrating Agricultural Activities

with Ecosystem Restoration and

Wildlife Protection

Enacted 2014-15

Sum: $4,097,913Enacted

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3640-001-6051 (1) Portion of support

budget

2020-21 Budget Act $9,477 B0591Program DeliveryProposed 2020-21

Sum: $9,477Proposed

Sum: $4,107,390

$679,702

Balance for Agriculture with ecosystem restoration:

Wednesday, January 29, Page 249 of 3421:20:09 PM Public Resources Code (PRC) Section PRC §75055(d)(4)Ch. 6Prop 84 Report

Page 253: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

Summary for Chapter 6

Enacted/Proposed: $445,233,883

Allocation: $5,000,000

Set Asides: $77,561

Outyears: $37,908

Balance: $679,702

Forest and Wildlife Conservation

Prop 1 Reduction: $97,439

Wednesday, January 29, Page 250 of 3421:20:09 PM Public Resources Code (PRC) Section PRC §75055(d)(4)Ch. 6Prop 84 Report

Page 254: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

Protection of Beaches, Bays and Coastal WatersChapter 7

Allocation: Areas of Special Biological Significance

projects

Allocation $: $35,000,000$182,191

$360,738Statewide Set Asides: $542,929 {

Outyear Obligations: $0

$0

$0

{

PRC §75060(a), ref 1Ch. 7

Appropriations, Proposals and Reversions

Statewide, requiring appropriation:

Statewide, not requiring appropriation:

Outyear Program Delivery commitments:

Outyear Cap. Outlay (to complete started projects):Reversions are shown below$0

Outyear Local Asst. commitments:

Matching grants for protecting beaches and coastal waters from pollution and toxic contamination pursuant to the Clean Beaches Program. Minimum portion for

grants to local public agencies to assist in compliance with discharge prohibition into Areas of Special Biological Significance.

Dept.: State Water Resources Control

Board

Other Outyear Support commitments:$0

Committed

$0

$0

$0

$0

Proposed

$0

Prop 1 Reduction $682,071

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3940-001-6051 Portion of support

budget

2007-08 Budget Act $475,123 B0601Areas of Special Biological

Significance

Enacted 2007-08

3940-001-6051 Portion of support

budget: Natural

Reversion

2007-08 Natural

Reversion

($279,939) B0601Areas of Special Biological

Significance

Enacted 2009-10

3940-001-6051 Portion of support

budget

2008-09 Budget Act $475,123 B0601Areas of Special Biological

Significance

Enacted 2008-09

3940-001-6051 Portion of support

budget: Reversion

2008-09 Budget Act ($224,738) B0601Areas of Special Biological

Significance

Enacted 2010-11

3940-001-6051 Portion of support

budget

2009-10 Budget Act $475,123 B0601Areas of Special Biological

Significance

Enacted 2009-10

3940-001-6051 Portion of support

budget: Control Section

Adjustment

2009-10 Control

Section

Adjustment

($237,562) B0601Areas of Special Biological

Significance

Enacted 2009-10

3940-001-6051 Portion of support

budget: Reversion

2009-10 Budget Act ($237,561) B0601Areas of Special Biological

Significance

Enacted 2010-11

3940-001-6051 Portion of support

budget

2010-11 Budget Act $237,562 B0601Areas of Special Biological

Significance

Enacted 2010-11

3940-001-6051 Portion of support

budget: Control Section

Adjustment

2010-11 Control

Section

Adjustment

($3,185) B0601Areas of Special Biological

Significance

Enacted 2010-11

3940-001-6051 Portion of support

budget: Reversion

2010-11 Budget Act ($33,553) B0601Areas of Special Biological

Significance

Enacted 2012-13

3940-001-6051 Portion of support

budget

2011-12 Budget Act $292,313 B0601Areas of Special Biological

Significance

Enacted 2011-12

Wednesday, January 29, Page 251 of 3421:20:09 PM Public Resources Code (PRC) Section PRC §75060(a), ref 1Ch. 7Prop 84 Report

Page 255: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3940-001-6051 Portion of support

budget: Control Section

Adjustment

2011-12 Control

Section

Adjustment

($1,050) B0601Areas of Special Biological

Significance

Enacted 2011-12

3940-001-6051 Portion of support

budget: Natural

Reversion

2011-12 Natural

Reversion

($85) B0601Areas of Special Biological

Significance

Enacted 2013-14

3940-001-6051 Portion of support

budget: Reversion

2011-12 Budget Act ($2,682) B0601Areas of Special Biological

Significance

Enacted 2013-14

3940-001-6051 Portion of support

budget

2012-13 Budget Act $236,500 B0601Areas of Special Biological

Significance

Enacted 2012-13

3940-001-6051 Portion of support

budget: Control Section

Adjustment

2012-13 Control

Section

Adjustment

($720) B0601Areas of Special Biological

Significance

Enacted 2012-13

3940-001-6051 Portion of support

budget: Reversion

2012-13 Budget Act ($35,307) B0601Areas of Special Biological

Significance

Enacted 2014-15

3940-001-6051 Portion of support

budget

2013-14 Budget Act $222,000 B0601Areas of Special Biological

Significance

Enacted 2013-14

3940-001-6051 Portion of support

budget: Natural

Reversion

2013-14 Natural

Reversion

($6,084) B0601Areas of Special Biological

Significance

Enacted 2015-16

3940-001-6051 Portion of support

budget

2014-15 Budget Act $314,000 B0601Areas of Special Biological

Significance

Enacted 2014-15

3940-001-6051 Portion of support

budget: Natural

Reversion

2014-15 Natural

Reversion

($17,123) B0601Areas of Special Biological

Significance

Enacted 2016-17

3940-001-6051 Portion of support

budget: Reversion

2014-15 Budget Act ($25,000) B0601Areas of Special Biological

Significance

Enacted 2015-16

3940-001-6051 Portion of support

budget

2015-16 Budget Act $99,960 B0601Areas of Special Biological

Significance

Enacted 2015-16

3940-001-6051 Portion of support

budget: Reversion

2015-16 Budget Act ($29,922) B0601Areas of Special Biological

Significance

Enacted 2016-17

3940-001-6051 Portion of support

budget

2016-17 Budget Act $39,855 B0601Areas of Special Biological

Significance

Enacted 2016-17

3940-001-6051 Portion of support

budget: Natural

Reversion

2016-17 Natural

Reversion

($5,865) B0601Areas of Special Biological

Significance

Enacted 2018-19

3940-001-6051 Portion of support

budget

2017-18 Budget Act $16,000 B0601Areas of Special Biological

Significance

Enacted 2017-18

3940-101-6051 Portion of local

assistance budget

2008-09 Budget Act $29,607,500 B0602Areas of Special Biological

Significance

Enacted 2008-09

3940-101-6051 Portion of local

assistance budget

2011-12 Budget Act $2,417,500 B0602Areas of Special Biological

Significance

Enacted 2011-12

Sum: $33,768,182Enacted

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

Wednesday, January 29, Page 252 of 3421:20:09 PM Public Resources Code (PRC) Section PRC §75060(a), ref 1Ch. 7Prop 84 Report

Page 256: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3940-101-6051 Portion of local

assistance budget:

Reappropriation

(decrease)

2008-09 Budget Act ($29,607,500) B0602Areas of Special Biological

Significance

Enacted/Not 2016-17

3940-101-6051 Portion of local

assistance budget:

Reappropriation

(increase)

2008-09 Budget Act $29,607,500 B0602Areas of Special Biological

Significance

Enacted/Not 2019-20

3940-101-6051 Portion of local

assistance budget:

Reappropriation

(decrease)

2011-12 Budget Act ($2,417,500) B0602Areas of Special Biological

Significance

Enacted/Not 2016-17

3940-101-6051 Portion of local

assistance budget:

Reappropriation

(increase)

2011-12 Budget Act $2,417,500 B0602Areas of Special Biological

Significance

Enacted/Not 2019-20

Sum: $0Enacted/Not Posted

Sum: $33,768,182

$6,818

Balance for Areas of Special Biological Significance projects:

Wednesday, January 29, Page 253 of 3421:20:09 PM Public Resources Code (PRC) Section PRC §75060(a), ref 1Ch. 7Prop 84 Report

Page 257: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

Protection of Beaches, Bays and Coastal WatersChapter 7

Allocation: Santa Monica Bay Restoration

Commission projects

Allocation $: $18,000,000$93,698

$185,522Statewide Set Asides: $279,220 {

Outyear Obligations: $0

$0

$0

{

PRC §75060(a), ref 2Ch. 7

Appropriations, Proposals and Reversions

Statewide, requiring appropriation:

Statewide, not requiring appropriation:

Outyear Program Delivery commitments:

Outyear Cap. Outlay (to complete started projects):Reversions are shown below$0

Outyear Local Asst. commitments:

Matching grants for Santa Monica Bay Restoration Commission projects protecting beaches and coastal waters from pollution and toxic contamination pursuant to

the Clean Beaches Program.

Dept.: State Water Resources Control

Board

Other Outyear Support commitments:$0

Committed

$0

$0

$0

$0

Proposed

$0

Prop 1 Reduction $350,780

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3940-001-6051 Portion of support

budget

2007-08 Budget Act $284,746 B0611Santa Monica Bay Restoration

Commission

Enacted 2007-08

3940-001-6051 Portion of support

budget: Natural

Reversion

2007-08 Natural

Reversion

($84,308) B0611Santa Monica Bay Restoration

Commission

Enacted 2009-10

3940-001-6051 Portion of support

budget

2008-09 Budget Act $284,746 B0611Santa Monica Bay Restoration

Commission

Enacted 2008-09

3940-001-6051 Portion of support

budget: Reversion

2008-09 Budget Act ($83,296) B0611Santa Monica Bay Restoration

Commission

Enacted 2010-11

3940-001-6051 Portion of support

budget

2009-10 Budget Act $284,746 B0611Santa Monica Bay Restoration

Commission

Enacted 2009-10

3940-001-6051 Portion of support

budget: Control Section

Adjustment

2009-10 Control

Section

Adjustment

($142,372) B0611Santa Monica Bay Restoration

Commission

Enacted 2009-10

3940-001-6051 Portion of support

budget: Reversion

2009-10 Budget Act ($142,374) B0611Santa Monica Bay Restoration

Commission

Enacted 2010-11

3940-001-6051 Portion of support

budget

2010-11 Budget Act $142,372 B0611Santa Monica Bay Restoration

Commission

Enacted 2010-11

3940-001-6051 Portion of support

budget: Control Section

Adjustment

2010-11 Control

Section

Adjustment

($2,214) B0611Santa Monica Bay Restoration

Commission

Enacted 2010-11

3940-001-6051 Portion of support

budget: Reversion

2010-11 Budget Act ($140,158) B0611Santa Monica Bay Restoration

Commission

Enacted 2012-13

3940-001-6051 Portion of support

budget

2011-12 Budget Act $141,372 B0611Santa Monica Bay Restoration

Commission

Enacted 2011-12

Wednesday, January 29, Page 254 of 3421:20:09 PM Public Resources Code (PRC) Section PRC §75060(a), ref 2Ch. 7Prop 84 Report

Page 258: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3940-001-6051 Portion of support

budget: Control Section

Adjustment

2011-12 Control

Section

Adjustment

($350) B0611Santa Monica Bay Restoration

Commission

Enacted 2011-12

3940-001-6051 Portion of support

budget: Reversion

2011-12 Budget Act ($141,022) B0611Santa Monica Bay Restoration

Commission

Enacted 2013-14

3940-001-6051 Portion of support

budget

2012-13 Budget Act $141,300 B0611Santa Monica Bay Restoration

Commission

Enacted 2012-13

3940-001-6051 Portion of support

budget: Control Section

Adjustment

2012-13 Control

Section

Adjustment

($446) B0611Santa Monica Bay Restoration

Commission

Enacted 2012-13

3940-001-6051 Portion of support

budget: Reversion

2012-13 Budget Act ($114,473) B0611Santa Monica Bay Restoration

Commission

Enacted 2014-15

3940-001-6051 Portion of support

budget

2013-14 Budget Act $141,300 B0611Santa Monica Bay Restoration

Commission

Enacted 2013-14

3940-001-6051 Portion of support

budget: Natural

Reversion

2013-14 Natural

Reversion

($44,680) B0611Santa Monica Bay Restoration

Commission

Enacted 2015-16

3940-001-6051 Portion of support

budget

2014-15 Budget Act $190,000 B0611Santa Monica Bay Restoration

Commission

Enacted 2014-15

3940-001-6051 Portion of support

budget: Natural

Reversion

2014-15 Natural

Reversion

($10,081) B0611Santa Monica Bay Restoration

Commission

Enacted 2016-17

3940-001-6051 Portion of support

budget: Reversion

2014-15 Budget Act ($14,000) B0611Santa Monica Bay Restoration

Commission

Enacted 2015-16

3940-001-6051 Portion of support

budget

2015-16 Budget Act $188,000 B0611Santa Monica Bay Restoration

Commission

Enacted 2015-16

3940-001-6051 Portion of support

budget: Reversion

2015-16 Budget Act ($54,833) B0611Santa Monica Bay Restoration

Commission

Enacted 2016-17

3940-001-6051 Portion of support

budget

2016-17 Budget Act $56,611 B0611Santa Monica Bay Restoration

Commission

Enacted 2016-17

3940-001-6051 Portion of support

budget: Natural

Reversion

2016-17 Natural

Reversion

($15,024) B0611Santa Monica Bay Restoration

Commission

Enacted 2018-19

3940-001-6051 Portion of support

budget

2017-18 Budget Act $18,000 B0611Santa Monica Bay Restoration

Commission

Enacted 2017-18

3940-101-6051 Portion of local

assistance budget

2007-08 Budget Act $1,600,000 B0612Santa Monica Bay Restoration

Commission

Enacted 2007-08

3940-101-6051 Portion of local

assistance budget:

Reversion

2007-08 Budget Act ($1,600,000) B0612Santa Monica Bay Restoration

Commission

Enacted 2011-12

3940-101-6051 Portion of local

assistance budget

2008-09 Budget Act $9,812,500 B0612Santa Monica Bay Restoration

Commission

Enacted 2008-09

3940-101-6051 Portion of local

assistance budget:

Reversion

2008-09 Budget Act ($5,770,000) B0612Santa Monica Bay Restoration

Commission

Enacted 2011-12

3940-101-6051 Portion of local

assistance budget

2011-12 Budget Act $6,000,000 B0612Santa Monica Bay Restoration

Commission

Enacted 2011-12

3940-101-6051 Portion of local

assistance budget

2013-14 Budget Act $6,427,500 B0612Santa Monica Bay Restoration

Commission

Enacted 2013-14

Wednesday, January 29, Page 255 of 3421:20:09 PM Public Resources Code (PRC) Section PRC §75060(a), ref 2Ch. 7Prop 84 Report

Page 259: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3940-101-6051 Portion of local

assistance budget:

Reversion

2013-14 Budget Act ($6,427,500) B0612Santa Monica Bay Restoration

Commission

Enacted 2015-16

3940-101-6051 Portion of local

assistance budget

2015-16 Budget Act $6,428,000 B0612Santa Monica Bay Restoration

Commission

Enacted 2015-16

3940-101-6051 Portion of local

assistance budget:

Reappropriation

(decrease)

2015-16 Budget Act ($6,428,000) B0612Santa Monica Bay Restoration

Commission

Enacted 2015-16

3940-101-6051 Portion of local

assistance budget:

Reappropriation

(increase)

2015-16 Budget Act $6,428,000 B0612Santa Monica Bay Restoration

Commission

Enacted 2018-19

Sum: $17,354,062Enacted

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3940-101-6051 Portion of local

assistance budget:

Reappropriation

(decrease)

2008-09 Budget Act ($4,042,500) B0612Santa Monica Bay Restoration

Commission

Enacted/Not 2016-17

3940-101-6051 Portion of local

assistance budget:

Reappropriation

(increase)

2008-09 Budget Act $4,042,500 B0612Santa Monica Bay Restoration

Commission

Enacted/Not 2019-20

3940-101-6051 Portion of local

assistance budget:

Reappropriation

(decrease)

2011-12 Budget Act ($6,000,000) B0612Santa Monica Bay Restoration

Commission

Enacted/Not 2016-17

3940-101-6051 Portion of local

assistance budget:

Reappropriation

(increase)

2011-12 Budget Act $6,000,000 B0612Santa Monica Bay Restoration

Commission

Enacted/Not 2019-20

Sum: $0Enacted/Not Posted

Sum: $17,354,062

$15,938

Balance for Santa Monica Bay Restoration Commission projects:

Wednesday, January 29, Page 256 of 3421:20:09 PM Public Resources Code (PRC) Section PRC §75060(a), ref 2Ch. 7Prop 84 Report

Page 260: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

Protection of Beaches, Bays and Coastal WatersChapter 7

Allocation: Clean Beaches projects

Allocation $: $37,000,000$192,602

$381,351Statewide Set Asides: $573,953 {

Outyear Obligations: $0

$0

$0

{

PRC §75060(a), unspecifiedCh. 7

Appropriations, Proposals and Reversions

Statewide, requiring appropriation:

Statewide, not requiring appropriation:

Outyear Program Delivery commitments:

Outyear Cap. Outlay (to complete started projects):Reversions are shown below$0

Outyear Local Asst. commitments:

Matching grants for protecting beaches and coastal waters from pollution and toxic contamination pursuant to the Clean Beaches Program. May or may not be for

grants to local public agencies to assist in compliance with discharge prohibition into Areas of Special Biological Significance.

Dept.: State Water Resources Control

Board

Other Outyear Support commitments:$0

Committed

$0

$0

$0

$0

Proposed

$0

Prop 1 Reduction $721,047

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3940-001-6051 Portion of support

budget

2007-08 Budget Act $517,267 B0981Clean Beaches ProgramEnacted 2007-08

3940-001-6051 Portion of support

budget: Natural

Reversion

2007-08 Natural

Reversion

($300,470) B0981Clean Beaches ProgramEnacted 2009-10

3940-001-6051 Portion of support

budget

2008-09 Budget Act $824,259 B0981Clean Beaches ProgramEnacted 2008-09

3940-001-6051 Portion of support

budget: Reversion

2008-09 Budget Act ($124,624) B0981Clean Beaches ProgramEnacted 2010-11

3940-001-6051 Portion of support

budget

2009-10 Budget Act $508,474 B0981Clean Beaches ProgramEnacted 2009-10

3940-001-6051 Portion of support

budget: Control Section

Adjustment

2009-10 Control

Section

Adjustment

($254,237) B0981Clean Beaches ProgramEnacted 2009-10

3940-001-6051 Portion of support

budget: Reversion

2009-10 Budget Act ($254,237) B0981Clean Beaches ProgramEnacted 2010-11

3940-001-6051 Portion of support

budget

2010-11 Budget Act $254,237 B0981Clean Beaches ProgramEnacted 2010-11

3940-001-6051 Portion of support

budget: Control Section

Adjustment

2010-11 Control

Section

Adjustment

($3,450) B0981Clean Beaches ProgramEnacted 2010-11

3940-001-6051 Portion of support

budget: Reversion

2010-11 Budget Act ($250,787) B0981Clean Beaches ProgramEnacted 2012-13

3940-001-6051 Portion of support

budget

2011-12 Budget Act $253,237 B0981Clean Beaches ProgramEnacted 2011-12

Wednesday, January 29, Page 257 of 3421:20:09 PM Public Resources Code (PRC) Section PRC §75060(a), unspecifiedCh. 7Prop 84 Report

Page 261: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3940-001-6051 Portion of support

budget: Control Section

Adjustment

2011-12 Control

Section

Adjustment

($1,050) B0981Clean Beaches ProgramEnacted 2011-12

3940-001-6051 Portion of support

budget: Reversion

2011-12 Budget Act ($252,187) B0981Clean Beaches ProgramEnacted 2013-14

3940-001-6051 Portion of support

budget

2012-13 Budget Act $253,200 B0981Clean Beaches ProgramEnacted 2012-13

3940-001-6051 Portion of support

budget: Control Section

Adjustment

2012-13 Control

Section

Adjustment

($756) B0981Clean Beaches ProgramEnacted 2012-13

3940-001-6051 Portion of support

budget: Natural

Reversion

2012-13 Natural

Reversion

($18,616) B0981Clean Beaches ProgramEnacted 2014-15

3940-001-6051 Portion of support

budget: Reversion

2012-13 Budget Act ($116,890) B0981Clean Beaches ProgramEnacted 2014-15

3940-001-6051 Portion of support

budget

2013-14 Budget Act $253,200 B0981Clean Beaches ProgramEnacted 2013-14

3940-001-6051 Portion of support

budget: Natural

Reversion

2013-14 Natural

Reversion

($10,363) B0981Clean Beaches ProgramEnacted 2015-16

3940-001-6051 Portion of support

budget

2014-15 Budget Act $422,000 B0981Clean Beaches ProgramEnacted 2014-15

3940-001-6051 Portion of support

budget: Natural

Reversion

2014-15 Natural

Reversion

($11,747) B0981Clean Beaches ProgramEnacted 2016-17

3940-001-6051 Portion of support

budget

2015-16 Budget Act $205,200 B0981Clean Beaches ProgramEnacted 2015-16

3940-001-6051 Portion of support

budget: Reversion

2015-16 Budget Act ($100,095) B0981Clean Beaches ProgramEnacted 2016-17

3940-001-6051 Portion of support

budget

2016-17 Budget Act $13,000 B0981Clean Beaches ProgramEnacted 2016-17

3940-001-6051 Portion of support

budget: Natural

Reversion

2016-17 Natural

Reversion

($424) B0981Clean Beaches ProgramEnacted 2018-19

3940-001-6051 Portion of support

budget

2017-18 Budget Act $28,000 B0981Clean Beaches ProgramEnacted 2017-18

3940-101-6051 Portion of local

assistance budget

2007-08 Budget Act $6,399,999 B0982Clean Beaches ProgramEnacted 2007-08

3940-101-6051 Portion of local

assistance budget

2008-09 Budget Act $14,000,000 B0982Clean Beaches ProgramEnacted 2008-09

3940-101-6051 Portion of local

assistance budget:

Reversion

2008-09 Budget Act ($9,756,750) B0982Clean Beaches ProgramEnacted 2011-12

3940-101-6051 Portion of local

assistance budget

2011-12 Budget Act $3,448,500 B0982Clean Beaches ProgramEnacted 2011-12

3940-101-6051 Portion of local

assistance budget

2013-14 Budget Act $7,966,500 B0982Clean Beaches ProgramEnacted 2013-14

Wednesday, January 29, Page 258 of 3421:20:09 PM Public Resources Code (PRC) Section PRC §75060(a), unspecifiedCh. 7Prop 84 Report

Page 262: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3940-101-6051 Portion of local

assistance budget:

Reversion

2013-14 Budget Act ($7,966,500) B0982Clean Beaches ProgramEnacted 2015-16

3940-101-6051 Portion of local

assistance budget

2014-15 Budget Act $11,796,524 B0982Clean Beaches ProgramEnacted 2014-15

3940-101-6051 Portion of local

assistance budget

2015-16 Budget Act $4,677,000 B0982Clean Beaches ProgramEnacted 2015-16

3940-101-6051 Portion of local

assistance budget:

Reappropriation

(decrease)

2015-16 Budget Act ($4,677,000) B0982Clean Beaches ProgramEnacted 2015-16

3940-101-6051 Portion of local

assistance budget:

Reappropriation

(increase)

2015-16 Budget Act $4,677,000 B0982Clean Beaches ProgramEnacted 2018-19

3940-101-6051 Portion of local

assistance budget

2016-17 Budget Act $3,289,000 B0982Clean Beaches ProgramEnacted 2016-17

Sum: $35,686,414Enacted

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3940-101-6051 Portion of local

assistance budget:

Reappropriation

(decrease)

2007-08 Budget Act ($6,399,999) B0982Clean Beaches ProgramEnacted/Not 2016-17

3940-101-6051 Portion of local

assistance budget:

Reappropriation

(increase)

2007-08 Budget Act $6,399,999 B0982Clean Beaches ProgramEnacted/Not 2019-20

3940-101-6051 Portion of local

assistance budget:

Reappropriation

(decrease)

2011-12 Budget Act ($3,448,500) B0982Clean Beaches ProgramEnacted/Not 2016-17

3940-101-6051 Portion of local

assistance budget:

Reappropriation

(increase)

2011-12 Budget Act $3,448,500 B0982Clean Beaches ProgramEnacted/Not 2019-20

3940-101-6051 Portion of local

assistance budget:

Reappropriation

(decrease)

2014-15 Budget Act ($11,796,524) B0982Clean Beaches ProgramEnacted/Not 2016-17

3940-101-6051 Portion of local

assistance budget:

Reappropriation

(increase)

2014-15 Budget Act $11,796,524 B0982Clean Beaches ProgramEnacted/Not 2019-20

3940-101-6051 Portion of local

assistance budget:

Reappropriation

(decrease)

2016-17 Budget Act ($3,289,000) B0982Clean Beaches ProgramEnacted/Not 2016-17

Wednesday, January 29, Page 259 of 3421:20:09 PM Public Resources Code (PRC) Section PRC §75060(a), unspecifiedCh. 7Prop 84 Report

Page 263: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3940-101-6051 Portion of local

assistance budget:

Reappropriation

(increase)

2016-17 Budget Act $3,289,000 B0982Clean Beaches ProgramEnacted/Not 2019-20

Sum: $0Enacted/Not Posted

Sum: $35,686,414

$18,586

Balance for Clean Beaches projects:

Wednesday, January 29, Page 260 of 3421:20:09 PM Public Resources Code (PRC) Section PRC §75060(a), unspecifiedCh. 7Prop 84 Report

Page 264: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

Protection of Beaches, Bays and Coastal WatersChapter 7

Allocation: State Coastal Conservancy projects

Allocation $: $135,000,000$702,737

$1,391,417Statewide Set Asides: $2,094,154 {

Outyear Obligations: $2,860,000

$0

$0

{

PRC §75060(b)Ch. 7

Appropriations, Proposals and Reversions

Statewide, requiring appropriation:

Statewide, not requiring appropriation:

Outyear Program Delivery commitments:

Outyear Cap. Outlay (to complete started projects):Reversions are shown below$0

Outyear Local Asst. commitments:

For State Coastal Conservancy projects.

