S A N M A R C O S U N I F I E D S C H O O L D I S T R I C T. Proposition K. U P D A T E. Governing Board Presentation August 23, 2010. LPA. Part 1 of 2 Parts. FACILITY PLANNING PROCESS. 1.District Wide Modernization Needs Assessment Site Surveys - PowerPoint PPT PresentationTRANSCRIPT
LPAS A N M A R C O S USD
Proposition K
Governing Board PresentationAugust 23, 2010
S A N M A R C O S U N I F I E D S C H O O L D I S T R I C T
U P D A T E
LPAPart 1 of 2 Parts
LPAS A N M A R C O S USDPHOTOS OF PAST LPA INC PROJECTS FOR CONCEPTUAL USE ONLY
FACILITY PLANNING PROCESS
1. District Wide Modernization Needs AssessmentSite Surveys(3) Meetings w/ each MS Family Sub-
committee
2. Facilities Advisory Committee(4) MeetingsDistrict & Community Members
3. District Facilities Master PlanFinalize AnalysisScope Prioritization
11/ 07 – 7 / 08
4 / 08 – 7 / 08
10 / 09 – 7 / 10
LPAS A N M A R C O S USD LPA
Scope Categories
LPAS A N M A R C O S USD
SCOPE CATEGORIES
PHOTOS OF PAST LPA INC PROJECTS FOR CONCEPTUAL USE ONLY
First Floor
pod
rr
stclassroo
m classroo
m
classroom
classroom
pod
rr
stclassroo
mclassroo
m
classroom
classroom
core
4
1. Portable Replacement & Student Safety
replace Aging Sub-Standard Classrooms & Upgrade Site Infrastructure
2. Kindergarten CDE compliance
Construct New 1,350 SF Classroom
3A.Elementary Facility Program EquityReconfigure MPR to Library or New Library
3B. ES & MS Facility Program Equity
New MPR, Lunch shelter, or Food Service
4. Program Enhancement
New (3) CR Facility @ (3) Sites
District wide visual & performing arts,
math science & communications
Classroom / lab 3
Classroom/
lab 2
Classroom/
lab 1
Library/ Media Center
SmallGroup
Instruction
Speech/Tutoring center
Courtyard
LPAS A N M A R C O S USDPHOTOS OF PAST LPA INC PROJECTS FOR CONCEPTUAL USE ONLY
5
5. Technology InfrastructureEssential Systems Upgrade &Technology Equipment
6. Existing ClassroomsModernize Existing InstructionalSpaces to Facilitate 21st Century Learning
7. Existing Library/MPR/Performing ArtsModernize Existing Program Enrichment Spaces
8. Existing Physical EducationModernize Existing Gyms andAdd Sports court Flooring
9. Future Growth flexibilityStub-Out Utilities for Future Classrooms
after
after
SCOPE CATEGORIES
LPAS A N M A R C O S USDPHOTOS OF PAST LPA INC PROJECTS FOR CONCEPTUAL USE ONLY
10. Curb Appeal site SecurityLandscape and Site Perimeter Fencing
11. Play fields UpgradesAs Needed
12. Weather ProtectionNew Covered Walks and/or Shade Structure
13. Administration/Staff Support SpacesModernize and/or ExpandAdministration/Staff Lounge
6
after
after
SCOPE CATEGORIES
LPAS A N M A R C O S USD 7
PROGRAM SCOPE CHECKLIST
MAJOR RECONSTRUCTION
BASE PROGRAM
PORTABLE REPLACEMENT
LPAS A N M A R C O S USD LPA
Base Program SitesCarrillo Elementary School
Discovery Elementary SchoolSan Elijo Elementary School
San Elijo Middle SchoolMission Hills High School
Twin Oaks High School
Student Safety & Technology
LPAS A N M A R C O S USD
MASTER PLAN PROGRAM Discovery Elementary School
Proposed Scope of work(Plus Scope #13
Technology & Infrastructure)
LPAS A N M A R C O S USD LPA
Portable Replacement Sites
10
Knob Hill Elementary SchoolPaloma Elementary School
Twin Oaks Elementary SchoolWoodland Park Middle School
LPAS A N M A R C O S USD
Proposed Scope of work(Plus Scope #13 Technology & Infrastructure)
MASTER PLAN PROGRAM Knob Hill Elementary School
LPAS A N M A R C O S USD
Proposed Scope of work(Plus Scope #13 Technology & Infrastructure)
MASTER PLAN PROGRAMWoodland Park Middle School
LPAS A N M A R C O S USD LPA
Major Reconstruction Sites
13
Alvin Dunn Elementary SchoolLa Costa Meadows Elementary