Dept.: State Coastal Conservancy

Other Outyear Support commitments:$2,860,000

Committed

$0

$0

$0

$0

Proposed

$0

Prop 1 Reduction $2,630,846

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3760-001-6051 Portion of support

budget

2007-08 Budget Act $186,000 B0621Coastal Conservancy ProgramsEnacted 2007-08

3760-001-6051 Portion of support

budget: Budget Revision

2007-08 Budget

Revision

$0 B0621Coastal Conservancy ProgramsEnacted 2007-08

3760-001-6051 Portion of support

budget: Control Section

Adjustment

2007-08 Control

Section

Adjustment

$4,722 B0621Coastal Conservancy ProgramsEnacted 2007-08

3760-001-6051 Portion of support

budget: Natural

Reversion

2007-08 Natural

Reversion

($94) B0621Coastal Conservancy ProgramsEnacted 2009-10

3760-001-6051 Portion of support

budget

2008-09 Budget Act $192,360 B0621Coastal Conservancy ProgramsEnacted 2008-09

3760-001-6051 Portion of support

budget: Control Section

Adjustment

2008-09 Control

Section

Adjustment

($3,940) B0621Coastal Conservancy ProgramsEnacted 2008-09

3760-001-6051 Portion of support

budget

2009-10 Budget Act $685,160 B0621Coastal Conservancy ProgramsEnacted 2009-10

3760-001-6051 Portion of support

budget: Control Section

Adjustment

2009-10 Control

Section

Adjustment

($53,247) B0621Coastal Conservancy ProgramsEnacted 2009-10

3760-001-6051 Portion of support

budget

2010-11 Budget Act $345,192 B0621Coastal Conservancy ProgramsEnacted 2010-11

3760-001-6051 Portion of support

budget

2010-11 Budget Act $151,828 B0622Coastal Conservancy ProgramsEnacted 2010-11

Wednesday, January 29, Page 261 of 3421:20:09 PM Public Resources Code (PRC) Section PRC §75060(b)Ch. 7Prop 84 Report

Page 265: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3760-001-6051 Portion of support

budget: Control Section

Adjustment

2010-11 Control

Section

Adjustment

($17,476) B0621Coastal Conservancy ProgramsEnacted 2010-11

3760-001-6051 Portion of support

budget

2011-12 Budget Act $865,772 B0621Coastal Conservancy ProgramsEnacted 2011-12

3760-001-6051 Portion of support

budget

2011-12 Budget Act $297,048 B0622Coastal Conservancy ProgramsEnacted 2011-12

3760-001-6051 Portion of support

budget: Control Section

Adjustment

2011-12 Control

Section

Adjustment

($23,216) B0621Coastal Conservancy ProgramsEnacted 2011-12

3760-001-6051 Portion of support

budget: Natural

Reversion

2011-12 Natural

Reversion

($548,402) B0621Coastal Conservancy ProgramsEnacted 2013-14

3760-001-6051 Portion of support

budget

2012-13 Budget Act $364,121 B0621Coastal Conservancy ProgramsEnacted 2012-13

3760-001-6051 Portion of support

budget

2012-13 Budget Act $285,879 B0622Coastal Conservancy ProgramsEnacted 2012-13

3760-001-6051 Portion of support

budget: Control Section

Adjustment

2012-13 Control

Section

Adjustment

($40,886) B0621Coastal Conservancy ProgramsEnacted 2012-13

3760-001-6051 Portion of support

budget

2013-14 Budget Act $466,898 B0622Coastal Conservancy ProgramsEnacted 2013-14

3760-001-6051 Portion of support

budget - Planning

2013-14 Budget Act $98,102 B0623Coastal Conservancy ProgramsEnacted 2013-14

3760-001-6051 Portion of support

budget: Control Section

Adjustment

2013-14 Control

Section

Adjustment

$67,881 B0622Coastal Conservancy ProgramsEnacted 2013-14

3760-001-6051 Portion of support

budget

2014-15 Budget Act $1,881,555 B0621Coastal Conservancy ProgramsEnacted 2014-15

3760-001-6051 Portion of support

budget

2014-15 Budget Act $718,445 B0622Coastal Conservancy ProgramsEnacted 2014-15

3760-001-6051 Portion of support

budget: Control Section

Adjustment

2014-15 Control

Section

Adjustment

$131,831 B0621Coastal Conservancy ProgramsEnacted 2014-15

3760-001-6051 Portion of support

budget

2015-16 Budget Act $1,442,418 B0621Coastal Conservancy ProgramsEnacted 2015-16

3760-001-6051 Portion of support

budget

2015-16 Budget Act $757,582 B0622Coastal Conservancy ProgramsEnacted 2015-16

3760-001-6051 Portion of support

budget

2016-17 Budget Act $75,000 B0623Coastal Conservancy ProgramsEnacted 2016-17

3760-001-6051 Portion of support

budget

2016-17 Budget Act $425,000 B0621Coastal Conservancy ProgramsEnacted 2016-17

3760-001-6051 Portion of support

budget

2016-17 Budget Act $500,000 B0622Coastal Conservancy ProgramsEnacted 2016-17

3760-001-6051 Portion of support

budget

2017-18 Budget Act $600,000 B0621Coastal Conservancy ProgramsEnacted 2017-18

3760-001-6051 Portion of support

budget: Control Section

Adjustment

2017-18 Control

Section

Adjustment

$67,000 B0621Coastal Conservancy ProgramsEnacted 2017-18

Wednesday, January 29, Page 262 of 3421:20:10 PM Public Resources Code (PRC) Section PRC §75060(b)Ch. 7Prop 84 Report

Page 266: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3760-001-6051 Portion of support

budget

2018-19 Budget Act $673,000 B0623Coastal Conservancy ProgramsEnacted 2018-19

3760-001-6051 Portion of support

budget: Control Section

Adjustment

2018-19 Control

Section

Adjustment

$60,000 B0623Coastal Conservancy ProgramsEnacted 2018-19

3760-001-6051 Portion of support

budget

2019-20 Budget Act $715,000 B0623Coastal Conservancy ProgramsEnacted 2019-20

3760-101-6051 (1) Portion of local

assistance budget

2016-17 Budget Act $500,000 B0623Coastal Conservancy ProgramsEnacted 2016-17

3760-101-6051 (1) Portion of local

assistance budget

2016-17 Budget Act $16,939,000 B0622Coastal Conservancy ProgramsEnacted 2016-17

3760-101-6051 (1) Portion of local

assistance budget

2017-18 Budget Act $2,639,000 B0622Coastal Conservancy ProgramsEnacted 2017-18

3760-101-6051 (1) Portion of local

assistance budget

2018-19 Budget Act $7,561,000 B0622Coastal Conservancy ProgramsEnacted 2018-19

3760-101-6051 (1) Portion of local

assistance budget

2019-20 Budget Act $2,000,000 B0622Coastal Conservancy ProgramsEnacted 2019-20

3760-301-6051 Conservancy Programs:

Budget Revision

2007-08 Budget

Revision

$0 B0622Coastal Conservancy ProgramsEnacted 2007-08

3760-301-6051 (2) Conservancy Programs2007-08 Budget Act $35,093,000 B0622Coastal Conservancy ProgramsEnacted 2007-08

3760-301-6051 (2) Conservancy Programs:

Natural Reversion

2007-08 Natural

Reversion

($16,173,090) B0622Coastal Conservancy ProgramsEnacted 2011-12

3760-301-6051 Conservancy Programs2008-09 Budget Act $35,000,000 B0622Coastal Conservancy ProgramsEnacted 2008-09

3760-301-6051 Conservancy Programs:

Natural Reversion

2008-09 Natural

Reversion

($6,647,673) B0622Coastal Conservancy ProgramsEnacted 2015-16

3760-301-6051 Conservancy Programs:

Refund to Reverted

2008-09 ($6,553) B0622Coastal Conservancy ProgramsEnacted 2016-17

3760-301-6051 Conservancy Programs2009-10 Budget Act $38,697,000 B0622Coastal Conservancy ProgramsEnacted 2009-10

3760-301-6051 Conservancy Programs:

Natural Reversion

2009-10 Natural

Reversion

($1,457,483) B0622Coastal Conservancy ProgramsEnacted 2016-17

3760-301-6051 Conservancy Programs:

Reversion

2009-10 Budget Act ($16,594,678) B0622Coastal Conservancy ProgramsEnacted 2016-17

3760-301-6051 Conservancy Programs:

Reversion Reversal

2009-10 Natural

Reversion

$117,562 B0622Coastal Conservancy ProgramsEnacted 2017-18

3760-301-6051 Conservancy Programs2010-11 Budget Act $10,590,000 B0622Coastal Conservancy ProgramsEnacted 2010-11

3760-301-6051 Conservancy Programs2013-14 Budget Act $4,000,000 B0622Coastal Conservancy ProgramsEnacted 2013-14

Sum: $123,627,618Enacted

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3760-001-6051 (1) Portion of support

budget

2020-21 Budget Act $715,000 B0623Coastal Conservancy ProgramsProposed 2020-21

3760-101-6051 (1) Portion of local

assistance budget

2020-21 Budget Act $3,072,000 B0622Coastal Conservancy ProgramsProposed 2020-21

Sum: $3,787,000Proposed

Wednesday, January 29, Page 263 of 3421:20:10 PM Public Resources Code (PRC) Section PRC §75060(b)Ch. 7Prop 84 Report

Page 267: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

Sum: $127,414,618

$382

Balance for State Coastal Conservancy projects:

Wednesday, January 29, Page 264 of 3421:20:10 PM Public Resources Code (PRC) Section PRC §75060(b)Ch. 7Prop 84 Report

Page 268: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

Protection of Beaches, Bays and Coastal WatersChapter 7

Allocation: San Francisco Bay Area Conservancy

Allocation $: $86,400,000$449,751

$890,507Statewide Set Asides: $1,340,258 {

Outyear Obligations: $1,200,000

$0

$0

{

PRC §75060(c), ref 1Ch. 7

Appropriations, Proposals and Reversions

Statewide, requiring appropriation:

Statewide, not requiring appropriation:

Outyear Program Delivery commitments:

Outyear Cap. Outlay (to complete started projects):Reversions are shown below$0

Outyear Local Asst. commitments:

Available for the San Francisco Bay Area Conservancy. This portion may include projects in watersheds draining directly to the Pacific Ocean.

Dept.: State Coastal Conservancy

Other Outyear Support commitments:$1,200,000

Committed

$0

$0

$0

$0

Proposed

$0

Prop 1 Reduction $1,683,742

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3760-001-6051 Portion of support

budget

2007-08 Budget Act $149,000 B0631San Francisco Bay Area

Conservancy Program

Enacted 2007-08

3760-001-6051 Portion of support

budget: Control Section

Adjustment

2007-08 Control

Section

Adjustment

$4,627 B0631San Francisco Bay Area

Conservancy Program

Enacted 2007-08

3760-001-6051 Portion of support

budget

2008-09 Budget Act $153,640 B0631San Francisco Bay Area

Conservancy Program

Enacted 2008-09

3760-001-6051 Portion of support

budget

2009-10 Budget Act $481,840 B0631San Francisco Bay Area

Conservancy Program

Enacted 2009-10

3760-001-6051 Portion of support

budget: Control Section

Adjustment

2009-10 Control

Section

Adjustment

($37,445) B0631San Francisco Bay Area

Conservancy Program

Enacted 2009-10

3760-001-6051 Portion of support

budget

2010-11 Budget Act $345,404 B0631San Francisco Bay Area

Conservancy Program

Enacted 2010-11

3760-001-6051 Portion of support

budget

2010-11 Budget Act $157,576 B0632San Francisco Bay Area

Conservancy Program

Enacted 2010-11

3760-001-6051 Portion of support

budget

2011-12 Budget Act $767,473 B0631San Francisco Bay Area

Conservancy Program

Enacted 2011-12

3760-001-6051 Portion of support

budget

2011-12 Budget Act $409,607 B0632San Francisco Bay Area

Conservancy Program

Enacted 2011-12

3760-001-6051 Portion of support

budget: Control Section

Adjustment

2011-12 Control

Section

Adjustment

($34,003) B0631San Francisco Bay Area

Conservancy Program

Enacted 2011-12

Wednesday, January 29, Page 265 of 3421:20:10 PM Public Resources Code (PRC) Section PRC §75060(c), ref 1Ch. 7Prop 84 Report

Page 269: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3760-001-6051 Portion of support

budget: Natural

Reversion

2011-12 Natural

Reversion

($470,597) B0631San Francisco Bay Area

Conservancy Program

Enacted 2013-14

3760-001-6051 Portion of support

budget

2012-13 Budget Act $190,019 B0631San Francisco Bay Area

Conservancy Program

Enacted 2012-13

3760-001-6051 Portion of support

budget

2012-13 Budget Act $309,981 B0632San Francisco Bay Area

Conservancy Program

Enacted 2012-13

3760-001-6051 Portion of support

budget

2013-14 Budget Act $107,110 B0631San Francisco Bay Area

Conservancy Program

Enacted 2013-14

3760-001-6051 Portion of support

budget

2013-14 Budget Act $647,021 B0632San Francisco Bay Area

Conservancy Program

Enacted 2013-14

3760-001-6051 Portion of support

budget - Planning

2013-14 Budget Act $45,869 B0633San Francisco Bay Area

Conservancy Program

Enacted 2013-14

3760-001-6051 Portion of support

budget

2014-15 Budget Act $281,594 B0631San Francisco Bay Area

Conservancy Program

Enacted 2014-15

3760-001-6051 Portion of support

budget

2014-15 Budget Act $318,406 B0632San Francisco Bay Area

Conservancy Program

Enacted 2014-15

3760-001-6051 Portion of support

budget

2015-16 Budget Act $576,941 B0631San Francisco Bay Area

Conservancy Program

Enacted 2015-16

3760-001-6051 Portion of support

budget

2015-16 Budget Act $423,059 B0632San Francisco Bay Area

Conservancy Program

Enacted 2015-16

3760-001-6051 Portion of support

budget

2016-17 Budget Act $50,000 B0633San Francisco Bay Area

Conservancy Program

Enacted 2016-17

3760-001-6051 Portion of support

budget

2016-17 Budget Act $150,000 B0631San Francisco Bay Area

Conservancy Program

Enacted 2016-17

3760-001-6051 Portion of support

budget

2016-17 Budget Act $300,000 B0632San Francisco Bay Area

Conservancy Program

Enacted 2016-17

3760-001-6051 Portion of support

budget: Control Section

Adjustment

2016-17 Control

Section

Adjustment

$94,000 B0631San Francisco Bay Area

Conservancy Program

Enacted 2016-17

3760-001-6051 Portion of support

budget

2017-18 Budget Act $300,000 B0631San Francisco Bay Area

Conservancy Program - Coastal

Watershed

Enacted 2017-18

3760-001-6051 Portion of support

budget

2018-19 Budget Act $300,000 B0633San Francisco Bay Area

Conservancy Program - Coastal

Watershed

Enacted 2018-19

3760-001-6051 Portion of support

budget

2019-20 Budget Act $300,000 B0633San Francisco Bay Area

Conservancy Program - Coastal

Watershed

Enacted 2019-20

3760-101-6051 Conservancy Programs2015-16 Budget Act $1,500,000 B0632San Francisco Bay Area

Conservancy Program

Enacted 2015-16

3760-101-6051 (1) Portion of local

assistance budget

2016-17 Budget Act $300,000 B0633San Francisco Bay Area

Conservancy Program

Enacted 2016-17

3760-101-6051 (1) Portion of local

assistance budget

2016-17 Budget Act $1,700,000 B0632San Francisco Bay Area

Conservancy Program

Enacted 2016-17

3760-101-6051 (1) Portion of local

assistance budget

2017-18 Budget Act $2,000,000 B0632San Francisco Bay Area

Conservancy Program - Coastal

Watershed

Enacted 2017-18

Wednesday, January 29, Page 266 of 3421:20:10 PM Public Resources Code (PRC) Section PRC §75060(c), ref 1Ch. 7Prop 84 Report

Page 270: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3760-101-6051 (1) Portion of local

assistance budget

2019-20 Budget Act $1,500,000 B0632San Francisco Bay Area

Conservancy Program - Coastal

Watershed

Enacted 2019-20

3760-30104-60 Conservancy

Programs: Natural

Heritage Preservation

Tax Credit

2012-13 $1,000,000 B0632Natural Heritage Preservation Tax

Credit

Enacted 2015-16

3760-301-6051 (2) Conservancy Programs2007-08 Budget Act $18,555,000 B0632San Francisco Bay Area

Conservancy Program

Enacted 2007-08

3760-301-6051 (2) Conservancy Programs:

Natural Reversion

2007-08 Natural

Reversion

($2,690,970) B0632San Francisco Bay Area

Conservancy Program

Enacted 2011-12

3760-301-6051 Conservancy Programs2008-09 Budget Act $19,116,549 B0632San Francisco Bay Area

Conservancy Program

Enacted 2008-09

3760-301-6051 Conservancy Programs:

Natural Reversion

2008-09 Natural

Reversion

($961,352) B0632San Francisco Bay Area

Conservancy Program

Enacted 2015-16

3760-301-6051 Conservancy Programs2009-10 Budget Act $19,038,800 B0632San Francisco Bay Area

Conservancy Program

Enacted 2009-10

3760-301-6051 Conservancy Programs:

Natural Reversion

2009-10 Natural

Reversion

($172,077) B0632San Francisco Bay Area

Conservancy Program

Enacted 2016-17

3760-301-6051 Conservancy Programs:

Reversion

2009-10 Budget Act ($608,394) B0632San Francisco Bay Area

Conservancy Program

Enacted 2016-17

3760-301-6051 Conservancy Programs2010-11 Budget Act $8,161,600 B0632San Francisco Bay Area

Conservancy Program

Enacted 2010-11

3760-301-6051 Conservancy Programs2012-13 Budget Act $8,000,000 B0632San Francisco Bay Area

Conservancy Program

Enacted 2012-13

3760-301-6051 Conservancy

Programs: Transfer for

Natural Heritage

Preservation Tax Credit

2012-13 ($1,000,000) B0632San Francisco Bay Area

Conservancy Program

Enacted 2015-16

3760-301-6051 Conservancy Programs:

Natural Reversion

2012-13 Natural

Reversion

($3,147,622) B0632San Francisco Bay Area

Conservancy Program

Enacted 2016-17

3760-301-6051 Conservancy Programs:

Reversion Reversal

2012-13 Natural

Reversion

$500,000 B0632San Francisco Bay Area

Conservancy Program

Enacted 2017-18

3760-301-6051 Conservancy Programs2013-14 Budget Act $1,184,051 B0632San Francisco Bay Area

Conservancy Program

Enacted 2013-14

Sum: $80,296,708Enacted

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3760-001-6051 (1) Portion of support

budget

2020-21 Budget Act $300,000 B0633San Francisco Bay Area

Conservancy Program - Coastal

Watershed

Proposed 2020-21

3760-101-6051 (1) Portion of local

assistance budget

2020-21 Budget Act $1,579,000 B0632San Francisco Bay Area

Conservancy Program - Coastal

Watershed

Proposed 2020-21

Sum: $1,879,000Proposed

Wednesday, January 29, Page 267 of 3421:20:10 PM Public Resources Code (PRC) Section PRC §75060(c), ref 1Ch. 7Prop 84 Report

Page 271: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

Sum: $82,175,708

$292

Balance for San Francisco Bay Area Conservancy:

Wednesday, January 29, Page 268 of 3421:20:10 PM Public Resources Code (PRC) Section PRC §75060(c), ref 1Ch. 7Prop 84 Report

Page 272: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

Protection of Beaches, Bays and Coastal WatersChapter 7

Allocation: San Francisco Bay Area Conservancy

Allocation $: $21,600,000$112,438

$222,627Statewide Set Asides: $335,065 {

Outyear Obligations: $800,000

$0

$0

{

PRC §75060(c), ref 2Ch. 7

Appropriations, Proposals and Reversions

Statewide, requiring appropriation:

Statewide, not requiring appropriation:

Outyear Program Delivery commitments:

Outyear Cap. Outlay (to complete started projects):Reversions are shown below$0

Outyear Local Asst. commitments:

Available for the San Francisco Bay Area Conservancy. This portion equals not less than 20% of the entire $108,000,000 allocated by this paragraph to be

expended on projects in watersheds draining directly to the Pacific.

Dept.: State Coastal Conservancy

Other Outyear Support commitments:$800,000

Committed

$0

$0

$0

$0

Proposed

$0

Prop 1 Reduction $420,935

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3760-001-6051 Portion of support

budget

2015-16 Budget Act $493,325 B0641San Francisco Bay Area

Conservancy Program - Coastal

Watershed

Enacted 2015-16

3760-001-6051 Portion of support

budget

2015-16 Budget Act $56,675 B0642San Francisco Bay Area

Conservancy Program - Coastal

Watershed

Enacted 2015-16

3760-001-6051 Portion of support

budget: Control Section

Adjustment

2015-16 Control

Section

Adjustment

$122,000 B0641San Francisco Bay Area

Conservancy Program - Coastal

Watershed

Enacted 2015-16

3760-001-6051 Portion of support

budget

2016-17 Budget Act $25,000 B0643San Francisco Bay Area

Conservancy Program - Coastal

Watershed

Enacted 2016-17

3760-001-6051 Portion of support

budget

2016-17 Budget Act $367,000 B0641San Francisco Bay Area

Conservancy Program - Coastal

Watershed

Enacted 2016-17

3760-001-6051 Portion of support

budget

2016-17 Budget Act $100,000 B0642San Francisco Bay Area

Conservancy Program - Coastal

Watershed

Enacted 2016-17

3760-001-6051 Portion of support

budget

2017-18 Budget Act $200,000 B0641San Francisco Bay Area

Conservancy Program - Coastal

Watershed

Enacted 2017-18

3760-001-6051 Portion of support

budget

2018-19 Budget Act $200,000 B0643San Francisco Bay Area

Conservancy Program - Coastal

Watershed

Enacted 2018-19

Wednesday, January 29, Page 269 of 3421:20:10 PM Public Resources Code (PRC) Section PRC §75060(c), ref 2Ch. 7Prop 84 Report

Page 273: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3760-001-6051 Portion of support

budget

2019-20 Budget Act $200,000 B0643San Francisco Bay Area

Conservancy Program - Coastal

Watershed

Enacted 2019-20

3760-101-6051 (1) Portion of local

assistance budget

2016-17 Budget Act $1,000,000 B0642San Francisco Bay Area

Conservancy Program - Coastal

Watershed

Enacted 2016-17

3760-101-6051 (1) Portion of local

assistance budget

2017-18 Budget Act $1,500,000 B0642San Francisco Bay Area

Conservancy Program - Coastal

Watershed

Enacted 2017-18

3760-101-6051 (1) Portion of local

assistance budget

2019-20 Budget Act $1,500,000 B0642San Francisco Bay Area

Conservancy Program - Coastal

Watershed

Enacted 2019-20

3760-301-6051 (2) Conservancy Programs2007-08 Budget Act $4,740,000 B0642San Francisco Bay Area

Conservancy Program - Coastal

Watershed

Enacted 2007-08

3760-301-6051 (2) Conservancy Programs:

Natural Reversion

2007-08 Natural

Reversion

($2,471,857) B0642San Francisco Bay Area

Conservancy Program - Coastal

Watershed

Enacted 2011-12

3760-301-6051 Conservancy Programs2008-09 Budget Act $4,883,451 B0642San Francisco Bay Area

Conservancy Program - Coastal

Watershed

Enacted 2008-09

3760-301-6051 Conservancy Programs:

Natural Reversion

2008-09 Natural

Reversion

($1,013,354) B0642San Francisco Bay Area

Conservancy Program - Coastal

Watershed

Enacted 2015-16

3760-301-6051 Conservancy Programs2009-10 Budget Act $4,759,200 B0642San Francisco Bay Area

Conservancy Program - Coastal

Watershed

Enacted 2009-10

3760-301-6051 Conservancy Programs:

Natural Reversion

2009-10 Natural

Reversion

($150,000) B0642San Francisco Bay Area

Conservancy Program - Coastal

Watershed

Enacted 2016-17

3760-301-6051 Conservancy Programs:

Reversion

2009-10 Budget Act ($1,215,536) B0642San Francisco Bay Area

Conservancy Program - Coastal

Watershed

Enacted 2016-17

3760-301-6051 Conservancy Programs:

Reversion Reversal

2009-10 Natural

Reversion

$150,000 B0642San Francisco Bay Area

Conservancy Program - Coastal

Watershed

Enacted 2017-18

3760-301-6051 Conservancy Programs2010-11 Budget Act $2,040,400 B0642San Francisco Bay Area

Conservancy Program - Coastal

Watershed

Enacted 2010-11

3760-301-6051 Conservancy Programs2012-13 Budget Act $2,000,000 B0642San Francisco Bay Area

Conservancy Program - Coastal

Watershed

Enacted 2012-13

3760-301-6051 Conservancy Programs:

Natural Reversion

2012-13 Natural

Reversion

($1,177,229) B0642San Francisco Bay Area

Conservancy Program - Coastal

Watershed

Enacted 2016-17

3760-301-6051 Conservancy Programs2013-14 Budget Act $2,340,949 B0642San Francisco Bay Area

Conservancy Program - Coastal

Watershed

Enacted 2013-14

Sum: $20,650,024Enacted

Wednesday, January 29, Page 270 of 3421:20:10 PM Public Resources Code (PRC) Section PRC §75060(c), ref 2Ch. 7Prop 84 Report

Page 274: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3760-001-6051 (1) Portion of support

budget

2020-21 Budget Act $200,000 B0643San Francisco Bay Area

Conservancy Program - Coastal

Watershed

Proposed 2020-21

Sum: $200,000Proposed

Sum: $20,850,024

($806,024)

Balance for San Francisco Bay Area Conservancy:

Wednesday, January 29, Page 271 of 3421:20:10 PM Public Resources Code (PRC) Section PRC §75060(c), ref 2Ch. 7Prop 84 Report

Page 275: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

Protection of Beaches, Bays and Coastal WatersChapter 7

Allocation: Santa Monica Bay and its watersheds

Allocation $: $20,000,000$104,109

$206,136Statewide Set Asides: $310,245 {

Outyear Obligations: $0

$0

$0

{

PRC §75060(d)(1)Ch. 7

Appropriations, Proposals and Reversions

Statewide, requiring appropriation:

Statewide, not requiring appropriation:

Outyear Program Delivery commitments:

Outyear Cap. Outlay (to complete started projects):Reversions are shown below$0

Outyear Local Asst. commitments:

Protection of Santa Monica Bay and its watersheds.

Dept.: Santa Monica Mountains

Conservancy

Other Outyear Support commitments:$0

Committed

$0

$0

$0

$0

Proposed

$0

Prop 1 Reduction $389,755

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3810-001-6051 Portion of support

budget

2007-08 Budget Act $167,000 B0651Program DeliveryEnacted 2007-08

3810-001-6051 Portion of support

budget: Control Section

Adjustment

2007-08 Control

Section

Adjustment

$5,744 B0651Program DeliveryEnacted 2007-08

3810-001-6051 Portion of support

budget: Natural

Reversion

2007-08 Natural

Reversion

($36,264) B0651Program DeliveryEnacted 2010-11

3810-001-6051 Portion of support

budget

2008-09 Budget Act $179,000 B0651Program DeliveryEnacted 2008-09

3810-001-6051 Portion of support

budget: Control Section

Adjustment

2008-09 Control

Section

Adjustment

($3,484) B0651Program DeliveryEnacted 2008-09

3810-001-6051 Portion of support

budget: Natural

Reversion

2008-09 Natural

Reversion

($82,871) B0651Program DeliveryEnacted 2010-11

3810-001-6051 Portion of support

budget

2009-10 Budget Act $182,240 B0651Program DeliveryEnacted 2009-10

3810-001-6051 Portion of support

budget: Control Section

Adjustment

2009-10 Control

Section

Adjustment

($11,470) B0651Program DeliveryEnacted 2009-10

3810-001-6051 Portion of support

budget: Natural

Reversion

2009-10 Natural

Reversion

($51,546) B0651Program DeliveryEnacted 2011-12

3810-001-6051 Portion of support

budget

2010-11 Budget Act $182,240 B0651Program DeliveryEnacted 2010-11

Wednesday, January 29, Page 272 of 3421:20:10 PM Public Resources Code (PRC) Section PRC §75060(d)(1)Ch. 7Prop 84 Report

Page 276: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3810-001-6051 Portion of support

budget: Control Section

Adjustment

2010-11 Control

Section

Adjustment

($4,333) B0651Program DeliveryEnacted 2010-11

3810-001-6051 Portion of support

budget: Natural

Reversion

2010-11 Natural

Reversion

($25,088) B0651Program DeliveryEnacted 2012-13

3810-001-6051 Portion of support

budget

2011-12 Budget Act $180,620 B0651Program DeliveryEnacted 2011-12

3810-001-6051 Portion of support

budget: Control Section

Adjustment

2011-12 Control

Section

Adjustment

($1,799) B0651Program DeliveryEnacted 2011-12

3810-001-6051 Portion of support

budget: Natural

Reversion

2011-12 Natural

Reversion

($14,826) B0651Program DeliveryEnacted 2013-14

3810-001-6051 (1) Portion of support

budget: Reversion

2011-12 Budget Act ($6,000) B0651Program DeliveryEnacted 2013-14

3810-001-6051 Portion of support

budget

2012-13 Budget Act $205,400 B0651Program DeliveryEnacted 2012-13

3810-001-6051 Portion of support

budget: Control Section

Adjustment

2012-13 Control

Section

Adjustment

($2,999) B0651Program DeliveryEnacted 2012-13

3810-001-6051 Portion of support

budget: Natural

Reversion

2012-13 Natural

Reversion

($61,579) B0651Program DeliveryEnacted 2014-15

3810-001-6051 Portion of support

budget

2013-14 Budget Act $136,500 B0651Program DeliveryEnacted 2013-14

3810-001-6051 Portion of support

budget: Control Section

Adjustment

2013-14 Control

Section

Adjustment

$1,500 B0651Program DeliveryEnacted 2013-14

3810-001-6051 Portion of support

budget: Natural

Reversion

2013-14 Natural

Reversion

($15) B0651Program DeliveryEnacted 2015-16

3810-001-6051 Portion of support

budget

2014-15 Budget Act $20,420 B0651Program DeliveryEnacted 2014-15

3810-001-6051 Portion of support

budget: Natural

Reversion

2014-15 Natural

Reversion

($30) B0651Program DeliveryEnacted 2016-17

3810-001-6051 Portion of support

budget

2015-16 Budget Act $17,680 B0651Program DeliveryEnacted 2015-16

3810-001-6051 Portion of support

budget: Natural

Reversion

2015-16 Natural

Reversion

($7,474) B0651Program DeliveryEnacted 2017-18

3810-001-6051 Portion of support

budget

2016-17 Budget Act $74,000 B0653Planning and Monitoring for

protection of Santa Monica Bay and

its watersheds.

Enacted 2016-17

3810-001-6051 Portion of support

budget: Control Section

Adjustments

2016-17 Control

Section

Adjustment

$1,000 B0653Planning and Monitoring for

protection of Santa Monica Bay and

its watersheds.

Enacted 2016-17

Wednesday, January 29, Page 273 of 3421:20:10 PM Public Resources Code (PRC) Section PRC §75060(d)(1)Ch. 7Prop 84 Report

Page 277: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3810-001-6051 Portion of support

budget: Natural

Reversion

2016-17 Natural

Reversion

($10,920) B0653Planning and Monitoring for

protection of Santa Monica Bay and

its watersheds.

Enacted 2018-19

3810-001-6051 Portion of support

budget

2017-18 Budget Act $51,000 B0653Planning and Monitoring for

protection of Santa Monica Bay and

its watersheds.

Enacted 2017-18

3810-001-6051 Portion of support

budget: Control Section

Adjustment

2017-18 Control

Section

Adjustment

$4,000 B0653Planning and Monitoring for

protection of Santa Monica Bay and

its watersheds.

Enacted 2017-18

3810-101-6051 Portion of local

assistance budget

2016-17 Budget Act $468,000 B0652Capital Outlay or Local Assistance

Grants for protection of Santa

Monica Bay and its watersheds.

Enacted 2016-17

3810-101-6051 Portion of local

assistance budget

2016-17 Budget Act $74,000 B0653Planning and Monitoring for

protection of Santa Monica Bay and

its watersheds.

Enacted 2016-17

3810-301-6051 (1) Capital Outlay and

Local Assistance

2007-08 Budget Act $7,000,000 B0652Acquisition and Local Assistance

Grants: Protection of Santa Monica

Bay and its watersheds.

Enacted 2007-08

3810-301-6051 (1) Capital Outlay and

Local Assistance:

Natural Reversion

2007-08 Natural

Reversion

($149,898) B0652Acquisition and Local Assistance

Grants: Protection of Santa Monica

Bay and its watersheds.

Enacted 2013-14

3810-301-6051 (2) Capital Outlay and

Local Assistance:

Reversion

2007-08 Budget Act ($6,198) B0652Acquisition and Local Assistance

Grants: Protection of Santa Monica

Bay and its watersheds.

Enacted 2013-14

3810-301-6051 Capital Outlay and

Local Assistance

2008-09 Budget Act $10,000,000 B0652Acquisition and Local Assistance

Grants: Protection of Santa Monica

Bay and its watersheds.

Enacted 2008-09

3810-301-6051 Capital Outlay and

Local Assistance:

Natural Reversion

2008-09 Natural

Reversion

($881,067) B0652Acquisition and Local Assistance

Grants: Protection of Santa Monica

Bay and its watersheds.

Enacted 2013-14

3810-301-6051 (3) Capital Outlay and

Local Assistance:

Reversion

2008-09 Budget Act ($118,749) B0652Acquisition and Local Assistance

Grants: Protection of Santa Monica

Bay and its watersheds.

Enacted 2013-14

3810-301-6051 Capital Outlay and

Local Assistance

2011-12 Budget Act $949,100 B0652Acquisition and Local Assistance

Grants: Protection of Santa Monica

Bay and its watersheds.

Enacted 2011-12

3810-301-6051 Capital Outlay and

Local Assistance:

Natural Reversion

2011-12 Natural

Reversion

($623,334) B0652Acquisition and Local Assistance

Grants: Protection of Santa Monica

Bay and its watersheds.

Enacted 2015-16

3810-301-6051 Capital Outlay and

Local Assistance

2013-14 Budget Act $124,947 B0652Acquisition and Local Assistance

Grants: Protection of Santa Monica

Bay and its watersheds.

Enacted 2013-14

3810-301-6051 Capital Outlay and

Local Assistance:

Reappropriation

(decrease)

2013-14 Budget Act ($124,947) B0652Acquisition and Local Assistance

Grants: Protection of Santa Monica

Bay and its watersheds.

Enacted 2013-14

3810-301-6051 Capital Outlay and

Local Assistance:

Reappropriation

(increase)

2013-14 Budget Act $124,947 B0652Acquisition and Local Assistance

Grants: Protection of Santa Monica

Bay and its watersheds.

Enacted 2018-19

Wednesday, January 29, Page 274 of 3421:20:10 PM Public Resources Code (PRC) Section PRC §75060(d)(1)Ch. 7Prop 84 Report

Page 278: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3810-301-6051 Capital Outlay and

Local Assistance

2014-15 Budget Act $1,358,009 B0652Acquisition and Local Assistance

Grants: Protection of Santa Monica

Bay and its watersheds.

Enacted 2014-15

3810-301-6051 Capital Outlay and

Local Assistance

2014-15 Budget Act $1,991 B0653Planning and MonitoringEnacted 2014-15

3810-301-6051 Capital Outlay and

Local Assistance:

Reappropriation

(decrease)

2014-15 Budget Act ($1,358,009) B0652Acquisition and Local Assistance

Grants: Protection of Santa Monica

Bay and its watersheds.

Enacted 2014-15

3810-301-6051 Capital Outlay and

Local Assistance:

Reappropriation

(decrease)

2014-15 Budget Act ($1,991) B0653Planning and MonitoringEnacted 2014-15

3810-301-6051 Capital Outlay and

Local Assistance:

Reappropriation

(increase)

2014-15 Budget Act $1,358,009 B0652Acquisition and Local Assistance

Grants: Protection of Santa Monica

Bay and its watersheds.

Enacted 2018-19

3810-301-6051 Capital Outlay and

Local Assistance:

Reappropriation

(increase)

2014-15 Budget Act $1,991 B0653Planning and MonitoringEnacted 2018-19

Sum: $19,284,446Enacted

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3810-001-6051 (1) Portion of support

budget

2020-21 Budget Act $9,000 B0653Planning and Monitoring for

protection of Santa Monica Bay and

its watersheds.

Proposed 2020-21

Sum: $9,000Proposed

Sum: $19,293,446

$6,554

Balance for Santa Monica Bay and its watersheds:

Wednesday, January 29, Page 275 of 3421:20:10 PM Public Resources Code (PRC) Section PRC §75060(d)(1)Ch. 7Prop 84 Report

Page 279: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

Protection of Beaches, Bays and Coastal WatersChapter 7

Allocation: Ballona Creek/Baldwin Hills watershed

Allocation $: $10,000,000$52,055

$103,068Statewide Set Asides: $155,122 {

Outyear Obligations: $156,000

$0

$0

{

PRC §75060(d)(2)Ch. 7

Appropriations, Proposals and Reversions

Statewide, requiring appropriation:

Statewide, not requiring appropriation:

Outyear Program Delivery commitments:

Outyear Cap. Outlay (to complete started projects):Reversions are shown below$0

Outyear Local Asst. commitments:

Protection of Santa Monica Bay and its watersheds, specifically the protection of the Ballona Creek/Baldwin Hills watershed.

Dept.: Baldwin Hills Conservancy

Other Outyear Support commitments:$156,000

Committed

$0

$0

$0

$0

Proposed

$0

Prop 1 Reduction $194,878

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3835-001-6051 Portion of support

budget

2008-09 Budget Act $116,000 B0663PlanningEnacted 2008-09

3835-001-6051 Portion of support

budget: Control Section

Adjustment

2008-09 Control

Section

Adjustment

($1,382) B0663PlanningEnacted 2008-09

3835-001-6051 Portion of support

budget: Natural

Reversion

2008-09 Natural

Reversion

($29,461) B0663PlanningEnacted 2010-11

3835-001-6051 Portion of support

budget

2009-10 Budget Act $117,000 B0663PlanningEnacted 2009-10

3835-001-6051 Portion of support

budget: Control Section

Adjustment

2009-10 Control

Section

Adjustment

($9,764) B0663PlanningEnacted 2009-10

3835-001-6051 Portion of support

budget: Natural

Reversion

2009-10 Natural

Reversion

($12,543) B0663PlanningEnacted 2011-12

3835-001-6051 Portion of support

budget

2010-11 Budget Act $117,000 B0661Program DeliveryEnacted 2010-11

3835-001-6051 Portion of support

budget: Control Section

Adjustment

2010-11 Control

Section

Adjustment

($14,000) B0661Program DeliveryEnacted 2010-11

3835-001-6051 Portion of support

budget: Reversion

2010-11 Budget Act ($103,000) B0661Program DeliveryEnacted 2012-13

3835-001-6051 Portion of support

budget

2011-12 Budget Act $103,000 B0661Program DeliveryEnacted 2011-12

Wednesday, January 29, Page 276 of 3421:20:10 PM Public Resources Code (PRC) Section PRC §75060(d)(2)Ch. 7Prop 84 Report

Page 280: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3835-001-6051 Portion of support

budget: Reversion

2011-12 Budget Act ($103,000) B0661Program DeliveryEnacted 2012-13

3835-001-6051 Portion of support

budget

2012-13 Budget Act $101,000 B0661Program DeliveryEnacted 2012-13

3835-001-6051 Portion of support

budget: Control Section

Adjustment

2012-13 Control

Section

Adjustment

($2,518) B0661Program DeliveryEnacted 2012-13

3835-001-6051 Portion of support

budget: Natural

Reversion

2012-13 Natural

Reversion

($84,379) B0661Program DeliveryEnacted 2014-15

3835-001-6051 Portion of support

budget

2013-14 Budget Act $101,000 B0661Program DeliveryEnacted 2013-14

3835-001-6051 Portion of support

budget: Reversion

2013-14 Budget Act ($101,000) B0661Program DeliveryEnacted 2015-16

3835-001-6051 Portion of support

budget

2014-15 Budget Act $101,000 B0661Program DeliveryEnacted 2014-15

3835-001-6051 Portion of support

budget: Control Section

Adjustment

2014-15 Control

Section

Adjustment

$1,960 B0661Program DeliveryEnacted 2014-15

3835-001-6051 Portion of support

budget: Reversion

2014-15 Budget Act ($97,960) B0661Program DeliveryEnacted 2015-16

3835-001-6051 Portion of support

budget

2015-16 Budget Act $129,000 B0661Program DeliveryEnacted 2015-16

3835-001-6051 Portion of support

budget: Natural

Reversion

2015-16 Natural

Reversion

($67,940) B0661Program DeliveryEnacted 2017-18

3835-001-6051 Portion of support

budget

2016-17 Budget Act $129,000 B0661Program DeliveryEnacted 2016-17

3835-001-6051 Portion of support

budget: Control Section

Adjustment

2016-17 Control

Section

Adjustment

$4,000 B0661Program DeliveryEnacted 2016-17

3835-001-6051 Portion of support

budget: Reversion

2016-17 Budget Act ($42,880) B0661Program DeliveryEnacted 2018-19

3835-001-6051 Portion of support

budget

2017-18 Budget Act $129,000 B0661Program DeliveryEnacted 2017-18

3835-001-6051 Portion of support

budget: Control Section

Adjustment

2017-18 Control

Section

Adjustment

$4,000 B0661Program DeliveryEnacted 2017-18

3835-001-6051 Portion of support

budget: Reversion

2017-18 Budget Act ($29,176) B0661Program DeliveryEnacted 2018-19

3835-001-6051 Portion of support

budget

2018-19 Budget Act $104,000 B0661Program DeliveryEnacted 2018-19

3835-001-6051 Portion of support

budget: Control Section

Adjustment

2018-19 Control

Section

Adjustment

$6,000 B0661Program DeliveryEnacted 2018-19

3835-001-6051 Portion of support

budget

2019-20 Budget Act $110,000 B0661Program DeliveryEnacted 2019-20

Wednesday, January 29, Page 277 of 3421:20:10 PM Public Resources Code (PRC) Section PRC §75060(d)(2)Ch. 7Prop 84 Report

Page 281: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3835-301-6051 (1) Capital Outlay

Acquisition and

Improvement Program

2007-08 Budget Act $3,050,000 B0662Acquisition & Improvement

Program

Enacted 2007-08

3835-301-6051 (1) Capital Outlay

Acquisition and

Improvement Program:

Natural reversion

2007-08 Natural

Reversion

($1,522,107) B0662Acquisition & Improvement

Program

Enacted 2014-15

3835-301-6051 (1) Capital Outlay

Acquisition and

Improvement Program:

Reversion

2007-08 Budget Act ($1,050,000) B0662Acquisition & Improvement

Program

Enacted 2014-15

3835-301-6051 (1) Capital Outlay

Acquisition and

Improvement Program

2008-09 Budget Act $3,050,000 B0662Acquisition & Improvement

Program

Enacted 2008-09

3835-301-6051 (1) Capital Outlay

Acquisition and

Improvement Program:

Natural Reversion

2008-09 Natural

Reversion

($799,431) B0662Acquisition & Improvement

Program

Enacted 2015-16

3835-301-6051 (1) Capital Outlay

Acquisition and

Improvement Program:

Reversion

2008-09 Budget Act ($2,118,206) B0662Acquisition & Improvement

Program

Enacted 2015-16

3835-301-6051 Capital Outlay

Acquisition and

Improvement Program

2009-10 Budget Act $3,050,000 B0662Acquisition & Improvement

Program

Enacted 2009-10

3835-301-6051 Capital Outlay

Acquisition and

Improvement Program:

Natural Reversion

2009-10 Natural

Reversion

($2,293,277) B0662Acquisition & Improvement

Program

Enacted 2013-14

3835-301-6051 Capital Outlay

Acquisition and

Improvement Program

2014-15 Budget Act $3,120,000 B0662Acquisition & Improvement

Program

Enacted 2014-15

3835-301-6051 Capital Outlay

Acquisition and

Improvement Program

2015-16 Budget Act $2,118,000 B0662Acquisition & Improvement

Program

Enacted 2015-16

3835-301-6051 Capital Outlay

Acquisition and

Improvement Program:

Reappropriation

(decrease)

2015-16 Budget Act ($2,118,000) B0662Acquisition & Improvement

Program

Enacted 2015-16

3835-301-6051 Capital Outlay

Acquisition and

Improvement Program:

Reappropriation

(increase)

2015-16 Budget Act $2,118,000 B0662Acquisition & Improvement

Program

Enacted 2018-19

Sum: $7,278,936Enacted

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

Wednesday, January 29, Page 278 of 3421:20:10 PM Public Resources Code (PRC) Section PRC §75060(d)(2)Ch. 7Prop 84 Report

Page 282: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3835-001-6051 Portion of support

budget: Control Section

Adjustment

2019-20 Control

Section

Adjustment

$1,000 B0663PlanningEnacted/Not 2019-20

Sum: $1,000Enacted/Not Posted

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3835-001-6051 (1) Portion of support

budget: Reversion

2018-19 Budget Act ($88,270) B0661Program DeliveryProposed 2020-21

3835-001-6051 (1) Portion of support

budget

2020-21 Budget Act $39,000 B0663PlanningProposed 2020-21

3835-001-6051 (1) Portion of support

budget

2020-21 Budget Act $94,000 B0661Program DeliveryProposed 2020-21

3835-301-6051 Capital Outlay

Acquisition and

Improvement Program:

Reappropriation

(decrease)

2014-15 Budget Act ($3,120,000) B0662Acquisition & Improvement

Program

Proposed 2017-18

3835-301-6051 (1) Capital Outlay

Acquisition and

Improvement Program:

Reappropriation

(increase)

2014-15 Budget Act $3,120,000 B0662Acquisition & Improvement

Program

Proposed 2020-21

Sum: $44,730Proposed

Sum: $7,324,666

$2,169,334

Balance for Ballona Creek/Baldwin Hills watershed:

Wednesday, January 29, Page 279 of 3421:20:10 PM Public Resources Code (PRC) Section PRC §75060(d)(2)Ch. 7Prop 84 Report

Page 283: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

Protection of Beaches, Bays and Coastal WatersChapter 7

Allocation: Santa Monica Bay and its watersheds

Allocation $: $15,000,000$78,082

$154,602Statewide Set Asides: $232,684 {

Outyear Obligations: $0

$0

$0

{

PRC §75060(d)(3)Ch. 7

Appropriations, Proposals and Reversions

Statewide, requiring appropriation:

Statewide, not requiring appropriation:

Outyear Program Delivery commitments:

Outyear Cap. Outlay (to complete started projects):Reversions are shown below$0

Outyear Local Asst. commitments:

Protection of Santa Monica Bay and its watersheds.

Dept.: San Gabriel and Lower Los

Angeles Rivers and Mountains

Conservancy

Other Outyear Support commitments:$0

Committed

$0

$0

$0

$0

Proposed

$0

Prop 1 Reduction $292,316

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3825-001-6051 Portion of support

budget

2007-08 Budget Act $152,000 B0671Proposition Program Delivery StaffEnacted 2007-08

3825-001-6051 Portion of support

budget

2008-09 Budget Act $156,930 B0671Program DeliveryEnacted 2008-09

3825-001-6051 Portion of support

budget

2009-10 Budget Act $130,000 B0671Program DeliveryEnacted 2009-10

3825-001-6051 Portion of support

budget: Control Section

Adjustment

2009-10 Control

Section

Adjustment

($10,000) B0671Program DeliveryEnacted 2009-10

3825-001-6051 Portion of support

budget: Natural

Reversion

2009-10 Natural

Reversion

($45,951) B0671Program DeliveryEnacted 2011-12

3825-001-6051 Portion of support

budget

2010-11 Budget Act $130,000 B0671Program DeliveryEnacted 2010-11

3825-001-6051 Portion of support

budget: Control Section

Adjustment

2010-11 Control

Section

Adjustment

($6,318) B0671Program DeliveryEnacted 2010-11

3825-001-6051 Portion of support

budget

2011-12 Budget Act $126,810 B0671Program DeliveryEnacted 2011-12

3825-001-6051 Portion of support

budget: Control Section

Adjustment

2011-12 Control

Section

Adjustment

$0 B0671Program DeliveryEnacted 2011-12

3825-001-6051 Portion of support

budget

2012-13 Budget Act $211,612 B0671Program DeliveryEnacted 2012-13

Wednesday, January 29, Page 280 of 3421:20:10 PM Public Resources Code (PRC) Section PRC §75060(d)(3)Ch. 7Prop 84 Report

Page 284: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3825-001-6051 Portion of support

budget: Control Section

Adjustment

2012-13 Control

Section

Adjustment

($2,563) B0671Program DeliveryEnacted 2012-13

3825-001-6051 Portion of support

budget: Natural

Reversion

2012-13 Natural

Reversion

($107,136) B0671Program DeliveryEnacted 2014-15

3825-001-6051 Portion of support

budget

2013-14 Budget Act $45,700 B0671Program DeliveryEnacted 2013-14

3825-001-6051 Portion of support

budget: Control Section

Adjustment

2013-14 Control

Section

Adjustment

$501 B0671Program DeliveryEnacted 2013-14

3825-001-6051 Portion of support

budget

2014-15 Budget Act $46,128 B0671Program DeliveryEnacted 2014-15

3825-001-6051 Portion of support

budget: Control Section

Adjustment

2014-15 Control

Section

Adjustment

$1,401 B0671Program DeliveryEnacted 2014-15

3825-001-6051 Portion of support

budget

2015-16 Budget Act $28,500 B0671Program DeliveryEnacted 2015-16

3825-001-6051 Portion of support

budget: Control Section

Adjustments

2015-16 Control

Section

Adjustment

$1,200 B0671Program DeliveryEnacted 2015-16

3825-001-6051 Portion of support

budget: Natural

Reversion

2015-16 Natural

Reversion

($700) B0671Program DeliveryEnacted 2017-18

3825-001-6051 Portion of support

budget

2016-17 Budget Act $96,000 B0673Planning and MonitoringEnacted 2016-17

3825-001-6051 Portion of support

budget: Control Section

Adjustments

2016-17 Control

Section

Adjustment

$2,000 B0673Planning and MonitoringEnacted 2016-17

3825-001-6051 Portion of support

budget: Natural

Reversion

2016-17 Natural

Reversion

($9,245) B0673Planning and MonitoringEnacted 2018-19

3825-001-6051 Portion of support

budget

2017-18 Budget Act $97,000 B0673Planning and MonitoringEnacted 2017-18

3825-001-6051 Portion of support

budget: Control Section

Adjustments

2017-18 Control

Section

Adjustment

$5,000 B0673Planning and MonitoringEnacted 2017-18

3825-001-6051 Portion of support

budget

2018-19 Budget Act $42,000 B0673Planning and MonitoringEnacted 2018-19

3825-001-6051 Portion of support

budget

2019-20 Budget Act $42,000 B0673Planning and MonitoringEnacted 2019-20

3825-101-6051 Capital Outlay and

Local Assistance

2019-20 Budget Act $858,000 B0672Proposition 84, Capital Outlay and

Grants

Enacted 2019-20

3825-301-6051 Portion of capital outlay

budget

2007-08 Budget Act $7,250,000 B0672Proposition 84, Capital Outlay and

Grants

Enacted 2007-08

3825-301-6051 Portion of capital outlay

budget: Natural

Reversion

2007-08 Natural

Reversion

($7,371) B0672Proposition 84, Capital Outlay and

Grants

Enacted 2016-17

Wednesday, January 29, Page 281 of 3421:20:10 PM Public Resources Code (PRC) Section PRC §75060(d)(3)Ch. 7Prop 84 Report

Page 285: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3825-301-6051 Portion of capital outlay

budget: Reversion

2007-08 Budget Act ($7,000) B0672Proposition 84, Capital Outlay and

Grants

Enacted 2012-13

3825-301-6051 Portion of capital outlay

budget

2008-09 Budget Act $2,320,000 B0672Capital Outlay and GrantsEnacted 2008-09

3825-301-6051 Portion of capital outlay

budget: Natural

Reversion

2008-09 Natural

Reversion

($167,564) B0672Capital Outlay and GrantsEnacted 2016-17

3825-301-6051 Portion of capital outlay

budget

2009-10 Budget Act $2,030,000 B0672Capital Outlay and GrantsEnacted 2009-10

3825-301-6051 Portion of capital outlay

budget: Natural

Reversion

2009-10 Natural

Reversion

($2,030,000) B0672Capital Outlay and GrantsEnacted 2013-14

3825-301-6051 Portion of capital outlay

budget

2011-12 Budget Act $1,991,047 B0672Capital Outlay and GrantsEnacted 2011-12

3825-301-6051 Portion of capital outlay

budget:

Reappropriation

(decrease)

2011-12 Budget Act ($1,991,047) B0672Capital Outlay and GrantsEnacted 2014-15

3825-301-6051 Portion of capital outlay

budget:

Reappropriation

(increase)

2011-12 Budget Act $1,991,047 B0672Capital Outlay and GrantsEnacted 2019-20

3825-301-6051 Portion of capital outlay

budget

2015-16 Budget Act $1,953,000 B0672Proposition 84, Capital Outlay and

Grants

Enacted 2015-16

Sum: $15,322,982Enacted

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3825-301-6051 Portion of capital outlay

budget: Reversion

2011-12 Budget Act ($746,366) B0672Capital Outlay and GrantsEnacted/Not 2019-20

3825-301-6051 Portion of capital outlay

budget: Reversion

2015-16 Budget Act ($111,205) B0672Proposition 84, Capital Outlay and

Grants

Enacted/Not 2019-20

Sum: ($857,571)Enacted/Not Posted

Sum: $14,465,411

$9,589

Balance for Santa Monica Bay and its watersheds:

Wednesday, January 29, Page 282 of 3421:20:10 PM Public Resources Code (PRC) Section PRC §75060(d)(3)Ch. 7Prop 84 Report

Page 286: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

Protection of Beaches, Bays and Coastal WatersChapter 7

Allocation: Monterey Bay and its watersheds

Allocation $: $45,000,000$234,246

$463,806Statewide Set Asides: $698,051 {

Outyear Obligations: $600,000

$0

$0

{

PRC §75060(e)Ch. 7

Appropriations, Proposals and Reversions

Statewide, requiring appropriation:

Statewide, not requiring appropriation:

Outyear Program Delivery commitments:

Outyear Cap. Outlay (to complete started projects):Reversions are shown below$0

Outyear Local Asst. commitments:

Protection of Monterey Bay and its watersheds.

Dept.: State Coastal Conservancy

Other Outyear Support commitments:$600,000

Committed

$0

$0

$0

$0

Proposed

$0

Prop 1 Reduction $876,949

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3760-001-6051 Portion of support

budget

2010-11 Budget Act $28,134 B0681Monterey Bay WatershedsEnacted 2010-11

3760-001-6051 Portion of support

budget

2010-11 Budget Act $31,866 B0682Monterey Bay WatershedsEnacted 2010-11

3760-001-6051 Portion of support

budget

2011-12 Budget Act $106,388 B0681Monterey Bay WatershedsEnacted 2011-12

3760-001-6051 Portion of support

budget

2011-12 Budget Act $37,412 B0682Monterey Bay WatershedsEnacted 2011-12

3760-001-6051 Portion of support

budget: Control Section

Adjustment

2011-12 Control

Section

Adjustment

($8,018) B0681Monterey Bay WatershedsEnacted 2011-12

3760-001-6051 Portion of support

budget

2012-13 Budget Act $613,962 B0681Monterey Bay WatershedsEnacted 2012-13

3760-001-6051 Portion of support

budget

2012-13 Budget Act $40,038 B0682Monterey Bay WatershedsEnacted 2012-13

3760-001-6051 Portion of support

budget

2013-14 Budget Act $619,463 B0681Monterey Bay WatershedsEnacted 2013-14

3760-001-6051 Portion of support

budget

2013-14 Budget Act $99,070 B0682Monterey Bay WatershedsEnacted 2013-14

3760-001-6051 Portion of support

budget - Planning

2013-14 Budget Act $2,467 B0683Monterey Bay WatershedsEnacted 2013-14

3760-001-6051 Portion of support

budget

2014-15 Budget Act $342,112 B0681Monterey Bay WatershedsEnacted 2014-15

3760-001-6051 Portion of support

budget

2014-15 Budget Act $57,888 B0682Monterey Bay WatershedsEnacted 2014-15

Wednesday, January 29, Page 283 of 3421:20:10 PM Public Resources Code (PRC) Section PRC §75060(e)Ch. 7Prop 84 Report

Page 287: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3760-001-6051 Portion of support

budget

2015-16 Budget Act $259,263 B0681Monterey Bay WatershedsEnacted 2015-16

3760-001-6051 Portion of support

budget

2015-16 Budget Act $40,737 B0682Monterey Bay WatershedsEnacted 2015-16

3760-001-6051 Portion of support

budget

2016-17 Budget Act $5,000 B0683Monterey Bay WatershedsEnacted 2016-17

3760-001-6051 Portion of support

budget

2016-17 Budget Act $70,000 B0681Monterey Bay WatershedsEnacted 2016-17

3760-001-6051 Portion of support

budget

2016-17 Budget Act $25,000 B0682Monterey Bay WatershedsEnacted 2016-17

3760-001-6051 Portion of support

budget

2017-18 Budget Act $150,000 B0681Monterey Bay WatershedsEnacted 2017-18

3760-001-6051 Portion of support

budget

2018-19 Budget Act $150,000 B0683Monterey Bay WatershedsEnacted 2018-19

3760-001-6051 Portion of support

budget

2019-20 Budget Act $150,000 B0683Monterey Bay WatershedsEnacted 2019-20

3760-101-6051 Conservancy Programs2015-16 Budget Act $3,000,000 B0682Monterey Bay WatershedsEnacted 2015-16

3760-101-6051 Conservancy Programs:

Reversion

2015-16 Budget Act ($2,046,500) B0682Monterey Bay WatershedsEnacted 2018-19

3760-101-6051 (1) Portion of local

assistance budget

2016-17 Budget Act $200,000 B0683Monterey Bay WatershedsEnacted 2016-17

3760-101-6051 (1) Portion of local

assistance budget

2016-17 Budget Act $1,800,000 B0682Monterey Bay WatershedsEnacted 2016-17

3760-101-6051 (1) Portion of local

assistance budget

2017-18 Budget Act $4,000,000 B0682Monterey Bay WatershedsEnacted 2017-18

3760-101-6051 (1) Portion of local

assistance budget

2018-19 Budget Act $2,000,000 B0682Monterey Bay WatershedsEnacted 2018-19

3760-101-6051 (1) Portion of local

assistance budget

2019-20 Budget Act $2,000,000 B0682Monterey Bay WatershedsEnacted 2019-20

3760-301-6051 (2) Conservancy Programs2007-08 Budget Act $9,650,000 B0682Monterey Bay WatershedsEnacted 2007-08

3760-301-6051 (2) Conservancy Programs:

Natural Reversion

2007-08 Natural

Reversion

($6,992,475) B0682Monterey Bay WatershedsEnacted 2011-12

3760-301-6051 Conservancy Programs2008-09 Budget Act $11,500,000 B0682Monterey Bay WatershedsEnacted 2008-09

3760-301-6051 Conservancy Programs:

Natural Reversion

2008-09 Natural

Reversion

($2,429,000) B0682Monterey Bay WatershedsEnacted 2015-16

3760-301-6051 Conservancy Programs2009-10 Budget Act $10,615,000 B0682Monterey Bay WatershedsEnacted 2009-10

3760-301-6051 Conservancy Programs:

Natural Reversion

2009-10 Natural

Reversion

($1,919,258) B0682Monterey Bay WatershedsEnacted 2016-17

3760-301-6051 Conservancy Programs:

Reversion

2009-10 Budget Act ($2,923,435) B0682Monterey Bay WatershedsEnacted 2016-17

3760-301-6051 Conservancy Programs:

Reversion Reversal

2009-10 Natural

Reversion

$1,899,784 B0682Monterey Bay WatershedsEnacted 2017-18

3760-301-6051 Conservancy Programs2010-11 Budget Act $6,280,000 B0682Monterey Bay WatershedsEnacted 2010-11

3760-301-6051 Conservancy Programs2013-14 Budget Act $2,130,000 B0682Monterey Bay WatershedsEnacted 2013-14

Sum: $41,584,898Enacted

Wednesday, January 29, Page 284 of 3421:20:10 PM Public Resources Code (PRC) Section PRC §75060(e)Ch. 7Prop 84 Report

Page 288: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3760-001-6051 (1) Portion of support

budget

2020-21 Budget Act $150,000 B0683Monterey Bay WatershedsProposed 2020-21

3760-101-6051 (1) Portion of local

assistance budget

2020-21 Budget Act $1,090,000 B0682Monterey Bay WatershedsProposed 2020-21

Sum: $1,240,000Proposed

Sum: $42,824,898

$102

Balance for Monterey Bay and its watersheds:

Wednesday, January 29, Page 285 of 3421:20:10 PM Public Resources Code (PRC) Section PRC §75060(e)Ch. 7Prop 84 Report

Page 289: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

Protection of Beaches, Bays and Coastal WatersChapter 7

Allocation: San Diego Bay and its watersheds

Allocation $: $27,000,000$140,547

$278,283Statewide Set Asides: $418,831 {

Outyear Obligations: $400,000

$0

$0

{

PRC §75060(f)Ch. 7

Appropriations, Proposals and Reversions

Statewide, requiring appropriation:

Statewide, not requiring appropriation:

Outyear Program Delivery commitments:

Outyear Cap. Outlay (to complete started projects):Reversions are shown below$0

Outyear Local Asst. commitments:

Protection of San Diego Bay and its watersheds.