SchoolRichland Elementary School
San Marcos Middle SchoolSan Marcos High School
LPAS A N M A R C O S USD
legendParking
New Construction
Existing Building
Reconfigured Building
Portable Building
Gathering Areas
Hard Courts
Play Structure
Covered Walkway
Renovated Play Fields
Vehicular Circulation
Bus Circulation
Drop-Off
Fire Access
Campus Entry
H
A1 Lower Primary: (4)crA2 Lower Primary: (2)crA3 Lower Primary: (1)rsp,
(1)lhB 2-Story Upper Primary
(14)cr,(1)lh,(1)rspC Multi-Purpose BldgD Convert MPR into
Library/ Media Center, Computer Lab and Speech/ Tutoring Center
E1 Kindergarten: (1)crE2 Kindergarten: (2)crF Future Expansion:
(4)crG Relocated Play
StructureH Covered WalkwayJ Convert into Admin K1 Existing Pre-schoolL Relocated Boys & Girls
ClubM (1)Art/Science, (1)At
Risk Office, (2) Intervention
N Existing Classrooms: (1)Adaptive PE, (2) Title1(1)CSUSM
O New ParkingP Lunch Shelter
F
G
O
PADMI
N
DE2 A1
A1
A1 A3
A2
E1
B
C
M
M
J
L
K1
N N N N
Proposed Scope of work(Plus Scope #13 Technology & Infrastructure)
Not Used
MASTER PLAN PROGRAMAlvin Dunn Elementary School
LPAS A N M A R C O S USD
legendParking
New Construction
Existing Building
Reconfigured Building
Portable Building
Gathering Areas
Hard Courts
Play Structure
Covered Walkway
Renovated Play Fields
Vehicular Circulation
Bus Circulation
Drop-Off
Fire Access
Campus Entry
M
M
A K-1st Grade: (3)k,(8)1stcr,(2)rsp,(2)lh,(2)pk lh,(2)sh, (1)autism
B 2-Story 2nd-5th Grade: (20)cr
C Enrichment CenterD Reconstruct MPR
into Library/Media Center
E Lunch ShelterF Future Expansion:
(4)crG Relocated Play
StructureH Covered WalkwayJ1 Reconstruct AdminJ2 Reconstruct Kind.
into Speech/Tutoring
J3 Reconstruct Kind. into Staff Workroom/Lounge
K1 KOCK2 Future PreschoolL Food ServicesM New Parking
f
HH
D
J1J2J3
B
ACD
L
BE
G
GK1
K2
Proposed Scope of work(Plus Scope #13 Technology & Infrastructure)
Joint-UsePlay Fields
NotUsed
MASTER PLAN PROGRAMLa Costa Meadows Elementary School
LPAS A N M A R C O S USD
legendParking
New Construction
Existing Building
Reconfigured Building
Portable Building
Gathering Areas
Hard Courts
Play Structure
Covered Walkway
Renovated Play Fields
Vehicular Circulation
Bus Circulation
Drop-Off
Fire Access
Campus Entry
J1J2
K2
F
A1 Lower Primary: (4)cr
A2 Lower Primary: (2)cr, (1)lh, (1)rsp
B 2-Story Upper Primary (14)cr,(1)lh,(1)rsp
C Enrichment CenterD Reconstruct into
Library/Media Center & Speech/Psychologist/Counseling
E Kindergarten: (3)cr
E1 Kindergarten: (1)cr
F Future Expansion: (4)cr
G Relocated Play Structure
H Covered WalkwayI Reconstruct into
Admin and Staff Workroom
J1 Relocated Preschool
J2 Relocated KOCK1 Food ServicesK2 Lunch Shelter
I
A1
E
DA1A1
G
G
K1
MPR
C
BA2E1
H
Proposed Scope of work(Plus Scope #13 Technology & Infrastructure)
MASTER PLAN PROGRAM Richland Elementary School
LPAS A N M A R C O S USD
legendlegendParking
New Construction
Existing Building
Reconfigured Building
Portable Building
Gathering Areas
Hard Courts
Play Structure
Covered Walkway
Renovated Play Fields
Vehicular Circulation
Bus Circulation
Drop-Off
Fire Access
Campus Entry
A1 2-Story 7th/8th Grade: (12)la/ss,(2)rsp,(2)lh
A2 7TH/8TH Grade:(6)math
A3 7th/8th Grade:(6)science
B1 2-Story 6th Grade: (6)math/science labs, (1)art,(3)cr,(1)sh
B2 6TH Grade: (6)la/ss, (1)rsp,(1)lh,(1)tech
C Convert Kitchen to Music/Choral
E Shower/Locker Rooms -Lower Level
F Relocated Boys and Girls Club
G1Food ServicesG2Lunch ShelterH Future GrowthJ Pe Expansion Lab
H
A1
B1
G1
G2
E(BELO
W)
CADMIN
MPR
GYM
ADMIN
A2
A3
LIBRARY
A2
B2
FJ
Proposed Scope of work(Plus Scope #13 Technology & Infrastructure)
MASTER PLAN PROGRAM San Marcos Middle School