Dept.: State Coastal Conservancy

Other Outyear Support commitments:$400,000

Committed

$0

$0

$0

$0

Proposed

$0

Prop 1 Reduction $526,169

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3760-001-6051 Conservancy Programs2008-09 Budget

Revision

$25,000 B0691San Diego Bay WatershedsEnacted 2008-09

3760-001-6051 Portion of support

budget

2009-10 Budget

Revision

$41,000 B0691San Diego Bay WatershedsEnacted 2009-10

3760-001-6051 Portion of support

budget

2010-11 Budget Act $72,784 B0691San Diego Bay WatershedsEnacted 2010-11

3760-001-6051 Portion of support

budget

2010-11 Budget Act $28,216 B0692San Diego Bay WatershedsEnacted 2010-11

3760-001-6051 Portion of support

budget: Control Section

Adjustment

2010-11 Control

Section

Adjustment

($17,476) B0691San Diego Bay WatershedsEnacted 2010-11

3760-001-6051 Portion of support

budget

2011-12 Budget Act $102,666 B0691San Diego Bay WatershedsEnacted 2011-12

3760-001-6051 Portion of support

budget

2011-12 Budget Act $41,134 B0692San Diego Bay WatershedsEnacted 2011-12

3760-001-6051 Portion of support

budget: Control Section

Adjustment

2011-12 Control

Section

Adjustment

($8,017) B0691San Diego Bay WatershedsEnacted 2011-12

3760-001-6051 Portion of support

budget

2012-13 Budget Act $291,564 B0691San Diego Bay WatershedsEnacted 2012-13

3760-001-6051 Portion of support

budget

2012-13 Budget Act $58,436 B0692San Diego Bay WatershedsEnacted 2012-13

3760-001-6051 Portion of support

budget

2013-14 Budget Act $291,827 B0691San Diego Bay WatershedsEnacted 2013-14

Wednesday, January 29, Page 286 of 3421:20:10 PM Public Resources Code (PRC) Section PRC §75060(f)Ch. 7Prop 84 Report

Page 290: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3760-001-6051 Portion of support

budget

2013-14 Budget Act $50,734 B0692San Diego Bay WatershedsEnacted 2013-14

3760-001-6051 Portion of support

budget - Planning

2013-14 Budget Act $7,438 B0693San Diego Bay WatershedsEnacted 2013-14

3760-001-6051 Portion of support

budget

2014-15 Budget Act $299,118 B0691San Diego Bay WatershedsEnacted 2014-15

3760-001-6051 Portion of support

budget

2014-15 Budget Act $50,882 B0692San Diego Bay WatershedsEnacted 2014-15

3760-001-6051 Portion of support

budget

2015-16 Budget Act $58,218 B0691San Diego Bay WatershedsEnacted 2015-16

3760-001-6051 Portion of support

budget

2015-16 Budget Act $41,782 B0692San Diego Bay WatershedsEnacted 2015-16

3760-001-6051 Portion of support

budget

2016-17 Budget Act $5,000 B0693San Diego Bay WatershedsEnacted 2016-17

3760-001-6051 Portion of support

budget

2016-17 Budget Act $80,000 B0691San Diego Bay WatershedsEnacted 2016-17

3760-001-6051 Portion of support

budget

2016-17 Budget Act $15,000 B0692San Diego Bay WatershedsEnacted 2016-17

3760-001-6051 Portion of support

budget

2017-18 Budget Act $100,000 B0691San Diego Bay WatershedsEnacted 2017-18

3760-001-6051 Portion of support

budget

2018-19 Budget Act $100,000 B0693San Diego Bay WatershedsEnacted 2018-19

3760-001-6051 Portion of support

budget

2019-20 Budget Act $100,000 B0693San Diego Bay WatershedsEnacted 2019-20

3760-101-6051 Conservancy Programs2015-16 Budget Act $1,800,000 B0692San Diego Bay WatershedsEnacted 2015-16

3760-101-6051 Conservancy Programs:

Reversion

2015-16 Budget Act ($187,110) B0692San Diego Bay WatershedsEnacted 2018-19

3760-101-6051 (1) Portion of local

assistance budget

2016-17 Budget Act $100,000 B0693San Diego Bay WatershedsEnacted 2016-17

3760-101-6051 (1) Portion of local

assistance budget

2016-17 Budget Act $900,000 B0692San Diego Bay WatershedsEnacted 2016-17

3760-101-6051 (1) Portion of local

assistance budget

2017-18 Budget Act $800,000 B0692San Diego Bay WatershedsEnacted 2017-18

3760-101-6051 (1) Portion of local

assistance budget

2018-19 Budget Act $1,000,000 B0692San Diego Bay WatershedsEnacted 2018-19

3760-101-6051 (1) Portion of local

assistance budget

2019-20 Budget Act $1,000,000 B0692San Diego Bay WatershedsEnacted 2019-20

3760-301-6051 (2) Conservancy Programs2007-08 Budget Act $6,689,000 B0692San Diego Bay WatershedsEnacted 2007-08

3760-301-6051 (2) Conservancy Programs:

Natural Reversion

2007-08 Natural

Reversion

($4,506,275) B0692San Diego Bay WatershedsEnacted 2011-12

3760-301-6051 Conservancy Programs2008-09 Budget Act $5,157,000 B0692San Diego Bay WatershedsEnacted 2008-09

3760-301-6051 Conservancy Programs:

Natural Reversion

2008-09 Natural

Reversion

($370,696) B0692San Diego Bay WatershedsEnacted 2015-16

3760-301-6051 Conservancy Programs2009-10 Budget Act $5,207,000 B0692San Diego Bay WatershedsEnacted 2009-10

3760-301-6051 Conservancy Programs:

Natural Reversion

2009-10 Natural

Reversion

($1,305,978) B0692San Diego Bay WatershedsEnacted 2016-17

Wednesday, January 29, Page 287 of 3421:20:10 PM Public Resources Code (PRC) Section PRC §75060(f)Ch. 7Prop 84 Report

Page 291: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3760-301-6051 Conservancy Programs:

Reversion

2009-10 Budget Act ($86,229) B0692San Diego Bay WatershedsEnacted 2016-17

3760-301-6051 Conservancy Programs2010-11 Budget Act $5,690,000 B0692San Diego Bay WatershedsEnacted 2010-11

3760-301-6051 Conservancy Programs2013-14 Budget Act $1,500,000 B0692San Diego Bay WatershedsEnacted 2013-14

Sum: $25,222,018Enacted

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3760-001-6051 (1) Portion of support

budget

2020-21 Budget Act $100,000 B0693San Diego Bay WatershedsProposed 2020-21

3760-101-6051 (1) Portion of local

assistance budget

2020-21 Budget Act $332,000 B0692San Diego Bay WatershedsProposed 2020-21

Sum: $432,000Proposed

Sum: $25,654,018

$982

Balance for San Diego Bay and its watersheds:

Wednesday, January 29, Page 288 of 3421:20:10 PM Public Resources Code (PRC) Section PRC §75060(f)Ch. 7Prop 84 Report

Page 292: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

Protection of Beaches, Bays and Coastal WatersChapter 7

Allocation: California Ocean Protection Trust Fund

Allocation $: $90,000,000$468,491

$927,611Statewide Set Asides: $1,396,102 {

Outyear Obligations: $0

$0

$0

{

PRC §75060(g)Ch. 7

Appropriations, Proposals and Reversions

Statewide, requiring appropriation:

Statewide, not requiring appropriation:

Outyear Program Delivery commitments:

Outyear Cap. Outlay (to complete started projects):Reversions are shown below$0

Outyear Local Asst. commitments:

California Ocean Protection Trust Fund. Available for projects consistent with the fund (Section 35650). Priority projects include development of scientific data

needed to adaptively manage state`s marine resources and reserves, including development of marine habitat maps, develop and implement projects to foster

sustainable fisheries using loans and grants and develop and implement projects to conserve marine wildlife.

Dept.: Secretary for Natural

Resources

Other Outyear Support commitments:$0

Committed

$0

$0

$0

$0

Proposed

$0

Prop 1 Reduction $1,753,898

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3760-001-6051 Ocean Protection

Council

2007-08 Budget Act $0 B0701Ocean Protection CouncilEnacted 2007-08

3760-301-6051 Ocean Protection

Council: Transfer to

OPTF

2007-08 Budget Act $0 B0702Ocean Protection CouncilEnacted 2007-08

3760-811-6051 Transfer to Ocean

Protection Trust Fund

(Fund 6076)

2006-07 Statutory

from Bond

$86,850,000 B0702Ocean Protection CouncilEnacted 2006-07

Sum: $86,850,000Enacted

Sum: $86,850,000

$0

Balance for California Ocean Protection Trust Fund:

Wednesday, January 29, Page 289 of 3421:20:10 PM Public Resources Code (PRC) Section PRC §75060(g)Ch. 7Prop 84 Report

Page 293: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

Summary for Chapter 7

Enacted/Proposed: $513,661,446

Allocation: $90,000,000

Set Asides: $1,396,102

Outyears: $0

Balance: $0

Protection of Beaches, Bays and Coastal Waters

Prop 1 Reduction: $1,753,898

Wednesday, January 29, Page 290 of 3421:20:10 PM Public Resources Code (PRC) Section PRC §75060(g)Ch. 7Prop 84 Report

Page 294: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

Parks and Nature Education FacilitiesChapter 8

Allocation: State Park System

Allocation $: $400,000,000$2,082,183

$4,122,717Statewide Set Asides: $6,204,900 {

Outyear Obligations: $45,200,000

$584,000

$26,973,000

{

PRC §75063(a)Ch. 8

Appropriations, Proposals and Reversions

Statewide, requiring appropriation:

Statewide, not requiring appropriation:

Outyear Program Delivery commitments:

Outyear Cap. Outlay (to complete started projects):Reversions are shown below$0

Outyear Local Asst. commitments:

For development, acquisition, interpretation, restoration and rehabilitation of the State Park System and its natural, historical and visitor serving resources. Shall

include the following goals in setting spending priorities: (1) Restore, rehabilitate and improve existing State Park System lands and facilities; (2) Expand the State

Park System to reflect the growing population and shifting population centers and needs of the state; and (3) Protect representative natural resources based on the

criteria and priorities identified in Section 75071.

Dept.: California State Parks

Other Outyear Support commitments:$0

Committed

$0

$17,643,000

$0

$0

Proposed

$0

Prop 1 Reduction $7,795,100

$12,000,000Prop 68 Reduction:

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3790-001-6051 Portion of support

budget

2007-08 Budget Act $1,292,000 B1221State Park System Allocation:

Program Delivery

Enacted 2007-08

3790-001-6051 Portion of support

budget

2007-08 Budget Act $1,480,000 B1163State Park System: PlanningEnacted 2007-08

3790-001-6051 Portion of support

budget: Natural

Reversion

2007-08 Natural

Reversion

($40,584) B1221State Park System Allocation:

Program Delivery

Enacted 2009-10

3790-001-6051 Portion of support

budget: Natural

Reversion

2007-08 Natural

Reversion

($1,243,601) B1163State Park System: PlanningEnacted 2009-10

3790-001-6051 Portion of support

budget

2008-09 Budget Act $1,000,000 B0713Empire Mine State Historic Park

Remediation

Enacted 2008-09

3790-001-6051 Portion of support

budget

2008-09 Special

Legislation

$11,000,000 B1132Funding for the Americans with

Disabilities Act

Enacted 2008-09

3790-001-6051 Portion of support

budget

2008-09 Budget Act $400,000 B0712Labor Compliance ProgramEnacted 2008-09

3790-001-6051 Portion of support

budget

2008-09 Budget Act $1,907,000 B1163State Park System: PlanningEnacted 2008-09

3790-001-6051 Portion of support

budget

2008-09 Budget Act $2,430,000 B1221State Park System: Program DeliveryEnacted 2008-09

3790-001-6051 Portion of support

budget

2008-09 Budget Act $1,169,000 B1142Statewide: Cultural Stewardship

Program

Enacted 2008-09

3790-001-6051 Portion of support

budget

2008-09 Budget Act $1,458,000 B1182Statewide: Interpretive Exhibit

Program

Enacted 2008-09

Wednesday, January 29, Page 291 of 3421:20:10 PM Public Resources Code (PRC) Section PRC §75063(a)Ch. 8Prop 84 Report

Page 295: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3790-001-6051 Portion of support

budget

2008-09 Budget Act $1,804,000 B1192Statewide: Natural Heritage

Stewardship Program

Enacted 2008-09

3790-001-6051 Portion of support

budget: Control Section

Adjustment

2008-09 Control

Section

Adjustment

$1,000 B1182Statewide: Interpretive Exhibit

Program

Enacted 2008-09

3790-001-6051 Portion of support

budget: Control Section

Adjustment

2008-09 Control

Section

Adjustment

$1,000 B1192Statewide: Natural Heritage

Stewardship Program

Enacted 2008-09

3790-001-6051 Portion of support

budget: Natural

Reversion

2008-09 Natural

Reversion

($1,000,000) B0713Empire Mine State Historic Park

Remediation

Enacted 2010-11

3790-001-6051 Portion of support

budget: Natural

Reversion

2008-09 Natural

Reversion

($674,929) B1132Funding for the Americans with

Disabilities Act

Enacted 2012-13

3790-001-6051 Portion of support

budget: Natural

Reversion

2008-09 Natural

Reversion

($384,579) B0712Labor Compliance ProgramEnacted 2010-11

3790-001-6051 Portion of support

budget: Natural

Reversion

2008-09 Natural

Reversion

($942,416) B1163State Park System: PlanningEnacted 2010-11

3790-001-6051 Portion of support

budget: Natural

Reversion

2008-09 Natural

Reversion

($234,632) B1221State Park System: Program DeliveryEnacted 2010-11

3790-001-6051 Portion of support

budget: Natural

Reversion

2008-09 Natural

Reversion

($186,892) B1142Statewide: Cultural Stewardship

Program

Enacted 2012-13

3790-001-6051 Portion of support

budget: Natural

Reversion

2008-09 Natural

Reversion

($284,867) B1182Statewide: Interpretive Exhibit

Program

Enacted 2010-11

3790-001-6051 Portion of support

budget: Natural

Reversion

2008-09 Natural

Reversion

($130,927) B1192Statewide: Natural Heritage

Stewardship Program

Enacted 2010-11

3790-001-6051 Portion of support

budget

2009-10 Budget Act $8,000,000 B1132Funding for the Americans with

Disabilities Act

Enacted 2009-10

3790-001-6051 Portion of support

budget

2009-10 Budget Act $1,957,000 B1163State Park System: PlanningEnacted 2009-10

3790-001-6051 Portion of support

budget

2009-10 Budget Act $2,990,000 B1221State Park System: Program DeliveryEnacted 2009-10

3790-001-6051 Portion of support

budget

2009-10 Budget Act $1,270,000 B1142Statewide: Cultural Stewardship

Program

Enacted 2009-10

3790-001-6051 Portion of support

budget

2009-10 Budget Act $1,591,000 B1182Statewide: Interpretive Exhibit

Program

Enacted 2009-10

3790-001-6051 Portion of support

budget

2009-10 Budget Act $6,046,000 B1202Statewide: Large Natural Resource

Restoration Projects

Enacted 2009-10

3790-001-6051 Portion of support

budget

2009-10 Budget Act $1,818,000 B1192Statewide: Natural Heritage

Stewardship Program

Enacted 2009-10

3790-001-6051 Portion of support

budget

2009-10 Budget Act $5,000,000 B0712Yosemite SloughEnacted 2009-10

Wednesday, January 29, Page 292 of 3421:20:10 PM Public Resources Code (PRC) Section PRC §75063(a)Ch. 8Prop 84 Report

Page 296: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3790-001-6051 Portion of support

budget: Control Section

Adjustment

2009-10 Control

Section

Adjustment

($258,527) B1163State Park System: PlanningEnacted 2009-10

3790-001-6051 Portion of support

budget: Control Section

Adjustment

2009-10 Control

Section

Adjustment

($616,710) B1221State Park System: Program DeliveryEnacted 2009-10

3790-001-6051 Portion of support

budget: Control Section

Adjustment

2009-10 Control

Section

Adjustment

($154,496) B1142Statewide: Cultural Stewardship

Program

Enacted 2009-10

3790-001-6051 Portion of support

budget: Control Section

Adjustment

2009-10 Control

Section

Adjustment

($193,546) B1182Statewide: Interpretive Exhibit

Program

Enacted 2009-10

3790-001-6051 Portion of support

budget: Control Section

Adjustment

2009-10 Control

Section

Adjustment

($735,500) B1202Statewide: Large Natural Resource

Restoration Projects

Enacted 2009-10

3790-001-6051 Portion of support

budget: Control Section

Adjustment

2009-10 Control

Section

Adjustment

($221,161) B1192Statewide: Natural Heritage

Stewardship Program

Enacted 2009-10

3790-001-6051 Portion of support

budget: Natural

Reversion

2009-10 Natural

Reversion

($99,091) B1132Funding for the Americans with

Disabilities Act

Enacted 2013-14

3790-001-6051 Portion of support

budget: Natural

Reversion

2009-10 Natural

Reversion

($268,210) B1163State Park System: PlanningEnacted 2011-12

3790-001-6051 Portion of support

budget: Natural

Reversion

2009-10 Natural

Reversion

($203,437) B1221State Park System: Program DeliveryEnacted 2011-12

3790-001-6051 Portion of support

budget: Natural

Reversion

2009-10 Natural

Reversion

($321,274) B1142Statewide: Cultural Stewardship

Program

Enacted 2013-14

3790-001-6051 Portion of support

budget: Natural

Reversion

2009-10 Natural

Reversion

($154,385) B1182Statewide: Interpretive Exhibit

Program

Enacted 2013-14

3790-001-6051 Portion of support

budget: Natural

Reversion

2009-10 Natural

Reversion

($913,787) B1202Statewide: Large Natural Resource

Restoration Projects

Enacted 2013-14

3790-001-6051 Portion of support

budget: Natural

Reversion

2009-10 Natural

Reversion

($59,372) B1192Statewide: Natural Heritage

Stewardship Program

Enacted 2013-14

3790-001-6051 Portion of support

budget: Natural

Reversion

2009-10 Natural

Reversion

($414,115) B0712Yosemite SloughEnacted 2013-14

3790-001-6051 Portion of support

budget: Reversion

2009-10 Budget Act ($526,000) B1202Statewide: Large Natural Resource

Restoration Projects

Enacted 2014-15

3790-001-6051 Portion of support

budget: Reversion

2009-10 Budget Act ($112,000) B1192Statewide: Natural Heritage

Stewardship Program

Enacted 2014-15

3790-001-6051 Portion of support

budget

2010-11 Budget Act $8,378,000 B1132Funding for the Americans with

Disabilities Act

Enacted 2010-11

3790-001-6051 Portion of support

budget

2010-11 Budget Act $2,008,500 B1163State Park System: PlanningEnacted 2010-11

Wednesday, January 29, Page 293 of 3421:20:10 PM Public Resources Code (PRC) Section PRC §75063(a)Ch. 8Prop 84 Report

Page 297: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3790-001-6051 Portion of support

budget

2010-11 Budget Act $3,130,000 B1221State Park System: Program DeliveryEnacted 2010-11

3790-001-6051 Portion of support

budget

2010-11 Budget Act $14,175,000 B1242Statewide: California Museum

Collection Center

Enacted 2010-11

3790-001-6051 Portion of support

budget

2010-11 Budget Act $1,267,000 B1142Statewide: Cultural Stewardship

Program

Enacted 2010-11

3790-001-6051 Portion of support

budget

2010-11 Budget Act $1,588,000 B1182Statewide: Interpretive Exhibit

Program

Enacted 2010-11

3790-001-6051 Portion of support

budget

2010-11 Budget Act $1,432,000 B1202Statewide: Large Natural Resource

Restoration Projects

Enacted 2010-11

3790-001-6051 Portion of support

budget

2010-11 Budget Act $1,811,500 B1192Statewide: Natural Heritage

Stewardship Program

Enacted 2010-11

3790-001-6051 Portion of support

budget: Natural

Reversion

2010-11 Natural

Reversion

($477,455) B1132Funding for the Americans with

Disabilities Act

Enacted 2012-13

3790-001-6051 Portion of support

budget: Natural

Reversion

2010-11 Natural

Reversion

($1,559,606) B1163State Park System: PlanningEnacted 2012-13

3790-001-6051 Portion of support

budget: Natural

Reversion

2010-11 Natural

Reversion

($760,630) B1221State Park System: Program DeliveryEnacted 2012-13

3790-001-6051 Portion of support

budget: Natural

Reversion

2010-11 Natural

Reversion

($268,907) B1242Statewide: California Museum

Collection Center

Enacted 2013-14

3790-001-6051 Portion of support

budget: Natural

Reversion

2010-11 Natural

Reversion

($372,352) B1142Statewide: Cultural Stewardship

Program

Enacted 2013-14

3790-001-6051 Portion of support

budget: Natural

Reversion

2010-11 Natural

Reversion

($165,906) B1182Statewide: Interpretive Exhibit

Program

Enacted 2013-14

3790-001-6051 Portion of support

budget: Natural

Reversion

2010-11 Natural

Reversion

($416,473) B1202Statewide: Large Natural Resource

Restoration Projects

Enacted 2014-15

3790-001-6051 Portion of support

budget: Natural

Reversion

2010-11 Natural

Reversion

($38,240) B1192Statewide: Natural Heritage

Stewardship Program

Enacted 2013-14

3790-001-6051 Portion of support

budget: Reversion

2010-11 Budget Act ($308,000) B1182Statewide: Interpretive Exhibit

Program

Enacted 2014-15

3790-001-6051 Portion of support

budget: Reversion

2010-11 Budget Act ($258,000) B1192Statewide: Natural Heritage

Stewardship Program

Enacted 2014-15

3790-001-6051 Portion of support

budget

2011-12 Budget Act $131,000 B1163State Park System: PlanningEnacted 2011-12

3790-001-6051 Portion of support

budget

2011-12 Budget Act $3,235,000 B1221State Park System: Program DeliveryEnacted 2011-12

3790-001-6051 Portion of support

budget: Natural

Reversion

2011-12 Natural

Reversion

($131,000) B1163State Park System: PlanningEnacted 2013-14

Wednesday, January 29, Page 294 of 3421:20:10 PM Public Resources Code (PRC) Section PRC §75063(a)Ch. 8Prop 84 Report

Page 298: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3790-001-6051 Portion of support

budget: Natural

Reversion

2011-12 Natural

Reversion

($502,161) B1221State Park System: Program DeliveryEnacted 2013-14

3790-001-6051 Portion of support

budget

2012-13 Budget Act $134,000 B1163State Park System: PlanningEnacted 2012-13

3790-001-6051 Portion of support

budget

2012-13 Budget Act $3,228,000 B1221State Park System: Program DeliveryEnacted 2012-13

3790-001-6051 Portion of support

budget: Natural

Reversion

2012-13 Natural

Reversion

($134,000) B1163State Park System: PlanningEnacted 2014-15

3790-001-6051 Portion of support

budget: Natural

Reversion

2012-13 Natural

Reversion

($139,549) B1221State Park System: Program DeliveryEnacted 2014-15

3790-001-6051 Portion of support

budget

2013-14 Budget Act $65,000 B0712Labor Compliance Program

Project(s)

Enacted 2013-14

3790-001-6051 Portion of support

budget

2013-14 Budget Act $55,000 B1163State Park System: PlanningEnacted 2013-14

3790-001-6051 Portion of support

budget

2013-14 Budget Act $2,309,000 B1221State Park System: Program DeliveryEnacted 2013-14

3790-001-6051 Portion of support

budget: Natural

Reversion

2013-14 Natural

Reversion

($39,460) B0712Labor Compliance Program

Project(s)

Enacted 2015-16

3790-001-6051 Portion of support

budget: Natural

Reversion

2013-14 Natural

Reversion

($55,000) B1163State Park System: PlanningEnacted 2015-16

3790-001-6051 Portion of support

budget: Natural

Reversion

2013-14 Natural

Reversion

($549,263) B1221State Park System: Program DeliveryEnacted 2015-16

3790-001-6051 Portion of support

budget

2014-15 Budget Act $120,000 B0712Hearst Castle San Simeon Campfire

Center - Project

Enacted 2014-15

3790-001-6051 Portion of support

budget

2014-15 Budget Act $42,000 B0712Labor Compliance Program

Project(s)

Enacted 2014-15

3790-001-6051 Portion of support

budget

2014-15 Budget Act $2,023,000 B1221State Park System: Program DeliveryEnacted 2014-15

3790-001-6051 Portion of support

budget: Natural

Reversion

2014-15 Natural

Reversion

($120,000) B0712Hearst Castle San Simeon Campfire

Center - Project

Enacted 2016-17

3790-001-6051 Portion of support

budget: Natural

Reversion

2014-15 Natural

Reversion

($42,000) B0712Labor Compliance Program

Project(s)

Enacted 2016-17

3790-001-6051 Portion of support

budget: Natural

Reversion

2014-15 Natural

Reversion

($227,275) B1221State Park System: Program DeliveryEnacted 2016-17

3790-001-6051 Portion of support

budget

2015-16 Budget Act $65,000 B0712Labor Compliance Program

Project(s)

Enacted 2015-16

3790-001-6051 Portion of support

budget

2015-16 Budget Act $551,000 B1221State Park System: Program DeliveryEnacted 2015-16

Wednesday, January 29, Page 295 of 3421:20:10 PM Public Resources Code (PRC) Section PRC §75063(a)Ch. 8Prop 84 Report

Page 299: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3790-001-6051 Portion of support

budget: Natural

Reversion

2015-16 Natural

Reversion

($65,000) B0712Labor Compliance Program

Project(s)

Enacted 2017-18

3790-001-6051 Portion of support

budget: Natural

Reversion

2015-16 Natural

Reversion

($228,536) B1221State Park System: Program DeliveryEnacted 2017-18

3790-001-6051 Portion of support

budget

2016-17 Budget Act $180,000 B1162Austin Creek SRA: Pond Farm

Guest House

Enacted 2016-17

3790-001-6051 Portion of support

budget

2016-17 Budget Act $65,000 B0712Labor Compliance Program

Project(s)

Enacted 2016-17

3790-001-6051 Portion of support

budget

2016-17 Budget Act $33,000 B1163State Park System: PlanningEnacted 2016-17

3790-001-6051 Portion of support

budget

2016-17 Budget Act $253,000 B1221State Park System: Program DeliveryEnacted 2016-17

3790-001-6051 Portion of support

budget: Natural

Reversion

2016-17 Natural

Reversion

($22,473) B1162Austin Creek SRA: Pond Farm

Guest House

Enacted 2018-19

3790-001-6051 Portion of support

budget: Natural

Reversion

2016-17 Natural

Reversion

($58,787) B0712Labor Compliance Program

Project(s)

Enacted 2018-19

3790-001-6051 Portion of support

budget: Natural

Reversion

2016-17 Natural

Reversion

($33,000) B1163State Park System: PlanningEnacted 2018-19

3790-001-6051 Portion of support

budget: Natural

Reversion

2016-17 Natural

Reversion

($97,490) B1221State Park System: Program DeliveryEnacted 2018-19

3790-001-6051 Portion of support

budget

2017-18 Budget Act $311,000 B0713State Park System: PlanningEnacted 2017-18

3790-001-6051 Portion of support

budget

2017-18 Budget Act $253,000 B0711State Park System: Program DeliveryEnacted 2017-18

3790-001-6051 Portion of support

budget

2018-19 Budget Act $83,000 B0713State Park System: PlanningEnacted 2018-19

3790-001-6051 Portion of support

budget

2018-19 Budget Act $253,000 B0711State Park System: Program DeliveryEnacted 2018-19

3790-001-6051 Portion of support

budget

2019-20 Budget Act $299,000 B0711State Park System: Program DeliveryEnacted 2019-20

3790-002-6051 Portion of support

budget

2007-08 Special

Legislation

$24,868,982 B1152Deferred MaintenanceEnacted 2007-08

3790-002-6051 Portion of support

budget: Natural

Reversion

2007-08 Natural

Reversion

($599,534) B1152Deferred MaintenanceEnacted 2015-16

3790-002-6051 Portion of support

budget: Reversion

2007-08 Budget Act ($10,000,000) B1152Deferred MaintenanceEnacted 2012-13

3790-002-6051 (1) Portion of support

budget

2007-08 Special

Legislation

$5,131,018 B1152Deferred MaintenanceEnacted 2007-08

3790-002-6051 Portion of support

budget

2008-09 Budget Act $6,661,000 B1152Deferred MaintenanceEnacted 2008-09

Wednesday, January 29, Page 296 of 3421:20:11 PM Public Resources Code (PRC) Section PRC §75063(a)Ch. 8Prop 84 Report

Page 300: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3790-002-6051 Portion of support

budget: Control Section

Adjustment

2008-09 Control

Section

Adjustment

($142,330) B1152Deferred MaintenanceEnacted 2008-09

3790-002-6051 Portion of support

budget: Natural

Reversion

2008-09 Natural

Reversion

($2,920,117) B1152Deferred MaintenanceEnacted 2015-16

3790-002-6051 (2) Portion of support

budget

2008-09 Budget Act $5,607,000 B1152Deferred MaintenanceEnacted 2008-09

3790-002-6051 Portion of support

budget

2009-10 Budget Act $4,000 B1152Deferred MaintenanceEnacted 2009-10

3790-002-6051 Portion of support

budget: Natural

Reversion

2009-10 Natural

Reversion

($4,000) B1152Deferred MaintenanceEnacted 2011-12

3790-002-6051 General Plans - Planning2017-18 Budget Act $2,000,000 B1163General Plans - PlanningEnacted 2017-18

3790-002-6051 Portion of support

budget

2019-20 Budget Act $4,000,000 B0713Statewide: Cultural Stewardship

Program - Planning

Enacted 2019-20

3790-002-6051 Portion of support

budget

2019-20 Budget Act $500,000 B0712Statewide: Interpretive Exhibit

Program

Enacted 2019-20

3790-003-6051 Portion of support

budget

2011-12 Budget Act $2,700,000 B1403Empire Mine State Historic Park:

Remediation Measures

Enacted 2011-12

3790-003-6051 Portion of support

budget

2011-12 Budget Act $7,701,000 B1132Funding for the Americans with

Disabilities Act

Enacted 2011-12

3790-003-6051 Portion of support

budget

2011-12 Budget Act $1,494,000 B1163State Park System: PlanningEnacted 2011-12

3790-003-6051 Portion of support

budget

2011-12 Budget Act $2,011,000 B1142Statewide: Cultural Stewardship

Program

Enacted 2011-12

3790-003-6051 Portion of support

budget

2011-12 Budget Act $4,070,000 B1182Statewide: Interpretive Exhibit

Program

Enacted 2011-12

3790-003-6051 Portion of support

budget

2011-12 Budget Act $1,440,000 B1202Statewide: Large Natural Resource

Restoration Projects

Enacted 2011-12

3790-003-6051 Portion of support

budget

2011-12 Budget Act $1,792,700 B1192Statewide: Natural Heritage

Stewardship Program

Enacted 2011-12

3790-003-6051 Portion of support

budget

2011-12 Budget Act $107,300 B1193Statewide: Natural Heritage

Stewardship Program: Planning

Enacted 2011-12

3790-003-6051 Portion of support

budget: Natural

Reversion

2011-12 Natural

Reversion

($2,700,000) B1403Empire Mine State Historic Park:

Remediation Measures

Enacted 2015-16

3790-003-6051 Portion of support

budget: Natural

Reversion

2011-12 Natural

Reversion

($51,429) B1132Funding for the Americans with

Disabilities Act

Enacted 2015-16

3790-003-6051 Portion of support

budget: Natural

Reversion

2011-12 Natural

Reversion

($564,049) B1163State Park System: PlanningEnacted 2015-16

3790-003-6051 Portion of support

budget: Natural

Reversion

2011-12 Natural

Reversion

($253,030) B1142Statewide: Cultural Stewardship

Program

Enacted 2015-16

3790-003-6051 Portion of support

budget: Natural

Reversion

2011-12 Natural

Reversion

($1,187,613) B1182Statewide: Interpretive Exhibit

Program

Enacted 2015-16

Wednesday, January 29, Page 297 of 3421:20:11 PM Public Resources Code (PRC) Section PRC §75063(a)Ch. 8Prop 84 Report

Page 301: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3790-003-6051 Portion of support

budget: Natural

Reversion

2011-12 Natural

Reversion

($341,471) B1202Statewide: Large Natural Resource

Restoration Projects

Enacted 2015-16

3790-003-6051 Portion of support

budget: Natural

Reversion

2011-12 Natural

Reversion

($179,804) B1192Statewide: Natural Heritage

Stewardship Program

Enacted 2015-16

3790-003-6051 Portion of support

budget: Natural

Reversion

2011-12 Natural

Reversion

($86) B1193Statewide: Natural Heritage

Stewardship Program: Planning

Enacted 2015-16

3790-003-6051 Portion of support

budget: Reversion

2011-12 Budget Act ($565,000) B1202Statewide: Large Natural Resource

Restoration Projects

Enacted 2014-15

3790-003-6051 Portion of support

budget

2012-13 Budget Act $8,121,000 B1132Funding for the Americans with

Disabilities Act

Enacted 2012-13

3790-003-6051 Portion of support

budget

2012-13 Budget Act $1,452,000 B1163State Park System: PlanningEnacted 2012-13

3790-003-6051 Portion of support

budget

2012-13 Budget Act $2,018,000 B1142Statewide: Cultural Stewardship

Program

Enacted 2012-13

3790-003-6051 Portion of support

budget

2012-13 Budget Act $1,055,000 B1182Statewide: Interpretive Exhibit

Program

Enacted 2012-13

3790-003-6051 Portion of support

budget

2012-13 Budget Act $1,443,000 B1202Statewide: Large Natural Resource

Restoration Projects

Enacted 2012-13

3790-003-6051 Portion of support

budget

2012-13 Budget Act $955,000 B1192Statewide: Natural Heritage

Stewardship Program

Enacted 2012-13

3790-003-6051 Portion of support

budget: Natural

Reversion

2012-13 Natural

Reversion

($365,091) B1132Funding for the Americans with

Disabilities Act

Enacted 2016-17

3790-003-6051 Portion of support

budget: Natural

Reversion

2012-13 Natural

Reversion

($761,732) B1163State Park System: PlanningEnacted 2016-17

3790-003-6051 Portion of support

budget: Natural

Reversion

2012-13 Natural

Reversion

($265,850) B1142Statewide: Cultural Stewardship

Program

Enacted 2016-17

3790-003-6051 Portion of support

budget: Natural

Reversion

2012-13 Natural

Reversion

($355,441) B1182Statewide: Interpretive Exhibit

Program

Enacted 2016-17

3790-003-6051 Portion of support

budget: Natural

Reversion

2012-13 Natural

Reversion

($367,569) B1202Statewide: Large Natural Resource

Restoration Projects

Enacted 2016-17

3790-003-6051 Portion of support

budget: Natural

Reversion

2012-13 Natural

Reversion

($240,725) B1192Statewide: Natural Heritage

Stewardship Program

Enacted 2016-17

3790-003-6051 Portion of support

budget

2013-14 Budget Act $9,146,000 B1132Funding for the Americans with

Disabilities Act

Enacted 2013-14

3790-003-6051 Portion of support

budget: Natural

Reversion

2013-14 Natural

Reversion

($169,743) B1132Funding for the Americans with

Disabilities Act

Enacted 2017-18

3790-003-6051 Portion of support

budget

2014-15 Budget Act $1,279,000 B1163State Park System: PlanningEnacted 2014-15

Wednesday, January 29, Page 298 of 3421:20:11 PM Public Resources Code (PRC) Section PRC §75063(a)Ch. 8Prop 84 Report

Page 302: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3790-003-6051 Portion of support

budget

2014-15 Budget Act $751,000 B1142Statewide: Cultural Stewardship

Program Project(s)

Enacted 2014-15

3790-003-6051 Portion of support

budget

2014-15 Budget Act $420,000 B1182Statewide: Interpretive Exhibit

Program Project(s)

Enacted 2014-15

3790-003-6051 Portion of support

budget

2014-15 Budget Act $1,070,000 B1202Statewide: Large Natural Resource

Restoration Projects Project(s)

Enacted 2014-15

3790-101-6051 (1) Portion of local

assistance budget: East

Bay Regional Park

District

2013-14 Budget Act $1,210,000 B0712Brickyard Cove at McLaughlin

Eastshore State Park - Design

Enacted 2013-14

3790-101-6051 (1) East Bay Regional Park

District: Brickyard

Cove Improvements

2014-15 Budget Act $3,790,000 B0712Brickyard Cove Improvements at

McLaughlin Eastshore State Park

Enacted 2014-15

3790-30115-60 Los Angeles SHP: Site

Development - Const.

& Equip

2013-14 Executive

Order

(excluding

CS)

$7,392,000 B0712Los Angeles SHP: Site

Development - Planning & Phase 1

Build-Out; CE

Enacted 2015-16

3790-30116-60 Donner Memorial SP:

Entrance Museum

Exhibits - WD & Const.

2012-13 Executive

Order

(excluding

CS)

$104,000 B0712Donner Memorial SP: Entrance

Museum Exhibits

Enacted 2016-17

3790-30117-60 Fort Ord Dunes SP:

New Campground and

Beach Access: WD

Augmentation

2010-11 Executive

Order

(excluding

CS)

$290,000 B0712Fort Ord Dunes SP: New

Campground and Beach Access

Enacted 2017-18

3790-30117-60 Silverwood Lake SRA:

Nature Center Exhibits:

CE Augmentation

2010-11 Executive

Order

(excluding

CS)

$115,000 B0712Silverwood Lake SRA: Nature

Center Exhibits

Enacted 2017-18

3790-30117-60 Torrey Pines State

Natural Reserve Utility

Modernization: P-WD

Augmentation

2015-16 Executive

Order

(excluding

CS)

$54,000 B0712Torrey Pines State Natural Reserve

Utility Modernization

Enacted 2017-18

3790-30117-60 (5) Malibu Creek State

Park: New Stokes

Creek Bridge - P

Augmentation

2015-16 Executive

Order

(excluding

CS)

$60,000 B0712Malibu Creek State Park: New

Stokes Creek Bridge

Enacted 2017-18

3790-301-6051 Calaveras Big Trees

State Park: New Visitor

Center—Working

drawings, construction,

and equipment

2007-08 Natural

Reversion

($350,429) B0712Calaveras Big Trees State Park:

New Visitor Center

Enacted 2014-15

3790-301-6051 Calaveras Big Trees

State Park: New Visitor

Center—Working

drawings, construction,

and equipment;

Executive Order

2007-08 Executive

Order

(excluding

CS)

$161,650 B0712Calaveras Big Trees State Park:

New Visitor Center

Enacted 2007-08

Wednesday, January 29, Page 299 of 3421:20:11 PM Public Resources Code (PRC) Section PRC §75063(a)Ch. 8Prop 84 Report

Page 303: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3790-301-6051 Pfeiffer Big Sur State

Park: Park Entrance

and Day Use

Redevelopment—Worki

ng drawings,

construction, and

equipment: Natural

Reversion

2007-08 Natural

Reversion

($1,015,589) B0712Pfeiffer Big Sur State Park: Park

Entrance and Day Use

Redevelopment

Enacted 2015-16

3790-301-6051 Statewide: State Park

System Opportunity

and Inholding

Acquisitions--

Acquisition: Natural

Reversion

2007-08 Natural

Reversion

($5,176,057) B1122Statewide: State Park System

Opportunity and Inholding

Acquisitions

Enacted 2015-16

3790-301-6051 (1) Millerton Lake State

Recreation Area:

Rehabilitate La Playa

Day Use

Area—Construction

2007-08 Budget Act $3,877,000 B0712Millerton Lake State Recreation

Area: Rehabilitate La Playa Day

Use Area

Enacted 2007-08

3790-301-6051 (1) Millerton Lake State

Recreation Area:

Rehabilitate La Playa

Day Use

Area—Construction:

Reversion

2007-08 Budget Act ($3,877,000) B0712Millerton Lake State Recreation

Area: Rehabilitate La Playa Day

Use Area

Enacted 2009-10

3790-301-6051 (2) Pfeiffer Big Sur State

Park: Park Entrance

and Day Use

Redevelopment—Worki

ng drawings,

construction, and

equipment

2007-08 Budget Act $9,180,000 B0712Pfeiffer Big Sur State Park: Park

Entrance and Day Use

Redevelopment

Enacted 2007-08

3790-301-6051 (3) Silverwood Lake State

Recreation Area:

Campground and Day

Use

Improvements—Constru

ction

2007-08 Budget Act $5,091,000 B0712Silverwood Lake State Recreation

Area: Campground and Day Use

Improvements

Enacted 2007-08

3790-301-6051 (3) Silverwood Lake State

Recreation Area:

Campground and Day

Use

Improvements—Constru

ction: Natural Reversion

2007-08 Natural

Reversion

($1,487,523) B0712Silverwood Lake State Recreation

Area: Campground and Day Use

Improvements

Enacted 2012-13

3790-301-6051 (3.5) Los Angeles State

Historic Park

(Cornfields): Planning

and Phase I Build-

Out—Preliminary plans

2007-08 Budget Act $5,854,000 B0712Los Angeles State Historic Park

(Cornfields): Planning and Phase I

Build-Out

Enacted 2007-08

Wednesday, January 29, Page 300 of 3421:20:11 PM Public Resources Code (PRC) Section PRC §75063(a)Ch. 8Prop 84 Report

Page 304: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3790-301-6051 (3.5) Los Angeles State

Historic Park

(Cornfields): Planning

and Phase I Build-

Out—Preliminary

plans: Natural Reversion

2007-08 Natural

Reversion

($967,512) B0712Los Angeles State Historic Park

(Cornfields): Planning and Phase I

Build-Out

Enacted 2013-14

3790-301-6051 (3.7) Statewide: State Park

System Opportunity

and Inholding

Acquisitions--

Acquisition

2007-08 Budget Act $15,000,000 B1122Statewide: State Park System

Opportunity and Inholding

Acquisitions

Enacted 2007-08

3790-301-6051 (4) Statewide: Budget

Development—Studies

2007-08 Budget Act $2,000,000 B0713Statewide: Budget DevelopmentEnacted 2007-08

3790-301-6051 (4) Statewide: Budget

Development—Studies:

Natural Reversion

2007-08 Natural

Reversion

($1,090,315) B0713Statewide: Budget DevelopmentEnacted 2009-10

3790-301-6051 (5) Calaveras Big Trees

State Park: New Visitor

Center—Working

drawings, construction,

and equipment

2007-08 Budget Act $4,876,000 B0712Calaveras Big Trees State Park:

New Visitor Center

Enacted 2007-08

3790-301-6051 (1) Marshall Gold SP: Park

Improvements - PP

2008-09 Budget Act $340,000 B0712Marshall Gold Discovery SHP:

Improvements

Enacted 2008-09

3790-301-6051 (1) Marshall Gold SP: Park

Improvements - PP:

Natural Reversion

2008-09 Natural

Reversion

($5,945) B0712Marshall Gold Discovery SHP:

Improvements

Enacted 2012-13

3790-301-6051 (2) Gaviota State Park:

Coastal Trail

Development - PP WD

& Const

2008-09 Budget Act $3,017,000 B0712Gaviota State Park: Coastal Trail

Development

Enacted 2008-09

3790-301-6051 (2) Gaviota State Park:

Coastal Trail

Development - PP WD

& Const: Reversion

2008-09 Budget Act ($2,959,140) B0712Gaviota State Park: Coastal Trail

Development

Enacted 2013-14

3790-301-6051 (3) Statewide: Recreational

Trail Minors

2008-09 Budget Act $500,000 B1212Statewide: Recreational Trails

Minor Projects

Enacted 2008-09

3790-301-6051 (3) Statewide: Recreational

Trail Minors: Natural

reversion

2008-09 Natural

Reversion

($4,164) B1212Statewide: Recreational Trails

Minor Projects

Enacted 2014-15

3790-301-6051 (4) Statewide: State Park

System Minor Capital

Outlay

2008-09 Budget Act $1,648,000 B0712Statewide: State Park System Minor

Capital Outlay

Enacted 2008-09

3790-301-6051 (4) Statewide: State Park

System Minor Capital

Outlay: Natural

Reversion

2008-09 Natural

Reversion

($161,438) B0712Statewide: State Park System Minor

Capital Outlay

Enacted 2013-14

3790-301-6051 (5) Statewide: Volunteer

Enhancement Minors

2008-09 Budget Act $649,000 B1172Statewide: Volunteer Enhancement

Minors

Enacted 2008-09

Wednesday, January 29, Page 301 of 3421:20:11 PM Public Resources Code (PRC) Section PRC §75063(a)Ch. 8Prop 84 Report

Page 305: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3790-301-6051 (5) Statewide: Volunteer

Enhancement Minors:

Natural Reversion

2008-09 Natural

Reversion

($79,678) B1172Statewide: Volunteer Enhancement

Minors

Enacted 2013-14

3790-301-6051 (6) Statewide: Budget

Development—Studies

2008-09 Budget Act $300,000 B0713Statewide: Budget DevelopmentEnacted 2008-09

3790-301-6051 (6) Statewide: Budget

Development—Studies:

Natural Reversion

2008-09 Natural

Reversion

($44,380) B0713Statewide: Budget DevelopmentEnacted 2012-13

3790-301-6051 (7) Cuyamaca Rancho SP

Equestrian Facility - PP

2008-09 Budget Act $183,000 B0712Cuyamaca Rancho SP Equestrian

Facility - PP

Enacted 2008-09

3790-301-6051 (7) Cuyamaca Rancho SP

Equestrian Facility -

PP: Natural Reversion

2008-09 Natural

Reversion

($1,189) B0712Cuyamaca Rancho SP Equestrian

Facility - PP

Enacted 2012-13

3790-301-6051 (7.5) Cuyamaca Rancho SP

Equestrian Facility - PP

/ WD

2008-09 Budget Act $227,000 B0712Cuyamaca Rancho SP Equestrian

Facility - PP / WD

Enacted 2008-09

3790-301-6051 (7.5) Cuyamaca Rancho SP

Equestrian Facility - PP

/ WD: Natural reversion

2008-09 Natural

Reversion

($60,787) B0712Cuyamaca Rancho SP Equestrian

Facility - PP / WD

Enacted 2014-15

3790-301-6051 (7.5) Cuyamaca Rancho SP

Equestrian Facility - PP

/ WD: Reversion

2008-09 Budget Act ($122,928) B0712Cuyamaca Rancho SP Equestrian

Facility - PP / WD

Enacted 2014-15

3790-301-6051 (8) McLaughlin Eastshore

State Park: Brickyard

Cove—Preliminary

plans

2008-09 Budget Act $771,000 B0712McLaughlin Eastshore State Park:

Brickyard Cove Development -- P

Enacted 2008-09

3790-301-6051 (8) McLaughlin Eastshore

State Park: Brickyard

Cove—Preliminary

plans: Reversion

2008-09 Budget Act ($718,046) B0712McLaughlin Eastshore State Park:

Brickyard Cove Development -- P

Enacted 2014-15

3790-301-6051 Angel Island State Park:

Immigration Station

Hospital Rehab

2009-10 Budget Act $214,992 B0712Angel Island State Park:

Immigration Station Hospital Rehab

Enacted 2009-10

3790-301-6051 Cuyamaca Rancho SP:

Equestrian Trailhead

and Facilities

2009-10 Budget Act $3,031,000 B0712Cuyamaca Rancho SP: Equestrian

Trailhead and Facilities

Enacted 2009-10

3790-301-6051 Cuyamaca Rancho SP:

Equestrian Trailhead

and Facilities: Reversion

2009-10 Budget Act ($3,031,000) B0712Cuyamaca Rancho SP: Equestrian

Trailhead and Facilities

Enacted 2013-14

3790-301-6051 El Capitan SB:

Construct New

Lifeguard HQ

2009-10 Budget Act $591,000 B0712El Capitan SB: Construct New

Lifeguard HQ

Enacted 2009-10

3790-301-6051 El Capitan SB:

Construct New

Lifeguard HQ:

Reversion

2009-10 Budget Act ($541,074) B0712El Capitan SB: Construct New

Lifeguard HQ

Enacted 2014-15

3790-301-6051 Fort Ord Dunes SP:

New Campground and

Beach Access

2009-10 Budget Act $1,004,345 B0712Fort Ord Dunes SP: New

Campground and Beach Access

Enacted 2009-10

Wednesday, January 29, Page 302 of 3421:20:11 PM Public Resources Code (PRC) Section PRC §75063(a)Ch. 8Prop 84 Report

Page 306: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3790-301-6051 Grover Hot Springs SP:

Renovate Pool Complex

2009-10 Budget Act $531,000 B0712Grover Hot Springs SP: Renovate

Pool Complex

Enacted 2009-10

3790-301-6051 Grover Hot Springs SP:

Renovate Pool

Complex: Natural

Reversion

2009-10 Natural

Reversion

($531,000) B0712Grover Hot Springs SP: Renovate

Pool Complex

Enacted 2012-13

3790-301-6051 Los Angeles SHP: Site

Development

2009-10 Budget Act $1,533,657 B0712Los Angeles SHP: Site DevelopmentEnacted 2009-10

3790-301-6051 Marshall Gold

Discovery SHP:

Improvements

2009-10 Budget Act $328,590 B0712Marshall Gold Discovery SHP:

Improvements

Enacted 2009-10

3790-301-6051 McLaughlin Eastshore

State Park: Brickyard

Cove Development

2009-10 Budget Act $833,000 B0712McLaughlin Eastshore State Park:

Brickyard Cove Development

Enacted 2009-10

3790-301-6051 McLaughlin Eastshore

State Park: Brickyard

Cove Development:

Reversion

2009-10 Budget Act ($833,000) B0712McLaughlin Eastshore State Park:

Brickyard Cove Development

Enacted 2014-15

3790-301-6051 Old Town San Diego:

Building Demo and

IPU Facilities - P

2009-10 Budget Act $436,000 B0712Old Town San Diego: Building

Demo and IPU Facilities

Enacted 2009-10

3790-301-6051 Old Town San Diego:

Building Demo and

IPU Facilities - P:

Natural Reversion

2009-10 Natural

Reversion

($172,791) B0712Old Town San Diego: Building

Demo and IPU Facilities

Enacted 2017-18

3790-301-6051 Silverwood Lake SRA:

Nature Center Exhibits

2009-10 Budget Act $316,878 B0712Silverwood Lake SRA: Nature

Center Exhibits

Enacted 2009-10

3790-301-6051 Statewide Volunteer

Enhancement Program

Minor Projects

2009-10 Budget Act $248,129 B1172Statewide Volunteer Enhancement

Program Minor Projects

Enacted 2009-10

3790-301-6051 Statewide: Budget

Development

2009-10 Budget Act $300,000 B0713Statewide: Budget DevelopmentEnacted 2009-10

3790-301-6051 Statewide: Budget

Development: Natural

Reversion

2009-10 Natural

Reversion

($257,424) B0713Statewide: Budget DevelopmentEnacted 2012-13

3790-301-6051 Statewide: Recreational

Trails Minor Projects

2009-10 Budget Act $299,367 B1212Statewide: Recreational Trails

Minor Projects

Enacted 2009-10

3790-301-6051 Statewide: State Park

System Acquisition

Program

2009-10 Budget Act $0 B1122Statewide: State Park System

Acquisition Program

Enacted 2009-10

3790-301-6051 Statewide: State Park

System Minor Capital

Outlay Program

2009-10 Budget Act $2,523,000 B0712Statewide: State Park System Minor

Capital Outlay Program

Enacted 2009-10

3790-301-6051 Statewide: State Park

System Minor Capital

Outlay Program:

Natural Reversion

2009-10 Natural

Reversion

($2,432,263) B0712Statewide: State Park System Minor

Capital Outlay Program

Enacted 2013-14

3790-301-6051 Angel Island State Park:

Immigration Station

Hospital Rehab

2010-11 Budget Act $332,619 B0712Angel Island State Park:

Immigration Station Hospital Rehab

Enacted 2010-11

Wednesday, January 29, Page 303 of 3421:20:11 PM Public Resources Code (PRC) Section PRC §75063(a)Ch. 8Prop 84 Report

Page 307: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3790-301-6051 El Capitan SB:

Construct New

Lifeguard HQ

2010-11 Budget Act $612,000 B0712El Capitan SB: Construct New

Lifeguard HQ

Enacted 2010-11

3790-301-6051 El Capitan SB:

Construct New

Lifeguard HQ:

Reversion

2010-11 Budget Act ($612,000) B0712El Capitan SB: Construct New

Lifeguard HQ

Enacted 2014-15

3790-301-6051 Fort Ord Dunes SP:

New Campground and

Beach Access

2010-11 Budget Act $2,001,000 B0712Fort Ord Dunes SP: New

Campground and Beach Access

Enacted 2010-11

3790-301-6051 Fort Ord Dunes SP:

New Campground and

Beach Access: Natural

Reversion

2010-11 Natural

Reversion

($3,350) B0712Fort Ord Dunes SP: New

Campground and Beach Access

Enacted 2017-18

3790-301-6051 Marshall Gold

Discovery SHP:

Improvements

2010-11 Budget Act $3,391,000 B0712Marshall Gold Discovery SHP:

Improvements

Enacted 2010-11

3790-301-6051 Marshall Gold

Discovery SHP:

Improvements: Natural

Reversion

2010-11 Natural

Reversion

($729,462) B0712Marshall Gold Discovery SHP:

Improvements

Enacted 2016-17

3790-301-6051 Marshall Gold

Discovery SHP:

Improvements:

Reversion Reversal

2010-11 Natural

Reversion

$729,462 B0712Marshall Gold Discovery SHP:

Improvements

Enacted 2017-18

3790-301-6051 Old Town San Diego:

Building Demo and

IPU Facilities - WD

2010-11 Budget Act $299,000 B0712Old Town San Diego: Building

Demo and IPU Facilities

Enacted 2010-11

3790-301-6051 Old Town San Diego:

Building Demo and

IPU Facilities - WD:

Reversion

2010-11 Budget Act ($299,000) B0712Old Town San Diego: Building

Demo and IPU Facilities

Enacted 2014-15

3790-301-6051 Silverwood Lake SRA:

Nature Center Exhibits

2010-11 Budget Act $827,000 B0712Silverwood Lake SRA: Nature

Center Exhibits

Enacted 2010-11

3790-301-6051 Silverwood Lake SRA:

Nature Center Exhibits:

Natural Reversion

2010-11 Natural

Reversion

($264,608) B0712Silverwood Lake SRA: Nature

Center Exhibits

Enacted 2017-18

3790-301-6051 Silverwood Lake SRA:

Nature Center Exhibits:

Reversion Reversal

2010-11 Natural

Reversion

$264,608 B0712Silverwood Lake SRA: Nature

Center Exhibits

Enacted 2018-19

3790-301-6051 Statewide Volunteer

Enhancement Program

Minor Projects

2010-11 Budget Act $88,801 B1172Statewide Volunteer Enhancement

Program Minor Projects

Enacted 2010-11

3790-301-6051 Statewide: Budget

Development

2010-11 Budget Act $112,044 B0713Statewide: Budget DevelopmentEnacted 2010-11

3790-301-6051 Statewide: Recreational

Trails Minor Projects

2010-11 Budget Act $192,529 B1212Statewide: Recreational Trails

Minor Projects

Enacted 2010-11

3790-301-6051 Statewide: State Park

System Minor Capital

Outlay Program

2010-11 Budget Act $1,106,908 B0712Statewide: State Park System Minor

Capital Outlay Program

Enacted 2010-11

Wednesday, January 29, Page 304 of 3421:20:11 PM Public Resources Code (PRC) Section PRC §75063(a)Ch. 8Prop 84 Report

Page 308: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3790-301-6051 (3.7) Statewide: State Park

System Opportunity

and Inholding

Acquisitions--

Acquisition

2010-11 Budget Act $1,500,000 B1122Statewide: State Park System

Opportunity and Inholding

Acquisitions

Enacted 2010-11

3790-301-6051 (3.7) Statewide: State Park

System Opportunity

and Inholding

Acquisitions--

Acquisition: Natural

Reversion

2010-11 Natural

Reversion

($1,484,881) B1122Statewide: State Park System

Opportunity and Inholding

Acquisitions

Enacted 2015-16

3790-301-6051 (1) Statewide Volunteer

Enhancement Program

Minor Projects

2011-12 Budget Act $295,395 B1172Statewide Volunteer Enhancement

Program Minor Projects

Enacted 2011-12

3790-301-6051 (2) Statewide: Recreational

Trails Minor Projects

2011-12 Budget Act $143,399 B1212Statewide: Recreational Trails

Minor Projects

Enacted 2011-12

3790-301-6051 (3) Statewide: Budget

Development

2011-12 Budget Act $0 B0713Statewide: Budget DevelopmentEnacted 2011-12

3790-301-6051 (4) Donner Memorial SP:

Entrance Museum

Exhibits - Preliminary

Plans

2011-12 Budget Act $167,663 B0712Donner Memorial SP: Entrance

Museum Exhibits

Enacted 2011-12

3790-301-6051 (5) Marshall Gold SP: Park

Improvements -

WD/Const.

2011-12 Budget Act $1,128,000 B0712Marshall Gold Discovery SHP:

Improvements

Enacted 2011-12

3790-301-6051 (5) Marshall Gold SP: Park

Improvements -

WD/Const.: Natural

Reversion

2011-12 Natural

Reversion

($274,769) B0712Marshall Gold Discovery SHP:

Improvements

Enacted 2016-17

3790-301-6051 (5) Marshall Gold SP: Park

Improvements -

WD/Const.: Reversion

Reversal

2011-12 Natural

Reversion

$274,769 B0712Marshall Gold Discovery SHP:

Improvements

Enacted 2017-18

3790-301-6051 Donner Memorial SP:

Entrance Museum

Exhibits - WD &

Const.: Natural

Reversion

2012-13 Natural

Reversion

($11,570) B0712Donner Memorial SP: Entrance

Museum Exhibits

Enacted 2017-18

3790-301-6051 El Capitan SB:

Construct New

Lifeguard HQ - Const.

2012-13 Budget Act $7,864,000 B0712El Capitan SB: Construct New

Lifeguard HQ

Enacted 2012-13

3790-301-6051 El Capitan SB:

Construct New

Lifeguard HQ - Const.:

Reversion

2012-13 Budget Act ($7,864,000) B0712El Capitan SB: Construct New

Lifeguard HQ

Enacted 2014-15

3790-301-6051 (4) Donner Memorial SP:

Entrance Museum

Exhibits - WD & Const.

2012-13 Budget Act $881,000 B0712Donner Memorial SP: Entrance

Museum Exhibits

Enacted 2012-13

3790-301-6051 Angel Island State Park:

Immigration Station

Hospital Rehab-Const

2013-14 Budget Act $4,763,000 B0712Angel Island State Park:

Immigration Station Hospital Rehab

Enacted 2013-14

Wednesday, January 29, Page 305 of 3421:20:11 PM Public Resources Code (PRC) Section PRC §75063(a)Ch. 8Prop 84 Report

Page 309: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3790-301-6051 Angel Island State Park:

Immigration Station

Hospital Rehab-Const:

Natural Reversion

2013-14 Natural

Reversion

($1,595,388) B0712Angel Island State Park:

Immigration Station Hospital Rehab

Enacted 2017-18

3790-301-6051 Los Angeles SHP: Site

Development - Const.

& Equip

2013-14 Budget Act $20,843,000 B0712Los Angeles SHP: Site

Development - Planning & Phase 1

Build-Out; CE

Enacted 2013-14

3790-301-6051 Los Angeles SHP: Site

Development - Const.

& Equip: Natural

Reversion

2013-14 Natural

Reversion

($26,062) B0712Los Angeles SHP: Site

Development - Planning & Phase 1

Build-Out; CE

Enacted 2017-18

3790-301-6051 MacKerricher SP:

Replace Water

Treatment Plant - P:

Natural Reversion

2014-15 Budget Act ($414,888) B0712MacKerricher SP: Replace Water

Treatment Plant

Enacted 2017-18

3790-301-6051 MacKerricher SP:

Replace Water

Treatment Plant - P:

Reversion Reversal

2014-15 Budget Act $414,888 B0712MacKerricher SP: Replace Water

Treatment Plant

Enacted 2018-19

3790-301-6051 (1) Fort Ord Dunes SP:

New Campground and

Beach Access - Const.

2014-15 Budget Act $19,176,000 B0712Fort Ord Dunes SP: New

Campground and Beach Access

Enacted 2014-15

3790-301-6051 (2) Old Town San Diego:

Building Demo and

IPU Facilities - WD/C

2014-15 Budget Act $7,643,000 B0712Old Town San Diego: Building

Demo and IPU Facilities

Enacted 2014-15

3790-301-6051 (3) El Capitan SB:

Construct New

Lifeguard HQ - P

2014-15 Budget Act $723,000 B0712El Capitan SB: Construct New

Lifeguard HQ

Enacted 2014-15

3790-301-6051 (3) El Capitan SB:

Construct New

Lifeguard HQ - P:

Natural Reversion

2014-15 Natural

Reversion

($425,361) B0712El Capitan SB: Construct New

Lifeguard HQ

Enacted 2017-18

3790-301-6051 (4) MacKerricher SP:

Replace Water

Treatment Plant - P

2014-15 Budget Act $581,000 B0712MacKerricher SP: Replace Water

Treatment Plant

Enacted 2014-15

3790-301-6051 (5) South Yuba River SP:

Historic Covered

Bridge - C

2014-15 Budget Act $1,000,000 B0712South Yuba River SP: Historic

Covered Bridge

Enacted 2014-15

3790-301-6051 (5) South Yuba River SP:

Historic Covered

Bridge: Reversion

2014-15 Budget Act ($1,000,000) B0712South Yuba River SP: Historic

Covered Bridge

Enacted 2015-16

3790-301-6051 El Capitan SB:

Construct New

Lifeguard HQ - WD:

Natural Reversion

2015-16 Natural

Reversion

($619,000) B0712El Capitan SB: Construct New

Lifeguard HQ

Enacted 2018-19

3790-301-6051 Gaviota State Park:

Main Water Supply

Upgrades - P: Natural

Reversion

2015-16 Budget Act ($198,689) B0712Gaviota State Park: Main Water

Supply Upgrades

Enacted 2017-18

Wednesday, January 29, Page 306 of 3421:20:11 PM Public Resources Code (PRC) Section PRC §75063(a)Ch. 8Prop 84 Report

Page 310: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3790-301-6051 Gaviota State Park:

Main Water Supply

Upgrades - P:

Reversion Reversal

2015-16 Budget Act $198,689 B0712Gaviota State Park: Main Water

Supply Upgrades

Enacted 2018-19

3790-301-6051 Malibu Creek State

Park: New Stokes

Creek Bridge - P:

Natural Reversion

2015-16 Budget Act ($80,220) B0712Malibu Creek State Park: New

Stokes Creek Bridge

Enacted 2017-18

3790-301-6051 Malibu Creek State

Park: New Stokes

Creek Bridge - P:

Reversion Reversal

2015-16 Budget Act $80,220 B0712Malibu Creek State Park: New

Stokes Creek Bridge

Enacted 2018-19

3790-301-6051 (1) El Capitan SB:

Construct New

Lifeguard HQ - WD

2015-16 Budget Act $619,000 B0712El Capitan SB: Construct New

Lifeguard HQ

Enacted 2015-16

3790-301-6051 (2) MacKerricher SP:

Replace Water

Treatment Plant - WD-C

2015-16 Budget Act $2,474,000 B0712MacKerricher SP: Replace Water

Treatment Plant

Enacted 2015-16

3790-301-6051 (3) South Yuba River SP:

Historic Covered

Bridge - P-WD-C

2015-16 Budget Act $772,000 B0712South Yuba River SP: Historic

Covered Bridge

Enacted 2015-16

3790-301-6051 (3)(2) MacKerricher SP:

Replace Water

Treatment Plant - WD-

C: Reappropriation

(decrease)

2015-16 Budget Act ($2,474,000) B0712MacKerricher SP: Replace Water

Treatment Plant

Enacted 2017-18

3790-301-6051 (3)(2) MacKerricher SP:

Replace Water

Treatment Plant - WD-

C: Reappropriation

(increase)

2015-16 Budget Act $2,474,000 B0712MacKerricher SP: Replace Water

Treatment Plant

Enacted 2018-19

3790-301-6051 (3)(3) South Yuba River SP:

Historic Covered

Bridge - P-WD-C:

Reappropriation

(decrease)

2015-16 Budget Act ($772,000) B0712South Yuba River SP: Historic

Covered Bridge

Enacted 2017-18

3790-301-6051 (3)(3) South Yuba River SP:

Historic Covered

Bridge - P-WD-C:

Reappropriation

(increase)

2015-16 Budget Act $772,000 B0712South Yuba River SP: Historic

Covered Bridge

Enacted 2018-19

3790-301-6051 (3)(4) Malibu Creek State

Park: New Stokes

Creek Bridge - P:

Reappropriation

(decrease)

2015-16 Budget Act ($232,000) B0712Malibu Creek State Park: New

Stokes Creek Bridge

Enacted 2015-16

3790-301-6051 (3)(4) Malibu Creek State

Park: New Stokes

Creek Bridge - P:

Reappropriation

(increase)

2015-16 Budget Act $232,000 B0712Malibu Creek State Park: New

Stokes Creek Bridge

Enacted 2018-19

Wednesday, January 29, Page 307 of 3421:20:11 PM Public Resources Code (PRC) Section PRC §75063(a)Ch. 8Prop 84 Report

Page 311: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3790-301-6051 (3)(5) Gaviota State Park:

Main Water Supply

Upgrades - P:

Reappropriation

(decrease)

2015-16 Budget Act ($215,000) B0712Gaviota State Park: Main Water

Supply Upgrades

Enacted 2015-16

3790-301-6051 (3)(5) Gaviota State Park:

Main Water Supply

Upgrades - P:

Reappropriation

(increase)

2015-16 Budget Act $215,000 B0712Gaviota State Park: Main Water

Supply Upgrades

Enacted 2018-19

3790-301-6051 (3)(6) Torrey Pines State

Natural Reserve Utility

Modernization - P-WD:

Reappropriation

(decrease)

2015-16 Budget Act ($287,000) B0712Torrey Pines State Natural Reserve

Utility Modernization

Enacted 2017-18

3790-301-6051 (3)(6) Torrey Pines State

Natural Reserve Utility

Modernization - P-WD:

Reappropriation

(increase)

2015-16 Budget Act $287,000 B0712Torrey Pines State Natural Reserve

Utility Modernization

Enacted 2018-19

3790-301-6051 (3)(7) Old Sacramento State

Historic Park - Boiler

Shop Renovation - P:

Reappropriation

(decrease)

2015-16 Budget Act ($1,452,000) B0712Old Sacramento State Historic

Park - Boiler Shop Renovation

Enacted 2017-18

3790-301-6051 (3)(7) Old Sacramento State

Historic Park - Boiler

Shop Renovation - P:

Reappropriation

(increase)

2015-16 Budget Act $1,452,000 B0712Old Sacramento State Historic

Park - Boiler Shop Renovation

Enacted 2018-19

3790-301-6051 (4) Gaviota State Park:

Main Water Supply

Upgrades - P

2015-16 Budget Act $215,000 B0712Gaviota State Park: Main Water

Supply Upgrades

Enacted 2015-16

3790-301-6051 (5) Malibu Creek State

Park: New Stokes

Creek Bridge - P

2015-16 Budget Act $232,000 B0712Malibu Creek State Park: New

Stokes Creek Bridge

Enacted 2015-16

3790-301-6051 (6) Torrey Pines State

Natural Reserve Utility

Modernization - P-WD

2015-16 Budget Act $287,000 B0712Torrey Pines State Natural Reserve

Utility Modernization

Enacted 2015-16

3790-301-6051 (7) Old Sacramento State

Historic Park - Boiler

Shop Renovation - P

2015-16 Budget Act $726,000 B0712Old Sacramento State Historic

Park - Boiler Shop Renovation

Enacted 2015-16

3790-301-6051 Statewide: Minor

Capital Outlay

Program: Natural

Reversion

2016-17 Natural

Reversion

($353,190) B0712Statewide: Minor Capital Outlay

Program

Enacted 2018-19

3790-301-6051 Statewide: Rec Trails

Minor Capital Outlay

Program: Natural

Reversion

2016-17 Natural

Reversion

($465,605) B0712Statewide: Rec Trails Minor Capital

Outlay Program

Enacted 2018-19

Wednesday, January 29, Page 308 of 3421:20:11 PM Public Resources Code (PRC) Section PRC §75063(a)Ch. 8Prop 84 Report

Page 312: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3790-301-6051 (1) El Capitan State Beach:

Entrance

Improvements - P

2016-17 Budget Act $358,000 B0712El Capitan State Beach: Entrance

Improvements

Enacted 2016-17

3790-301-6051 (2) Gaviota State Park:

Main Water Supply

Upgrades - WD

2016-17 Budget Act $142,000 B0712Gaviota State Park: Main Water

Supply Upgrades

Enacted 2016-17

3790-301-6051 (3) Malibu Creek State

Park: New Stokes

Creek Bridge - WD

2016-17 Budget Act $233,000 B0712Malibu Creek State Park: New

Stokes Creek Bridge - WD

Enacted 2016-17

3790-301-6051 (4) Statewide: Minor

Capital Outlay Program

2016-17 Budget Act $395,000 B0712Statewide: Minor Capital Outlay

Program

Enacted 2016-17

3790-301-6051 (5) Torrey Pines State

Natural Reserve: Utility

Modernization - C

2016-17 Budget Act $2,149,000 B0712Torrey Pines State Natural Reserve:

Utility Modernization

Enacted 2016-17

3790-301-6051 (6) Topanga State Park:

Rehabilitate Trippet

Ranch Parking Lot - P

2016-17 Budget Act $316,000 B0712Topanga State Park: Rehabilitate

Trippet Ranch Parking Lot

Enacted 2016-17

3790-301-6051 (7) Statewide: Rec Trails

Minor Capital Outlay

Program

2016-17 Budget Act $900,000 B0712Statewide: Rec Trails Minor Capital

Outlay Program

Enacted 2016-17

3790-301-6051 (8) El Capitan SB:

Construct New

Lifeguard Operations

Facility - C&E

2016-17 Budget Act $8,345,000 B0712El Capitan State Beach: Construct

New Lifeguard Operations Facility

Enacted 2016-17

3790-301-6051 (1) Fort Ord Dunes SP:

New

Campground—Construc

tion

2017-18 Budget Act $3,196,000 B0712Fort Ord Dunes SP: New

Campground—Construction

Enacted 2017-18

3790-301-6051 (2) South Yuba River SP:

Historic Covered

Bridge—Construction

2017-18 Budget Act $2,810,000 B0712South Yuba River SP: Historic

Covered Bridge—Construction

Enacted 2017-18

3790-301-6051 (3) El Capitan SB:

Entrance

Improvements—Workin

g drawings

2017-18 Budget Act $378,000 B0712El Capitan SB: Entrance

Improvements—Working drawings

Enacted 2017-18

3790-301-6051 (4) Topanga SP:

Rehabilitate Trippet

Ranch Parking

Lot—Working drawings

2017-18 Budget Act $219,000 B0712Topanga SP: Rehabilitate Trippet

Ranch Parking Lot—Working

drawings

Enacted 2017-18

3790-301-6051 (4)(7) Torrey Pines State

Natural Reserve: Utility

Modernization - C:

Reversion

2017-18 Budget Act ($1,024,000) B0712Torrey Pines State Natural Reserve:

Utility Modernization

Enacted 2018-19

3790-301-6051 (5) Lake Oroville SRA:

Bidwell Canyon Gold

Flat

Campground—Prelimin

ary plans

2017-18 Budget Act $216,000 B0712Lake Oroville SRA: Bidwell

Canyon Gold Flat

Campground—Preliminary plans

Enacted 2017-18

Wednesday, January 29, Page 309 of 3421:20:11 PM Public Resources Code (PRC) Section PRC §75063(a)Ch. 8Prop 84 Report

Page 313: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3790-301-6051 (5)(5) Lake Oroville SRA:

Bidwell Canyon Gold

Flat

Campground—Prelimin

ary plans:

Reappropriation

(decrease)

2017-18 Budget Act ($216,000) B0712Lake Oroville SRA: Bidwell

Canyon Gold Flat

Campground—Preliminary plans

Enacted 2017-18

3790-301-6051 (5)(5) Lake Oroville SRA:

Bidwell Canyon Gold

Flat

Campground—Prelimin

ary plans:

Reappropriation

(increase)

2017-18 Budget Act $216,000 B0712Lake Oroville SRA: Bidwell

Canyon Gold Flat

Campground—Preliminary plans

Enacted 2018-19

3790-301-6051 (5)(6) Statewide: VEP Minor

Program—Minor

projects:

Reappropriation

(decrease)

2017-18 Budget Act ($124,000) B0712Statewide: VEP Minor

Program—Minor projects

Enacted 2017-18

3790-301-6051 (5)(6) Statewide: VEP Minor

Program—Minor

projects:

Reappropriation

(increase)

2017-18 Budget Act $124,000 B0712Statewide: VEP Minor

Program—Minor projects

Enacted 2018-19

3790-301-6051 (6) Statewide: VEP Minor

Program—Minor

projects

2017-18 Budget Act $124,000 B0712Statewide: VEP Minor

Program—Minor projects

Enacted 2017-18

3790-301-6051 (7) Torrey Pines State

Natural Reserve: Utility

Modernization - WD-C

2017-18 Budget Act $1,259,000 B0712Torrey Pines State Natural Reserve:

Utility Modernization

Enacted 2017-18

3790-301-6051 (1) Topanga SP:

Rehabilitate Trippet

Ranch Parking Lot - C

2018-19 Budget Act $3,202,000 B0712Topanga SP: Rehabilitate Trippet

Ranch Parking Lot—Construction

Enacted 2018-19

3790-301-6051 (2) Lake Oroville SRA:

Bidwell Canyon Gold

Flat Campground - WD

2018-19 Budget Act $91,000 B0712Lake Oroville SRA: Bidwell

Canyon Gold Flat

Campground—WD

Enacted 2018-19

3790-301-6051 (3) Statewide: VEP Minor

Program—Minor

projects

2018-19 Budget Act $643,000 B0712Statewide: VEP Minor

Program—Minor projects

Enacted 2018-19

3790-301-6051 (4) Malibu Creek State

Park: New Stokes

Creek Bridge - WD

2018-19 Budget Act $375,000 B0712Malibu Creek State Park: New

Stokes Creek Bridge - WD

Enacted 2018-19

3790-301-6051 (5) South Yuba River SP:

Historic Covered

Bridge—Construction

2018-19 Budget Act $2,800,000 B0712South Yuba River SP: Historic

Covered Bridge—Construction

Enacted 2018-19

3790-301-6051 (1) Old Sacramento State

Historic Park - Boiler

Shop Renovation - WD

2019-20 Budget Act $423,000 B0712Old Sacramento State Historic

Park - Boiler Shop Renovation - WD

Enacted 2019-20

3790-301-6051 (10) Statewide VEP Minor

Program

2019-20 Budget Act $763,000 B0712Statewide VEP Minor ProgramEnacted 2019-20

Wednesday, January 29, Page 310 of 3421:20:11 PM Public Resources Code (PRC) Section PRC §75063(a)Ch. 8Prop 84 Report

Page 314: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3790-301-6051 (2)(a) El Capitan SB:

Entrance

Improvements - C

2019-20 Budget Act $2,648,000 B0712El Capitan SB: Entrance

Improvements - Construction

Enacted 2019-20

3790-301-6051 (2)(b) El Capitan SB:

Entrance

Improvements - WD

2019-20 Budget Act $378,000 B0712El Capitan SB: Entrance

Improvements - Working Drawings

Enacted 2019-20

3790-301-6051 (3) Lake Oroville SRA:

Bidwell Canyon Gold

Flat Campground - C

2019-20 Budget Act $1,299,000 B0712Lake Oroville SRA: Bidwell

Canyon Gold Flat Campground -

Construction

Enacted 2019-20

3790-301-6051 (4) Fort Ord Dunes SP:

New Campground - C

2019-20 Budget Act $22,372,000 B0712Fort Ord Dunes SP: New

Campground - Construction

Enacted 2019-20

3790-301-6051 (5) Old Town San Diego

SHP: Building

Demolition - C

2019-20 Budget Act $7,342,000 B0712Old Town San Diego SHP: Building

Demolition - Construction

Enacted 2019-20

3790-301-6051 (6) Gaviota SP: Main

Water Supply

Upgrades - WD

2019-20 Budget Act $142,000 B0712Gaviota SP: Main Water Supply

Upgrades - Working Drawings

Enacted 2019-20

3790-301-6051 (7) Malibu Creek SP: New

Stokes Creek Bridge -

WD

2019-20 Budget Act $233,000 B0712Malibu Creek SP: New Stokes

Creek Bridge - Working Drawings

Enacted 2019-20

3790-301-6051 (8)(a) Torrey Pines SNR:

Sewer and Utility

Modernization - PP

2019-20 Budget Act $199,000 B0712Torrey Pines SNR: Sewer and

Utility Modernization - Preliminary

Plans

Enacted 2019-20

3790-301-6051 (8)(b) Torrey Pines SNR:

Sewer and Utility

Modernization - WD

2019-20 Budget Act $235,000 B0712Torrey Pines SNR: Sewer and

Utility Modernization - Working

Drawings

Enacted 2019-20

3790-301-6051 (9) Statewide Minor

Capital Outlay

Program: Minor Projects

2019-20 Budget Act $379,000 B0712Statewide Minor Capital Outlay

Program: Minor Projects

Enacted 2019-20

3790-502-6051 Ch. 530/12 (AB 1478),

Sec. 5, PRC Section

541.6(a)

2012-13 Special

Legislation

$10,000,000 B0782Hearst Castle (AB1478)Enacted 2012-13

3790-511-6051 Ch. 39/12 (SB 1018),

Section 125, transfer to

CA State Park

Enterprise Fund 8072

2012-13 Special

Legislation

$10,000,000 B1492Revenue Generation Program (CA

State Park Enterprise Fund)

Enacted 2012-13

Sum: $361,146,669Enacted

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3790-301-6051 (1)(5) Silverwood Lake SRA:

Nature Center Exhibits:

Reappropriation

(decrease)

2010-11 Budget Act ($827,000) B0712Silverwood Lake SRA: Nature

Center Exhibits

Enacted/Not 2013-14

3790-301-6051 (1)(5) Silverwood Lake SRA:

Nature Center Exhibits:

Reappropriation

(increase)

2010-11 Budget Act $827,000 B0712Silverwood Lake SRA: Nature

Center Exhibits

Enacted/Not 2018-19

Wednesday, January 29, Page 311 of 3421:20:11 PM Public Resources Code (PRC) Section PRC §75063(a)Ch. 8Prop 84 Report

Page 315: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3790-301-6051 Fort Ord Dunes SP:

New Campground and

Beach Access - Const.:

Reversion

2014-15 Budget Act ($19,154,000) B0712Fort Ord Dunes SP: New

Campground and Beach Access

Enacted/Not 2019-20

3790-301-6051 Old Town San Diego:

Building Demo and

IPU Facilities - WD/C:

Reversion

2014-15 Budget Act ($4,908,000) B0712Old Town San Diego: Building

Demo and IPU Facilities

Enacted/Not 2019-20

3790-301-6051 (2)(1) Fort Ord Dunes SP:

New Campground and

Beach Access - Const.:

Reappropriation

(decrease)

2014-15 Budget Act ($19,176,000) B0712Fort Ord Dunes SP: New

Campground and Beach Access

Enacted/Not 2017-18

3790-301-6051 (2)(1) Fort Ord Dunes SP:

New Campground and

Beach Access - Const.:

Reappropriation

(increase)

2014-15 Budget Act $19,176,000 B0712Fort Ord Dunes SP: New

Campground and Beach Access

Enacted/Not 2018-19

3790-301-6051 (2)(2) Old Town San Diego:

Building Demo and

IPU Facilities - WD/C:

Reappropriation

(decrease)

2014-15 Budget Act ($7,643,000) B0712Old Town San Diego: Building

Demo and IPU Facilities

Enacted/Not 2017-18

3790-301-6051 (2)(2) Old Town San Diego:

Building Demo and

IPU Facilities - WD/C:

Reappropriation

(increase)

2014-15 Budget Act $7,643,000 B0712Old Town San Diego: Building

Demo and IPU Facilities

Enacted/Not 2018-19

3790-301-6051 (2)(4) MacKerricher SP:

Replace Water

Treatment Plant - P:

Reappropriation

(decrease)

2014-15 Budget Act ($581,000) B0712MacKerricher SP: Replace Water

Treatment Plant

Enacted/Not 2014-15

3790-301-6051 (2)(4) MacKerricher SP:

Replace Water

Treatment Plant - P:

Reappropriation

(increase)

2014-15 Budget Act $581,000 B0712MacKerricher SP: Replace Water

Treatment Plant

Enacted/Not 2018-19

3790-301-6051 Torrey Pines State

Natural Reserve Utility

Modernization - P-WD:

Reversion

2015-16 Budget Act ($31,000) B0712Torrey Pines State Natural Reserve

Utility Modernization

Enacted/Not 2019-20

3790-301-6051 (2)(2) MacKerricher SP:

Replace Water

Treatment Plant - WD-

C: Reversion

2015-16 Budget Act ($2,474,000) B0712MacKerricher SP: Replace Water

Treatment Plant

Enacted/Not 2018-19

3790-301-6051 El Capitan SB:

Construct New

Lifeguard Operations

Facility - C&E:

Reversion

2016-17 Budget Act ($8,345,000) B0712El Capitan State Beach: Construct

New Lifeguard Operations Facility

Enacted/Not 2018-19

Wednesday, January 29, Page 312 of 3421:20:11 PM Public Resources Code (PRC) Section PRC §75063(a)Ch. 8Prop 84 Report

Page 316: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3790-301-6051 Gaviota State Park:

Main Water Supply

Upgrades - WD:

Reversion

2016-17 Budget Act ($142,000) B0712Gaviota State Park: Main Water

Supply Upgrades

Enacted/Not 2019-20

3790-301-6051 Malibu Creek State

Park: New Stokes

Creek Bridge - WD:

Reversion

2016-17 Budget Act ($233,000) B0712Malibu Creek State Park: New

Stokes Creek Bridge - WD

Enacted/Not 2019-20

3790-301-6051 (3)(5) Torrey Pines State

Natural Reserve: Utility

Modernization - C:

Reversion

2016-17 Budget Act ($2,149,000) B0712Torrey Pines State Natural Reserve:

Utility Modernization

Enacted/Not 2018-19

3790-301-6051 (4)(2) Gaviota State Park:

Main Water Supply

Upgrades - WD:

Reappropriation

(decrease)

2016-17 Budget Act ($142,000) B0712Gaviota State Park: Main Water

Supply Upgrades

Enacted/Not 2016-17

3790-301-6051 (4)(2) Gaviota State Park:

Main Water Supply

Upgrades - WD:

Reappropriation

(increase)

2016-17 Budget Act $142,000 B0712Gaviota State Park: Main Water

Supply Upgrades

Enacted/Not 2018-19

3790-301-6051 (4)(3) Malibu Creek State

Park: New Stokes

Creek Bridge - WD:

Reappropriation

(decrease)

2016-17 Budget Act ($233,000) B0712Malibu Creek State Park: New

Stokes Creek Bridge - WD

Enacted/Not 2016-17

3790-301-6051 (4)(3) Malibu Creek State

Park: New Stokes

Creek Bridge - WD:

Reappropriation

(increase)

2016-17 Budget Act $233,000 B0712Malibu Creek State Park: New

Stokes Creek Bridge - WD

Enacted/Not 2018-19

3790-301-6051 El Capitan SB:

Entrance

Improvements—Workin

g drawings: Reversion

2017-18 Budget Act ($378,000) B0712El Capitan SB: Entrance

Improvements—Working drawings

Enacted/Not 2019-20

3790-301-6051 Fort Ord Dunes SP:

New

Campground—Construc

tion: Reversion

2017-18 Budget Act ($3,196,000) B0712Fort Ord Dunes SP: New

Campground—Construction

Enacted/Not 2019-20

3790-301-6051 Lake Oroville SRA:

Bidwell Canyon Gold

Flat

Campground—Prelimin

ary plans:

Reappropriation

(decrease)

2017-18 Budget Act ($216,000) B0712Lake Oroville SRA: Bidwell

Canyon Gold Flat

Campground—Preliminary plans

Enacted/Not 2018-19

Wednesday, January 29, Page 313 of 3421:20:11 PM Public Resources Code (PRC) Section PRC §75063(a)Ch. 8Prop 84 Report

Page 317: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3790-301-6051 Lake Oroville SRA:

Bidwell Canyon Gold

Flat

Campground—Prelimin

ary plans:

Reappropriation

(increase)

2017-18 Budget Act $216,000 B0712Lake Oroville SRA: Bidwell

Canyon Gold Flat

Campground—Preliminary plans

Enacted/Not 2019-20

3790-301-6051 Statewide: VEP Minor

Program—Minor

projects: Reversion

2017-18 Budget Act ($120,000) B0712Statewide: VEP Minor

Program—Minor projects

Enacted/Not 2019-20

3790-301-6051 Topanga SP:

Rehabilitate Trippet

Ranch Parking

Lot—WD:

Reappropriation

(decrease)

2017-18 Budget Act ($219,000) B0712Topanga SP: Rehabilitate Trippet

Ranch Parking Lot—Working

drawings

Enacted/Not 2017-18

3790-301-6051 Topanga SP:

Rehabilitate Trippet

Ranch Parking

Lot—WD:

Reappropriation

(increase)

2017-18 Budget Act $219,000 B0712Topanga SP: Rehabilitate Trippet

Ranch Parking Lot—Working

drawings

Enacted/Not 2019-20

3790-301-6051 Torrey Pines State

Natural Reserve: Utility

Modernization - WD:

Reversion

2017-18 Budget Act ($235,000) B0712Torrey Pines State Natural Reserve:

Utility Modernization

Enacted/Not 2019-20

3790-301-6051 Statewide: VEP Minor

Program—Minor

projects: Reversion

2018-19 Budget Act ($643,000) B0712Statewide: VEP Minor

Program—Minor projects

Enacted/Not 2019-20

3790-301-6051 Topanga SP:

Rehabilitate Trippet

Ranch Parking Lot - C:

Reappropriation

(decrease)

2018-19 Budget Act ($3,202,000) B0712Topanga SP: Rehabilitate Trippet

Ranch Parking Lot—Construction

Enacted/Not 2018-19

3790-301-6051 Topanga SP:

Rehabilitate Trippet

Ranch Parking Lot - C:

Reappropriation

(increase)

2018-19 Budget Act $3,202,000 B0712Topanga SP: Rehabilitate Trippet

Ranch Parking Lot—Construction

Enacted/Not 2019-20

Sum: ($42,008,000)Enacted/Not Posted

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3790-001-6051 (1) Portion of support

budget

2020-21 Budget Act $145,000 B0711State Park System: Program DeliveryProposed 2020-21

3790-301-6051 (1) Statewide: State Park

System Acquisition

Program

2020-21 Budget Act $1,000,000 B0712Statewide: State Park System

Acquisition Program

Proposed 2020-21

3790-301-6051 (2) Lake Perris State

Recreation Area:

Replace Lifeguard

Headquarters - P WD C

2020-21 Budget Act $414,000 B0712Lake Perris State Recreation Area:

Replace Lifeguard Headquarters - P

WD C

Proposed 2020-21

Wednesday, January 29, Page 314 of 3421:20:11 PM Public Resources Code (PRC) Section PRC §75063(a)Ch. 8Prop 84 Report

Page 318: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3790-301-6051 (3) Humboldt Redwoods

State Park: Replace

Founders Grove

Restroom - P WD C

2020-21 Budget Act $225,000 B0712Humboldt Redwoods State Park:

Replace Founders Grove Restroom -

P WD C

Proposed 2020-21

3790-301-6051 (4) Statewide: Museum

Collection Storage

Facility Acquisition

2020-21 Budget Act $15,000,000 B0712Statewide: Museum Collection

Storage Facility Acquisition

Proposed 2020-21

Sum: $16,784,000Proposed

Sum: $335,922,669

($7,122,669)

Balance for State Park System:

Wednesday, January 29, Page 315 of 3421:20:11 PM Public Resources Code (PRC) Section PRC §75063(a)Ch. 8Prop 84 Report

Page 319: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

Parks and Nature Education FacilitiesChapter 8

Allocation: Nature Education Facilities

Allocation $: $100,000,000$520,546

$1,030,679Statewide Set Asides: $1,551,225 {

Outyear Obligations: $446,000

$446,000

$0

{

PRC §75063(b)Ch. 8

Appropriations, Proposals and Reversions

Statewide, requiring appropriation:

Statewide, not requiring appropriation:

Outyear Program Delivery commitments:

Outyear Cap. Outlay (to complete started projects):Reversions are shown below$0

Outyear Local Asst. commitments:

Grants for nature education and research facilities and equipment to non-profit organizations and specified public institutions. Grants may be used for buildings,

structures and exhibit galleries that present the collections to inspire and education the public and for marine wildlife conservation research equipment and

facilities.

Dept.: California State Parks

Other Outyear Support commitments:$0

Committed

$0

$0

$0

$0

Proposed

$0

Prop 1 Reduction $1,948,775

$315,000Prop 68 Reduction:

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3790-001-6051 Portion of support

budget

2007-08 Budget Act $227,200 B0721Program Delivery for Local Grant

Programs

Enacted 2007-08

3790-001-6051 Portion of support

budget: Natural

Reversion

2007-08 Natural

Reversion

($139,551) B0721Program Delivery for Local Grant

Programs

Enacted 2009-10

3790-001-6051 Portion of support

budget

2008-09 Budget Act $248,000 B0721Program Delivery for Local Grant

Programs

Enacted 2008-09

3790-001-6051 Portion of support

budget: Natural

Reversion

2008-09 Natural

Reversion

($127,931) B0721Program Delivery for Local Grant

Programs

Enacted 2010-11

3790-001-6051 Portion of support

budget

2009-10 Budget Act $509,000 B0721Program Delivery for Local Grant

Programs

Enacted 2009-10

3790-001-6051 Portion of support

budget: Control Section

Adjustment

2009-10 Control

Section

Adjustment

($75,212) B0721Program Delivery for Local Grant

Programs

Enacted 2009-10

3790-001-6051 Portion of support

budget: Natural

Reversion

2009-10 Natural

Reversion

($149,778) B0721Program Delivery for Local Grant

Programs

Enacted 2011-12

3790-001-6051 Portion of support

budget

2010-11 Budget Act $485,000 B0721Program Delivery for Local Grant

Programs

Enacted 2010-11

3790-001-6051 Portion of support

budget: Natural

Reversion

2010-11 Natural

Reversion

($193,402) B0721Program Delivery for Local Grant

Programs

Enacted 2012-13

3790-001-6051 Portion of support

budget

2011-12 Budget Act $506,000 B0721Program Delivery for Local Grant

Programs

Enacted 2011-12

Wednesday, January 29, Page 316 of 3421:20:11 PM Public Resources Code (PRC) Section PRC §75063(b)Ch. 8Prop 84 Report

Page 320: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3790-001-6051 Portion of support

budget: Natural

Reversion

2011-12 Natural

Reversion

($308,370) B0721Program Delivery for Local Grant

Programs

Enacted 2013-14

3790-001-6051 Portion of support

budget

2012-13 Budget Act $474,000 B0721Program Delivery for Local Grant

Programs

Enacted 2012-13

3790-001-6051 Portion of support

budget: Natural

Reversion

2012-13 Natural

Reversion

($301,587) B0721Program Delivery for Local Grant

Programs

Enacted 2014-15

3790-001-6051 Portion of support

budget

2013-14 Budget Act $270,000 B0721Program Delivery for Local Grant

Programs

Enacted 2013-14

3790-001-6051 Portion of support

budget: Natural

Reversion

2013-14 Natural

Reversion

($111,131) B0721Program Delivery for Local Grant

Programs

Enacted 2015-16

3790-001-6051 Portion of support

budget

2014-15 Budget Act $230,000 B0721Program Delivery for Local Grant

Programs

Enacted 2014-15

3790-001-6051 Portion of support

budget: Natural

Reversion

2014-15 Natural

Reversion

($6,500) B0721Program Delivery for Local Grant

Programs

Enacted 2016-17

3790-001-6051 Portion of support

budget

2015-16 Budget Act $214,000 B0721Program Delivery for Local Grant

Programs

Enacted 2015-16

3790-001-6051 Portion of support

budget: Natural

Reversion

2015-16 Natural

Reversion

($16,285) B0721Program Delivery for Local Grant

Programs

Enacted 2017-18

3790-001-6051 Portion of support

budget

2016-17 Budget Act $215,000 B0721Program Delivery for Local Grant

Programs

Enacted 2016-17

3790-001-6051 Portion of support

budget: Natural

Reversion

2016-17 Natural

Reversion

($30,388) B0721Program Delivery for Local Grant

Programs

Enacted 2018-19

3790-001-6051 Portion of support

budget

2017-18 Budget Act $243,000 B0721Program Delivery for Local Grant

Programs

Enacted 2017-18

3790-001-6051 Portion of support

budget

2018-19 Budget Act $243,000 B0721Program Delivery for Local Grant

Programs

Enacted 2018-19

3790-001-6051 Portion of support

budget

2019-20 Budget Act $193,000 B0721Program Delivery for Local Grant

Programs

Enacted 2019-20

3790-101-6051 Portion of local

assistance budget:

Natural Reversion

2009-10 Natural

Reversion

($20,638,365) B0722Nature Education and Research

Facility Grant Program

Enacted 2016-17

3790-101-6051 Portion of local

assistance budget:

Reversion Reversal

2009-10 Natural

Reversion

$19,248,675 B0722Nature Education and Research

Facility Grant Program

Enacted 2017-18

3790-101-6051 (1) Portion of local

assistance budget

2009-10 Budget Act $93,000,000 B0722Nature Education and Research

Facility Grant Program

Enacted 2009-10

3790-101-6051 (1) Portion of local

assistance budget:

Reappropriation

(decrease)

2009-10 Budget Act ($7,843,000) B0722Nature Education and Research

Facility Grant Program

Enacted 2009-10

Wednesday, January 29, Page 317 of 3421:20:11 PM Public Resources Code (PRC) Section PRC §75063(b)Ch. 8Prop 84 Report

Page 321: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3790-101-6051 (1) Portion of local

assistance budget:

Reappropriation

(increase)

2009-10 Budget Act $7,843,000 B0722Nature Education and Research

Facility Grant Program

Enacted 2018-19

Sum: $94,207,374Enacted

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3790-001-6051 (1) Portion of support

budget

2020-21 Budget Act $124,000 B0721Program Delivery for Local Grant

Programs

Proposed 2020-21

Sum: $124,000Proposed

Sum: $94,331,374

$1,407,626

Balance for Nature Education Facilities:

Wednesday, January 29, Page 318 of 3421:20:11 PM Public Resources Code (PRC) Section PRC §75063(b)Ch. 8Prop 84 Report

Page 322: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

Summary for Chapter 8

Enacted/Proposed: $430,254,044

Allocation: $100,000,000

Set Asides: $1,551,225

Outyears: $446,000

Balance: $1,407,626

Parks and Nature Education Facilities

Prop 1 Reduction: $1,948,775

$315,000Prop 68 Reduction:

Wednesday, January 29, Page 319 of 3421:20:11 PM Public Resources Code (PRC) Section PRC §75063(b)Ch. 8Prop 84 Report

Page 323: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

Sustainable Communities and Climate Change ReductionChapter 9

Allocation: Urban Forestry

Allocation $: $21,000,000$109,315

$216,443Statewide Set Asides: $325,757 {

Outyear Obligations: $0

$0

$0

{

PRC §75065(a), ref 1Ch. 9

Appropriations, Proposals and Reversions

Statewide, requiring appropriation:

Statewide, not requiring appropriation:

Outyear Program Delivery commitments:

Outyear Cap. Outlay (to complete started projects):Reversions are shown below$0

Outyear Local Asst. commitments:

Minimum portion for urban forestry projects pursuant to the California Urban Forestry Act, Chapter 2 of Part 2.5 of Division 1. Available for urban greening

projects that reduce energy consumption, conserve water, improve air and water quality and other community benefits. Priority to projects that provide multiple

benefits, use existing public lands, serve communities with the greatest need and facilitate joint use of public resources and investments. Appropriation will be

made based under the broad guidance of the California Urban Forestry Act; Proposition 84 Bond Act language; AB 32, Chapter 488, Statutes of 2006; Executive

Orders S-03-05 and S-06-06; and other direction regarding the State`s climate change strategies.

Dept.: California Department of

Forestry and Fire Protection

Other Outyear Support commitments:$0

Committed

$0

$0

$0

$0

Proposed

$0

Prop 1 Reduction $409,243

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3540-001-6051 Portion of support

budget

2007-08 Budget Act $180,000 B0731Urban GreeningEnacted 2007-08

3540-001-6051 Portion of support

budget

2007-08 Budget Act $1,479,000 B0732Urban GreeningEnacted 2007-08

3540-001-6051 Portion of support

budget: Control Section

Adjustment

2007-08 Control

Section

Adjustment

$10,843 B0731Urban GreeningEnacted 2007-08

3540-001-6051 Portion of support

budget: Natural

Reversion

2007-08 Natural

Reversion

($133,727) B0731Urban GreeningEnacted 2009-10

3540-001-6051 Portion of support

budget: Natural

Reversion

2007-08 Natural

Reversion

($1,016,877) B0732Urban GreeningEnacted 2009-10

3540-001-6051 Portion of support

budget

2008-09 Budget Act $183,000 B0731Urban GreeningEnacted 2008-09

3540-001-6051 Portion of support

budget

2008-09 Budget Act $1,271,000 B0732Urban GreeningEnacted 2008-09

3540-001-6051 Portion of support

budget: Control Section

Adjustment

2008-09 Control

Section

Adjustment

($7,086) B0731Urban GreeningEnacted 2008-09

3540-001-6051 Portion of support

budget: Reversion

2008-09 Budget Act ($117,000) B0731Urban GreeningEnacted 2010-11

Wednesday, January 29, Page 320 of 3421:20:11 PM Public Resources Code (PRC) Section PRC §75065(a), ref 1Ch. 9Prop 84 Report

Page 324: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3540-001-6051 Portion of support

budget: Reversion

2008-09 Budget Act ($784,000) B0732Urban GreeningEnacted 2010-11

3540-001-6051 Portion of support

budget

2009-10 Budget Act $1,481,000 B0732Urban GreeningEnacted 2009-10

3540-001-6051 Portion of support

budget: Control Section

Adjustment

2009-10 Control

Section

Adjustment

($4,135) B0732Urban GreeningEnacted 2009-10

3540-001-6051 Portion of support

budget: Natural

Reversion

2009-10 Natural

Reversion

($54,108) B0732Urban GreeningEnacted 2014-15

3540-001-6051 Portion of support

budget

2010-11 Budget Act $154,000 B0731Urban GreeningEnacted 2010-11

3540-001-6051 Portion of support

budget

2010-11 Budget Act $1,326,000 B0732Urban GreeningEnacted 2010-11

3540-001-6051 Portion of support

budget: Control Section

Adjustment

2010-11 Control

Section

Adjustment

$3,700 B0731Urban GreeningEnacted 2010-11

3540-001-6051 Portion of support

budget: Control Section

Adjustment

2010-11 Control

Section

Adjustment

$22,465 B0732Urban GreeningEnacted 2010-11

3540-001-6051 Portion of support

budget: Natural

Reversion

2010-11 Natural

Reversion

($367,094) B0732Urban GreeningEnacted 2012-13

3540-001-6051 Portion of support

budget

2011-12 Budget Act $154,000 B0731Urban GreeningEnacted 2011-12

3540-001-6051 Portion of support

budget

2011-12 Budget Act $826,000 B0732Urban GreeningEnacted 2011-12

3540-001-6051 Portion of support

budget: Natural

Reversion

2011-12 Natural

Reversion

($83,208) B0732Urban GreeningEnacted 2013-14

3540-001-6051 Portion of support

budget

2012-13 Budget Act $272,000 B0731Urban GreeningEnacted 2012-13

3540-001-6051 Portion of support

budget

2012-13 Budget Act $154,000 B0732Urban GreeningEnacted 2012-13

3540-001-6051 Portion of support

budget: Natural

Reversion

2012-13 Natural

Reversion

($59,765) B0731Urban GreeningEnacted 2014-15

3540-001-6051 Portion of support

budget: Natural

Reversion

2012-13 Natural

Reversion

($64,384) B0732Urban GreeningEnacted 2014-15

3540-101-6051 Portion of local

assistance budget

2007-08 Budget Act $2,831,000 B0732Urban GreeningEnacted 2007-08

3540-101-6051 Portion of local

assistance budget:

Natural Reversion

2007-08 Natural

Reversion

($580,555) B0732Urban GreeningEnacted 2010-11

3540-101-6051 Portion of local

assistance budget

2008-09 Budget Act $5,395,000 B0732Urban GreeningEnacted 2008-09

Wednesday, January 29, Page 321 of 3421:20:11 PM Public Resources Code (PRC) Section PRC §75065(a), ref 1Ch. 9Prop 84 Report

Page 325: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3540-101-6051 Portion of local

assistance budget:

Reversion

2008-09 Budget Act ($5,395,000) B0732Urban GreeningEnacted 2010-11

3540-101-6051 Portion of local

assistance budget

2009-10 Budget Act $5,395,000 B0732Urban GreeningEnacted 2009-10

3540-101-6051 Portion of local

assistance budget:

Natural Reversion

2009-10 Natural

Reversion

($435,709) B0732Urban GreeningEnacted 2014-15

3540-101-6051 Portion of local

assistance budget

2010-11 Budget Act $3,200,000 B0732Urban GreeningEnacted 2010-11

3540-101-6051 Portion of local

assistance budget:

Natural Reversion

2010-11 Natural

Reversion

($400,366) B0732Urban GreeningEnacted 2014-15

3540-101-6051 Portion of local

assistance budget

2011-12 Budget Act $2,399,000 B0732Urban GreeningEnacted 2011-12

3540-101-6051 Portion of local

assistance budget:

Natural Reversion

2011-12 Natural

Reversion

($241,232) B0732Urban GreeningEnacted 2015-16

3540-101-6051 Portion of local

assistance budget

2012-13 Budget Act $566,000 B0732Urban GreeningEnacted 2012-13

3540-101-6051 Portion of local

assistance budget:

Natural Reversion

2012-13 Natural

Reversion

($42,681) B0732Urban GreeningEnacted 2016-17

3540-102-6051 Portion of local

assistance budget

2009-10 Budget Act $1,000,000 B0732Urban Forestry for Oakland Unified

School District

Enacted 2009-10

Sum: $18,516,082Enacted

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3540-101-6051 (1) Portion of local

assistance budget

2020-21 Budget Act $1,748,000 B0732Urban ForestryProposed 2020-21

Sum: $1,748,000Proposed

Sum: $20,264,082

$918

Balance for Urban Forestry:

Wednesday, January 29, Page 322 of 3421:20:11 PM Public Resources Code (PRC) Section PRC §75065(a), ref 1Ch. 9Prop 84 Report

Page 326: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

Sustainable Communities and Climate Change ReductionChapter 9

Allocation: Urban Greening

Allocation $: $69,000,000$359,177

$711,169Statewide Set Asides: $1,070,345 {

Outyear Obligations: $320,000

$320,000

$0

{

PRC §75065(a), ref 2Ch. 9

Appropriations, Proposals and Reversions

Statewide, requiring appropriation:

Statewide, not requiring appropriation:

Outyear Program Delivery commitments:

Outyear Cap. Outlay (to complete started projects):Reversions are shown below$0

Outyear Local Asst. commitments:

Available for urban greening projects that reduce energy consumption, conserve water, improve air and water quality and other community benefits. Priority to

projects that provide multiple benefits, use existing public lands, serve communities with the greatest need and facilitate joint use of public resources and

investments. Appropriation may only be made upon enactment of implementing legislation. Appropriation will be made based under the broad guidance of

Proposition 84 Bond Act; SB 732; Executive Orders S-03-05, S-06-06 and S-02-07; and direction from the Strategic Grouth Council.

Dept.: Unspecified

Other Outyear Support commitments:$0

Committed

$0

$0

$0

$0

Proposed

$0

Prop 1 Reduction $1,344,655

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

0540-001-6051 Portion of support

budget

2010-11 Budget Act $286,000 B1081Urban Greening for Sustainable

Communities

Enacted 2010-11

0540-001-6051 Portion of support

budget: Control Section

Adjustment

2010-11 Control

Section

Adjustment

($12,500) B1081Urban Greening for Sustainable

Communities

Enacted 2010-11

0540-001-6051 Portion of support

budget: Natural

Reversion

2010-11 Natural

Reversion

($178,554) B1081Urban Greening for Sustainable

Communities

Enacted 2013-14

0540-001-6051 Portion of support

budget

2011-12 Budget Act $342,000 B1081Urban Greening for Sustainable

Communities

Enacted 2011-12

0540-001-6051 Portion of support

budget: Control Section

Adjustment

2011-12 Control

Section

Adjustment

($55,500) B1081Urban Greening for Sustainable

Communities

Enacted 2011-12

0540-001-6051 Portion of support

budget: Natural

Reversion

2011-12 Natural

Reversion

($216,331) B1081Urban Greening for Sustainable

Communities

Enacted 2015-16

0540-001-6051 Portion of support

budget

2012-13 Budget Act $342,000 B1081Urban Greening for Sustainable

Communities

Enacted 2012-13

0540-001-6051 Portion of support

budget: Control Section

Adjustment

2012-13 Control

Section

Adjustment

($9,883) B1081Urban Greening for Sustainable

Communities

Enacted 2012-13

0540-001-6051 Portion of support

budget: Natural

Reversion

2012-13 Natural

Reversion

($282,143) B1081Urban Greening for Sustainable

Communities

Enacted 2016-17

Wednesday, January 29, Page 323 of 3421:20:11 PM Public Resources Code (PRC) Section PRC §75065(a), ref 2Ch. 9Prop 84 Report

Page 327: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

0540-001-6051 Portion of support

budget

2013-14 Budget Act $423,000 B1081Urban Greening for Sustainable

Communities

Enacted 2013-14

0540-001-6051 Portion of support

budget: Natural

Reversion

2013-14 Natural

Reversion

($328,893) B1081Urban Greening for Sustainable

Communities

Enacted 2017-18

0540-001-6051 Portion of support

budget

2014-15 Budget Act $444,000 B1081Urban Greening for Sustainable

Communities

Enacted 2014-15

0540-001-6051 Portion of support

budget: Control Section

Adjustment

2014-15 Control

Section

Adjustment

$5,407 B1081Urban Greening for Sustainable

Communities

Enacted 2014-15

0540-001-6051 Portion of support

budget: Natural

Reversion

2014-15 Natural

Reversion

($377,553) B1081Urban Greening for Sustainable

Communities

Enacted 2016-17

0540-001-6051 Portion of support

budget

2015-16 Budget Act $383,000 B1081Urban Greening for Sustainable

Communities

Enacted 2015-16

0540-001-6051 Portion of support

budget: Natural

Reversion

2015-16 Natural

Reversion

($216,467) B1081Urban Greening for Sustainable

Communities

Enacted 2017-18

0540-001-6051 Portion of support

budget

2016-17 Budget Act $448,000 B1081Urban Greening for Sustainable

Communities

Enacted 2016-17

0540-001-6051 Portion of support

budget

2017-18 Budget Act $422,000 B1081Urban Greening for Sustainable

Communities

Enacted 2017-18

0540-001-6051 Portion of support

budget: Control Section

Adjustment

2017-18 Control

Section

Adjustment

$48,000 B1081Urban Greening for Sustainable

Communities

Enacted 2017-18

0540-001-6051 Portion of support

budget

2018-19 Budget Act $402,000 B1081Urban Greening for Sustainable

Communities

Enacted 2018-19

0540-001-6051 Portion of support

budget: Control Section

Adjustment

2018-19 Control

Section

Adjustment

$43,000 B1081Urban Greening for Sustainable

Communities

Enacted 2018-19

0540-001-6051 Portion of support

budget

2019-20 Budget Act $237,000 B1081Urban Greening for Sustainable

Communities

Enacted 2019-20

0540-101-6051 Portion of local

assistance budget

2010-11 Budget Act $21,050,000 B1082Urban Greening for Sustainable

Communities

Enacted 2010-11

0540-101-6051 Portion of local

assistance budget

2011-12 Budget Act $21,000,000 B1082Urban Greening for Sustainable

Communities

Enacted 2011-12

0540-101-6051 Portion of local

assistance budget

2012-13 Budget Act $21,000,000 B1082Urban Greening for Sustainable

Communities

Enacted 2012-13

0540-101-6051 Portion of local

assistance budget:

Reappropriation

(decrease)

2012-13 Budget Act ($21,000,000) B1082Urban Greening for Sustainable

Communities

Enacted 2015-16

0540-101-6051 Portion of local

assistance budget:

Reappropriation

(increase)

2012-13 Budget Act $21,000,000 B1082Urban Greening for Sustainable

Communities

Enacted 2019-20

0540-101-6051 Portion of local

assistance budget

2016-17 Budget Act $729,000 B1082Urban Greening for Sustainable

Communities

Enacted 2016-17

Wednesday, January 29, Page 324 of 3421:20:11 PM Public Resources Code (PRC) Section PRC §75065(a), ref 2Ch. 9Prop 84 Report

Page 328: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

0540-101-6051 Portion of local

assistance budget:

Reappropriation

(decrease)

2016-17 Budget Act ($729,000) B1082Urban Greening for Sustainable

Communities

Enacted 2016-17

0540-101-6051 Portion of local

assistance budget:

Reappropriation

(increase)

2016-17 Budget Act $729,000 B1082Urban Greening for Sustainable

Communities

Enacted 2019-20

0540-502-6051 Portion of support

budget

2008-09 Special

Legislation

$220,000 B1081Strategic Growth Council SupportEnacted 2008-09

Sum: $66,146,583Enacted

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

0540-001-6051 Portion of support

budget: Control Section

Adjustment

2019-20 Control

Section

Adjustment

$36,000 B1081Urban Greening for Sustainable

Communities

Enacted/Not 2019-20

Sum: $36,000Enacted/Not Posted

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

0540-001-6051 (1) Portion of support

budget

2020-21 Budget Act $80,000 B1081Urban Greening for Sustainable

Communities

Proposed 2020-21

Sum: $80,000Proposed

Sum: $66,262,583

$2,417

Balance for Urban Greening:

Wednesday, January 29, Page 325 of 3421:20:11 PM Public Resources Code (PRC) Section PRC §75065(a), ref 2Ch. 9Prop 84 Report

Page 329: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

Sustainable Communities and Climate Change ReductionChapter 9

Allocation: Statewide Park Development

Allocation $: $400,000,000$2,082,183

$4,122,717Statewide Set Asides: $6,204,900 {

Outyear Obligations: $2,034,000

$2,034,000

$0

{

PRC §75065(b)Ch. 9

Appropriations, Proposals and Reversions

Statewide, requiring appropriation:

Statewide, not requiring appropriation:

Outyear Program Delivery commitments:

Outyear Cap. Outlay (to complete started projects):Reversions are shown below$0

Outyear Local Asst. commitments:

Competitive grants for local and regional parks. Funds may be allocated to existing programs or pursuant to implementing legislation, subject to the following: (1)

Preference to the acquisition and development of new parks and expansion of overused parks that provide park and recreational access to underserved

communities; (2) Preference to park creation in neighborhoods where none currently exist; (3) Outreach and technical assistance to underserved communities to

encourage full participation; (4) Preference to applicants that actively involve community based groups in the selection and planning of projects; and (5) Projects

designed to provide efficient use of water and other natural resources.

Dept.: California State Parks

Other Outyear Support commitments:$0

Committed

$0

$0

$0

$0

Proposed

$0

Prop 1 Reduction $7,795,100

$4,328,000Prop 68 Reduction:

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3790-001-6051 Portion of support

budget

2007-08 Budget Act $908,800 B1101Program Delivery for Local Grant

Programs

Enacted 2007-08

3790-001-6051 Portion of support

budget: Natural

Reversion

2007-08 Natural

Reversion

($558,205) B1101Program Delivery for Local Grant

Programs

Enacted 2009-10

3790-001-6051 Portion of support

budget

2008-09 Budget Act $992,000 B1101Program Delivery for Local Grant

Programs

Enacted 2008-09

3790-001-6051 Portion of support

budget: Natural

Reversion

2008-09 Natural

Reversion

($511,724) B1101Program Delivery for Local Grant

Programs

Enacted 2010-11

3790-001-6051 Portion of support

budget

2009-10 Budget Act $2,616,000 B1101Program Delivery for Local Grant

Programs

Enacted 2009-10

3790-001-6051 Portion of support

budget: Control Section

Adjustment

2009-10 Control

Section

Adjustment

($362,288) B1101Program Delivery for Local Grant

Programs

Enacted 2009-10

3790-001-6051 Portion of support

budget: Natural

Reversion

2009-10 Natural

Reversion

($1,117,670) B1101Program Delivery for Local Grant

Programs

Enacted 2011-12

3790-001-6051 Portion of support

budget

2010-11 Budget Act $2,494,000 B1101Program Delivery for Local Grant

Programs

Enacted 2010-11

3790-001-6051 Portion of support

budget: Natural

Reversion

2010-11 Natural

Reversion

($1,327,608) B1101Program Delivery for Local Grant

Programs

Enacted 2012-13

Wednesday, January 29, Page 326 of 3421:20:11 PM Public Resources Code (PRC) Section PRC §75065(b)Ch. 9Prop 84 Report

Page 330: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3790-001-6051 Portion of support

budget

2011-12 Budget Act $2,598,000 B1101Program Delivery for Local Grant

Programs

Enacted 2011-12

3790-001-6051 Portion of support

budget: Natural

Reversion

2011-12 Natural

Reversion

($1,807,479) B1101Program Delivery for Local Grant

Programs

Enacted 2013-14

3790-001-6051 Portion of support

budget

2012-13 Budget Act $2,440,000 B1101Program Delivery for Local Grant

Programs

Enacted 2012-13

3790-001-6051 Portion of support

budget: Natural

Reversion

2012-13 Natural

Reversion

($1,750,348) B1101Program Delivery for Local Grant

Programs

Enacted 2014-15

3790-001-6051 Portion of support

budget

2013-14 Budget Act $2,058,000 B1101Program Delivery for Local Grant

Programs

Enacted 2013-14

3790-001-6051 Portion of support

budget: Natural

Reversion

2013-14 Natural

Reversion

($1,422,525) B1101Program Delivery for Local Grant

Programs

Enacted 2015-16

3790-001-6051 Portion of support

budget

2014-15 Budget Act $1,219,000 B1101Program Delivery for Local Grant

Programs

Enacted 2014-15

3790-001-6051 Portion of support

budget: Natural

Reversion

2014-15 Natural

Reversion

($325,001) B1101Program Delivery for Local Grant

Programs

Enacted 2016-17

3790-001-6051 Portion of support

budget

2015-16 Budget Act $1,138,000 B1101Program Delivery for Local Grant

Programs

Enacted 2015-16

3790-001-6051 Portion of support

budget: Natural

Reversion

2015-16 Natural

Reversion

($347,141) B1101Program Delivery for Local Grant

Programs

Enacted 2017-18

3790-001-6051 Portion of support

budget

2016-17 Budget Act $1,147,000 B1101Program Delivery for Local Grant

Programs

Enacted 2016-17

3790-001-6051 Portion of support

budget: Natural

Reversion

2016-17 Natural

Reversion

($174,865) B1101Program Delivery for Local Grant

Programs

Enacted 2018-19

3790-001-6051 Portion of support

budget

2017-18 Budget Act $1,119,000 B1101Program Delivery for Local Grant

Programs

Enacted 2017-18

3790-001-6051 Portion of support

budget

2018-19 Budget Act $1,119,000 B1101Program Delivery for Local Grant

Programs

Enacted 2018-19

3790-001-6051 Portion of support

budget

2019-20 Budget Act $891,000 B1101Program Delivery for Local Grant

Programs

Enacted 2019-20

3790-102-6051 Portion of local

assistance budget

2009-10 Budget Act $161,357,000 B1102Local Assistance for Local Grant

Programs

Enacted 2009-10

3790-102-6051 Portion of local

assistance budget:

Natural Reversion

2009-10 Natural

Reversion

($22,364,154) B1101Local Assistance for Local Grant

Programs

Enacted 2017-18

3790-102-6051 Portion of local

assistance budget:

Natural Reversion

2009-10 Natural

Reversion

($28,767,173) B1102Local Assistance for Local Grant

Programs

Enacted 2016-17

3790-102-6051 Portion of local

assistance budget:

Reversion Reversal

2009-10 Natural

Reversion

$22,364,154 B1101Local Assistance for Local Grant

Programs

Enacted 2018-19

Wednesday, January 29, Page 327 of 3421:20:12 PM Public Resources Code (PRC) Section PRC §75065(b)Ch. 9Prop 84 Report

Page 331: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3790-102-6051 Portion of local

assistance budget:

Reversion Reversal

2009-10 Natural

Reversion

$28,767,173 B1102Local Assistance for Local Grant

Programs

Enacted 2017-18

3790-102-6051 Portion of local

assistance budget

2011-12 Budget Act $184,000,000 B1102Local Assistance for Local Grant

Programs

Enacted 2011-12

Sum: $356,391,946Enacted

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3790-102-6051 Portion of local

assistance budget

2009-10 Budget Act $22,643,000 B1102Local Assistance for Local Grant

Programs

Enacted/Not 2009-10

3790-102-6051 Portion of local

assistance budget:

Reappropriation

(decrease)

2009-10 Budget Act ($22,643,000) B1102Local Assistance for Local Grant

Programs

Enacted/Not 2009-10

3790-102-6051 Portion of local

assistance budget:

Reappropriation

(increase)

2009-10 Budget Act $22,643,000 B1102Local Assistance for Local Grant

Programs

Enacted/Not 2018-19

3790-102-6051 Portion of local

assistance budget:

Reappropriation

(decrease)

2011-12 Budget Act ($16,197,000) B1102Local Assistance for Local Grant

Programs

Enacted/Not 2011-12

3790-102-6051 Portion of local

assistance budget:

Reappropriation

(increase)

2011-12 Budget Act $16,197,000 B1102Local Assistance for Local Grant

Programs

Enacted/Not 2018-19

Sum: $22,643,000Enacted/Not Posted

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3790-001-6051 (1) Portion of support

budget

2020-21 Budget Act $575,000 B1101Program Delivery for Local Grant

Programs

Proposed 2020-21

Sum: $575,000Proposed

Sum: $379,609,946

$28,054

Balance for Statewide Park Development:

Wednesday, January 29, Page 328 of 3421:20:12 PM Public Resources Code (PRC) Section PRC §75065(b)Ch. 9Prop 84 Report

Page 332: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

Sustainable Communities and Climate Change ReductionChapter 9

Allocation: Planning grants and planning incentives

Allocation $: $90,000,000$468,491

$927,611Statewide Set Asides: $1,396,102 {

Outyear Obligations: $168,000

$0

$0

{

PRC §75065(c)Ch. 9

Appropriations, Proposals and Reversions

Statewide, requiring appropriation:

Statewide, not requiring appropriation:

Outyear Program Delivery commitments:

Outyear Cap. Outlay (to complete started projects):Reversions are shown below$0

Outyear Local Asst. commitments:

Available for planning grants and planning incentives, including revolving loan programs and other methods to encourage development of regional and local land

use plans designed to promote water conservation, reduce auto use and fuel consumption, encourage greater infill and compact development, protect natural

resources and agricultural lands, and revitalize urban and community centers. Per Section 75066, appropriation may only be made upon enactment of

implementing legislation.

Dept.: Unspecified

Other Outyear Support commitments:$168,000

Committed

$0

$0

$0

$0

Proposed

$0

Prop 1 Reduction $1,753,898

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

0540-001-6051 Portion of support

budget

2009-10 Budget

Revision

$9,202,000 B1232Modeling Incentives ProgramEnacted 2010-11

0540-001-6051 Portion of support

budget: Natural

Reversion

2009-10 Natural

Reversion

($54,214) B1232Modeling Incentives ProgramEnacted 2016-17

0540-001-6051 Portion of support

budget

2012-13 Budget

Revision

$385,000 B1091Strategic Growth Council SupportEnacted 2012-13

0540-001-6051 Portion of support

budget: Natural

Reversion

2012-13 Natural

Reversion

($70,942) B1091Strategic Growth Council SupportEnacted 2016-17

0540-001-6051 Portion of support

budget

2013-14 Budget

Revision

$385,000 B1091Strategic Growth Council SupportEnacted 2013-14

0540-001-6051 Portion of support

budget: Natural

Reversion

2013-14 Natural

Reversion

($29,739) B1091Strategic Growth Council SupportEnacted 2017-18

0540-101-6051 Portion of local

assistance budget

2009-10 Budget Act $2,028,000 B1232Modeling Incentives ProgramEnacted 2009-10

0540-502-6051 Portion of support

budget

2008-09 Special

Legislation

$280,000 B1091Strategic Growth Council SupportEnacted 2008-09

3480-001-6051 Portion of support

budget

2010-11 Budget Act $1,689,000 B1093Sustainable Communities Planning

Grant and Incentive Program

Enacted 2010-11

3480-001-6051 Portion of support

budget

2010-11 Budget Act $575,000 B1091Sustainable Communities Planning

Grant and Incentive Program

Enacted 2010-11

Wednesday, January 29, Page 329 of 3421:20:12 PM Public Resources Code (PRC) Section PRC §75065(c)Ch. 9Prop 84 Report

Page 333: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3480-001-6051 Portion of support

budget: Reversion

2010-11 Budget Act ($270,505) B1093Sustainable Communities Planning

Grant and Incentive Program

Enacted 2013-14

3480-001-6051 Portion of support

budget: Reversion

2010-11 Budget Act ($54,666) B1091Sustainable Communities Planning

Grant and Incentive Program

Enacted 2013-14

3480-001-6051 Portion of support

budget

2011-12 Budget Act $1,734,000 B1093Sustainable Communities Planning

Grant and Incentive Program

Enacted 2011-12

3480-001-6051 Portion of support

budget

2011-12 Budget Act $575,000 B1091Sustainable Communities Planning

Grant and Incentive Program

Enacted 2011-12

3480-001-6051 Portion of support

budget: Natural

Reversion

2011-12 Natural

Reversion

($209,733) B1093Sustainable Communities Planning

Grant and Incentive Program

Enacted 2013-14

3480-001-6051 Portion of support

budget: Natural

Reversion

2011-12 Natural

Reversion

($226,429) B1091Sustainable Communities Planning

Grant and Incentive Program

Enacted 2013-14

3480-001-6051 Portion of support

budget: Reversion

2011-12 Budget Act ($480,000) B1093Sustainable Communities Planning

Grant and Incentive Program

Enacted 2013-14

3480-001-6051 Portion of support

budget

2012-13 Budget Act $1,012,000 B1093Sustainable Communities Planning

Grant and Incentive Program

Enacted 2012-13

3480-001-6051 Portion of support

budget

2012-13 Budget Act $500,000 B1091Sustainable Communities Planning

Grant and Incentive Program

Enacted 2012-13

3480-001-6051 Portion of support

budget: Natural

Reversion

2012-13 Natural

Reversion

($35,534) B1093Sustainable Communities Planning

Grant and Incentive Program

Enacted 2014-15

3480-001-6051 Portion of support

budget: Natural

Reversion

2012-13 Natural

Reversion

($410) B1091Sustainable Communities Planning

Grant and Incentive Program

Enacted 2014-15

3480-001-6051 Portion of support

budget: Reversion

2012-13 Budget Act ($572,000) B1093Sustainable Communities Planning

Grant and Incentive Program

Enacted 2014-15

3480-001-6051 Portion of support

budget

2013-14 Budget Act $480,000 B1091Sustainable Communities Planning

Grant and Incentive Program

Enacted 2013-14

3480-001-6051 Portion of support

budget - Planning

2013-14 Budget Act $868,000 B1093Sustainable Communities Planning

Grant and Incentive Program

Enacted 2013-14

3480-001-6051 Portion of support

budget - Planning:

Natural Reversion

2013-14 Natural

Reversion

($67,643) B1093Sustainable Communities Planning

Grant and Incentive Program

Enacted 2015-16

3480-001-6051 Portion of support

budget - Planning:

Reversion

2013-14 Budget Act ($260,000) B1093Sustainable Communities Planning

Grant and Incentive Program

Enacted 2014-15

3480-001-6051 Portion of support

budget: Natural

Reversion

2013-14 Natural

Reversion

($686) B1091Sustainable Communities Planning

Grant and Incentive Program

Enacted 2015-16

3480-001-6051 Portion of support

budget

2014-15 Budget Act $456,000 B1091Sustainable Communities Planning

Grant and Incentive Program

Enacted 2014-15

3480-001-6051 Portion of support

budget - Planning

2014-15 Budget Act $1,102,000 B1093Sustainable Communities Planning

Grant and Incentive Program

Enacted 2014-15

3480-001-6051 Portion of support

budget - Planning:

Natural Reversion

2014-15 Natural

Reversion

($266,240) B1093Sustainable Communities Planning

Grant and Incentive Program

Enacted 2016-17

Wednesday, January 29, Page 330 of 3421:20:12 PM Public Resources Code (PRC) Section PRC §75065(c)Ch. 9Prop 84 Report

Page 334: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3480-001-6051 Portion of support

budget: Control Section

Adjustment

2014-15 Control

Section

Adjustment

$16,718 B1093Sustainable Communities Planning

Grant and Incentive Program

Enacted 2014-15

3480-001-6051 Portion of support

budget: Natural

Reversion

2014-15 Natural

Reversion

($621) B1091Sustainable Communities Planning

Grant and Incentive Program

Enacted 2016-17

3480-001-6051 Portion of support

budget

2015-16 Budget Act $542,000 B1091Sustainable Communities Planning

Grant and Incentive Program

Enacted 2015-16

3480-001-6051 Portion of support

budget: Natural

Reversion

2015-16 Natural

Reversion

($13) B1091Sustainable Communities Planning

Grant and Incentive Program

Enacted 2017-18

3480-001-6051 Portion of support

budget

2016-17 Budget Act $620,000 B1091Sustainable Communities Planning

Grant and Incentive Program

Enacted 2016-17

3480-001-6051 Portion of support

budget: Reversion

2016-17 Budget Act ($142,550) B1091Sustainable Communities Planning

Grant and Incentive Program

Enacted 2018-19

3480-001-6051 Portion of support

budget

2017-18 Budget Act $227,000 B1091Sustainable Communities Planning

Grant and Incentive Program

Enacted 2017-18

3480-001-6051 Portion of support

budget - Planning

2017-18 Budget Act $35,000 B1093Sustainable Communities Planning

Grant and Incentive Program

Enacted 2017-18

3480-001-6051 Portion of support

budget

2018-19 Budget Act $42,000 B1093Sustainable Communities Planning

Grant and Incentive Program

Enacted 2018-19

3480-001-6051 Portion of support

budget

2019-20 Budget Act $42,000 B1093Sustainable Communities Planning

Grant and Incentive Program

Enacted 2019-20

3480-101-6051 Portion of local

assistance budget

2010-11 Budget Act $40,000,000 B1092Sustainable Communities Planning

Grant and Incentive Program

Enacted 2010-11

3480-101-6051 Portion of local

assistance budget:

Natural Reversion

2010-11 Natural

Reversion

($1,917,479) B1092Sustainable Communities Planning

Grant and Incentive Program

Enacted 2014-15

3480-101-6051 Portion of local

assistance budget:

Reversion

2010-11 Budget Act ($14,427,000) B1092Sustainable Communities Planning

Grant and Incentive Program

Enacted 2013-14

3480-101-6051 Portion of local

assistance budget

2011-12 Budget Act $23,150,000 B1092Sustainable Communities Planning

Grant and Incentive Program

Enacted 2011-12

3480-101-6051 Portion of local

assistance budget:

Natural Reversion

2011-12 Natural

Reversion

($1,211,506) B1092Sustainable Communities Planning

Grant and Incentive Program

Enacted 2016-17

3480-101-6051 Portion of local

assistance budget

2013-14 Budget Act $17,191,000 B1092Sustainable Communities Planning

Grant and Incentive Program

Enacted 2013-14

3480-101-6051 Portion of local

assistance budget:

Natural Reversion

2013-14 Natural

Reversion

($1,744,402) B1092Sustainable Communities Planning

Grant and Incentive Program

Enacted 2018-19

3480-101-6051 Portion of local

assistance budget:

Reappropriation

(decrease)

2013-14 Budget Act ($17,191,000) B1092Sustainable Communities Planning

Grant and Incentive Program

Enacted 2013-14

3480-101-6051 Portion of local

assistance budget:

Reappropriation

(increase)

2013-14 Budget Act $17,191,000 B1092Sustainable Communities Planning

Grant and Incentive Program

Enacted 2018-19

Wednesday, January 29, Page 331 of 3421:20:12 PM Public Resources Code (PRC) Section PRC §75065(c)Ch. 9Prop 84 Report

Page 335: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3480-101-6051 Portion of local

assistance budget

2014-15 Budget Act $493,000 B1092Sustainable Communities Planning

Grant and Incentive Program

Enacted 2014-15

3480-101-6051 Portion of local

assistance budget:

Natural Reversion

2014-15 Natural

Reversion

($37,933) B1092Sustainable Communities Planning

Grant and Incentive Program

Enacted 2017-18

3480-101-6051 Portion of local

assistance budget

2016-17 Budget Act $1,917,000 B1092Sustainable Communities Planning

Grant and Incentive Program

Enacted 2016-17

3480-101-6051 Portion of local

assistance budget

2018-19 Budget Act $1,150,000 B1092Sustainable Communities Planning

Grant and Incentive Program

Enacted 2018-19

3480-101-6051 Portion of local

assistance budget

2019-20 Budget Act $407,000 B1092Sustainable Communities Planning

Grant and Incentive Program

Enacted 2019-20

Sum: $85,023,474Enacted

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3480-001-6051 (1) Portion of support

budget

2020-21 Budget Act $42,000 B1093Sustainable Communities Planning

Grant and Incentive Program

Proposed 2020-21

Sum: $42,000Proposed

Sum: $85,065,474

$1,616,526

Balance for Planning grants and planning incentives:

Wednesday, January 29, Page 332 of 3421:20:12 PM Public Resources Code (PRC) Section PRC §75065(c)Ch. 9Prop 84 Report

Page 336: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

Summary for Chapter 9

Enacted/Proposed: $551,202,085

Allocation: $90,000,000

Set Asides: $1,396,102

Outyears: $168,000

Balance: $1,616,526

Sustainable Communities and Climate Change Reduction

Prop 1 Reduction: $1,753,898

Wednesday, January 29, Page 333 of 3421:20:12 PM Public Resources Code (PRC) Section PRC §75065(c)Ch. 9Prop 84 Report

Page 337: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

Statewide Bond CostChapters 10/11

Allocation: Statewide Bond Costs

Allocation $: $0$0

$0Statewide Set Asides: $0 {

Outyear Obligations: $16,848,000

$0

$0

{

PRC §75078 et seq.Ch. 10/11

Appropriations, Proposals and Reversions

Statewide, requiring appropriation:

Statewide, not requiring appropriation:

Outyear Program Delivery commitments:

Outyear Cap. Outlay (to complete started projects):Reversions are shown below$0

Outyear Local Asst. commitments:

Statewide Bond Costs

Dept.: Unspecified

Other Outyear Support commitments:$16,848,000

Committed

$0

$0

$0

$0

Proposed

$0

Prop 1 Reduction $0

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

0540-001-6051 Portion of support

budget

2007-08 Budget Act $426,000 B0944Statewide Bond CostsEnacted 2007-08

0540-001-6051 Portion of support

budget: Natural

Reversion

2007-08 Natural

Reversion

($329,085) B0944Statewide Bond CostsEnacted 2011-12

0540-001-6051 Portion of support

budget

2008-09 Budget Act $274,000 B0944Statewide Bond Costs - Bond

Oversight

Enacted 2008-09

0540-001-6051 Portion of support

budget

2008-09 Budget Act $144,000 B0944Statewide Bond Costs - WebsiteEnacted 2008-09

0540-001-6051 Portion of support

budget: Natural

Reversion

2008-09 Natural

Reversion

($87,185) B0944Statewide Bond Costs - Bond

Oversight

Enacted 2012-13

0540-001-6051 Portion of support

budget: Natural

Reversion

2008-09 Natural

Reversion

($123,384) B0944Statewide Bond Costs - WebsiteEnacted 2012-13

0540-001-6051 Portion of support

budget

2009-10 Budget Act $382,000 B0944Statewide Bond Costs - Bond AuditsEnacted 2009-10

0540-001-6051 Portion of support

budget

2009-10 Budget Act $288,000 B0944Statewide Bond Costs - Bond

Oversight

Enacted 2009-10

0540-001-6051 Portion of support

budget

2009-10 Budget Act $144,000 B0944Statewide Bond Costs - WebsiteEnacted 2009-10

0540-001-6051 Portion of support

budget: Control Section

Adjustment

2009-10 Control

Section

Adjustment

($25,929) B0944Statewide Bond Costs - Bond

Oversight

Enacted 2009-10

Wednesday, January 29, Page 334 of 3421:20:12 PM Public Resources Code (PRC) Section PRC §75078 et seq.Ch. 10/11Prop 84 Report

Page 338: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

0540-001-6051 Portion of support

budget: Control Section

Adjustment

2009-10 Control

Section

Adjustment

($6,357) B0944Statewide Bond Costs - WebsiteEnacted 2009-10

0540-001-6051 Portion of support

budget: Natural

Reversion

2009-10 Natural

Reversion

($240,788) B0944Statewide Bond Costs - Bond AuditsEnacted 2016-17

0540-001-6051 Portion of support

budget: Natural

Reversion

2009-10 Natural

Reversion

($143,103) B0944Statewide Bond Costs - Bond

Oversight

Enacted 2016-17

0540-001-6051 Portion of support

budget: Natural

Reversion

2009-10 Natural

Reversion

($71,426) B0944Statewide Bond Costs - WebsiteEnacted 2016-17

0540-001-6051 Portion of support

budget

2010-11 Budget Act $382,000 B0944Statewide Bond Costs - Bond AuditsEnacted 2010-11

0540-001-6051 Portion of support

budget

2010-11 Budget Act $288,000 B0944Statewide Bond Costs - Bond

Oversight

Enacted 2010-11

0540-001-6051 Portion of support

budget

2010-11 Budget Act $144,000 B0944Statewide Bond Costs - WebsiteEnacted 2010-11

0540-001-6051 Portion of support

budget: Control Section

Adjustment

2010-11 Control

Section

Adjustment

($1,736) B0944Statewide Bond Costs - Bond

Oversight

Enacted 2010-11

0540-001-6051 Portion of support

budget: Natural

Reversion

2010-11 Natural

Reversion

($135,997) B0944Statewide Bond Costs - Bond AuditsEnacted 2013-14

0540-001-6051 Portion of support

budget: Natural

Reversion

2010-11 Natural

Reversion

($234,975) B0944Statewide Bond Costs - Bond

Oversight

Enacted 2013-14

0540-001-6051 Portion of support

budget: Natural

Reversion

2010-11 Natural

Reversion

($56,572) B0944Statewide Bond Costs - WebsiteEnacted 2013-14

0540-001-6051 Portion of support

budget

2011-12 Budget Act $947,000 B0944Statewide Bond Costs - Bond AuditsEnacted 2011-12

0540-001-6051 Portion of support

budget

2011-12 Budget Act $340,000 B0944Statewide Bond Costs - Bond

Oversight

Enacted 2011-12

0540-001-6051 Portion of support

budget

2011-12 Budget Act $112,000 B0944Statewide Bond Costs - WebsiteEnacted 2011-12

0540-001-6051 Portion of support

budget: Natural

Reversion

2011-12 Natural

Reversion

($556,058) B0944Statewide Bond Costs - Bond AuditsEnacted 2015-16

0540-001-6051 Portion of support

budget: Natural

Reversion

2011-12 Natural

Reversion

($298,940) B0944Statewide Bond Costs - Bond

Oversight

Enacted 2015-16

0540-001-6051 Portion of support

budget: Natural

Reversion

2011-12 Natural

Reversion

($46,103) B0944Statewide Bond Costs - WebsiteEnacted 2015-16

0540-001-6051 Portion of support

budget

2012-13 Budget Act $810,000 B0944Statewide Bond Costs - Bond AuditsEnacted 2012-13

0540-001-6051 Portion of support

budget

2012-13 Budget Act $338,000 B0944Statewide Bond Costs - Bond

Oversight

Enacted 2012-13

Wednesday, January 29, Page 335 of 3421:20:12 PM Public Resources Code (PRC) Section PRC §75078 et seq.Ch. 10/11Prop 84 Report

Page 339: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

0540-001-6051 Portion of support

budget

2012-13 Budget Act $144,000 B0944Statewide Bond Costs - WebsiteEnacted 2012-13

0540-001-6051 Portion of support

budget: Natural

Reversion

2012-13 Natural

Reversion

($328,443) B0944Statewide Bond Costs - Bond AuditsEnacted 2016-17

0540-001-6051 Portion of support

budget: Natural

Reversion

2012-13 Natural

Reversion

($138,079) B0944Statewide Bond Costs - Bond

Oversight

Enacted 2016-17

0540-001-6051 Portion of support

budget: Natural

Reversion

2012-13 Natural

Reversion

($83,193) B0944Statewide Bond Costs - WebsiteEnacted 2016-17

0540-001-6051 Portion of support

budget

2013-14 Budget Act $668,500 B0944Statewide Bond Costs - Bond AuditsEnacted 2013-14

0540-001-6051 Portion of support

budget

2013-14 Budget Act $1,328,500 B0944Statewide Bond Costs - Bond

Oversight

Enacted 2013-14

0540-001-6051 Portion of support

budget

2013-14 Budget Act $144,000 B0944Statewide Bond Costs - WebsiteEnacted 2013-14

0540-001-6051 Portion of support

budget: Natural

Reversion

2013-14 Natural

Reversion

($1,218,333) B0944Statewide Bond Costs - Bond

Oversight

Enacted 2017-18

0540-001-6051 Portion of support

budget: Natural

Reversion

2013-14 Natural

Reversion

($144,000) B0944Statewide Bond Costs - WebsiteEnacted 2017-18

0540-001-6051 Portion of support

budget

2014-15 Budget Act $1,721,000 B0944Statewide Bond Costs - Bond AuditsEnacted 2014-15

0540-001-6051 Portion of support

budget

2014-15 Budget Act $517,000 B0944Statewide Bond Costs - Bond

Oversight

Enacted 2014-15

0540-001-6051 Portion of support

budget: Natural

Reversion

2014-15 Natural

Reversion

($671,000) B0944Statewide Bond Costs - Bond AuditsEnacted 2016-17

0540-001-6051 Portion of support

budget: Natural

Reversion

2014-15 Natural

Reversion

($186,607) B0944Statewide Bond Costs - Bond

Oversight

Enacted 2016-17

0540-001-6051 Portion of support

budget

2015-16 Budget Act $1,806,000 B0944Statewide Bond Costs - Bond AuditsEnacted 2015-16

0540-001-6051 Portion of support

budget

2015-16 Budget Act $663,000 B0944Statewide Bond Costs - Bond

Oversight

Enacted 2015-16

0540-001-6051 Portion of support

budget: Control Section

Adjustment

2015-16 Control

Section

Adjustment

$5,000 B0944Statewide Bond Costs - Bond

Oversight

Enacted 2015-16

0540-001-6051 Portion of support

budget: Natural

Reversion

2015-16 Natural

Reversion

($857,030) B0944Statewide Bond Costs - Bond AuditsEnacted 2017-18

0540-001-6051 Portion of support

budget: Natural

Reversion

2015-16 Natural

Reversion

($50,927) B0944Statewide Bond Costs - Bond

Oversight

Enacted 2017-18

0540-001-6051 Portion of support

budget

2016-17 Budget Act $2,415,000 B0944Statewide Bond Costs - Bond

Oversight

Enacted 2016-17

Wednesday, January 29, Page 336 of 3421:20:12 PM Public Resources Code (PRC) Section PRC §75078 et seq.Ch. 10/11Prop 84 Report

Page 340: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

0540-001-6051 Portion of support

budget: Control Section

Adjustment

2016-17 Control

Section

Adjustment

$35,000 B0944Statewide Bond Costs - Bond

Oversight

Enacted 2016-17

0540-001-6051 Portion of support

budget

2017-18 Budget Act $2,507,000 B0944Statewide Bond Costs - Bond

Oversight

Enacted 2017-18

0540-001-6051 Portion of support

budget

2018-19 Budget Act $1,577,000 B0944Statewide Bond Costs - Bond

Oversight

Enacted 2018-19

0540-001-6051 Portion of support

budget

2019-20 Budget Act $2,735,000 B0944Statewide Bond Costs - Bond

Oversight

Enacted 2019-20

3790-001-6051 Portion of support

budget

2007-08 Budget Act $715,000 B0944Statewide Bond CostsEnacted 2007-08

3790-001-6051 Portion of support

budget: Control Section

Adjustment

2007-08 Control

Section

Adjustment

$68,000 B0944Statewide Bond CostsEnacted 2007-08

3790-001-6051 Portion of support

budget: Natural

Reversion

2007-08 Natural

Reversion

($529,720) B0944Statewide Bond CostsEnacted 2009-10

3790-001-6051 Portion of support

budget

2008-09 Budget Act $612,000 B0944Statewide Bond CostsEnacted 2008-09

3790-001-6051 Portion of support

budget: Control Section

Adjustment

2008-09 Control

Section

Adjustment

$11,670 B0944Statewide Bond CostsEnacted 2008-09

3790-001-6051 Portion of support

budget: Natural

Reversion

2008-09 Natural

Reversion

($168,086) B0944Statewide Bond CostsEnacted 2010-11

3790-001-6051 Portion of support

budget

2009-10 Budget Act $704,000 B0944Statewide Bond CostsEnacted 2009-10

3790-001-6051 Portion of support

budget: Control Section

Adjustment

2009-10 Control

Section

Adjustment

($98,291) B0944Statewide Bond CostsEnacted 2009-10

3790-001-6051 Portion of support

budget: Natural

Reversion

2009-10 Natural

Reversion

($208,949) B0944Statewide Bond CostsEnacted 2011-12

3790-001-6051 Portion of support

budget

2010-11 Budget Act $657,000 B0944Statewide Bond CostsEnacted 2010-11

3790-001-6051 Portion of support

budget: Natural

Reversion

2010-11 Natural

Reversion

($283,586) B0944Statewide Bond CostsEnacted 2012-13

3790-001-6051 Portion of support

budget

2011-12 Budget Act $759,000 B0944Statewide Bond CostsEnacted 2011-12

3790-001-6051 Portion of support

budget: Natural

Reversion

2011-12 Natural

Reversion

($321,711) B0944Statewide Bond CostsEnacted 2013-14

3790-001-6051 Portion of support

budget

2012-13 Budget Act $953,000 B0944Statewide Bond CostsEnacted 2012-13

3790-001-6051 Portion of support

budget: Natural

Reversion

2012-13 Natural

Reversion

($456,903) B0944Statewide Bond CostsEnacted 2014-15

Wednesday, January 29, Page 337 of 3421:20:12 PM Public Resources Code (PRC) Section PRC §75078 et seq.Ch. 10/11Prop 84 Report

Page 341: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3790-001-6051 Portion of support

budget

2013-14 Budget Act $953,000 B0944Statewide Bond CostsEnacted 2013-14

3790-001-6051 Portion of support

budget: Natural

Reversion

2013-14 Natural

Reversion

($204,360) B0944Statewide Bond CostsEnacted 2015-16

3790-001-6051 Portion of support

budget

2014-15 Budget Act $938,000 B0944Statewide Bond CostsEnacted 2014-15

3790-001-6051 Portion of support

budget: Natural

Reversion

2014-15 Natural

Reversion

($205,534) B0944Statewide Bond CostsEnacted 2016-17

3790-001-6051 Portion of support

budget

2015-16 Budget Act $995,000 B0944Statewide Bond CostsEnacted 2015-16

3790-001-6051 Portion of support

budget: Natural

Reversion

2015-16 Natural

Reversion

($103,167) B0944Statewide Bond CostsEnacted 2017-18

3790-001-6051 Portion of support

budget

2016-17 Budget Act $1,070,000 B0944Statewide Bond CostsEnacted 2016-17

3790-001-6051 Portion of support

budget: Natural

Reversion

2016-17 Natural

Reversion

($254,860) B0944Statewide Bond CostsEnacted 2018-19

3790-001-6051 Portion of support

budget

2017-18 Budget Act $1,037,000 B0944Statewide Bond CostsEnacted 2017-18

3790-001-6051 Portion of support

budget

2018-19 Budget Act $1,265,000 B0944Statewide Bond CostsEnacted 2018-19

3790-001-6051 Portion of support

budget

2019-20 Budget Act $1,588,000 B0944Statewide Bond CostsEnacted 2019-20

3860-001-6051 Portion of support

budget

2013-14 Budget Act $92,000 B1504DWR CERES IO - IT ConsolidationEnacted 2013-14

3860-001-6051 Portion of support

budget

2014-15 Budget Act $92,000 B1504DWR CERES IO - IT ConsolidationEnacted 2014-15

3860-001-6051 Portion of support

budget: Natural

Reversion

2014-15 Natural

Reversion

($1,349) B1504DWR CERES IO - IT ConsolidationEnacted 2016-17

3860-001-6051 Portion of support

budget: Reversion

Reverse

2014-15 Natural

Reversion

$1,349 B1504DWR CERES IO - IT ConsolidationEnacted 2017-18

3860-001-6051 Portion of support

budget

2015-16 Budget Act $92,000 B1504DWR CERES IO - IT ConsolidationEnacted 2015-16

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2015-16 Budget Act ($92,000) B1504DWR CERES IO - IT ConsolidationEnacted 2016-17

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2015-16 Budget Act $92,000 B1504DWR CERES IO - IT ConsolidationEnacted 2018-19

3860-001-6051 Portion of support

budget

2016-17 Budget Act $92,000 B1504DWR CERES IO - IT ConsolidationEnacted 2016-17

Wednesday, January 29, Page 338 of 3421:20:12 PM Public Resources Code (PRC) Section PRC §75078 et seq.Ch. 10/11Prop 84 Report

Page 342: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2016-17 Control

Section

Adjustment

$5,000 B1504DWR CERES IO - IT ConsolidationEnacted 2016-17

3860-001-6051 Portion of support

budget: Control Section

Adjustment:

Reappropriation

(decrease)

2016-17 Budget Act ($5,000) B1504DWR CERES IO - IT ConsolidationEnacted 2016-17

3860-001-6051 Portion of support

budget: Control Section

Adjustment:

Reappropriation

(increase)

2016-17 Budget Act $5,000 B1504DWR CERES IO - IT ConsolidationEnacted 2019-20

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2016-17 Budget Act ($92,000) B1504DWR CERES IO - IT ConsolidationEnacted 2016-17

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2016-17 Budget Act $92,000 B1504DWR CERES IO - IT ConsolidationEnacted 2019-20

3860-001-6051 Portion of support

budget

2017-18 Budget Act $100,000 B1504DWR CERES IO - IT ConsolidationEnacted 2017-18

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2017-18 Control

Section

Adjustment

$5,000 B1504DWR CERES IO - IT ConsolidationEnacted 2017-18

3860-001-6051 Portion of support

budget

2018-19 Budget Act $105,000 B1504DWR CERES IO - IT ConsolidationEnacted 2018-19

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2018-19 Control

Section

Adjustment

$4,000 B1504DWR CERES IO - IT ConsolidationEnacted 2018-19

3860-001-6051 Portion of support

budget: Control Section

Adjustment:

Reappropriation

(decrease)

2018-19 Budget Act ($4,000) B1504DWR CERES IO - IT ConsolidationEnacted 2018-19

3860-001-6051 Portion of support

budget: Control Section

Adjustment:

Reappropriation

(increase)

2018-19 Budget Act $4,000 B1504DWR CERES IO - IT ConsolidationEnacted 2019-20

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2018-19 Budget Act ($105,000) B1504DWR CERES IO - IT ConsolidationEnacted 2018-19

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2018-19 Budget Act $105,000 B1504DWR CERES IO - IT ConsolidationEnacted 2019-20

3860-001-6051 Portion of support

budget

2019-20 Budget Act $37,000 B1504Digital MigrationEnacted 2019-20

Wednesday, January 29, Page 339 of 3421:20:12 PM Public Resources Code (PRC) Section PRC §75078 et seq.Ch. 10/11Prop 84 Report

Page 343: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

3860-001-6051 Portion of support

budget

2019-20 Budget Act $109,000 B1504DWR CERES IO - IT ConsolidationEnacted 2019-20

9892-501-6051 Portion of support

budget

2018-19 Special

Legislation

$161,950 B0944Statewide Bond CostsEnacted 2018-19

Sum: $25,635,204Enacted

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

3860-001-6051 Portion of support

budget:

Reappropriation

(decrease)

2013-14 Budget Act ($92,000) B1504DWR CERES IO - IT ConsolidationEnacted/Not 2017-18

3860-001-6051 Portion of support

budget:

Reappropriation

(increase)

2013-14 Budget Act $92,000 B1504DWR CERES IO - IT ConsolidationEnacted/Not 2019-20

3860-001-6051 Portion of support

budget: Control Section

Adjustment

2019-20 Control

Section

Adjustment

$4,000 B1504DWR CERES IO - IT ConsolidationEnacted/Not 2019-20

Sum: $4,000Enacted/Not Posted

AppropriationEnactment YearStatus Agency UseApprop. Description Program PurposeAdj. Year Source Amount

0540-001-6051 (1) Portion of support

budget

2020-21 Budget Act $3,083,000 B0944Statewide Bond Costs - Bond

Oversight

Proposed 2020-21

3790-001-6051 (1) Portion of support

budget

2020-21 Budget Act $1,123,000 B0944Statewide Bond CostsProposed 2020-21

3860-001-6051 (1) Portion of support

budget

2020-21 Budget Act $25,000 B1504Digital MigrationProposed 2020-21

3860-001-6051 (1) Portion of support

budget

2020-21 Budget Act $128,000 B1504DWR CERES IO - IT ConsolidationProposed 2020-21

Sum: $4,359,000Proposed

Sum: $29,998,204

($46,846,204)

Balance for Statewide Bond Costs:

Wednesday, January 29, Page 340 of 3421:20:12 PM Public Resources Code (PRC) Section PRC §75078 et seq.Ch. 10/11Prop 84 Report

Page 344: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

Summary for Chapters 10/11

Enacted/Proposed: $29,998,204

Allocation: $0

Set Asides: $0

Outyears: $16,848,000

Balance: ($46,846,204)

Statewide Bond Cost

Prop 1 Reduction: $0

Wednesday, January 29, Page 341 of 3421:20:12 PM Public Resources Code (PRC) Section PRC §75078 et seq.Ch. 10/11Prop 84 Report

Page 345: Proposition 84 Allocation Balance Reportresources.ca.gov/CNRALegacyFiles/docs/bonds_and_grants/... · 2020-01-29 · Proposition 84 Allocation Balance Report as of January 29, 2020

Enacted/Proposed: $5,150,535,052

Balance: ($58,086,052)

Allocation: $5,388,000,000

Outyears: $90,328,000

SetAsides: $83,580,000

Statewide Summary:

Note: The total balance above is understated by the amount appropriated in PRC Section 75078, as these statewide costs have already been accounted for once in the set asides

for each allocation.

$105,000,000Prop 1 Reduction:

Prop 1 reduction by voter mandate, proportional across all Program Allocations

1

1

Prop 68 Reduction: $16,643,0002

Prop 68 reduction by voter mandate for PRC 75063(a), 75063(b) and 75065(b)2

Wednesday, January 29, Page 342 of 3421:20:12 PM Public Resources Code (PRC) Section PRC §75078 et seq.Ch. 10/11Prop 84 Report